Laguador, Edjay A. Bsa 3 Year Assignment:: Answer

The document presents a linear programming problem to maximize total profit for a company that manufactures two types of baseball gloves. It provides the production time requirements and profit contributions for each glove type. The optimal solution is to produce 500 regular gloves and 150 special gloves for a total profit of 37,000. This will utilize 47,500 minutes of cutting and sewing time, 18,000 minutes of finishing time, and 6,000 minutes of packaging time, leaving 6,500 minutes of slack time in the cutting and sewing department.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
407 views4 pages

Laguador, Edjay A. Bsa 3 Year Assignment:: Answer

The document presents a linear programming problem to maximize total profit for a company that manufactures two types of baseball gloves. It provides the production time requirements and profit contributions for each glove type. The optimal solution is to produce 500 regular gloves and 150 special gloves for a total profit of 37,000. This will utilize 47,500 minutes of cutting and sewing time, 18,000 minutes of finishing time, and 6,000 minutes of packaging time, leaving 6,500 minutes of slack time in the cutting and sewing department.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

LAGUADOR, EDJAY A.

BSA 3RD YEAR

Assignment:
Bataan Sporting Equipment Inc., makes two different types of baseball gloves. A regular
model and special model. The firm has 54,000 minutes of production time available in its cutting
and sewing department, 18,000 minutes available in its finishing department, and 6,000 minutes
available in its packaging and shipping department. The production time requirement and the
profit contribution per glove are given in the table below.

Assuming that the company is interested in maximizing the total profit contribution, answer the
following questions:
1. What is the linear programming model for this problem?
2. How many gloves of each model should the Bataan Company manufacture?
3. What is the total profit contribution Bataan Company earn with the given production
quantities?
4. How many minutes of production time will be scheduled in each department?
5. What is the slack time in each department?

Answer:
1. Question: What is the linear programming model for this problem?

Maximize: Z= 50x + 80y 1st Constraint


Subject to: 68x + 90y < 54,000 (Cutting and Sewing Department)
30x + 20y < 18,000 2nd Constraint
7.5x + 15y < 6,000 (Finishing Department)
x, y > 0 3rd Constraint
(Packaging and Shipping Department)
Constraint 1
30x + 20y = 18,000
68x + 90y = 54,000 30x + 20(0) = 18,000
68(0) + 90y = 54,000 X= 600
Y = 600 X intercept = (600, 0)
Y intercept = (0,600)
Constraint 3
68x + 90y = 54,000
68x + 90(0) = 54,000 7.5x + 15y = 6,000
X = 794 7.5(0) + 15y = 6,000
X intercept = (794, 0) Y = 400
Y intercept = (0,400)
Constraint 2
7.5x + 15y = 6,000
30x + 20y = 18,000 7.5x + 15(0) = 6,000
30(0) + 20y = 18,000 X = 800
Y= 900 X intercept = (800, 0)
Y intercept = (0,900)

*I choose the variable that can be easily eliminated. I Eliminate x by multiplying equation 3 by (-4) bring
down equation 2 then add. Substitute 150 in place of y in any of the two equations to get the coordinate
point of c (500,150).

30x + 20y = 18,000


7.5x + 15y = 6,000

7.5x + 15y = 6,000


7.5(-4) + 15 (-4) = 6,000 (-4)
-30x – 60y = -24,000
30x + 20y = 18,000
-40y = -6,000
Y = 150

30x + 20y = 18,000


30x + 20 (150) = 18,000
30x + 3,000 = 18,000
30x = 18,000-3,000
X = 500
Test Area ABCD
Z = 50x + 80y
Point A (0, 0) 50(0) + 80 (0) = 0
Point B (0, 400) 50(0) + 80 (400) = 32,000
Point C (500, 150) 50(500) + 80 (150) = 37,000
Point D (600, 0) 50(600) + 80 (0) = 30,000

2. Question: How many gloves of each model should the Bataan Company manufacture?

The company will produce:


X = 500 regular model of baseball gloves and
Y = 150 special model of baseball gloves

3. Question: What is the total profit contribution Bataan Company earn with the given
production quantities?

The company will earn 37,000.

Solution:
Where x= 500 and y=150
Substitute:
50(500) + 80(150)
25,000 + 12,000
= 37,000

4. Question: How many minutes of production time will be scheduled in each department?

Schedule time per production:

Constraint 1 (Cutting and Sewing Department)


68x + 90y
68(500) + 90(150)
34,000 + 13,500
= 47,500 minutes
Constraint 2 (Finishing Department)
30x + 20y
30(500) + 20(150)
15,000 + 3,000
= 18,000 minutes

Constraint 3 (Packaging and Shipping Department)


7.5x + 15y
7.5(500) + 15(150)
3,750 + 2,250
= 6,000 minutes

5. Question: What is the slack time in each department?

Department Time Available Usage Slack Time


Cutting and Sewing 54,000 minutes 47,500 minutes 6,500 minutes
Finishing 18,000 minutes 18,000 minutes 0
Packaging and 6,000 minutes 6,000 minutes 0