We are pleased to announce the release of ETAP 19.5 - Integrated Power Analysis & Operation
Technology software.
ETAP 19.5 release offers an impressive new set of integrated power analysis modules, electrical
safety capabilities, and operational compliance solutions to serve the needs of generation,
transmission, distribution, industrial, transportation, data centers, and low-voltage industries.
The new release includes the following Major Features & Capabilities plus 100’s of enhancements
and time-saving improvements that are automatically added to the existing ETAP modules.
Upon completion of ETAP 19.5 installation, a new 48-digit activation code is required. The
activation code is emailed to you.
For more information on this new release, please take a few moments to review the information
in this document.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2019 ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP System
Application
• Improved compatibility with Office 365
• Improved print preview quality
• License Manager Compatibility with IPv6
• High Resolution Display Support
• More responsive and performance improvements throughout
Element Editors
• Magnetization Curve for 2 Winding and 3 Winding Transformers
• Harmonics for Wind Turbine
Panel Systems
• Enriched Graphical Panel Representation
• User-Defined Load Code Factor Tables
• Revit Load Code Factor Mapping
Voltage Stability
• Voltage Security Analysis & Loadability
• Identify Voltage Stability Limits & Proximity
• Simulate the Impact of Voltage Instability
• Perform Sensitivity Analysis
• Calculate & Report Instability Indices
• Calculate & Report Minimum distance to instability
• Assess Study Results via Network Views & Plots
• P-V and Q-V Analysis or Continuation Load Flow Analysis
• Graphical results and plots
Transformer Inrush
• Transformer Energization or Inrush Simulation using Transient Stability
• Individual and Multi-Transformer Sympathetic Inrush
• Inrush simulation using Magnetization Characteristics
Transient Stability
• Frequency action for power grid
• Step & Ramp frequency change
DC Load Flow
• Design & Analyze Hybrid DC Topologies
• Solar Photovoltaic (PV Array)
• Battery Storage
• DC-DC Converter
• Single & Multiple Grid Connected Inverters
• Capability of bi-directional power flow for inverters with Maximum Peak Power Tracking
(MPPT)
• Constant Power Load & Rectifier/UPS
Harmonics
• Consider wind turbine generator as harmonic source
• Model Type 3 and Type 4 wind turbine generator harmonics
• Frequency Dependent Cable Impedance
• User-Defined Input Data via Excel
• Harmonic Load Flow & Frequency Scan
Cable Sizing
• NF C15-100 Overload Requirement for Phase Conductor Sizing
• Fast & Accurate Cable Sizing per French Std.
• Complete Sizing & Shock Protection
• LV Underground & Aboveground Cable Sizing
• Capacity Assessment & Overload Consideration
Ground Grid
SKM Import
• Improved transmission line mapping
• Improved one-line diagram layout
EasyPower Import
• Import EasyPower 9.x project files
• Import EasyPower 10.0 project files
PSS®E Import
• RAW, SEQ, DYR
• V33 & V34
• Automatic layout using location file
• User-defined Mapping of dynamic models and parameters
DataX Plus
OSM Import
• Import from OpenStreetMap (.osm) format
• Automatic GIS Diagram Generation
• Import Transmission & Distribution Network
• Import DC Railway Network
Library Additions
• The following protective device manufacturers and models added to the library.
Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)
PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM
We are pleased to announce the release of ETAP 19 - Power System Design & Operation
Software.
Upon completion of ETAP 19 installation, a new 48-digit activation code is required. The activation
code is emailed to you.
For more information on this new release, please take a few moments to review the information
in this document.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2019 ETAP/Operation Technology, Inc. All Rights Reserved.
1 of 8
Smart Collaborative &
Team-Based Operation
2 of 8
1
Products & Solutions
Team Engineering Cloud-Based Collaboration Industry Standard
3 of 8
2
Products & Solutions
Integrated Comprehensive Open Architecture
4 of 8
3
Network Project Modeling & Management
• Change Management
Maintenance
Operator Crew
NetPM
Analysis
Planning Engr
Engr
etap
Control & APP™ Field Engr
Data Collection
Approval
5 of 8
4
Arc Flash IEEE 1584-2018
Extend compliance to latest industry methodologies
• Operational Delays
6 of 8
5
Arc Flash Graphical Calculators
Quick ‘What-if’ Scenarios & Instant Result Visualization
• DC Arc Flash
• BGI/GUV-I 5188 E
7 of 8
6
ETAP 19.0.0 System Requirements
Operating System (64-bit)
• Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
• Microsoft Windows 8 & 8.1 (Standard, Professional)
• Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
• Microsoft® Server 2016 (Standard)
• Microsoft Server 2012 & 2012 R2 (Standard)
Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)
PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM
8 of 8
ETAP 18.1.1
September 2018
We are pleased to announce the release of ETAP 18.1.1 - Power System Design & Operation
Software. ETAP 18.1.1 is the latest upgrade to the ETAP 18 series, which expands on the
innovative solutions developed for modeling, analysis, and operation.
Please note the following when upgrading to ETAP 18.1.1:
• It is a minor upgrade to ETAP 18.1.0 and utilizes the same 48-Digit Activation Code as
provided with ETAP 18.1.0 release.
• It is a complete program and does not require any previous ETAP installation. ETAP
18.1.1 is compatible with ETAP 18.1.0 license manager.
• Project database will be converted from ETAP 18.1.0 to 18.1.1 and will not have the
same database version. Make sure to maintain a backup of your project in its original
version should you choose to reload the project in its earlier version.
1. Migration of projects from older versions (ETAP 16.2 or lower) directly to 18 series
related to Arc Flash Analysis module.
2. Added ability for ETAP Plot Manager to visualize results utilizing plot files stored on
network drives.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.
Page 1 of 2
ETAP 18.1.1 System Requirements
Operating System (64-bit)
• Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
• Microsoft Windows 8 & 8.1 (Standard, Professional)
• Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
• Microsoft® Server 2016 (Standard)
• Microsoft Server 2012 & 2012 R2 (Standard)
Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)
PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM
New Features
ETAP Application
o Improved performance & analysis run-time
o Library defragmentation & compaction
o Improved PDF printing of the one-line diagram
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.
Page 1 of 3
Library Additions
The following protective device manufacturers and models are added to the library.
Manufacturer Model
Cable Conductor
Manufacturer Model #/C Type kV Insulation
5, 8, 15,
Prysmian Airguard 3/C Copper 25, 35 EPR
AWG PowerGuard 1/C Aluminum 35 XLPE
Nexans Power and Fiber Optics Subsea Cable 3/C Copper 10, 20, 30 XLPE
Page 2 of 3
ETAP 18.1.0 System Requirements
Operating System (64-bit)
Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
Microsoft Windows 8 & 8.1 (Standard, Professional)
Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
Microsoft® Server 2016 (Standard)
Microsoft Server 2012 & 2012 R2 (Standard)
Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft .NET Framework v4.6.2
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)
PC Configuration Requirements
64-bit hardware
USB port for security key
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%
Recommended Hardware
One-Line Diagram
o Enhanced auto-build & layout
o Enhanced batch print & Zoom views
o Synchronized presentation views
o Region classifications & coloring
o Remote connectors
o Support remote connection for CT & VTs
o Split differential protection schemes across nested networks
o Avoid intersections for multiple input configuration
Geospatial Diagram
o Intelligent Geospatial Diagram
o Feeder & Substation Diagrams
o Geospatial model manager
o Import from 3rd Party geodatabases
o Synchronized with one-line diagram
o Download background maptiles from Bing or Google Maps using ETAP
MapServer™ (requires API key)
o Edit Geospatial Diagram similar to the one-line diagram, such as add, modify, &
reconnect elements
o Circuit & feeder tracing
o Decluttering, color themes, user-defined symbols
o Graphical display of study results & alerts
o Study result & alert animation
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.
Page 1 of 17
Microgrid Modeling
o Transient Stability (TS) to User-Defined Dynamic Model (UDM) network control
signal types
o Internal or external inputs from:
o Power system stability network
o Real-time input measurements or tags
o TS voltage & power flows from network can be accessed by UDM Microgrid
Controller
o User-defined renewable energy models for Wind Turbine Generator &
Photovoltaic Array
Enhanced/New Features
Plot Manager
o Plot & view results from multiple studies
o User-configurable plots & settings
o Customize properties & save as template
o Works with all ETAP modules
o User-defined application styles
o Automatic data fit to plot
o Automatic label layout
o Zoom, pan, tile, etc.
Datablock
o Expanded input data & study results
o Arc Flash & Motor Starting results
o Display results, input, tags
o User-defined templates
o Auto-adjusting protective device settings
o Independent tooltip & display
o Duplicate datablocks across multiple views
ETAP Application
o Installation wizard
o Keyless license manager
o Ribbon bar for Ground Grid & Cable Pulling
o Windows Active Directory authentication
Page 2 of 17
etapAPP™ - Data Collection & Synchronization App
o Collection & Verification
Collect data, verify existing data & transfer to ETAP
View ETAP data on mobile device
Create new one-line diagrams on mobile device or append to existing
Smart connections including auto-insert
Layered diagram using composite networks
o Mobile App
Geotag asset information including pictures & synchronize with ETAP
model
Windows authentication for data security
ETAP DataHub™ synchronizes data with ETAP over the network
Available for tablets running Windows® or Apple® iOS
Page 3 of 17
etap iCE™ - Intelligent Control Enterprise Hardware
o Remote Terminal Units
Substation Data Acquisition & Control
Field/pole mount RTUs
Integrated RTU & fault deletion
o Controllers
Substation Automation
Intelligent Load Shedding
Generation Control
Data Acquisition
Secure & Scalable Controller
o Communication Protocols
IEC 60870-5-104/101
DNP 3
Modbus
IEC 61850
MMS/GOOSE
GPRS, xDSL, VSAT, Tetra
New Elements
Series Capacitor
o User-selectable capacitor location
o Calculate degree of compensation
o Consider MOV protection & bypass
Switched Capacitor
o Automatic control modes: voltage, current, power factor
o Control buses & branches
Voltage Regulator
o Automatic control modes: forward, reverse
o Include line drop compensation (LDC)
o Per phase voltage regulator adjustment
o Control based on load side voltage requirements
Page 4 of 17
Traction Power Elements
o Rectifier - Controlled & Uncontrolled
o Transformers - Booster, Auto, Scott-T
o Speed, Elevation, Signal, etc.
o Insulator & Isolators
Distribution Elements
o Jumper, cut & open point
o Distributed load
Enhanced Elements
o Wind Turbine Generator (WTG)
o Dynamic models based on IEC 61400-27-1-ed1
o Short circuit modeling per IEC 60909-2016
o Crowbar & current limit short circuit model with active & reactive
o Auto-trip voltage & duration for LVRT
Page 5 of 17
Enhanced Libraries
Engineering Libraries
o Distance relay
o Distribution transformer
o Train rolling stock
o Traction rectifier library
o Sector & profile library
o Over 450 new V&V protective device models
o Over 40 detailed distance relay models with manufacturer specific settings
Equipment Warehouse
o Overhead line – phase, ground, tower/pole
o Overhead catenary
o Power cables
o Distribution transformer
o Low-voltage circuit breakers
o Power fuses
o Railway track
o Equipment reliability
Enhanced Modules
Page 6 of 17
Motor Starting
o Enhanced inverter model
o Plot Manager interface
Short Circuit
o Compliance with IEC 60909-2016 Ed. 2.0
o Variable fault current vs. voltage
o LV to EHV system fault current calculation
Reliability Assessment
o Reliability warehouse
o Multiple phase configurations
o GIS system element handling
o Unbalanced system reliability calculation
o Reliability new indices
CTAIDI
ALII
ACCI
o Reliability momentary indices
MAIFI
MAIDI
o Optimized for multi-core CPU
Transient Stability
o Line-to-line fault event simulation
o Line-to-line-to-ground fault event simulation
o Improved synchronous machine saturation model
o Enhanced built-in excitation systems
o Enhanced frequency-dependent network & generator modeling
o Microgrid Controller network parameter inputs to UDM
o Improved inverter transient response
o Enhanced UDM model library
o Plot Manager interface
Page 7 of 17
New Modules
Page 8 of 17
o Distance Relay Library
Detailed distance protection element for over 40 relay models:
Schweitzer
GE Multilin
ABB
Schneider
Alstom/Areva
Siemens
ZIV
ERL Phase
ARCTEQ
Toshiba
Universal (Generic)
Page 9 of 17
o Traction Analysis
Train Performance Calculation
Solve unbalanced AC & DC systems together
Unified AC & DC Time Series Power Flow
Optimized for multi-core CPU
o Interface
Track Editor & Warehouse
Line Editor & Warehouse
Route & Timetable Editor
Automatically generate train timetable based on number of trains, head-
way, dwell time, etc.
Import train schedule from Excel format for faster data entry
o Results & Plots
Graphical plots using Plot Manager
Rail energy consumption including maximum, peak & average
rolling demand
Trip profiles - acceleration, speed, elevation, etc.
Substation power flows & voltages
Train power flows & voltages per route
Rail voltage, track potential
Alerts based on EN 50163 & EN 50329 standards
Page 10 of 17
ETAP-RT™ - Power Monitoring & Control
o etapADMS™ - Advanced Distribution Management System
Long-Term Load Forecasting
Automatically download weather data
Automatic incremental model updates
Improved dispatcher training simulator
Integrated restoration & isolation plans
Historical, library & Excel data sources
o SCADA System & Architecture
MCC / BCC redundancy with disaster recovery
Encryption & authentication security
Self-healing strategies
Integrated front-end processor with native communication drivers
Web services communication
Automatic historical data replication
Unlimited signals or measurements
Native IEC 60870 protocol
Native ICCP protocol
Interface to ADMS & OMS
o Visualization & Dashboards
Common workstation & Web HMIs
HMI objects library
Alarms & Events displays
Service Tags / Operator Notes integrated with advanced applications
o Real-Time & Historical Reports
User-definable scheduled & on-demand reports
Real-Time & historical data
Customizable Alarms & Events reports
Web enabled reporting
PDF & Excel formats
o Intelligent Load Shedding Dashboard
Intelligent Load Shedding Dashboard
Thin-client HMIs
Monitor spinning reserve, load to shed, load status
Automatic & manual trigger controls
Graphical load shedding event analyzer & viewer
Hardware communication dashboard
o Load Preservation
Steady-state & transient response
Fast response time (10ms) with secured communication
Priority optimization based on number of trips per time period
Page 11 of 17
o Switching Order Management
Mobile interface
Crew assignment & field confirmation of actions
Link switching sequences to orders
Scheduled & active order viewer
Control center confirmation of order
Estimated time to completion
Classification & Area of Responsibility management
o Switching Sequence Management
Unbalanced system validation
Transfer to Mobile Switching Order Management
o Alarm Management
Prioritizes events via graphical & tabular views
Integrated SMS & e-mail services
o Generator Operations & Maintenance
Track life operating time & cost
Multiple maintenance levels notifications
Alerts for due maintenance schedules
Page 12 of 17
Library Additions
The following protective device manufacturers and models are added to the library.
Manufacturer Model
Page 13 of 17
Manufacturer Model
Page 15 of 17
Manufacturer Model
Page 16 of 17
ETAP 18.0.0 System Requirements
Operating System (64-bit)
Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
Microsoft Windows 8 & 8.1 (Standard, Professional)
Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
Microsoft® Server 2016 (Standard)
Microsoft Server 2012 & 2012 R2 (Standard)
Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft .NET Framework v4.6.2
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)
PC Configuration Requirements
64-bit hardware
USB port for security key
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%
Recommended Hardware
We are pleased to announce the release of ETAP 16.2 Power System Design & Operation Software.
ETAP 16.2 is the latest upgrade to the ETAP 16 series which expands on system modeling and
comprehensive simulation capabilities.
ETAP 16.2 release includes several new enhancements and general improvements:
− HVDC Link
Model and simulate HVDC (High Voltage Direct Current) Link response under steady-
state and transient conditions.
Note that project files for ETAP 16.2 and 16.1 have the same database version.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
1
System Requirements
Operating System (64-bit)
Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
2
ETAP 16.1.1
July 2017
We are pleased to announce the release of ETAP 16.1.1 Power System Design & Operation Software.
Upon f inishing installation o f E TAP 16.1.1, a ne w 48-digit activation co de is r equired. The a ctivation
code is provided on the ETAP 16.1.1 DVD and/or emailed to you.
ETAP 16.1.1 is a minor upgrade to ETAP 16.1.0. The only purpose of this release is to protect your
16.1.0 project files after abnormal shutdowns.
Problem Description
After an abnormal s hutdown of ETAP 16.1.0, user may r eceive the following error when attempting t o
open the project file:
ETAP has encountered an exception while trying to retrieve database version information.
Error=Could not open new database '..filename..' CREATE DATABASE is aborted.
Database load aborted!
This error is due to SQL Server failing to rebuild log or .LDf file.
Installation of ETAP 16.1.1 eliminates o ccurrence of this error by improving the database save and
recovery procedure.
If you encounter this error message, please contact ETAP Help Desk to assist in fixing your project.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed o r e xhibited in e ither e lectronic o r p rinted f ormats without t he written a uthorization o f
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
1
ETAP 16.1.1 System Requirements
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed o r e xhibited in e ither e lectronic o r p rinted f ormats without t he written a uthorization o f
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
2
ETAP 16.1
February 2017
We are pleased to announce the release of ETAP 16.1 Power System Design & Operation Software.
ETAP 16.1 is the latest upgrade to the ETAP 16 series which expands on system modeling and
comprehensive simulation capabilities.
Upon finishing installation of ETAP 16.1, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 16.1 installation DVD.
For more information on this new release, please take a few moments to review the information below.
Multi-Language Edition
English Portuguese
Spanish Korean
Russian Turkish*
Japanese Italian*
Chinese
*Output Reports Only
Datablock
Automatically hide properties or results equal to zero
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
1
Electric Shock Calculation
Per BS 7671:2008+A3:2015, Note 1 of Section 411.4.5, the Minimum Voltage Factor (Cmin) has been
defaulted to a value of 0.95 for the Electric Shock calculation. For projects prior to ETAP 16.0, since the
Cmin factor was not considered based on BS 7671 17th edition, projects converted to ETAP 16.1 will
have the value automatically converted from 1.0 to 0.95. Please note that the Electric Shock results will
be re-calculated accordingly using the Cmin factor of 0.95. If existing results want to be kept, simply reset
the value on the Minimum Voltage Factor field on the Sizing-GND/PE Electric Shock page back to 1. For
projects created in ETAP 16.0, if the Cmin equals to 1 it will be converted to 0.95 otherwise the values
will be kept.
Enhanced Modules
Star – Protection & Coordination
Short Circuit IEC
Panel Systems
Library Additions
New Exciter UDM Models - AC Rotating Excitation Systems
IEEE 421.5 Description Date
Alternator-rectifier excitation system with non-controlled rectifiers and
AC1C 2016
feedback from exciter field current
High initial response alternator-rectifier excitation system with non-
AC2C 2016
controlled rectifiers and feedback from exciter field current
AC3C Alternator-rectifier exciter with alternator field current limiter 2016
AC4C Alternator-supplied controlled rectifier exciter 2016
AC5C Simplified rotating rectifier excitation system 2016
Alternator-rectifier excitation system with non-controlled rectifier and
AC6C 2016
system supplied electronic voltage regulator
AC7C Alternator-rectifier excitation system 2016
AC8B Alternator-rectifier excitation system 2006
AC8C Alternator-rectifier excitation system 2016
AC9C Alternator-rectifier excitation system 2016
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
2
New Exciter UDM Models - Static Excitation Systems
IEEE 421.5 Description Date
Potential or compound-source controlled-rectifier exciter with field volt.
ST3A 2006
control loop
ST5B Static potential-source excitation system 2006
ST5C Static potential source excitation system 2016
ST6B Static potential-source excitation system with field current limiter 2006
Static potential and compound source excitation system with field current
ST6C 2016
limiter
ST7B Static potential-source excitation system 2006
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
3
New Power System Stabilizer Models - PSS Models
IEEE 421.5 Description Date
2B Dual-input power system stabilizer 2013
2C Dual-input power system stabilizer 2013
3B Dual-input power system stabilizer 2013
3C Dual-input power system stabilizer 2013
4B Multi-band power system stabilizer 2013
4C Speed deviation transducers 2013
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.
4
System Requirements
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
5
ETAP 16
October 2016
We are pleased to announce the release of ETAP 16 Power System Design & Operation Software.
ETAP 16.0 Model-Driven Power System Design & Operations Software expands on immersive system
modeling and comprehensive simulation capabilities.
Upon finishing installation of ETAP 16, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 16 installation DVD and via e-mail.
For more information on this new release, please take a few moments to review the information below.
