The document discusses the new features and capabilities of ETAP 19.5 software release including major improvements and enhancements across various modules.

New modules introduced include Voltage Stability, Grid Code Compliance, Transformer Inrush, Zone Selective Interlock, Short Circuit - IEC 61363 Device Duty, Arc Flash - Incident Energy Area Boundary Curves, Panel Systems, Battery Discharge Analysis, Single-Phase System, and Ground Grid Systems.

New capabilities in the Transient Stability module include individual and multi-transformer sympathetic inrush simulation using magnetization characteristics, generator start-up analysis integration, and customizable Excel reports.

ETAP 19.

5
November 2019

We are pleased to announce the release of ETAP 19.5 - Integrated Power Analysis & Operation
Technology software.
ETAP 19.5 release offers an impressive new set of integrated power analysis modules, electrical
safety capabilities, and operational compliance solutions to serve the needs of generation,
transmission, distribution, industrial, transportation, data centers, and low-voltage industries.
The new release includes the following Major Features & Capabilities plus 100’s of enhancements
and time-saving improvements that are automatically added to the existing ETAP modules.

Upon completion of ETAP 19.5 installation, a new 48-digit activation code is required. The
activation code is emailed to you.
For more information on this new release, please take a few moments to review the information
in this document.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2019 ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP System

Application
• Improved compatibility with Office 365
• Improved print preview quality
• License Manager Compatibility with IPv6
• High Resolution Display Support
• More responsive and performance improvements throughout

One-Line Diagram & Plot Manager


• Result persistence
• Filter device list based on kV

Element Editors
• Magnetization Curve for 2 Winding and 3 Winding Transformers
• Harmonics for Wind Turbine

Panel Systems
• Enriched Graphical Panel Representation
• User-Defined Load Code Factor Tables
• Revit Load Code Factor Mapping

Network Modeling & Project Management (NetPM)


• Revision Data Synchronization
• GIS Data Synchronization
• Efficient Queue Management

etapAPP 3.0 - Mobile Field Data Collection & Synchronization


• Geo-Tagging
• Equipment Search
• Multiple Photos, Favorites, Editing, Camera Roll
• Full Screen Mode
• Support for Text Box, CT, Relay
Analysis Modules

Voltage Stability
• Voltage Security Analysis & Loadability
• Identify Voltage Stability Limits & Proximity
• Simulate the Impact of Voltage Instability
• Perform Sensitivity Analysis
• Calculate & Report Instability Indices
• Calculate & Report Minimum distance to instability
• Assess Study Results via Network Views & Plots
• P-V and Q-V Analysis or Continuation Load Flow Analysis
• Graphical results and plots

Grid Code Compliance


• Quickly Check & Validate Grid Code Compliance
• Comply with ANSI, IEC & Regional Grid Codes
• Python Scripted & Customizable Excel Reports
• Utilize Grid Impedance Locus
• Fast & Automated Harmonic Simulation
• Incremental Harmonic Distortion Calculation
• Frequency Ramp, Impact & Active Power Impact for Transient Stability

Transformer Inrush
• Transformer Energization or Inrush Simulation using Transient Stability
• Individual and Multi-Transformer Sympathetic Inrush
• Inrush simulation using Magnetization Characteristics

Star – Zone Selective Interlock


• Zone Selective Interlock (ZSI)
• Improve Safety & Minimize Equipment Damage
• Validate ZSI Mitigation Technique & Scenarios
• Simulate ZSI Operation for Various Fault Types
• Intuitive & Graphical Zone Selective Interlocking
• Evaluate & Compare ZSI Performance
• Phase & Ground Zone Interlock Modeling
• Manufacturer Specific ZSI Schemes per Device
• Fast & Efficient Modeling of CB ZSI Settings

Short Circuit – IEC 61363 Device Duty


• Design Safer Systems & Improve Reliability
• IEC 61363 Device Duty Evaluation
• Device Duty using Total Bus Fault Current
• Alert Visualization, Tabulation & Reports
• Consider Generator Preload Condition

Arc Flash - Incident Energy Area Boundary Curves


• Constant Energy Line & Area Plots
• Optimal PD Settings in a Single Step, Boosts Productivity & Saves Time
• Graphically Evaluate Equipment Limits
• Update Datablock from Result Analyzer
• Enhanced Arc-Resistant Damage Point

eTraX – Solution for AC & DC Railway Systems


• Static Var Compensations Systems
o SVC - Single Phase
o STATCOM / SVG – Three Phase & Single Phase
• Train Coasting Markers
• GIS Projection System

Transient Stability
• Frequency action for power grid
• Step & Ramp frequency change

DC Load Flow
• Design & Analyze Hybrid DC Topologies
• Solar Photovoltaic (PV Array)
• Battery Storage
• DC-DC Converter
• Single & Multiple Grid Connected Inverters
• Capability of bi-directional power flow for inverters with Maximum Peak Power Tracking
(MPPT)
• Constant Power Load & Rectifier/UPS

Harmonics
• Consider wind turbine generator as harmonic source
• Model Type 3 and Type 4 wind turbine generator harmonics
• Frequency Dependent Cable Impedance
• User-Defined Input Data via Excel
• Harmonic Load Flow & Frequency Scan
Cable Sizing
• NF C15-100 Overload Requirement for Phase Conductor Sizing
• Fast & Accurate Cable Sizing per French Std.
• Complete Sizing & Shock Protection
• LV Underground & Aboveground Cable Sizing
• Capacity Assessment & Overload Consideration

Ground Grid

• Multi-core Calculations → Fast & Efficient


• Analysis of Fragmented Earthing Mats
• Handling of Very Large Grounding Systems
• Soil Resistivity Calculator
DataX

CYME Import (.sxst)


• Import CYME 8.0 (.sxst) format
• Automatic GIS and One-Line Generation

MATLAB Import (.m)


• Import MATPOWER (.m) project files
• Automatic One-Line Generation

Hardware-in-the-loop Testing (HIL Testing)


• Complete Workflow Linking ETAP & OPAL-RT
• Reduce Risk & Costly Commissioning Time
• System Validation before Implementation
• Export from ETAP to ePhasorSim

SKM Import
• Improved transmission line mapping
• Improved one-line diagram layout

EasyPower Import
• Import EasyPower 9.x project files
• Import EasyPower 10.0 project files

PSS®E Import
• RAW, SEQ, DYR
• V33 & V34
• Automatic layout using location file
• User-defined Mapping of dynamic models and parameters
DataX Plus

Autodesk Revit® Interface


• Improve Engineering Design Quality
• Direct Two-Way Communication with Revit
• Validate Revit Electrical BIM with ETAP
• Export ETAP Simulation Results to Revit
• Intelligent Default Auto Mapping

Excel Import (New Elements)


• 3 Winding Transformer
• Transmission Line
• Inverters
• Support for Office 2007 and higher (.xlsx) format

OSM Import
• Import from OpenStreetMap (.osm) format
• Automatic GIS Diagram Generation
• Import Transmission & Distribution Network
• Import DC Railway Network

Library Additions
• The following protective device manufacturers and models added to the library.

Type Manufacturer Model ZSI


Enhancement
HVCB Eaton VCP-W

HVCB Eaton VCP-T

HVCB Siemens GMSG

LVSST Cutler-Hammer Digitrip 310+ (NG) ALSI Yes


Digitrip 310+ (NG) ALSIG
Digitrip 310+ (NG) LS
Digitrip 310+ (NG) LSG
Digitrip 310+ (NG) LSI
Digitrip 310+ (NG) LSIG
Type Manufacturer Model ZSI
Enhancement
LVSST Cutler-Hammer Digitrip 310+ (RG) ALSI Yes
Digitrip 310+ (RG) ALSIG
Digitrip 310+ (RG) LS
Digitrip 310+ (RG) LSG
Digitrip 310+ (RG) LSI
Digitrip 310+ (RG) LSIG

LVSST Merlin Gerin MICROLOGIC Full-LE Yes


MICROLOGIC Full-ME
Series 3)
MICROLOGIC Full-ME
(Series 4,5)
MICROLOGIC Full-NE
(Series 1) MICROLOGIC
Full-NE (Series 2,3)
MICROLOGIC Full-PE
(Series 4)

LVSST Square-D MICROLOGIC Full-LE Yes


MICROLOGIC Full-ME
Series 3)
MICROLOGIC Full-ME
(Series 4,5)
MICROLOGIC Full-NE
(Series 1) MICROLOGIC
Full-NE (Series 2,3)
MICROLOGIC Full-PE
(Series 4)

Solar Solar World SW


220,225,235,240,245,270

Solar SUNTECH STP300-24/Vd

Solar Canadian Solar CS6U-330P

LVCB Merlin Gerin NSF

TM Merlin Gerin NSF

Relay GE Multilin CEY51A


ETAP 19.5.0 System Requirements
Operating System (64-bit)
• Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
• Microsoft Windows 8 & 8.1 (Standard, Professional)
• Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
• Microsoft® Server 2016 (Standard)
• Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)

Other Third Party Software


• Microsoft SQL Management Studio 2012 (x64)
• Mongo DB
• DB Browser for SQLite
• Python 3.5

PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)
ETAP 19
February 2019

We are pleased to announce the release of ETAP 19 - Power System Design & Operation
Software.
Upon completion of ETAP 19 installation, a new 48-digit activation code is required. The activation
code is emailed to you.
For more information on this new release, please take a few moments to review the information
in this document.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2019 ETAP/Operation Technology, Inc. All Rights Reserved.

1 of 8
Smart Collaborative &
Team-Based Operation

Products & Solutions


Team Engineering Cloud-Based Collaboration Industry Standard

Network Model IEEE 1584-2018 Soil Resistivity


Management Calculations Modeling
NetPM™ Arc Flash Ground Grid

2 of 8
1
Products & Solutions
Team Engineering Cloud-Based Collaboration Industry Standard

DGUV 5188 E HV Arc Flash Plot Manager


German Std. OSHA Compliant Charts & Plots
Arc Flash Lite™ ArcFault Lite™ ePlot™

Products & Solutions


Intelligence Performance Precision

Field Verification HV Arc Flash Rail Traction Data Acquisition


Data Collection 1 to 1000 kV Analysis RTU & PLC
etapApp™ ArcFault™ eTraX ™
iCE™

3 of 8
2
Products & Solutions
Integrated Comprehensive Open Architecture

Model-Driven Data Acquisition


eSCADA

Intelligent Load Shedding


ILS
Advanced Distribution
Management System
ADMS

Products & Solutions


Intelligent Network Builders Geospatial & Schematic Network Visualization

Intelligent Geospatial Diagram


GIS View

Graphical Logical Interface


One-Line Diagram

4 of 8
3
Network Project Modeling & Management

• Change Management

• Review & Approval Process

• Simultaneous Modeling & Analysis

• Joint Operation & Control

Collaborate in Parallel from Anywhere


Automation Modeling
Engr Engr

Maintenance
Operator Crew
NetPM
Analysis
Planning Engr
Engr
etap
Control & APP™ Field Engr
Data Collection
Approval

5 of 8
4
Arc Flash IEEE 1584-2018
Extend compliance to latest industry methodologies

• Equipment Enclosures Templates


• Multiple Electrode Configurations

Arc Flash IEEE 1584-2018


Integrated Safety & Protection Software

• Arc Flash Analyzer


• Arc Flash Sequence-of-Operation
• Arc Flash Mitigation
• Light Detection
• Pressure

• Operational Delays

6 of 8
5
Arc Flash Graphical Calculators
Quick ‘What-if’ Scenarios & Instant Result Visualization

• IEEE 1584-2018 Batch Process


1000’s of Calculations

• ArcFault

• DC Arc Flash
• BGI/GUV-I 5188 E

7 of 8
6
ETAP 19.0.0 System Requirements
Operating System (64-bit)
• Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
• Microsoft Windows 8 & 8.1 (Standard, Professional)
• Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
• Microsoft® Server 2016 (Standard)
• Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)

Other Third Party Software


• Microsoft SQL Management Studio 2012 (x64)
• Mongo DB
• DB Browser for SQLite
• Python 3.5

PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)

8 of 8
ETAP 18.1.1
September 2018

We are pleased to announce the release of ETAP 18.1.1 - Power System Design & Operation
Software. ETAP 18.1.1 is the latest upgrade to the ETAP 18 series, which expands on the
innovative solutions developed for modeling, analysis, and operation.
Please note the following when upgrading to ETAP 18.1.1:

• It is a minor upgrade to ETAP 18.1.0 and utilizes the same 48-Digit Activation Code as
provided with ETAP 18.1.0 release.

• It is a complete program and does not require any previous ETAP installation. ETAP
18.1.1 is compatible with ETAP 18.1.0 license manager.

• Project database will be converted from ETAP 18.1.0 to 18.1.1 and will not have the
same database version. Make sure to maintain a backup of your project in its original
version should you choose to reload the project in its earlier version.

This upgrade includes general improvements:

1. Migration of projects from older versions (ETAP 16.2 or lower) directly to 18 series
related to Arc Flash Analysis module.

2. Added ability for ETAP Plot Manager to visualize results utilizing plot files stored on
network drives.

3. Improved compatibility with Microsoft PDF printer.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.

Page 1 of 2
ETAP 18.1.1 System Requirements
Operating System (64-bit)
• Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
• Microsoft Windows 8 & 8.1 (Standard, Professional)
• Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
• Microsoft® Server 2016 (Standard)
• Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
• Microsoft .NET Framework v3.5 (SP1)
• Microsoft .NET Framework v4.0
• Microsoft .NET Framework v4.5
• Microsoft .NET Framework v4.6.2
• Microsoft SQL Server Compact 3.5 (SP2)
• Microsoft Windows Update (KB2670838)
• Microsoft SQL Server 2012 Express LocalDB (x64)
• Microsoft SQL Server 2012 Native Client (x64)
• Microsoft SQL Management Studio 2012 (x64)

Other Third Party Software


• Microsoft SQL Management Studio 2012 (x64)
• Mongo DB
• DB Browser for SQLite
• Python 3.5

PC Configuration Requirements
• 64-bit hardware
• USB port for security key
• Ethernet port w/ network access (if network licensing required)
• DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
• Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)
Page 2 of 2
ETAP 18.1
August 2018
We are pleased to announce the release of ETAP 18.1. Convergence of Power & Intelligence.
ETAP 18.1 is the latest upgrade to the ETAP 18 series, which expands on the innovative solutions
developed for modeling, analysis, and operation.
ETAP 18.1 release includes enhancements and general improvements:

New Features

 ETAP Application
o Improved performance & analysis run-time
o Library defragmentation & compaction
o Improved PDF printing of the one-line diagram

 DataX™ - Data Exchange


o Autodesk Revit
 Supports incremental Revit model import
 Smart Connect: Revit Plug-in to ETAP
 Auto-generation of one-line diagram
o Import from SKM 8.0
o Detailed built-in conversion tool
o Create & save device library mapping as templates

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.

