Work Breakdown Structure Project X: Prepared By: Ali Hassan Date: 13/04/2020

This document outlines the work breakdown structure for Project X, which includes 5 main phases - initiating, planning, execution, monitoring and controlling, and closing. The initiating phase involves identifying stakeholders, preparing a project charter and holding a kick-off meeting. Planning consists of team planning meetings, preparing contracts and documents like the work breakdown structure and schedule. Execution covers starting programming, getting user inputs, designing and creating the product vision. Monitoring and controlling has progress reports and reviews. Closing comprises a final report, presentation and lessons learned.

Uploaded by

Ali Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Work Breakdown Structure Project X: Prepared By: Ali Hassan Date: 13/04/2020

This document outlines the work breakdown structure for Project X, which includes 5 main phases - initiating, planning, execution, monitoring and controlling, and closing. The initiating phase involves identifying stakeholders, preparing a project charter and holding a kick-off meeting. Planning consists of team planning meetings, preparing contracts and documents like the work breakdown structure and schedule. Execution covers starting programming, getting user inputs, designing and creating the product vision. Monitoring and controlling has progress reports and reviews. Closing comprises a final report, presentation and lessons learned.

Uploaded by

Ali Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Breakdown Structure Project X

Prepared by: Ali Hassan Date: 13/04/2020

1.0 Initiating
1.1 identify stakeholder
1.2 Prepare project charter
1.3 Hold project kick-off meeting

2.0 Planning
2.1 Hold team planning meeting
2.2 prepare team contract
2.3 prepare scope statement
2.4 prepare WBS
2.5 prepare schedule and cost baseline
2.5.1 Determine cost
2.5.2 create schedule line
2.5.3 create Gantt chart
2.5.4 Determine the task Dependency
2.5.5 Review and finalize Gantt chart

3.0 Execution
3.1 Start programming
3.2 User inputs
3.3 Make design of product
3.4 Create vision of product
3.5 Ask to expert
3.6 User request feature
3.7 Identify, discuss, and prioritize risk

4.0 Monitoring and controlling


4.1 Progress report
4.2 Review progress report

5.0 Closing
5.1 prepare final project report
5.2 prepare final project presentation
5.3 lessons learned