Acme Transfer Warehouse: Getting Started 1 Print Kit Pages
Acme Transfer Warehouse: Getting Started 1 Print Kit Pages
Getting Started
1.4
Tip: We like applying glue to the mat board. Applying glue to the paper
stretches the paper resulting in pieces of the wrong size. Surprisingly, this
Using glue stick apply glue to Exterior
is a model of precise piece sizes and applying glue in this fashion helps
Texture tabs. Wrap and glue tabs around
ensure a good result.
side edges first, top edge last.
Another Note: We hate to use specialized tools but we couldn’t figure out
a reasonable way to make the roof vents without an adjustable punch.
These are readily available at craft and hardware stores for around $5. We
will continue to make use of this tool for various details in our models so it 1.5
could be a good investment.
Using glue stick apply glue to poster
board being sure to thoroughly cover
an area slightly larger than the Interior
Wall Texture. Press Interior Wall Texture to
Assembly Instructions: poster board.
1.6
Section 1: Standard Wall Pieces Cut out Interior Wall with knife.
Use these steps for solid walls with no windows and doors, and for walls
with windows and doors where will not be inset. For craftsman wall pieces
with inset windows and doors skip to Section 2. You can elect to make
some wall pieces Standard and some Craftsman. Standard Walls are faster
and easier to construct while Craftsman Walls add extra detail and the 1.7
opportunity to open freight doors and windows.
Using glue stick glue Interior Wall piece to
A Standard Wall piece is made of a mat board exterior wall and an poster backside of Exterior Wall piece, aligning
board interior wall. The poster board interior provides structure and the bottom of the Interior Wall to the blue
guiding for later glueing to the roof and floor. alignment line and centered side to side.
NOTE: For corner walls, align Interior Wall
1.1 to the blue alignment line and the right
edge of the Interior Wall with the edge of
Glue Standard Wall Base to mat board. the Exterior Piece. This leaves a gap left of
Using glue stick apply glue to mat board the Interior Wall piece for mating to the
being sure to thoroughly cover an area next wall.
slightly larger than the Standard Wall Base.
Press Standard Wall Base to mat board.
2.2 2.9
Cut out Wall Base with knife. Cut out Using glue stick glue Craftsman Interior
window and/or door opening. Wall Texture to Interior Wall Base. Note
pieces A and B do not have windows
or doors. Therefore these walls are
constructed like a Standard Wall where the
interior texture is on the Interior Wall Base
and no Interior Wall Texture is used.
2.3
2.6
2.10b Windows
Using glue stick apply glue to poster board
being sure to thoroughly cover an area For hinged windows such as some panes of
slightly larger than the Craftsman Interior an industrial window, cut along the sides
Wall Base. Press Craftsman Interior Wall and bottom of the pane, lightly score the
Base to poster board. exterior top edge, and gently fold open the
pane.
2.7
2.11
Cut out Interior Wall Base with knife.
Using glue stick glue Interior Wall piece to
backside of Exterior Wall Piece, aligning
the bottom of the Interior Wall to the blue
alignment line and centered side to side.
NOTE: For corner walls, align Interior Wall
2.8 to the blue alignment line and the right
edge of the Interior Wall with the edge of
For Office Walls only (pieces a-d), glue the the Exterior Piece. This leaves a gap left of
Office Wall Exterior Wall Base Texture to the the Interior Wall Piece for mating to the
Interior Wall Base in the blue alignment next wall.
box. The Exterior Wall Base Texture will
extend past the Wall Base slightly.
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 3 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!
Acme Transfer Warehouse Finish: Concrete Gauge: All Item: ATC
3.1 4.1
Using glue stick or spray adhesive Using PVA glue, apply glue to inside of
apply glue to mat board being sure to Wall Piece just below Interior Texture
thoroughly cover an area slightly larger edge. Press and hold wall piece to Floor
than each roof and floor texture. Press roof edge, aligning the left exterior edge of the
and floor textures to mat board. There are wall piece with the corner of the Floor. Be
separate roof and floor textures for the careful to keep the Wall Piece vertical and
warehouse and office building portions. perpendicular to the floor while the glue
sets, about 10-20 seconds.
3.2
4.2
Cut out roof and floor pieces with knife.
Using PVA glue, apply glue to inside of
Wall Piece just below Interior Texture and
to the left Wall Piece edge. Press and hold
Wall Piece to Floor edge, aligning the left
edge of the Wall Piece with the right edge
of the previous Wall Piece, aligning top and
bottoms. Keep the Wall Piece vertical and
perpendicular to the Floor while the glue
sets.