Page 1 of 3
Library Additions
The following protective device manufacturers and models are added to the library.

Manufacturer Model

Fuse Bussmann JKS (08/13)


Fuse Littelfuse LLSRK
LVSST Cutler-Hammer Digitrip 310+ (NG) ALSI
LVSST Cutler-Hammer Digitrip 310+ (NG) ALSIG
LVSST Cutler-Hammer Digitrip 310+ (RG) ALSI
LVSST Cutler-Hammer Digitrip 310+ (RG) ALSIG
Relay GE Multilin 869

Cable Conductor
Manufacturer Model #/C Type kV Insulation
5, 8, 15,
Prysmian Airguard 3/C Copper 25, 35 EPR
AWG PowerGuard 1/C Aluminum 35 XLPE
Nexans Power and Fiber Optics Subsea Cable 3/C Copper 10, 20, 30 XLPE

Page 2 of 3
ETAP 18.1.0 System Requirements
Operating System (64-bit)
 Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
 Microsoft Windows 8 & 8.1 (Standard, Professional)
 Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
 Microsoft® Server 2016 (Standard)
 Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
 Microsoft .NET Framework v3.5 (SP1)
 Microsoft .NET Framework v4.0
 Microsoft .NET Framework v4.5
 Microsoft .NET Framework v4.6.2
 Microsoft SQL Server Compact 3.5 (SP2)
 Microsoft Windows Update (KB2670838)
 Microsoft SQL Server 2012 Express LocalDB (x64)
 Microsoft SQL Server 2012 Native Client (x64)
 Microsoft SQL Management Studio 2012 (x64)

Other Third Party Software


 Microsoft SQL Management Studio 2012 (x64)
 Mongo DB
 DB Browser for SQLite
 Python 3.5

PC Configuration Requirements
 64-bit hardware
 USB port for security key
 Ethernet port w/ network access (if network licensing required)
 DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
 Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware

100 Bus Projects


Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)
Page 3 of 3
ETAP 18.0
April 2018
We are pleased to announce the release of ETAP 18.0. Convergence of Power & Intelligence.
ETAP 18.0 offers a powerful set of new products and major features & capabilities. This game-
changing release brings together innovative solutions for modeling, analysis, and operation at
your fingertips.
ETAP 18.0 release includes several new enhancements and general improvements:
Enhanced Modeling

 One-Line Diagram
o Enhanced auto-build & layout
o Enhanced batch print & Zoom views
o Synchronized presentation views
o Region classifications & coloring
o Remote connectors
o Support remote connection for CT & VTs
o Split differential protection schemes across nested networks
o Avoid intersections for multiple input configuration

 Geospatial Diagram
o Intelligent Geospatial Diagram
o Feeder & Substation Diagrams
o Geospatial model manager
o Import from 3rd Party geodatabases
o Synchronized with one-line diagram
o Download background maptiles from Bing or Google Maps using ETAP
MapServer™ (requires API key)
o Edit Geospatial Diagram similar to the one-line diagram, such as add, modify, &
reconnect elements
o Circuit & feeder tracing
o Decluttering, color themes, user-defined symbols
o Graphical display of study results & alerts
o Study result & alert animation

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified, copied, published,
disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of ETAP/Operation Technology, Inc., 17
Goodyear, Irvine, CA 92618, USA. © 2018 ETAP/Operation Technology, Inc. All Rights Reserved.

Page 1 of 17
 Microgrid Modeling
o Transient Stability (TS) to User-Defined Dynamic Model (UDM) network control
signal types
o Internal or external inputs from:
o Power system stability network
o Real-time input measurements or tags
o TS voltage & power flows from network can be accessed by UDM Microgrid
Controller
o User-defined renewable energy models for Wind Turbine Generator &
Photovoltaic Array
Enhanced/New Features

 Plot Manager
o Plot & view results from multiple studies
o User-configurable plots & settings
o Customize properties & save as template
o Works with all ETAP modules
o User-defined application styles
o Automatic data fit to plot
o Automatic label layout
o Zoom, pan, tile, etc.

 Datablock
o Expanded input data & study results
o Arc Flash & Motor Starting results
o Display results, input, tags
o User-defined templates
o Auto-adjusting protective device settings
o Independent tooltip & display
o Duplicate datablocks across multiple views

 ETAP Application
o Installation wizard
o Keyless license manager
o Ribbon bar for Ground Grid & Cable Pulling
o Windows Active Directory authentication

Page 2 of 17
 etapAPP™ - Data Collection & Synchronization App
o Collection & Verification
 Collect data, verify existing data & transfer to ETAP
 View ETAP data on mobile device
 Create new one-line diagrams on mobile device or append to existing
 Smart connections including auto-insert
 Layered diagram using composite networks
o Mobile App
 Geotag asset information including pictures & synchronize with ETAP
model
 Windows authentication for data security
 ETAP DataHub™ synchronizes data with ETAP over the network
 Available for tablets running Windows® or Apple® iOS

 DataX™ - Data Exchange


o Autodesk Revit
 Import Revit drawings to ETAP one-line diagrams
 Support for .RVT v2017
 Identify & alert modeling issues
o ArcGIS Import & Export
 Import ESRI ArcGIS electrical information
 Map ArcGIS attributes with ETAP elements & properties
 Database mapping via graphic user interface
 Export ETAP GIS electrical data to XML
 Support for ESRI ArcGIS 10.x
o MultiSpeak
 Import & export power system data
 User-defined mapping of elements & properties
 Supports MultiSpeak v3.0 & v4.0
o Common Information Model, CIM
 Import & export data from ETAP using CIM XML
 User-defined mapping of elements & properties
 IEC 61970 & IEC 61968 standard
o Universal Mapping
 Powerful element & property mapping
 Customizable logic definitions
 Pre-defined math & power functions
 Categorization of devices for easy recognition
 Supports CIM, ESRI ArcGIS, AVEVA Electrical, SmartPlant Electrical,
MultiSpeak, MS Excel.

Page 3 of 17
 etap iCE™ - Intelligent Control Enterprise Hardware
o Remote Terminal Units
 Substation Data Acquisition & Control
 Field/pole mount RTUs
 Integrated RTU & fault deletion
o Controllers
 Substation Automation
 Intelligent Load Shedding
 Generation Control
 Data Acquisition
 Secure & Scalable Controller
o Communication Protocols
 IEC 60870-5-104/101
 DNP 3
 Modbus
 IEC 61850
 MMS/GOOSE
 GPRS, xDSL, VSAT, Tetra

New Elements

 Series Capacitor
o User-selectable capacitor location
o Calculate degree of compensation
o Consider MOV protection & bypass

 Switched Capacitor
o Automatic control modes: voltage, current, power factor
o Control buses & branches

 Voltage Regulator
o Automatic control modes: forward, reverse
o Include line drop compensation (LDC)
o Per phase voltage regulator adjustment
o Control based on load side voltage requirements

 ZigZag Grounding Transformer


o Consider effect in unbalanced studies & harmonics
o Alert based on nameplate rating

Page 4 of 17
 Traction Power Elements
o Rectifier - Controlled & Uncontrolled
o Transformers - Booster, Auto, Scott-T
o Speed, Elevation, Signal, etc.
o Insulator & Isolators

 Distribution Elements
o Jumper, cut & open point
o Distributed load

 Busway (trunking busbar)


o User-defined or typical impedance
o Alert based on nameplate rating

 Elements - Dynamics & Safety Modeling


o Busbar
o Inverter
o Wind turbine generator
o Photovoltaic array inverter
o HVDC - Voltage Source Converter (VSC)

Enhanced Elements
o Wind Turbine Generator (WTG)
o Dynamic models based on IEC 61400-27-1-ed1
o Short circuit modeling per IEC 60909-2016
o Crowbar & current limit short circuit model with active & reactive
o Auto-trip voltage & duration for LVRT

o Solar/Photovoltaic Inverter Modeling


o Current limit model for short circuit
o Reactive & power factor control with constant current limitation
o Minimum & maximum operating values for current limits
o Low-voltage ride through (LVRT) auto-trip voltage & duration for incident energy
reduction
o Enhanced current limit modeling for inverters
o Inverter modeling for arc flash in renewable energy systems
Enhanced Rulebook

 Rule Book - Harmonic Compliance Limits


o ANSI/IEEE 519-2014
o IEC 61000-3-6: 2008
o User-defined grid code & local standards

Page 5 of 17
Enhanced Libraries

 Engineering Libraries
o Distance relay
o Distribution transformer
o Train rolling stock
o Traction rectifier library
o Sector & profile library
o Over 450 new V&V protective device models
o Over 40 detailed distance relay models with manufacturer specific settings

 Equipment Warehouse
o Overhead line – phase, ground, tower/pole
o Overhead catenary
o Power cables
o Distribution transformer
o Low-voltage circuit breakers
o Power fuses
o Railway track
o Equipment reliability
Enhanced Modules

 Harmonics & Power Quality


o Compliance with power quality standards
 IEEE 519-2014
 IEC 61000-3-14
 IEC 61000-3-6
o Global, local & individual location compliance rule book for voltage & current
distortion
o New skin effect models for motors & transformers
o Enhanced current distortion alerts
o Automatic TDD current distortion limit evaluation
o Enhanced voltage & current alerts with percentile multipliers
o Enhanced load equipment cable modeling

 Star™ - Protection & Coordination


o Sorting & filtering options for device settings report
o Globally include one-line diagram during batch print
o Expanded current & voltage inputs
o Phase current summation
o Up to 6 settings group with labels & copy/paste
o Ground & neutral protection for overload function

Page 6 of 17
 Motor Starting
o Enhanced inverter model
o Plot Manager interface

 Short Circuit
o Compliance with IEC 60909-2016 Ed. 2.0
o Variable fault current vs. voltage
o LV to EHV system fault current calculation

 Reliability Assessment
o Reliability warehouse
o Multiple phase configurations
o GIS system element handling
o Unbalanced system reliability calculation
o Reliability new indices
 CTAIDI
 ALII
 ACCI
o Reliability momentary indices
 MAIFI
 MAIDI
o Optimized for multi-core CPU

 Enhancements to Arc Flash: ArcFault™ - High Voltage Arc Flash


o ArcFault™ - NESC C2 - Up to 800 kV
o Arc Flash - IEEE 1584 & NFPA 70E
o Arc-in-a-Box- 15 to 36 kV
o Damage Point for Arc Resistant Switchgear

 Transient Stability
o Line-to-line fault event simulation
o Line-to-line-to-ground fault event simulation
o Improved synchronous machine saturation model
o Enhanced built-in excitation systems
o Enhanced frequency-dependent network & generator modeling
o Microgrid Controller network parameter inputs to UDM
o Improved inverter transient response
o Enhanced UDM model library
o Plot Manager interface

 LV & Cable Systems


o Ground Grid & Cable Pulling user interface
o User-defined Final Temperature for cable damage curve plotting

Page 7 of 17
New Modules

 StarZ™ - T&D Protection & Coordination


o Protective Relay Performance & Evaluation
 Simulate model-specific protection settings & functions including distance,
directional & load encroachment
 Plot R-X characteristics & seen impedances
 In-depth performance evaluation of impedance relays
 Evaluate protective device operation & coordination
 Intelligent alert viewer to identify & resolve setting & logic errors
 Virtually animate protective devices operation
 Breaker failure & relay communication
 User-editable scheme logic
 Use real-time operational data for system evaluation
 Intuitive relay setting editor
 Primary & secondary relay settings based on actual model
 Comprehensive relay library
o Embedded Fault Analyses & Power Flow
 Sliding fault analysis
 Single fault analysis for unbalanced networks
 Unbalanced load flow & transmission line load-ability analysis
 Protective device sequence-of-operation
 Fault insertion between CT, VTs & CBs
 Multiple fault locations & resistances analysis in one-click
 Series compensated line evaluation with MOV action
 Support single-phase system & train applications
o Plots & Reports
 Time state plots
 Time distance characteristic plots
 Time distance-resistance characteristic plots
 Detailed device setting reports
 Export relay settings to xml & Excel formats
o Distance Relay
 Distance function
 Scheme logic (input, output, timer, latch, variables)
 Expanded current & voltage inputs
 Digital inputs
 Phase current summation
 Up to 6 setting groups with labels & copy/paste

Page 8 of 17
o Distance Relay Library
Detailed distance protection element for over 40 relay models:
 Schweitzer
 GE Multilin
 ABB
 Schneider
 Alstom/Areva
 Siemens
 ZIV
 ERL Phase
 ARCTEQ
 Toshiba
 Universal (Generic)

 eTraX™ - Rail Traction System


o AC & DC Railway Simulation
 Tool for analysis & operation of tractions systems
 Solve transmission, distribution, traction, & signaling together
 Integrate GIS, planning, protection & operations
 Energy demand calculation based on train timetables
 Resolve challenges of unbalanced system operation
 Evaluate substation location & capacity
 Determine the impact of various rolling stock
 Determine capacity restrictions & analyze mitigation methods
 Determine impact of unplanned events on the traction power system
using real-time data
 GIS for overhead catenary system
 Data exchange with third-party applications & templates
 Traction power equipment templates
 Utilize real-time data for Energy Forecasting & Switching Management
 Verified & Validated against benchmarks
o Traction Elements
 Overhead Catenary System
 Track Resistance
 Traction Substation (TSS) & Switching Station (SSP)
 Traction Rectifier - Controlled & Uncontrolled
 Train Station & Platform
 Insulator, Insulated Overlap, neutral section & Isolator
 Traction transformers - Auto, Booster, Scott-T
 Signal, Speed Limit, Level Crossing
 Distance, Elevation & Bend Radius

Page 9 of 17
o Traction Analysis
 Train Performance Calculation
 Solve unbalanced AC & DC systems together
 Unified AC & DC Time Series Power Flow
 Optimized for multi-core CPU
o Interface
 Track Editor & Warehouse
 Line Editor & Warehouse
 Route & Timetable Editor
 Automatically generate train timetable based on number of trains, head-
way, dwell time, etc.
 Import train schedule from Excel format for faster data entry
o Results & Plots
 Graphical plots using Plot Manager
 Rail energy consumption including maximum, peak & average
rolling demand
 Trip profiles - acceleration, speed, elevation, etc.
 Substation power flows & voltages
 Train power flows & voltages per route
 Rail voltage, track potential
 Alerts based on EN 50163 & EN 50329 standards

