Ras Markaz Crude Oil Park Project (Phase1) : Site Inspection and Testing Procedure

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

SITE INSPECTION AND TESTING PROCEDURE


Doc No: 9686-6150-PR-000-0029 Rev. 03 Doc. Class 1 /Cat: 2

• Welding Procedure Qualification reports

• Welder / Welding operator qualification test records

• NDE records inclusive of RT, UT, MPT, DP, visual as applicable

• Radiographs

• PWHT records

• Coating and painting qualification report inclusive of test reports

• All records of tests performed in connection with the WORKS, inclusive of all onsite tests and
any off-site tests.

• Final Quality Control reports carrying Company Approval by activity and discipline inclusive of:

 Civil works

 Structural Works

 Piping Works

 Mechanical Works

 Electrical Works

 Instrumentation Works

 Telecoms Works

 Pipeline Works

 Painting Works

 Insulation Works

 Materials certification

 Final KPI and Quality Metrics for the entire Works