MOP For Manual LTE ENodeB Integration - Site
MOP For Manual LTE ENodeB Integration - Site
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Contents
1 Introduction .......................................................................................... 2
2 Revision ................................................................................................ 2
3 Preparation ........................................................................................... 2
3.1 Field tool requirements ............................................................. 2
4 Summary Time Plan ............................................................................. 3
4.1 Summary time plan .................................................................. 3
5 Network Impact .................................................................................... 3
6 Detailed Plan ........................................................................................ 3
6.1 Integration phase...................................................................... 3
6.1.1 Formatting DUS........................................................................ 3
6.1.2 Copy source to DUS ................................................................. 6
6.1.3 Setting the date and time on eNodeB ....................................... 9
6.1.4 Integrate enodeB ...................................................................... 9
Ericsson Internal
METHOD OF PROCEDURE 2 (16)
Prepared (also subject responsible if other) No.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
1 Introduction
2 Revision
3 Preparation
The field engineer should have a laptop with the following software
The field engineer should have the following cables to connect to the DUS
board.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
5 Network Impact
None
6 Detailed Plan
During the integration phase a field engineer will go to the site and do
commissioning which is explained in the steps below.
Since the DUS from the factory may contain different software, it is
recommended to format the DUS and load the required software L16A. The
steps for formatting are as shown below
Connect the serial cable to the LMT A port of DUS. Start the secureCRT
software and choose the correct USB interface.
Ericsson Internal
METHOD OF PROCEDURE 4 (16)
Prepared (also subject responsible if other) No.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
If prompted for a user name and password in the terminal please enter
rbs/rbs. Once logged in the terminal should look as shown below.
On the SecureCRT, the eNodeB has to be brought to the backup mode. This
is done by using the reload -- command
Ericsson Internal
METHOD OF PROCEDURE 5 (16)
Prepared (also subject responsible if other) No.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Check the disk volume by using the vols command. If /c2 is missing we will
have to mount it by command as below
mount_c2
formathd /c2
formathd /d
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Now a default IP address is configured for the eNodeB. This is done by the
following command.
Now that the DUS is formatted we can transfer the Package (/c2 and /d) to
the DUS. In order to do that the first step is to connect a LAN cable from the
laptop to port LMTB of DUS.
Set IP address of the laptop should be set as 169.254.1.11. The subnet mask
should be 255.255.0.0 and the gateway should be 169.254.1.10
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Now select both /c2 and /d in the laptop and upload them to the DUS.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
We have to set the clock on the eNodeB so that the integration unlock
functionality can work well. The clock can be set by the command setclock as
shown below.
Open RBS Element Manager, then click on Tools and Integrate RBS.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Checked on:
1. Do not use Security Activation
2. Do not use IP Security Activation
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
.
Ericsson Internal
METHOD OF PROCEDURE 14 (16)
Prepared (also subject responsible if other) No.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
2. Cabinet define
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
Ericsson Internal
METHOD OF PROCEDURE 16 (16)
Prepared (also subject responsible if other) No.
Minh Le C
Approved Checked Date Rev Reference
2016-04-01
For manual integration, we will not be seeing the above message as the
transport, radio and feature state scripts are not yet executed on the
node. The execution for manual integration stops at 80%.