1650 E Olive Way: Proposed Mixed-Use Development DPD # 3002133 January 19, 2011 Design Review Recommendation
1650 E Olive Way: Proposed Mixed-Use Development DPD # 3002133 January 19, 2011 Design Review Recommendation
1650 E Olive Way: Proposed Mixed-Use Development DPD # 3002133 January 19, 2011 Design Review Recommendation
The proposed project is an 7-story mixed-use condominium building containing 76 residential units above 2 live-
work units (78 total) and retail / office uses at the street level. Parking for 52 vehicles will be located in a below
grade parking garage, which is accessed from Belmont Ave E to the west of the site. The five existing structures
on site will be demolished. The site is zoned NC3-65 and MR. The building mass on the site responds to this
zoning context and the many projects currently under construction or permit review on adjacent blocks.
PROJECT HISTORY
Early Design Guidance meetings were held on April 19th 2006, January 21st 2009, and March 4th 2009.
The latest Master-Use Permit submittal was November 19, 2010.
PROJECT
SITE
NORTH
ZONING MAP (NTS)
1 2 3 4 5 6
7 8 9 10 11 12
BOYLSTON AVE E
• Mix of multi-family buildings, and commercial, retail
E HARRISON ST and office buildings
SUMMIT AVE E
LL
NHI
BELMONT AVE E
DOW • E Olive Way is a busy arterial; Belmont Ave E
relatively quiet
SAN REMO
THOMAS ST.
APARTMENTS E THOMAS ST • Close to Broadway commercial district
MINI PARK
BROADWAY E
LL Not currently strong for retail, but changing
MELROSE AVE E
•
NHI
DOW FIRST HILL/CAPITOL HILL Buildings vary widely in style and age
BELLEVUE AVE E
•
URBAN CENTER VILLAGE
East Olive Way
VIEW
NC3-40 • Across the street from a 3 story office building, a
6-story mixed use building, and a 1-story
commercial building
VIEW NC3-65 E OLIVE WAY • Busy with vehicular and pedestrian traffic
E JOHN ST
• Street parking on both sides
HARVARD AVE E
E JOHN ST
BOYLSTON AVE E
• Slopes down to the west and begins turning south
10TH AVE E
W at the project site
V IE
MR E LORETTA PL
• Street trees are sporadically placed
Mixed building scales (Street-level parking to 6
W
•
stories)
VIE
LL
NHI
DOW Belmont Avenue East
NAGLE PL
WARD
E DENNY WAY HOUSE PANTAGES • Narrow, quiet street
HOUSE CAL
ANDERSON • Mostly 3 to 6-story apartment buildings
MR SEATTLE COMMUNITY
COLLEGE
PARK
• Pedestrian-friendly streetscape
EO
• Alley has residential patios at ground level with gate access L/W
UNITS
LIVE
PLAZA
COURT
Amenities & Views GARAGE YARD CAFE
WA
ENTRY
• Landscaped courtyard, streetscapes, & roof deck provide
Y
comfortable social spaces
BELMONT AVENUE E
• Excellent city & mountain views
• Live/Work units bring additional pedestrian activity to Belmont
Ave E and courtyard
SINGLE
FAMILY PARKING
SAN REMO SAN REMO SEALTH
BELMONT PLACE LOT
3-STORY 2-STORY VISTA
6-STORY
BRICK BRICK 3-STORY
MULTI-FAMILY
MULTI- MULTI- BRICK
FAMILY FAMILY MULTI-FAMILY
NORTH
Side Setback For portions of a struc- Below 42’ from grade, we 3% less than required average The proposed building massing modulates A-5 Adjacent Sites
(SMC 23.45.518 ture <42’, 7’-0” average have an average side set- side setback and waiving mini- north façade and helps strengthen existing B-1 Hght, Bulk, Scale
Table A) setback with a 5’-0” min. back of 6’-9.5” with a 2” mum requirement for lower courtyard on adjacent site. The Board C-1 Arch Context
is required. minimum. portion of structure. conceptually approved this building con- D-1 Pedestrian Space
figuration at EDG, as an area offset for the E-3 Site Conditions
For portions of a struc- Above 42’ from grade, we 4% less than required average upper level setbacks that respect the adja-
ture >42’, 10’-0” average have and average side set- side setback for upper portion cent buildings.
setback with a 7’-0” min. back of 9’-7.5” with 8’-1” of structure.
is required. minimum.
