Giriraj Precision Screws PVT - Ltd. Quality Manual Procedure APQP (Advanced Product Quality Planning) 1. Purpose
Giriraj Precision Screws PVT - Ltd. Quality Manual Procedure APQP (Advanced Product Quality Planning) 1. Purpose
:-Pr-26
GIRIRAJ PRECISION SCREWS PVT.LTD. Rev.No.:-00
Eff.Date:-15.07.17
QUALITY MANUAL PROCEDURE Page No.: 1 of 9
APQP(Advanced Product Quality Planning)
1. PURPOSE
This Procedure is to be defining new product development and ECN Parts and to define the
process needed for the Product Quality planning process to ensure that:
1. Resources are directed to satisfy the customer.
2. To promote early identification of problems / changes to avoid late changes
3. To provide a quality product on time at the lowest cost.
4. Use of CFT approach & Simultaneous engineering during design and development of
the process.
2. SCOPE
A Absolutely new component : no Experience of Production so far
That the part happens to be similar to what had been produced so far but there
happens to be large scale difference in raw
A component similar to the component produced so far but there happens to be large
scale difference in raw material,Machining ,Methodology,In the structure or in the
B
function.
That whenever there happens to be changed in production site
That whenever the place/country of development happens to be different from the
place/country of production
That whenever there happens to be extremely Process Change in details related to the
C component ,so much so that even the inspection
3. RESPONSIBILITY
It is the responsibility of the MR to ensure that this procedure is latest, implemented and
understood by all appropriate personnel across the organization.
It is the responsibility of the CFT & relevant functional heads to ensure that this procedure is
implemented in their respective departments.
4. PROCEDURE
Responsibility/ Document No
Sl. No. Activity
Authority
Receive enquiry / Customer drawing / Customer provided sample / M.D./
4.1.1 any standards and specifications from CUSTOMER, Sample --
submission time requirement (If any). PLANT HEAD
Perform enquiry review and the details will be entered in Enquiry HOD F/MKT/06
4.1.2 Register The details shall be reviewed for adequacy if engineering
(Marketing)
drawing were provided by the customer.
Identify the Customer drawing, standards, if given by putting
`MASTER COPY’ on the rear side of the drawing and standard.
Mark the date of receipt suitably handwritten on the rear side or front
4.1.3 side and update the master list of customer drawing immediately. In PLANT HEAD
case if any drawings received for reference purpose as design input, it
can be considered only for reference by putting `Reference only’ on --
the rear side of the drawing.
Photocopies of the customer drawing affixed with `CONTROLLED --
4.1.4 PLANT HEAD
COPY’ stamp can be used for reference purpose
Top management shall constitute a Manufacturing Cross Functional F/PD/13
Team consisting of members from Marketing, Production,
4.1.5 M.D
Maintenance, Quality, and Purchasing to carry out the Advanced
Product Quality Planning. List of CFT Members
Drawing Review: The drawing shall be reviewed by Manager. F/PD/15
In case of samples received from the customer, it can be used for
CFT
Comparative purpose only and does not absolve the CFT to comply
with customer requirement as stated in the drawing.
4.1.6
Clarification from customer, If required:
During drawing review if any incomplete information found, the
marketing person shall interact with customer to get the relevant
Marketing --
required information.
Additionally CFT Team shall collect information on Internal voices /
Past History based on:
a) In house rejections / Rework
b) Customer complaints
4.1.7 CFT
c) Process changes and their impact
d) SPC results
CFT Members shall appraise the Top Management about the status F/PD/17
and analysis for any variance to provide further appropriate supports
(Interims of Resource Requirements) and the same are minuted in CFT / APQP
4.1.14
Management Support & Review Meeting Report. For Long champion
duration project shall be reviewed month wise instead of phase
wise.
Appropriate personnel of CFT shall prepare Proto Control Plan for all
processes as per the preliminary Process flow Chart. Control Plan shall be F/PD/03&F/PD/06
4.2.10 CFT
prepared based on APQP Manual / customer approved methodology. (If
req.)
Evaluate feasibility through Product Data and Team Feasibility Report. F/PD/02 &
Marketing / Customer Representative shall interact with customer for any
clarifications.
F/PD/15
CFT /
4.2.11 Team feasibility Commitment Report shall be signed by the CFT and the
MANAGER
team now agrees to develop the new product. If required communicate
with customer & time fixed with customer for spec meeting or DFR
issues.
CFT Review: CFT Members will review the project status every week & F/PD/17
the same will be recorded in MOM. If any delay found it will be reviewed MR / APQP
4.2.12
& corrective action planned. Timing plan also updated accordingly if champion
required.
CFT Members shall appraise the Top Management about the status and F/PD/17
analysis for any variance to provide further appropriate supports (Interims
CFT / APQP
4.2.13 of Resource Requirements) and the same are minuted in Management
champion
Support & Review Meeting Report. For Long duration project shall
be reviewed month wise instead of phase wise.
CFT shall conduct Process Failure Mode and Effect analysis (PFMEA) F/PD/05
4.3.6 for all value adding processes as per the PFMEA Manual / methodology CFT
given in Customer Supplier Development Manual.
Appropriate personnel of CFT shall prepare Pre-launch Control Plan for --
all processes as per the Process flow diagram. Control Plan shall be
4.3.7 prepared based on APQP Manual / customer approved methodology. CFT
CFT Review: CFT Members will review the project status every week & F/PD/17
the same will be recorded in MOM. If any delay found it will be reviewed MR / APQP
4.3.11
& corrective action planned. Timing plan also updated accordingly if champion
required.
4.3.12 CFT Members shall appraise the Top Management about the status and CFT / APQP F/PD/17
analysis for any variance to provide further appropriate supports (Interims champion
of Resource Requirements) and the same are minuted in Management
Support & Review Meeting Report For Long duration project shall be
Prepared By: Reviewed and Approved By:
After completion of development part handover to production deptt. QA Manager / Refer to initial control
And start the initial control. During first trial of mass production do the Plant head Procedure (Pr-30)
4.4.5 audit for production trial & record in production readiness check sheet
& take the necessary action for observations.
CFT shall sign Quality planning sign off with production team to F/PD/16
assure that the new product developed has met the customer
4.4.6 CFT
requirements and that all tools, equipment’s, facilities, testing
requirements are in line with customer expectations.
CFT Review: CFT Members will review the project status every week F/PD/17
& the same will be recorded in MOM. If any delay found it will be MR / APQP
reviewed & corrective action planned. Timing plan also updated champion
accordingly if required.
CFT Members shall appraise the Top Management about the status and F/PD/17
analysis for any variance to provide further appropriate supports
(Interims of Resource Requirements) and the same are minuted in CFT / APQP
4.4.7
Management Support & Review Meeting Report. For Long champion
duration project shall be reviewed month wise instead of phase
wise.
CFT Members shall appraise the Top Management about the status and F/PD/17
analysis for any variance to provide further appropriate supports
(Interims of Resource Requirements) and the same are minuted in CFT / APQP
4.5.4
Management Support & Review Meeting Report For Long duration champion
project shall be reviewed month wise instead of phase wise.
5. REFERENCES - DOCUMENTS:
6. REFERENCES – RECORDS:
• - Customer Representative shall maintain copies of the above records in the APQP file for
each part.