CR Ingenieros: Limite de Proyecto

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

TO

R OYEC
D EP
ITE
LIM

L
RA
TU
NA
ÑO .00
CA 167

BZ-71
MAGNETIC

CT:166.53
CF:165.33
H:1.20m
BZ

200mm
LT-80 2 Ø "

LT-128
MZ-24

S=1.00% L=43.16m
Ø " 2

TUBERIA PVC SN-2


MZ-16
LT-128A
LT-78 LT-79 LT-129

Ø "
Ø "
"

LT-77

Ø "
Ø

2
2
LT-75 LT-76

2
2
BZ-69 2 Ø "

CT:167.59 DN
CF:166.32
CT:167.61 " Ø 2

DN 110mm S= 110 BZ-72


DN 110mm H:1.27m
CF:164.36 DN 110mm CT:167.84
mm BZ-70 L= 1.0 mm
DN H:3.25m
S=1.00% S=1.00% CF:166.54 160 5.2 0% CT:166.82
BZ-68 S=1.00% L=15.92m. H:1.30m DN 1.00% CT:167.99 8m
L=12.05m. 1
S= 60m L=27.60m. S .35m.
= . CF:163.72
CT:165.83 L= 1.00 m L=7 CF:164.04 H:3.10m
12
CF:164.63 .85 % H:3.95mTUBERIA PVC SN-4 200mm
m. 200mm BZ
H:1.20m JR. S/N 04 BZ
TUBERIA PVC SN-4 BZ
S=-0.54% L=58.06m CT:166.62
m S=-0.56% L=56.73m

DN =1 96m
BZ 0m
16 mm CF:165.35
200mm DN 1.00% 160

S 3.
TUBERIA PVC SN-4

16 00% .
H:1.27m
DN 1.00%

L=
S= .72m.

0m
S=-0.51% L=52.20m m S= .34m.

.
DN 110m DN 110mm
L=3

m
DN 110mm CT:168.35
L=6
S=1.00% CT:168.00 S=1.00% CF:167.08
. CF:166.73 S=1.00%
L=11.29m L=15.70m. H:1.27m
H:1.27m L=15.70m.

200mm
2 Ø "

2
AL

2
2

Ø
"

UR

" Ø
" Ø
S=2.87% L=62.36m
T
NA

2
ÑO

Ø
LT-83
"

JR. ELEODORO MAYNAS


C LT-82

TUBERIA PVC SN-2


CTO
LT-84
YE
Ø " 2

LT-122
E PRO
TE D 00 LT-81
65.
I LOCAL DEL
LIM 1 ADULTO
MAYOR

LT-74
LT-121

MZ-23

JR. SAN MARTIN


BZ-75
.00

JR. DIEGO ZUMBA


CT:167.62
165 CF:166.42
MZ-17
H:1.20m
L MZ-15 BZ
A
UR
AT .00
O N 164
Ñ
CA
.00
166

200mm
LT-86 LT-127

S=2.15% L=55.24m
MZ-6
A

LT-88

TUBERIA PVC SN-2


LT-87
2 Ø "

06 07 LT-126
LT-85
"

Ø
B

2
DN 110mm

Ø "

Ø "
B

Ø "
Ø "
JR. BELISARIO PANDURO

Ø "
2

2
S=1.00%

2
2
CT:171.08 DN 110mm

2
L=4.43m. CT:170.69 CF:169.78
05 S=1.00%
BZ-66 DN 110mmCF:169.39 DN 110mm H:1.30m
C

LT-73 L=11.14m.
CASETA DE EQUIPOS

H:1.30m S=1.00%
CT:169.10 CT:169.81 S=1.00% BZ-40

" Ø
DN 110mm CF:168.51 L=15.57m. L=17.71m.

2
04 CT:170.90
" Ø

CF:164.41 S=1.00% H:1.30m


" Ø

LT-21 L=11.66m. CF:163.80 DN 110mm


H:4.70m
2

LT-18 LT-19 LT-20 BZ-100 BZ-67

DN .00%
03
H:7.10m S=1.00%

S=1 73m.
CT:166.66 JR. LA UNION BZ L=11.31m.
Ø "

CT:166.46

L=6
LT-17

160
2

BZ
CF:165.46

DN =1.0 2m.
CF:165.26

.
MZ-5
Ø "

BZ-23
S = 10 %

200mm

DN =1 66m
TUBERIA PVC SN-8

mm
02 BZ
TUBERIA PVC N° 91 200mm

S 0.4
2

L=
200mm

S 7.
H:1.20m

16 0%
H:1.20m TUBERIA PVC SN-8

16 00% .
BZ
S=0.52% L=57.44m CT:171.14
S = 10 %

BZ-99 m

L=
BZ-101 S=0.55% L=57.46m

0m
0m

0m
.
01 CT:170.60
BZ
TUBERIA PVC SN-4 200mm 16 0% S=0.55% L=57.44m CF:163.49

m
m
CT:168.36 N 0
DN 110m
m D =1. m.
O CF:164.59 S=1.39% L=75.70m S 0.23 H:7.65m
CT CF:164.29 DN 110mm
BZ

E mm S=1.00% = 1 BZ-65
S=1.00% CT:170.41 L
OY 110 m. H:6.01m BZ
H:4.07m
DN 00% L=20.28
R CF:169.10 CT:170.18
14

B L=16.17m.
13

EP
.
12
11

S=1 8m.
10

m LEYENDA
09
08

H:1.31m
07

D 0m
06

CF:164.13
05

=9.7
04
03

16 0%
TE
02

200mm
01

L
A

I DN =1.0 m. C SN-8 H:6.05m


LIM TUBERIA PV
BZ

2
.00
CR-02 S 7.60 67 .5 5m SIMBOLO DESCRIPCION

Ø
"

