CR Ingenieros: Limite de Proyecto
CR Ingenieros: Limite de Proyecto
CR Ingenieros: Limite de Proyecto
R OYEC
D EP
ITE
LIM
L
RA
TU
NA
ÑO .00
CA 167
BZ-71
MAGNETIC
CT:166.53
CF:165.33
H:1.20m
BZ
200mm
LT-80 2 Ø "
LT-128
MZ-24
S=1.00% L=43.16m
Ø " 2
Ø "
Ø "
"
LT-77
Ø "
Ø
2
2
LT-75 LT-76
2
2
BZ-69 2 Ø "
CT:167.59 DN
CF:166.32
CT:167.61 " Ø 2
DN =1 96m
BZ 0m
16 mm CF:165.35
200mm DN 1.00% 160
S 3.
TUBERIA PVC SN-4
16 00% .
H:1.27m
DN 1.00%
L=
S= .72m.
0m
S=-0.51% L=52.20m m S= .34m.
.
DN 110m DN 110mm
L=3
m
DN 110mm CT:168.35
L=6
S=1.00% CT:168.00 S=1.00% CF:167.08
. CF:166.73 S=1.00%
L=11.29m L=15.70m. H:1.27m
H:1.27m L=15.70m.
200mm
2 Ø "
2
AL
2
2
Ø
"
UR
" Ø
" Ø
S=2.87% L=62.36m
T
NA
2
ÑO
Ø
LT-83
"
LT-122
E PRO
TE D 00 LT-81
65.
I LOCAL DEL
LIM 1 ADULTO
MAYOR
LT-74
LT-121
MZ-23
200mm
LT-86 LT-127
S=2.15% L=55.24m
MZ-6
A
LT-88
06 07 LT-126
LT-85
"
Ø
B
2
DN 110mm
Ø "
Ø "
B
Ø "
Ø "
JR. BELISARIO PANDURO
Ø "
2
2
S=1.00%
2
2
CT:171.08 DN 110mm
2
L=4.43m. CT:170.69 CF:169.78
05 S=1.00%
BZ-66 DN 110mmCF:169.39 DN 110mm H:1.30m
C
LT-73 L=11.14m.
CASETA DE EQUIPOS
H:1.30m S=1.00%
CT:169.10 CT:169.81 S=1.00% BZ-40
" Ø
DN 110mm CF:168.51 L=15.57m. L=17.71m.
2
04 CT:170.90
" Ø
DN .00%
03
H:7.10m S=1.00%
S=1 73m.
CT:166.66 JR. LA UNION BZ L=11.31m.
Ø "
CT:166.46
L=6
LT-17
160
2
BZ
CF:165.46
DN =1.0 2m.
CF:165.26
.
MZ-5
Ø "
BZ-23
S = 10 %
200mm
DN =1 66m
TUBERIA PVC SN-8
mm
02 BZ
TUBERIA PVC N° 91 200mm
S 0.4
2
L=
200mm
S 7.
H:1.20m
16 0%
H:1.20m TUBERIA PVC SN-8
16 00% .
BZ
S=0.52% L=57.44m CT:171.14
S = 10 %
BZ-99 m
L=
BZ-101 S=0.55% L=57.46m
0m
0m
0m
.
01 CT:170.60
BZ
TUBERIA PVC SN-4 200mm 16 0% S=0.55% L=57.44m CF:163.49
m
m
CT:168.36 N 0
DN 110m
m D =1. m.
O CF:164.59 S=1.39% L=75.70m S 0.23 H:7.65m
CT CF:164.29 DN 110mm
BZ
E mm S=1.00% = 1 BZ-65
S=1.00% CT:170.41 L
OY 110 m. H:6.01m BZ
H:4.07m
DN 00% L=20.28
R CF:169.10 CT:170.18
14
B L=16.17m.
13
EP
.
12
11
S=1 8m.