 TDLF - Time Domain Load Flow


o Time Series Load Flow
 Simultaneous time series simulation of AC & DC networks
 Demand & generation
 Diversity factor, demand factor, unbalance factors, etc.
 Voltage drop, energy losses, yield, and costs
 Time series behavior of adjustable devices
 Transformer load tap changers
 Switched capacitor
 Voltage regulator
 Single & multi-year load growth analysis
 Irradiance, temp & load profile library
o Unified Load Flow
 Solve AC & DC systems together
 Solve LV power panel, UPS circuits & facility network simultaneously
 Handle load & source connection below panel
 Allows for panel & UPS loop connections
 Enhanced current limit modeling for inverters
 Optimized for multi-core CPU

Page 10 of 17
 ETAP-RT™ - Power Monitoring & Control
o etapADMS™ - Advanced Distribution Management System
 Long-Term Load Forecasting
 Automatically download weather data
 Automatic incremental model updates
 Improved dispatcher training simulator
 Integrated restoration & isolation plans
 Historical, library & Excel data sources
o SCADA System & Architecture
 MCC / BCC redundancy with disaster recovery
 Encryption & authentication security
 Self-healing strategies
 Integrated front-end processor with native communication drivers
 Web services communication
 Automatic historical data replication
 Unlimited signals or measurements
 Native IEC 60870 protocol
 Native ICCP protocol
 Interface to ADMS & OMS
o Visualization & Dashboards
 Common workstation & Web HMIs
 HMI objects library
 Alarms & Events displays
 Service Tags / Operator Notes integrated with advanced applications
o Real-Time & Historical Reports
 User-definable scheduled & on-demand reports
 Real-Time & historical data
 Customizable Alarms & Events reports
 Web enabled reporting
 PDF & Excel formats
o Intelligent Load Shedding Dashboard
 Intelligent Load Shedding Dashboard
 Thin-client HMIs
 Monitor spinning reserve, load to shed, load status
 Automatic & manual trigger controls
 Graphical load shedding event analyzer & viewer
 Hardware communication dashboard
o Load Preservation
 Steady-state & transient response
 Fast response time (10ms) with secured communication
 Priority optimization based on number of trips per time period

Page 11 of 17
o Switching Order Management
 Mobile interface
 Crew assignment & field confirmation of actions
 Link switching sequences to orders
 Scheduled & active order viewer
 Control center confirmation of order
 Estimated time to completion
 Classification & Area of Responsibility management
o Switching Sequence Management
 Unbalanced system validation
 Transfer to Mobile Switching Order Management
o Alarm Management
 Prioritizes events via graphical & tabular views
 Integrated SMS & e-mail services
o Generator Operations & Maintenance
 Track life operating time & cost
 Multiple maintenance levels notifications
 Alerts for due maintenance schedules

Page 12 of 17
Library Additions
The following protective device manufacturers and models are added to the library.

Manufacturer Model

Battery EnerSys EC-2007


Battery YUASA-EXIDE EC
Cable NEXANS Coreflex
Cable Southwire DLO
Line British Standard ACSR
Fuse ABB DO-III 143G
Fuse ABB OFAA 00
Fuse ABB OFAA 000
Fuse ABB OFAA 000 aM
Fuse ABB OFAA 1
Fuse ABB OFAA 2
Fuse ABB OFAA 3
Fuse ABB OFAA 4a
Fuse ABB OFAF 0
Fuse ABB OFAF 00
Fuse ABB OFAF 000
Fuse ABB OFAF 1
Fuse ABB OFAF 2
Fuse ABB OFAF 3
Fuse ABB OFAF 4
Fuse ABB OFAF 4a
Fuse Cooper Bay-O-Net (38kV)
Fuse Cooper ELSP
R-Rated Medium
Fuse Littelfuse Voltage
Fuse S&C SM-4
Fuse S&C SM-5
Fuse S&C SMU-20
Fuse S&C SMU-40
MCCB Cutler-Hammer NGC
MCCB Cutler-Hammer NGH
MCCB Cutler-Hammer NGS
MCCB Cutler-Hammer RGC
MCCB Cutler-Hammer RGH
MCCB Cutler-Hammer NGC (800A)

Page 13 of 17
Manufacturer Model

MCCB Cutler-Hammer NGC (1200A)


MCCB Cutler-Hammer NGH (800A)
MCCB Cutler-Hammer NGH (1200A)
MCCB Cutler-Hammer NGS (800A)
MCCB Cutler-Hammer NGS (1200A)
MCCB Cutler-Hammer NGS (1600A)
MCCB Cutler-Hammer RGC (1600A)
MCCB Cutler-Hammer RGC (2000A)
MCCB Cutler-Hammer RGC (2500A)
MCCB Cutler-Hammer RGH (1600A)
MCCB Cutler-Hammer RGH (2000A)
MCCB Cutler-Hammer RGH (2500A)
MCCB Square-D EDB
MCCB Square-D EGB
MCCB Square-D EJB
TM Square-D ED
TM Square-D EDB
TM Square-D EG
TM Square-D EGB
TM Square-D EJ
TM Square-D EJB
LVSST Cutler-Hammer Digitrip 310+ (NG) LS
LVSST Cutler-Hammer Digitrip 310+ (NG) LSG
LVSST Cutler-Hammer Digitrip 310+ (NG) LSI
LVSST Cutler-Hammer Digitrip 310+ (NG) LSIG
LVSST Cutler-Hammer Digitrip 310+ (RG) LS
LVSST Cutler-Hammer Digitrip 310+ (RG) LSG
LVSST Cutler-Hammer Digitrip 310+ (RG) LSI
LVSST Cutler-Hammer Digitrip 310+ (RG) LSIG
LVSST SURE-TRIP RMS-2007 AF
LVSST WESTRIP RMS-2012AF
Relay ABB REC 670
Relay ABB REM 620
Relay ABB RET 670
Relay ABB RED 670 v1.2 ANSI
Relay ABB RED 670 v1.2 IEC
Relay ABB REL 650 v1.1 IEC
Relay ABB REL 650 v1.3 ANSI
Relay Allen Bradley 857
Page 14 of 17
Manufacturer Model

Relay Allen Bradley 857 (Directional)


Relay ALSTOM MCGG X2/X3
Relay ARCTEQ L3x7
Relay ARCTEQ L3x9
Relay Beifanghy HY6801M
Relay Eaton D64RPB100
Relay ERL Phase Power Tech. L-PRO 2100
Relay ERL Phase Power Tech. L-PRO 4000
Relay GE Multilin 850 (50Hz)
Relay GE Multilin 850 (60Hz)
Relay GE Multilin MM300
Relay GE Multilin D30
Relay GE Multilin D60
Relay GE Multilin D90Plus
Relay GE Multilin G60
Relay GE Multilin L60
Relay GE Multilin L90
Relay GE Multilin T60
Relay Schneider Electric P211
Relay Schneider Electric TeSys T
Relay Schneider Electric P441
Relay Schneider Electric P442
Relay Schneider Electric P443
Relay Schneider Electric P444
Relay Schneider Electric P445
Relay Schneider Electric P446
Relay Schweitzer 487E-3,-4
Relay Schweitzer 311L
Relay Schweitzer 321
Relay Schweitzer 411L
Relay Schweitzer 421
Relay Siemens 7SA522
Relay Siemens 7SA61
Relay Siemens 7SA63
Relay Siemens 7SA64
Relay Siemens 7SD522
Relay Siemens SIPROTEC 7SA6
Relay Startco Engineering Ltd. MPS
Relay Startco Engineering Ltd. MPU-32

Page 15 of 17
Manufacturer Model

Relay Toshiba GRE110


Relay Toshiba GRE120
Relay Toshiba GRE140
Relay Univesal Generic
Relay Woodward WIC1
Rectifier DCTrain DCTrain
Rectifier DCTrain DCTrain1
Rectifier Rectifier Test1
Rectifier Rectifier Test2
Rolling Stock AC Rolling Stock Broad Gauge EMU
Rolling Stock Passenger Coach
Rolling Stock DCRollingStock DCRollingStock1
Rolling Stock DCTrain DCTrain

Page 16 of 17
ETAP 18.0.0 System Requirements
Operating System (64-bit)
 Microsoft Windows® 10 (Home Premium, Professional, Enterprise)
 Microsoft Windows 8 & 8.1 (Standard, Professional)
 Microsoft Windows 7 (SP1) (Home Premium, Professional, Ultimate, Enterprise)
 Microsoft® Server 2016 (Standard)
 Microsoft Server 2012 & 2012 R2 (Standard)

Software Prerequisites
Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
ETAP launches the following installations:
 Microsoft .NET Framework v3.5 (SP1)
 Microsoft .NET Framework v4.0
 Microsoft .NET Framework v4.5
 Microsoft .NET Framework v4.6.2
 Microsoft SQL Server Compact 3.5 (SP2)
 Microsoft Windows Update (KB2670838)
 Microsoft SQL Server 2012 Express LocalDB (x64)
 Microsoft SQL Server 2012 Native Client (x64)
 Microsoft SQL Management Studio 2012 (x64)

Other Third Party Software


 Microsoft SQL Management Studio 2012 (x64)
 Mongo DB
 DB Browser for SQLite
 Python 3.5

PC Configuration Requirements
 64-bit hardware
 USB port for security key
 Ethernet port w/ network access (if network licensing required)
 DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
 Recommended Display
o 19" monitors or higher
o Dual monitors highly recommended
o Resolution -1920 X 1080
o Font scaling - 100% - 125%

Recommended Hardware

100 Bus Projects


Intel Core i5 or better – 2.4 GHz or better
8 GB of RAM

500 Bus Projects


Intel Core i5 or better – 3.0 GHz or better
8 GB of RAM

1,000 Bus Projects


Intel Core i7 or better – 3.0 GHz or better
16 GB of RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz or better
32 GB RAM - (high-speed)
Page 17 of 17
ETAP 16.2
October 2017

We are pleased to announce the release of ETAP 16.2 Power System Design & Operation Software.

ETAP 16.2 is the latest upgrade to the ETAP 16 series which expands on system modeling and
comprehensive simulation capabilities.

ETAP 16.2 release includes several new enhancements and general improvements:

• Enhancement to Cable Pulling maximum allowable tension alert


• Expansion of IEC-60909 User-definable “c Factor” range for special applications
• Updated engineering libraries
• Inclusion of the renewable elements and HVDC Link as a part of the Base Package configuration:

− Wind Turbine Generator


Model and simulate wind farm operation with grid connection.

− Photovoltaic Array and Solar Panel


Model unlimited solar panels individually or in groups to form a solar array.

− HVDC Link
Model and simulate HVDC (High Voltage Direct Current) Link response under steady-
state and transient conditions.

Note that project files for ETAP 16.2 and 16.1 have the same database version.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

1
System Requirements
Operating System (64-bit)
Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express (x64)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
32 GB RAM - (high-speed)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

2
ETAP 16.1.1
July 2017

We are pleased to announce the release of ETAP 16.1.1 Power System Design & Operation Software.

Upon f inishing installation o f E TAP 16.1.1, a ne w 48-digit activation co de is r equired. The a ctivation
code is provided on the ETAP 16.1.1 DVD and/or emailed to you.

ETAP 16.1.1 is a minor upgrade to ETAP 16.1.0. The only purpose of this release is to protect your
16.1.0 project files after abnormal shutdowns.

Problem Description
After an abnormal s hutdown of ETAP 16.1.0, user may r eceive the following error when attempting t o
open the project file:

ETAP has encountered an exception while trying to retrieve database version information.
Error=Could not open new database '..filename..' CREATE DATABASE is aborted.
Database load aborted!

This error is due to SQL Server failing to rebuild log or .LDf file.

Installation of ETAP 16.1.1 eliminates o ccurrence of this error by improving the database save and
recovery procedure.

If you encounter this error message, please contact ETAP Help Desk to assist in fixing your project.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed o r e xhibited in e ither e lectronic o r p rinted f ormats without t he written a uthorization o f
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

1
ETAP 16.1.1 System Requirements

Operating System (64-bit)


Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express (x64)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
32 GB RAM - (high-speed)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed o r e xhibited in e ither e lectronic o r p rinted f ormats without t he written a uthorization o f
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

2
ETAP 16.1
February 2017

We are pleased to announce the release of ETAP 16.1 Power System Design & Operation Software.

ETAP 16.1 is the latest upgrade to the ETAP 16 series which expands on system modeling and
comprehensive simulation capabilities.

Upon finishing installation of ETAP 16.1, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 16.1 installation DVD.

For more information on this new release, please take a few moments to review the information below.

Multi-Language Edition
 English  Portuguese
 Spanish  Korean
 Russian  Turkish*
 Japanese  Italian*
 Chinese
*Output Reports Only

Enhancements & Features


User-Defined Dynamic Model Additions
 IEEE 421.5 Exciters
 IEEE 421.5 PSS/UEL/OEL
 WECC approved exciters
 WECC approved governors
 Energy Storage Models
 Enhanced Initialization

Datablock
 Automatically hide properties or results equal to zero

Star – Protection & Coordination


 Enhanced the Star Batch Print to use Print Setup of one Star View as reference for Global Print.

Short Circuit – Device Duty


 Enhanced default Test Power Factor of Low Voltage IEC Fuse based on IEC 60269-1 when
reference is not available in selected model from library.
 The interrupting duty of 1-pole circuit breakers (L1 or L2) inside panels which are below center-
tap transformers (L1, N, L2) are modified and updated in the output reports.

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

1
Electric Shock Calculation
Per BS 7671:2008+A3:2015, Note 1 of Section 411.4.5, the Minimum Voltage Factor (Cmin) has been
defaulted to a value of 0.95 for the Electric Shock calculation. For projects prior to ETAP 16.0, since the
Cmin factor was not considered based on BS 7671 17th edition, projects converted to ETAP 16.1 will
have the value automatically converted from 1.0 to 0.95. Please note that the Electric Shock results will
be re-calculated accordingly using the Cmin factor of 0.95. If existing results want to be kept, simply reset
the value on the Minimum Voltage Factor field on the Sizing-GND/PE Electric Shock page back to 1. For
projects created in ETAP 16.0, if the Cmin equals to 1 it will be converted to 0.95 otherwise the values
will be kept.

