FORWARD 132,600.00
not to be released to any person or organization without the prior written consent of Vision Architects 1/33
Owner: Project:
One Fire fighting zone Extinguishing panel (manual and automatic) c/W standby
batteries 8 hours and all related accessories (for FM200 extinguishing system).
gas automatic solenoid release unit.
Gas manual release unit
monitor and control modules.
6" fire alarm bell.
Strobe horn unit with ( flasher )
360 degree nozzle according drawing
Optical smoke detector
Optical Heat detector
Seamless galvanized steel piping table 40 network Lumb sum
The item shall include calculation of the clean agent required quantities in addition to
the system execution
Outlet complete with all required accessories, ((2x1.5mm2) Fire resistant shield Cable
105C , EMT conduits) dedicated for the system and FM200 Cylinder with the hereunder
capacities
not to be released to any person or organization without the prior written consent of Vision Architects 2/33
Owner: Project:
The listed capacities below is an indicative capacities and the contractor must
submit the related calculation and hydraulic sheet in this respect in order to get the
Consultant approval prior to starting any works, although no claims will be
accepted for any increasing of the listed capacities.
14.6.2.1 Ditto as above but for 10 kg UNIT 2.00 940,000.00 1,880,000.00
14.6.2.2 Ditto as above but for 15 kg UNIT 2.00 110,000.00 220,000.00
14.6.2.3 Ditto as above but for 22 kg UNIT 1.00 126,000.00 126,000.00
FORWARD 2,358,600.00
15.2.1 FCU
not to be released to any person or organization without the prior written consent of Vision Architects 3/33
Owner: Project:
Supplying, installing, and commissioning of chilled water fan coil units, ceiling
concealed as indicate on drawing plans manufactured by "SAIVER, EGAT OR
CARRIER" or approved similar complete with ALL HookUp Accessories&auxilliary
drain pain (2 flexible connection , 3 gate/ball valve, 1 balance valve, 1 strainer, 2way or
3way valve , Die Electric connection if required ) and all needed for operating &all
needed to complete job.
15.2.1.1 TYPE C/W FCU-1 (1 TR) 400 CFM & Ext. St.P 0.25" w.g UNIT 6.00
15.2.1.2 TYPE C/W FCU-2 (1.5 TR) 600 CFM & Ext. St.P 0.25" w.g UNIT 3.00
15.2.1.3 TYPE C/W FCU-3 (2 TR) 800 CFM & Ext. St.P 0.25" w.g UNIT 4.00
15.2.1.4 TYPE C/W FCU-4 (2.5 TR) 1000 CFM & Ext. St.P 0.25" w.g UNIT 4.00
not to be released to any person or organization without the prior written consent of Vision Architects 4/33
Owner: Project:
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 5/33
Owner: Project:
K.G 6200.00
15.7 Thermal Insulation Works
15.7.1
Supply, install of duct thermal insulation fiber glass 24Kg/M³ density,1"thickness.
Complete with vapor barrier and all other accessories, aluminum cladding if needed &all
needed to complete work according to specifiction ,drawings& Codes
IZOCAM , KIMMCO OR EQU.
m2 800.00
15.8.1 Supply, install of Supply Celling Diffuser 24"*24" (S.C.D) No. 27.00
15.8.2 Supply, install of Return Celling Diffuser 24"*24" (R.C.D) No. 26.00
15.8.3 Supply ,install of Supply linear slot Diffuser 2 Slot (S.L.S.D). complete with
plenum box pre internal insulated &connection to main Duct No.
8.00
15.8.4 Supply ,install of Supply linear slot Diffuser 4 Slot (S.L.S.D). complete with
plenum box pre internal insulated &connection to main Duct No.