10
m LEYENDA
09
08
H:1.31m
07
D 0m
06
CF:164.13
05
=9.7
04
03
16 0%
TE
02
200mm
01
L
A
2
.00
CR-02 S 7.60 67 .5 5m SIMBOLO DESCRIPCION
Ø
"
S=0.84% L=
200mm
L= CT:168.35
CT:168.09 S= 0.533 %
2
200mm
170
CF:167.04
LIMITE D
BZ
SN-8
TUBERIA PVC
Ø
"
CF:164.01
2
H:1.31m LT-71 BUZON
200mm m
S=0.57% L=61.04
166.00
2
SN-4 LT-89
" Ø
BZ
H:4.08m TUBERIA PVC
S=0.57% L=61.32m
Ø
"
0
L= 36 .05 m LT-69
JR. LA UNION
171.0
S=0.53%
" Ø
BUZONETA
B 167.00
BZ-90
200mm
CONEXION CONDOMINIAL
2
167.00 CT:166.31
2
2
" Ø
" Ø
LT-70
" Ø
LT-26
2
LT-25 LT-26A
" Ø
CF:164.10 LT-25A
" Ø
L= 15.84 m
0
172.0
168.00 LILIANA FORGIARINI
PVC - UF, SN-4
TUBERIA PVC SN-8
LT-24
L=6.66m.
S=1.00%
BZ
MZ-3 MZ-14
MZ-7
Ø " 2
16
9.0 BZ-88 VIVIENDAS EXISTENTES
BZ-91 0
CT:171.82 CT:173.81 CT:168.70
CF:167.50
MAGNETIC
CF:172.54 .
CF:170.62
MAGNETIC
LT-14 5m BZ
H:1.27m 4.9 %
MZ-4 L= 1.30 m H:1.20m 2
Ø "
200mm
H:1.20m LT-16 LT-23
BZ
BZ-98
S= 160m
BZ CT= COTA DE TAPA DE BUZON
DN
CT:173.34
S=0.58% L=52.88m
CF= COTA DE FONDO
JR. S/N 01
CF:166.14
200mm
200mm
H:7.20m
LT-72
S=0.69% L=56.12m
200mm
"
Ø
173
.00 MZ-18
2
S=0.65% L=57.47m
LT-27
TUBERIA PVC SN-2
BZ-86 BZ-51
BZ-89 CT:171.56 BZ-87 CT:172.90
Ø "
"
CT:171.79
171.00
Ø
LT-15
2
CR INGENIEROS
4.0
LT-13 CF:166.53
TUBERIA PVC- SN-4
200mm BZ S=1.4 3% L= 57 .07 m
JR. VICENTE MAYNAS 17
H:7.70m S=0 .64 % L=5 7.8 4m
200mm
TUBERIA PVC SN-8
"Ø 2
BZ
D
JR. VICENTE MAYNAS TUBERIA PVC SN-4
200mm BZ S=0.63% L=57.27m S 1
N
L= =1. 60m DN 110mm
S=-4.89% L=60.59m
172 OBRA : FECHA:
200mm .00
TUBERIA PVC SN-2 5. 00 mCT:172.21
BZ
11 % D S=1.00%
"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN
S=-0.66% L=54.58m
200mm
BZ m
.
CF:170.97 N
S 1 DN L=9.57m.
BZ-92 H:1.24mL = 60 1 EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL ABRIL-2020
=5 1.0 m S=1 10mm
CT:172.95 .6 0% m L=2 .00% PORTILLO, UCAYALI"
3m
S=0.63% L=65.80m
.60m
CF:170.25
2
. .
2
"
2
Ø "
H:2.70m LT-9A
Ø
"
"
LT-34 LAMINA N°
2
Ø "
RS-01
2
2
LT-5
" Ø
Ø "
2
"
Ø " 2
Ø
"
SUPERVISOR:
LT-8
DN 110mm
L=13.54m.
LT-8A 2 Ø "
.00
" Ø 2
175
.00
173
LIMITE DE PROYECTO
BZ-73
CT:168.12
CF:166.92
H:1.20m
BZ
.00
167
MAGNETIC
CT:166.53
200mm
CF:165.33
H:1.20m 17
S=1.01% L=63.05m
0.0
0
LIMITE DE PROYECTO
MZ-25
16
LIMIT
E DE
BZ-27
PROY
17
2.0
0 CT:172.88
BZ-72 BZ-35 CF:171.68
EC
BZ-70 CT:169.37 H:1.20m
CT:166.82
TO
CT:167.99 CF:163.42 BZ
CF:163.72
CF:164.04 TUBERIA PVC SN-4 200mm H:5.95m
H:3.10m
H:3.95m S=-0.54% L=58.06m BZ
BZ
200mm
CATOLICA
S=2.71% L=57.15m
TUBERIA PVC SN-2
S=-0.53% L=58.27m
TUBERIA PVC SN-8
.00
MAL
169
17
1.0
0
17
BZ-26
ECO
0.0
CT:171.34
0
167.0 CF:170.14
169
0
BZ-33
ZONA INUNDABLE
.00
CT:169.51 H:1.20m
0
17
BZ
CAMPO DEPORTIVO
168.0
CF:163.11 2.0
0
MZ-23
N YA
H:6.40m
BZ
167
MZ-26
.00
200mm
RINA
200mm
S=3.55% L=57.29m
16
6.0
S=-0.55% L=57.62m
COC
TUBERIA PVC SN-8
00
CAMARA DE
1.