DIAGRAM FROM LAND USE CODE
Parking Access Access to parking shall be Parking access is proposed To allow parking access from Street access was the only EDG where the A-1 Site Charact.
(SMC 23.45.536) from an improved alley from Belmont Ave E. street rather than alley. Board was unanimous. Our proposed de- A-4 Human Activity
sign greatly reduces the amount of parking A-8 Parking Access
garage visible above ground and maintains A-9 Parking Location
the alley as a pedestrian environment with C-5 Parking Struct.
at grade patios. D-2 Blank Walls
D-5 Visual Impacts
Sight Triangle 10’x10’ triangle at right 5’-6”x 5’-6” sight triangle to 45% reduction in required size A full-size sight triangle would eliminate A-2 Streetscape
(SMC 23.54.030) side of exit lane. pedestrian sidewalk of site triangle the column immediately north of the vehi- A-8 Parking Access
cle entry and hurt the overall look of the A-9 Parking Location
building. We are providing convex mirrors B-1 Hght, Bulk, Scale
which are allowed downtown in lieu of C-2 Arch Concept
triangle. C-4 Ext. Materials
D-5 Visual Impacts
NC3-65’ ZONE (NEIGHBORHOOD COMMERCIAL)
Development
Design Review
Standard Requirement Proposed Departure Amount Reason for Departure
Guidelines
Nonresidential 13’ floor to floor @ 12’-8” @ SE commercial 4” reduction in floor-to-floor The floor elevation of the SE commercial A-1 Site Charact.
Space (Height) street-Level non- space along E Olive Way for one commercial space. space is set to align with the existing grade A-2 Streetscape
residential space along E Olive Way. The horizontal loca- A-3 Visible Entrances
(SMC
tion of the entrance is set relative to the C-2 Arch Concept
23.47A.008) facades above, and the floor elevation D-1 Pedestrian Space DIAGRAM OF DEPARTURE AREAS
Public Courtyard
Belmont Avenue E
Deck
Deck Deck
• Main residential entry and shared courtyard
ST+ ST+ 1/1
• Maximized commercial transparency and minimized blank wall
Dec
1/1 1/1 +
2/2
k
• 2 Live-Work units north of courtyard
• Accent paving defining area of café seating
E Olive Way
E O
• Commercial space @ SW corner with recessed corner entry
Dec
LIV
Corridor 2/2
• Truncated corner with large plaza space
E
• Large continuous commercial space stepping up slope with ability to subdivide ELEVS
WA
• Recessed commercial entry dividing mass of facade
Deck
1/1
Y
Garage
Dec
k
• Parking access from Belmont Ave E
1/1 1/1
• Garbage & recycling room inside building
• Transformer room and meters completely inside garage 2/2
Deck Deck
• P1 Level provides van access to commercial space
1/1 1/1+ 1/1
• Long-term bicycle parking secure inside garage
Live/Work
Deck Deck Deck Deck
• 2 live/work lofts accessed from Belmont Ave E
• Direct pedestrian access from street and courtyard BELMONT AVENUE E
• Marquees over entries LEVELS 4-5
• Generous commercial glazing provides “eyes on street and courtyard ” at all hours
(3 SIM)
ALLEY ALLEY
ENTRY
E
E O
OL
BICYCLES Corridor
LIV
IV
DOWN TO ELEVS ELEVS
E
P2
E W
ST
W
AY
AY
Patio
RESIDENTIAL
TRASH
Open
LOBBY CAFÉ/ EXIT L/W L/W 1/1 1/1 to
RESTAURANT UNIT UNIT Below
LIVE/ LIVE/
WORK WORK
UNIT UNIT ENTRY Garage
COMM. COMM. Below Open to Open to
Courtyard Below
ENTRY ENTRY Below Below
COURT-
YARD PLAZA
GARAGE L/W L/W CAFE
ENTRY ENTRY ENTRY
BELMONT AVENUE E
BELMONT AVENUE E
LEVEL 1 LEVEL 2
E O
MR zone Deck
LIV
Roof Deck
Private Private Vestibule
Private Private
E W
• Public areas for all tenants and guests Deck Deck Private
Deck Deck ELEVS Deck
AY
