Activity Loading

The document contains a schedule for the major milestones of a condominium development project broken into general requirements, siteworks, substructure, superstructure, and interior and exterior finishing. It includes activity IDs, names, quantities, unit rates, amounts, original durations, start and finish dates, total float, and contact information for suggestions.

Uploaded by

Ray Agacia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views7 pages

Activity Loading

The document contains a schedule for the major milestones of a condominium development project broken into general requirements, siteworks, substructure, superstructure, and interior and exterior finishing. It includes activity IDs, names, quantities, unit rates, amounts, original durations, start and finish dates, total float, and contact information for suggestions.

Uploaded by

Ray Agacia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Activity ID

Activity Name Amount


Activity ID Activity Name Unit
STUDIO 2 CONDOMINIUM - TRUE SCHEDULE
MAJOR MILESTONES
GENERAL REQUIREMENTS
GENERAL REQUIREMENTS
ON SITE CONSTRUCTION
GENERAL REQUIREMENTS
SITEWORKS
SUBSTRUCTURE
SUPERSTRUCTURE
E.ROUGH FINISHING
E.FINAL FINISHING
I.ROUGH FINISHING
I.FINAL FINISHING
Qty Unit Rate Amount

50,000.00
1,438,000.00
62,356,500.00

9,790,450.00
5,331,000.00
21,929,700.00
30,898,100.00
Original Duration Start Finish Total Float ACODE - STAGE
ACODE - LEVEL