Plastic Injection Mold Assembly and Disassembly Checklist
Plastic Injection Mold Assembly and Disassembly Checklist
Plastic Injection Mold Assembly and Disassembly Checklist
Disassembly:
The mold must be placed on two rails on a clean table with sufficient space. Tools used must be in good
condition and should include allen wrenches, aluminum pry bars, rubber mallet, duct tape, and some
containers.
Separate mold at parting line carefully and look for any visible damage. If mold is damaged, report it at
once. Check for rust in core and cavity and report it at once if found.
Have containers to put all the parts in and identify it with the proper job number.
Check for core pins in Ejector Housing (at the bottom clamp plate) and remove the core pins first.
Remove all necessary screws in the Ejector Housing and remove it.
Remove screws from the Ejector Plate and remove it.
Check if all pins are marked, if not mark as necessary.
Check if lift cores are marked, if not mark as necessary.
Remove all pins and parts from Ejector Housing. Protect all fragile parts and critical areas with duct tape.
Remove all water line jiffy-plugs
Remove all slides assemblies and protect all critical areas with tape or carefully store in container.
Remove the Sprue bushing, hot sprue, or any hot runner system.
Remove all screws from cavity and core inserts and install two or four longer screws in cavity and core.
Then knock out cavity and core inserts from mold base by hitting screws with a rubber, aluminum, or
copper mallet. BE CAREFUL NOT to knock insert out onto the bench or floor and damage it. If you can't
bump the insert out into your own hand GET HELP.
Once the primary inserts are removed, remove all sub-inserts, gate inserts, core pins, etc. and protect all
critical edges with tape or carefully store in container.
Carefully clean all details with a clean, mild solvent and clean towels being careful NOT to damage
sharp edges, parting surfaces, shutoffs, or the cavity finish.
Finally, store all inserts in such a way that the molding surfaces are protected and cannot be accidentally
damaged.
Assembly:
Have all the mold plates, inserts, and components in one place ready for assembly. Have a clean table
and two rails to slide plates on. Tools used must be in good condition and should include allen wrenches,
aluminum pry bars, rubber/copper/aluminum mallets.
Cleanliness is critical in mold assembly. Make sure all plates, inserts, and components are clean and free
from grit, debris, and chips. After you have carefully cleaned all details with a clean, mild solvent and
clean towels THEN wipe everything again with your clean, bare hand to remove small grit (Careful NOT
to damage sharp edges, parting surfaces, shutoffs, or the cavity finish)
Install all sub-inserts, gate inserts, core pins, etc. into the primary inserts. Check that all inserts and pins
are marked and that they are installed in the correct location and position.
Mount the B-Plate to the Support Plate
Install the B-Half insert set, any slide assemblies, and any other B-plate components. Check that all parts
are marked and that they are installed in the correct location and position.
Insert and grease all ejector pins, ejector sleeves, and ejector blades through the pin retainer plate,
support plate, and core inserts. Install all return pins and springs. Install and grease any Lifter
mechanisms. Bolt on the Ejector plate.
Assemble the ejector housing, with support pillars, guided ejection pins, etc. Guide this assembly through
the ejector & other plates and bolt it to the support plate. Insert any core pins that mount in the bottom
clamp plate and fasten their backup plates. Lubricate the entire assembly.
Verify that the Slide assembly moves freely, is greased, and that the slide retainer is functioning
properly.
Move the Ejector assembly forward and check if all pins, sleeves, lift cores and all other moving
components spin freely. Wiggle to verify correct clearance and that all components move freely
Check that ejector plate can use the full length of travel. Check if runner & part will clear the core when
ejected.
Mount the A-Plate to the top clamp plate
Install A-Half insert set, heel blocks, angle pins, and any other A-plate components. Check that all parts
are marked and that they are installed in the correct location and position.
Install the locating ring & sprue bushing, check that sprue radius, and orifice are the correct size and
verify that the sprue bushing is rotation locked and retained
If the mold features 3-plate or hot runner system install them at this stage.
For Three-Plate molds, verify that all latches function properly, that they latch and release in assembly,
and that plate separation is sufficient to let both the part AND the runner drop through. Also check that all
latch dowel pins are secured so as not to come loose during operation. Lubricate the whole assembly and
verify that it moves freely.
For Hot Runner molds check that all wiring is in a channel, free from damage, and free from possible
"pinches" during assembly. Check continuity all circuits
Install all jiffy-connectors with Teflon tape or suitable thread sealant and water test.