17
BOMBEO 01
TUB. Ø200 mm,
L= 16.30 m
HA
PVC - UF, SN-4
BZ-29
CR-01
BZ BZ-9
CT:167.81
S= 0.675 %
JR. LA UNION 200mm CT:170.86
CF:162.46 CT:164.68 TUBERIA PVC SN-2
00
200mm S=-0.5 4% L=5 8.0 9m CF:168.25
H:5.35m CF:162.06 TUBERIA PVC SN-2 BZ
170.
H:2.62m TUBERIA PVC SN-2 200mm S=-0.5 7% L=5 6.0 0m H:2.61m
TUBERIA PVC SN-2 200mm S=-5.30% L=55.67m
BZ
BZ-8
BZ-40
CT:170.90 TUBERIA PVC SN-4 200mm S=-1.04% L=58.69m BZ-37 BZ
BZ-10 CT:171.49
200mm
170..000
TUBERIA PVC-SN -8 S=0.52% L=57.03m
BZ
CT:166.99 CF:167.94
0
CF:163.80 TUBERIA PVC SN-8 200mm CT:170.25
S=0.58% L=57.60m BZ
BZ
CF:164.67 H:3.55m
H:7.10m S=1.23% L=57.18m BZ-1 CF:167.62
170
BZ
BZ
CT:166.86 H:2.32m H:2.63m
200mm
BZ
200mm
S=0.52% L=56.75m
CF:163.49 CF:162.79 172.00 CENTRO
H:7.65m H:7.75m DE SALUD
200mm
LEYENDA
JR. UCAYALI
TUBERIA PVC SN-2
SIMBOLO DESCRIPCION
BUZON
I.E. PRIMARIA N° 64097
VICTOR PINEDO BARDAL BZ-16 BUZONETA
COMEDOR CT:170.47
BZ-45 POPULAR BZ
CF:168.55 CONEXION CONDOMINIAL
.00
BZ-31 166 CT:171.91 H:1.92m
BZ-41 CT:166.48 LINEA DE IMPULSION Ø 90 mm PVC-U
CT:170.62 CF:170.71
168.00
CF:164.43 H:1.20m BZ
CF:169.42 H:2.05m MZ-34
170.00
COLECTOR PRINCIPAL Ø 200 mm SN-2
170.00
H:1.20m BZ
BZ MZ-27 COLECTOR PRINCIPAL Ø 200 mm SN-4
172.00
MZ-33
200mm
200mm
COLECTOR PRINCIPAL Ø 200 mm SN-8
00
S=1.87% L=62.59m
S=1.26% L=57.82m
2.