6.00
15.8.5 Supply ,install of return linear slot Diffuser 2 Slot (R.L.S.D). No. 8.00
15.8.6 Supply, install of Supply Round Celling Diffuser (S.R.C.D) 24 Ø. No. 6.00
15.8.7 Supply, install of Supply Round Celling Diffuser (S.R.C.D) 18" Ø. No. 6.00
15.8.8 Supply, install of Return Round Celling Diffuser (R.R.C.D) 24 Ø. No. 8.00
15.8.9 Supply, install of Supply Celling Diffuser 12"*12" (S.C.D) No. 5.00
15.8.10 Supply, install of Return Celling Diffuser 12"*12" (R.C.D) No. 5.00
HVAC WORKS TOTAL 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 6/33
Owner: Project:
( Testing ,Adjusting and Balancing) for all hvac works(Air/Water) &Temperature test
during (July, August& September)months from third part Specialized according to
Design requirement.
L.S 1.00
not to be released to any person or organization without the prior written consent of Vision Architects 7/33
Owner: Project:
24 HR redundancy panel for AC units along IT&control room to be over control cables
not power and including ( Timer 24 hr – 3 relay – digital thermostat )
L.S 1.00
HVAC WORKS TOTAL 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 8/33
Owner: Project:
16.1.1 Double conversion UPS 30KVA ,3ph/1ph, 20Min backup time No. 1.00
16.1.2 Online UPS 10KVA ,3ph/1ph,20Min backup time No. 1.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 9/33
Owner: Project:
# Contractor shall not supply panels before testing on factory in the presence of
consultant
# Panel Assembler shall attend panel starting up and setting control and metering devices
on site
# Contractor shall require the panel assembler to train the owner staff on the operating
steps instructions , power sources manoeuvring , metering values acquisition and Install
guide boards for operating Steps instructions on the electrical room
# Contractor shall install the load schedule and SLD at each panel internal shutter side so
that it irrevocable
# To reduce line transients on system no stage shall switch more than 120 KVAR and no
capacitor cell shall
#All controls shall be
exceed 25.0 on
mounted KVAR.
enclosure door for easy inspection and service
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 10/33
Owner: Project:
#A door interlock shall be provided to disconnect control power when enclosure door is
opened.
# A personnel ground fault breaker shall be provided to disconnect control power upon
accidental contact with control power and earth (ground).
# Panel Assembler shall set up power factor meter functions (V,target p.f, steps,
automatic & manual settings) on site according to the actual operation conditions
not to be released to any person or organization without the prior written consent of Vision Architects 11/33
Owner: Project:
# Contractor shall leave sufficient lengths in outlets dedicated for floor boxes, racks or
any non-fixed parts to give flexibility to modify their places during execution in
accordance with the coordinate the length required to be left with specialized
departments
# Contractor shall coordinate with the architecture ceiling, furniture and flooring to
achieve the desired Arch. impression
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 12/33
Owner: Project:
Supplying, installing, testing and commissioning outdoor lighting outlet controlled via
lighting switches , sensors or direct from control panel including main & sub main circuit
from outlet to the other, conduits , junction boxes, hand holes , and all ancillary works
according to DWG's & Specs
# Contractor shall fitting out outdoor wiring with water-leakage materials and
accessories and perform the necessary arrangements for prevention of ground leakage by
installing earth leakage devices and grounding lighting units with a earth rod for every 10
outdoor lighting units
