The document discusses technical specifications for DPS panel boards. It lists 16 specifications such as requiring panel enclosures to be 2mm CRCA steel without powder coating, panels to be fully compartmentalized, busbars to be electrolytic aluminum, meters to show various readings, CTs to be metering class, and earthing requirements. It also specifies requirements for relays, MCCBs, earth leakage relays, capacitors, and commissioning support. Dimensions are to be provided to ensure cables fit and maintenance access.
The document discusses technical specifications for DPS panel boards. It lists 16 specifications such as requiring panel enclosures to be 2mm CRCA steel without powder coating, panels to be fully compartmentalized, busbars to be electrolytic aluminum, meters to show various readings, CTs to be metering class, and earthing requirements. It also specifies requirements for relays, MCCBs, earth leakage relays, capacitors, and commissioning support. Dimensions are to be provided to ensure cables fit and maintenance access.
The document discusses technical specifications for DPS panel boards. It lists 16 specifications such as requiring panel enclosures to be 2mm CRCA steel without powder coating, panels to be fully compartmentalized, busbars to be electrolytic aluminum, meters to show various readings, CTs to be metering class, and earthing requirements. It also specifies requirements for relays, MCCBs, earth leakage relays, capacitors, and commissioning support. Dimensions are to be provided to ensure cables fit and maintenance access.
The document discusses technical specifications for DPS panel boards. It lists 16 specifications such as requiring panel enclosures to be 2mm CRCA steel without powder coating, panels to be fully compartmentalized, busbars to be electrolytic aluminum, meters to show various readings, CTs to be metering class, and earthing requirements. It also specifies requirements for relays, MCCBs, earth leakage relays, capacitors, and commissioning support. Dimensions are to be provided to ensure cables fit and maintenance access.
Panel Enclosure mainframe, doors, partitions should be of 2mm CRCA without Powder Coating and Powder Coating of minimum 80 micron. Base Channel 1 Yes No 75x5 for main panel
Panel should be fully compartmentalised(Cubicle type)
including all individual Capacitors feeders 2 Yes No
Cable Gland Plate - ACB chamber - 3mm , All other
chambers 2mm with Rubber Gasket 3 Yes No
Fan Filters with Louvers for all Chambers in all Panels .
Heater with Thermostat for ACB chambers 4 Yes No
All Busbars including Drop Busbars shall be Electrolytic
Aluminium of 99% purity with colour sleeved. The current density shall be 0.8 Neutral =100% as of Phase. APFC main Busbar should 5 be of 1200A Rating as there will be number of holes. Yes No Flexible copper wire wherever used should follow the same rule.
All panels should have Al Earth Bars of 50 % of Neutral
current 6
MFM should show V, A, F,PF,
KVA,KW,KwH,KVAH,KVARH 7 Yes No
All CTs should be Moulded CT of Metering Class of Class
1 Accuracy with 7.5VA Burden. Tape wound CTs are not 8 allowed. Yes No
U/V and O/V Relay should be Digital microcontroller
based LCD display and site selectable U/V & O/V settings range and settable Trip Time delay and Fault 9 Indications Yes No All MCCBs should be Adjustable Thermal and Adjustable Short Circuit of rated fault level. Handle, Spreader, Shunt Trip Auxiliary and Trip Contact should 10 Yes No be provided
All Earth Leakage Relay flush mounting type should be
microcontroller based LCD Display with continuously showing Leakage Current as well as set current. The leakage current should be adjustable 30 to 300Milli Ampere. It should have Test & Reset Facility. 11 There should be inbuilt Trip Circuit Monitoring and Yes No indication to detect the failure of the ELR to trip the MCCB during fault. Prefered Make : Prok DvsMPEL 02, Elmeasure iELR400D. (Please submit the Technical Catalogue)
The Core Balance Current Transformer CBCT should be
Resin Cast of 250mm Dia for 630A, 150mm for 250A MCCB as we have 240Sq mm cable available with us 12 and for all other feeders 100mm Dia Resin Cast. Tape Yes No wound or Moulded CBCTs are not allowed. Cast resin CT prefered for avoiding moisture related tripping
Overall Dimensions of each panels should be
mentioned to evaluate the space as we have to 13 Yes No accommodate the cables as per the spare cable available with us and ease of maintenance. You should agree to provide commissioning support for each and every panel during installation. Each and every Earth Leakage Relay with Resin Cast CBCT is to be Tested at site for trpping at 30 mA 14 sensitivity with portable Test Kit. Yes No You should also ensure that >0.99 PF is maintained in DPS monthly Energy Bill.
Cubicle Space with wiring should be provided for
800KVA Transformer Fixed Compensation capacitors
15 Yes No
All Capacitors are to be Heavy Duty Box Type, 440V AC .
APFC Relay should be only Beluk with Dual Auto Selection of CESU and DG mode. 16 APFC should have Auto/ Manual and OFF mode. Yes No (CESU pf & DG 0.9 pf)