Enhanced Modules
 Star – Protection & Coordination
 Short Circuit IEC
 Panel Systems

Library Additions
New Exciter UDM Models - AC Rotating Excitation Systems
IEEE 421.5 Description Date
Alternator-rectifier excitation system with non-controlled rectifiers and
AC1C 2016
feedback from exciter field current
High initial response alternator-rectifier excitation system with non-
AC2C 2016
controlled rectifiers and feedback from exciter field current
AC3C Alternator-rectifier exciter with alternator field current limiter 2016
AC4C Alternator-supplied controlled rectifier exciter 2016
AC5C Simplified rotating rectifier excitation system 2016
Alternator-rectifier excitation system with non-controlled rectifier and
AC6C 2016
system supplied electronic voltage regulator
AC7C Alternator-rectifier excitation system 2016
AC8B Alternator-rectifier excitation system 2006
AC8C Alternator-rectifier excitation system 2016
AC9C Alternator-rectifier excitation system 2016

New Exciter UDM Models - DC Excitation Systems


IEEE 421.5 Description Date
DC1A DC commutator exciter 2006
DC1C DC commutator exciter 2016
DC2A DC commutator exciter with bus-fed regulator 2006
DC2C DC commutator exciter with bus-fed regulator 2016
DC3A DC commutator exciter with non-continuously acting regulators 2016
DC4C DC commutator exciter with PID style regulator 2016

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

2
New Exciter UDM Models - Static Excitation Systems
IEEE 421.5 Description Date
Potential or compound-source controlled-rectifier exciter with field volt.
ST3A 2006
control loop
ST5B Static potential-source excitation system 2006
ST5C Static potential source excitation system 2016
ST6B Static potential-source excitation system with field current limiter 2006
Static potential and compound source excitation system with field current
ST6C 2016
limiter
ST7B Static potential-source excitation system 2006

New WECC Approved UDM Exciter Models


WECC Description
BBSEX1 Brown Boveri Static Excitation System Model
Alternator-rectifier excitation system with non-controlled rectifiers and feedback
EXAC1A
from exciter field current
EXELI Static PI Transformer-fed Excitation System
REXS General Purpose Rotating Excitation System Model
SCRX Generic Excitation System
T1 1968 IEEE Type 1 Excitation System Model

New Approved UDM Governor Models


Governor
Description Date
Models
GAST Gas Turbine Governor 2013
GGOV1 General Governor Turbine Model 2013
HYGOV Hydro Turbine Governor Model 2013
HYGOVDD Double Derivative Hydro Governor and Turbine 2013
TGOV1 Steam Turbine Governor 2013
HYGOVPID PID Hydro Turbine Governor Simulation Model 2013
HYGOVSPH General purpose linearized turbine governor Model 2013
HYGOVLL Fourth Order Lead-lag Governor and Hydro Turbine Model 2013
DEGOV1 Woodward Diesel Governor
DT Diesel Turbine Governor Model
ST Steam Turbine Governor
UG8 Woodward UG8 Governor Model
Woodward 2301 - Woodward Governor 2301 with Frequency Change
GOV2301FC
Action included (Sample Case for Frequency Change)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

3
New Power System Stabilizer Models - PSS Models
IEEE 421.5 Description Date
2B Dual-input power system stabilizer 2013
2C Dual-input power system stabilizer 2013
3B Dual-input power system stabilizer 2013
3C Dual-input power system stabilizer 2013
4B Multi-band power system stabilizer 2013
4C Speed deviation transducers 2013

New Reactive Power & Frequency Control ESS Models


ESS Description Date
Simplified Energy Storage System with Current Injection Output for
ESS1
Voltage and Frequency Support
ESS2 Energy Storage Device - Frequency Regulation Mode 2014

New Cable Libraries


Conductor # of sizes
Manufacturer Standard/Model #/C kV Insulation
Type added
BATT BS6724 4/C Copper 0.6/1 PVC 17
BATT BS5467 4/C Copper 0.6/1 PVC 17
ELAND BS6724 4/C Copper 0.6/1 PVC 16
ELAND BS5467 4/C Copper 0.6/1 PVC 16
CABELTE EPB18135/Class 2 2/C Aluminum 0.6/1 XLPE 9
Firestop FS 110 (X-
Prysmian 1/C Copper 0.6/1 XLPE 13
HF-110)
OLEX XHHP 1/C Copper 3.8/6.6 XLPE 12
NEXANS XHHP 1/C Copper 3.8/6.6 XLPE 12
Solidal A2X(FL)2Y 1/C Aluminum 12/20 XLPE 12
Indeco N2XSY 1/C Copper 6/10 XLPE 12
Indeco N2XSY 1/C Copper 12/20 XLPE 11
Draka 2XY-GTX2 2/C Copper 0.6/1 XLPE 8

New Fuse Libraries


MFR Model
Fuse – ANSI Bussmann LPJ_SP (05/02)
(AC)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

4
System Requirements

Operating System (64-bit)


Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express (x64)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1920 X 1080
Recommended display font size – 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz with Hyper-Threading & high-speed bus (or equivalent)
32 GB RAM - (high-speed)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may not be modified,
copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without the written authorization of
ETAP/Operation Technology, Inc., 17 Goodyear, Irvine, CA 92618, USA. © 2017 ETAP/Operation Technology, Inc. All Rights Reserved.

5
ETAP 16
October 2016

We are pleased to announce the release of ETAP 16 Power System Design & Operation Software.

ETAP 16.0 Model-Driven Power System Design & Operations Software expands on immersive system
modeling and comprehensive simulation capabilities.

Upon finishing installation of ETAP 16, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 16 installation DVD and via e-mail.

For more information on this new release, please take a few moments to review the information below.

Multi-Language Edition
 English  Chinese
 Spanish  Japanese
 Portuguese  Korean
 Russian  Italian*
 Turkish*
*Output Reports Only

Major Enhancements & Features

User-Defined Dynamic Models


 Blazing performance up to 50 X faster
 Enhanced Result Visualization with Multi-Scope
 Math functions with Multiple Inputs
 Enhanced Timer Integration
 Customizable Events for Test Routines
 New Generic Load Test Routines
 Go-To blocks for Internal and External UDM Communication
 MIMO User-Defined Function Blocks using C# Script

Cable Capacity Sizing - IEC 60092


 Size Power Cables based on IEC 60092 Electrical Installation in Ships & Marine Vessels
 Line Conductor Sizing
 Consider Short-Time Duty
 Selectable Annex B for General Installations
 Enhanced Reports and Cable Manager

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
1
Datablock
 New Intelligent Device Settings Datablock
 Auto-update Device Functions & Settings
 Export One-Lines and Datablock to AutoCAD™ (DXF) Drawing Files

System Elements
 Motor Operated Valve Dynamic Voltage Limits
 Enhanced Overhead Line Impedance Calculations
 Enhanced IEC Fuse Ratings

Short Circuit
 Export Short Circuit Analyzer Results to MS Excel
 User-Defined Fuse Test PF and X/R for Short-Circuit Duty Evaluation

Transient Stability
 Consider MOV Dynamic Voltage Limits
 Enhanced Generator Excitation Systems

Wind Turbine Generator


 New Control Block Test Routines
 New Complex Terminal Voltage Input Blocks
 Complex Terminal Current Output Blocks

Enhanced Modules
 Data Exchange (DataX)
 Underground Raceway Thermal Analysis
 Dynamic Parameter Estimation & Tuning (DPET)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
2
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
Cable Indeco N2XSY
SolidAl A2X(FL)2Y

MFR Model
Fuse – ANSI Edison TJS
(AC)
Fuse – ANSI Bussmann FRN-R (10/08)
(DC)

MFR Model
LVCB – ANSI Square-D ECB-G3, ECB-G3 (15A&20A), ECB-G3
(AC) (30A), HR, JR, LR
LVCB – ANSI Eaton LG PV, MDL PV
(DC)

MFR Model
LVCB – IEC Square-D HR, JR, LR (400A), LR (600A)
(AC)

MFR Model
TM Eaton LG PV, MDL PV
Siemens LMD
Square-D ECB-G3

MFR Model
Relay ERL Phase Power Tech. 5B3
GE Multilin IAC-70A, IAC-70B
Schweitzer 411L
Siemens 7PG23-5B3

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
3
System Requirements

Operating System (64-bit)


Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution – 1920 X 1080
Recommended display font size – 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i7 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
32 GB RAM - (high-speed)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2016
ETAP/Operation Technology, Inc. All Rights Reserved.
4
ETAP 14.1
December 2015

We are pleased to announce the release of ETAP 14.1 Power System Design & Operation Software.

ETAP 14.1 is the latest upgrade to the ETAP 14 series and includes important enhancements based on the
industry’s latest demands such as multi-language output reports and arc flash labels.

Upon finishing installation of ETAP 14.1, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 14.1 installation DVD.

For more information on this new release, please take a few moments to review the information below.

1. New & Enhanced Features

ETAP
 Improved Window 10 Compatibility
 Windows font handling up to 125% magnification
 Refreshed Element Editors & Printing
 Helpline & User Guide revisions
 Enhancements to ETAP License Manager
 Improved Library & Project conversions

Short Circuit
 Short Circuit Analyzer – Ability to save analyzer settings
 Thermal Withstand Duty Evaluation for IEC Standard

Arc Flash
 Arc Flash Analyzer – Enhanced speed & report location viewing capability
 Translated Arc Flash Labels

• Spanish
• French
• Portuguese
• German
• Chinese
• Russian
• Japanese
• Korean NEW
• Italian NEW

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
1
Star – Protective Device Coordination
 New Protective Device Settings Reports in Excel format
 Addition of Crystal Reports with support of DC protective devices
 Addition of Excel Brief Reports with automated print fit
 Support of Panel and DC Device Settings in Excel Report
 Addition of Adjacent Bus to Excel Detail Report for sorting by substation
 Addition of more than 60 models for relay and breaker protective devices

Cable Sizing & Derating


 Comply with British Standard 7671:2008 +A3:2015 cable sizing
 Updated IEC 60364-5-52 LV cable sizing standard

Other Modules
 Improved Underground Raceway Systems Alignment Tools
 Transient Stability Plot Enhancements
 Updated Harmonics Alert View
 Translated Study Reports

• Spanish
• French
• Portuguese
• German
• Chinese
• Russian
• Japanese
• Korean
• Italian NEW

 Faster Crystal Report generation speed for device settings reports

2. ETAP Real-Time – New & Enhanced Capabilities

eSCADA
 Multistate element colors & symbols
 General Measurements Alarming
 Enhanced Quick Navigation & Toolbar layout
 Transformer Tap Control
 IEC 61850 - Support up to 125 devices per data collection concentrator
 CSV Driver Communications
 Electrical & Non-Electrical Control Commands
 Real-Time Continuity Coloring

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
2
Intelligent Load Shedding (ILS)
 Sequence-of-Events Recording
 Event Analyzer

Automatic Generation Control (AGC)


 Generator Maintenance Warning & Alarms
 Fuel Level Monitoring
 Forbidden Operational Areas

Customizable Reports
 Reports Designer
 ETAP SCADA & Web Report Viewer
 Automatic Report Scheduler
 Real-Time & Historical Data Access

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
3
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
LVCB – ANSI Federal Pacific XF
(AC)
Westinghouse BJ, BJH

MFR Model
LVCB – IEC L&T DM 100, DM 16, DM 160, DM 250, DM 400
(AC)

MFR Model
TM Federal Pacific XF

Westinghouse BJ / BJH

MFR Model
Relay ABB MCU, REF 620, REF 630, REG 630, REM 620,
REM 30, RET 620, RET 630
Schneider Electric P111

MFR Model
MCP L&T DM

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
4
System Requirements

Operating System (64-bit)


Microsoft® Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express (x64)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024
Recommended display font size – 100% - 125%

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
32 GB RAM - (high-speed)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
5
ETAP 14.0
August 2015

We are pleased to announce the release of ETAP 14 Power System Design & Operation Software.

ETAP 1 4 d elivers u nmatched s peed, i ntelligence, and r eliability t o i ncrease p roductivity. It o ffers
powerful rule-books, result analyzers, and automated evaluation tools to reduce engineering time, enforce
standards, en sure d esign i ntegrity, an d o ptimize sy stem o peration. Gain a co mpetitive ed ge an d
accelerate system design and analysis with ETAP.

Upon finishing installation of ETAP 14.0, a new 48-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 14.0 installation DVD.

For more information on this new release, please take a few moments to review the information below.

New Features Enhanced Modules


• 64-bit architecture • One-Line Diagram
• System Manager & Docking • Theme Manager
• Graphical Contouring based on results • Load Flow
• Circuit Tracing • Short Circuit
• Auto-Build • AC/DC Arc Flash Analysis
• Datablock • Star
• Load Flow Model Validation • Transient Stability
• Short Circuit Analyzer
Libraries
New Analysis Modules • Quickpick tabular views
• Star, Auto-Evaluation • Low Voltage Circuit Breakers
• Contingency Analysis • Low Voltage Solid State Trip
• Motor Dynamic Parameter Tuning • Relays
• IEC 60502 • Cables
• NF C 15-100 • Induction Motors

Data Exchange Enhanced Elements


• Import from SKM® • Relays
• Import from EasyPower® • LV Circuit Breakers
• PSS/E® • LV Solid State Trip Units
• Aveva Electrical™ • Induction Motors
• SmartPlant® Electrical • Synchronous Motors
• EMTP-RV® • Transformers
• PSCAD® / EMTDC® • Cables

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
1
1. New Features

ETAP Foundation
• 64-bit architecture
• Local SQL database
• System Manager & Docking

One-Line Diagram
• High-resolution graphics
• Graphical symbol selection
• Graphical contouring based on results
• Circuit Tracing

Auto-Build
Auto Build i s a n a utomated a nd powerful t ool for creating and editing the one -line di agram. T he r ule-
based design of Auto-Build can significantly reduce the time spent on creating a one-line.

Features
• Automated creation of one-line without leaving the equipment toolbar
• Quick & Intuitive One-Line Generation
• Automatic Spacing & Alignment Rules
• No Need to Drag, Drop, Locate, and Connect

Datablock
Add component information, input data, and study results in one block to view on the one-line diagram.
Datablocks a re also fully customizable allowing them t o be s hown, hidden, arranged, and formatted
according to the user’s preference. An advantage with using datablocks is showing properties and results
from different studies and displaying this information within the same one-line diagram.

Features
• Customize input data & study results
• Display results, tags, and/or properties
• Define templates & share
• Automatically apply templates
• Instant preview of Datablock

Load Flow Model Validation


Identify and alert against modelling issues whether critical, marginal, or informative.