16.5.4.2.1 Landscape Lighting outlet 3x3mm2,CU/PVC drawn on 25mm PVC conduit No. 5.00
16.5.4.2.2 Landscape Lighting outlet 3x4mm2,CU/PVC drawn on 25mm PVC conduit No. 5.00
#Duplex and single socket consider as one outlet , group with normal and
emergency/UPS feeding consider as two outlets
16.5.4.3.1 Socket outlet 3x3mm2, CU/PVC drawn on 20mm PVC conduit No. 1.00
16.5.4.3.2 Socket outlet 3x4mm2, CU/PVC drawn on 20mm PVC conduit No. 60.00
Supplying, installing, testing and commissioning power circuit for power sockets
,EWH ,Hand dryers , AC Loads , industrial sockets , Air curtain , rolling shutters , light
current control panels or exhaust / Fresh fans including main & sub main circuit even
plugging on the unit terminals , conduits , junction boxes , and all ancillary works
according to DWG's & Specs
# HVAC Split unit Circuits extends from the control panel to the disconnect switch
beside the internal unit up to the external disconnect beside the outdoor unit
16.5.4.4.1 Power circuit 3x3mm2, CU/PVC drawn on 20mm PVC conduit No. 1.00
16.5.4.4.2 Power circuit 3x4mm2, CU/PVC drawn on 20mm PVC conduit No. 36.00
FORWARD 0.00
16.5.4.4.3 Power circuit 3x6mm2, CU/PVC drawn on 25mm PVC conduit No. 10.00
not to be released to any person or organization without the prior written consent of Vision Architects 13/33
Owner: Project:
#Contractor shall label wiring devices with Irrevocable labels indicate outlet and
electrical circuit code
#Contractor shall submit samples for approval for each item and have to be kept on site
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 14/33
Owner: Project:
#Contractor shall label disconnect switches with Irrevocable labels indicate outlet and
electrical circuit code
#Contractor shall submit samples for approval for each item and have to be kept on site
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 15/33
Owner: Project:
#Contractor Shall install batteries and drivers inside proper fixed junction boxes and
#Contractor Shall comply with supplying drivers suitable for fixed or dimming operation
according to Specs & DWGs without demanding additional cost
#Contractor Shall comply with providing an warranty certificate for each type of lighting
unit for at least three years
#Contractor Shall comply with supplying at least 10% of drivers and batteries total
amount - as spare parts- to owner under the delivery record
#Contractor shall approve the lighting fixtures in terms of architecture view , lighting
color from the architectural consultant and the owner
#Contractor shall submit samples for approval for each item and have to be kept on site
#Contractor shall comply with suppling non leakage accessories and plugs for weather
proof lighting Fixtures
16.5.9.1 Mounted recessed LED luminaire(60x60cm) with opal diffuser 40w , CRI not less than
0.8 , 4000K, lumen not less than 4000lm
No. 23.00
16.5.9.2 Recessed LED round luminaire 20w (Down light) , CRI not less than 0.8 , 4000K, lumen
not less than 2000lm
No. 105.00
16.5.9.3 Ceiling recessed Linear LED profile with opal louver 100 CM,30w, CRI not less than 0.8
, 4000K, lumen not less than 3000lm
No. 4.00
16.5.9.4 Ceiling Suspended Linear LED profile with opal louver 120 CM,30w, CRI not less than
0.8 , 4000K, lumen not less than 3000lm
No. 22.00
16.5.9.5 Recessed LED Spot luminaire 10w (Down light) , CRI not less than 0.8 , 3000K, lumen
not less than 1000lm, IP44 No. 18.00
16.5.9.6 Ditto 16.5.9.9 but movable No. 1.00
16.5.9.7 Recessed double Spot luminaire 2x16w (adjustable) , CRI not less than 0.8 , 4000K,
lumen not less than 3000lm No. 16.00
16.5.9.8 Decorative suspended fixture (Highbay or cylindar), CRI not less than 0.8 , 4000K, not
less than 2500LM with high efficiency specular aluminum reflector for uniform
symmetrical light distribution.
