Compliance & Response Sheet: Sensitivity: LNT Construction Internal Use

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Compliance & Response Sheet

Project Name: 56 MW - NTPC Solar Power Project at Kawas, Gujarat


Document Title: Tie TRANSFORMERS - FOUNDATION DESIGN CALCULATION & FOUNDATION DETAIL
VSL Document No: VSL-CG0051-DWG-S02-009
NTPC Document No: 5732-040-001-PVC-U-002
Document Revision No: R-01
Sl. No NTPC Comments dated 19-03-2021 Response dated 23.03.2021

Refer Technical specification C5- Page 32 Clause 4.0. In


1 On what basis 30% oil of transfromer consideredfor soak pit? case of separate oil pit is provided, soak pit shall be
designed for 1/3 of oil capacity of transformer.
500mm beyond transformer extent provided in revised
2 Extra width of pit beyond transformer.
calculation.
Density of trasformer oil is 0.89 T/m3 , hence the volume is
3 Calcuated for weight area shall be 30.5 cum calculated accordingly. However taken as 30.5 cum in
revised calculation.
4 Area of transformer side wall missing Added in revised calculation.
Provided volume is much higher than required. Volume of
5 Required volume of Pit higher than provided
Oil is 10.07 cum as against 12.24 Cum provided.
Y direction is not critical as surface area is less. However
6 Consider Y direction also and calculate wind load and moment
now added in revised calculations.
7 Seismic- Please check and revise as per Part 4 of Code. Revised as per Part 4 of IS 1893.
8 Check due to wind in Y-direction. Checked . Wind is not critical.
9 FOS is 1.65 Typographical error. FOS available is higher.
Length considered assuming transformer is at edge of wall
10 Length and thickness of Rail wall and 45 Deg dispersion of load. Revised accordingly.
Thickness of raft for rail wall is 400mm.
COMMENTS ON DRAWING
11 Mark all dimension All relevant dimensions marked in revised drawing
12 Define FGL with NGL FGL considered at =0.0 which shall match with actual RL.
13 Correct section mark XX and YY Corrected.
14 Show further section of rail track foundation Added in revised drawings
15 Rail shall be 52 kg/m Note added in revised drawing.
Document Revision No: R-02
NTPC Comments dated 05-04-2021 Response dated 06.04.2021

Oil soak pit below transformer designed for 1/3 capacity of


oil. Considering 40% voids volume required is 10.07 Cum
Kindly provide the key plan indicating separate oil collection tank as against provided 15.39Cum. Separate Burnt oil pit is
1
and calculation of capacity of collection tank. designed for full oil capacity + 10mins water Provided
volume of tannk = 30.5+25 = 50.5 Cum. Key plan added in
drawing.
Soak pit size revised as per the clause with 1000mm
2 Please check wrt clause 1.02.20/ B-13 of Tech Specs
beyond transformer edge.
3 Calculation of loads: Two walls should be included Corrected
4 Use bulk density for load calculation Loads revised with bulk density
5 Correct total load Total load accordingly revised. Foundation size revised.
COMMENTS ON DRAWING
6 MSM layer to be shown on both sides MSM layer shown on both sides
Size of foundation and Reinforcement revised as per
7 Hold
design
FGL considered at =+5.2 m Lvl and top of foundation
8 Define FGL with NGL considered as +5.5 which matches with existing switchyard
levels.

Sensitivity: LNT Construction Internal Use


#

You might also like