0% found this document useful (0 votes)
143 views1 page

2 Required Testing For Soil Embankment

The document provides specifications for soil testing requirements for embankments and subgrades on the Western Indonesia National Roads Improvement Project. It lists 13 types of soil tests, the relevant testing standards, required minimum values, and testing frequency. Tests include sieve analysis, liquid limit, moisture content, CBR, density, classification, and expansiveness. Testing is required periodically for quality control as well as with changes in material source or quality.

Uploaded by

ivan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
143 views1 page

2 Required Testing For Soil Embankment

The document provides specifications for soil testing requirements for embankments and subgrades on the Western Indonesia National Roads Improvement Project. It lists 13 types of soil tests, the relevant testing standards, required minimum values, and testing frequency. Tests include sieve analysis, liquid limit, moisture content, CBR, density, classification, and expansiveness. Testing is required periodically for quality control as well as with changes in material source or quality.

Uploaded by

ivan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) IBRD Loan 8043-IND

PACKAGE :
PROVINCE :

REQUIRED TESTING NUMBER FOR SOIL EMBANKMENT


ACCORDING TO SPECIFICATIONS

Regency No. Batch Functional Length (Km) Start Km End Km

Report Date : Effective Length (Km) Start Km End Km

Contractor Name

TESTING METHOD SPEC. REQUIREMENT TESTING FREQUENCY


NO. KIND OF TEST SNI AASHTO EMB SUBGRADE BASIC PERIO- DIARY REMARKS
DICALLY
01 Sieve Analysis 03-1968-1990 T - 27 - - ▲ ●
02 Hydrometer 03-3422-1994 T - 88 - - ▲ ●
03 Liquid Limit 03-1967-1990 T - 89 - - ▲ ●
04 Plastic Limit & Pl. Index 03-1966-1989 T - 90/91 - - ▲ ● PI max. 6% for selected Emb.
05 Mouisture Content - - ▲ ● ○
06 Standard Proctor 03-1742-1989 T - 99 - - ▲ ●
07 CBR (Laboratory) 03-1744-1989 T - 193 min. 6% min. 6% ▲ ● Min. 10% for selected Emb.
08 Specific Gravity T - 100 - - ▲ ●
09 Classification of Soils M - 145 No. as A-7-6 or CH ▲ ●
10 Determining Expansive T - 258 maks. 1.25 maks. 1.25 ▲ ●
11 Field Density 03-2828-1992 T - 191 95% 100% - - ¯
12 Proof-Rolling No movements - - ∆
13 Dynamic Cone Penetrometer - - - - x
LEGEND : ▲ Every Beginning ● Every 1.000 Cu.m ∆ Every laying after compacted
Every Quarry/Borrow material (minimum 1 test) ○ Every laying (2 times during compacted)
Every Change Quality x Instruction by Engineer
Every Trial ¯ Every 200 meter (min. 1 test)
(minimum 3 test)