No. 6.00
16.5.9.9 Chandelier 3 lamps 3000k for VIP area No. 2.00
16.5.9.10 Chandelier 1 lamp 3000k for Manager room No. 1.00
16.5.9.11 Chandelier 1 lamp 3000k for SME area No. 6.00
not to be released to any person or organization without the prior written consent of Vision Architects 16/33
Owner: Project:
16.5.9.12 Led Strip 15w per meter 4000k, IP65 Mt. 100.00
16.5.9.13 Ditto 16.5.9.15 but 3000K Mt. 1.00
16.5.9.14 Exit Sign (Ceiling mounted) No. 4.00
16.5.9.15 Ditto 16.5.9.17 but wall mounted No. 1.00
FORWARD
not to be released to any person or organization without the prior written consent of Vision Architects 17/33
Owner: Project:
No. 2.00
# All system component shall be manufactured by aforesaid brands except earthing pits
and cables permitted to be local
# Contractor shall fitting out system via a specified authorized earthing company
# Contractor shall submit earthing calculation for approval prior based on the
calculations of the value of the soil resistance from a 3rd party specialist - soil works -
# Contractor shall separate the earthing systems from each other to ensure that the fault
currents do not reverse from one system to another, leaving a distance between the rods
not less than twice the length of the rod
# The Contractor shall coordinate with the IT Department of the Owner to comply their
requirements for maximum earthing resistance values and required ponding points
# Contractor shall comply with handover the measurement of the resistance of the rods
and system in the presence of the consultant and the Owner after the execution and upon
the initial handover with a valid certificate
16.5.10.1 Earthing System for low voltage system with resistance not less than 2 ohm LS 1.00
16.5.10.2 Earthing System for Light Current system with resistance not less than 0.5 ohm
LS 1.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 18/33
Owner: Project:
Supplying, installing, testing and commissioning network run from outlet to associated
data rack or from outlet to its tying destination include conduits, Trunks with covers ,
supports , junction boxes , termination on rack and all ancillary works according to
DWG's & Specs
16.6.1.1.1 Network outlet with pulling thread drawn in PVC conduit 25mm No. 35.00
1.6.6.2.1
Supplying, installing, testing and commissioning fire alarm system outlet run from outlet
to other to the FACP including , conduits , junction boxes ,Accessories and all ancillary
works according to Standards , DWG's & Specs
# Contractor shall select the types of conduits suitable according to the conditions of
installation in locations exposed to mechanical exposure according to standards without
demanding additional cost
16.6.2.1.1 Fire alarm outlet with shielded cables Shielded 2x1.5mm2 ,Operation temp. 105C drawn
in EMT conduit Dia. 20mm2 - for each cable No. 50.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 19/33
Owner: Project:
# Tying with elevators, Public address, evacuation system, Audio Visual system , smart
systems , communications system & BMS (If Found)
# Tying with main fire alarm control panels of related buildings (If Found) -Via network
cards - Not including tying cables
# Tying with distribution panel boards to shied HVAC loads in case of fire
# Fault isolator every 10-15 detectors according to the manufacturer's instructions
#Contractor shall coordinate all the specializations associated with the system and
include them in the price
**Approved manufactures for fire alarm system UL/FM (Esser-FireLite-Simplex-
Notifire)
# contractor shall enhance shop drawing by reviewing and approving the security
department of the owner and the Fire Alarm Specialist, as well as providing the
calculations of loss of voltage for cables and calculations of the capacity of batteries -
according to the number of reagents - therefore increasing the Cables CSA or the
capacity of batteries without demanding additional cost
# contractor shall comply with the supplier's presence in the handover committees
# contractor shall supplying from suppliers have round the clock 24/7 customer service
Centre
Addressable Fire Alarm system including Fire Alarm Control Panel including power
supplies (including spare power supply), batteries sufficient to 24h Normal operation &