S=0.84% L=

200mm
L= CT:168.35
CT:168.09 S= 0.533 %

2
200mm

170
CF:167.04
LIMITE D

BZ
SN-8
TUBERIA PVC

Ø
"

CF:164.01

2
H:1.31m LT-71 BUZON
200mm m
S=0.57% L=61.04
166.00

2
SN-4 LT-89

" Ø
BZ
H:4.08m TUBERIA PVC

S=0.57% L=61.32m
Ø
"

0
L= 36 .05 m LT-69
JR. LA UNION

171.0
S=0.53%

" Ø
BUZONETA
B 167.00

TUBERIA PVC SN-4


E PROYE

BZ-90
200mm

CONEXION CONDOMINIAL
2

167.00 CT:166.31
2
2

" Ø
" Ø

LT-70
" Ø

LT-26
2

LT-25 LT-26A
" Ø

CF:164.10 LT-25A
" Ø

TUB. Ø200 mm,


S=2.70% L=57.50m

LT-24A LINEA DE IMPULSION Ø 90 mm PVC-U


H:2.20m JARDIN N° 310 - SOR
CTO

L= 15.84 m

0
172.0
168.00 LILIANA FORGIARINI
PVC - UF, SN-4
TUBERIA PVC SN-8

COLECTOR PRINCIPAL Ø 200 mm SN-2


S= 0.58 %

16 COLECTOR PRINCIPAL Ø 200 mm SN-4


8.0
0
COLECTOR PRINCIPAL Ø 200 mm SN-8
BZ-74
CT:169.81 3.0
0
CF:164.76 17 RED CONEXION CONDOMINIAL Ø 110 mm
170.00 H:5.06m
LT-68 SENTIDO DE FLUJO
DN 110mm

LT-24
L=6.66m.
S=1.00%

BZ

MZ-3 MZ-14
MZ-7
Ø " 2

16
9.0 BZ-88 VIVIENDAS EXISTENTES
BZ-91 0
CT:171.82 CT:173.81 CT:168.70
CF:167.50

MAGNETIC
CF:172.54 .
CF:170.62
MAGNETIC

LT-14 5m BZ
H:1.27m 4.9 %
MZ-4 L= 1.30 m H:1.20m 2
Ø "

200mm
H:1.20m LT-16 LT-23
BZ
BZ-98
S= 160m
BZ CT= COTA DE TAPA DE BUZON
DN
CT:173.34

S=0.58% L=52.88m
CF= COTA DE FONDO
JR. S/N 01

CF:166.14
200mm
200mm

H:7.20m

TUBERIA PVC SN-8


170 H= ALTURA TOTAL DE BUZON
.00
S=-0.53% L=45.21m

LT-72
S=0.69% L=56.12m
200mm

TUBERIA PVC SN-4


TUBERIA PVC SN-8

"

Ø
173
.00 MZ-18

2
S=0.65% L=57.47m

LT-27
TUBERIA PVC SN-2

BZ-86 BZ-51
BZ-89 CT:171.56 BZ-87 CT:172.90
Ø "

"

CT:171.79
171.00
Ø

LT-22 LT-28 CF:167.26 CT:172.37 CF:165.06


2

LT-15
2

BZ-94 CF:166.89 H:4.30m CF:170.87 H:7.84m


CT:172.49 H:4.90m
H:1.50m -2 200mm BZ

CF:169.89 BZ-102 DN 110mm CT:172.20 TUBERIA PVC SN m


H:2.60m CT:174.23 S=1.00% CF:170.86
-2 200mm BZ S=1.46% L=57.07
L=36.87m. H:1.34m TUBERIA PVC SN 0

CR INGENIEROS
4.0
LT-13 CF:166.53
TUBERIA PVC- SN-4
200mm BZ S=1.4 3% L= 57 .07 m
JR. VICENTE MAYNAS 17
H:7.70m S=0 .64 % L=5 7.8 4m
200mm
TUBERIA PVC SN-8
"Ø 2

BZ

D
JR. VICENTE MAYNAS TUBERIA PVC SN-4
200mm BZ S=0.63% L=57.27m S 1
N
L= =1. 60m DN 110mm
S=-4.89% L=60.59m
172 OBRA : FECHA:
200mm .00
TUBERIA PVC SN-2 5. 00 mCT:172.21
BZ
11 % D S=1.00%
"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN
S=-0.66% L=54.58m

200mm
BZ m
.
CF:170.97 N
S 1 DN L=9.57m.
BZ-92 H:1.24mL = 60 1 EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL ABRIL-2020
=5 1.0 m S=1 10mm
CT:172.95 .6 0% m L=2 .00% PORTILLO, UCAYALI"
3m

S=0.63% L=65.80m
.60m
CF:170.25
2

. .
2

PLANO REPLANTEO: ESCALA:


REDES DE DESAGUE (PTAR COMPACTA)
Ø

"
2

Ø "

H:2.70m LT-9A
Ø

"

JR. SAN MARTIN


1/750
2

TUBERIA PVC SN-8


LT-64
Ø

"

LT-34 LAMINA N°
2
Ø "

LT-34A LT-35 DIST : YARINACOCHA


LT-9 CCRISAC PROV: CORONEL PORTILLO

RS-01
2
2

LT-33 DPTO : UCAYALI


2

LT-5
" Ø
Ø "
2

"

Ø " 2
Ø

"

SUPERVISOR:
LT-8
DN 110mm

L=13.54m.

LT-6 LT-7 RESIDENTE DE OBRA:


S=1.00%

LT-8A 2 Ø "

Ing. Jorge Gutiérrez Vela CIP. 206346 01 DE 04

.00
" Ø 2

175
.00
173
LIMITE DE PROYECTO

BZ-73
CT:168.12
CF:166.92
H:1.20m
BZ

.00
167

JR. TUPAC AMARU


BZ-71

MAGNETIC
CT:166.53

200mm
CF:165.33
H:1.20m 17

S=1.01% L=63.05m
0.0
0
LIMITE DE PROYECTO

TUBERIA PVC SN-2


00
8.

MZ-25
16

MZ-24 LIMITE DE PROYECTO


17
1.0
0

LIMIT
E DE
BZ-27

PROY
17
2.0
0 CT:172.88
BZ-72 BZ-35 CF:171.68

EC
BZ-70 CT:169.37 H:1.20m
CT:166.82

TO
CT:167.99 CF:163.42 BZ
CF:163.72
CF:164.04 TUBERIA PVC SN-4 200mm H:5.95m
H:3.10m
H:3.95m S=-0.54% L=58.06m BZ
BZ

TUBERIA PVC SN-8 200mm


S=-0.53% L=58.20m
IGLESIA

200mm
CATOLICA

JR. MANCO CAPAC


(SAN JOSE)
200mm

S=2.71% L=57.15m
TUBERIA PVC SN-2
S=-0.53% L=58.27m
TUBERIA PVC SN-8

.00

MAL
169

17
1.0
0
17
BZ-26

ECO
0.0
CT:171.34
0
167.0 CF:170.14

169

0
BZ-33
ZONA INUNDABLE

.00
CT:169.51 H:1.20m

0
17
BZ
CAMPO DEPORTIVO

168.0
CF:163.11 2.0
0
MZ-23

N YA
H:6.40m
BZ

167
MZ-26

.00

200mm

RINA
200mm

S=3.55% L=57.29m
16
6.0
S=-0.55% L=57.62m

TUBERIA PVC SN-2

COC
TUBERIA PVC SN-8

00
CAMARA DE

1.
17
BOMBEO 01
TUB. Ø200 mm,
L= 16.30 m

HA
PVC - UF, SN-4
BZ-29
CR-01
BZ BZ-9
CT:167.81

S= 0.675 %
JR. LA UNION 200mm CT:170.86
CF:162.46 CT:164.68 TUBERIA PVC SN-2

00
200mm S=-0.5 4% L=5 8.0 9m CF:168.25
H:5.35m CF:162.06 TUBERIA PVC SN-2 BZ

170.
H:2.62m TUBERIA PVC SN-2 200mm S=-0.5 7% L=5 6.0 0m H:2.61m
TUBERIA PVC SN-2 200mm S=-5.30% L=55.67m
BZ
BZ-8
BZ-40
CT:170.90 TUBERIA PVC SN-4 200mm S=-1.04% L=58.69m BZ-37 BZ
BZ-10 CT:171.49
200mm

170..000
TUBERIA PVC-SN -8 S=0.52% L=57.03m
BZ
CT:166.99 CF:167.94

0
CF:163.80 TUBERIA PVC SN-8 200mm CT:170.25
S=0.58% L=57.60m BZ
BZ
CF:164.67 H:3.55m
H:7.10m S=1.23% L=57.18m BZ-1 CF:167.62

170
BZ
BZ
CT:166.86 H:2.32m H:2.63m

200mm
BZ

200mm BZ-23 BZ-18 CF:162.16


TUBERIA PVC N° 91
CT:171.14 CT:170.54 H:4.70m
S=0.55% L=57.46m

200mm

S=0.52% L=56.75m
CF:163.49 CF:162.79 172.00 CENTRO
H:7.65m H:7.75m DE SALUD
200mm

TUBERIA PVC SN-2


S=-4.51% L=57.77m
200mm
S=1.53% L=57.30m

TUBERIA PVC SN-2


S=0.63% L=57.95m
TUBERIA PVC SN-2

LEYENDA
JR. UCAYALI
TUBERIA PVC SN-2

SIMBOLO DESCRIPCION

BUZON
I.E. PRIMARIA N° 64097
VICTOR PINEDO BARDAL BZ-16 BUZONETA
COMEDOR CT:170.47
BZ-45 POPULAR BZ
CF:168.55 CONEXION CONDOMINIAL

.00
BZ-31 166 CT:171.91 H:1.92m
BZ-41 CT:166.48 LINEA DE IMPULSION Ø 90 mm PVC-U
CT:170.62 CF:170.71

168.00
CF:164.43 H:1.20m BZ
CF:169.42 H:2.05m MZ-34

170.00
COLECTOR PRINCIPAL Ø 200 mm SN-2
170.00

H:1.20m BZ
BZ MZ-27 COLECTOR PRINCIPAL Ø 200 mm SN-4

172.00
MZ-33

200mm
200mm
COLECTOR PRINCIPAL Ø 200 mm SN-8
00

S=1.87% L=62.59m
S=1.26% L=57.82m
2.

RED CONEXION CONDOMINIAL Ø 110 mm

LIMIT
17

167.0

200mm

173
200mm

168.00
0

.00

TUBERIA PVC SN-4


TUBERIA PVC SN-2
1.0

SENTIDO DE FLUJO

E DE
17

S=0.53% L=55.30m
S=-3.32% L=56.68m

VIVIENDAS EXISTENTES

PROY
TUBERIA PVC SN-2
TUBERIA PVC SN-2

MAGNETIC
MAGNETIC

ECTO
CT= COTA DE TAPA DE BUZON

BZ-44 CF= COTA DE FONDO


CT:172.64
CF:167.39 BZ-46 H=

170.00
ALTURA TOTAL DE BUZON
BZ-24 CT:174.29 JR. VICENTE MAYNAS BZ-47

172.00
BZ-17 H:5.25m

169.00
BZ-25 BZ-12 CT:167.08 CF:173.09 CT:173.97
MZ-18 CT:169.34 CT:166.92
CT:168.17 CF:165.08 H:1.20m CF:169.72
CF:167.54 CF:164.72
CF:166.97 H:2.00m BZ
BZ
H:4.25m
H:1.80m H:2.20m BZ TUBERIA PVC SN-2 200mm
JR. VICENTE MAYNAS H:1.20m BZ
BZ
TUBERIA PVC SN-2 200mm S=1.08% L=57.41m
BZ
200mm TUBERIA PVC SN-2 200mm TUBERIA PVC SN-8 200mm
BZ TUBERIA PVC SN-2 S=3.41% L=57.39m
200mm BZ-25 S=-3.79% L=57.24m S=0.63% L=57.10m S=4.07% L=57.18m
TUBERIA PVC SN-2

JR. EDUARDO DEL AGUILA


S=-1.00% L=57.05m CT:168.17
CF:166.97

200mm
200mm

200mm

H:1.20m
200mm

S=0.57% L=56.67m
S=0.99% L=53.95m

S=-0.56% L=56.89m
JR. TUPAC AMARU

CR INGENIEROS
170
S=3.00% L=56.05m

TUBERIA PVC SN-4


TUBERIA PVC SN-2

TUBERIA PVC SN-8


.00
TUBERIA PVC SN-2

IGLESIA
00

JR. MANCO CAPAC


7.

EVANGELICA OBRA : FECHA:


16

168

"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN


JR. UCAYALI
0

.00
8.0

EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL ABRIL-2020


16

PORTILLO, UCAYALI"

174.00
PLANO REPLANTEO: ESCALA:
REDES DE DESAGUE (PTAR COMPACTA)
BZ-11 1/750
CT:167.75 BZ-21 BZ-15
BZ-20 DIST : YARINACOCHA LAMINA N°
CF:166.40 MZ-32 CT:169.95 CT:173.65
CT:169.27 CCRISAC PROV: CORONEL PORTILLO

RS-02
H:1.35m CF:167.65 IGLESIA CF:170.05
CF:168.07 DPTO : UCAYALI
H:2.30m PENTECOSTES BZ
H:3.60m
H:1.20m MZ-35 SUPERVISOR:
BZ
MZ-28 BZ
BZ
RESIDENTE DE OBRA:
PNSR
Ing. Jorge Gutiérrez Vela CIP. 206346 02 DE 04
DN 110mm
.00

L=9.53m.
S=1.00%
173

DN 110mm

L=26.54m.
S=1.00%
2

Ø "

JR. DIEGO ZUMBA


Ø " 2

BZ-62
LT-10 CT:171.51
LT-65
LT-4 LT-63 MZ-13 CF:165.41
H:6.10m
" Ø 2

BZ
LT-32 CT:171.69 LT-91

DN 110mm

L=22.90m.
CAMPO DEPORTIVO

S=1.00%
2 Ø "

CF:170.38
LT-11 MZ-8

DN 110mm
H:1.31m

L=10.70m.
S=1.00%
2 Ø "

BZ-85
CT:173.94 UBICACION : I.E. SECUNDARIA
LT-3
-REHABILTACION DE TANQUE ELEVAD
AREA PARA

CF:172.74 CARLOS CUETO FERNANDINI


GENERADOR ELECTRICO

BZ
O

200mm
2
Ø "

H:1.20m EXISTENTE DE V=57.00 M3


2
Ø "

LT-31
LT-12 CT:173.20 DN 110mm
CF:171.91 -CASETA DE BOMBEO PROYECTAD
O

S=0.56% L=47.73m
BZ-93 S=1.00%
H:1.29m
DN 160mm BZ CT:173.73 L=3.76m. -POZO TUBULAR PROYECTADO

17
CT:173.96 S=1.00% CF:172.53DN 160mm LT-30

4.

TUBERIA PVC SN-8


173 DN 110mm

00
CF:172.76 L=5.50m. H:1.20m S=1.00% .00
BZ-97 L=6.21m. S=1.00%
H:1.20m

200mm
MZ-2 CT:172.50 2
Ø "
L=7.03m.
BZ
CF:168.00 Ø "
2
2 Ø "

H:4.50m

m
DN 110mm CT:171.749

S=-5.04% L=53.89
LT-29 LT-62 LT-66 S=1.00% CF:170.519
L=9.17m. H:1.23m BZ-50A

200mm
2 Ø "

CT:171.95 BZ-78 CC-16A

-2
LT-67 CC-15A

TUBERIA PVC SN
CT:171.98
CF:170.38
CF:165.68 CT:175.75 CT:174.28 CT:173.50
IGLESIA DN 160mm
H:6.28m CF:172.70

S=0.80% L=67.47m
H:1.29m CF:174.55 CF:173.48

TUB. PVC SN-8 200mm


S=1.00%

JR. BELISARIO PANDURO


MISIONERA DN 160mm BZ
CC-17A H:1.20m H:0.80m H:0.80m
MAGNETIC

L=7.20m.
"

Ø
S=1.00%
"Ø 2

S=0.62% L=20.32m
172

2
TUBERIA PVC SN-4
.00 L=7.20m. CT:174.00
CC-19A DN 110mm
CF:173.20 BZ
S=5.66%
BZ-83A
2 Ø "

CT:170.63 H:0.80m L=13.81m.


CT:171.23 BN-11A CF:170.03
LT-36
CF:169.53 CT:171.34 0mm H:0.60m

2
DN 11 %

2
DN 160mm DN 110mm

200mm

Ø
"

" Ø
4
LT-39 H:1.70m S=1.52% CF:169.64 S=0.8 m.
LT-38 3 S=5.67%
L=7.54m. L=43.7
2 Ø "

"

H:1.70m L=35.99m.

Ø
LT-37 BZ BZ

S=2.66% L=50.88m
2
DN 160mm BN-9A

2
200mm
"

BZ

Ø
CC-21A CC-20A CC-18A

Ø
S=3.34%
"

BZ-50 CT:172.26

2
Ø "

S=2.89% L=23.47m
CT:170.11 CT:170.32 CT:170.39 L=7.77m. LT-118

2
CT:172.40

TUBERIA PVC SN-2


CC-22A CF:171.16
CF:169.41 CF:169.62 CF:169.59 CF:165.80

200mm
CT:170.10 H:1.10m
BZTA-12A H:0.70m H:0.70m BZ-83 H:0.80m H:6.60m LT-93

TUB.PVC SN-2
BZ-96 CF:169.30 LT-116 LT-117
CT:170.18 CT:170.35 LT-92

S=0.64% L=47.74m
CT:170.54 H:0.80m
CF:168.98 0mm 0mm
DN 11 % CF:168.85 DN 11 %
CF:168.54 H:1.20m 3
S=1.1 m. 8
0mm H:1.50m S=1.0 m.
DN 11 % MZ-22

TUBERIA PVC N° 8
H:2.00m 7 8
4 L=18.6 L=26.5
0mm S=0.8 m.
BZ
DN 11 % L=12.2
1
4 BZ
BN-10A
DN 160mm S=1.0 m. DN 160mm
2
L=30.9 S=4.86% CT:170.50

2
S=3.31%

Ø
"

L=13.42m. E L=7.46m.
JOS CF:169.30
SAN

200mm
" Ø 2

JR. ELEODORO MAYNAS


H:1.20m LT-58
JR. 2
Ø "

LT-94
LT-57

S=-3.35% L=42.58m
LT-40 BZ BZ-39 LT-115
DN 160mm CT:174.39
2 Ø "

LT-95
LT-56 S=1.00% Ø "

CF:173.19

TUBERIA PVC SN-2


2

LT-101 " Ø 2

L=4.09m. DN 110mm
MZ-19 H:1.20m
MZ-12 DN 110mm BZ
S=1.00%
S=1.00% L=6.70m.
LT-114
L=7.00m. DN 160mm
LT-59
BZ-61 S=1.00%

17
CT:172.16 L=3.40m.

1.0
" Ø 2

0
CF:166.11 2 Ø

"
200mm
H:6.05m
BZ-82

200mm
17

S=3.33% L=59.30m
CT:168.62 LT-120
2.0
0

BZ
CF:167.42

S=0.62% L=57.88m

TUBERIA PVC SN-2


MZ-9 H:1.20m LT-98
LT-97A LT-97
17

TUBERIA PVC SN-8


3.0

LT-96
0

LT-99 "

Ø
17

"

Ø
200mm

2
4.0

2
LT-100
0

" Ø
" Ø

2
LT-61

S=-0.60% L=48.72m

2
BZ-60 BZ-77
BZ-48
CT:170.40 CT:174.92
LT-60 CT:172.42

TUBERIA PVC SN-2


CF:169.20 CF:173.72
CF:171.22
LT-55
H:1.20m H:1.20m
BZ-63 H:1.20m BZ
LT-41 CT:168.63 BZ-49
A
JR. MOYOBAMB
BZ
BZ-81 CF:166.78 CT:170.06 200mm
CEMENTERIO TUBERIA PVC SN-2
"

Ø
BZ-80 CT:168.73 H:1.85m CF:166.46

2
S=4 .37 % L=5 7.1 3m
CF:167.13 200mm BZ
SN-2 200mm
CT:169.65 H:3.60m BERIA PVC SN-2
TU TUBERIA PVC .73m
H:1.60m L=56 .1 4m S= 3. 43 % L= 58
CF:168.45 S=2.03%
200mm
BZ

H:1.20m C SN-2
TUBERIA PV 54.81m
S= -0 .57% L=
SN-2 200mm BZ
BZ-79 TUBERIA PVC
LIMITE D

L= 56 .9 0m

200mm
CT:172.54 S=-0 .6 2% LT-105 LT-112
BN-13A A
JR. MOYOBAMB 200mm

2
BZ

2
SN-2

2
TUBERIA PVC

" Ø
CT:172.49 CF:171.34

Ø
"

Ø
"

.28 m

2
55 LT-104
DN 160mm H:1.20m S=-2.39% L= LT-110

5m
CF:171.49 200mm BZ

JR. SAN MARTIN

" Ø
SN-2
S=1.00%
TUBERIA PVC

2.6
H:1.00m
E PROYE

LT-102

2
.46m LT-111
L=11.08m. BZ S=-5.30% L=62

" Ø
TUBERIA PVC SN-4
L=4

2
LT-103

" Ø
"Ø 2

MZ-21

S=0.56%
.
m

L=22.64m

2
S=1.00%
CTO

DN 110m

" Ø
2

" Ø
CC-24A

" Ø
LT-50

2
CT:172.92 LT-49 MZ-20

Ø
"

LT-48 LT-51 BZ-57


CF:171.92

Ø
2
"

CT:168.20

" Ø
H:1.00m LT-44
CF:166.70 LT-110A

" Ø
LT-43

JR. DIEGO ZUMB

2
" Ø 2

H:1.50m
BZ
LT-45

" Ø
2
200mm

" Ø
LT-106
MZ-11 LT-107

2
"

Ø
S=1.37% L=42.85m

2
L=37.92m.

BZ-55
DN 110mm
S=1.00%

LT-108
CT:170.24
JR. BELISARIO PA

TUBERIA PVC SN-2


A
LT-02
CF:169.04 172
.00
LT-52 H:1.20m
LT-53 LT-109 BZ
BZ-56
MZ-10 CT:168.91 200mm
P V C SN-2 m
CF:167.71 RIA 6.82

17
LT-54 TUBE % L=5
MZ-1 H:1.20m S=2.33

0 .0
ND

BZ
BZ

0
200mm
URO

-2
R IA P VC SN .69m
TUBE 6
LT-47 % L=5
"

Ø
S=0.76
Ø " 2

CC-23A

2
CT:172.83 BZ

3.0
0 CF:172.33
17 BZ-54 168.00
"
Ø

H:0.50m BZ-58
2

LT-46 CT:169.43 CT:168.49


m
200m CF:167.29
CF:167.93 -2
LT-42
P V C SN 3.13m H:1.20m
H:1.50m BZ
RIA =5
BZ-53 TUBE =-1.20% L
LT-01 S
CT:171.38
CF:169.48 200mm
H:1.90m P VC SN-2 .89m
RIA 56
BZ TUBE =-2.73% L=
S
SEND
TOW
RMO
UILLE m
JR. G 200m
BZ-52 VC S N-2
m
RIA P 63.94
CT:171.78 BZ TUBE =0.74% L=
BZ-59 S
CF:170.28
CT:172.25
H:1.50m .00
CF:169.95 169 LEYENDA
200mm H:2.30m 00
BZ
P VC SN-2 .77m 171. SIMBOLO
RIA 47 DESCRIPCION
TUBE =-0.67% L=
S
BUZON
2 .00
17
BUZONETA

CONEXION CONDOMINIAL

LINEA DE IMPULSION Ø 90 mm PVC-U

COLECTOR PRINCIPAL Ø 200 mm SN-2

COLECTOR PRINCIPAL Ø 200 mm SN-4

COLECTOR PRINCIPAL Ø 200 mm SN-8

RED CONEXION CONDOMINIAL Ø 110 mm

CR INGENIEROS
LIM

SENTIDO DE FLUJO
ITE

OBRA : FECHA:
VIVIENDAS EXISTENTES
DE

"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN


ENERO-2020
PR

EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL


MAGNETIC
OY

MAGNETIC

PORTILLO, UCAYALI"
EC

PLANO REPLANTEO: ESCALA:


CT= COTA DE TAPA DE BUZON REDES DE DESAGUE (PTAR COMPACTA)
TO

YEC TO 1/750
T E DE PRO
LIM I CF= COTA DE FONDO
DIST : YARINACOCHA LAMINA N°
CCRISAC PROV: CORONEL PORTILLO
H= ALTURA TOTAL DE BUZON

RESIDENTE DE OBRA:

Ing. Jorge Gutiérrez Vela CIP. 206346


DPTO : UCAYALI
SUPERVISOR:
PNSR
RS-03 03 DE 04
LT-185 "

Ø
" Ø

2
" Ø 2

2
" Ø
BZ-44

" Ø
2

2
CT:172.64
CF:167.39 BZ-46

170.00
BZ-24 CT:174.29 JR. VICENTE MAYNAS BZ-47

172.00
BZ-17 H:5.25m

169.00
BZ-12 CT:167.08 CF:173.09 CT:173.97
MZ-18 CT:169.34 CT:166.92 CF:165.08 H:1.20m CF:169.72
CF:167.54 TUBERIA PVC SN-2 200mm
CF:164.72 H:2.00m TUBERIA PVC SN-2 200mm BZ
BZ
H:4.25m
H:1.80m TUBERIA PVC SN-2 200mm TUBERIA PVC SN-8 200mm S=1.08% L=57.41m
200mm H:2.20m BZ
BZ
S=3.41% L=57.39m
TUBERIA PVC SN-2 BZ
S=0.63% L=57.10m S=4.07% L=57.18m
TUBERIA PVC SN-2 200mm
BZ
BZ
S=-3.79% L=57.24m
S=-1.00% L=57.05m
BZ-25
JR. VICENTE MAYNAS

JR. EDUARDO DEL AGUILA


CT:168.17
CF:166.97

200mm
200mm

200mm
H:1.20m LT-194

200mm

S=0.57% L=56.67m
2

2
S=0.99% L=53.95m

2
S=-0.56% L=56.89m

" Ø

Ø
"

LT-195

JR. TUPAC AMARU

2
LT-196

" Ø
170
2

Ø
"

Ø
"

" Ø
S=3.00% L=56.05m

TUBERIA PVC SN-4


TUBERIA PVC SN-2

TUBERIA PVC SN-8


.00
2
LT-193

" Ø

TUBERIA PVC SN-2


IGLESIA

00

JR. MANCO CAPAC


7.
EVANGELICA LT-177A

16
LT-177

MAGNETIC
168
LT-151

JR. UCAYALI
0

.00
8.0
LT-152

16

174.00
LT-178
BZ-11
2 Ø "

CT:167.75 BZ-15
BZ-20 CF:166.40 MZ-32
" Ø 2


2

CT:173.65
CT:169.27 " Ø 2

H:1.35m IGLESIA CF:170.05


CF:168.07 Ø "

PENTECOSTES LT-197A BZ
H:3.60m
MZ-35
2

H:1.20m BZ-21
BZ
MZ-28 LT-153 BZ
LT-179
BZ

CT:169.95 LT-192
CF:167.65
LT-176
H:2.30m
LT-150

MAL
2 Ø "

" Ø 2

200mm
2 Ø "

172.00
200mm

200mm
" Ø 2

200mm
2
Ø "

LT-197

S=-0.54% L=48.23m
S=2.47% L=53.47m

S=0.51% L=58.40m
S=3.94% L=47.76m
LT-191
LT-91

E
170.00
TUBERIA PVC SN-2
TUBERIA PVC SN-2 0

TUBERIA PVC SN-4


168.0

TUBERIA PVC SN-2

CON
169
.00
" Ø 2

LT-154 LT-199 LT-198


LT-175 LT-190 CC-2A BN-1A

LIMIT
BN-5A

" Ø
"

CC-1A

Ø
CT:172.03
"

Ø
BZ-22A
2 Ø "

CT:171.80

2
2
LT-200

2
LT-155 CT:170.28 CT:173.31 CF:171.23 CF:170.60

YAR
2 Ø "

CT:169.10 CC-9A

E DE
CF:169.18 2 Ø "

BN-4A CF:172.51 H:0.80m

" Ø
CF:167.90 CT:172.10 H:1.20m

2
H:1.10m BZ-13A DN 160mm CT:169.32 H:0.80m 110mm
CC-10A H:1.20m DN 110mm CF:171.30 DN

PROY
DN 160mm CT:169.83 S=8.91% CF:168.36
BZ-42A LT-149 S=6.20% S=5.25% BZ-4
CT:170.46 S=7.25% H:0.80m
00 CF:168.33 L=5.16m. DN 160mm
70.
CT:170.68 H:0.96m

TUB.PVC SN-2 200mm


DN 110mm BZ BZ L=47.52m. L=24.39m. CT:171.55
CF:169.55 S=1.41% L=7.66m.

TUB.PVC SN-2 200mm


1

INAC
H:1.50m S=3.02%

S=0.61% L=20.37m

ECTO
CF:169.18 DN 110mm CF:170.35

S=2.71% L=22.34m
H:0.91m L=26.11m. L=8.38m.
200mm

H:1.50m CC-7A CC-6A CC-3A CC-4A CC-5A S=7.28% H:1.20m


BZ-22 CC-8A
BZ
BN-3A JR. SAN JOSE CT:172.21 CT:173.15 CT:173.00 CT:172.85 L=8.71m. BZ
S=2.14% L=18.64m

CT:169.24 CT:170.54 CT:171.27 BZ 169


CC-11A CT:169.50 CF:172.35 CF:172.20 CF:172.05 .00
CC-13A CC-12A BZ
CF:168.04 CF:169.83 CF:170.47 CF:171.41 DN 160mm
BN-8A BN-7A CT:170.51 CF:168.40 H:0.80m H:0.80m H:0.80m S=1.00%
BZ-78 CC-15A CC-16A CT:170.71 CT:170.71
BZ DN 110mm H:1.20m H:0.80m H:0.80m H:0.80m

OCH
CT:171.18 CF:169.71 H:1.10m L=7.59m.
TUB. PVC SN-2

CT:175.75 CT:173.50 JR. SAN JOSE CT:170.84 CF:170.21 S=3.17% BN-2A


CT:174.28 CF:170.01 H:0.80m
CF:174.55 CF:172.70 CF:170.18 CF:169.74 H:0.50m L=17.99m.
DN 110mm
CF:173.48 H:0.70m DN 110mm
DN 110mm DN 110mm DN 110mm DN 110mm CT:171.98
H:1.00m S=7.56%
H:1.20m H:0.80m H:0.80m H:1.10m
BN-6A BZ-13
BZ
DN 160mm S=6.88%
L=20.78m.
S=6.61% S=6.08%
LT-205
S=1.23% S=1.39%
L=15.58m.
CF:170.78 LEYENDA
DN 110mm DN 110mm BZ S=5.11% L=9.67m. L=15.46m. L=11.80m. L=10.84m.
CT:170.34 DN 160mm CT:170.43 H:1.20m
DN 110mm DN 110mm S=0.91% S=1.17% L=7.11m.

2
2
BZ-42

200mm
DN 160mm BZ
SIMBOLO DESCRIPCION

2
CF:168.93

A
BZ

2
S=4.92% L=29.84m. CF:169.14 S=2.60%

Ø
"

L=16.86m.

Ø
"

S=5.66%

" Ø
" Ø
S=8.44% CT:170.98

Ø "
L=6.59m. LT-172

Ø "
L=13.81m. L=51.08m. DN 160mm H:1.20m H:1.50m

2
L=7.16m. LT-207
CF:169.58
Ø "

LT-206 LT-208 BUZON


2

S=1.96% LT-203

200mm
" Ø
LT-204
2

S=2.45% L=55.73m
2

Ø
"

H:1.40m L=8.21m.
" Ø

LT-202
" Ø 2
2
2

200mm

0
200mm

" Ø

LT-159
" Ø

BUZONETA

170.0
2 Ø "

TUBERIA PVC SN-2


S=-1.86% L=55.74m
2 Ø "
"Ø 2

2 Ø "

LT-161
200mm

LT-171

S=3.23% L=46.94m
CONEXION CONDOMINIAL
S=2.66% L=50.88m

LT-209 2

TUBERIA PVC SN-2


17

LT-158
IGLESIA LT-161A 0.0
S=2.57% L=46.36m

TUBERIA PVC SN-2


LT-118 0 LINEA DE IMPULSION Ø 90 mm PVC-U
TUBERIA PVC SN-2

ADVENTISTA
LT-160
TUBERIA PVC SN-2

COLECTOR PRINCIPAL Ø 200 mm SN-2


LT-116 LT-117
COLECTOR PRINCIPAL Ø 200 mm SN-4
LT-210 BZ-3

JR. MANCO CAPAC


MZ-22 BZ-32 CT:172.91 COLECTOR PRINCIPAL Ø 200 mm SN-8
BZ-36 CT:171.85 CF:171.71
CT:171.97 CF:170.45 17 MZ-36 BZ
2 Ø "

1.0
0 H:1.20m RED CONEXION CONDOMINIAL Ø 110 mm
CF:170.77 LT-170 LT-173
" Ø 2

BZ-38
H:1.40m MZ-31
H:1.20m MZ-29 BZ
CT:170.28
SENTIDO DE FLUJO
00 CF:169.08
JR. ELEODORO MAYNAS

BZ 3.
17
2 Ø "

LT-157 H:1.20m

0
171.0
LT-119 BZ VIVIENDAS EXISTENTES
BZ-39 LT-115
2 Ø "

BZ
" Ø 2
JR. TUPAC AMARU

CT:174.39

MAGNETIC
MAGNETIC

CF:173.19
H:1.20m

200mm
" Ø 2
2 Ø " CT= COTA DE TAPA DE BUZON
LT-170A
200mm

LT-114 CF= COTA DE FONDO

S=0.99% L=58.01m
LT-162A
" Ø 2

2 Ø "

H=
S=5.77% L=58.43m

200mm
ALTURA TOTAL DE BUZON
TUBERIA PVC SN-2
Ø "

2
200mm

LT-163
LT-156A LT-174A
TUBERIA PVC SN-2

2 Ø "

S=-1.12% L=66.77m
LT-162
S=3.33% L=59.30m

LT-120

17
174.00
JR. UCAYALI

1.

TUBERIA PVC SN-2


00
LT-164
TUBERIA PVC SN-2

" Ø 2

.00
LT-156 BZ-43
LT-165

172
CT:174.86 LT-169
" Ø

"
Ø

" Ø 2
" Ø

CF:173.66
2

LT-201
END
2

H:1.20m OT OWS
BZ-7 U ILLERM
BZ-77 JR. G
BZ-48 CT:175.34 LT-174
CT:174.92 CF:174.14 JR. MOYOBAMBA BZ-2
CT:172.42 TO
OYEC
BZ
CF:173.72 H:1.20m CT:172.22
E PR
BZ
CF:171.22
H:1.20m
H:1.20m TUBERIA PVC SN-2 200mm BZ

200mm TUBERIA PVC SN-2 200mm CF:171.02


LIM ITE D
BZ
S=0.76 % L=56.24m TUBERIA PVC SN-2 S=-4.48% L=59.03m H:1.20m
S=0.86% L=55.37m 0
BZ BZ-14 173.0
200mm
TUBERIA PVC SN-2 CT:171.82
S=4.37% L=57.13m CF:169.82
BZ
H:2.00m

0
2.0
LT-113

17
2

MZ-30
2

"
2

" Ø
2

" Ø

LT-167 171.00
" Ø
2
" Ø

LT-112 LT-166 LT-168


2
2

" Ø
Ø

"

LT-110
LT-111
0
1.0
17
MZ-21 0
2.0
17

0
3.0
17

0
4.0
LT-110A 17
" Ø
2

SEND
0
174.0
TOW
RMO
UILLE
JR. G
BZ-55
CT:170.24
CF:169.04 172
.00
H:1.20m
BZ
TO
E PR OYEC
LIM ITE D
17
0.
00

OBRA :
CR INGENIEROS FECHA:
"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN
EL CENTRO POBLADO SAN JOSE, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL ABRIL-2020
PORTILLO, UCAYALI"
PLANO REPLANTEO: ESCALA:
REDES DE DESAGUE (PTAR COMPACTA)
1/750

DIST : YARINACOCHA LAMINA N°


CCRISAC PROV: CORONEL PORTILLO

RESIDENTE DE OBRA:

Ing. Jorge Gutiérrez Vela CIP. 206346


DPTO : UCAYALI
SUPERVISOR:
PNSR
RS-04 04 DE 04

You might also like