LIMIT
17
167.0
200mm
173
200mm
168.00
0
.00
SENTIDO DE FLUJO
E DE
17
S=0.53% L=55.30m
S=-3.32% L=56.68m
VIVIENDAS EXISTENTES
PROY
TUBERIA PVC SN-2
TUBERIA PVC SN-2
MAGNETIC
MAGNETIC
ECTO
CT= COTA DE TAPA DE BUZON
170.00
ALTURA TOTAL DE BUZON
BZ-24 CT:174.29 JR. VICENTE MAYNAS BZ-47
172.00
BZ-17 H:5.25m
169.00
BZ-25 BZ-12 CT:167.08 CF:173.09 CT:173.97
MZ-18 CT:169.34 CT:166.92
CT:168.17 CF:165.08 H:1.20m CF:169.72
CF:167.54 CF:164.72
CF:166.97 H:2.00m BZ
BZ
H:4.25m
H:1.80m H:2.20m BZ TUBERIA PVC SN-2 200mm
JR. VICENTE MAYNAS H:1.20m BZ
BZ
TUBERIA PVC SN-2 200mm S=1.08% L=57.41m
BZ
200mm TUBERIA PVC SN-2 200mm TUBERIA PVC SN-8 200mm
BZ TUBERIA PVC SN-2 S=3.41% L=57.39m
200mm BZ-25 S=-3.79% L=57.24m S=0.63% L=57.10m S=4.07% L=57.18m
TUBERIA PVC SN-2
200mm
200mm
200mm
H:1.20m
200mm
S=0.57% L=56.67m
S=0.99% L=53.95m
S=-0.56% L=56.89m
JR. TUPAC AMARU
CR INGENIEROS
170
S=3.00% L=56.05m
IGLESIA
00
168
.00
8.0
PORTILLO, UCAYALI"
174.00
PLANO REPLANTEO: ESCALA:
REDES DE DESAGUE (PTAR COMPACTA)
BZ-11 1/750
CT:167.75 BZ-21 BZ-15
BZ-20 DIST : YARINACOCHA LAMINA N°
CF:166.40 MZ-32 CT:169.95 CT:173.65
CT:169.27 CCRISAC PROV: CORONEL PORTILLO
RS-02
H:1.35m CF:167.65 IGLESIA CF:170.05
CF:168.07 DPTO : UCAYALI
H:2.30m PENTECOSTES BZ
H:3.60m
H:1.20m MZ-35 SUPERVISOR:
BZ
MZ-28 BZ
BZ
RESIDENTE DE OBRA:
PNSR
Ing. Jorge Gutiérrez Vela CIP. 206346 02 DE 04
DN 110mm
.00
L=9.53m.
S=1.00%
173
DN 110mm
L=26.54m.
S=1.00%
2
Ø "
BZ-62
LT-10 CT:171.51
LT-65
LT-4 LT-63 MZ-13 CF:165.41
H:6.10m
" Ø 2
BZ
LT-32 CT:171.69 LT-91
DN 110mm
L=22.90m.
CAMPO DEPORTIVO
S=1.00%
2 Ø "
CF:170.38
LT-11 MZ-8
DN 110mm
H:1.31m
L=10.70m.
S=1.00%
2 Ø "
BZ-85
CT:173.94 UBICACION : I.E. SECUNDARIA
LT-3
-REHABILTACION DE TANQUE ELEVAD
AREA PARA
BZ
O
200mm
2
Ø "
LT-31
LT-12 CT:173.20 DN 110mm
CF:171.91 -CASETA DE BOMBEO PROYECTAD
O
S=0.56% L=47.73m
BZ-93 S=1.00%
H:1.29m
DN 160mm BZ CT:173.73 L=3.76m. -POZO TUBULAR PROYECTADO
17
CT:173.96 S=1.00% CF:172.53DN 160mm LT-30
4.
00
CF:172.76 L=5.50m. H:1.20m S=1.00% .00
BZ-97 L=6.21m. S=1.00%
H:1.20m
200mm
MZ-2 CT:172.50 2
Ø "
L=7.03m.
BZ
CF:168.00 Ø "
2
2 Ø "
H:4.50m
m
DN 110mm CT:171.749
S=-5.04% L=53.89
LT-29 LT-62 LT-66 S=1.00% CF:170.519
L=9.17m. H:1.23m BZ-50A
200mm
2 Ø "
-2
LT-67 CC-15A
TUBERIA PVC SN
CT:171.98
CF:170.38
CF:165.68 CT:175.75 CT:174.28 CT:173.50
IGLESIA DN 160mm
H:6.28m CF:172.70
S=0.80% L=67.47m
H:1.29m CF:174.55 CF:173.48
L=7.20m.
"
Ø
S=1.00%
"Ø 2
S=0.62% L=20.32m
172
2
TUBERIA PVC SN-4
.00 L=7.20m. CT:174.00
CC-19A DN 110mm
CF:173.20 BZ
S=5.66%
BZ-83A
2 Ø "
2
DN 11 %
2
DN 160mm DN 110mm
200mm
Ø
"
" Ø
4
LT-39 H:1.70m S=1.52% CF:169.64 S=0.8 m.
LT-38 3 S=5.67%
L=7.54m. L=43.7
2 Ø "
"
H:1.70m L=35.99m.