30 minute alarm with capacity not less than 7Amp-h, battery charger, interface with
Public Address (if exist), connection to LAN network, Battery charger, Network
Interface Card and auto dialler
16.6.2.2.1 Addressable Fire Alarm Control Panel FACP 2-Loop No. 1.00
16.6.2.2.2 Addressable Fire Alarm Repeater Panel FARP at security desk No. 1.00
FORWARD 0.00
0.00
not to be released to any person or organization without the prior written consent of Vision Architects 20/33
Owner: Project:
16.6.4.1.1 Intrusion system outlet with UTP Cat.6 Cable drawn in PVC conduit Dia. 20mm2 - for
each cable No. 80.00
16.6.4.1.2 Intrusion system outlet with UTP Cat.6 Cable drawn in EMT conduit Dia. 20mm2 - for
each cable No. 1.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 21/33
Owner: Project:
16.6.4.2.1 Addressable wired Intrusion control panel with suitable capacity and keypad
No. 1.00
16.6.4.2.1 Addressable Intrusion Repeater panel with keypad at security desk No. 1.00
16.6.4.3 Addressable Intrusion system Devices and detectors
Supplying, installing, testing and commissioning Intrusion system devices and detectors
including junction boxes , indication lamps - separate in case the detector is a composite
hidden or enclosed in a mostly closed room - , bases, supports and all ancillary works
according to standards , DWG's & Specs
16.6.5.1.1 Proximity Card Reader outlet - UTP Cat.6 / 20mmPVC conduit No. 4.00
16.6.5.1.2 Push to Exit outlet - UTP Cat.6 / 20mmPVC conduit No. 4.00
16.6.5.1.3 Electro/Magnetic Lock for Single/double/sliding Door outlet - UTP Cat.6 / 20mmPVC
conduit No. 4.00
16.6.5.1.4 Door Contact for Single/double/sliding Door outlet - UTP Cat.6 / 20mmPVC conduit No. 4.00
16.6.5.1.5 Ditto but in EMT conduit No. 1.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 22/33
Owner: Project:
**Approved manufactures for access control system (HID EVO - Lenel - Mercury).
# Tying with main fire alarm control panels (If Found) -Via network cards - Not
including tying cables
16.6.5.2.1 Access Control Panel with suitable capacity. No. 1.00
# Size and color of the lock should be acc. To approved by Arch. Provision
16.6.5.3.1 Proximity Card Reader (HID) No. 4.00
16.6.5.3.2 Metal Push to Exit same manufacturer No. 4.00
16.6.5.3.3 Magnetic door Lock for Single/double/sliding door manufactured by same system
supplier or by "Nordson" No. 4.00
16.6.5.3.4 Magnetic Contact for Single/double/sliding door No. 4.00
16.6.5.3.5 Proximity Cards "By HID" No. 50.00
FORWARD 0.00
16.6.5.4.1 Standalone access control for individual door No. 1.00 ................. Alternative
not to be released to any person or organization without the prior written consent of Vision Architects 23/33
Owner: Project:
Supplying, installing, testing and commissioning CCTV outlet run from outlet to
associated rack or from outlet to its tying destination include conduits, Trunks with
covers , supports , junction boxes , termination on rack and all ancillary works according
to DWG's & Specs
16.6.6.1.1 CCTV outlet with UTP Cat6 cable drawn in PVC conduit 20mm No. 40.00
16.6.6.1.2 CCTV outlet with UTP Cat6 cable drawn in EMT conduit 20mm No. 1.00
not to be released to any person or organization without the prior written consent of Vision Architects 24/33
Owner: Project:
FORWARD 0.00
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 25/33
Owner: Project:
DESCRIPTION
ITEM
UNIT QTY RATE EGP AMOUNT EGP
Before 0.00
16.6.6.3.1 VMS Software and Licenses with failover (Appendix2) LS. 1.00
16.6.6.3.2 Storage servers for all branch cameras with storage capacity for 90 days continious No. 1.00
16.6.6.3.3 Failover servers for all branch cameras with storage capacity for 2 days continious No. 1.00
16.6.6.5.1 24 ports Copper Patch Panel complete with Copper patch cord, connector, pigtail and
horizontal organizer. No. 4.00
16.6.6.5.2 12 ports Main Fiber Optic Patch Panel complete with fiber patch cord, Fiber connector,
pigtail and horizontal organizer. No. 1.00
16.6.6.5.3 Media converter for incoming cable (if needed) No. 1.00
Access Switch
Access Switches, Supplying, Installing, testing, and commissioning of an access Ethernet
switches. The stacks must contain all needed hardware, uplinks ports, software elements,
and licenses to have all functions and features required as specified.
