Apqp (Fac)

This document is an advanced quality planning worksheet that outlines the key elements and timeline for quality planning of a new part from 16 weeks prior to production start through the initial production runs. It includes assessing quality history, process FMEA, prototype build and verification, ensuring production equipment and processes are capable, and evaluating initial sample and first production parts. The goal is to have all quality planning elements completed and signed off on prior to the start of regular production.

Uploaded by

Fernando Mejía
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
394 views1 page

Apqp (Fac)

This document is an advanced quality planning worksheet that outlines the key elements and timeline for quality planning of a new part from 16 weeks prior to production start through the initial production runs. It includes assessing quality history, process FMEA, prototype build and verification, ensuring production equipment and processes are capable, and evaluating initial sample and first production parts. The goal is to have all quality planning elements completed and signed off on prior to the start of regular production.

Uploaded by

Fernando Mejía
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ADVANCED QUALITY PLANNING WORKSHEET

Part No. Production Plans: Quality Plan Report:


Part Name: Scheduled Date for Initial Samples: Original Issue Date:
Program: Scheduled Date for First Production: Revision Date(s):
Customer: Scheduled Date for Regular Production:

Mes / Semnana Weeks Prior to


Quality Planning Elements Production
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Star

Initial Quality Assessments


Preliminary Feasibility
Quality History Review
Customer Complaints
Warranty Info (if applicable)
Prior Statistical Info
All Other Indicators
Process FMEA
Major Characteristics (Process/Product)
Gage & Test Equipment
Variable
Attribute

Standards Preparation
Process Flowchart including Control Points
Control Plan including SPC Requirements
Inspection Instruction Sheet

Prototype Build/Verification

Prototype Build with Process Potential for Feasiblity


Final Feasibility & Sign-off

Processing Equipment/Verification
Order Production Tooling, Gages, & Test Equipment
Process Potential Studies on Vendor's Floor
Setup & Debug Production & Inspection Equipment
Process Potential Studies for all Major Characs.

Evaluation Activities
Process Review/Production Sign-off
Process Sheets
Gage & Test Equipment
Packaging
Initial Sample & First Production Part Evaluation
SPC Data