Ø
LT-37 BZ BZ
S=2.66% L=50.88m
2
DN 160mm BN-9A
2
200mm
"
BZ
Ø
CC-21A CC-20A CC-18A
Ø
S=3.34%
"
BZ-50 CT:172.26
2
Ø "
S=2.89% L=23.47m
CT:170.11 CT:170.32 CT:170.39 L=7.77m. LT-118
2
CT:172.40
200mm
CT:170.10 H:1.10m
BZTA-12A H:0.70m H:0.70m BZ-83 H:0.80m H:6.60m LT-93
TUB.PVC SN-2
BZ-96 CF:169.30 LT-116 LT-117
CT:170.18 CT:170.35 LT-92
S=0.64% L=47.74m
CT:170.54 H:0.80m
CF:168.98 0mm 0mm
DN 11 % CF:168.85 DN 11 %
CF:168.54 H:1.20m 3
S=1.1 m. 8
0mm H:1.50m S=1.0 m.
DN 11 % MZ-22
TUBERIA PVC N° 8
H:2.00m 7 8
4 L=18.6 L=26.5
0mm S=0.8 m.
BZ
DN 11 % L=12.2
1
4 BZ
BN-10A
DN 160mm S=1.0 m. DN 160mm
2
L=30.9 S=4.86% CT:170.50
2
S=3.31%
Ø
"
L=13.42m. E L=7.46m.
JOS CF:169.30
SAN
200mm
" Ø 2
LT-94
LT-57
S=-3.35% L=42.58m
LT-40 BZ BZ-39 LT-115
DN 160mm CT:174.39
2 Ø "
LT-95
LT-56 S=1.00% Ø "
CF:173.19
LT-101 " Ø 2
L=4.09m. DN 110mm
MZ-19 H:1.20m
MZ-12 DN 110mm BZ
S=1.00%
S=1.00% L=6.70m.
LT-114
L=7.00m. DN 160mm
LT-59
BZ-61 S=1.00%
17
CT:172.16 L=3.40m.
1.0
" Ø 2
0
CF:166.11 2 Ø
"
200mm
H:6.05m
BZ-82
200mm
17
S=3.33% L=59.30m
CT:168.62 LT-120
2.0
0
BZ
CF:167.42
S=0.62% L=57.88m
LT-96
0
LT-99 "
Ø
17
"
Ø
200mm
2
4.0
2
LT-100
0
" Ø
" Ø
2
LT-61
S=-0.60% L=48.72m
2
BZ-60 BZ-77
BZ-48
CT:170.40 CT:174.92
LT-60 CT:172.42
Ø
BZ-80 CT:168.73 H:1.85m CF:166.46
2
S=4 .37 % L=5 7.1 3m
CF:167.13 200mm BZ
SN-2 200mm
CT:169.65 H:3.60m BERIA PVC SN-2
TU TUBERIA PVC .73m
H:1.60m L=56 .1 4m S= 3. 43 % L= 58
CF:168.45 S=2.03%
200mm
BZ
H:1.20m C SN-2
TUBERIA PV 54.81m
S= -0 .57% L=
SN-2 200mm BZ
BZ-79 TUBERIA PVC
LIMITE D
L= 56 .9 0m
200mm
CT:172.54 S=-0 .6 2% LT-105 LT-112
BN-13A A
JR. MOYOBAMB 200mm
2
BZ
2
SN-2
2
TUBERIA PVC
" Ø
CT:172.49 CF:171.34
Ø
"
Ø
"
.28 m
2
55 LT-104
DN 160mm H:1.20m S=-2.39% L= LT-110
5m
CF:171.49 200mm BZ
" Ø
SN-2
S=1.00%
TUBERIA PVC
2.6
H:1.00m
E PROYE
LT-102
2
.46m LT-111
L=11.08m. BZ S=-5.30% L=62
" Ø
TUBERIA PVC SN-4
L=4
2
LT-103
" Ø
"Ø 2
MZ-21
S=0.56%
.
m
L=22.64m
2
S=1.00%
CTO
DN 110m
" Ø
2
" Ø
CC-24A
" Ø
LT-50
2
CT:172.92 LT-49 MZ-20
Ø
"
Ø
2
"
CT:168.20
" Ø
H:1.00m LT-44
CF:166.70 LT-110A
" Ø
LT-43
2
" Ø 2
H:1.50m
BZ
LT-45
" Ø
2
200mm
" Ø
LT-106
MZ-11 LT-107
2
"
Ø
S=1.37% L=42.85m
2
L=37.92m.
