Hira RCC Cement Mill
Hira RCC Cement Mill
Hira RCC Cement Mill
Probab
Probab
Severit
Severit
Residu
al risk
Sl Initial Additional control
ility
ility
Basic Job Steps Potential Hazard Consequence/Risk Current control measure
y
No. Risk measure
• Pinch Point
• Cut injury
• person Injury due to • Use Mandatory PPE’s & Appropriate Hand gloves.( Safety Shoes, Helmet,
improper handling of Safety Goggles, Reflective Jackle, Cut Resistance Hand Gloves etc.
Reinforcement • Injury to workmen • . Shoulder pad should be used while shifting of Rebar. Ensure daily Tool box
1 Reinforcement work 3 2 6 2 1 2
• Injury of shoulder. • property damage . Proper communication and co ordination with co workers talk(TBT)
• . Ensure good housekeeping in work area
Electric shock .
• Fall the person.
• Use Mandatory PPE’s & Appropriate Hand gloves.( Safety Shoes, Helmet,
• Eye injury · • Injury to Safety Goggles, Reflective Jackle, Cut Resistance Hand Gloves etc.
• slip & trip hazard workmen • Work location should be housekeeped
given tbt before start
3 RCC Pouring • Pinch Point • property damage • pouring of concrete by using Boom presser machine & concrete pump 2 1 2
the job
• falling hazard • fall of person • inspection of shuttering and support, check reinforcement as per BBS
• Hand injury •
• Only trained person involbe in job
• Physical injury
during Lifting /
• Ensure application of mandatory as well as job specific PPEs by the
shifting / stacking /
team and by the others.
manual handling of
• Ensure trade validated Fflagmen and Riggers are deployed for the job. tbt and work permit
material and
• Ensure tag lines with appropriate length provided with the load and no must be insure before
machinery · • Personal Injury.
4 Material Lifting & shifting person to be allowed to move near or under a suspended load 3 2 6 start the job and only 2 1 2
• Failure of Lifting • property damage
• Work shall be done under strict supervision. trande person involbe in
Tool – Tackles
• . SWL, load radius & boom length shall be checked before lifting. job
• slip & trip hazard
• Crane/Fraena or jcb operator should have valid TPI
• pinch point
.
• falling hazard
Reference:
Reviewed By concern Reviewed By Project
Prepared By Approved By
Dept. Safety
Enclosure:
1. Any Drgs
Probab
Probab
Severit
Severit
Residu
al risk
Sl Initial Additional control
ility
ility
Basic Job Steps Potential Hazard Consequence/Risk Current control measure
y
No. Risk measure
2..Method statement.