Installation of FGD System Equipment Status: (If Any)
Installation of FGD System Equipment Status: (If Any)
Installation of FGD System Equipment Status: (If Any)
EQUIPMENT STATUS
EPC DATE to
EQUIPMENT
DUE
CALIBRATION DATE CALIBRATION
DATE
CALIBRATING AGENCY
BORROW LAB/
INSTITUTION
STATION
EPC
STRUCTURE
SUB- PART OF
STRUCTURE
NCR obtained
(if any) Remarsk
Sl.
No. MDCC No. Location Description Qty
FABRICATED COMPONENTMS:
• EMERGENCY WATER
TANK STRUCTURE,
DUCT SUPPORT
1 1444 RTPS STRUCTURE, 57.468MT
BOOSTER FAN
MAINTENANCE STR
FABRICATED COMPONENT-MS:
• Crusher House Structure
•Duct Support Structure
•Booster Fan Maintenance Structure 31.471MT
2 1447 DSTPS
FABRICATED COMPONENT-MS:
• Duct Support Structure
• Conveyor Structure
• Emergency Water Tank Structure 9.935MT
FABRICATED COMPONENTS-MS:
•CRUSHER HOUSE STRUCTURE
•BOOSTER FAN MAINTENANCE STRUCTURE
• EMERGENCY WATER TANK STRUCTURE
3 1448 MTPS 31.860MT
FABRICATED COMPONENTS-MS:
•CRUSHER HOUSE STRUCTURE
•BOOSTER FAN MAINTENANCE STRUCTURE
• EMERGENCY WATER TANK STRUCTURE
4 1449 MTPS 90.489MT
FABRICATED COMPONENTS-MS:
•CRUSHER HOUSE STRUCTURE
5 1456 MTPS 62.650MT
FABRICATED COMPONENT-MS:
• Crusher House Structure
•Duct Support Structure
6 1457 DSTPS •Booster Fan Maintenance Structure 53.875MT