BZ-55
DN 110mm
S=1.00%
LT-108
CT:170.24
JR. BELISARIO PA
17
LT-54 TUBE % L=5
MZ-1 H:1.20m S=2.33
0 .0
ND
BZ
BZ
0
200mm
URO
-2
R IA P VC SN .69m
TUBE 6
LT-47 % L=5
"
Ø
S=0.76
Ø " 2
CC-23A
2
CT:172.83 BZ
3.0
0 CF:172.33
17 BZ-54 168.00
"
Ø
H:0.50m BZ-58
2
CONEXION CONDOMINIAL
CR INGENIEROS
LIM
SENTIDO DE FLUJO
ITE
OBRA : FECHA:
VIVIENDAS EXISTENTES
DE
MAGNETIC
PORTILLO, UCAYALI"
EC
YEC TO 1/750
T E DE PRO
LIM I CF= COTA DE FONDO
DIST : YARINACOCHA LAMINA N°
CCRISAC PROV: CORONEL PORTILLO
H= ALTURA TOTAL DE BUZON
RESIDENTE DE OBRA:
Ø
" Ø
2
" Ø 2
2
" Ø
BZ-44
" Ø
2
2
CT:172.64
CF:167.39 BZ-46
170.00
BZ-24 CT:174.29 JR. VICENTE MAYNAS BZ-47
172.00
BZ-17 H:5.25m
169.00
BZ-12 CT:167.08 CF:173.09 CT:173.97
MZ-18 CT:169.34 CT:166.92 CF:165.08 H:1.20m CF:169.72
CF:167.54 TUBERIA PVC SN-2 200mm
CF:164.72 H:2.00m TUBERIA PVC SN-2 200mm BZ
BZ
H:4.25m
H:1.80m TUBERIA PVC SN-2 200mm TUBERIA PVC SN-8 200mm S=1.08% L=57.41m
200mm H:2.20m BZ
BZ
S=3.41% L=57.39m
TUBERIA PVC SN-2 BZ
S=0.63% L=57.10m S=4.07% L=57.18m
TUBERIA PVC SN-2 200mm
BZ
BZ
S=-3.79% L=57.24m
S=-1.00% L=57.05m
BZ-25
JR. VICENTE MAYNAS
200mm
200mm
200mm
H:1.20m LT-194
200mm
S=0.57% L=56.67m
2
2
S=0.99% L=53.95m
2
S=-0.56% L=56.89m
" Ø
Ø
"
LT-195
2
LT-196
" Ø
170
2
Ø
"
Ø
"
" Ø
S=3.00% L=56.05m
" Ø
00
16
LT-177
MAGNETIC
168
LT-151
JR. UCAYALI
0
.00
8.0
LT-152
16
174.00
LT-178
BZ-11
2 Ø "
CT:167.75 BZ-15
BZ-20 CF:166.40 MZ-32
" Ø 2
"Ø
2
CT:173.65
CT:169.27 " Ø 2
PENTECOSTES LT-197A BZ
H:3.60m
MZ-35
2
H:1.20m BZ-21
BZ
MZ-28 LT-153 BZ
LT-179
BZ
CT:169.95 LT-192
CF:167.65
LT-176
H:2.30m
LT-150
MAL
2 Ø "
" Ø 2
200mm
2 Ø "
172.00
200mm
200mm
" Ø 2
200mm
2
Ø "
LT-197
S=-0.54% L=48.23m
S=2.47% L=53.47m
S=0.51% L=58.40m
S=3.94% L=47.76m
LT-191
LT-91
E
170.00
TUBERIA PVC SN-2
TUBERIA PVC SN-2 0
CON
169
.00
" Ø 2
LIMIT
BN-5A
" Ø
"
CC-1A
Ø
CT:172.03
"
Ø
BZ-22A
2 Ø "
CT:171.80
2
2
LT-200
2
LT-155 CT:170.28 CT:173.31 CF:171.23 CF:170.60
YAR
2 Ø "
CT:169.10 CC-9A
E DE
CF:169.18 2 Ø "
" Ø
CF:167.90 CT:172.10 H:1.20m
2
H:1.10m BZ-13A DN 160mm CT:169.32 H:0.80m 110mm
CC-10A H:1.20m DN 110mm CF:171.30 DN
PROY
DN 160mm CT:169.83 S=8.91% CF:168.36
BZ-42A LT-149 S=6.20% S=5.25% BZ-4
CT:170.46 S=7.25% H:0.80m
00 CF:168.33 L=5.16m. DN 160mm
70.