Multi-Language Edition
English Chinese
Spanish Japanese
Portuguese Korean
Russian Italian*
Turkish*
*Output Reports Only
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
1
Datablock
New Intelligent Device Settings Datablock
Auto-update Device Functions & Settings
Export One-Lines and Datablock to AutoCAD™ (DXF) Drawing Files
System Elements
Motor Operated Valve Dynamic Voltage Limits
Enhanced Overhead Line Impedance Calculations
Enhanced IEC Fuse Ratings
Short Circuit
Export Short Circuit Analyzer Results to MS Excel
User-Defined Fuse Test PF and X/R for Short-Circuit Duty Evaluation
Transient Stability
Consider MOV Dynamic Voltage Limits
Enhanced Generator Excitation Systems
Enhanced Modules
Data Exchange (DataX)
Underground Raceway Thermal Analysis
Dynamic Parameter Estimation & Tuning (DPET)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
2
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
Cable Indeco N2XSY
SolidAl A2X(FL)2Y
MFR Model
Fuse – ANSI Edison TJS
(AC)
Fuse – ANSI Bussmann FRN-R (10/08)
(DC)
MFR Model
LVCB – ANSI Square-D ECB-G3, ECB-G3 (15A&20A), ECB-G3
(AC) (30A), HR, JR, LR
LVCB – ANSI Eaton LG PV, MDL PV
(DC)
MFR Model
LVCB – IEC Square-D HR, JR, LR (400A), LR (600A)
(AC)
MFR Model
TM Eaton LG PV, MDL PV
Siemens LMD
Square-D ECB-G3
MFR Model
Relay ERL Phase Power Tech. 5B3
GE Multilin IAC-70A, IAC-70B
Schweitzer 411L
Siemens 7PG23-5B3
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
3
System Requirements
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution – 1920 X 1080
Recommended display font size – 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
4
ETAP 14.1
December 2015
We are pleased to announce the release of ETAP 14.1 Power System Design & Operation Software.
ETAP 14.1 is the latest upgrade to the ETAP 14 series and includes important enhancements based on the
industry’s latest demands such as multi-language output reports and arc flash labels.
Upon finishing installation of ETAP 14.1, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 14.1 installation DVD.
For more information on this new release, please take a few moments to review the information below.
ETAP
Improved Window 10 Compatibility
Windows font handling up to 125% magnification
Refreshed Element Editors & Printing
Helpline & User Guide revisions
Enhancements to ETAP License Manager
Improved Library & Project conversions
Short Circuit
Short Circuit Analyzer – Ability to save analyzer settings
Thermal Withstand Duty Evaluation for IEC Standard
Arc Flash
Arc Flash Analyzer – Enhanced speed & report location viewing capability
Translated Arc Flash Labels
• Spanish
• French
• Portuguese
• German
• Chinese
• Russian
• Japanese
• Korean NEW
• Italian NEW
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
1
Star – Protective Device Coordination
New Protective Device Settings Reports in Excel format
Addition of Crystal Reports with support of DC protective devices
Addition of Excel Brief Reports with automated print fit
Support of Panel and DC Device Settings in Excel Report
Addition of Adjacent Bus to Excel Detail Report for sorting by substation
Addition of more than 60 models for relay and breaker protective devices
Other Modules
Improved Underground Raceway Systems Alignment Tools
Transient Stability Plot Enhancements
Updated Harmonics Alert View
Translated Study Reports
• Spanish
• French
• Portuguese
• German
• Chinese
• Russian
• Japanese
• Korean
• Italian NEW
eSCADA
Multistate element colors & symbols
General Measurements Alarming
Enhanced Quick Navigation & Toolbar layout
Transformer Tap Control
IEC 61850 - Support up to 125 devices per data collection concentrator
CSV Driver Communications
Electrical & Non-Electrical Control Commands
Real-Time Continuity Coloring
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
2
Intelligent Load Shedding (ILS)
Sequence-of-Events Recording
Event Analyzer
Customizable Reports
Reports Designer
ETAP SCADA & Web Report Viewer
Automatic Report Scheduler
Real-Time & Historical Data Access
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
3
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
LVCB – ANSI Federal Pacific XF
(AC)
Westinghouse BJ, BJH
MFR Model
LVCB – IEC L&T DM 100, DM 16, DM 160, DM 250, DM 400
(AC)
MFR Model
TM Federal Pacific XF
Westinghouse BJ / BJH
MFR Model
Relay ABB MCU, REF 620, REF 630, REG 630, REM 620,
REM 30, RET 620, RET 630
Schneider Electric P111
MFR Model
MCP L&T DM
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
4
System Requirements
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
Recommended display font size – 100% - 125%
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
We are pleased to announce the release of ETAP 14 Power System Design & Operation Software.
ETAP 1 4 d elivers u nmatched s peed, i ntelligence, and r eliability t o i ncrease p roductivity. It o ffers
powerful rule-books, result analyzers, and automated evaluation tools to reduce engineering time, enforce
standards, en sure d esign i ntegrity, an d o ptimize sy stem o peration. Gain a co mpetitive ed ge an d
accelerate system design and analysis with ETAP.
Upon finishing installation of ETAP 14.0, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 14.0 installation DVD.
For more information on this new release, please take a few moments to review the information below.
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
1
1. New Features
ETAP Foundation
• 64-bit architecture
• Local SQL database
• System Manager & Docking
One-Line Diagram
• High-resolution graphics
• Graphical symbol selection
• Graphical contouring based on results
• Circuit Tracing
Auto-Build
Auto Build i s a n a utomated a nd powerful t ool for creating and editing the one -line di agram. T he r ule-
based design of Auto-Build can significantly reduce the time spent on creating a one-line.
Features
• Automated creation of one-line without leaving the equipment toolbar
• Quick & Intuitive One-Line Generation
• Automatic Spacing & Alignment Rules
• No Need to Drag, Drop, Locate, and Connect
Datablock
Add component information, input data, and study results in one block to view on the one-line diagram.
Datablocks a re also fully customizable allowing them t o be s hown, hidden, arranged, and formatted
according to the user’s preference. An advantage with using datablocks is showing properties and results
from different studies and displaying this information within the same one-line diagram.
Features
• Customize input data & study results
• Display results, tags, and/or properties
• Define templates & share
• Automatically apply templates
• Instant preview of Datablock
Features
• Causes for Non-Convergence
• Voltage-Stability Considerations
• Excessive Loading and Generation Levels
• Areas with Unacceptable Voltage Values
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
2
• MW and Mvar Transfer Capability Limits
• Elements with Possible Incorrect Parameters
• Provide Possible Solutions
Features
• Compare & Analyze Study Results
• User-Defined Base-Line / Reference
• Identify Deviations
• Worst Case Scenarios
2. New Modules
Star, Auto-Evaluation
Auto-Evaluation is a STAR mode f eature w hich is designed for automated pr otection and c oordination
evaluation of electrical networks with overcurrent protective devices based on rules.
Features
• Automated and intelligent detection of protection zones
• Automated overcurrent Protection and Coordination Evaluation
• Customized evaluation criteria based on Rule Book
• Through-fault current calculation based on ANSI and IEC standards
• Support of standards and industry practice rules
• Evaluation and Fault Current Type selection
• Tabular and graphical display of evaluation results in colorful formats
• Extensive condition messages highlighting the violation of evaluation criteria
• Dynamic capability to correct the violations and update the results
• Easy-to-make reports from graphical snapshots and evaluation tabular sheets
Contingency Analysis
Contingency analysis represents an important tool to study the effect of elements outages in power system
security during operation and planning. It investigates, evaluates, filters and prioritizes the impacts on an
electric power system whenever typically unplanned problems or outages occur. Evaluate the impact of
N-1 a nd N -2 co ntingencies, d etermine sy stem p erformance i ndices, and co mpare r esults ag ainst sa fe
operating l imits for ea ch element in the p ower system b ased o n u ser-defined c omponent ou tage a nd
failure scenarios. For accurate results, AC load flow is run for each contingency.
Features
• N-1 and N-2 Contingency Assessment & Ranking
• Multiple Graphical Outage Lists
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
3
• Fast Screening Method
o Scan Outage List
o Identify higher risk contingencies for further evaluation
• Automatic Performance Indices Calculation
o Bus voltage security
o Real power flow change
o Reactive power flow change index
o Branch overloading index
Features
• Non-Linear dynamic circuit-models - MPET
• Include Rotor Core Losses, Rc
• Match actual MFR characteristic curves
• Save estimated results to library
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
4
3. Enhanced Modules
Theme Manager
• User-defined result format
• Display / hide based on
o Zoom level
o Equipment type
o Equipment state
o Info annotations
o Study results
o Datablocks
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
5
Transient Stability
• Motor Core Losses
• Non-linear Rotor Saturation Effects
• Match Test Measurement Data / Manufacture Curves
• Automatic Reference-Source Selection, Enhanced
• Exciter Load Current Compensation
License Manager
• Keyless network licensing
4. Data Exchange
Features
• Converts Dapper® PTW32 versions 6.0, 6.5, & 7.0
• Import CAPTOR TCCs into STAR
• Automatic, one click conversion of SKM Dapper projects
• One-line diagram layout conversion per the original project drawing
• Support for multiple one-Line drawing into composite networks
• Automatic protective device settings mapping
• Conversion of AC &DC networks
Features
• Automatic import of AC elements including all their input data
• Library m apping u tility f or im porting p rotective d evice settings f or f uses, L ow v oltage c ircuit
breakers and trip units as well as relays
• Automatic One-Line diagram import to match the original project layout
• Import of EasyPower TCCs into ETAP’s Star coordination module
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
6
SmartPlant® Electrical Interface
• Supports DC elements
• Supports AC composite networks and composite motors
• Enhanced default mapping
• Merge and sync wizard allows the users to review and change each action per element
• Ignore l ocation changes provides t he ability t o i gnore l ocation changes for existing elements in
ETAP
EMTP Interface
• Export the ETAP one-line diagram to EMTP-RV®
• Export the ETAP one-line diagram to PSCAD® / EMTDC®
Export to PSS/E®
• Version 30
• Version 32
5. Enhanced Elements
Relays
• Enhanced and redesigned the Current and Voltage Input
• Added Device Parameters of equipment as reference for protection by relay
• Added B ase C urrent a s a new m ultiplier w ith sep arate r eference f or m odeling and an alysis o f
modern microprocessor relays
• Redesigned the Output with unlimited interlock
• Added the reference terminal to OCR/OLR tabs as the input reference for functions
• Added Relay preloading factor
• Block TOC by IOC function
o When checked, the definite delay time of IOC will take over the TOC delay, starting from the IOC
pickup and the TOC+IOC will be combined as a single curve in Star View TCC. The Sequence-
Of-Operation and Arc Flash will calculate the trip time based on the displayed curve and
respective bolted or arcing fault currents.
Cables
• Automatic cable positive sequence impedance calculation
• Automatic cable zero sequence impedance calculation
• Global System Frequency Impedance adjustment
• Cable Constants
• Cable Armor thermal calculation
• Cable Sheath thermal calculation
• Calculations based on BS 5467, BS 7671 & IEC 60364
• Enhanced Cable Reports
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
7
Transformer
• Added Transformer FLA marker selection for multi-stage kVA/MVA ratings
• Enhanced the Transformer Fault Frequency withstand capability for protection by source and load
side devices
Synchronous Generator
• Added Stator & Excitation Damage to Generator Protection
Synchronous Motor
• Enhanced the thermal curve to represent Stator Hot & Cold or acceleration withstand curve
Induction Motor
• Enhanced the thermal curve to represent Stator Hot & Cold or acceleration withstand curve
• Non-linear dynamic circuit models
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
8
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
LVCB – ANSI Allen-Bradley 140M-J8P
(AC)
Cutler Hammer BR, BRH, CH, CHB, DS-206H, GCH, GHB, JL,
LGC, LGE, LGH, LGS, MD, MDS, MDSC,
MDSY, MDY
Federal Pacific HES 100, HES 160, NES 100, NES 102, NES 160,
NP632000
Hyundai HAT06, HAT08, HAT10, HAT12, HAT16, HAT20,
HAT25, HAT32, HAT40, HAT50
Merlin Gerin CF-250H, CF-250HC, CF-250L, CF-250LC, CF-
250N, CK 1200H (06/89), CK 400H (06/89), CK
400HH (06/89), CK 800H (06/89), CK 800HH
(06/89)
Square-D MGP36 (600A), MGP36 (800A), NW60H2,
NW60H3, NW60L1
Terasaki AR208S, AR212H, AR212S, AR216H, AR216S,
AR220H, AR220S, AR316H, AR320H, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S
Westinghouse MDS, MDSC, MDSY, MDY
MFR Model
LVCB – ANSI Cutler Hammer JL
(DC)
Federal Pacific HES 100, HES 160, NES 100, NES 102, NES 160
Secheron HPB45-81, HPB45-82, HPB60-81, HPB60-82
Square-D PCF-DC
MFR Model
LVCB – IEC ABB MS132-0.16 - 2.5, MS132-25, MS132-32, MS132-
(AC) 4.0 - 20, S2X 80
Allen-Bradley 140M-J8P
Cutler-Hammer LGC (250A-400A), LGC (630A), LGE (250A-
400A), LGE (630A), LGH (250A-400A), LGH
(630A), LGS (250A-400A), LGS (630A), MWI608,
MWI610, MWI612, MWI616, MWI620, MWI625,
MWI632, MWI64N, MWI808, MWI810, MWI812,
MWI816, MWI820, MWI825, MWI832, MWI84N,
MWI85N, MWI86N, MWIC08, MWIC10,
MWIC12, MWIC16, MWIC20, MWIC25,
MWIC32, MWIC4N, MWIC5N, MWIC6N,
MWN408, MWN410, MWN412, MWN508,
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
9
MWN510, MWN512, MWN516, MWN520,
MWN608, MWN610, MWN612, MWN616,
MWN620
Hyundai HAT06, HAT08, HAT10, HAT12, HAT16, HAT20,
HAT25, HAT32, HAT40, HAT50
Merlin Gerin CF-250H, CF-250L, CF-250N, CM1250H,
CM1250N, CM1600H, CM1600N, CM2000H,
CM2000N, CM2500H, CM2500N, CM3200H,
CM3200N, NS1000 H (E), NS1000 H (M), NS1000
L (E), NS1000 L (M), NS1000 N (E), NS1000 N
(M), NS1000b H (M), NS1000b N (M), NS1250 H
(E), NS1250 H (E), NS1250 H (M), NS1250 H (M),
NS1250 N (E), NS1250 N (E), NS1250 N (M),
NS1250 N (M), NS1250b H (M), NS1250b N (M),
NS1250H, NS1250N, NS1600 H (E), NS1600 H
(M), NS1600 N (E), NS1600 N (M), NS1600b H
(M), NS1600b N (M), NS2000 H (M), NS2000 N
(M), NS2500 H (M), NS2500 N (M), NS3200 H
(M), NS3200 N (M), NS630b H (E), NS630b H
(M), NS630b L (E), NS630b L (M), NS630b N (E),
NS630b N (M), NS630b R (M), NS800 H (E),
NS800 H (M), NS800 L (E), NS800 L (M), NS800
N (E), NS800 N (M), NS800 R (M), NS800b H
(M), NS800b N (M)
Schneider Electric MVS08-H, MVS08-N, MVS10-H, MVS10-N,
MVS12-H, MVS12-N, MVS16-H, MVS16-N,
MVS20-H, MVS20-N, MVS25-H, MVS25-N,
MVS32-H, MVS32-N, MVS40-H, MVS40-N
Square-D NW40bH1, NW40bH2
Terasaki AR208S, AR212H, AR212S, AR216HS, AR216S,
AR220H, AR220S, AR316H, AR320HS, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S,
E630-NE, H250-NE, H400-NE, L400-NE, S250-
GE, S250-NE, S250-PE, S400-GE, S400-NE, S630-
CE, S630-GE, XS800SE
MFR Model
LVCB – IEC Terasaki AR208S, AR212H, AR212S, AR216HS, AR216S,
(DC) AR220H, AR220S, AR316H, AR320HS, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S
MFR Model
TM ABB MS132, S500-B, S500-C, S500-D, S500UC-B,
S500UC-B (DC)
Cutler-Hammer BR (1P), BR (2P), BR (3P), CH(1P), CH(2P),
CH(3P), CHB(1P), CHB(2P), CHB(3P), F, JL, LW,
MD
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
10
Federal Pacific NP
General Electric TFJ [04], TFK [04], THFK [04], THKM, THMM,
TKM, TPMM
Merlin Gerin CF-250
Square-D LC (Series 3), PC-DC
MFR Model
LVSST ABB S500-K, S500UC-K (DC), SACE PR113
Cutler-Hammer Digitrip 310+ (LG) LSI, Digitrip 310+ (LG) LSIG,
H, MDS, MDSG
Federal Pioneer SD-3, SD-6, SS-1, SS-2, SS-3, SS-4, SS-5, SS-6
Hyundai AOR-1D-GM, AOR-1L-AL, AOR-1L-AM, AOR-
1L-AS, AOR-1L-GL, AOR-1L-GM, AOR-1L-GS,
AOR-1S-AL, AOR-1S-AS
Merlin Gerin ST 215D, ST 308S, ST 318S, ST 408S, ST 408ST,
STCM1, STCM2, STCM3, STR 18M
Schneider Electric ET2I, ET5S, ET6G
Siemens ETU 555 (DG Frame), ETU 555 (FG Frame), ETU
555 (JG Frame), ETU 555 (LG Frame), ETU 555
(MG frame), ETU 555 (NG Frame), ETU 555 (PG
Frame)
SURE TRIP RMS-2002
Terasaki AGR-S, AGR-S (LT Curve), E630-NE (Curve 1-2),
E630-NE (Curve 3), E630-NE (Curve 4-6),
Microprocessor (630A, 800A), S250-NE (Curve 1-
2), S250-NE (Curve 3), S250-NE (Curve 4), S250-
NE (Curve 5-7), S400-NE (Curve 1-2), S400-NE
(Curve 3), S400-NE (Curve 4), S400-NE (Curve 5-
7)
Utility Relay AC-PRO with quick trip
MFR Model
Fuse – ANSI Bussmann 55GDMSJD, 55GFMSJD, CGL, DCM, FNQ-R,
(AC) FRS-R (10/02)
Cooper Bay-O-Net (353C), ECNR (2009), ECSR (2009)
Cutler-Hammer 15HLE, Current Limiter – TRI-PAC CB
Federal Pioneer JCL, LCL
Gould Shawmut
A150X
(Ferraz)
Hinode Electric 1000GH
Littelfuse JLS, KLNR, KLSR
Mersen A155B
Siba SQB3
MFR Model
Fuse – ANSI Bussmann CGL, DCM, TPB, TPL
(DC)
Cooper ECNR (2009)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
11
Gould Shawmut
A150X
(Ferraz)
Hinode Electric 1000GH
Littelfuse KLNR, KLSR
Mersen HP6J
MFR Model
Fuse – IEC Bussmann 170M (Size 24), CJB
(AC)
GEC CJ
Siba SQB3, SQB3-2, SQB3-70
MFR Model
Fuse – IEC Bussmann CJB
(DC)
GEC CJ
MFR Model
Relay ABB CA-6, E200DU, GR-200, GRC, HCB1, IKC911,
IKC912, IKC913, IRV, LCB II, NI 40/41, PR-512,
REB 611, RED 615, REF 550, REF 611, REF 615,
REJ 603, REM 611, REM 615, RET 615, REU 615,
RI (50 Hz), RI (60 Hz), SPAC 320 C, UMC100-
FBP, UMC22-FBP
AEG PS431
Allen Bradley CGCM, SMC Dialog Plus Controller
ALSTOM KBCH 120, KBCH 130, KBCH 140, MBCH 12,
MBCH 13, MBCH 16, MBCI, MFAC 14, MFAC
34, MOPN 01, MOPN 02, MX3IPG1A
AREVA MCAG 12, MCAG 13, MCAG 19, MCAG 32,
MCAG 33, MCAG 39, MCTI 19, MCTI 39, MCTI
40
Basler Electric BE1-CDS240, BE1-IPS100, DGC-2020
Beckwith Electric M4272
Cooper IM30AB
Eaton D64RPB100, D64RPB250
Electromagnetic GFP
Industries LLP
ERL Phase Power 8700
Tech.
Federal Pioneer GLR-12S
Fuji Electric UM42C, UM42F, UM43FD, UM43FG
GE Multilin IBCV51M, IBCV51M(-)Y1A, IBCV52M,
IBCV53M, IBCV53M(-)Y1A, IBCV54M,
IBCV77M, IBCV78M, PVD21, SMOR-B,
STD15C, STD15D, STD16C, STD17C, STD18C,
STD21C, STD25D, STD26C, STD28C, STD29C
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
12
GEC CTG 11, CTG 13, CTG 14, CTG 21, CTG 23, CTG
24, CTIG39, FAC14, FAC34
I-Gard FALCON ARC PROTECTION
L&T MCOMP
Microelettrica- DMTR, IM30AB, MM30-743, N-DIN-F, N-DIN-
Scientifica MA
MIKRO MK1000A, MK201A, MK203A, MK2200,
MK300/MK300E
Motortronics RX
Neopis Co.Ltd PROMET-F
Omron SE
P&B Engineering M5A, Mn3, Mn4, Mn5A, MR-EF, Mw5A
Schneider Electric TeSys LT6-P, TeSys LT6-P (CT)
Schweitzer 487V, 751A (R410), 849 (R101)
SELCO S600
Siemens 3RB12, 7SG18, 7SS601, 7UT612, 7UT613,
7UT633/635
Skymatic Controls GFR-3
Inc.