• Private decks for east-facing units with direct access from mezzanines
PUBLIC ROOF
• Tree planters separate spaces and frame views to west and south DECK
PUBLIC ROOF
• Green roof trays reduce amount of exposed roof membrane DECK
Green Roof
Trays
Trellis Below
BELMONT AVENUE E
LEVEL 7 MEZZANINE
ALLEY ALLEY
Deck
Deck
E O
E O
2/2 Corridor 2/2
LIV
Corridor
LIV
ELEVS E ELEVS
E
WA
WA
Deck
1/1
Y
Y
1/1 1/1 1/1 1/1
2/2 + 1/1
2/2 2/2
Deck Deck Deck Deck
ck
De
Terrace Terrace
Deck Deck
BELMONT AVENUE E
LEVEL 6 BELMONT AVENUE E LEVEL 7
Landscaping
Upper level around Trellis over Mezzanines and Truncated Existing 6 story
setbacks in Articulated shared tenant upper level private roof decks Elevator/stair Articulated Brick corner w/bay multi-family building
MR zone metal siding roof deck terraces for east units penthouse metal siding facade window beyond
E Olive Way
Existing 6 story Existing Ornamental Vehicle Live-work Brick façade Wood siding Café seating Banded brick Existing
multi-family apartment metalwork entry units w/corbels w/concrete frame at along veneer at commercial
building building above above residential entry Belmont Ave E commercial level building
vehicle entry
Recessed Stepped
Truncated decks building massing Existing
Existing 6 story
corner w/bay Articulated Shared Elevator/stair w/accent relative to commercial
multi-family
window metal siding roof deck penthouse color rails sloped site structure beyond
structure
Alley
Belmont Ave E
Existing New street Translucent marquee Stepped Banded brick Recessed Metal siding Brick Existing
apartment trees w/transom concrete base veneer at commercial spandrels to facades mixed-use
building windows above relative to commercial entry group structure
sloped site level windows
E Olive Way
New street Banded brick Brick façade Picket Sconce lights Wood gates Wood siding Brick veneer on Existing apartment Existing 6 story
trees veneer at w/recessed rails along alley from patios horizontal slats planter walls/car building multi-family
commercial steel channels streetscape to alley barriers building
base
Alley
Belmont Ave E
Existing 6 story Existing residential Ground level Blank façade at Ground level patio Brick façade New street Existing apartment
multi-family apartment structure patios along alley property line at existing courtyard w/corbels trees building
building beyond on adjacent property above
14
Fiberglass Operable Residential Window Frame: 6 14 14
Cascadia; Silver With Dark Grey J-Trim
19 19
5 5
7
17
Residential Metal Deck Rail Powder Coated and Painted:
Benjamin Moore Citrus Orange 9
13
13
18
18
14
11
2
10 17
4
4
6 14 14
19 19
15 15
7
15
2
15 12
12
14
10 17 10
13
13
18
PRIVATE 9 Sedum 2
DECK
PATIO 11 11 11
4 10
SHARED ROOF DECK
4 SHARED ROOF DECK 4
8 Bowhall Maple 10
4
NORTH
1 2
1
2 1
LED Down Lights at Entry Marquees
National Specialty Lighting 1 1 1 1
LED Minidisc Light 1
1
3 1
3 3
1
3 2
1
1 2 1 1
3 Safety lighting 3
4
1 1
LBL Lighting 4
4
Visir 30 Metallic Gray 2
1
1 2 1 2 1 1 1 1 1
1 2
4 Festival lights
Ooga Lights
M-24 Medium Base w/
25watt clear bulbs @ 24” o.c.
Steel C-channel
frame Translucent
polycarbonate
Wall Sconces
Black Storefront
Festival Lighting
Live-Work Units
Brick Façade
ROY STREET TOWNHOMES Completed 2010 CHELAN RESORT SUITES Completed 2007
WESTLAKE VILLAGE Completed 2008 222 VIEW APARTMENTS Completed 2010 THE DAKOTA CONDOMINIUMS Completed 2009
6TH AVENUE MIXED-USE Construction Documents MARKET STREET APARTMENTS Nearing construction