Features
• Causes for Non-Convergence
• Voltage-Stability Considerations
• Excessive Loading and Generation Levels
• Areas with Unacceptable Voltage Values
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
2
• MW and Mvar Transfer Capability Limits
• Elements with Possible Incorrect Parameters
• Provide Possible Solutions

Short Circuit Analyzer


The short-circuit result analyzer i s a p owerful t ool which allows the f iltering and analysis of the short-
circuit results of multiple output reports (scenarios) in one glance. The Short Circuit analyzer provides the
worst case condition for ANSI and IEC Device Duty calculations.

Features
• Compare & Analyze Study Results
• User-Defined Base-Line / Reference
• Identify Deviations
• Worst Case Scenarios

2. New Modules
Star, Auto-Evaluation
Auto-Evaluation is a STAR mode f eature w hich is designed for automated pr otection and c oordination
evaluation of electrical networks with overcurrent protective devices based on rules.

Features
• Automated and intelligent detection of protection zones
• Automated overcurrent Protection and Coordination Evaluation
• Customized evaluation criteria based on Rule Book
• Through-fault current calculation based on ANSI and IEC standards
• Support of standards and industry practice rules
• Evaluation and Fault Current Type selection
• Tabular and graphical display of evaluation results in colorful formats
• Extensive condition messages highlighting the violation of evaluation criteria
• Dynamic capability to correct the violations and update the results
• Easy-to-make reports from graphical snapshots and evaluation tabular sheets

Contingency Analysis
Contingency analysis represents an important tool to study the effect of elements outages in power system
security during operation and planning. It investigates, evaluates, filters and prioritizes the impacts on an
electric power system whenever typically unplanned problems or outages occur. Evaluate the impact of
N-1 a nd N -2 co ntingencies, d etermine sy stem p erformance i ndices, and co mpare r esults ag ainst sa fe
operating l imits for ea ch element in the p ower system b ased o n u ser-defined c omponent ou tage a nd
failure scenarios. For accurate results, AC load flow is run for each contingency.

Features
• N-1 and N-2 Contingency Assessment & Ranking
• Multiple Graphical Outage Lists
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
3
• Fast Screening Method
o Scan Outage List
o Identify higher risk contingencies for further evaluation
• Automatic Performance Indices Calculation
o Bus voltage security
o Real power flow change
o Reactive power flow change index
o Branch overloading index

Motor Dynamic Parameter Tuning


Calculate equivalent circuit parameters for induction machines from nameplate or characteristic data. This
calculation i s ba sed on a computational i ntelligence technique, w hich requires m achine n ameplate o r
characteristic data. I n g eneral, t he e stimated m odel p arameters include the resistance and r eactance
representing the machine stator, rotor and magnetizing branches characteristics. Nonlinear rotor resistance
and reactance including stator impedance are introduced in this module to especially match characteristic
curves with a belly.

Features
• Non-Linear dynamic circuit-models - MPET
• Include Rotor Core Losses, Rc
• Match actual MFR characteristic curves
• Save estimated results to library

Cable Ampacity and Sizing


Two new standards are supported by ETAP:
• IEC 60502
• NF C 15-100

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
4
3. Enhanced Modules

Theme Manager
• User-defined result format
• Display / hide based on
o Zoom level
o Equipment type
o Equipment state
o Info annotations
o Study results
o Datablocks

Star, Protection & Coordination


• Automated and intelligent detection of protection zones
• Automated Overcurrent Protection and Coordination Evaluation
• Standard, industry practice, and user defined rule book for evaluation criteria
• Evaluation and Fault Current Type selection in Study Case
• Tabular and graphical display of evaluation results in Analysis Viewer
• Graphical snapshot and tabular evaluation reports
• Scenario and Study Wizard for automated evaluation of multiple scenarios with single click of a
button

Star View TCC


• Enhanced t he Time D ifference Tool w ith intelligence t o find the m in t ime or go t o predefined
time-current
• Enhanced the Crosshair Tool to go to predefined time-current point
• Added Screen Capture for direct paste to third party applications
• Added Label Auto Layout for better automated positioning of labels
• Enhanced the AC Device Settings Report
• Added DC Device Settings Report
• Added Panel Device Settings Report

AC / DC Arc Flash Analysis


• Compliance with the latest standards
• New Dedicated AC and DC Arc Flash Modes
• Create and Append TCCs with Energy Curves
• New NFPA 70E 2015 and CSA Z462 Labels
• Enclosure Isolation for Main and Load Protective Devices
• Conductor Orientation & Equipment Configuration
• New Iterative Method Solution for Photovoltaic Array Systems

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
5
Transient Stability
• Motor Core Losses
• Non-linear Rotor Saturation Effects
• Match Test Measurement Data / Manufacture Curves
• Automatic Reference-Source Selection, Enhanced
• Exciter Load Current Compensation

License Manager
• Keyless network licensing

4. Data Exchange

Import from SKM®


Enhanced S KM i mport utility t hat a llows for t he a utomatic c onversion o f pr ojects c reated i n S KM
including automatic protective device mapping and TCC import. This data exchange tool allows for direct
import of SKM Dapper® PTW32 versions 6.0 & 6.5.

Features
• Converts Dapper® PTW32 versions 6.0, 6.5, & 7.0
• Import CAPTOR TCCs into STAR
• Automatic, one click conversion of SKM Dapper projects
• One-line diagram layout conversion per the original project drawing
• Support for multiple one-Line drawing into composite networks
• Automatic protective device settings mapping
• Conversion of AC &DC networks

Import from EasyPower®


ETAP 14.0 b rings a b rand n ew E asyPower import u tility th at a llows for th e a utomatic conversion o f
projects created in EasyPower ver. 8.0 and 9.0.

Features
• Automatic import of AC elements including all their input data
• Library m apping u tility f or im porting p rotective d evice settings f or f uses, L ow v oltage c ircuit
breakers and trip units as well as relays
• Automatic One-Line diagram import to match the original project layout
• Import of EasyPower TCCs into ETAP’s Star coordination module

AVEVA Electrical™ Interface


• Bi-directional data exchange
• Map attributes of AVEVA Electrical with ETAP elements & properties using Universal Mapping

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
6
SmartPlant® Electrical Interface
• Supports DC elements
• Supports AC composite networks and composite motors
• Enhanced default mapping
• Merge and sync wizard allows the users to review and change each action per element
• Ignore l ocation changes provides t he ability t o i gnore l ocation changes for existing elements in
ETAP

EMTP Interface
• Export the ETAP one-line diagram to EMTP-RV®
• Export the ETAP one-line diagram to PSCAD® / EMTDC®

Export to PSS/E®
• Version 30
• Version 32

5. Enhanced Elements

Relays
• Enhanced and redesigned the Current and Voltage Input
• Added Device Parameters of equipment as reference for protection by relay
• Added B ase C urrent a s a new m ultiplier w ith sep arate r eference f or m odeling and an alysis o f
modern microprocessor relays
• Redesigned the Output with unlimited interlock
• Added the reference terminal to OCR/OLR tabs as the input reference for functions
• Added Relay preloading factor
• Block TOC by IOC function
o When checked, the definite delay time of IOC will take over the TOC delay, starting from the IOC
pickup and the TOC+IOC will be combined as a single curve in Star View TCC. The Sequence-
Of-Operation and Arc Flash will calculate the trip time based on the displayed curve and
respective bolted or arcing fault currents.

Cables
• Automatic cable positive sequence impedance calculation
• Automatic cable zero sequence impedance calculation
• Global System Frequency Impedance adjustment
• Cable Constants
• Cable Armor thermal calculation
• Cable Sheath thermal calculation
• Calculations based on BS 5467, BS 7671 & IEC 60364
• Enhanced Cable Reports

Low Voltage Circuit Breaker


• Added LV Circuit Breaker Override in addition to LV Trip Unit Override

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
7
Transformer
• Added Transformer FLA marker selection for multi-stage kVA/MVA ratings
• Enhanced the Transformer Fault Frequency withstand capability for protection by source and load
side devices

Synchronous Generator
• Added Stator & Excitation Damage to Generator Protection

Synchronous Motor
• Enhanced the thermal curve to represent Stator Hot & Cold or acceleration withstand curve

Induction Motor
• Enhanced the thermal curve to represent Stator Hot & Cold or acceleration withstand curve
• Non-linear dynamic circuit models

Fuse & Inline Overload Relay


• Added Library Quickpick in tabular format with sorting and filtering capabilities

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
8
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
LVCB – ANSI Allen-Bradley 140M-J8P
(AC)
Cutler Hammer BR, BRH, CH, CHB, DS-206H, GCH, GHB, JL,
LGC, LGE, LGH, LGS, MD, MDS, MDSC,
MDSY, MDY
Federal Pacific HES 100, HES 160, NES 100, NES 102, NES 160,
NP632000
Hyundai HAT06, HAT08, HAT10, HAT12, HAT16, HAT20,
HAT25, HAT32, HAT40, HAT50
Merlin Gerin CF-250H, CF-250HC, CF-250L, CF-250LC, CF-
250N, CK 1200H (06/89), CK 400H (06/89), CK
400HH (06/89), CK 800H (06/89), CK 800HH
(06/89)
Square-D MGP36 (600A), MGP36 (800A), NW60H2,
NW60H3, NW60L1
Terasaki AR208S, AR212H, AR212S, AR216H, AR216S,
AR220H, AR220S, AR316H, AR320H, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S
Westinghouse MDS, MDSC, MDSY, MDY

MFR Model
LVCB – ANSI Cutler Hammer JL
(DC)
Federal Pacific HES 100, HES 160, NES 100, NES 102, NES 160
Secheron HPB45-81, HPB45-82, HPB60-81, HPB60-82
Square-D PCF-DC

MFR Model
LVCB – IEC ABB MS132-0.16 - 2.5, MS132-25, MS132-32, MS132-
(AC) 4.0 - 20, S2X 80
Allen-Bradley 140M-J8P
Cutler-Hammer LGC (250A-400A), LGC (630A), LGE (250A-
400A), LGE (630A), LGH (250A-400A), LGH
(630A), LGS (250A-400A), LGS (630A), MWI608,
MWI610, MWI612, MWI616, MWI620, MWI625,
MWI632, MWI64N, MWI808, MWI810, MWI812,
MWI816, MWI820, MWI825, MWI832, MWI84N,
MWI85N, MWI86N, MWIC08, MWIC10,
MWIC12, MWIC16, MWIC20, MWIC25,
MWIC32, MWIC4N, MWIC5N, MWIC6N,
MWN408, MWN410, MWN412, MWN508,
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
9
MWN510, MWN512, MWN516, MWN520,
MWN608, MWN610, MWN612, MWN616,
MWN620
Hyundai HAT06, HAT08, HAT10, HAT12, HAT16, HAT20,
HAT25, HAT32, HAT40, HAT50
Merlin Gerin CF-250H, CF-250L, CF-250N, CM1250H,
CM1250N, CM1600H, CM1600N, CM2000H,
CM2000N, CM2500H, CM2500N, CM3200H,
CM3200N, NS1000 H (E), NS1000 H (M), NS1000
L (E), NS1000 L (M), NS1000 N (E), NS1000 N
(M), NS1000b H (M), NS1000b N (M), NS1250 H
(E), NS1250 H (E), NS1250 H (M), NS1250 H (M),
NS1250 N (E), NS1250 N (E), NS1250 N (M),
NS1250 N (M), NS1250b H (M), NS1250b N (M),
NS1250H, NS1250N, NS1600 H (E), NS1600 H
(M), NS1600 N (E), NS1600 N (M), NS1600b H
(M), NS1600b N (M), NS2000 H (M), NS2000 N
(M), NS2500 H (M), NS2500 N (M), NS3200 H
(M), NS3200 N (M), NS630b H (E), NS630b H
(M), NS630b L (E), NS630b L (M), NS630b N (E),
NS630b N (M), NS630b R (M), NS800 H (E),
NS800 H (M), NS800 L (E), NS800 L (M), NS800
N (E), NS800 N (M), NS800 R (M), NS800b H
(M), NS800b N (M)
Schneider Electric MVS08-H, MVS08-N, MVS10-H, MVS10-N,
MVS12-H, MVS12-N, MVS16-H, MVS16-N,
MVS20-H, MVS20-N, MVS25-H, MVS25-N,
MVS32-H, MVS32-N, MVS40-H, MVS40-N
Square-D NW40bH1, NW40bH2
Terasaki AR208S, AR212H, AR212S, AR216HS, AR216S,
AR220H, AR220S, AR316H, AR320HS, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S,
E630-NE, H250-NE, H400-NE, L400-NE, S250-
GE, S250-NE, S250-PE, S400-GE, S400-NE, S630-
CE, S630-GE, XS800SE

MFR Model
LVCB – IEC Terasaki AR208S, AR212H, AR212S, AR216HS, AR216S,
(DC) AR220H, AR220S, AR316H, AR320HS, AR325H,
AR325S, AR332H, AR332S, AR420H, AR440H,
AR440S, AR440SB, AR650S, AR663H, AR663S

MFR Model
TM ABB MS132, S500-B, S500-C, S500-D, S500UC-B,
S500UC-B (DC)
Cutler-Hammer BR (1P), BR (2P), BR (3P), CH(1P), CH(2P),
CH(3P), CHB(1P), CHB(2P), CHB(3P), F, JL, LW,
MD
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
10
Federal Pacific NP
General Electric TFJ [04], TFK [04], THFK [04], THKM, THMM,
TKM, TPMM
Merlin Gerin CF-250
Square-D LC (Series 3), PC-DC

MFR Model
LVSST ABB S500-K, S500UC-K (DC), SACE PR113
Cutler-Hammer Digitrip 310+ (LG) LSI, Digitrip 310+ (LG) LSIG,
H, MDS, MDSG
Federal Pioneer SD-3, SD-6, SS-1, SS-2, SS-3, SS-4, SS-5, SS-6
Hyundai AOR-1D-GM, AOR-1L-AL, AOR-1L-AM, AOR-
1L-AS, AOR-1L-GL, AOR-1L-GM, AOR-1L-GS,
AOR-1S-AL, AOR-1S-AS
Merlin Gerin ST 215D, ST 308S, ST 318S, ST 408S, ST 408ST,
STCM1, STCM2, STCM3, STR 18M
Schneider Electric ET2I, ET5S, ET6G
Siemens ETU 555 (DG Frame), ETU 555 (FG Frame), ETU
555 (JG Frame), ETU 555 (LG Frame), ETU 555
(MG frame), ETU 555 (NG Frame), ETU 555 (PG
Frame)
SURE TRIP RMS-2002
Terasaki AGR-S, AGR-S (LT Curve), E630-NE (Curve 1-2),
E630-NE (Curve 3), E630-NE (Curve 4-6),
Microprocessor (630A, 800A), S250-NE (Curve 1-
2), S250-NE (Curve 3), S250-NE (Curve 4), S250-
NE (Curve 5-7), S400-NE (Curve 1-2), S400-NE
(Curve 3), S400-NE (Curve 4), S400-NE (Curve 5-
7)
Utility Relay AC-PRO with quick trip

