"Hotel Management System": Savitribai Phule Pune University
"Hotel Management System": Savitribai Phule Pune University
VIDHYA
BHAVAN TRUST’S
CHRIST COLLEGE, PUNE-14
A
PROJECT REPORT
ON
CHRIST COLLEGE
PUNE – 411014
__________ __________
Internal Examiners External Examiners
ACKNOWLEDGEMENT
Our heartfelt thanks to Our Project Guide Mr.YogeshPatil and who depleted their
time in guiding me in our project. Under their proficient guidance, we were able to overcome
all the complexities during the development of the project. Their enthusiastic advice and
constant encouragement with affectionate attitude have inspired us a lot to conclude our project
work successfully.
Our special thanks to Dr (Fr) SONY CHUNDATTU CMI, Principal Christ College,
Mrs. NilimaShingate (H.O.D. Dept. of Computer Science), who guided me through the
intricacies of the project, fruitful discussions and their encouraging words of advice which
helped boost our morale.
Last but not least, we are thankful to all Teaching and Non-Teaching staff and our
friends whose names are not mentioned here but are directly or indirectly helped us in
completion of this project.
Date:
Place: Pune
INDEX
1. Introduction.
2. Analysis.
2.1Feasibility study.
3. System design.
3.1ERD.
3.3 DFD.
4. Form Design
5. Reports
7. Future Enhancement
8. Bibliography
1. INTRODUCTION
➢ 1.1 Introduction to system:-
• The Hotel Management System helps to manage ordered items by the customer,
make entries of the items in the table and make bill by using this software.
• It helps to make it easier to manage overall hotel billing, sales report etc.
• The Project is totally built at administrative end and thus only the administrator is
guaranteed the access.
• The purpose of the project is to build an application program to reduse the manual
work for managing the payments, booking, customer, hotel.
• To avoid errors.
There are mainly three kind of feasibility study that are equally important for this
software development:
Operational feasibility:
Operational feasibility is a measure of how well a proposed system solves the problems,
and takes advantage of the opportunities identified during scope definition and how it
satisfies the requirements identified in the requirements analysis phase of system
development.
Economic Feasibility:
Economic feasibility is used for evaluating the effectiveness of a proposed system. This
system is also known as cost/benefit analysis. The procedure is to determine the benefits
and saving that are expected from a proposed system and compare them with the cost.
If the benefit outweighs the cost, then the decision is made to design and implement the
proposed system.
Technical Feasibility:
The technical aspect of feasibility is mainly concerned with the smooth operation and
proper connectivity of the database regarding the software.
a. Software requirement
b. Hardware requirement
➢ 2.2 HARDWARE AND SOFTWARE REQUIREMENT
Hardware Requirement:
1. PC Pentium III
2. 128 MB RAM
3. 1 GB Hard disk
Operating System:-
Windows 7, XP etc.
Software Requirement:
➢ 3.1 E-R-DIAGRAM
➢ 3.2 CONTEXT LEVEL DIAGRAM
➢ 3.3 DATA FLOW DIAGRAM
➢ 3.4 DATA DICTIONARY
➢ 3.5 FORM DESIGN
Entity Relationship Diagram
Mak Allocates
Checks es Room To
Bill
of
RoomN room
o
RoomTyp
e
Location
Status avail
LOGIN
0.0 LOGIN
CUSTOMER BOOKING
CUSTOMER
BOOKING DETAILS
HOTEL
ADMIN MANAGEMEN
T
ROOM DETAILS
ROOM DETAILS
SYSTEM
EMPLOYEE DETAILS
EMPLOYEE
DETAILS
Data Flow Diagram
1.0
Login Authentication
Admin Admin
Response Login
Login Admin
3.0
A
A
4.0
Employee Name Employee Name
Employee Allocated
Employee Employee
5.0
6.0
Customer Check-in details Check-In Customer Check-in detailsCheck-in
Check-In
A
A
7.0
Check- Customer Check-Out detailsCustomer Check-Out details Check-Out
Out Check-
Out
8.0
Total Amount Total Amount
Amount Amount
Amount
Response
Customer
Request
9.0 Query
Admin Report
Room
Response
Query
Booked/Vaccant
Response
Query
Employee
Response
Data Dictionary
Admin Information:-
Field Name Field Data type Description
Room Details:-
Field Name Field Data type Key
RoomNo Number Room Number(Primary key)
ROOM DETAILS :-
EMPLOYEE DETAILS :-
EMPLOYEE REPORT :-
CHANGE PASSWORD :-
5.Reports
EMPLOYEE REPORT:
ROOM REPORT:
CUSTOMER BILL REPORT:
CUSTOMER REPORT:
6. ADVANTAGES AND LIMITATIONS OF SYSTEM
ADVANTAGES: -
o The system gives feature called as Data Binding, which provides simplest way for
connecting to the Database.
DISADVANTAGE: –
o Only the only The Hotel Management Staff members can have access to the system.
7. FUTURE ENHANCEMENT
➢ System is Upgradable.
➢ The system is upgradable in such a way that more features like multiple users can use
the software simultaneously and can be made more user friendly.
➢ In this way data can be dynamic,and several bug fixes can be peformed.
8. BIBLIOGRAPHY
➢ Visual Basic 6.0(Black book by Steven Holzner)
➢ Project guide
➢ WWW.vbforums.com
➢ WWW.vbcity.com
➢ WWW.stackoverflow.com
➢ Experienced Professionals