Check all limit switches
Spray with WD-40 and close the assembly
Verify that the mold has a mold strap and that it is fastened correctly
Check all shutoff areas with spotting blue. Tryout any pieces to be insert molded in assembly, check fit
and shutoff
The cavity & core blocks have 0.002 pre load per side (above the mold base plates)
Cavity surface finish is correct to print. As a rule remove all tool and EDM marks, especially deep ribs.
Check for nicks, scratches, damaged edges or corners, chipped or damaged pins and damaged
or loose pin holes.
All cavities have been numbered, and have part numbers (if applicable)
All inserts are numbered to correspond to cavity numbers. Details should be stamped with detail number
and material type
Tool has pry slots (on back side of "A", both sides of "B", & top of "Ejector" plate) and is chamfered in
correct areas
Water line countersink diameter is correct for Jiffy-Tite plug being used. Check plug holes for
smoothness, lead in chamfer, & cleanliness. Sealant has been used on all threads. Jiffy plugs, regular
plugs, baffles, and bubblers are in place and have been flow and pressure tested.
Mold Info has been stamped correctly on the Support plate, all water lines are clearly stamped, and
stamp "top of mold" and "operator side" on the appropriate sides
Verify that all cavities have gates and the gates are the same size.
All sliding parts must have grease grooves, be lubricated, and move easily.
Verify that slides do not interfere with ejector pins or other moving components. Verify that travel is
sufficient to clear molded part
Check for proper clearance on angle pins, and slides when entering opposite side. Make sure pins don't
bottom out. Check if slides lock properly in slide retainer.
All limit switches must be orientated properly for wiring and function.
Check hydraulic cylinders for length of stroke.
K.O. holes are in correct location and tapped to correct dimensions (if applicable).
Verify that all pins, sleeves and lift cores have the proper hole clearance, head clearance and proper
depth clearance. All pins and sleeves must have lead in clearance and lead in chamfer in core insert.
Must be a smooth transition.
All return and ejector pins, and support pillars are the correct length, ejector system moves easily, all pins
are in place (and should be marked for proper location), and the entire assembly lubricated
Push ejector plate forward and check if all pins, sleeves, lift cores and all other moving
components spin freely. Wiggle to verify correct clearance and that all components move freely
Check that ejector plate can use the full length of travel and has spring return if needed. Check if runner
& part will clear the core
Verify that sprue puller design will work as needed
Open and close tool in assembly to check for any interference. Activate any and all side actions and
lifters to check for proper travel and interference of any kind
All core pins are the correct length, and all pins are in place, do the necessary pins shutoff?
Runner must be benched smooth with rounded corners and transitions. Gate to Runner transition should
be blended smooth. (Parting Line edges stay sharp)
All runners are vented at every direction change, and part detail is vented directly opposite the gate, at
the parts ends & corners, and every 2 inches in between as necessary. Vent all guide pins
Verify that all plates have eyebolt holes on every side
Safety strap is attached to mold between A and B halves on the operator side
Locating ring and sprue bushing are in place, and sprue radius and orifice diameter is correct size. Sprue
Busing is rotation locked and retained
Clamp slots are in place and free from any interference.
If inserts are fit on surface plate, check fit in assembly also.
Demagnetize all components.
All screws/bolts are in place and tight. (Follow a pattern to prevent missing a screw)
Verify that cavity, core, slides, mold base and all other applicable parts are clean and clear of chips,
debris, and benching grit, and spotting blue, especially deep ribs and bosses.
Check all holes for missing pins by looking in every hole of the assembled mold.
Verify that parting line locks function properly.
Open and close mold on bench that everything functions properly. Check if slides clear ejector pins, lift
cores and any other moving parts with sufficient clearance and that mold closes freely.
On hot sprue bushing, check if it is properly installed and assembled, make sure all components are
installed and no wires are broken or damaged. Check that wire channel is in mold base and that clamps
are in place to hold wires.
Water lines must be pressure tested with diversion plugs, "O" rings and correct jiffy-plugs installed
All slides, core pins, angle pins, cam locks and guide pins must be greased.
For Hot Runner molds check the size and fit of every drop diameter. Check overall lengths and heights to
verify heat expansion and proper "crush".
For Hot Runner molds check that all wiring is in a channel, free from damage, and free from possible
"pinches" during assembly. Check continuity all circuits (compare all zones to the drawing, note any
changes or additions)
For Three-Plate molds, verify that all latches function properly, that they latch and release in assembly,
and that plate separation is sufficient to let both the part AND the runner drop through. Also check that all
latch dowel pins are secured so as not to come loose during operation.
Tool is sprayed with WD-40 or equivalent for shipping