MFR Model
Fuse – ANSI Bussmann 55GDMSJD, 55GFMSJD, CGL, DCM, FNQ-R,
(AC) FRS-R (10/02)
Cooper Bay-O-Net (353C), ECNR (2009), ECSR (2009)
Cutler-Hammer 15HLE, Current Limiter – TRI-PAC CB
Federal Pioneer JCL, LCL
Gould Shawmut
A150X
(Ferraz)
Hinode Electric 1000GH
Littelfuse JLS, KLNR, KLSR
Mersen A155B
Siba SQB3

MFR Model
Fuse – ANSI Bussmann CGL, DCM, TPB, TPL
(DC)
Cooper ECNR (2009)
This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
11
Gould Shawmut
A150X
(Ferraz)
Hinode Electric 1000GH
Littelfuse KLNR, KLSR
Mersen HP6J

MFR Model
Fuse – IEC Bussmann 170M (Size 24), CJB
(AC)
GEC CJ
Siba SQB3, SQB3-2, SQB3-70

MFR Model
Fuse – IEC Bussmann CJB
(DC)
GEC CJ

MFR Model
Relay ABB CA-6, E200DU, GR-200, GRC, HCB1, IKC911,
IKC912, IKC913, IRV, LCB II, NI 40/41, PR-512,
REB 611, RED 615, REF 550, REF 611, REF 615,
REJ 603, REM 611, REM 615, RET 615, REU 615,
RI (50 Hz), RI (60 Hz), SPAC 320 C, UMC100-
FBP, UMC22-FBP
AEG PS431
Allen Bradley CGCM, SMC Dialog Plus Controller
ALSTOM KBCH 120, KBCH 130, KBCH 140, MBCH 12,
MBCH 13, MBCH 16, MBCI, MFAC 14, MFAC
34, MOPN 01, MOPN 02, MX3IPG1A
AREVA MCAG 12, MCAG 13, MCAG 19, MCAG 32,
MCAG 33, MCAG 39, MCTI 19, MCTI 39, MCTI
40
Basler Electric BE1-CDS240, BE1-IPS100, DGC-2020
Beckwith Electric M4272
Cooper IM30AB
Eaton D64RPB100, D64RPB250
Electromagnetic GFP
Industries LLP
ERL Phase Power 8700
Tech.
Federal Pioneer GLR-12S
Fuji Electric UM42C, UM42F, UM43FD, UM43FG
GE Multilin IBCV51M, IBCV51M(-)Y1A, IBCV52M,
IBCV53M, IBCV53M(-)Y1A, IBCV54M,
IBCV77M, IBCV78M, PVD21, SMOR-B,
STD15C, STD15D, STD16C, STD17C, STD18C,
STD21C, STD25D, STD26C, STD28C, STD29C

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
12
GEC CTG 11, CTG 13, CTG 14, CTG 21, CTG 23, CTG
24, CTIG39, FAC14, FAC34
I-Gard FALCON ARC PROTECTION
L&T MCOMP
Microelettrica- DMTR, IM30AB, MM30-743, N-DIN-F, N-DIN-
Scientifica MA
MIKRO MK1000A, MK201A, MK203A, MK2200,
MK300/MK300E
Motortronics RX
Neopis Co.Ltd PROMET-F
Omron SE
P&B Engineering M5A, Mn3, Mn4, Mn5A, MR-EF, Mw5A
Schneider Electric TeSys LT6-P, TeSys LT6-P (CT)
Schweitzer 487V, 751A (R410), 849 (R101)
SELCO S600
Siemens 3RB12, 7SG18, 7SS601, 7UT612, 7UT613,
7UT633/635
Skymatic Controls GFR-3
Inc.
Square-D DR-LXS01
Westinghouse CA-6

MFR Model
MCP ABB S2X 80, S3 160, S3 250, Tmax T2 & T3
Allen-Bradley 140M-J8P
Cutler-Hammer HMCPE
Merlin Gerin CF-250
Siemens HEM

MFR Model
Cable AlcatelWire Energex-SP
AmerCable CIRVFD
NEC NEC Tab9 AL, NEC Tab9 PVC, NEC Tab9 ST
Prysmian Airguard CSA
Southwire SIMpull XHHW/CT
TFKable Type DLO

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
13
System Requirements

Operating System (64-bit)


Microsoft Windows® 10 Pro
Microsoft® Windows® 8 & 8.1 (Standard, Professional)
Microsoft® Windows 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft® Server 2012 & 2012 R2 (Standard)
Microsoft® Server 2008 R2 (Standard) (SP1)

Other Software Requirements


Internet Explorer® 10 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP1)
Microsoft .NET Framework v4.0
Microsoft .NET Framework v4.5
Microsoft SQL Server Compact 3.5 (SP2)
Microsoft Windows Update (KB2670838)
Microsoft SQL Server 2012 Express (x64)
Microsoft SQL Server 2012 Express LocalDB (x64)
Microsoft SQL Server 2012 Native Client (x64)
Microsoft SQL Management Studio 2012 (x64)

PC Configuration Requirements
64-bit hardware
USB port
Ethernet port w/ network access (if network licensing required)
DVD Drive, 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware
100 Bus Projects
Intel Core i5 or better – 2.0 GHz or better (or equivalent)
4 GB RAM

500 Bus Projects


Intel Core i5 or better – 2.0 GHz or better (or equivalent)
8 GB RAM

1,000 Bus Projects


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
16 GB RAM (high-speed)

10,000 Bus Projects and Higher


Intel Core i5 or better – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
32 GB RAM - (high-speed)

This document and the information within it are confidential and proprietary to ETAP/Operation Technology, Inc. and may
not be modified, copied, published, disclosed, distributed, displayed or exhibited in either electronic or printed formats without
the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2015
ETAP/Operation Technology, Inc. All Rights Reserved.
14
ETAP 12.6.5
February 2015

The ETAP Development Team is pleased to provide you with the ETAP 12.6.5 release.

ETAP 12.6.5 is a point release to 12.6. This is a complete installation which does not require an
earlier installation of ETAP.

Included in this latest release are enhancements to the Checker access-level action for Revision
data, cable temperature calculations for 1/C cables with random arrangements in underground
duct banks, and library data.

ETAP 12.6.5 System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Server 2012 (Standard)
Microsoft Windows® 8 & 8.1 (Standard, Professional)
Microsoft Windows 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (Home Edition, Professional) (SP 3)
Microsoft Server 2008 R2 (Standard)
Microsoft Server 2008 (Standard)
Microsoft Server 2003 R2 (Standard) (SP 2)
Microsoft Server 2003 (Standard) (SP 2)

Other Software Requirements


Internet Explorer® 5.01 or higher (or minimum version level specified by the Operating
System)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP2)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2015 BY OPERATION TECHNOLOGY, INC.
1
500 Bus Projects
Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2015 BY OPERATION TECHNOLOGY, INC.
2
ETAP 12.6
March 2014

ETAP is pleased t o provide you w ith t he e nclosed E TAP 12.6 point release. ETAP 1 2.6 is a co mplete
program and does not require any previous ETAP installation.

This point release is the latest in the ETAP 12 series and includes important updates based on the
industry’s latest demands. This Readme contains key information about ETAP that may not be
included in Help file.

ETAP continues to expand and enhance its capabilities based on the requirements of the industry. In
ETAP 12.6, the Unbalanced Load Flow module was enhanced to simulate double open-phase faults.
This e nhancement i s i n re sponse t o t he r equirements f or the nuclear g eneration p lants t o c onduct
single a nd doubl e op en-phase f ault s tudies f or t heir of f-site pow er supplies. Enhancements t o the
Unbalanced Load Flow module include:

• Simulate a double open-phase fault at any terminal of a three-phase branch


• Transition of motors to locked rotor conditions based on undervoltage conditions
• Display of current angle on the one-line diagram

IEEE exciter t ype AC7B has b een m odified ba sed on I EEE 421.5 e rrata from J une o f 2 008. P revious
versions of E TAP included de tailed m odeling of the AC7B excitation sy stem based on IEEE s tandard
421.5-2005. T he revised model i ncludes exciter t ime constant modeled a s a n i ntegrator rather than a
simple time constant. The enhanced AC7B model also includes the load current compensation circuit as
described in s ection 4, figure 4-1, of 421.5-2005. T he l oad current compensation circuit can be used to
effectively regulate voltage a t a poi nt beyond t he terminal of t he generator and compensate f or step-up
transformer drops. Additional enhancements and capabilities include:

Module Enhancements Multi-Language Edition


• Load Flow • English
• Unbalanced Load Flow • Spanish
• Transient Stability • Chinese
• Arc Flash • Japanese
• Transformer Ratings • Russian
• Device Libraries • Portuguese
• Korean
• German (output reports only)

Upon finishing installation of ETAP 12.6, a new 36-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 12.6 installation DVD.
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2014 BY OPERATION TECHNOLOGY, INC.
1
System Requirements
Before y ou i nstall ETAP 12.6 , m ake su re that y our co mputer m eets t he recommended hardware a nd
software requirements listed below.

Operating System (32-bit or 64-bit)


Microsoft® Server 2012 (Standard)
Microsoft Windows® 8 & 8.1 (Standard, Professional)
Microsoft Windows 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (Home Edition, Professional) (SP 3)
Microsoft Server 2008 R2 (Standard)
Microsoft Server 2008 (Standard)
Microsoft Server 2003 R2 (Standard) (SP 2)
Microsoft Server 2003 (Standard) (SP 2)

Other Software Requirements


Internet Explorer® 5.01 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP2)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2014 BY OPERATION TECHNOLOGY, INC.
2
ETAP 12.5
August 2013

The ETAP Development Team is pleased to provide you with the enclosed ETAP 12.5 release. ETAP
12.5 is a complete program and does not require any previous ETAP installation.

ETAP 12.5 release is the latest upgrade of the market-leading electrical power system design and
operation software. The new analysis features and enhanced capabilities effectively enable optimized
design, increasing safety, quality, and productivity.

ETAP 12.5 Faster Than Real-Time™ solution provides for better decision making, improved
operations management, cost saving, and compliancy.

Upon finishing installation of ETAP 12.5, a new 36-digit activation code is required to activate and open
the application. The activation code is provided on the ETAP 12.5 installation DVD.

For more information on this new release, please take a few moments to review the information below.

New Features & Capabilities


 Dynamic Parameter Estimation & Tuning - DPET
 Short Circuit GOST R 52735 Standard
 New Web Consoles for Monitoring & Simulation
 Customizable Web Console Templates
 Native e-SCADA Communication Protocols
 Waveform Capturing & Synchrophasor Measurements
 New Library Merge & Cable Library Quick-Pick
 Enhanced Analysis Modules
 3,500 New Device Libraries
 Multi-Language Edition

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
1
New Features

Dynamic Parameter Estimation & Tuning - DPET


Combined with the UDM variable parameter capability, DPET adds a whole new layer in time saving
capabilities which can literally save hundreds of engineering man-hours spent on the tedious process of
model validation parameter tuning.

Features
 Tune dynamic models with multiple input/output
 Estimate model parameters using actual field measurements
 Utilize field data from disturbance recorders & PMUs
 Automatically exclude questionable data & filter noise
 Compliance with NERC MOD standards
 Multi-objective stochastic optimization method
 Utilize ETAP User-Defined Dynamic Model to build custom models
 Combinations of models: Generators, Governors, Exciters, Power System Stabilizers, Dynamic
Loads, Networks, etc.
 Graphical platform to create and edit dynamic models
 Generate comparisons of multiple estimation results
 Determine model parameters resulting in the best model & measured data fit
 View parameter sensitivity, measured vs. simulated model outputs, & residual values
 View & compare tuned parameters for New Case
 Multiple sets of input/output data-files for tuning comparison
 Easily change the parameter initial values, including block limits

GOST Standard R 52735 Compliance


Save hours of tedious hand calculations, manual excel manipulations, and take the guesswork out of
short-circuit studies by automating the process with multiple calculations and result analysis.

Features
 Calculate periodic & aperiodic components and surge current
 Consider pre-fault loading condition
 Calculation of short-circuit current at any specified time
 Radial and multi-loop circuit calculations
 GOST short-circuit output report in Russian language

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
2
Scenario Wizard Enhancements
ETAP Scenario Wizard now includes the ability to automatically run multiple Underground Raceway
System scenarios with different project files and verify their study results against benchmark reports.
Once the scenarios are set up, you can compare hundreds of study reports together with one click.

Features
 New Underground Raceway System (UGS) Scenarios
 Direct access to Study Cases Editors
 Direct access to Revision and Configuration Managers
 Automatically compare, verify and validate Transient Stability plots
 Export plots and data points to Excel
 Simulate “What if” events
 Dynamic update of preference file; INI entries

New Cable Library Quick Pick Editor


Cable library quick pick editor is enhanced to provide an easy to use search environment to quickly locate
the cable in your facility from within the library. Utilize powerful search and sort tools to quickly filter
specific groups of cables.

Library Merge Utility


Faster library file merge process.

Features
 New library merge process with increased speed
 Create custom library files faster
 Enhanced library merge functionality

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
3
ETAP Real-Time

Distributed Electrical SCADA Technology


ETAP e-SCADA technology allows you to, predict, control, visualize, optimize, summarize and
automate your power system. Distributed and web-based technologies provide the tools to make
informative decisions based on planned or unplanned events from any location.

Features
 Smart Grid & Microgird Master Controllers
 Real-Time decision making applications
 Predictive Simulation, Optimization & Automation
 Online & archive data trending
 Operator training simulator
 Enhanced e-SCADA component library
 Web-based SCADA architecture

Thin Client & Web Consoles


As the demand for web-based design and simulation increases, ETAP has created a powerful web-
based interface to build and model your electrical system through an accessible URL.