Section 4: Assembling Walls to Floor and Roof
Wall pieces are glued to the floor beginning at the right side of a corner 4.3
of the floor, and adding each additional wall piece around the floor in a
clock-wise direction. The last wall piece along a wall will extend past the Repeat step 4.2 for each remaining Wall
floor corner the thickness of the perpendicular next wall piece. Piece along this wall. The last Wall Piece will
extend past the Floor to form a corner with
For the warehouse portion of this model we have laid out the Wall Pieces the next wall.
in the following order. Start with Wall A and proceed to Wall B, etc.:
L K J I H 4.4
G
M
Proceeding around the Floor in a counter-
clockwise direction, repeat step 4.2 to glue
the first Wall Piece of the next wall, aligning
the left exterior edge of the Wall Piece with
the right inside edge of the previous wall.
F
N
4.5
A B C D E
d
a
4.6
b c
Using PVA glue, apply glue to the
Roof edge along each of the two sides
corresponding to the two walls previously
completed. Fit, square, press and hold the
roof to the top edges of the interior wall
textures until the glue sets, about 10-20
seconds.
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 4 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!
Acme Transfer Warehouse Finish: Concrete Gauge: All Item: ATC
6.4
4.12 Using glue stick glue Top Stair Texture to
Top Stair Base, wrapping texture around
Using PVA glue the Office Roof to the top front edge only.
of the Interior Walls.
6.5
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 5 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!
Acme Transfer Warehouse Finish: Concrete Gauge: All Item: ATC
6.6 7.4
With glue stick glue remaining Top Stair Using glue stick on one side glue the end
Texture around unfinished end of all stairs. tabs and then the side of the HVAC Unit
Texture to the HVAC Unit Top and Bottom.
Be sure to square up the box shape of the
unit. Repeat for the other end tabs and
side.
6.7
7.5
Using glue stick glue Wall Texture to Wall.
Wrap, fold and glue side tabs, followed by With glue stick glue Duct Base Sides to mat
top tab. board. Cut out pieces.
6.8
7.6
Using PVA glue Wall to side of Stair so that
stairs lead down to the left.
Pre-fold Duct Texture. Using glue stick glue
the long edge of Duct Base Side along the
long fold of the Duct Texture as shown.
Repeat for the second Duct Base Side
6.9 along the opposite long fold.
7.8
7.1
Using PVA glue the HVAC Unit to the
With glue stick glue HVAC Unit Top and Roof of the Office, centered and to one
Bottom to mat board. Cut out pieces. side, with the gray square marked “Duct”
pointing to towards the open Roof. Using
PVA glue the Duct to the Roof so the
unfinished end of the Duct meets the
HVAC Unit at the small gray square marked
7.2 “Duct” as shown.
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 6 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!
Acme Transfer Warehouse Finish: Concrete Gauge: All Item: ATC
8.2 9.1
Each Base piece will be rounded over Cut out Bumper Board Base strips. Don’t
on top and concave on the bottom. It is separate Left, Middle and Right just yet.
important to keep this orientation as we
glue the pieces together. Using PVA glue
each pair of Vent Stand Bases together as
well as each pair of Vent Cap Bases.
9. 2
8.3 Pre-fold flaps top and bottom of Bumper
Board Textures. Cut out Bumper Board
Using glue stick wrap and glue Vent Stand Textures.
Texture around Vent Stand Base. Note:
Wrap the Stand Texture with the darker
edge towards the rounded over end of
the Stand Base. Repeat this process for
remaining Stand Bases as well as Cap
Textures around Cap Bases.
9. 3
9. 4
8.6 9. 5
Using PVA glue bottom of Vent Stand to Glue finished boards over the pre-printed
Warehouse Roof. We recommend centered Bumper Boards below the three truck
down the centerline of the Roof aligned at loading doors of Walls C, D and E. For Left
each Wall seam. and Right Bumpers keep the light edge up.
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 7 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!
Acme Transfer Warehouse Finish: Concrete Gauge: All Item: ATC
11.1
10.1
Cut out Loaded Pallet Bases. There are two
bases per Loaded Pallet.
Cut out Pallet Bases. For HO scale there is
one mat board base per pallet. For N scale
glue 2 poster board Pallet Bases together
to create the proper thickness.
11.2
a)
10. 3 11.3
Glue and wrap Pallet Textures around Pallet Working quickly, wrap and glue the side
Bases using glue stick, beginning with the flap, followed by the remaining three sides
a) Side flaps, b) bottom flap A, and ending of the Loaded Pallet.
with c) bottom flap B.
b) 11.4
c) 11.5
Wrapping Up
We have included optional signage for the company marquee, doors and walls around the building. Use them as you’d like. You now have the elements to
build your warehouse scene. You may wish to have a paved parking lot or a gravel lot. Place your warehouse - glue to the layout as you prefer. Using your
longest rail car make sure you leave enough room between the warehouse and the track.
Congratulations! You’re finished! Thank you for building our Team Track Models’ Acme Transfer Warehouse. Please share your experience with us and your
railroading friends.
Best wishes from Aaron and John and Team Track Models.
Copyright © 2017 Team Track Models. Thank you for purchasing our design. You may print out this page as many times as you like for your own use. You
Page 8 of 8 may not share this file or printouts of this page, but instead ask you to kindly direct others to our website at TeamTrackModels.com. Happy modeling!