Ras Markaz Crude Oil Park Project (Phase1) : Site Inspection and Testing Procedure
Ras Markaz Crude Oil Park Project (Phase1) : Site Inspection and Testing Procedure
• Supervise and coordinate all QA/QC activities at work place during construction phase.
• Lead and provide guidance to all site QA/QC Engineers and inspectors.
• Interface and coordination with client QA/QC contact point for all QA/QC related matters.
• Responsible for conducting all internal inspection at site through dedicated QC Inspectors of each
discipline
• Continuous monitoring and surveillance at site for quality compliance before, during and after
execution.
• Ensure that all site audits are conducted as per approved project Audit schedule
• Generate non-conformance reports – if any within project scope and follow up for corrective actions
as per the procedure. Closure of NCR correction shall be up to the satisfaction Company.
• Perform weekly QA/QC site walk with EPC Contractors / Subcontractors personnel
• Monitor EPC Contractors and sub-contractors site QA/QC performance and implement appropriate
improvement action if required.
• Organizing site inspection and testing activities, reviewing and issuing site NCRs to the responsible
parties and monitoring the execution of corrective actions.
• Identifying risks related to quality management and devising mitigation measures as required.
• Monitor the execution of outcome from quality audit and management review.
• Ensure all quality control documentation is compiled and completed for hand over.
Page 8 of 24