Service Information 6-1 Engine Removal 6-2
Service Information 6-1 Engine Removal 6-2
6. Engine Removal
Service Information
General Safety
NOTE
ҮUse a jack to remove or install the engine. Support the motorcycle with a jack firmly, taking precautions
not to damage the frame, engine, cable or harness.
ҮAttach tape to the frame to protect it during the engine removal or installation.
ƃ The following works can be carried out without removing the engine from the vehicle body.
- Transmission (ਨ Section 11)
- A.C. generator (ਨ Section 8)
- Kick starter, continuously variable transmission(ਨ Section 7)
- Cylinder head, cylinder, and piston (ਨ Section 9 and 10)
- Carburetor (ਨ Section 5)
- Oil pump (ਨ Section 2)
ƃItems to be worked after removing engine
- Crankshaft, crankshaft bearing, crank case bearing
ƃ Engine oil capacity: 1.0ֹ-when disassembled
Torque values:
Engine hanger bolt (Front): 2.7kg-m(27N.m, 20ft-1b)
(Rear) : 3.5kg-m(35N.m, 25ft-1b)
6-1
Engine Removal
Engine Removal
ƃ Drain the engine oil. A.C.G connector
ƃ Remove the following parts.
- Luggage box (ऻ 4-5)
- Body cover (ऻ 4-6)
- Air cleaner (ऻ 5-4)
- Carburetor (ऻ 5-6)
ƃ Disconnect the A.C. generator connector and
starter motor cable cord.
ƃ Disconnect the high-tension cord from the engine.
ƃ Remove the negative pressure tube from the
caburetor insulator.
ƃ Remove the EX. muffler. (ऺ 4-9)
ƃ Remove the rear brake caliper.
ƃ Remove the L.floor side cover.(ऺ 4-5)
ƃ remove the radiator hose.
Hanger bolt
Lower bolt
6-2
Engine Removal
Engine Installation
ƃ Install in the reverse order of removal.
NOTE
Ү Take precautions not to damage wiring and cable.
Ү Take precautions not to damage the threaded part of
bolts.
Ү Arrange the cable, tubes and wiring in the right
positions.
Toque:
Engine hanger bolt:(Front)2.7kg-m(27N.m, 20ft-lb)
(Rear)3.5kg-m(35N.m, 25ft-lb)
ƃ Check the following after the engine is assembled.
- Engine oil
- Electric systems
6-3