Square-D DR-LXS01
Westinghouse CA-6
MFR Model
MCP ABB S2X 80, S3 160, S3 250, Tmax T2 & T3
Allen-Bradley 140M-J8P
Cutler-Hammer HMCPE
Merlin Gerin CF-250
Siemens HEM
MFR Model
Cable AlcatelWire Energex-SP
AmerCable CIRVFD
NEC NEC Tab9 AL, NEC Tab9 PVC, NEC Tab9 ST
Prysmian Airguard CSA
Southwire SIMpull XHHW/CT
TFKable Type DLO
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
13
System Requirements
PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
14
ETAP 12.6.5
February 2015
The ETAP Development Team is pleased to provide you with the ETAP 12.6.5 release.
ETAP 12.6.5 is a point release to 12.6. This is a complete installation which does not require an
earlier installation of ETAP.
Included in this latest release are enhancements to the Checker access-level action for Revision
data, cable temperature calculations for 1/C cables with random arrangements in underground
duct banks, and library data.
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2015 BY OPERATION TECHNOLOGY, INC.
1
500 Bus Projects
Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2015 BY OPERATION TECHNOLOGY, INC.
2
ETAP 12.6
March 2014
ETAP is pleased t o provide you w ith t he e nclosed E TAP 12.6 point release. ETAP 1 2.6 is a co mplete
program and does not require any previous ETAP installation.
This point release is the latest in the ETAP 12 series and includes important updates based on the
industry’s latest demands. This Readme contains key information about ETAP that may not be
included in Help file.
ETAP continues to expand and enhance its capabilities based on the requirements of the industry. In
ETAP 12.6, the Unbalanced Load Flow module was enhanced to simulate double open-phase faults.
This e nhancement i s i n re sponse t o t he r equirements f or the nuclear g eneration p lants t o c onduct
single a nd doubl e op en-phase f ault s tudies f or t heir of f-site pow er supplies. Enhancements t o the
Unbalanced Load Flow module include:
IEEE exciter t ype AC7B has b een m odified ba sed on I EEE 421.5 e rrata from J une o f 2 008. P revious
versions of E TAP included de tailed m odeling of the AC7B excitation sy stem based on IEEE s tandard
421.5-2005. T he revised model i ncludes exciter t ime constant modeled a s a n i ntegrator rather than a
simple time constant. The enhanced AC7B model also includes the load current compensation circuit as
described in s ection 4, figure 4-1, of 421.5-2005. T he l oad current compensation circuit can be used to
effectively regulate voltage a t a poi nt beyond t he terminal of t he generator and compensate f or step-up
transformer drops. Additional enhancements and capabilities include:
Upon finishing installation of ETAP 12.6, a new 36-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 12.6 installation DVD.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2014 BY OPERATION TECHNOLOGY, INC.
1
System Requirements
Before y ou i nstall ETAP 12.6 , m ake su re that y our co mputer m eets t he recommended hardware a nd
software requirements listed below.
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2014 BY OPERATION TECHNOLOGY, INC.
2
ETAP 12.5
August 2013
The ETAP Development Team is pleased to provide you with the enclosed ETAP 12.5 release. ETAP
12.5 is a complete program and does not require any previous ETAP installation.
ETAP 12.5 release is the latest upgrade of the market-leading electrical power system design and
operation software. The new analysis features and enhanced capabilities effectively enable optimized
design, increasing safety, quality, and productivity.
ETAP 12.5 Faster Than Real-Time™ solution provides for better decision making, improved
operations management, cost saving, and compliancy.
Upon finishing installation of ETAP 12.5, a new 36-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 12.5 installation DVD.
For more information on this new release, please take a few moments to review the information below.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
1
New Features
Features
Tune dynamic models with multiple input/output
Estimate model parameters using actual field measurements
Utilize field data from disturbance recorders & PMUs
Automatically exclude questionable data & filter noise
Compliance with NERC MOD standards
Multi-objective stochastic optimization method
Utilize ETAP User-Defined Dynamic Model to build custom models
Combinations of models: Generators, Governors, Exciters, Power System Stabilizers, Dynamic
Loads, Networks, etc.
Graphical platform to create and edit dynamic models
Generate comparisons of multiple estimation results
Determine model parameters resulting in the best model & measured data fit
View parameter sensitivity, measured vs. simulated model outputs, & residual values
View & compare tuned parameters for New Case
Multiple sets of input/output data-files for tuning comparison
Easily change the parameter initial values, including block limits
Features
Calculate periodic & aperiodic components and surge current
Consider pre-fault loading condition
Calculation of short-circuit current at any specified time
Radial and multi-loop circuit calculations
GOST short-circuit output report in Russian language
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
2
Scenario Wizard Enhancements
ETAP Scenario Wizard now includes the ability to automatically run multiple Underground Raceway
System scenarios with different project files and verify their study results against benchmark reports.
Once the scenarios are set up, you can compare hundreds of study reports together with one click.
Features
New Underground Raceway System (UGS) Scenarios
Direct access to Study Cases Editors
Direct access to Revision and Configuration Managers
Automatically compare, verify and validate Transient Stability plots
Export plots and data points to Excel
Simulate “What if” events
Dynamic update of preference file; INI entries
Features
New library merge process with increased speed
Create custom library files faster
Enhanced library merge functionality
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
3
ETAP Real-Time
Features
Smart Grid & Microgird Master Controllers
Real-Time decision making applications
Predictive Simulation, Optimization & Automation
Online & archive data trending
Operator training simulator
Enhanced e-SCADA component library
Web-based SCADA architecture
Features
Thin client applications
Automatically generate electrical diagrams from ETAP
Intelligent web graphical user interface
HMI template library
Configurable web visualization & control
Electrical grid view - Geographical map
Utilize geospatial maps for situational awareness
Alarm & warning views
Flexibility to create “what if” scenarios
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
4
Disturbance Monitoring & Wave Capturing
ETAP provides the ability to replay recorded voltage and current waveforms; visualize and analyze
power quality throughout the system.
Features
Digital Fault Recorder
Synchrophasor Measurement Unit (PMU)
Replay recorded voltage & current waveforms
Capture data from Disturbance Monitoring Equipment:
o COMTRADE Sequence of Events Recorders & PMUs
o Fault & Dynamic Disturbance Recorders
Online & archive data trending:
o Current
o Voltage
o Power
o Frequency
Multi-Language Editions
ETAP interface is localized in 7 languages and provides output reports in 8 languages.
Languages
English
Spanish
Chinese
Japanese
Russian
Portuguese
Korean
German (output reports only)
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
5
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
LVCB - ABB E1B-A(2005),E1N-A(2005),E2B-A(2005),E2H-A(2005),E2N-
ANSI A(2005),E2S-A(2005),E3H-A(2005),E3N-A(2005),E3S-
A(2005),E3V-A(2005),E3X-A(2010),E4H-A(2005),E4H-
A/f(2005),E4L-A(2005),E4L-A(2010),E4S-A(2005),E4V-
A(2005),E6H-A(2005),E6H-A/f(2005),E6L-A(2005),E6V-
A(2005),E6X-A(2010),E6X-A/f(2010),X1N-A(2008)
Allen-Bradley 140U-I0C3,140U-I3C3,140U-I6C3,140M-I8P,140M-I8R,140U-
J0C3,140U-J2C3,140U-J3C3,140U-J6C3,140U-JD0,140U-
JD3,140U-JD6,140U-K0X3,140U-K3X3,140U-K6X3,140U-L0,
140U-L3,140U-L6,140U-I0C3, 140U-I3C3, 140U-I6C3,140U-
JD0,140U-JD3,140U-JD6,140U-K0X3,140U-K3X3,140U-
K6X3
Cutler Hammer AQB-A103
General Electric FEH,FEL,FEN,TEYD,TEYH,TEYL
Schneider Electric NSX100–F,NSX100–H,NSX100–N,NSX160–F,NSX160H,
NSX160–N,NSX250–F,NSX250–H,NSX250–N,NSX400F,
NSX400–H,NSX400–N,NSX630–F,NSX630–H,NSX630-N
Square-D HD,HG,HJ,HL,JD,JG,JJ,JL,LD,LG,LJ,LL
Terasaki AH-40C, AH-60C
K Moeller NZMH2,NZMH3,NZMN3
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
6
NSX400–N,NSX400–S,NSX630–H,NSX630 – L,NSX630–N,
NSX630 - S
Square-D HD,HG,HJ,HL,JD,JG,JJ,JL,LD,LD(600A),LG,LG(600A),LJ, LJ
(600A),LL,LL (600A)
Terasaki AH-40C, AH-60C
Toshiba NJ100MB, NJ100NB, NJ100NB-T, NJ100P, NJ50EB, NJ50FB
NJ100MB, NJ100NB, NJ100NB-T, NJ100P, NJ50EB, NJ50FB
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
7
MFR Model
Fuse - Bussman FRN-R (10/08), TJN
ANSI
Cooper ELSP (08/12), ELSP (08/12),ELSP (08/12)
Cutler-Hammer CLE2 (7/03),CLE3 (7/03)
Mersen CP
MFR Model
Relay ABB ICM2
ALSTOM MX3IPD1A, MX3IPD1B
BBC ICM2(50Hz), ICM2(60Hz), ICM21(50Hz)
Basler Electric BE1-87B, BE1-87G, BE1-87T
LSIS IMP
Schneider Electric TeSys T
Siemens ESP200
MFR Model
Recloser Cooper RX <100A Coil>,RX <140-225A Coil>,RX <25A Coil>,
RX <280A Coil>,RX <280X Coil>,RX <35A Coil>,RX
<400A Coil>, RX <400X Coil>,RX <50A Coil>,RX <70A
Coil>
MFR Model
TMCP ABB T2 160-MA,T2 160-MF,T3 250-MA,T4 250-MA
Allen-Bradley 140M-I
MFR Model
Cable BICC 3X1/C Parallel Empower Fill Concentric Neutral Power
Cable
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
8
System Requirements
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
9
ETAP 12.0.0
January 2013
The ETAP Development Team is pleased to provide you with the enclosed ETAP 12.0.0 release. ETAP
12.0.0 is a complete program and does not require any previous ETAP installation.
ETAP 12.0.0 is a major release that advances our continued shared commitment with clients and business
partners to provide the most comprehensive analytical solutions for the design and operation of power
systems now, and the energy technologies for tomorrow. As the industry’s market leader, ETAP delivers
the future of power systems engineering and operation – today. The new enhancements and analysis
modules are still developed with mathematical precision using our Quality Assurance and Verification &
Validation Procedures.
Upon finishing installation of ETAP 12.0.0., a new 36-digit activation code is required to activate and
open the application. The activation code is provided on the ETAP 12.0.0 installation CD.
For more information on this new release, please take a few moments to review the information below.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
1
1. New Features
Auto-Connect
A new tool is added to increase the efficiency and convenience of connect or disconnect the elements on
one-line.
Features
Automatic equipment connection mode
Automated selection of available pins
Auto connection to closest highlighted element
Auto Disconnect & Reconnect
Adaptive Newton-Raphson
This new Newton-Raphson method has been added to most modules requiring load flow calculations,
such as Load Flow, Motor Starting, Harmonic Analysis, Transient Stability Analysis, and Optimal
Capacitor Placement, etc. The method greatly enhances convergence of load flow calculations for special
system configurations and operating conditions that do not yield a solution by regular Newton-Raphson
method. When it determines such a case, it adaptively adjusts the step size of the iterative calculation
process to provide a solution.
Features
Increased convergence for systems with negligible impedance
Improved handling of transmission line series capacitors (i.e. negative line series reactance)
Features
Auto enforcement of switching interlock logics
Automatic pre-switching & post-switching logic verification
Interlock based on switching devices positions
Interlocks based on load flow results, power flows and voltages
Automatic interlock conflict checking
Ability to model cascade control of switching devices
Active monitoring of switching interlock violations
Switching plan validation against hazardous actions
Cable Manager
The Cable Manager allows the “batch” management of all the cable data, as they appear in the Cable
Editors of each cable. The Cable Manager shows cable data in a consolidated fashion in a grid; with the
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
2
presence of intelligent filters, cables can be searched and grouped by their relevant parameters, thereby
simplifying their engineering management. Cable Manager allows batch reporting and selecting from
library.
Features
Batch cable management
Customizable cable reports
Multi-cable sizing & shock protection evaluation
Intelligent search and filtering
Export to Excel sheets
Features
Converts Dapper® PTW32 versions 6.0 & 6.5
Import CAPTOR TCCs into STAR
Automatic, one click conversion of SKM Dapper projects
One-line diagram layout conversion per the original project drawing
Support for multiple one-Line drawing into composite networks
Automatic protective device settings mapping
Conversion of AC &DC networks
Features
Automatic import of AC elements including all their input data
Library mapping utility for importing protective device settings for fuses, Low voltage circuit
breakers and trip units as well as relays
Automatic One-Line diagram import to match the original project layout
Import of EasyPower TCCs into Etap’s STAR coordination module
Features
Freehand polyline shapes & styles
Graphically define revision boundary on the OLV
Dynamic textbox object
Save with OLV Templates
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
3
License Checkout/Borrowing
The ETAP license manager has been enhanced to include License Checkout/Borrowing, also known as
“Check-Out” license. ETAP 12 License Manager provides the ability to allow the user to borrow or check
out a license from the host network for a specified amount of time. The engineer can select the amount of
days to borrow the license, up to a maximum of 120 days, and then use that license away from the
network before that seat is automatically returned. During the time the license is borrowed, the checked
out license is removed from the available licenses in the network and can be used on the computer as a
keyless seat outside the network.
Capabilities:
License borrowing option can be set up through the ETAP LM Configuration utility.
Borrowed license can run with the computer disconnected from the network until the borrowing
period ends.
Borrowed duration is determined per user account.
LM tracks and keeps count of remaining / available licenses for checkout
Borrowed license duration can be configured from 1 day up to 120 days
Borrowed licenses are linked to the computers used during checkout
License Manager
The license manager also includes an editor for IT administrators to enhance the management of license
usage. The new license manager editor allows the administrator to monitor the number of users and the
time they logged in. From this manager, the IT administrator can remove a connected user from the user
list and make a license available for others.
Features
License Checkout/Borrowing
Start/Stop Service
View Logon Time
Remove connected users
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
4
2. New and Enhanced Modules
Interharmonics
ETAP Harmonic Analysis module has been enhanced with new features including interharmonic
modeling and studies, options to use device/equipment rating or fundamental frequency load flow data as
harmonic current source or voltage source base, along with a new design of Harmonic Library to allow
user inputting harmonic spectrum up to 250th harmonic order, or automatically populating harmonic
order, magnitude and phase angle based on power converter pulse number and other parameters.
Features
Interharmonic modeling & simulation
Perform voltage flicker limitation studies
Interharmonic distortion indices calculation based on IEC 61000-4-7
Handling of harmonic order up to 250th order
Automatic interharmonic frequency generation
Manual or automatic harmonic spectrum generation
Adjustable harmonic current base
Features
Open-Phase A, B, or C phase
Modeling of 2-winding and 3-winding transformer excitation branch
Include buried delta winding for 2-winding and 3-winding transformers
Report sequence values of voltages and current flows
Features
User-friendly switching plan builder
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
6
Point & click selection of switching device from the one-line diagrams
Graphical display of selected switching devices
Multi-level switching request approval
Assignment of user-definable & interlock logic per each switching device
Checking of selected switching plans against forbidden or potentially hazardous actions
Unlimited switching plans each with an unlimited number of switching actions
Switching order reports include switching mode, start / stop time, & nature of work
Simulate & evaluate switching plans in all states prior to execution
Project Merge
Project Merge functionality has been enhanced to allow the user to include TCCs in an export when
exporting a portion of the project.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
7
3. New and Enhanced Elements
Transformer
2W & 3W buried Delta transformer
Calculation of zero sequence based on test data
Core & shell type mechanical construction
3L, 4L & 5L models
Cables
Automatic cable positive sequence impedance calculation
Automatic cable zero sequence impedance calculation
Global System Frequency Impedance adjustment
Cable Constants
Cable Armor thermal calculation
Cable Sheath thermal calculation
Calculations based on BS 5467, BS 7671 & IEC 60364
Enhanced Cable Reports
Inverter
MPPT controller to interact with DC PV Array Systems
Enhanced modes of operation for load flow simulations
Power Grid
Enhanced 3-Phase and 1-Phase grounding impedance models
DC Circuit Breaker
Added additional trip device and trip unit capabilities (similar to AC LV circuit breakers)
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
8
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
LVCB - ANSI ABB S8V
Allen-Bradley 140U-D (0.5-10A), 140U-D (12-30A), 140U-K0X3,
140U-K3X3, 140U-K6X3
Carling F-Series
Technologies
Cutler Hammer CHH, EC, EHC, FC, FDCE, FDE, GDB, GHQ,
HGHB, HGHC, HFDE, MDD-X40 (2012), MDD-
X50 (2012), MDD-X60 (2012), MDN-408 (2012),
MDN-416 (2012), MDN-508 (2012), MDN-516
(2012), MDN-608 (2012), MDN-616 (2012), MDN-
620 (2012), MDN-640 (2012), MDN-840 (2012),
MDN-C08 (2012), MDN-C16 (2012), MDN-C20
(2012), MDN-C40 (2012), MDS-408 (2012), MDS-
608 (2012), MDS – 612, MDS-616 (2012), MDS-
620 (2012), MDS-632 (2012), MDS-808 (2012),
MDS-816 (2012), MDS-820 (2012), MDS-832
(2012), MDS-840 (2012), MDS-850 (2012), MDS-
C08 (2012), MDS-C16 (2012), MDS-C20 (2012),
MDS-C32 (2012), MDS-C40 (2012), MDS-C50
(2012), MDS-C60 (2012), MDS-L08 (2012), MDS-
L16 (2012), MDS-L20 (2012), MDS-X08 (2012),
MDS-X16 (2012), MDS-X20 (2012), MDS-X32
(2012), MDS-X40 (2012), MDS-X50 (2012),
MDSL, MDSX (800-2000), MDSX (3200-5000)
Federal Pioneer NA, NB, NBH, NC
Siemens HEG, NEG, HMG, HNG, HPG, LMG, LNG, LPG,
NMG, NNG NPG
Square-D DG 400, DG 600, DJ 400, DJ 600, DL 400, DL 600
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
9
L16, GV2 L20, GV2 L22, GV2 L32, GV2 LE07,
GV2 LE08, GV2 LE10, GV2 LE14, GV2 LE20,
GV2 LE22, GV2 LE32, GV2 M07, GV2 M08, GV2
M10, GV2 M14, GV2 M16, GV2 M20, GV2 M21,
GV2 M22, GV2 ME 07, GV2 ME 08, GV2 ME 10,
GV2 ME 14, GV2 ME 16, GV2 ME 20, GV2 ME
21, GV2 ME 22, GV2 ME 32, GV2 P07, GV2 P08,
GV2 P10, GV2 P14, GV2 P16, GV2 P20, GV2 P21,
GV2 P22, GV2 P32
Terasaki E125-NJ, E250-NJ, E400-NJ, H125-NJ, H160-NJ,
H250-NJ, H400-NJ, L125-NJ, L160-NJ, L250-NJ,
L400-NJ, S125-GJ, , E250-NJ, E400-NJ, H125-NJ,
H160-NJ, H250-NJ, H400-NJ, L125-NJ, L160-NJ,
L250-NJ, L400-NJ, S125-NF, S125-NJ, S125-GJ,
S160-GJ, S160-NF, S160-NJ (20,32A), S160-NJ
(50-160A), S400-CJ, S400-GJ, S400-NJ S250-GJ,
S250-NJ
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
10
frame), ETU 576 (FG frame), ETU 576 (JG frame),
ETU 576 (LG frame), ETU 576 (MG frame), ETU
576 (NG frame), ETU 576 (PG frame)
Square-D GFM100FA, GFM100FI, GFM250
MFR Model
Fuse - ANSI ABB DO-III 143G, DO-III 144G, DO-III 145G
Bussman DFJ, FRN-R(8/00), FWA, FWH, FWJ 35-2000A,
FWP, FWX
Cutler-Hammer LFB Current Limiter
Edison LCL, LCU
Gould Shawmut A100C Type 30, A150C Type 10, A150C Type 20,
(Ferraz) A150C Type 40, A150C Type 50, A200C Type 10,
A200C Type 50, A250C Type 10, A250C Type 30,
A250C Type 50, A300C Type 10, A300C Type 20,
A300C Type 60, A430C Type 15, A430C Type 70,
A430C Type 75, A550C Type 15, A550C Type 70,
A550C Type 75, PSC aR Sizes 70 (350A), PSC aR
Sizes 70 (63A-315A), PSC aR Sizes 71 (160A-
500A), PSC aR Sizes 71 (500A-630A), PSC aR
Sizes 72 (280A-630A), PSC aR Sizes 72 (630A-
800A), PSC aR Sizes 73 (1000A-1400A), PSC aR
Sizes 73 (1400A), PSC aR Sizes 73 (315A-900A),
PSC aR Sizes 73 (800A), PSC aR Sizes 73 (900A-
1100A)
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
11
ES,XS
HRC-Type OS, HRC-Type SS, NH-General
Purpose, NH-Motor Starting, Nit and Net
Gould Shawmut NH (Size 0), NH (Size 00), NH (Size 000), NH
(Ferraz) (Size 1), NH (Size 2), NH (Size 3), PSC aR Sizes 70
(350A), PSC aR Sizes 70 (63A-250A), PSC aR
Sizes 70 (280A-315A), PSC aR Sizes 71 (160A-
450A), PSC aR Sizes 71 (500A-630A),PSC aR
Sizes 72 (280A-630A), PSC aR Sizes 72 (630A-
800A), PSC aR Sizes 72 (700A-800A), PSC aR
Sizes 73 (1000A-1400A), PSC aR Sizes 73
(1100A), PSC aR Sizes 73 (1400A), PSC aR Sizes
73 (315A-800A), PSC aR Sizes 73 (700A-900A),
PSC aR Sizes 73 (800A), PSC aR Sizes 73 (900A-
1100A), PSC aR 2x72(1250A-1400A), PSC aR
2x72 (1600A), PSC aR 2x72 (630A-1100A), PSC
aR 2x73 (1400A-1800A), PSC aR 2x73 (2000A),
PSC aR 2x73 (2200A), PSC aR 2x73 (2500A), PSC
aR 2x73 (2800A), PSC aR 2x73 (800A-1250A)
Hitachi FPLS
L&T HF, HN (Size 0), HN (Size 00), HN (Size 000), HN
(Size 1), HN (Size 2), HN (Size 3)
Merlin Gerin NS80H, MA
Mitsubishi AE630 –SW, AE1000-SW, AE1250-SW, AE1600-
SW, AE2000-SW, AE2000-SWA, AE2500-SW,
AE3200-SW, AE4000-SW, AE4000-SWA,
AE5000-SW, AE6300-SW
MFR Model
Relay ABB DPU
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
12
System Requirements
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
13
ETAP 11.1.1
June 2012
ETAP is pleased to send you the enclosed ETAP 11.1.1 point release. ETAP 11.1.1 is a complete
program and does not require any previous ETAP installation.
ETAP 11.1.1 will utilize the same 36-Digit Activation Code as provided with the ETAP 11 series
release.
The elements inside Composite Networks become de-energized when a Composite Network is selected
and a Star View (TCC) is generated. This problem does not affect Composite Motor or the data in the
selected Composite Networks.
If this issue is detected in your project, ETAP 11.1.1 will automatically fix the problems with the
disabled Composite Networks upon opening the project file.
The list of fixed Composite Networks is placed in a conversion log located in the converted project
directory.
Note that in ETAP 11.1.0 the elements within the disabled Composite Networks were de-energized and
thus ignored in network analysis. After the project conversion, it is recommended to review any study
involving the listed disabled Composite Networks.
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Library Additions
The following devices were added to ETAP 11.1.1
Thermal
Magnetic Trip Hitachi F-400R
Units (TM)
Siemens 525(MG frame), 525(NG frame), 525(PG frame)
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
System Requirements
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP 11.1
January 2012
The OTI Research & Development Team is pleased to offer you the enclosed ETAP 11.1 release. ETAP
11.1 is a complete program and does not require any previous ETAP installation.
The first time you run ETAP 11.1, you will need to enter the 36-Digit Activation Code as provided on the
back cover of the ETAP 11.1 installation DVD.
This point release expands on the current release by offering multiple language support. ETAP 11.1 is
completely localized in six languages: English, Spanish, Chinese, Japanese, Portuguese, and Russian.
New Modules
DC Arc Flash Analysis
Enhanced Features
Conversion tool from Dapper® PTW32 versions 6.0 & 6.5
Import from PSS®E version 29 & 30
Enhanced Libraries
Updated cable library based on NEC® 2008
New cable library based on British Std. 7671
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
DC Arc Flash Analysis
The ETAP DC Arc Flash analysis module uses several methods to determine the level of incident energy
which can be generated by different direct-current electric circuits. The program is fully integrated into
the ETAP DC Short-Circuit calculation program which has been an industry standard for the analysis of
DC equipment faults for many years. The program can be used to determine the arc flash energy for
industrial, nuclear, data centers, electrochemical, petrochemical and any other DC electrical applications.
The DC arc flash incident energy and arc flash boundaries are determined based on the equations and
methodology presented in the following documents
Features
Incident Energy & Shock Protection Boundary Calculations
Maximum Power, Stokes & Oppenlander, Paukert Methods
NFPA 70E 2012 Compliant
Integrated DC Short Circuit Analysis Software
DC Arc Flash Result Analyzer
Incident Energy Plots
DC Arc Flash Labels
Integrated DC Protective Device Library
Determine Fault Clearing Time from DC protective devices
MS Excel® Export & Report
Data Exchange
ETAP 11.1 brings a new import utility that allows for the automatic conversion of projects created in
SKM. This feature is included as a part of the base module. This data exchange tool allows for direct
import of SKM Dapper® PTW32 versions 6.0 & 6.5. For converting projects in earlier PTW32 versions,
first open and save the projects under ver. 6.0 or 6.5
Features
Converts Dapper® PTW32 versions 6.0 & 6.5
Automatic, one click conversion of SKM Dapper projects
One-line diagram layout conversion per the original project drawing
Support for multiple one-Line drawing files
Conversion of AC &DC networks
ETAP and ETAP Real Time are trademarks of Operation Technology, Inc. All other trademarks, product names and/or logos are the property of
their respective holders.
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Library Additions
The following devices were added to the ETAP 11.1.
Thermal
Magnetic Trip Siemens NGB, NGG
Units (TM)
Non-
Southwire-PV English 60 CU Mag. 0.6 100 1/C USE2
Non-
Southwire-PV English 60 CU Mag. 2 100 1/C USE2
Non-
Southwire-PV English 60 AL Mag. 2 100 1/C USE2
Non-
Southwire-PV English 60 CU Mag. 0.6 100 1/C RHW2
Non-
Southwire-PV English 60 CU Mag. 2 100 1/C RHW2
Non-
Southwire-PV English 60 AL Mag. 2 100 1/C RHW2
NEC English 60 CU Magn. 0.6 100 1/C UF
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHW
NEC English 60 CU Magn. 0.6 100 1/C THW
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 1/C USE
NEC English 60 CU Magn. 0.6 100 1/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C ZW
NEC English 60 CU Magn. 0.6 100 1/C RHH
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHN
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 3/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C TW
NEC English 60 CU Magn. 0.6 100 1/C UF
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHW
NEC English 60 CU Magn. 0.6 100 1/C THW
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 1/C USE
NEC English 60 CU Magn. 0.6 100 1/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C ZW
NEC English 60 CU Magn. 0.6 100 1/C FEP
NEC English 60 CU Magn. 0.6 100 1/C FEPB
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Unit Freq. Cond. %
Source System (Hz) Type
Instal. kV
Class
#/C Insulation
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
System Requirements
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP 11.0
September 2011
The OTI Research & Development Team is pleased to offer you the enclosed ETAP 11.0 release. ETAP
11 is a complete program and does not require any previous ETAP installation.
This release offers rule-based, automated design and analysis tools that enable engineers and managers to
significantly increase their productivity and reduce the amount of design and review man-hours.
ETAP 11 represents our continued commitment to provide the analytical and operation software tools for
design and development of power systems now, and energy technologies for tomorrow.
New Features
Data Manager Enhanced Modules
Project Merge
Multi-Dimensional Database
New Elements Data Exchange – Data X
Theme Manager
Bus Duct
Protective Device Coordination
Single Phase Source
– Star
Photovoltaic Array
Arc Flash Analysis
Switching Devices
Underground Raceway System
Open-Delta Transformer
Cable System
Variable Frequency Drive -
Cable Ampacity & Sizing –
VFD
IEEE/NEC
New Modules Cable Ampacity & Sizing –
IEC/BS
User-Defined Dynamic Model –
Load Flow
UDM
Unbalanced Load Flow
Protective Conductor Sizing –
IEC/BS Motor Acceleration
Electric Shock Calculation – Harmonics
IEC/BS Transient Stability
Power System Monitoring &
Enhanced Elements Simulation
Induction Machine Event Playback
Transformer Intelligent Fast Load Shedding
Uninteruptable Power Supply – Interchange Transaction
UPS Scheduling
Wind Turbine Generator – WTG Enhanced Libraries
Relay
LVCB + trip unit
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Below is a detailed list of new features and capabilities of ETAP 11.
New Features
Data Manager
View & edit Base & Revisions Data differences
View equipment property differences
Display & filter study data
Graphical management of data
Project Merge
Multi-user management of project merge
Parallel ETAP project development
Self-contained snapshots of the parent & branch projects
New Elements
Bus Duct
Graphical representation on the One-Line Diagram
Bus duct length, construction type, & material
Photovoltaic Array
Performance adjustment coefficients
Solar farm modeling
Solar irradiance based on location & time
AC & DC system analysis
Inverter dynamic modeling & operation modes
Maximum Peak Power Tracking (MPPT)
Extensive Manufacturer/Model library
P-V & I-V curves
Switching Devices
Safety ground switch
Integrated operation with Switching Management System
Supervisory control for real-time switching operation
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
12
Variable Frequency Drive - VFD
Multi-input connection for 6-24 pulse
Sub-system modeling between VFD & motor
Rectifier & inverter control models
Output voltage & frequency control
Frequency dependent modeling of sub-system
Adjustable speed drive operation
Motor acceleration control schemes
Bypass switch for soft starter operation
Input PF control
New Modules
Induction Machine
PF & EFF at no-load & over-load conditions
Locked-Rotor current based on NEMA MG1 Code Letter
Option to calculate Xd” & Xd’ based on machine time constant
Transformer
Open-Delta transformer
Three 1-phase transformer
MVA rating based on first & second stage cooling
Option to display Vector Group
Enhanced Modules
Multi-Dimension Database
Lock & unlock element properties
16 States to track equipment conditions
Local SQL server connectivity
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
14
Theme Manager
Display color coding based on:
- User-defined
- Voltage level
- Area
- Grounding (Solid, Low-Z, High-Z, Un-Grounded)
- Earthing (TT, TN, IT, NEC, earthing elements)
Display faulted buses by symbol or color
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
15
Underground Raceway System
Intelligent rule-based alignment & spacing tools
Automatic conduit distribution & spacing
Uniform & non-uniform conduit arrangements
Utilize custom, NEC, or standard IEEE rule-based spacing
Wizard for creating raceways based on rule-book
Cable System
Cable Library with neutral, grounding/ protective conductor (PE)
Add auxiliary neutral & PE conductors to cables
Damage curve for neutral & PE conductors
Load Flow
Auto-Run load flow based on system changes
New toolbar to change & display result units
Report voltage in %, kV, V
Report power in MVA, kVA
Isolated 1-phase source modeling
Harmonics
VFD harmonic modeling
Calculate & report I*TB (Balanced) & I*TR (Residual)
UPS AC input & output modeling for harmonic orders
PV Array modeling for harmonic orders
Transient Stability
Lumped Load user-defined dynamic modeling
New built-in IEEE standard exciters:
- AC2A, AC7B, DC4B, ST1A, ST2A
VFD dynamic modeling:
- Rectifier, DC link, & inverter models
- Voltage & frequency control models
- Frequency control acceleration & operation
UPS parallel operation modeling
PV Array source modeling
Inverter source modeling
Event Playback
Playback of event views
Historical alarm database
Real-Time
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
18
Library Additions
The following devices were added to the ETAP 11.0 library.
LVCB + trip
USD-6
unit Federal Pioneer
USD-20
USR
BS 7671 RCD (General Non-Delay)
RCD (Delay'S')
ABB Ekip I (XT4)
Ekip LS/I (XT4)
Ekip LSI (Electronic XT4)
Ekip LSI (Manual XT4)
Ekip LSIG (Electronic XT4)
Ekip LSIG (Manual XT4)
Ekip I (X2)
Ekip LS/I (XT2)
Ekip LSI (Electronic XT2)
Ekip LSI (Manual XT2)
Ekip LSIG (Electronic XT2)
Ekip LSIG (Manual XT2)
Ekip G-LS/I (XT2)
Ekip G-LS/I (XT4)
Ekip G-LS/I (XT2)
Ekip G-LS/I (XT4)
XT1 16-63A TMD
XT1 80-160A TMD
XT2 160 TMA
XT2 160 TMG
XT3 250 TMD
XT3 250 TMG
XT4 250 TMA
S 700 E
S 700 K(16-50A)
S 700 K(63-100A)
S800-B, C, D
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
21
Device Type Manufacturer Model
S800-B, C, D
S800-B, C, D
S800-B, C, D
LVCB + trip
unit S800-B, C, D
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T3 250-TMD, T3 250-TMG
T3 250-TMD, T3 250-TMG
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
22
System Requirements
PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
23
ETAP 7.5.2
March 2011
The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.5.2 release. ETAP
7.5.2 is a complete program and does not require any previous ETAP installation.
This point release expands on the current release by offering multiple language support. ETAP 7.5.2 is
completely localized in four languages plus translated output reports in six languages.
Starting with ETAP 7.5.2, ETAP will utilize the ETAP 1600-USB Security key. Please contact sales at
[email protected] or 949-900-1000 for any key replacement. Please note ETAP will no longer support the
black parallel keys and the blue USB-1410 keys.
The first time you run ETAP 7.5.2, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.5.2 installation DVD.
Enhanced
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
24
ETAP 7.5.0
June 2010
The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.5.0 release. ETAP
7.5.0 is a complete program and does not require any previous ETAP installation.
This point release expands on the current release by offering multiple language support. ETAP 7.5.0 is
completely localized in four languages plus translated output reports in six languages.
The first time you run ETAP 7.5.0, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.5.0 installation DVD.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
25
Library Additions
The following devices were added to the ETAP 7.5.0 library for protective device coordination.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
26
System Requirements
Operating System (32-bit or 64-bit)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate)
Microsoft® Windows Vista® (SP1) (Home Premium, Business, Enterprise)
Microsoft® Windows® XP (SP3) (Professional or Home Edition)
Microsoft® Server 2008 (SP2)
Microsoft® Server 2003 R2 (SP2), Microsoft Server 2003 (SP2)
Software Requirements
Microsoft® Internet Explorer® 5.01 or higher
(or minimum version level as specified by the operating system in use)
Microsoft® .NET Framework v1.1 (SP1)
Microsoft® .NET Framework v2.0 (SP1)
Hardware Requirements
USB port (for stand-alone license)
Ethernet port with network access (for network license)
DVD drive
10 to 80 GB hard disk space (based on project size, number of buses)
Note: An additional 5 GB may be required if additional language support is installed
19” monitors recommended (dual monitors highly recommended)
Minimum display resolution - 1024x768
Recommended Hardware
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
27
ETAP 7.1.0
November 2009
The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.1.0 release. ETAP
7.1.0 is a complete program and does not require any previous ETAP installation.
This point release is the latest in ETAP 7.0 series that delivers new design and analysis innovations and
carries ETAP to a new level of advancement. ETAP 7.1.0 provides the platform upon which future ETAP
innovations will follow. We recommend that you utilize this latest release in order to take advantage of
the new features and capabilities.
The first time you run ETAP 7.1.0, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.1.0 installation DVD.
For more information on this new release, please take a few moments to review the information below.
New Features
IEC Cable Sizing (IEC 60364-4-43)
IEC Cable Ampacity (IEC 60364-5-52)
Arc Flash Custom Labels
Enhanced Modules
Short Circuit
Arc Flash Analysis
Transient Stability
Data Exchange
Control System Diagram
Underground Thermal Analysis
Enhanced Libraries
HVCB
Relay
LVCB
LVSST
Fuse
Thermal Magnetic
Harmonics
Recloser
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
1
New Features
Arc Flash Custom Labels
Many labels need to be customized according to different regulations or preferences (i.e., CSAZ462,
NFPA 70E, NEC, ANSI Z535, etc.). ETAP 7.1.0 brings the capability to create and print custom arc flash
labels based on different standards and safety requirements. Custom arc flash label templates can be
generated using Microsoft Word® and linked to a Microsoft Excel® spreadsheet database to populate the
label template with results from the arc flash calculation. Utilizing standard tools like Microsoft Excel and
Word allows you to have greater flexibility in customizing labels for your facility in compliance with
safety standards.
Enhanced Modules
Short Circuit
The ETAP Short Circuit module has been enhanced to check the fused and un-fused low voltage circuit
breaker rated kV per ANSI C37.11/ UL489 (Standard Requirements for Electrical Control for AC High
Voltage Breakers Rated on a Symmetrical Basis). This enhancement allows you to easily verify that the
correct voltage rating is used for your application.
Transient Stability
ETAP frequency-dependent modeling option for system component such as subtransient synchronous
machines, induction machines (single- and double-cage) and networks are now included as a standard
feature of the transient stability module. In the past, this option was available only with the purchase of
Generator Start-Up module.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
2
SmartPlant Electrical Interface
The ETAP-SPEL Data Exchange Interface provides data synchronization between ETAP and Intergraph’s
SmartPlant Electrical (SPEL). In addition to bringing in a list of new connections, ETAP now provides a
list of modified connections based on changes being made in SPEL.
Sheath/Armor Type
None St Armor/45dg/20w St Armor/45dg/80w Cu Concentric Wire
Lead Sheath St Armor/45dg/25w St Armor/45dg/90w Al Concentric Wire
Aluminum Sheath St Armor/45dg/30w St Armor/45dg/100w Copper Sheath
St Armor/30dg/15w St Armor/45dg/40w St Armor/45dg/9999w
St Armor/30dg/20w St Armor/45dg/50w Copper Armor
St Armor/30dg/25w St Armor/45dg/60w Steel Armor
St Armor/45dg/15w St Armor/45dg/70w Aluminum Armor
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
3
Library Additions
The following devices were added to the ETAP 7.1.0 library for protective device coordination and
harmonic analysis.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
4
Device Type Manufacturer Model
Allen-Bradley 1492-GH
LH, LHB-240V, LHB-600V, LS, LSB-240V, LSB-
Cutler-Hammer
600V, FH-6, FS-2, FS-4, FS-6, JH, JS
General Electric EGF, EGH, EGS, EGX
HBE (31 models), HBH (15 models), HBL (30
models), HBS (28 models), HBX (5Models), HBD (6
Hyundai models), HBE (34 models), HBH (15 models), HBL
Low Voltage (30 models), HBS (28 models), HBX (5Models), HBD
(4 models), HBE (22 models), HBH (12 models), HBL
Circuit Breaker (30 models), HBS (19 models), HBX (5Models)
(LVCB) Merlin Gerin C60H, C60L, C60N, CJ 400H, CJ 400L, CJ 400N
NV250-CW, NV250-SW, NV400-CW, NV400-SW,
Mitsubishi
NV630-CW, NV630-SW
NJG, HJG, LJG, NLG, HLG, LLG, NFG, HFG, LFG,
NDG, HDG, LDG, 3RV13 21 (0.16-12.5A), 3RV13 21
Siemens
(16-25A), 3RV13 31, 3RV13 41 (16-75A), 3RV13 41
(90-100A), 3RV13 42 (16-75A), 3RV13 42 (90-100A)
Square D QO, QO-VH
Allen-Bradley 1492-GH
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
5
Device Type Manufacturer Model
Electronic Vista (15.5kV), Vista (27kV), Vista (38kV), Vista
S&C Electric Company
Reclosers (12kV), Vista (24kV), Vista (36kV)
Vista (E Speed), Vista (K Speed), Vista (Main
Electronic
S&C Electric Company Interrupter), Vista (SEL Relay Curves), Vista (Tap
Controller Interrupter)
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
6
System Requirements
Operating System (32-bit or 64-bit)
Microsoft® Windows® 7 (Professional, Ultimate)
Microsoft® Windows Vista® (SP1) (Home Premium, Business, Enterprise)
Microsoft® Windows® XP (SP3) (Professional or Home Edition)
Microsoft® Server 2008 (SP2)
Microsoft® Server 2003 R2 (SP2), Microsoft Server 2003 (SP2)
Software Requirements
Microsoft® Internet Explorer® 5.01 or higher
(or minimum version level as specified by the operating system in use)
Microsoft® .NET Framework v1.1 (SP1)
Microsoft® .NET Framework v2.0 (SP1)
Hardware Requirements
USB port (for stand-alone license)
Ethernet port with network access (for network license)
DVD drive
5 to 80 GB hard disk space (based on project size, number of buses)
19” monitors recommended (dual monitors highly recommended)
Minimum display resolution - 1024x768
Recommended Hardware
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
7
ETAP 7.0.0
May 2009
The OTI Development Team is pleased to provide you with the enclosed ETAP 7.0.0 release. ETAP 7.0.0
is a complete program and does not require any previous ETAP installation.
ETAP 7.0.0 is a major r elease that d elivers new design and analy sis innovation to a new level of
advancement and provide s the plat form upon which future ETAP innovatio n will follow. This version
adds new powerful analy sis m odules and tim e-saving capabilities to the ETAP Suite. The new
enhancements and analy sis modules are still develo ped with mathematical precision using our Qualit y
Assured Verification and Validation Procedure.
The first time you run ET AP 7.0.0, you will need t o enter the 36-Digit Activation Code as provided on
the ETAP 7.0.0 installation DVD.
For more information on this new release, please take a few moments to review the information below.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
1
1. One-Line Diagram
Templates
This upgrade provides the abilit y to cr eate and recall unlimited graphical tem plates. Create tem plate
versions of common electrical network confi gurations such as breaker-and-a-half, d ouble-ended
substation, and spot network. Utilize templates to quickly construct an entire electrical network faster than
ever before with a single click. Creat e new online diagra m te mplates or sel ect fro m more 40 pre-built
ANSI and IEC templates.
Features
• Create & Utilize unlimited one-line templates
• Share templates created by other ETAP engineers
• Use default project ID or template ID
• Use properties from default project or template
• Instant preview of templates
Auto Select
One of the new innovations to the On e-Line Diagram is the inclusion of the Graphical Auto Selection
tool. Graphical Auto Selection pr ovides the capability to move the associ ated components with a si mple
mouse strok e (shortcut Alt+Click). For exam ple, selecting a Motor Control Center (MCC) bus
automatically select s the l oads and protective device s connected to that bus. These relat ed elements ar e
automatically grouped for quicker one-line layouts.
Features
• Intelligent load & feeder selection designed for electrical systems
• Works with bus, branch, loads, & protective devices
• Auto-grouping & ungrouping
Symbol Library
Substitute default one-line diagram sy mbols with an alternative symbol set for indivi dual device ty pes.
Need a SCADA look for your circuit breakers? Launch the symbol substitution tool and swap symbol sets
with the press of a button. Sy mbol substitution allow s you to store and recall the default sy mbols at any
point in time.
Features
• Instant preview of alternative symbols
• Instantly create a new look on the one-line diagram
• New SCADA and IEC standard symbols
Keyboard Shortcuts
ETAP 7.0 in cludes a large array of k eyboard shor tcuts, which saves ti me a nd effort in creating and
editing.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
2
2. Arc Flash
ETAP 7.0 brings you new and enhanced capabilities which allow for faster and easier perfor mance of arc
flash hazard analysis. Identify and analy ze high risk arc flash areas in your electrical system with greater
flexibility by simulating various incident energy mitigation methods. Arc Flash is a co mpletely integrated
module that solves multiple scenarios to determine worst case incident energy levels and it also produces
professional reports and high quality arc flash labels at a press of a button.
Features
• Automatic consideration of generator AC decay & decrement curve
• AC motor short-circuit current decay handling
• Time varying fault clearing time calculation short-circuit current decay
• Arc flash calculations for 3-phase & 1-phase panel / UPS systems
• Radial & multiple source system handling
• Extended search beyond the point of multiple upstream source
• Automatic or User-defined source protective device search algorithm option
• Modeling of differential relays, maintenance mode switches, & arc flash photo-sensors
• Zone Selective Interlock Protection (ZSIP) representation
• Three phase and single phase systems
• User-Interface for defining hazard categories (NFPA 70E 2000, 2004, & 2009) or customize
based on your safety program requirements
• Generate IEEE 1584 & NFPA 70E l ook-up tabl e results for different working distances &
generate simple summary reports to communicate the results to personnel
• Alerts for PPE ATPV rating violations (maximum allowable PPE arc rating alerts)
• Find the safest mode of operation for maintenance work
• Automatically batch print arc flash lab els based on highest incident energy from all operating
modes
Features
• Sort results from different studies by multiple criteria
• Find the worst-case incident energy results
• Quickly isolate & identify arc flash mis-coordination
• Find which protective devices failed to operate
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
3
• Filter out & analyze only the higher hazard category results
• Filter out all equipment with % Ia variation problems
• Locate slow responding protective devices
• Export customized arc flash results to Excel reports
• Analyze the results in Metric or English units
• Color code & filter results by category
Work Permits
According to NFPA 70E guidelines, permits are required when performing work on energized equipment.
Work permits include shock hazard and arc flash anal ysis results. The work permit needs to be generated
or individual bus arc flash results in addition to other pertinent information.
Data Sheets
The Data Sh eet is an enh anced version of the arc flash analy sis report. It gives detailed description of
what selectio ns were made in the Short Circuit st udy case and how the bus results were o btained. Data
sheets can be customized to communicate arc flash study parameters.
Features
• Consider motor fault current decay during the arc flash calculation
• Automatically exclude small motor contributions entirely from the simulation
• Automatically identify and exclude transformers with relatively low voltage and kVA
• Assign a hazard category to these types of equipments automatically based on fault current ranges
Features
• Global definition of arc flash analy sis data eliminates the need to specify this information in each
bus
• Global defini tion of work ing distance, bus gaps , ap proach bou ndaries, and voltage-rated glove
classes
• Specify Arc Flash Analysis Data based on IEEE 1584 2002 or user-defined values
• Globally select Shock Hazard Analy sis Data ba sed on NFPA 7 0E 2004 , 20 09 or user-defined
settings
• Globally change the class settings given by ASTM D 120-02a Standard for voltage-rated
protective gloves
• Updates can be made globally wit hout havi ng to modify each bus editor indivi dually
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
4
3. ETAP Star
ETAP 7.0 includes an ext ensive list of enhancements for the ET AP Star module. Using these ne w user-
oriented capabilities, the process of design and ev aluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with new short circuit fault
types: Line-to-Line, Line-to-Line-to-Ground in addition to 3-phase and Line-to-Ground.
Sequence of Operation
Star Sequence-of-Operati on evaluates, verifies, and confirm s the operation and selectivit y of th e
protective devices for vari ous types of faults for a ny location directly from the one-line diagra m and vi a
normalized TCC curve views. Sequence-of-Operation provides a system wide solution for an accurate and
realistic oper ating time an d state of protective devices, such as relay , fuse, circuit breaker, trip devices,
contactor, etc. The operati on time is calculated fo r each protect ive device b ased on its settings, ti me
current chara cteristic, and interlocks for a specifi ed fault location and ty pe. ETAP 7.0 enhances thi s
invaluable tool by including Line-to-Line and Li ne-to-Line-to-Ground Drag-and-Drop Faults in addition
to 3-Phase and Line-to-Ground Faults.
Features
• Partial Differential Relay Modeling
• Ring-Bus Protection
• Multiple Source Systems Protection
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
5
4. Data Exchange
ETAP Data Exchange is used to import, export, and sy nchronize data between external data sources and
ETAP. DataX provides many utilities including:
DataX includes several new conversion programs that allow for conversion of third party electrical power
system databases to ETAP. The conversion program will automatically generate a multi-layered graphical
one-line diagram. A list of available conversion programs are available upon request.
The SPEL XML file cont ains the electrical data for equipment and connectivity information in the SPEL
project. The ETAP data exchange interface uses information available in SPEL to add, modify, and delete
elements. The interface not onl y auto creates one-line diagrams, it also facilitat es multiple data transfers
(synchronization) between ETAP and SPEL. As a resu lt, data in ETAP and SPEL are kept consistent
without going through the time-cons uming manual process of recording additions and modifications i n
both systems.
The ETAP-SPEL cable library data synchronization is bridged by a Microsoft Access database. Users can
import or export ETAP project cable l ibrary data into or from the Microsoft Access database using the
ETAP Lib Utility. Through the SPEL Lib Utility, users can also export or import cable library data into or
from the Microsoft Access database.
5. Load Analyzer
The Load A nalyzer m odule is design ed as a genera lized load list to report load schedul es for power
system co mponents such as switchgear , MCC, transformer s, cabl es, lines, panels, etc. Diff erent reports
provide informative data regarding all loads connected downstream to the equipment. Load Analy zer is
an invaluable tool during the design / planning pha se as w ell as analy zing e xisting electrical sy stems
because running sy stem studies like load flow analy sis may not be possible d ue to inco mplete one-line
diagram or data.
6. Enhanced Elements
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
7
7. Enhanced Modules
Short Circuit
ETAP Short-Circuit module has enhan ced duty calculati ons for g enerator circuit breakers per the latest
version of IEEE Std C37.013, “IEEE Standard for AC High-Voltage Generator Circuit Breakers Rated on
a Sy mmetrical Current Basis”. The g enerators are m odeled by the sub-transient dy namic model to
represent AC and DC dec ay of short-circuit contribu tions from the generator. It calculates both s ystem-
source and generator-source short-circuit currents and considers no-load, lagging PF load, and leading-PF
load for pre-fault conditions.
ETAP provi des several options for m ultiplication fa ctor (MF) fo r hig h-voltage circuit breaker and bus
momentary duty calculations. The options include MF calculated based on s ystem X/R, fixe d values at
1.6/2.6, or use of 1.6/2.6 as minimum values. These options allow the user to obtain accurate results a s
well as to ensure conservativeness in short-circuit calculations.
Features
• Generator sub-transient model to represent AC and DC decays
• Generator-source and system-source short-circuit currents with no-load, leading PF, and Lagging
PF
• Symmetrical, asymmetrical, and peak kA at 1/2 cycle
• Symmetrical, asy mmetrical, peak, and DC kA as w ell as degree of asy mmetry at generator CB
contact parting time
Transient Stability
The latest edition of ETA P provides the following ne w capabilities to transient stabilit y, m aking it the
most powerful stability program in the industry hands-down.
Features
• State-of-the art Governor-Turbine models used in the majority of large industrial power systems
• Isochronous / Droop switching capabilit y for Gas Go vernor-Turbine with GE Mark IV, V & VI
model (GGOV3)
• Solar Gas Governor-Turbine with DLN combustion system model (SGOV1)
• Westinghouse Gas Governor-Turbine with jump rate limiter model (WGOV1)
• Ability to sim ulate the n ew Governor-Turbi ne dynam ics including m anufacturer unpublished
details
• Governor-Turbine m odels are fully verified a nd validated by field measurements / benc hmark
tests
• Higher order integration solution method for synchronous machine swing equation
• Synchronous machine typical data
Harmonics
The Newton-Raphson method for initia l load flow p rovides an improved conve rgence for larger sy stems
with small impedances.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
8
8. System Requirements
PC Configuration Requirements
• USB port (if stand-alone licensing required)
• Ethernet port w/network access (if network licensing required)
• DVD Drive
• 5 to 80 GB hard disk space (based on project size, number of buses)
• 19" monitors recommended (dual monitors highly recommended)
• Minimum display resolution -1024x768
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
9
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
ABB 121PM20, 121PM40, 121PM50, 121PM63, 145PM20,
HVCB 145PM40, 145PM50, 145PM63, 169PM20, 169PM40
Toshiba V K-10M25A2,VK-10M40A, VK-10M40AH, VK-
10M50, VK -10P25A2, VK -10P40A, VK -10P40AH, VK-
10P50, VK-10Q40, VK-10Q40H, VK-10Q50, VK-20J13,
VK-6M32A, VK -6M40A, VK -6M50, V K-6P32A , V K-
6P40A, VK -6P50, VK -6Q50, VK -8M40A, VK -8P40A,
VK-8Q40, VY -20M25A, V Y-20P25A, V Y-30M25A,
VY-30P25A
RELAY ABB 50B, COQ, KAB, IRC, IRD, IRP, SSC-T, REX 521,
Areva CAG17, CAG37, CTU12, CTU22, CTU32, CTU62
BBC ISM2, ISM 21
Cooper iD P-210
Cutler-Hammer IQ-1000 II, FP-4000, FP-5000
Eaton MP4 000
Federal Pioneer GFR
GE Multlin MIF II, MIF-P, IAC-99AY, T35, MM300, MIF-P, MIF-N,
B90
Merlin Gerin SEPAM 20, SEPAM 40
Mitsubishi CMP2 - A02D2, COC4-A02D1
P&B Engineering Advanced Feedervision II, Advanced Motorvision II,
Feedervision II, Microfeeder Plus, Microvision Plus,
Motorvision II, MPC 2000+, MPC 2000D, MPR 10, MPR
2500, MPR 3E5, MPR 3E5 (Vision 100), PBSJ 120, PBSJ
140C (SPCJ 4D29), PBSJ 3E5 N11
Reyrolle Rh o3
S&C Electric Co. ZSD
Schweitzer Rho 3 , 3 87A, 75 1A, 7 10, 48 7B, 4 87E, 99 95A, 787,
MGFR-1-ZB, MG FR-2-ZB, MG FR-20-ZB, MGFR-200-
ZB, MGFR-1200-ZB, MGFR-SE-ZB, 587Z
Siemens 3UF7
Square D SEPAM SERIES 40, SEPAM SERIES 80
Startco Engineering MPU-16A, SE-701, MPS, MPU-32, FPU-16, FPU-32, SE-
Ltd. 134C
Thytronic D IG 5200
TMT&D CAC1-A01D2 , COC1-A01D1
Vamp Vamp 230, Vamp, 245, VAMP 255, VAMP 257
Westinghouse IT, ITH, ITH-T
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
10
Fuse Bussman LPS-R K_SPI (12/00)
GEC CC, CCP, CF, CFP, CIA, CIS, CLM, CM, CMF
Gould Shawmut A25Z-2, CRN, CRS, NRN, NRS
Hi-Tech Fuses Inc Trans-Guard OS, Trans-Guard OS Shorty
Littelfuse CCMR, KLLU
Reproel FH-15, FH-17, FH-18, FH-25, FH-27, FH-28, FH-35, FH-
37, FH-38, FH-45, FH-47, FH-48, FH-55, FH-57, FH-S40,
FH-S50
MFR Model
LVCB Cutler-Hammer MH , MS
MCP General Electric TEC (02/04), TFC (03/97), TJC (03/97), TKC (03/97),
LVSST Square D ET1.0 (MG), ET1.0 (MJ), ET1.0 (PG), ET1.0 (PK), ET1.0
(PL), ET1.0 (RG), ET1.0 (RJ), ET1.0 (RK), ET1.0 (RL)
Terasaki AGR-L (LT Curve), AGR-R (LT Curve)
MFR Model
Electronic Cooper VFI (5kV), VFI (15kV), VFI (25kV), VFI (35kV)
Reclosers
MFR Model
Overload General Electric CR124
Heater
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
11
ETAP 6.0.0
March 2008
The OTI Development Team is pleased to provide you with the enclosed ETAP 6.0.0 release. ETAP 6.0.0
is a complete program and does not require any previous ETAP installation.
ETAP 6.0.0 is a major release that deli vers new cap abilities to si gnificantly enhance y our power system
analysis experience while making the process faster and easier. This version is enhanced with easy to use
features that allow you t o easily create and organize a one-line di agram with one click oper ations. The
new enhancements and analy sis m odules are still developed w ith m athematical precisio n using our
Quality Assured Verification and Validation Procedure.
The first time you r un ETAP 6.0.0, you will need t o enter the 36-Digit CD Activation Code as provided
on the ETAP 6.0.0 installation CD.
For more information on this new release, please take a few moments to review the information below.
New Features
Graphical Undo & Redo Enhanced Modules
Graphical Alignment Tools Load Flow
Group Rotation Arc Flash Analysis
Element Mirroring & Polarity Transient Stability
Coloring Based on Voltage Level Star TCC
Voltage Propagation (Single-Phase) Star Sequence of Operation
User-Defined Symbol Text Motor Starting & Acceleration
Ground Grid System
New Analysis Modules GIS Map
Cable Ampacity & Sizing - BS 7671 Data Exchange
Single Phase Duty Calculation
Panel Systems Duty Calculation New Libraries
Reclosers
New Elements Differential Relays
Reclosers Maintenance Mode Setting
Differential Relays
In-Line Overload Relay New Tools
Motor-Generator Set Study Result Comparator
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
1
1. One Line Diagram
Undo/Redo
ETAP One-Line Diagram now remem bers unlimited gr aphical actions with the help of graphical
undo/redo feature also widely known as the Oops command. You can now backtrack single or multiple
steps to correct mistakes or reverse the effect of the undo command by using redo.
Features
• Unlimited Undo / Redo Actions within Individual Presentations
• Undo/Redo Actions within composite networks
• Undo/Redo show/hide protective devices
• Undo/Redo movement of any device
• Undo/Redo moving, adding or deleting a connection
• Standard Keyboard Shortcuts (Undo - CTRL+Z, Redo - CTRL+Y)
Features
• Straight & Space Alignment
• Horizontal Alignment (Middle, Top, Bottom)
• Vertical Alignment (Left, Center, Right)
• Distribute Spacing (Horizontal, Vertical)
Features
• Up to 20 user-defined voltage levels and colors
• Instantly create or switch between multiple color schemes using theme templates
• Set different themes for individual one-line diagrams
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
2
Relay & Current Transformer Mirroring
Group Rotation
• Rotate selected elements or single elements by 90, -90 180 degrees.
Voltage Propagation
In addition to the existing voltage propagation on th ree phase networks, the vo ltage propagation is no w
capable of detecting single-phase connections and propagating voltage through single-phase two wire and
three wire systems as well as panel systems.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
3
2. Enhanced Modules
Load Flow
The Load Fl ow Result Analy zer is a tim e saving to ol that allows you t o compare and analyze different
reports coming from different projects, within the s ame directory, in a single displa y. You can co mpare
the results of general info rmation abou t the project or m ore spe cific informa tion such as the results
contained from buses, branches, loads or sources in a load flow study.
Features
• Compare and View Multiple Load Flow Results in One View
• Analyze and Compare Reports from Multiple Projects
• Create a base line report and quickly identify deviations for all cases
• View Multiple Bus, Branch, Loads and Source Results at a glance
• Advanced Alert and Warning feature identifies and highlights components that are overstressed
and need your attention
• Quickly find components on the one-line diagram from the analyzer view
• Export summary view into MS Excel for maximum data flexibility
Short Circuit
The highl y c apable Short Circuit Analy sis is m ore diverse and, in addition to ANSI/IEEE and IEC
methods for 3-Phase short circuit current calculation, can now perform 1-Phase device duty short circuit
study. ANSI and IEC 60909 Standards are available for calculating short circuit current for a main panel,
sub-panel, UPS and phase adapter. Si ngle phase devi ce duty calculation com pares the c alculated faul t
current for evaluation of protective devices and gene rates critical and marginal alerts based on user-
defined limits. Loads and motors, even if they have protective devices, monitoring devices and a cable,
do not need t heir own buses/nodes. And yes, load terminal voltages and voltage drops are calculated and
displayed on the one-line diagram s. ETAP 6.0 ta kes this functionalit y t o t he next level by not onl y
calculating but also display ing and reporting the s hort circuit c urrent at all load term inals that have
equipment cables. The benefits include is faster calculation time, de-cluttered one-line diagram and more
concise reporting.
Features
• Include all panel subsystems in device duty calculations
• Include all UPS systems in device duty calculations
• Include all Single phase systems in device duty calculations
• Calculate the load terminal fault current for Motor, MOV, Static Load and Capacitor
• IEC compound excitation modeling for Ikmin based on IEC 60909-0 2000.
• Enhanced display options to allow display of 3-Phase and 1-Phase SC results from the same study
• Enhanced modeling of synchronous machines impedance values like R2/X2 and R0/X0
• Positive tolerance adjustment for calculating minimum short-circuit currents
• Enhanced detection of 1-Phase connections for short-circuit load terminal faults
• Calculate device short-circuit duty for ANSI/IEC reclosers
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
4
Arc Flash
ETAP Arc Flash Analysis estimates the arc flash incident energy under a bolted 3-phase short circuit fault
and determ ines the flash protective bo undary to li ve parts for shock protecti on. Design safer po wer
systems by i nsuring com pliance with OSHA 29 CFR 1910 .132(d) 19 90, NFPA 70E-20 04, and IEEE
1584-2002 Standards. Arc Flash no w provides the flex ibility to calculate arc flash results at load
terminals that are fed via equipment cables.
Features
• Motor / Load Terminal Arc Fault Calculation
• Maintenance Mode Switch for Low Voltage Solid State Trip device
• Relay actions (79, 87, 49, 27, 59, 67) in arc fault calculation
• Enhanced search capabilities for source protective devices
• New arc flash label templates (English, Spanish & Portuguese) with user-defined text fields
• Enhanced user-defined fixed fault clearing time
ETAP STAR
ETAP 6.0 includes an ext ensive list of enhancements for the ET AP Star module. Using these ne w user-
oriented capabilities, the process of design and ev aluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with enhanced handling of
protective devices such as differential relay (87), directional relay (67) and voltage relay (27).
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
5
Transient Stability
The latest edition of ETA P provi des the following new capabilities to transient stabilit y making it the
most powerful stability program in the industry hands-down:
Features
• Initial Load Flow using Newton Raphson Method in addition to Accelerated Gauss Siedel
• Faster Calculation Time by providing option to skip tabulated plots
• New transient event - Line to Ground Fault
• New GE Turbine-Governor Model (GGOV3)
• New Exciter IEEE ST4B
• Auto Sync-Check Action
• Enhanced Synchronous Machine Saturation Factor
• Enhanced Synchronous Machine Salient-Pole Model
Installation Type
• Trenches
• Embedded Direct
• Brackets
• Cleats
• Ladder
• Open and Clipped Direct
• Building Voids
• Trunking
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
6
Motor Starting
• Faster Calculation Time by providing option to skip tabulated plots
Data Exchange
• Enhanced user interface for data synchronization
• Added Sequence (.seq) and Dynamic (.dyr) data with Raw data import
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
7
3. New and Enhanced Elements
Recloser
• Hydraulic
• Electronic with Static Controller
• Electronic with Microprocessor Controller
• Device Coordination (Star) - Star SQOP
• ANSI/IEC Short-Circuit Duty Evaluation
• Overload alerts in Load Flow Analysis
• Comprehensive library of old and new reclosers / controllers
• Detailed modeling of reclosing device
Differential Relay
• Partial-Bus, Total Bus, Transformer, Line & Cable
• Percentage and High Impedance Types
• Device Coordination (Star) - Star SQOP
• Considered in Arc Flash Analysis
• Library of differential relays
• Please note that checker functions for multifunction differential relays may show the relay as
unchecked if you remove other functions like overload or overcurrent.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
8
Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
Electronic ABB OVR-1 Series Rs14x-RS28x, OVR-3 Series R111x-
Reclosers R378x, VR-3S Series V115x-V378x
Cooper NOVA1-15 400-800A, NOVA1-27 400-800A, NOVA15,
NOVA27, NOVA38, NOVA-TS-15 400-800A, NOVA-
TS-27 400-800A, PWE, PWVE, RXE, VSA12, VSA12B,
VSA16, VSA20, VSA20A, VSO12, VSO16, VWE,
VWVE27, VWVE38X, WE, WVE27, VWVE38X, WE,
WVE27, WVE38X, VXE15, VXE27
FKI Switchgear GVR15, GVR27, GVR38
G&W Electric Viper-G 15.5kV – 38kV, Viper-S 15.5kV-38kV, Viper-ST
15.5kV-38kV
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
9
MFR Model
Microprocessor ABB ICD
Cooper Form 4C, Form 5, Form 5 Triple-Single, Form 6, Form 6
Triple-Single, FXA, FXA/FXB, NOVA1 Control, VXE
Control
FKI Switchgear Panacea (SEL-351P)
Joslyn 351J, Faultmaster 2500, PowerMAX 100
Nu-Lec AD VC
Schweitzer 3 51R, 651R
Static Cooper Form 3A, Form 3A (RE, RVE, RXE), Form 3A (Type
VSA), Form 3A (Type VSO), Form 3A (W-group)
RELAY ABB REA 101, REM543, SC, SC-1, REF 545, REL 561
Allen Bradley SMP1, SMP3, 825-P
Areva P- 132
GE Multilin G650, C60, F650, 735/737
P&B Engineering MREF
Schweitzer 710 (R100), 701 (R106-R113)
Square D Sepam Series 20, GC-200
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
10
MFR Model
LVCB Cutler-Hammer MDS-C xx
Federal Pioneer CE-B, CE-E, CE-E4, CE-H, CE-N, CJM-E, CJM-H, CJM-
N, CK-E, CK-H, CK-N, CMH, FKD, FKG, HEW, HEZ,
TH1, TH4, TH8, CJL-E, CJL-N, CJL-H
Merlin Gerin C60N Series, C60H, C60L
Square-D QB, QD, QG, QJ, QE-VH
Nikko SK202, SK203, SK204
Siemens HEG , NEG
TM Federal Pioneer CMH, CJM, CE-B, CE-E, CE-E4, CE-H, CE-N, FK-D,
FK-G, HEW, HEZ, TH1, TH4, TH8, CJL-E, CJL-N, CJL-
H
Merlin Gerin C60N C-Curve, C60N/H D-Curve, C60N/H/L C-Curve,
C60N/H/L B-Curve
Nikko SK2 25
Square-D QB (50 Hz) (60Hz), QD (50 Hz) (60Hz), QG (50 Hz)
(60Hz), QJ (50 Hz) (60Hz)
Siemens HEG , NEG
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
11
ETAP 5.5.6
March 2007
The OTI Development Team is pleased to provide you with the enclosed ETAP 5.5.6 release. ETAP 5.5.6
is a complete program and does not require any previous ETAP installation.
This point release is the latest in the ETAP 5.5 serie s and includes sev eral enhanc ements and
modifications from the ear lier 5.5.5 rele ase. We re commend that you utilize this latest release in order
to take advantage of the n ew features and capabilities. Note that network users must also u pdate their
ETAP License Manager. The updated License Manager is compatible with earlier releases.
ETAP 5.5.6 will utilize the same 36-Digit Key Code as provided with the ETAP 5.5.5 release.
For more information on this new release, please take a few moments to review the information below.
1. Library Additions
The following protective device manufacturers and models are added to the library.
MFR Model
RELAY Startco Engineering SE-320, 325
ABB REJ 525, REF 610, REM 610
GE Multilin MM3, TMC14B, IAC-60T, IAC-80T, IAC-90T
VA TECH Argus 1, 2, 4, 6
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
1
2. Protective Device Library Information Exporting Tool
An ETAP tool is added to this version to extract library information for all protective devices in an
ETAP project. The extracted inform ation is exported to a Microsoft Excel file which is placed in the
ETAP project directory. The extracted information includes device ID, Ty pe, Manufacturer, Model,
etc. This ha ndy tool can be used to ea sily determine protective devices that utilize specific device
libraries.
Once you install ETAP 5.5.6, a tool na med “PD Lib rary Export” will automatically be adde d to the
ETAP Tools menu. To use this tool, open ETAP Tools menu an d click on the PD Library Export
tool. A Mic rosoft Excel file will be generated in the ETAP project director y with a fi le name
“PDLibExport-XXX.xls”, where XXX will be replaced by the ETAP project file name.
You can change the Excel filena me fr om the ETA PS.INI file. To change th e filename, open the
ETAPS.INI file from your application directory (by default installation C:\ETAP 556) an d locate the
statement for the tool in the [AppVari ables] se ction, which sho uld be sim ilar to the fol lowing.
Change the b lue section “ PDLibExport” to the nam e you prefer. Note that if the ETAPS.INI file is
not in the application directory then use the ETAPS.INI located in your windows directory.
3. Arc Flash
In ETAP 5.5. 5, under a set of very spe cial cond itions (Low Voltage Solid State Trip LVSST with
Short-Time I 2t delay band set to “IN” while the library is set to zero), the cal culated fault clearing
time is differ ent from the actual clearin g time if the Source Protective Device is one of the libraries
listed below. ETAP 5.5.6 has been enhanced in this version to handle these special conditions.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
2
ETAP 5.5.5
December 20, 2006
The OTI Development Team is pleased to provide you with the enclosed ETAP 5.5.5 release. ETAP 5.5.5 is a
complete program and does not require any previous ETAP installation.
This point release i s the latest in the ETAP 5.5 seri es and includes sever al en hancements and modifications
from the earlier 5.5.0 release. We recommend that you utilize this latest release in order to take advantage of
the new features and cap abilities. Note that network users must also update their ETAP License M anager.
The updated License Manager is compatible with earlier releases.
ETAP 5.5.5 will utilize the same 36-Digit Key Code as provided with the ETAP 5.5.0 release.
ETAP 5.5.5 allows y ou to explore the ETAP Real-Ti me capabilities including Power Sy stem Monitoring &
Simulation (PSMS), Energy Management Sy stem (EMS ), and Intelligent Load Shedding (ILS). A sam ple
system is pro vided along with the ETAP Real-Time in stallation which allows y ou to take ETAP online and
experience the power of ETAP Real-Time enterprise. For more information, please contact [email protected] or
visit our web site at etap.com.
For more information on this new release, please take a few moments to review the information below.
1. Library
• Cable library
Added Olex Cable library
• Fuse library
Added the following models:
MFR Model
Bussmann OEF, OHF, OLG, OEG, OHG, NH Series
Cooper Bay-O-Net (High Ampere), ELSP, X-Limiter
Cutler-Hammer CLS (07/03), CLE (0703)
Little Fuse FLSR (01/03)
Siemens 3NA Series
Gould Shawmut (Ferraz) A50P
MFR Model
Square-D HD, HG, HJ, HL, JD, JG, JJ, JL, GJL
Cutler-Hammer PA, T4 and T5 Series, HFA, HMDL-DC, ELFD, ELFDC, ELHFD, ELHJD,
ELHKD, ELJD, ELJDC, ELKD, ELKDC
ABB S500 Series
Westinghouse PA, T4 and T5 Series, HFA
MFR Model
ABB SACE PR221, SACE PR121, SACE PR122, SACE PR123
THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
1
• Thermal Magnetic Circuit-Breaker library
Added the following models:
MFR Model
ABB T4, T5 Series
Federal Pacific HEF, NE, NEF Series
Cutler-Hammer HMDL-DC, NH, NS, HFA, PA
Square-D Powerpact H and J frame Series, GJL Series
• Relay library
Added the following models:
MFR Model
ABB REF 543, REF 541,
SPAJ 110C, SPAJ 111C, SPAJ 115C, SPAJ 135C, SPAJ 141C, SPAJ 142C,
SPAJ 144C, RAMDE, REM 545, SPAD 346C, SPAJ 1B1 J3
Schweitzer 311L
AREVA P4 41
VAMP VAMP 130, VAMP 140, VAMP 265
Beckwith Electric M-3425
Siemens 7UM 62
GE Multilin G30
Orion Italia IPR-A, SMPR
Startco Engineering SE 105, SE 135
2. Localization
• Enhanced the program to handle period (.) or comma (,) decimal separators for float numbers.
3. GIS
• Upgraded ETAP GIS Map to interface with ArcGIS Version 9.1
• Enhanced ETAP GIS interface to work with ArcGIS run time engine
4. Short-Circuit
• For ANSI De vice Duty of generator circuit-breaker, an automatic search is added to deter mine a
single path between a generator and the genera tor circuit-breaker. For a generator and the
associated circuit-breaker with a single path, the ci rcuit-breaker duty is calculated by the s ystem-
only contribution or generator-only contribution.
• Added a new preference option to allow the user to decide if machine FLA to be included in duty
calculations when the opt ion of “Based on Maxim um Through Fault Current” is select ed for
machine protective device duty.
THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
2
The ETAP LM service may not start automatically after rebooting the ETAP LM server if virtual machine
software exists on the sa me machine. If virtual machine software is present on LM server machine, it is
recommended to verif y t hat the ' ETAP Lic Mgr' se rvice is running or start the service manually u nder
System Services.
THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
3
ETAP 5.5.0
June 19, 2006
ETAP 5.5.0 is a major release that delivers new capabilities to significantly enhance
your power system analysis experience while making the process faster and easier.
Contributing to this objective includes the addition of new features to graphically
animate the system response for Protective Device Operation, Control System Logic
Sequence, and Dynamic Response Operation with more flexible configuration options
and greater display.
The ETAP WTG module comes to market with proven utility. It is currently being used for real-time
monitoring of power exchange between wind turbines and the power grid at one of the largest wind farms
in the United States.
Features
• Ability to model unlimited wind turbine generators individually, or in groups
• Detailed modeling of turbine dynamics including aerodynamics & power coefficients
• Model doubly-fed induction generators with pitch & converter controller characteristics
• Simulate transient wind conditions with ramp, gust, & noise disturbances & calculate dynamic impact
on wind machines
• Create multiple wind categories for predictive “what if” studies & scenarios
• Perform transient stability analysis with individual or zone-based disturbances
• Run one instance or continuous steady-state calculations in analysis mode
New Capabilities
• Test relays & import the test results into ETAP Star
• Test, simulate, & calibrate overcurrent, differential, & distance relays
• Fully integrated interface with ETAP Star & Short-Circuit modules
• Compare actual steady-state & transient responses of relays with published manufacturer specifications
• Playback transient waveforms for evaluation
• Archive relay test data for historical reference & retrieval
• Customizable test reports
ETAP 5.5 includes an extensive list of enhancements for the ETAP Star module. Using these new user-
oriented capabilities, the process of design and evaluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with enhanced graphical
animation of the operation of protective devices on the one-line diagram.
Graphical Animation of Protective Device Operation
New Features
• Virtual animation of sequence-of-operation playback on the one-line diagram
• Normalized TCC plots with shifted curves based on fault contributions
• User-definable curves & fault arrows
• Batch print TCC plots & diagrams for various paper sizes
• Automated color sequencing of TCC curves
• Enhanced print options & functionality
• Flexible user-definable display & plot options
• Star library Merge Manager
• Intelligent alert view for troubleshooting
• Enhanced relay library interface
• Acceleration curve for overload relays
• Transformer inrush curve
• Graphical TCC curve tracker with cross lines
• Expanded verified & validated device library
• New Relay Test-Set Interface for evaluating steady-state & transient relay response
Tag-Link Element
The new Tag-Link element brings measurements from metering systems, PLC, and SCADA into ETAP
using a graphic element in the one-line diagram.
New Features
• New Programmable Logic Editor (PLE) for user-defined control commands
• User-defined macro-based logic without hardware installation
• System optimization & automation
• Automatic generation control
• Security control
• Intelligent feeder & demand management
• Peak shaving
• Cost allocation
• Operator training simulator
• Supervisory & advisory control
• Intelligent inhibition & permissive control
Special handling techniques have been incorporated for islanded systems and power exchange between
subsystems. The user interface has been enhanced to enable logic switching and/or load priority schedules
without interrupting operations or re-programming devices. Operators can now easily switch schedules
based on operating requirements such as summer and winter demands. In addition, specific monitor
windows have been added to allow one view to provide a complete status of the system. The Priority
Schedule editor has been enhanced to easily define factors that specify significance of individual loads,
feeders, etc.
New Capabilities
• Programmable Logic Editor to add user-defined control logics (simple & complex) such as limits,
interlocks, permissions, inhibitions, etc.
• New user-friendly editors to define associations & interlocks
• Multiple priority schedules with user-defined sensitivity factors
• User-definable group numbers for optimal breaker selection
• Simultaneous display of the real-time operation & local simulation results
• Easily simulate & validate load shedding commands
• OPC alarm & notification
• Monitor & respond automatically to electrical & non-electrical disturbances
• New user-friendly editors for setting up ILS
• View & print customizable full-color reports
• Monitor “Live” load shedding operation in XML on web page
• Full security access control
Arc Flash
Arc Flash now provides the flexibility to print customizable labels on either Avery® labels or high-end
Brady® label printers using new label templates and printing capabilities.
New Features
• Capability to limit incident energy based on maximum Fault Clearing Time (FCT)
• Automatic application of calculated & user-defined FCT simultaneously
• Algorithm for automatic detection of the primary protective device in complex looped networks
• Export results to Excel spreadsheets for interface with third party software & label printers
• New user-interface for defining PPE requirements for each risk category
• Coordinate protective devices using the arc flash incident energy plotted on the TCCs
• New arc flash label templates with user-defined text fields
• New incident energy summary reports
Short-Circuit Analysis
For both ANSI and IEC standards, determine short circuit duty of tie circuit breakers based on the
“Maximum Through Fault Current.”
Panel Systems
The Panel Systems module, an intuitive graphical user interface for the design and analysis of low voltage
distribution systems, can now export panel data and schedules to third party CAD systems and
Microsoft® Excel. The new features include:
• User-definable ground wire fields per branch circuit
• User-definable conduit size field per branch circuit
• Export panel schedules to Excel worksheets
• Five new panel schedule & report templates
• Export panel report & schedule to CAD systems
Harmonic Analysis
A new option has been added that allows you to use long-line model for transmission lines and cables.
Data Exchange
DataX represents a rich set of customizable ETAP interfaces that can be used to bridge gaps between
ETAP and other databases.
DataX - Base
The new import tools added to the base package allow you to:
• Import IEEE format files
• Import RAW data files
• Import & export configurations
• Import ground grids from AutoCAD
DataX - Microsoft® Access & Excel
This new module provides the ability to import and synchronize data from Microsoft Excel and Microsoft
Access into ETAP.
• Import data from a Microsoft Access table
• Import data from Microsoft Excel worksheets
• Customize data mapping through the graphical user interface
• Automatic data range checking with library data substitution
• Automatic one-line diagram generation
• Intelligent data validation & consistency checking
• Automatic modify & delete actions for existing elements
• View modifications & accept or reject actions
SmartPlant® Interface
The ETAP-SmartPlant interface has been enhanced to allow modification of existing project files from
SmartPlant. Major enhancements include:
• Automatic add, modify, & delete actions of elements
• Enhanced one-line diagram generation
• Enhanced element mapping
e-DPP® Interface
The ETAP e-DPP interface now provides:
• Automatic one-line diagram generation
• Enhanced element mapping
• Automatic add, modify, & delete actions of elements
GIS Map
Modify the display of load flow and short circuit results on GIS maps using the new ETAP display
options.
Get-Set Defaults
The new capability to set and obtain parameters to-and-from element defaults enables parameters to be
passed from one element to another.
ETAP Preferences
Now you can apply new preference settings directly from ETAP. Adjust settings in the INI file to
customize your ETAP application behavior. These settings are categorized alphabetically or based on an
analysis module.
Control System Diagram
The highly capable CSD module streamlines the modeling and simulation of control systems by using
a unique state-dependent process that allows you to easily evaluate control logic of new and existing
systems. The sequence-of-operation animates the operation of control systems with associated interlocks
and controlled devices. This includes elements such as control relays, solenoids, controlled contacts,
multi-sequence contacts, push buttons, switches, and actuators. You can select from a large library of
control devices to quickly determine pickup and dropout voltages, losses and current flows at various
time instances including inrush current. As control devices go through the time sequence and various
states, the program provides marginal and critical alerts.
New Features
• Graphical animation of complex control logic with or without voltage drop calculation
• Include time-dependent loads of control systems in battery discharge & sizing calculation
• Operator initiated control actions and/or auto-run mode
• Display and alert overloading as well as pickup/dropout voltage violations
• Flexible device modeling with user-defined duty cycle or actual inrush/burden rating
• Validate the voltage requirements of controlling devices
• Generate automatic alerts for pickup & dropout voltage
• View detailed operating states of the devices with the new Event Viewer
Cable Sizing
In addition to the existing ampacity and voltage drop requirements, a new capability has been
added to size cables based on short circuit current.
Transmission Line
ETAP 5.5 determines sag and tension for transmission lines on towers with different elevations.
Automatic alerts notify when power interchange exceeds derated ampacity of the line.
Transient Stability
The Transient Stability module has been upgraded to present a graphically animated display of the system
dynamic response after disturbances. The program is also enhanced for faster calculation speed and plot
generations. You can simulate system disturbances and events while performing load shedding, fast bus
transfer, critical clearing time, generator start-up studies, and the acceleration or re-acceleration of
motors, etc.
New Features
• New sequence-of-operation with interactive time-slider & action list
• New wind turbine generator dynamic models
• New action commands for wind gust, ramp, & noise disturbances
• Apply voltage limits to MOV open & close stages
New Features
• Calculate the most cost-effective installation locations & bank size
• Calculate return on investment for the entire planning period
• Consider voltage support & power factor correction objectives
• Generate reports & plots of capacitor operating profit
• Handle unlimited network configurations
• Options to constrain installation locations with user-defined parameters
• Option to constrain the maximum number of capacitors installed at any location
• Use both individual & global constraints
• Utilize individual source or global energy costs
• Evaluate the capacitor installation for various system loadings
Configuration Manager
The Configuration Manager provides a tabular view of individual device status and allows you to view,
control, and manage the status of all elements from one editor. This dynamic new feature adds increased
flexibility to change, track changes, and compare status of devices. For example, intelligent filtering
isolates specific open protective devices making it easy to locate on the one-line diagram. Additional
filtering exposes differences between configurations in a fraction of the time normally associated with
one-line diagram monitoring.
New Features
• Manage & view configuration status of devices at a glance
• Identify differences between configurations for better visual understanding
• Option to filter & display specific configurations & device types
• Options to customize display status
• Directly modify the status of multiple devices
• Create, copy, delete, & rename commands
• Export configurations to Microsoft Access tables for further queries & reporting
Configuration Checking
In addition to the In addition to the properties (elements in the project) and library data, you now can
check and validate configuration status of elements.
Theme Manager
The Theme Manager allows you to create and recall templates for the graphic display of elements,
connectors, annotations, results, alerts, and background colors. You can graphically distinguish phase
connections (such as A, C, D, 1-phase, 2-phase, 3-phase, 2W, 3W, 4W, etc.) by changing the connector
style and colors. This highly versatile interface permits customization at nearly every level. This includes
the flexibility to select from existing templates, Microsoft Windows environment, or personalized themes.
A significant advantage of the Theme Manager is that unlimited project-independent custom styles may
be stored on a computer and are readily available when you switch from one ETAP project to another.
New Features
• Instantly create or switch between multiple color schemes using theme templates
• Pick a background color for the best contrast when viewing one-lines, performing system studies, or
real-time monitoring
• Set different themes for individual one-line diagrams
• Flexible coloring for AC & DC elements, annotations, & composite networks
• Assign highly visible colors for alerts, alarms, & warnings
• Easily differentiate between 1-phase, 2-phase, & 3-phase systems
• Modify the element, grid, & background colors for specific presentations
• Easily set colors based on voltage levels
License Administrator & Wizard
Maintain optimal productivity and receive the greatest value from ETAP resources by monitoring and
administering access to your ETAP license. This new tool provides an at-a-glance view of all the
computers and users online with ETAP. It even keeps track of how long they’ve been logged online. The
License Wizard can switch access to different ETAP License Managers. Productivity bottlenecks can be
avoided by scheduling user access when demand exceeds the number of
• Identify all users logged onto ETAP
• Minimize accessibility conflicts
• Manage ETAP licenses via License Wizard
Output Reports
Viewing output reports and plots is now even easier. The new Find feature allows you to locate specific
information fast. Simply select an element type from a listing of element IDs, then choose the ID you
wish to review and search the report for occurrences of the selected ID. Examine the report electronically
in the viewer or save the data in a format that can be opened by a spreadsheet program. Experience faster
operation and easier access to your report data. Other enhancements include:
• Find elements or text
• Reports can be exported in five common spreadsheet & word processing formats
Text Box
• Add text in user-defined areas on one-line & control system diagrams
• Select the font, size, & color of text
• Modify the shape & opacity of a text box
• Edit appearance of text boxes for print output or electronic presentations
• Default text box settings
With the “ETAP Advantage” option, you receive the following additional documentation and services:
1. Verification & Validation Certification Letter which states that ETAP is verified and validated
per the requirements of ISO 9001:2000, Title 10 CFR 50, Appendix B, Title 10 CFR Part 21,
ANSI/ASME N45.2, ASME NQA-1, ANSI/IEEE Std 730.1, CAN/CSA-Q 396.1.2, and ANSI N45.22.
2. Performance Reporting will keep you updated with program deviations, limitations, and detailed
listing of changes from one release to the next. Deviations are reported within five working
days from discovery. Reporting includes minor deviations in calculations, library data, program
interface, output reports, plots, project database, etc. Major/substantial errors are reported to all
ETAP users.
ETAP Advantage is beneficial for all types of industries and consulting firms
The OTI Engineering and Development Teams are pleased to present you with the latest ETAP 5.0.3
release. ETAP 5.0.3 is a point release, which includes a number of fixes for the ETAP 5.0.2 release.
ETAP 5.0.3 CD is a complete program and does not require any previous ETAP installation.
We recommend that you utilize this latest release in order to take advantage of the new features and
capabilities. We strive to provide our customers with advanced features and industry standard
engineering tools.
2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
1
Operation Technology, Inc.
17 Goodyear, Suite 100
Irvine, CA 92618-1812
(949) 462-0100
Fax: (949) 462-0200
Support: (949) 462-0400
Email: [email protected]
www.etap.com
ETAP 5.0.2
May 24, 2005
The OTI Engineering and Development Teams are pleased to present you with the latest ETAP 5.0.2
release.
ETAP 5.0.2 is a point release, which includes several enhancements and corrections for the earlier 5.0.1
and 5.0.0 releases. ETAP 5.0.2 is a complete program and does not require any previous ETAP
installation. We recommend that you utilize this latest release in order to take advantage of the new
features and capabilities. We strive to provide our customers with advanced features and industry
standard engineering tools.
For more information about this new release, please take a few moments to read and review the
information below.
2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
1
Before performing calculation, users need to identify the unit transformers for power station
units. By doing this ETAP then automatically determines all the elements within the power
station units including their auxiliary systems, as well as network elements as defined by IEC
60909 Standard.
2) Enhanced the calculation of the breaking current (Ib) according to the adjustments described in
equation (75), page 115 of IEC 60909-0. The effect of equation (75) will reduce the breaking
current slightly. Note that this adjustment is considered optional and applies only to near
generators faults in mesh systems.
Library – etaplib502.lib
1) Released etaplib502 library including new protective device library models.
2) Validated and Verified (V&V) library data per OTI’s Quality Assurance program.
3) Changed Kerite Cable library data (cable reactance for magnetic installation).
4) Added Kerite Cable library data for non-magnetic installation.
5) MV Solid State Trip Relay (Long Time Curve) has been updated.
Manufacturer: Westinghouse, Models: DigiTrip 3000, DigiTrip MV.
6) Implemented a library release number (versioning) for newly issued libraries for the purpose of
library merge.
7) Enhanced library copy and paste capabilities.
8) The following time-current characteristics fuse curves were enhanced by digitizing the
manufacturer curves:
2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
2
9) Corrected the interrupting ratings for the following fuses:
2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
3
Operation Technology, Inc.
17 Goodyear
Irvine, CA 92618-1812
(949) 462-0100
Fax: (949) 462-0200
Support: (949) 462-0400
E-mail: [email protected]
www.etap.com
ETAP 5.0
September 2004
The OTI Development Team is pleased to provide you with the latest ETAP 5.0 release. ETAP 5.0 is a
major upgrade to ETAP 4.7.6.
The new 5.0 release includes major enhancements to existing modules as well as several new analysis
modules, including ETAP Star, which is a new concept for protective device coordination and protection.
ETAP Star has been in design and development for the last two years, and we are very excited about
sharing its features and benefits with our users.
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
1
w
ETAP Star
Ne ule
Mo
d ENHANCED MODULES
(Device Coordination/Selectivity)
Transient Stability Harmonics
ETAP Star is an advanced concept in performing steady-state and
ETAP Star Features Include: The Transient Stability module has been dramatically expanded to The new Harmonic Analysis module
dynamic coordination and selectivity of protective devices. This is increase the type of transient actions (disturbances, load and generation helps you quickly identify problems,
achieved by utilizing intelligent one-line diagrams, comprehensive • Graphically Adjustable Device Settings changes, relay actions, etc.) you can place on the system. reduce nuisance trips, design and test
device libraries, and an integrated three-dimensional database. • Sequence-of-Operation of Protective Devices Among the many added features are SVC, multi-mass shaft modeling, filters, and distortion limit violations
Designed and developed by OTI, Star is a fully integrated module • Embedded Fault & Motor Acceleration Analyses synchronous motor acceleration with discharge resistor, and alerts. The module provides
within ETAP, with built-in analyses such as short-circuit and motor • Extensive Device Library (Verified & Validated) automatic assignment of reference machine for each isolated subsystem. comprehensive load flow and
acceleration. • Phase & Ground Coordination Modes frequency scan calculations using
• Multi-Function Universal Relays • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters detailed harmonic models and non-
• (50/51 P, N, G, SG, 51V, 67, 46, & more)
• Motor Point-by-Point Load Model • HVDC Transmission Link integer harmonic filters.
• Built-In Interface with Relay Hardware
• Dynamic Model for Lumped Load • Universal Relay Actions
• Display Actual Relay Transient Response
• SVC (Steady-State & Transient Response) • New Harmonic Filters
• User-Definable Device Library Database
• Transformer LTC Initial & Operating Time Delays • Transformer k Factor Rating
• Fixed Point / Damage Curve Modeling
• Enhanced General Models for Lumped Load • Alerts for VTHD, VIHD, Transformer, Filter, Capacitor, & Cable
• Graphical Time-Difference Calculator
• Synchronous Motor Acceleration with Discharge Resistor • Report Resonance Frequencies & Magnitudes
• Automatic Current & Voltage Scaling of TCC View
• & Pull-in Process • Enhanced General Models for Lumped Load
• Advanced Curve-Fitting Algorithms
• Step & Ramp Changes of Generation Level, and AVR Reference • One-Line Display of Capacitor & Filter Current
• Auto Clipping for All Protective Devices
• Voltage • Generation of Harmonic Sources Based on Device Parameters for
• Click & Drag Curves to Adjust Settings
• Step & Ramp Changes of Synchronous & Induction Motor Loading • VFD, UPS, Charger, & Inverter
• Automatic Layout of the One-Line Diagram in Star View
• Enhanced Fractional Branch Faults
• Print or Plot on Multiple Pages
• (Transmission Line, Cable, & Impedance)
• Automatically Shrink to Fit on a Single Page
• System Zoning & Automatic Reference Machine Assignment
Libraries (New & Enhanced)
• Print or Plot to Various Paper Sizes, Including Full Size Plotters
• for Each Islanded Subsystem OTI has enhanced and created many new libraries with data locking
• Print Comprehensive Reports of Input Data & Study Results
• New Plots and checker capabilities. Also for ETAP 5.0, all libraries related to
• Customizable Print Functionality, Legends, & Device Labeling
• - Absolute Power Angle for Synchronous Generators & Motors protective devices are combined (short-circuit ratings and time current
• Display Input Data & Study Results on the Drawing
• - Generator & Motor Mvar Flows characteristics) into one ETAP library. The new library has been
w • - Terminal Voltage for Synchronous & Induction Motors validated and verified based on published manufacturer data per
Ne cept
Star Sequence-of-Operation C o n • - Difference of Variables for Fast Bus Transfer ETAP’s qaulity assurance program.
• Contactor Open & Close Action
ETAP Star Sequence-of-Operation provides a system wide solution • Control Relay • Solenoid
• Start Synchronous & Induction Motors by Starting Category
for accurate and realistic operating times and states of protective • LV Circuit Breaker • Fuse
• Multi-Mass Shaft Model for Generators & Motors
devices, such as relay, fuse, circuit breaker, trip devices, contactor, • Overload Relay & Heater
• New Bus Frequency Calculations using Electrical Distance Method
etc. The operation time is calculated for each protective device based • Point-by-Point Motor Load
on its settings, time current characteristics, and interlocks for a • Characteristics
specified fault location and type. • Transmission Line Library
ETAP Real-Time (PSMS) • (Phase & Ground Conductors)
With ETAP Star, not only can you work with the time-current curves, • Trip Devices (Solid State, Thermal-
Built on ETAP, the world-leading power system analysis software,
you can also determine the operating time of protective devices • Magnetic, Electro-Mechanical, & Motor Circuit Protector)
ETAP Real-Time is a real-time energy management system used by
simply by placing a fault on the one-line diagram. • Multi-Function (Universal) Relay (50/51 P, N, G, SG, 51V, 67, 46, …)
operators and managers to monitor, control, and optimize power
systems. New Protective Device Library
• Automatically calculate and display the fault current • ABB (BBC) • Federal Pioneer • Protecta
• contributions on the one-line diagram • AEG • Fuji Electric • RTE
• Enhanced State Estimator • Allen Bradley • G&W • S&C
• Graphically place a fault anywhere on the one-line diagram • Allis-Chalmers • GE Multilin • Schlumberger
• & Load Distribution • Alstom • GEC Alsthom • Schweitzer (SEL)
• Determine the operating time and state of all protective • Basler Electric • General Electric • Siba
• PF Meters • Brush • Gould Shawmut (Ferraz) • Siemens
• devices based on the actual fault current contribution • Bussmann • Heinemann • Snemo
• New Real-Time Simulation • Carriere • ITE (BBC) • Southern States
• flowing through each individual device • CEE • Joslyn • SPD Technologies
• Modules • Chance • K Moeller • Square D
• Globally view post fault actions • Combined Technologies • Kearney • Sure-Trip
• Enhanced Intelligent Load • Cooper • KyongBo Electric • Sylvania
• and associated operating time via a tabulated Event Viewer Coordinate via One-Line Diagram • Shedding
• Cooper (Edison) • L&T • Sytek
• Cutler-Hammer • LG • Terasaki
• Graphically examine the operation of protective devices via the • Deesys • McGraw-Edison • Toshiba
• Extended Communication • Dorman Smith • Merlin Gerin • Universal
• one-line diagram • Driescher • MicroelettricaScientifica • Utility Relay
• Protocols • Enertec • Mitsubishi • Westinghouse
• English Electric • Moeller • Xelpower
1 • Federal Pacific • P&B Engineering • ZIV 6
ENHANCED MODULES
w
Ne ule
Added Features to all Modules Motor Acceleration Optimal Capacitor Placement Mo
d
Thanks to user feedback, significant additions and improvements The Motor Acceleration module has been enhanced to reduce the Optimal Capacitor Placement allows engineers to strategically place capacitors for voltage support and power factor correction while
have been made to enhance all network analyses modules. These time it takes to conduct single and group motor acceleration studies. minimizing installation and long-term operation costs. The advanced graphical interface gives users the flexibility to control the capacitor
enhancements include various study options to globally change and Major enhancements include the new soft starters (control motor placement process and graphically view the results. The precise calculation approach automatically determines the best locations and bank
adjust system parameters and topology with a click of the mouse to voltage, current, or torque), alerts (report various violation for motors, sizes. In addition, it reports the branch capacity release and the estimated savings during the planning period due to var loss reduction.
increase your productivity. buses, generators, and engines), unlimited time events, and user-
defined point-by-point motor load modeling features. • Best Location & Bank Size
• Individual and/or Global Tolerance (Length and/or Impedance) for • Minimum Total Installation & Operation Cost
• Cables, Transmission Lines, OLH, Transformers, & Reactors • Partial-Winding, Y-•, Rotor • Voltage Support & Power Factor Correction
• Isolated Subsystem Index • External Impedance, & Soft • Branch Capacity Release & Cost Savings
• Parameter Adjustment Report • Starters • Capacitor Control Method
• Generation Category • Comprehensive Alert View • Review Capacitor Impact on the System
• Transmission Line Coupling • Unlimited Number of Events
• Protection Page (Cable, Transmission Line, Transformer, Generator, • Point-by-Point Motor Load w
Ne ule
• Model
• Induction Motor, Synchronization Motor)
Unbalanced Load Flow Mo
d
• Charging Current for Single-End Open Branches • Plots for Static Loads & Buses
• (Cable, Transmission Line, & Impedance Branch) • Source Voltage Sequencing A robust and efficient power flow solution method must be able to model special features of distribution systems with sufficient accuracy.
• New One-Line Diagram Zoom With ETAP's Unbalanced Load Flow module, you can easily model your unbalanced system with detailed representation of component
• Enhanced Connection Logic for One-Line Diagram unsymmetrical characteristics. Accurate and reliable per-phase results are available to describe your system’s unbalanced operating conditions.
• UPS Output Connection Arc Flash Automatic alarms/warnings and advanced features such as the automatic line constant calculator make it the most advanced Unbalanced
Load Flow program available today.
ETAP Arc Flash Analysis estimates the arc flash
Short-Circuit incident energy under a bolted 3-phase short
• Advanced Current-Injection Method
circuit fault and determines the flash protective
We have enhanced the IEC • Looped & Radial Systems
boundary to live parts for shock protection.
Standard for device evaluation • 1-Phase, 2-Phase, & 3-Phase Unbalanced Load Flow
Design safer power systems by insuring
based on maximum fault current • Unbalanced Branch & Load Modeling
compliance with OSHA 29 CFR 1910.132(d)
through protection devices, and • Transmission Line Coupling
1990, NFPA 70E-2004, and IEEE 1584-2002 Standards.
reporting of braking current • Charging Current for Open-End Branches
as a function breaker time • Phase & Sequence Voltage, Current, & Unbalanced Rates
• System Calculated or User-Defined Fault Current
delay. ETAP 5.0 also • Multiple Demand Factor Non-Linear Loads
• System Calculated or User-Defined Arcing Fault Clearing Time
provides detailed • Real & Reactive Power Losses & Voltage Drop Calculation
• (Interface with ETAP Star)
reports and graphical • Line & Cable Temperature Correction
• System Calculated or User-Defined System Grounding
display of line-to- • Automatic Alert for Device Evaluation
• Arcing Current Variation
ground, line-to-line, • Automatic Determination of Hazard/Risk Category for PPE w
Ne ule
and line-to-line-to- • Create Regulation Arc Flash Hazard Labels for Every Bus Control System Diagram Mo
d
ground fault currents. • Different Label Templates Available for Each Faulted Equipment
• Quick Incident Energy Calculator (Bus Arc Flash Page) ETAP seamlessly integrates power and control systems within one electrical analysis program. The Control System Diagram (CSD) simulates
• User-Defined Equipment Gap Between Conductors & X Factors the sequence-of-operation of control devices such as solenoids, relays, controlled contacts, multi-sequence contacts, and actuators including
• Limited Approach inrush conditions. CSD has the capability to determine pickup and dropout voltages, losses, and current flows at any time instance as well
Load Flow • Boundary Based on NFPA as overall marginal and critical alerts. A large library of equipment enables engineers to quickly model and simulate the action of relays
• 70E Table 2-1.3.4 associated with control interlocks after time delays.
ETAP’s advanced Load • Drag & Drop Control Relays, Solenoids, Contacts, Cables, etc.
• Added Arc Flash
Flow module includes • Control Logic Simulation (Relays, Circuit Breakers, Contacts, etc.)
• Calculation Icons to the
features such as • Voltage Drop Calculation including Inrush Currents
• Short-Circuit Toolbars
automatic device • Battery Discharge Calculations using Actual Control Logics
• Automatically Update Arc
evaluation, summary • Automatic Alert for Pickup & Dropout Voltages
• Flash Analysis Results to
alarms/warnings, and • Automatic Overloading Alerts
• Every Bus
intelligent graphics. Already a robust Simulate Control • Fully Integrated with One-Line Diagrams
power calculation tool, the module has Actions just like • Comprehensive Device Library (Verified & Validated)
enhanced device evaluation, alerts, and reporting. in Real Systems
5 2
NEW Elements Enhanced Elements
w
Ne ule
GIS Map Mo
d
(Geographic Information System) Static Var Compensator (SVC) Generator
ETAP GIS Map superimposes electrical one-line diagrams with the corresponding geographical maps of power generation, transmission, and • Capacitive & Inductive Characteristics • Generation Category • PF Control Mode
distribution systems. Synchronize relevant electrical equipment information from GIS into ETAP and maintain the relationship between them. • Modeling Within & Outside Control Range • MW-Mvar Capability Curve • Xd” Tolerance
• Full Controller Dynamic Modeling • Inertia Calculator (Prime Mover, Coupling Gear, & Generator)
• Data Synchronization with GIS • Several Typical Control Models • Shaft Torsion Parameters • Engine Rating
• Embedded Load Flow & Fault Analyses • Grounding Through Distribution Transformer
• Display Analysis Results on GIS Maps • Graphical Grounding Elements on One-Line Diagram
• Display Unlimited GIS Presentations High Voltage DC
• Perform Add, Modify, or Delete Actions Transmission Link (HVDC)
• View ESRI ArcGIS® Maps in ETAP Power Grid
• Use Map Tools – Zoom In, Zoom • Load Flow Modeling
• Different Combination of Operating Modes for Rectifier & Inverter • Generation Category
• Out, Full Extent, Pan, etc.
• Full AC/DC Controllers Dynamic Modeling • PF Control Mode
• Fully Control Analysis Results
• Displayed on the GIS Map • Current, Power, & Voltage Controllers for Rectifier & Inverter
• Map GIS Equipment Attributes to • Voltage-Dependent Current-Order Limits (VDCOL) Control Model
• Shut-Off & Re-Start Models
Bus
• ETAP Element Attributes
• Perform Data Consistency Checks • Arc Flash Parameters Based on Normal kV
Multi-Function (Universal) Relay • Unbalanced Initial Voltage
• Arc Flash Calculator with Embedded Fault Analysis
• Multi Level & Function • & Protective Device Clearing Time
w
Ne ule
w
Ne ule • Overcurrent (50/51)
Transmission Line Mo
d
ETAP Wizard Mo
d
(Added to Base Modules) • Voltage Control/Restraint (51V)
3 4
NEW Elements Enhanced Elements
w
Ne ule
GIS Map Mo
d
(Geographic Information System) Static Var Compensator (SVC) Generator
ETAP GIS Map superimposes electrical one-line diagrams with the corresponding geographical maps of power generation, transmission, and • Capacitive & Inductive Characteristics • Generation Category • PF Control Mode
distribution systems. Synchronize relevant electrical equipment information from GIS into ETAP and maintain the relationship between them. • Modeling Within & Outside Control Range • MW-Mvar Capability Curve • Xd” Tolerance
• Full Controller Dynamic Modeling • Inertia Calculator (Prime Mover, Coupling Gear, & Generator)
• Data Synchronization with GIS • Several Typical Control Models • Shaft Torsion Parameters • Engine Rating
• Embedded Load Flow & Fault Analyses • Grounding Through Distribution Transformer
• Display Analysis Results on GIS Maps • Graphical Grounding Elements on One-Line Diagram
• Display Unlimited GIS Presentations High Voltage DC
• Perform Add, Modify, or Delete Actions Transmission Link (HVDC)
• View ESRI ArcGIS® Maps in ETAP Power Grid
• Use Map Tools – Zoom In, Zoom • Load Flow Modeling
• Different Combination of Operating Modes for Rectifier & Inverter • Generation Category
• Out, Full Extent, Pan, etc.
• Full AC/DC Controllers Dynamic Modeling • PF Control Mode
• Fully Control Analysis Results
• Displayed on the GIS Map • Current, Power, & Voltage Controllers for Rectifier & Inverter
• Map GIS Equipment Attributes to • Voltage-Dependent Current-Order Limits (VDCOL) Control Model
• Shut-Off & Re-Start Models
Bus
• ETAP Element Attributes
• Perform Data Consistency Checks • Arc Flash Parameters Based on Normal kV
Multi-Function (Universal) Relay • Unbalanced Initial Voltage
• Arc Flash Calculator with Embedded Fault Analysis
• Multi Level & Function • & Protective Device Clearing Time
w
Ne ule
w
Ne ule • Overcurrent (50/51)
Transmission Line Mo
d
ETAP Wizard Mo
d
(Added to Base Modules) • Voltage Control/Restraint (51V)
3 4
ENHANCED MODULES
w
Ne ule
Added Features to all Modules Motor Acceleration Optimal Capacitor Placement Mo
d
Thanks to user feedback, significant additions and improvements The Motor Acceleration module has been enhanced to reduce the Optimal Capacitor Placement allows engineers to strategically place capacitors for voltage support and power factor correction while
have been made to enhance all network analyses modules. These time it takes to conduct single and group motor acceleration studies. minimizing installation and long-term operation costs. The advanced graphical interface gives users the flexibility to control the capacitor
enhancements include various study options to globally change and Major enhancements include the new soft starters (control motor placement process and graphically view the results. The precise calculation approach automatically determines the best locations and bank
adjust system parameters and topology with a click of the mouse to voltage, current, or torque), alerts (report various violation for motors, sizes. In addition, it reports the branch capacity release and the estimated savings during the planning period due to var loss reduction.
increase your productivity. buses, generators, and engines), unlimited time events, and user-
defined point-by-point motor load modeling features. • Best Location & Bank Size
• Individual and/or Global Tolerance (Length and/or Impedance) for • Minimum Total Installation & Operation Cost
• Cables, Transmission Lines, OLH, Transformers, & Reactors • Partial-Winding, Y-•, Rotor • Voltage Support & Power Factor Correction
• Isolated Subsystem Index • External Impedance, & Soft • Branch Capacity Release & Cost Savings
• Parameter Adjustment Report • Starters • Capacitor Control Method
• Generation Category • Comprehensive Alert View • Review Capacitor Impact on the System
• Transmission Line Coupling • Unlimited Number of Events
• Protection Page (Cable, Transmission Line, Transformer, Generator, • Point-by-Point Motor Load w
Ne ule
• Model
• Induction Motor, Synchronization Motor)
Unbalanced Load Flow Mo
d
• Charging Current for Single-End Open Branches • Plots for Static Loads & Buses
• (Cable, Transmission Line, & Impedance Branch) • Source Voltage Sequencing A robust and efficient power flow solution method must be able to model special features of distribution systems with sufficient accuracy.
• New One-Line Diagram Zoom With ETAP's Unbalanced Load Flow module, you can easily model your unbalanced system with detailed representation of component
• Enhanced Connection Logic for One-Line Diagram unsymmetrical characteristics. Accurate and reliable per-phase results are available to describe your system’s unbalanced operating conditions.
• UPS Output Connection Arc Flash Automatic alarms/warnings and advanced features such as the automatic line constant calculator make it the most advanced Unbalanced
Load Flow program available today.
ETAP Arc Flash Analysis estimates the arc flash
Short-Circuit incident energy under a bolted 3-phase short
• Advanced Current-Injection Method
circuit fault and determines the flash protective
We have enhanced the IEC • Looped & Radial Systems
boundary to live parts for shock protection.
Standard for device evaluation • 1-Phase, 2-Phase, & 3-Phase Unbalanced Load Flow
Design safer power systems by insuring
based on maximum fault current • Unbalanced Branch & Load Modeling
compliance with OSHA 29 CFR 1910.132(d)
through protection devices, and • Transmission Line Coupling
1990, NFPA 70E-2004, and IEEE 1584-2002 Standards.
reporting of braking current • Charging Current for Open-End Branches
as a function breaker time • Phase & Sequence Voltage, Current, & Unbalanced Rates
• System Calculated or User-Defined Fault Current
delay. ETAP 5.0 also • Multiple Demand Factor Non-Linear Loads
• System Calculated or User-Defined Arcing Fault Clearing Time
provides detailed • Real & Reactive Power Losses & Voltage Drop Calculation
• (Interface with ETAP Star)
reports and graphical • Line & Cable Temperature Correction
• System Calculated or User-Defined System Grounding
display of line-to- • Automatic Alert for Device Evaluation
• Arcing Current Variation
ground, line-to-line, • Automatic Determination of Hazard/Risk Category for PPE w
Ne ule
and line-to-line-to- • Create Regulation Arc Flash Hazard Labels for Every Bus Control System Diagram Mo
d
ground fault currents. • Different Label Templates Available for Each Faulted Equipment
• Quick Incident Energy Calculator (Bus Arc Flash Page) ETAP seamlessly integrates power and control systems within one electrical analysis program. The Control System Diagram (CSD) simulates
• User-Defined Equipment Gap Between Conductors & X Factors the sequence-of-operation of control devices such as solenoids, relays, controlled contacts, multi-sequence contacts, and actuators including
• Limited Approach inrush conditions. CSD has the capability to determine pickup and dropout voltages, losses, and current flows at any time instance as well
Load Flow • Boundary Based on NFPA as overall marginal and critical alerts. A large library of equipment enables engineers to quickly model and simulate the action of relays
• 70E Table 2-1.3.4 associated with control interlocks after time delays.
ETAP’s advanced Load • Drag & Drop Control Relays, Solenoids, Contacts, Cables, etc.
• Added Arc Flash
Flow module includes • Control Logic Simulation (Relays, Circuit Breakers, Contacts, etc.)
• Calculation Icons to the
features such as • Voltage Drop Calculation including Inrush Currents
• Short-Circuit Toolbars
automatic device • Battery Discharge Calculations using Actual Control Logics
• Automatically Update Arc
evaluation, summary • Automatic Alert for Pickup & Dropout Voltages
• Flash Analysis Results to
alarms/warnings, and • Automatic Overloading Alerts
• Every Bus
intelligent graphics. Already a robust Simulate Control • Fully Integrated with One-Line Diagrams
power calculation tool, the module has Actions just like • Comprehensive Device Library (Verified & Validated)
enhanced device evaluation, alerts, and reporting. in Real Systems
5 2
w
ETAP Star
Ne ule
Mo
d ENHANCED MODULES
(Device Coordination/Selectivity)
Transient Stability Harmonics
ETAP Star is an advanced concept in performing steady-state and
ETAP Star Features Include: The Transient Stability module has been dramatically expanded to The new Harmonic Analysis module
dynamic coordination and selectivity of protective devices. This is increase the type of transient actions (disturbances, load and generation helps you quickly identify problems,
achieved by utilizing intelligent one-line diagrams, comprehensive • Graphically Adjustable Device Settings changes, relay actions, etc.) you can place on the system. reduce nuisance trips, design and test
device libraries, and an integrated three-dimensional database. • Sequence-of-Operation of Protective Devices Among the many added features are SVC, multi-mass shaft modeling, filters, and distortion limit violations
Designed and developed by OTI, Star is a fully integrated module • Embedded Fault & Motor Acceleration Analyses synchronous motor acceleration with discharge resistor, and alerts. The module provides
within ETAP, with built-in analyses such as short-circuit and motor • Extensive Device Library (Verified & Validated) automatic assignment of reference machine for each isolated subsystem. comprehensive load flow and
acceleration. • Phase & Ground Coordination Modes frequency scan calculations using
• Multi-Function Universal Relays • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters detailed harmonic models and non-
• (50/51 P, N, G, SG, 51V, 67, 46, & more)
• Motor Point-by-Point Load Model • HVDC Transmission Link integer harmonic filters.
• Built-In Interface with Relay Hardware
• Dynamic Model for Lumped Load • Universal Relay Actions
• Display Actual Relay Transient Response
• SVC (Steady-State & Transient Response) • New Harmonic Filters
• User-Definable Device Library Database
• Transformer LTC Initial & Operating Time Delays • Transformer k Factor Rating
• Fixed Point / Damage Curve Modeling
• Enhanced General Models for Lumped Load • Alerts for VTHD, VIHD, Transformer, Filter, Capacitor, & Cable
• Graphical Time-Difference Calculator
• Synchronous Motor Acceleration with Discharge Resistor • Report Resonance Frequencies & Magnitudes
• Automatic Current & Voltage Scaling of TCC View
• & Pull-in Process • Enhanced General Models for Lumped Load
• Advanced Curve-Fitting Algorithms
• Step & Ramp Changes of Generation Level, and AVR Reference • One-Line Display of Capacitor & Filter Current
• Auto Clipping for All Protective Devices
• Voltage • Generation of Harmonic Sources Based on Device Parameters for
• Click & Drag Curves to Adjust Settings
• Step & Ramp Changes of Synchronous & Induction Motor Loading • VFD, UPS, Charger, & Inverter
• Automatic Layout of the One-Line Diagram in Star View
• Enhanced Fractional Branch Faults
• Print or Plot on Multiple Pages
• (Transmission Line, Cable, & Impedance)
• Automatically Shrink to Fit on a Single Page
• System Zoning & Automatic Reference Machine Assignment
Libraries (New & Enhanced)
• Print or Plot to Various Paper Sizes, Including Full Size Plotters
• for Each Islanded Subsystem OTI has enhanced and created many new libraries with data locking
• Print Comprehensive Reports of Input Data & Study Results
• New Plots and checker capabilities. Also for ETAP 5.0, all libraries related to
• Customizable Print Functionality, Legends, & Device Labeling
• - Absolute Power Angle for Synchronous Generators & Motors protective devices are combined (short-circuit ratings and time current
• Display Input Data & Study Results on the Drawing
• - Generator & Motor Mvar Flows characteristics) into one ETAP library. The new library has been
w • - Terminal Voltage for Synchronous & Induction Motors validated and verified based on published manufacturer data per
Ne cept
Star Sequence-of-Operation C o n • - Difference of Variables for Fast Bus Transfer ETAP’s qaulity assurance program.
• Contactor Open & Close Action
ETAP Star Sequence-of-Operation provides a system wide solution • Control Relay • Solenoid
• Start Synchronous & Induction Motors by Starting Category
for accurate and realistic operating times and states of protective • LV Circuit Breaker • Fuse
• Multi-Mass Shaft Model for Generators & Motors
devices, such as relay, fuse, circuit breaker, trip devices, contactor, • Overload Relay & Heater
• New Bus Frequency Calculations using Electrical Distance Method
etc. The operation time is calculated for each protective device based • Point-by-Point Motor Load
on its settings, time current characteristics, and interlocks for a • Characteristics
specified fault location and type. • Transmission Line Library
ETAP Real-Time (PSMS) • (Phase & Ground Conductors)
With ETAP Star, not only can you work with the time-current curves, • Trip Devices (Solid State, Thermal-
Built on ETAP, the world-leading power system analysis software,
you can also determine the operating time of protective devices • Magnetic, Electro-Mechanical, & Motor Circuit Protector)
ETAP Real-Time is a real-time energy management system used by
simply by placing a fault on the one-line diagram. • Multi-Function (Universal) Relay (50/51 P, N, G, SG, 51V, 67, 46, …)
operators and managers to monitor, control, and optimize power
systems. New Protective Device Library
• Automatically calculate and display the fault current • ABB (BBC) • Federal Pioneer • Protecta
• contributions on the one-line diagram • AEG • Fuji Electric • RTE
• Enhanced State Estimator • Allen Bradley • G&W • S&C
• Graphically place a fault anywhere on the one-line diagram • Allis-Chalmers • GE Multilin • Schlumberger
• & Load Distribution • Alstom • GEC Alsthom • Schweitzer (SEL)
• Determine the operating time and state of all protective • Basler Electric • General Electric • Siba
• PF Meters • Brush • Gould Shawmut (Ferraz) • Siemens
• devices based on the actual fault current contribution • Bussmann • Heinemann • Snemo
• New Real-Time Simulation • Carriere • ITE (BBC) • Southern States
• flowing through each individual device • CEE • Joslyn • SPD Technologies
• Modules • Chance • K Moeller • Square D
• Globally view post fault actions • Combined Technologies • Kearney • Sure-Trip
• Enhanced Intelligent Load • Cooper • KyongBo Electric • Sylvania
• and associated operating time via a tabulated Event Viewer Coordinate via One-Line Diagram • Shedding
• Cooper (Edison) • L&T • Sytek
• Cutler-Hammer • LG • Terasaki
• Graphically examine the operation of protective devices via the • Deesys • McGraw-Edison • Toshiba
• Extended Communication • Dorman Smith • Merlin Gerin • Universal
• one-line diagram • Driescher • MicroelettricaScientifica • Utility Relay
• Protocols • Enertec • Mitsubishi • Westinghouse
• English Electric • Moeller • Xelpower
1 • Federal Pacific • P&B Engineering • ZIV 6
ETAP PowerStation 4.7.6
January 2004
The OTI Development Team is pleased to present you with the latest ETAP PowerStation 4.7.6 and
PowerPlot v2.5, Release 167. ETAP PowerStation 4.7.6 is a point release, which includes some
enhancements and corrections for earlier releases.
ETAP PowerStation 4.7.6 release is a complete program and does not require an earlier program
installation.
We encourage you to install this latest release to take advantage of the new features and capabilities.
Please contact OTI sales to purchase the new Arch Flash IEEE 1584 module. We are excited about
providing our customers with advanced features and industry standard engineering tools.
For more information, please take a few moments to read and review the information below:
In the IEEE Std. 1584-2002 method, the empirically derived model is used for voltages in the range of
0.208-15kV. The theoretically derived Lee Model is used for voltage levels above 15kV. The
empirically derived model has a bolted fault current range of 0.7- 106kA. ETAP Arc Flash is available
for both ANSI and IEC Standards.
Arc Flash Analysis with NFPA 70E-2000 Standard continues to be an integral part of the ETAP Short
Circuit Analysis module.
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
2
Hyperlink NEW FEATURE
˙ Drag and drop the hyperlink on any device on the one-line diagram, raceway, or presentation
including composite motors and networks.
˙ Hyperlinks Editor opens automatically after dropping link onto an element or one-line diagram.
o Description
o Web or network address of file
o Tooltip (Roll-over)
˙ Multiple links per element are possible. Hyperlinks are easy to edit and remove.
The auto backup feature can be turned off in the ETAPS.INI file. The default setting is set to “1” to
create backup. To stop auto-backup functions, set the INI file value to “0”.
[ETAP PowerStation]
CreateBackupFile=0
Data Exchange
DXF file format is optimized. File size for each DXF file is considerably less if the file contains minimal
information.
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
3
System Requirements
Minimum Hardware Requirements
Your computer must meet the following minimum hardware requirements to run PowerStation 4.7.4:
• Intel Pentium III
• 256 MB of RAM
• 500 MB available hard disk space
• Parallel, USB*, or Serial* Ports (*PowerPlot licensing not available for these ports)
• CD ROM Drive – Stand Alone Licensing only
Operating System
Your computer must meet the following Operating System and software requirements to use
PowerStation 4.7.4:
Microsoft Windows
• 98SE (Second Edition) • 2000 (Service Pack 2)
• NT 4.0 (Service Pack 6 or higher) • Me
• XP • Internet Explorer 5.0 or higher
Recommended Hardware Requirements
For projects less than 500 busses
• Intel Pentium IV or higher – 2.0 GHz or higher
• 512 MB of RAM
• 20 GB disk space
• Dual 21" monitor with 1024x768 resolution
• Microsoft Windows 2000 Professional, XP Professional, XP Home
For projects over 2,000 buses (10,000, 20,000, 30,000, or unlimited busses)
• Intel Pentium IV Xeon (3.0 GHz or higher) w/Symmetrical Multi-Processing (Dual) and Hyper-
Threading Technology. 533 MHz System Bus.
• 2-8 GB RAM, depending on maximum number of busses - (RD RAM or High-speed DDR RAM)
• 80 GB disk space
• Dual 21" monitor with 1024x768 resolution, or higher
• Microsoft Windows 2000 Professional, XP Professional
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
4
ETAP PowerStation 4.7.0
October 2002
This release incorporates Cable Pulling, Transformer MVA Sizing, Transformer Tap Optimization, IEC
287 temperature analysis (Underground Raceway Systems), and Motor Parameter Estimation modules
into ETAP, making ETAP completely integrated within the Windows environment. In addition, hundreds
of enhancements have been added to the existing modules.
Following the tradition of ETAP integration of electrical and physical properties, the newly added
modules have been designed to fully integrate with existing modules to eliminate multiple instances of the
similar data. For example, the Cable Pulling module uses the data from the existing cables in your ETAP
project files. Thus, the data for a single cable can be used for:
With ETAP, you can model, design, analyze, and optimize your electrical systems. This integration of
data provides consistency throughout the project and eliminates repetitive data entry for the same
element. This in turn reduces the time required to model and analyze a power system in its entirety,
which results in time and cost savings.
Analysis Capabilities
ETAP PowerStation 4.7 is a major upgrade to ETAP PowerStation 4.0.4. The analysis capabilities
available to you will depend on the configuration of modules purchased.
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
5
• Considers ambient temperature, altitude, load growth, diversity factors, etc.
Load Flow
• Unbalanced load flow calculations for panel systems & single-phase networks
• Alert view for panel systems & single-phase networks
• Voltage drop calculation for panel systems & single-phase networks
• Added an option to display load terminal voltages using Load Rated kV or Bus Nominal kV
• Enhanced Equipment Cable Losses Summary Report
• Added option to display bus angles
Short-Circuit
• Graphical plots of transient short circuit currents (IEC 363)
• Generator circuit breaker interrupting duty calculation (ANSI C37.010 – 1999)
• User-definable contact parting time & time constant for HV circuit breakers
• Ith & Ik calculations (IEC 909)
• Expanded arc duration range for Arc Flash Hazard calculations
Motor Acceleration
• New plots & graphical display of power flows for MOVs, generators, & power grids
• New enhanced plots of accelerating motors
• Added an option to display load terminal voltage based on Load Rated kV or Bus Nominal kV
Transient Stability
• Expanded Crystal Reports®
• Expanded calculations to handle frequency-dependent models for induction machines
• Expanded calculations to handle non-windup limiters for exciter types ST2 and ST3 models
Reliability Assessment
• Enhanced program to handle double contingency or multi-stage failure analyses
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
6
Protective Device Coordination
• Motor Operated Valves (MOV)
• Expanded Device Library
One-Line Diagram
• Display of load flow results for single-phase networks
• Display of unbalanced three-phase load flow results for Panel Systems
• Wheel-mouse compatible panning/auto-scrolling
• Drag and drop between the one-line diagrams, composite networks, and Dumpster
• Long output report names (64 characters)
• Detailed display of license information in the About ETAP dialog box
Data Exchange
• DXF export of ETAP project files including graphical annotations, results, etc.
• Enhanced database conversion/synchronizations from common database formats, CSV, XML, IEEE,
GIS & most third party applications
• Enhanced XML export of ETAP project data including nested or flat layout of the one-line diagram
• One-click zip (compress) & e-mail an ETAP project with options to include reports and/or libraries
• XML - Duty cycles for DC elements are added to the XML file export
General
• USB key and serial printer port keys are available to license stand-alone copies
• Enhanced the Help/About PowerStation screen to include detailed license information for
PowerStation keys
• PowerStation projects (MS Access database®) created with earlier versions of ETAP PowerStation
are automatically converted to Microsoft Access 2000 upon opening
• Output filename length is increased from 8 to 64 alphanumeric characters
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
7
• Manufacturer data is added to fuse, cable, battery, and harmonics libraries
• Phase connections are added for Motor Nameplate reports for the Schedule Manager
Minimum PC Requirements
· Intel Pentium II
· 128 MB of RAM
· 500 MB available hard drive space
· 1024x768 resolution
· Parallel Port
· Optional - USB Port (stand-alone licensing only)
· Optional - Serial Port (stand-alone licensing only)
Recommended PC Configuration
· Intel Pentium IV or higher
· 512 MB of RAM
· 2 GB available hard drive space
· 21" monitor with 1024x768 resolution
· Internet Explorer 5.0 or higher
· Parallel Port
· Optional - USB Port (stand-alone licensing only)
· Optional - Serial Port (stand-alone licensing only)
· Microsoft Windows 2000 Professional or XP Professional
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
8
ETAP PowerStation 4.0.4
April 2002
ETAP PowerStation is the most sophisticated engineering power system analysis tool on the market
today. Thousands of hours of design and engineering experience have gone into the overall development
of this software. We have combined state-of-the-art software development experience with real-life,
practical engineering know-how to create an intelligent, yet user-friendly, engineering software.
Analysis Capabilities
ETAP PowerStation 4.0.4 is a minor upgrade to ETAP PowerStation 4.0.0. The analysis capabilities
available to you will depend on the configuration of modules purchased.
Load Flow
• New double-precision Newton-Raphson method with current injection
• Phase-shifting transformer
• New summary output report on bus loadings and overload conditions
• New Alert View to display critical and marginal limit violations
Short-Circuit
• CB Duty calculation based on the maximum-through fault current (ANSI)
• Phase-shifting transformer for ANSI unbalanced faults
• New Alert View to display critical and marginal limit violations
• New Arc Flash analysis program for determining incident energy and flash protective boundary
(ANSI and IEC)
Harmonics
• Filter Overloading
• I*T Index
• Phase-shifting transformer
• Customizable output reports using Crystal Reports format
Transient Stability
• Synchronous motor exciter/AVR system
• Automatic CB operation based on instantaneous relay settings
Overcurrent (50/50G)
Directional Overcurrent (67)
Reverse Power (32)
Motor Overcurrent (50M)
Solid State Trip (SST)
• Loss of excitation action
• New plots for machine terminal impedance (for out-of-step relay setting)
• New plots for branch flows (MW, Mvar, MVA, and Amps)
• IEEE models for Power System Stabilizers (PSS)
• New manufacture models for exciters and governors
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
9
• User-defined Dynamic Models (UDM) interface for:
Exciter/AVR
Governor - Turbine
Power System Stabilizer
• Complete integration with UDM for the Generator Start-Up program
• Phase-shifting transformer
• Segment (fractional) faults for cables and transmission lines
• Remote voltage control bus for all exciters
Libraries
• Reliability Index Library
• Interruption Cost Library
• Expanded existing library data
Cable Ampacity
• ICEA P-55-440 cable tray ampacity calculator (Stolpe Method)
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
10
• Stand-alone test model performance including isolated step response
• Complete integration with Generator Start-Up analysis
• Run-time compile within ETAP PowerStation
• Utilize models within the Transient Stability Program
• Select user-built models within generator editors
• Utilizes block diagrams generated by Simulink®
• Implement system-wide operations such as load shedding, fast bus transfer, islanding, etc.
Motor Starting
• Phase-shifting transformer
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
11
Optimal Power Flow
• Generator fuel cost minimization
• Utility electricity cost minimization
One-Line Diagrams
• Single-Phase System (2 and 3 wires)
• Remote Connector
• Panel Systems
• Phase Adapter
• Ground Grid Systems
• New Relays
• Active X (Programmable Objects)
• XML Data Exchange
2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
12