Features
 Thin client applications
 Automatically generate electrical diagrams from ETAP
 Intelligent web graphical user interface
 HMI template library
 Configurable web visualization & control
 Electrical grid view - Geographical map
 Utilize geospatial maps for situational awareness
 Alarm & warning views
 Flexibility to create “what if” scenarios

Direct Communication Protocols


ETAP offers direct connectivity to any industry compliant systems. While maintaining open
connectivity with the industry’s standard hardware components, this additional functionality provides
enhanced flexibility, higher performance, and easy to configure architectures.

New and Enhanced Features


 IEC 61850
 Modbus
 DNP3
 OPC
 OPC UA

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
4
Disturbance Monitoring & Wave Capturing
ETAP provides the ability to replay recorded voltage and current waveforms; visualize and analyze
power quality throughout the system.

Features
 Digital Fault Recorder
 Synchrophasor Measurement Unit (PMU)
 Replay recorded voltage & current waveforms
 Capture data from Disturbance Monitoring Equipment:
o COMTRADE Sequence of Events Recorders & PMUs
o Fault & Dynamic Disturbance Recorders
 Online & archive data trending:
o Current
o Voltage
o Power
o Frequency

Multi-Language Editions
ETAP interface is localized in 7 languages and provides output reports in 8 languages.

Languages
 English
 Spanish
 Chinese
 Japanese
 Russian
 Portuguese
 Korean
 German (output reports only)

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
5
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
LVCB - ABB E1B-A(2005),E1N-A(2005),E2B-A(2005),E2H-A(2005),E2N-
ANSI A(2005),E2S-A(2005),E3H-A(2005),E3N-A(2005),E3S-
A(2005),E3V-A(2005),E3X-A(2010),E4H-A(2005),E4H-
A/f(2005),E4L-A(2005),E4L-A(2010),E4S-A(2005),E4V-
A(2005),E6H-A(2005),E6H-A/f(2005),E6L-A(2005),E6V-
A(2005),E6X-A(2010),E6X-A/f(2010),X1N-A(2008)
Allen-Bradley 140U-I0C3,140U-I3C3,140U-I6C3,140M-I8P,140M-I8R,140U-
J0C3,140U-J2C3,140U-J3C3,140U-J6C3,140U-JD0,140U-
JD3,140U-JD6,140U-K0X3,140U-K3X3,140U-K6X3,140U-L0,
140U-L3,140U-L6,140U-I0C3, 140U-I3C3, 140U-I6C3,140U-
JD0,140U-JD3,140U-JD6,140U-K0X3,140U-K3X3,140U-
K6X3
Cutler Hammer AQB-A103
General Electric FEH,FEL,FEN,TEYD,TEYH,TEYL
Schneider Electric NSX100–F,NSX100–H,NSX100–N,NSX160–F,NSX160H,
NSX160–N,NSX250–F,NSX250–H,NSX250–N,NSX400F,
NSX400–H,NSX400–N,NSX630–F,NSX630–H,NSX630-N
Square-D HD,HG,HJ,HL,JD,JG,JJ,JL,LD,LG,LJ,LL
Terasaki AH-40C, AH-60C

K Moeller NZMH2,NZMH3,NZMN3

LVCB - ABB E1B(2005), E1N(2005), E2B(2005), E2L(2005), E2N(2005),


IEC E2S(2005), E3H(2005), E3L(2005), E3N(2005), E3S(2005),
E3V(2005), E4H(2005), E4H/f(2011), E4S(2005), E4S/f(2011),
E4V(2005), E6H(2005), E6H/f(2011), E6V(2005), X1B(2008),
X1L(2008), X1N(2008)
Allen-Bradley 140U-J0C3, 140U-J2C3, 140U-J3C3, 140U-J6C3, 140U-JD0,
140U-JD3,140U-JD6, 140U-K0X3, 140U-K3X3, 140U-K6X3,
140U-L0 (250A-400A),140U-L0 (500A), 140U-L0 (600A),
140U-L3 (250A-400A),140U-L3 (500A), 140U-L3 (600A),
140U-L6 (250A-400A),140U-L6 (500A), 140U-L6 (600A),
140U-JD0, 140U-JD3, 140U-JD6
K Moeller NZMH2, NZMH3 (250A-400A), NZMH3 (450A), NZMH3
(500A), NZMH3 (550A), NZMH3 (600A),NZMN3 (250A-
400A), NZMN3 (450A), NZMN3 (500A), NZMN3 (550A),
NZMN3 (600A)
LSIS AH-06D,AH-08D,AH-10D,AH-13D,AH-16D,AH-20D,AN-
06D,AN-08D,AN-10D,AN-13D,AN-16D,AS-20D,AS-20E,AS-
25E,AS-32E,AS-40E,AS-40G,AS-50F,AS-50G,AS-63G
Schneider Electric NSX100–B,NSX100–F,NSX100–H,NSX100–L,NSX100 – N,
NSX100–S,NSX160–B,NSX160–F, NSX160–H, NSX160L,
NSX160–N,NSX160–S,NSX250–B, NSX250–F,NSX250–H,
NSX250–L,NSX250–N, NSX250–S,NSX400–H,NSX400–L,

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
6
NSX400–N,NSX400–S,NSX630–H,NSX630 – L,NSX630–N,
NSX630 - S
Square-D HD,HG,HJ,HL,JD,JG,JJ,JL,LD,LD(600A),LG,LG(600A),LJ, LJ
(600A),LL,LL (600A)
Terasaki AH-40C, AH-60C
Toshiba NJ100MB, NJ100NB, NJ100NB-T, NJ100P, NJ50EB, NJ50FB
NJ100MB, NJ100NB, NJ100NB-T, NJ100P, NJ50EB, NJ50FB

TM ABB A1 125A - TMF Cold, A1 125A - TMF Hot,T1,T2,T3,T4,T4


(IEC),T5,T5 (IEC)
Allen-Bradley 140U-I0C3,140U-I3C3,140U-I6C3,140U-J,140U-JD0, 140U-
JD3,140U-JD3 (DC),140U-K0,140U-K0 (DC),140U-K3, 140U-
K3 (DC), 140U-K6, 140U-K6 (DC), 140U-L
GE Power Controls TEYD, TEYH, TEYL
K Moeller NZM2-A(F), NZM3-AE, NZM3-AEF
Schneider Electric TM100D,TM125D,TM16,TM160D,TM200D,TM25,TM250D,
TM32D,TM40,TM50D,TM63,TM80D
Square-D Powerpact H-frame (50Hz), Powerpact H-frame (60Hz)
Powerpact J-frame (50Hz),Powerpact J-frame (60Hz)
Toshiba NJ100P,NJ50EB

LVSST ABB PR331/P (IEC-2008-X1), PR331/P (UL-2008-X1),PR332/P


(IEC-2008-X1), PR332/P (UL-2008-X1), PR333/P (IEC-2008-
X1), PR333/P (UL-2008-X1), SACE PR111, SACE PR112,
SACE PR112 (IEC), SACE PR121, SACE PR121/P (IEC),
SACE PR122, SACE PR122/P (IEC), SACE PR123 (UL)
SACE PR123/P (IEC), SACE PR211,SACE PR212, SACE
PR221 (T2), SACE PR221 (T4), SACE PR221 (T5), SACE
PR222
Allen-Bradley 140U-J (LS), 140U-J (LSG), 140U-J (LSI), 140U-J (LSIG)
Cutler Hammer Navy AQB-A103 (1/10)
General Electric SMR1 (FE, 240V), SMR1 (FE, 480V)
LSIS A Type, N Type, P Type, S Type
Schneider Electric Micrologic 1.3 M (NSX),Micrologic 2.2 (NSX)
Micrologic 2.2 G (NSX),Micrologic 2.2 M (NSX)
Micrologic 2.3 (NSX),Micrologic 2.3 M (NSX)
Micrologic 5.2 A/E (NSX),Micrologic 5.3 A/E (NSX)
Micrologic 6.2 A/E (NSX),Micrologic 6.2 E/M (NSX)
Micrologic 6.3 A/E (NSX),Micrologic 6.3 E/M (NSX)
Square-D Micrologic 1.3 M (PP), Micrologic 2.2 M (PP)
Micrologic 2.3 M (PP), Micrologic 3.2 (PP)
Micrologic 3.2S(PP), Micrologic 3.3 (PP)
Micrologic 3.3S(PP), Micrologic 5.2 A/E (PP)
Micrologic 5.3 A/E (PP), Micrologic 6.2 A/E (PP)
Micrologic 6.3 A/E (PP)

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
7
MFR Model
Fuse - Bussman FRN-R (10/08), TJN
ANSI
Cooper ELSP (08/12), ELSP (08/12),ELSP (08/12)
Cutler-Hammer CLE2 (7/03),CLE3 (7/03)
Mersen CP

MFR Model
Relay ABB ICM2
ALSTOM MX3IPD1A, MX3IPD1B
BBC ICM2(50Hz), ICM2(60Hz), ICM21(50Hz)
Basler Electric BE1-87B, BE1-87G, BE1-87T
LSIS IMP
Schneider Electric TeSys T
Siemens ESP200

MFR Model
Recloser Cooper RX <100A Coil>,RX <140-225A Coil>,RX <25A Coil>,
RX <280A Coil>,RX <280X Coil>,RX <35A Coil>,RX
<400A Coil>, RX <400X Coil>,RX <50A Coil>,RX <70A
Coil>

MFR Model
TMCP ABB T2 160-MA,T2 160-MF,T3 250-MA,T4 250-MA
Allen-Bradley 140M-I

MFR Model
Cable BICC 3X1/C Parallel Empower Fill Concentric Neutral Power
Cable

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
8
System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Server 2012 (Standard)
Microsoft Windows® 8 (Standard, Professional)
Microsoft Windows 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (Home Edition, Professional) (SP 3)
Microsoft Server 2008 R2 (Standard)
Microsoft Server 2008 (Standard)
Microsoft Server 2003 R2 (Standard) (SP 2)
Microsoft Server 2003 (Standard) (SP 2)

Other Software Requirements


Internet Explorer® 5.01 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP2)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive 10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
9
ETAP 12.0.0
January 2013

The ETAP Development Team is pleased to provide you with the enclosed ETAP 12.0.0 release. ETAP
12.0.0 is a complete program and does not require any previous ETAP installation.

ETAP 12.0.0 is a major release that advances our continued shared commitment with clients and business
partners to provide the most comprehensive analytical solutions for the design and operation of power
systems now, and the energy technologies for tomorrow. As the industry’s market leader, ETAP delivers
the future of power systems engineering and operation – today. The new enhancements and analysis
modules are still developed with mathematical precision using our Quality Assurance and Verification &
Validation Procedures.

Upon finishing installation of ETAP 12.0.0., a new 36-digit activation code is required to activate and
open the application. The activation code is provided on the ETAP 12.0.0 installation CD.

For more information on this new release, please take a few moments to review the information below.

New Features Enhanced Modules


 Auto-Connect  Load Flow
 Adaptive Newton-Raphson Method  Unbalanced Load Flow
 Switching Device Interlock Enforcer  AC Arc Flash Analysis
 Cable Manager  Harmonics
 Cable Constants  Motor Starting & Acceleration
 Import from SKM® Captor™  Transient Stability
 Import from EasyPower®  Switching Sequence Management
 License Borrowing  Underground Thermal Analysis
 Polyline Text Box  Project Merge
 Data Exchange
New Analysis Modules
 Interharmonics Enhanced Elements
 Open-Phase Fault  Photovoltaic (PV) Panels
 Arc Flash Sequence-of-Operation  Buried Delta Transformer
 Cables
 Inverter
 Power Grid
 DC Circuit Breaker
 Charger
 Uninterruptible Power Supply
 Variable Frequency Drive
 Inverter

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
1
1. New Features

Auto-Connect
A new tool is added to increase the efficiency and convenience of connect or disconnect the elements on
one-line.

Features
 Automatic equipment connection mode
 Automated selection of available pins
 Auto connection to closest highlighted element
 Auto Disconnect & Reconnect

Adaptive Newton-Raphson
This new Newton-Raphson method has been added to most modules requiring load flow calculations,
such as Load Flow, Motor Starting, Harmonic Analysis, Transient Stability Analysis, and Optimal
Capacitor Placement, etc. The method greatly enhances convergence of load flow calculations for special
system configurations and operating conditions that do not yield a solution by regular Newton-Raphson
method. When it determines such a case, it adaptively adjusts the step size of the iterative calculation
process to provide a solution.

Features
 Increased convergence for systems with negligible impedance
 Improved handling of transmission line series capacitors (i.e. negative line series reactance)

Switching Device Interlock Enforcer


Switching interlock enforcer is an easy to use module in ETAP that allows the engineer to design and
simulate the system while being aware of the existing interlocking between switching devices in the
system. This has the potential to prevent the engineer from designing system configurations that are not
allowed and save time by simulating scenarios that are unnecessary due existing interlocks. As well as
checking for interlocks that prevent the user from changing the configuration of switching devices, it also
checks if switching a device will trigger the switching of another device or a chain of other devices. The
interlocking can be based on the configuration of another switching device or based on a meter readings
updated by running Load Flow study.

Features
 Auto enforcement of switching interlock logics
 Automatic pre-switching & post-switching logic verification
 Interlock based on switching devices positions
 Interlocks based on load flow results, power flows and voltages
 Automatic interlock conflict checking
 Ability to model cascade control of switching devices
 Active monitoring of switching interlock violations
 Switching plan validation against hazardous actions

Cable Manager
The Cable Manager allows the “batch” management of all the cable data, as they appear in the Cable
Editors of each cable. The Cable Manager shows cable data in a consolidated fashion in a grid; with the

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
2
presence of intelligent filters, cables can be searched and grouped by their relevant parameters, thereby
simplifying their engineering management. Cable Manager allows batch reporting and selecting from
library.

Features
 Batch cable management
 Customizable cable reports
 Multi-cable sizing & shock protection evaluation
 Intelligent search and filtering
 Export to Excel sheets

Import from SKM® Captor™


Enhanced SKM import utility that allows for the automatic conversion of projects created in SKM
including automatic protective device mapping and TCC import. This data exchange tool allows for direct
import of SKM Dapper® PTW32 versions 6.0 & 6.5.

Features
 Converts Dapper® PTW32 versions 6.0 & 6.5
 Import CAPTOR TCCs into STAR
 Automatic, one click conversion of SKM Dapper projects
 One-line diagram layout conversion per the original project drawing
 Support for multiple one-Line drawing into composite networks
 Automatic protective device settings mapping
 Conversion of AC &DC networks

Import from EasyPower®


ETAP 12.0 brings a brand new EasyPower import utility that allows for the automatic conversion of
projects created in EasyPower ver. 8.0 and 9.0.