CT:170.68 H:0.96m
INAC
H:1.50m S=3.02%
S=0.61% L=20.37m
ECTO
CF:169.18 DN 110mm CF:170.35
S=2.71% L=22.34m
H:0.91m L=26.11m. L=8.38m.
200mm
OCH
CT:171.18 CF:169.71 H:1.10m L=7.59m.
TUB. PVC SN-2
2
2
BZ-42
200mm
DN 160mm BZ
SIMBOLO DESCRIPCION
2
CF:168.93
A
BZ
2
S=4.92% L=29.84m. CF:169.14 S=2.60%
Ø
"
L=16.86m.
Ø
"
S=5.66%
" Ø
" Ø
S=8.44% CT:170.98
Ø "
L=6.59m. LT-172
Ø "
L=13.81m. L=51.08m. DN 160mm H:1.20m H:1.50m
2
L=7.16m. LT-207
CF:169.58
Ø "
S=1.96% LT-203
200mm
" Ø
LT-204
2
S=2.45% L=55.73m
2
Ø
"
H:1.40m L=8.21m.
" Ø
LT-202
" Ø 2
2
2
200mm
0
200mm
" Ø
LT-159
" Ø
BUZONETA
170.0
2 Ø "
2 Ø "
LT-161
200mm
LT-171
S=3.23% L=46.94m
CONEXION CONDOMINIAL
S=2.66% L=50.88m
LT-209 2
LT-158
IGLESIA LT-161A 0.0
S=2.57% L=46.36m
ADVENTISTA
LT-160
TUBERIA PVC SN-2
1.0
0 H:1.20m RED CONEXION CONDOMINIAL Ø 110 mm
CF:170.77 LT-170 LT-173
" Ø 2
BZ-38
H:1.40m MZ-31
H:1.20m MZ-29 BZ
CT:170.28
SENTIDO DE FLUJO
00 CF:169.08
JR. ELEODORO MAYNAS
BZ 3.
17
2 Ø "
LT-157 H:1.20m
0
171.0
LT-119 BZ VIVIENDAS EXISTENTES
BZ-39 LT-115
2 Ø "
BZ
" Ø 2
JR. TUPAC AMARU
CT:174.39
MAGNETIC
MAGNETIC
CF:173.19
H:1.20m
200mm
" Ø 2
2 Ø " CT= COTA DE TAPA DE BUZON
LT-170A
200mm
S=0.99% L=58.01m
LT-162A
" Ø 2
2 Ø "
H=
S=5.77% L=58.43m
200mm
ALTURA TOTAL DE BUZON
TUBERIA PVC SN-2
Ø "
2
200mm
LT-163
LT-156A LT-174A
TUBERIA PVC SN-2
2 Ø "
S=-1.12% L=66.77m
LT-162
S=3.33% L=59.30m
LT-120
17
174.00
JR. UCAYALI
1.
" Ø 2
.00
LT-156 BZ-43
LT-165
172
CT:174.86 LT-169
" Ø
"
Ø
" Ø 2
" Ø
CF:173.66
2
LT-201
END
2
H:1.20m OT OWS
BZ-7 U ILLERM
BZ-77 JR. G
BZ-48 CT:175.34 LT-174
CT:174.92 CF:174.14 JR. MOYOBAMBA BZ-2
CT:172.42 TO
OYEC
BZ
CF:173.72 H:1.20m CT:172.22
E PR
BZ
CF:171.22
H:1.20m
H:1.20m TUBERIA PVC SN-2 200mm BZ
0
2.0
LT-113
17
2
MZ-30
2
"
2
" Ø
2
" Ø
LT-167 171.00
" Ø
2
" Ø
" Ø
Ø
"
LT-110
LT-111
0
1.0
17
MZ-21 0
2.0
17
0
3.0
17
0
4.0
LT-110A 17
" Ø
2
SEND
0
174.0
TOW
RMO
UILLE
JR. G
BZ-55
CT:170.24
CF:169.04 172
.00
H:1.20m
BZ
TO
E PR OYEC
LIM ITE D
17
0.
00
OBRA :
CR INGENIEROS FECHA:
"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN
EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL ABRIL-2020
PORTILLO, UCAYALI"
PLANO REPLANTEO: ESCALA:
REDES DE DESAGUE (PTAR COMPACTA)
1/750
RESIDENTE DE OBRA: