Importance of LEC: Fig-1. Logical Equivalence Check Flow Diagram

The document discusses the importance of logical equivalence checking (LEC) in the chip design process. LEC verifies that the logical functionality of a design is intact throughout design steps like synthesis, placement, routing, and optimizations. The document outlines the three main steps of LEC - setup, mapping, and comparison. It provides examples of how to analyze LEC reports to debug failures by identifying missing connections or incorrectly mapped logic. Maintaining logical equivalence is critical to ensuring the design's functionality is not broken during the design process.

Uploaded by

Srinath M S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views7 pages

Importance of LEC: Fig-1. Logical Equivalence Check Flow Diagram

The document discusses the importance of logical equivalence checking (LEC) in the chip design process. LEC verifies that the logical functionality of a design is intact throughout design steps like synthesis, placement, routing, and optimizations. The document outlines the three main steps of LEC - setup, mapping, and comparison. It provides examples of how to analyze LEC reports to debug failures by identifying missing connections or incorrectly mapped logic. Maintaining logical equivalence is critical to ensuring the design's functionality is not broken during the design process.

Uploaded by

Srinath M S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Importance of LEC

 Design passes through various steps like synthesis, place and route, sign-offs, ECOs
(engineering change orders), and numerous optimizations before it reaches production. At
every stage, we need to make sure that the logical functionality is intact and does not break
because of any of the automated or manual changes. If the functionality changes at any
point during the entire process, the entire chip becomes useless. This is why LEC is one of
the most important checks in the entire chip design process.
 With shrinking technology nodes and increasing complexity, logical equivalence
check plays a major role in ensuring the correctness of the functionality.

LEC comprises of three steps as shown below: Setup Mode, Mapping Mode and Compare
Mode.

Fig-1. Logical Equivalence Check flow diagram

There are various EDA tools for performing LEC, such as Synopsys Formality and Cadence
Conformal. We are considering Conformal tool as a reference for the purpose of explaining
the importance of LEC.

Steps for Logical Equivalence Checks

Let’s take a close look at the various steps of logical equivalence checks:
1) Setup

In the setup mode, the Conformal tool reads two designs. We designate the design types,
which are Golden (synthesized netlist) and Revised (generally, the revised design is the
modified or post-processed design that the Conformal tool compares to the Golden design).
For the execution of LEC, the Conformal tool requires three types of files.

1. <design_name>.lec file guide the Conformal tool to execute different command in a


systematic way.
2. <design_name>.scan_const file provides scan related constraints like if we want to
ignore some scan connections/serdes input/output pins which are defined in this file.
3. <design_name>.stdlib file contains pointer of standard cells library.

In the transition from setup mode to LEC mode, the Conformal tool flattens and models the
golden and revised designs and automatically maps the key points. The key points are
defined as:

 Primary Inputs
 Primary Outputs
 D Flip-Flops
 D Latches
 TIE-E Gates (error gate, created when x-assignment exists in revised design)
 TIE-Z Gates (high impedance or floating signals)
 Black boxes
2) Mapping

During the second phase of equivalence checking, the Conformal tool automatically maps
key points and compares them. When the comparison is complete, it pinpoints the
differences. The Conformal tool employs two name-based methods and one no-name
method to map key points. Name-based mapping is useful for gate-to-gate comparisons
when minor changes have been made to the logic.

Conversely, the no-name-mapping method is useful when the Conformal tool must map
designs with completely different names. By default, it automatically maps key points with
the name-first mapping method when it exits the setup mode. The key points that the
Conformal tool does not map are classified as unmapped points.

Unmapped points are classified into three categories:

 Extra unmapped points are key points that are present in only one of the designs,
Golden or Revised.
 Unreachable unmapped points are key points that do not have an observable point,
such as a primary output.
 Not-mapped unmapped points are key points that are reachable but do not have a
corresponding point in the logic fan-in cone of the corresponding design.
3) Compare

After the Conformal tool maps the key points, the next step of the verification is
comparison. Comparison examines the key points to determine if they are equivalent or
non-equivalent. The comparison determines if the compared points are:

 Equivalent
 Non-equivalent
 Inverted-equivalent
 Aborted

In the case of aborted compare points, we can change the compare effort to a higher
setting. Thus, the Conformal tool can continue the comparison on only the aborted compare
points. The Conformal tool displays the completed run time and total memory used for the
comparison.

Multiple reports are generated once LEC is completed:

 Non-equivalence report
 Unmapped report
 Blockbox report
 Abort.rpt
 Unreachable.rpt
 Floating.rpt
 Mapped.rpt

At the time of sign-off or tapeout phase, the schedule is too tight to handle blocks with
some critical logical failure. At times, the logical connectivity is broken while doing manual
fixes or timing ECOs. The chances of a logical breakdown will be high at the tapeout phase
where the physical design engineer does not have much time for block closure. Also, the
chances of breaking logical connectivity are high, when you get the functional ECO and do
the manual connection. Let’s take a look at a practical example of LEC failure in a block and
see how it can be solved.

Sample case

First of all, do not panic if LEC fails during any of the levels, discussed earlier. When LEC is
failing, the first step is to check the "non-equivalent.rpt” file. It may be possible that due to
one broken connection, a higher number of cell names are reported in the "non-
equivalent.rpt" file.
The reason behind is that many paths which are going through one failed/broken connection
– and hence all its endpoints (compare points) – are reported “Non-equivalent”.

Step 1: Non-equivalent Report

The first step is to check the non-equivalent file. The sample non-equivalent file below
shows the 152 compare points that are failing in in LEC.

These 152 flip-flops reported as non-equivalent are the multibit flops. In multibit flops, we
merge two flops to form a single flop having multiple input and output pins. For example, if
we merge two single bit flops into one multibit flop, it will have D0,D1 as input pins and
Q0,Q1 as output pins.

Because of multibit flops, the report is showing 152 flop count as non-equivalent, but
actually only 72 are non-equivalent. As these are two bit flops, the total count is 72x2=144
flops. The remaining are single bit flops.

Step-2: Unmapped Report

Next step is to check the unmapped file. This file shows the unmapped nets where the
logical connectivity is broken. We need to trace nets and find out the missing connection of
those nets.
In the above image, we can see that one net (BUFT_net_362908) is not mapped in the
design. As it can be seen in Fig-2, once we check this net (BUFT_net_362908) connection in
LEC fail database, we see that it is connected only to the input pins of other cell
(*_364714/A), but the other connection (driver side) of this net is missing due to
unintentional cell deletion.

The highlighted net in the below figure shows the net reported in the unmapped.rpt file.

Fig-2. Net reported in unmapped report

Here, we can see the connection of reported net in the LEC fail design.

While we do the fanout of net (BUFT_net_362908) which is reported in unmapped file, it is


connected to 152 flops in LEC pass database.

Whereas 152 flops reported in non-equivalent file in LEC fail database are same as fanout of
net (BUFT_net_362908) reported in LEC pass database.
Now, we need to find the actual net connection of this net in the previous LEC pass
database. While checking, we can easily note that the reported net is connected to one
inverter which is missing in the LEC fail database.

For finding the missing cell, we have to back trace this net in the previously LEC passed
database and check actual connections.

Do not get confused between un-mapped and non-equivalent reports. In the un-mapped
report we only see the floating nets of the undriven input pins, whereas in the non-
equivalent report we see all the cells which are fanouts of this missing cell.

Step 3: Fix the LEC Issue

After finding the reason for the LEC failure, we have to insert one missing inverter and redo
the input/output logical connection of this inverter in the LEC failed database. Fig-3 shows
the newly added inverter and its input-output connection. Now, if we rerun the LEC it will
pass and non-equivalent report will show zero non-equivalent points.

Fig-3. Fix the missing connection


Common areas where LEC fail
 If multibit flops are used in the design, then the issue of mapping golden netlist
versus revised netlist will crop up, as flop names will be changed in revised netlist.
 Clock gating cells not getting mapped after cloning in revised netlist.
 Logical connectivity breaks during timing fixing or while doing manual ECO.
 Functional ECO implementation.
 Missing DFT constraints.
Benefits of LEC
 Less reliance on gate level simulation.
 Boosted confidence in new tool revisions for synthesis and place & route.
 Watch-dog for poor RTL coding areas in the design.
 Nearly exhaustive proof of equivalence without writing test patterns.
 Decreased risk of missing bugs inserted by the back-end process.

C Cadence Conformal C.1 The golden and revised design files ”ones syn.vhd” and ”ones syn1.vhd” are
here: [http://users.encs.concordia.ca/∼tahar/coen7501/ones syn.vhd], and
[http://users.encs.concordia.ca/∼tahar/coen7501/ones syn1.vhd] The ”class.db” and ”class.lib” library
files used in this tutorial are located in: [/CMC/tools/synopsys/syn/libraries/syn/] directory. C.2 The
command script //*********************************************** // design input
//*********************************************** Read Design -golden ones_syn.vhd Read
Library -both class.lib Read Design -revised ones_syn1.vhd report design data -both
//*********************************************** // design preparation and key points
mapping //*********************************************** set system mode lec
//*********************************************** // compare mapped key points
//*********************************************** add compare point -all compare
//*********************************************** // reporting result
//*********************************************** report compare data -summary