46 NSRP Nghi Son Refinery Vietnam Commissioning

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NSRP Nghi Son Refinery

Commissioning

Operator/ Client: NSRP JV (Petrovietnam -Idemitsu Kosan- Mitsui- Q8)/


JGCS Consortium ( JGC- CHIYODA-SK-GS- TECHNIP)
Project/ Location: Nghi Son Refinery/ Thanh Hoa Province, Vietnam
Scope of Services: Commissioning Services

Nghi Son Refinery at a glance:

NSRP Complex is located 260km away


from Hanoi capital in Nghi Son Economic
Zone, Tinh Gia District, Thanh Hoa
Province, one of the biggest provinces in
Vietnam. Estimated total investment cost
of NSRP Project is approximately $9
billion. The refinery has capacity to
process 200,000 barrels of crude oil
imported from Kuwait per day.

NSRP Project is a joint-venture project sponsored by


4 corporations: Vietnam Oil and Gas Group
(PetroVietnam), Kuwait Petroleum International Ltd
from Kuwait, Idemitsu Kosan Co., Ltd and Mitsui Chemical, Inc.

The EPC Consortium is comprised of JGC Corporation (Japan)


as the leader and other members: Chiyoda (Japan),
GS E&C (Korea), SK E&C (Korea), Technip France
(France) and Technip Geoproduction (Malaysia).
Commissioning Services

ARAMIS Scope of Work:


 Pre-commissioning
Commissioning
 300,000 Man-hours
 Dec 15 to Mar-17
Integrated Team
 Operation Leaders
 Shift Leaders
 Supervisors
 Panel Operators
 Field Operators
Pre- Commissioning Schedule:

Aramis Group Operational Headquarters E-05-01, Plaza Mont' Kiara 50480 Kuala Lumpur MALAYSIA
Tel: +603 6201 0388 - Fax: +603 6201 1088 Website: www.aramis-gr.com