16.6.6.6.2 Supplying, installing, testing, and commissioning an L3 Access Ethernet Switching No. 4.00
Stacks with capacity of (24) 10/100/1000 Base - T ports with POE/POE+ feature. All
access switched must have 10% free ports for future expansions.
16.6.6.7 OPERATOR WORKSTATIONS (Appendix4)
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 26/33
Owner: Project:
16.6.6.8.1 Professional CCTV Display 32" - heavy duty 24/7 No. 3.00
No. 1.00
16.6.8 Telephone Cables
Supplying, installing, testing and commissioning telephone cable include Conduits ,
cable trays, junction boxes, hand holes , terminals of indoor and outdoor (related to
telecommunication authorization) frame and all ancillary works according to standards ,
DWG's & Specs
16.6.9.1 Empty Queuing outlet with pulling thread drawn in PVC conduit 20mm No. 15.00
16.6.9.2 Sound outlet with PVC conduit with a diameter of 20mm fire rated heavy gauge (Beit El- No. 6.00
Handasa or similar) and 2*1.5 mm^2 standard wire from outlet (speaker - kiosk) to
amplifier.
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 27/33
Owner: Project:
16.6.10 MATV
MATV outlets
Supplying, installing, testing and commissioning MATV system outlet run from outlet
to Building roof or from outlet to its tying destination include conduits, Trunks with
covers , supports , junction boxes , termination on rack and all ancillary works according
to DWG's & Specs
16.6.10.1 MATV outlet with RG6 cable drawn in PVC conduit 20mm No. 1.00
16.6.10.2 HDMI outlet with HDMI cable drawn in PVC conduit 29mm No. 1.00
No. 5.00
not to be released to any person or organization without the prior written consent of Vision Architects 28/33
Owner: Project:
not to be released to any person or organization without the prior written consent of Vision Architects 29/33
Owner: Project:
including:
Manual Bypass
Over/Undere voltage protection at input (Window +/-30%)
Input MCCB & Output MCCB
Stabilizer should has control for each phase & common control rejected
not to be released to any person or organization without the prior written consent of Vision Architects 30/33
Owner: Project:
The following sanitary items of first class quality in approved color. Complete work
including all components complete with all supply, drainage, vent pipes, isolating valve
and all accessories, chromium plated, taps - mixers for cold and hot water - gate valves
produced by "Ideal Standard" or similar, anti-fungus sealant, …etc.
The Works shall include installing crewed and socked poly propylene pipes of adequate
diameter sizes- to the water source- (Hot & cold). To ensure a strong and continuous
water pressure for all pipes, the level of the feeding pipes shall be above the ceramic tiles
level whereas down pipes shall run downwards to the intake of each sanitary fixture
(independent pipe for each fixture). Complete work including elbows, bends, tees,
hangers and all necessary connections, sufficient stopcock valve of adequate diameter,
gate valve diam.3/4" for each individual sanitary fixture, ...etc.
The Works shall include all required works to compete the installation as per BDC / VA
instruction and up to their satisfaction.
17.1 WATER SUPPLY SYSTEM
17.1.1 VALVES
Supplying, installing, bronze gate valves PN20 for cold and hot water piping, including
all fixings and accessories.
Complete as specified, to the approval of the Engineer and according to manufacturer's
recommendations.
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 31/33
Owner: Project:
FORWARD 0.00
not to be released to any person or organization without the prior written consent of Vision Architects 32/33
Owner: Project:
SUMMARY
Item Description
No. Amount EGP
14 FIRFIGHTING WORKS
15 HVAC WORKS
16 ELECTRICAL WORKS
17 SANITARY WORKS
FINAL TOTAL