DOCUMENT SUBMITTED:
T & C Procedure for Transformer
DETAILS:
Hill1111111111111
lii IDlI!111111111111
l111111111
MTRC (LL) 0000038500
SIGNATURE:
DATE RETURNED TO CONTRACTOR:
I. CONSTRUCTION INSPECTION
General inspection for the construction of the transformer shall be carried out as per the
check list in the test form.
Check the earthing connection of the transformer frame, HV & LV cable box, LV neutral,
control and marshalling cubicle visually.
4. PRESSURE TEST
AC high voltage shall be increased gradually to 19.2kV between I IkV to 415V/earth and to
3 .5kV between 415V to 11 kV/earth for I minute.
Check the transformer ratio by connecting a three-phase, four wire, low voltage supply
(auto-transformer) to the H.V. terminals. Measure and record the data at the L.V. side.
Measure the phase voltages for HV & LV side (refer to the test form) to check the vector
group of the transformer.
Measure the winding resistance for H.V. side and L.V. side.
Check the noise level with the transformer on no load at rated voltage and frequency. The
position of the noise level meter shall be I metre from transformer body.
Test the CT magnetisation with a.c. voltage to measure the knee point voltage.
Test the insulating oil sample in compliance with IEC 60156 (Dielectric Test) &
IEC 60814 (Water Content Test) by accredit laboratory.
Connect a three-phase, four wire, low voltage supply (auto-transformer) to the H.V. terminals, the
following data is recorded:
Theoretical calculation:
AB = 415V
BC = 415V
CA = 415V
ab = 16.34V
bc = 16.34V
ca = 16.34V
Aa = OV
Ab = 16.34V
Ac = 16.34V
Ba = 415V
Bb = ' [AB 2 + ab2 - 2(AB)(ab)cos ZBAb] ZBAb = 300
= I[4152± 16.342- 2(415)(16.34)cos 300]
= 401V
Bc = Bb = 401V
Ca = 415V
ZAcB = 148.840
ZbcB = ZAcB - 600
= 88.840
Measured
Volt ___
Diagram 1
Aa
RN YN BN
Check the noise level with the transformer on no load at rated voltage and frequency. The position
of the noise level meter shall be 1 metre from transformer body.
Ambient Noise Level: _dB
Substation:
Transformer No:
Neutral C.T.
V
A
CT to Earth M ohm
Date
Date