Features
 Automatic import of AC elements including all their input data
 Library mapping utility for importing protective device settings for fuses, Low voltage circuit
breakers and trip units as well as relays
 Automatic One-Line diagram import to match the original project layout
 Import of EasyPower TCCs into Etap’s STAR coordination module

Polyline Text Box (highlight polyline shape)


Create a polygonal chain to highlight different sections of the one-line diagram.

Features
 Freehand polyline shapes & styles
 Graphically define revision boundary on the OLV
 Dynamic textbox object
 Save with OLV Templates

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
3
License Checkout/Borrowing
The ETAP license manager has been enhanced to include License Checkout/Borrowing, also known as
“Check-Out” license. ETAP 12 License Manager provides the ability to allow the user to borrow or check
out a license from the host network for a specified amount of time. The engineer can select the amount of
days to borrow the license, up to a maximum of 120 days, and then use that license away from the
network before that seat is automatically returned. During the time the license is borrowed, the checked
out license is removed from the available licenses in the network and can be used on the computer as a
keyless seat outside the network.

Capabilities:
 License borrowing option can be set up through the ETAP LM Configuration utility.
 Borrowed license can run with the computer disconnected from the network until the borrowing
period ends.
 Borrowed duration is determined per user account.
 LM tracks and keeps count of remaining / available licenses for checkout
 Borrowed license duration can be configured from 1 day up to 120 days
 Borrowed licenses are linked to the computers used during checkout

License Manager
The license manager also includes an editor for IT administrators to enhance the management of license
usage. The new license manager editor allows the administrator to monitor the number of users and the
time they logged in. From this manager, the IT administrator can remove a connected user from the user
list and make a license available for others.

Features
 License Checkout/Borrowing
 Start/Stop Service
 View Logon Time
 Remove connected users

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
4
2. New and Enhanced Modules

Interharmonics
ETAP Harmonic Analysis module has been enhanced with new features including interharmonic
modeling and studies, options to use device/equipment rating or fundamental frequency load flow data as
harmonic current source or voltage source base, along with a new design of Harmonic Library to allow
user inputting harmonic spectrum up to 250th harmonic order, or automatically populating harmonic
order, magnitude and phase angle based on power converter pulse number and other parameters.

Features
 Interharmonic modeling & simulation
 Perform voltage flicker limitation studies
 Interharmonic distortion indices calculation based on IEC 61000-4-7
 Handling of harmonic order up to 250th order
 Automatic interharmonic frequency generation
 Manual or automatic harmonic spectrum generation
 Adjustable harmonic current base

Open Phase Simulation by Unbalanced Load Flow Analysis


The Unbalanced Load Flow Analysis module has been enhanced to accurately simulate steady-state open-
phase conditions of power systems. An open-phase condition (on phase A, B, or C) can be studied by
placing a graphical icon on the one-line diagram at the terminal of branch. In order to study this
extremely unbalanced operating conditions, induction motor models have been enhanced in the
unbalanced load flow calculations.

Features
 Open-Phase A, B, or C phase
 Modeling of 2-winding and 3-winding transformer excitation branch
 Include buried delta winding for 2-winding and 3-winding transformers
 Report sequence values of voltages and current flows

AC & DC Arc Flash Analysis


The arc flash analysis module was significantly enhanced with many features requested to handle specific
problems and conditions encountered for many types of power systems. The enhanced systems include
those with a lot renewable energy sources and extremely complex multiple energy source configurations.
The highlight enhancement or new feature for this module is the AFSQOP tool. The arc flash sequence
of operation (AFSQOP) tool enhances the graphical analysis of the power system protection behavior
under “arc fault” conditions. The fault insertion, arc flash result analyzer and sequence viewer tools help
to determine what is the effect of the arc fault conditions like current variation and decay, missing
energized sources and miscoordination issues. AFSQOP however has taken the individual fault analysis
to the next level by storing and playing back the sequence of events for every faulted location. Combined
with the ETAP STAR sequence of operation tool, ETAP now has two simulators to show the behavior of
protected devices under both bolted and arcing fault conditions.

New and Enhanced Features


 Graphical Simulation of 3 & 1-Phase Arc Flash Sequence-of-Operation
 Tabulated display of protective device trip sequence using the “Arc Flash SQOP Viewer
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
5
 Single Arc Fault Insertion Tool
 Playback of multiple arc flash sequence of operation using the arc flash result analyzer
 Sequence of operation playback speed controls (to speed up slow down or remove the sequence
flashing on the one-line diagram)
 Two user-defined modes of operation for the AFSQOP to display first de-energizing PD only or
to view multiple source PD operations
 Exporting to MS Excel of all protective device sequence of operation
 Automatic verification of protective device short-circuit duty using bolted fault currents prior to
arc flash calculation.
 Enhanced source protective device search capability for systems with multiple energizing sources
(including renewable energy)
 Saving of all settings and display preferences in the Arc Flash result analyzer, including more
significant figures and additional filtering tools.
 Non-modal AFRA to aid in the analysis and to take advantage of multiple monitors
 User-definable Cf for low voltage equipment incident energy (IEEE 1584-2002 empirical
method)
 Enhanced display of results on the one-line diagram including the fault clearing time
 Use the “Maximum Fault Clearing Time” time setting to determine incident energy when the
fault clearing time is unavailable
 DC Photovoltaic System Arc Flash calculation which includes iterative method solution based on
the operating point on the PV curves.
 Added additional information fields to start collecting information about conductor
configurations (i.e. vertical in a box, horizontal in a box, vertical open air, etc). These fields are
for information only in preparation for upcoming new changes to IEEE 1584 guidelines.
 Enhanced handling of tie-protective device configurations. Allow different equipment type
configurations across a tie-pd bus. The worst-case incident energy is reported for the tie-pd.
 Enhanced handling of automatic incident energy assignment for low voltage equipment. This
enhancement allows for assignment of actual incident energy value rather than a hazard/risk
category. Also, it allows for the use of this tool with the NFPA 70E 2012 PPE requirements (for
arc flash analysis method based on annex H of the standard).

Switching Sequence Management


Switching Management is an easy to use module in ETAP that allows the engineer/dispatcher to build and
simulate a complete switching sequence using a graphical user interface and execute the switching plan.
The switching sequence contains a list of switching devices and time of execution for circuit breakers,
load disconnects, and ground disconnects. Before any switching sequence is executed, the application
verifies whether the sequence is compliant with safety switching procedures and requests confirmation
during execution of each step before proceeding to the next step in order to avoid inadvertent switching.
Switching plan may be configured for automatic transfer of bus loads on double-ended bus configurations
thus replacing the step-by-step method of switching for double-ended bus configurations that require
manual bus load transfer. Switching sequences can be ranked based on de-energized time, non-delivered
energy, and the order of switching allowing easy comparison between different variations of the plan.

Features
 User-friendly switching plan builder

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
6
 Point & click selection of switching device from the one-line diagrams
 Graphical display of selected switching devices
 Multi-level switching request approval
 Assignment of user-definable & interlock logic per each switching device
 Checking of selected switching plans against forbidden or potentially hazardous actions
 Unlimited switching plans each with an unlimited number of switching actions
 Switching order reports include switching mode, start / stop time, & nature of work
Simulate & evaluate switching plans in all states prior to execution

Low Voltage Systems


ETAP has been enhanced for grounding and earthing sources, cable thermal sizing and electric shock
calculation in low voltage systems.

New and Enhanced Features


 Enhanced single phase cables with IEC symbols
 Enhanced capabilities in Electric Shock calculation
 Enhanced Electric Shock model input data
 Integration of the Electric Shock Results within TCC plots

Underground Thermal Analysis


ETAP has been enhanced to allow the user to specify Shield Thickness, Sheath Thickness and Armor
Diameter individually. Shield has its Grounding selection while Sheath and Armor have common
grounding. ETAP also added the capability to have different order of layers in cable configuration.
Underground Raceway System (UGS) module handles all these flexibilities automatically in calculation.

Project Merge
Project Merge functionality has been enhanced to allow the user to include TCCs in an export when
exporting a portion of the project.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
7
3. New and Enhanced Elements

Photovoltaic (PV) Panels


 Discrete DC Photovoltaic panel element
 Constant current source modeling
 Model PV systems with individual panels
 Detailed modeling considers string cables & combiner boxes
 DC Load Flow and Short-circuit system analysis
 DC Arc Flash Analysis
 Modeling based on P-V & I-V curves

Transformer
 2W & 3W buried Delta transformer
 Calculation of zero sequence based on test data
 Core & shell type mechanical construction
 3L, 4L & 5L models

Cables
 Automatic cable positive sequence impedance calculation
 Automatic cable zero sequence impedance calculation
 Global System Frequency Impedance adjustment
 Cable Constants
 Cable Armor thermal calculation
 Cable Sheath thermal calculation
 Calculations based on BS 5467, BS 7671 & IEC 60364
 Enhanced Cable Reports

Inverter
 MPPT controller to interact with DC PV Array Systems
 Enhanced modes of operation for load flow simulations

Power Grid
 Enhanced 3-Phase and 1-Phase grounding impedance models

DC Circuit Breaker
 Added additional trip device and trip unit capabilities (similar to AC LV circuit breakers)

Power Converter Equipment (Charger/UPS/VFD/SVC/Inverter)


 Enhanced the Harmonic Spectrum Calculation Equation by using the IEEE 519 Equation
 Added additional interharmonics interface

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
8
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
LVCB - ANSI ABB S8V
Allen-Bradley 140U-D (0.5-10A), 140U-D (12-30A), 140U-K0X3,
140U-K3X3, 140U-K6X3
Carling F-Series
Technologies
Cutler Hammer CHH, EC, EHC, FC, FDCE, FDE, GDB, GHQ,
HGHB, HGHC, HFDE, MDD-X40 (2012), MDD-
X50 (2012), MDD-X60 (2012), MDN-408 (2012),
MDN-416 (2012), MDN-508 (2012), MDN-516
(2012), MDN-608 (2012), MDN-616 (2012), MDN-
620 (2012), MDN-640 (2012), MDN-840 (2012),
MDN-C08 (2012), MDN-C16 (2012), MDN-C20
(2012), MDN-C40 (2012), MDS-408 (2012), MDS-
608 (2012), MDS – 612, MDS-616 (2012), MDS-
620 (2012), MDS-632 (2012), MDS-808 (2012),
MDS-816 (2012), MDS-820 (2012), MDS-832
(2012), MDS-840 (2012), MDS-850 (2012), MDS-
C08 (2012), MDS-C16 (2012), MDS-C20 (2012),
MDS-C32 (2012), MDS-C40 (2012), MDS-C50
(2012), MDS-C60 (2012), MDS-L08 (2012), MDS-
L16 (2012), MDS-L20 (2012), MDS-X08 (2012),
MDS-X16 (2012), MDS-X20 (2012), MDS-X32
(2012), MDS-X40 (2012), MDS-X50 (2012),
MDSL, MDSX (800-2000), MDSX (3200-5000)
Federal Pioneer NA, NB, NBH, NC
Siemens HEG, NEG, HMG, HNG, HPG, LMG, LNG, LPG,
NMG, NNG NPG
Square-D DG 400, DG 600, DJ 400, DJ 600, DL 400, DL 600

LVCB - IEC ABB S8H, S8V


Allen-Bradley 140U-D (0.5-1A), 140U-D (2-6A), 140U-D (8-
10A), 140U-D (12-20A), 140U-D (25-30A)
GE Power Controls EP60, EP100, EP250, EP100, EP250 (6-25A),
EP250 (32-40A), EP250 (50-63A), EP250M (6-
25A), EP250M (40A), EP250M (63A), FD63C,
FD63E, FD63H, FD63L, FD63N, FD63S, FD63L
(160A), FD63L (20-125A), FD63N, FD63S,
FD160C, FD160E, FD160H, FD160L, FD160L
(160A), FD160L (20-125A), FD160N, FD160S,
FE160H, FE160L, FE160N, FE250H, FE250L,
FE250N, FE250V
Merlin Gerin C120H
Square-D DG 400, DG 600, DJ 400, DJ 600, DL 400, DL 600
Telemecanique GV2 L07, GV2 L08, GV2 L10, GV2 L14, GV2

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
9
L16, GV2 L20, GV2 L22, GV2 L32, GV2 LE07,
GV2 LE08, GV2 LE10, GV2 LE14, GV2 LE20,
GV2 LE22, GV2 LE32, GV2 M07, GV2 M08, GV2
M10, GV2 M14, GV2 M16, GV2 M20, GV2 M21,
GV2 M22, GV2 ME 07, GV2 ME 08, GV2 ME 10,
GV2 ME 14, GV2 ME 16, GV2 ME 20, GV2 ME
21, GV2 ME 22, GV2 ME 32, GV2 P07, GV2 P08,
GV2 P10, GV2 P14, GV2 P16, GV2 P20, GV2 P21,
GV2 P22, GV2 P32
Terasaki E125-NJ, E250-NJ, E400-NJ, H125-NJ, H160-NJ,
H250-NJ, H400-NJ, L125-NJ, L160-NJ, L250-NJ,
L400-NJ, S125-GJ, , E250-NJ, E400-NJ, H125-NJ,
H160-NJ, H250-NJ, H400-NJ, L125-NJ, L160-NJ,
L250-NJ, L400-NJ, S125-NF, S125-NJ, S125-GJ,
S160-GJ, S160-NF, S160-NJ (20,32A), S160-NJ
(50-160A), S400-CJ, S400-GJ, S400-NJ S250-GJ,
S250-NJ

TM Allen-Bradley 140U-K0 , 140U-K0 (DC), 140U-K3 , 140U-K3


(DC), 140U-K6 , 140U-K6 (DC)
Carling F-Series 11-Ultrashort, F-Series 12-Short, F-Series
Technologies 14-Medium, F-Series 16-Long,
Cutler-Hammer CHH, EC, EHC, FC, GDB, GHQ, HGHB (1 Pole),
HGHC (1 Pole),
Federal Pacific NFJ
Federal Pioneer NA (2P), NA (3P), NC (2P)
GE Power Controls Elfa Plus B Curve, Elfa Plus C Curve, Elfa Plus D
Curve
Merlin Gerin C120H-B curve (IEC), C120H-C curve (IEC),
C120H-D curve (IEC)
Siemens 525 (MG frame), 525 (MG frame) (DC), 525 (NG
frame), 525 (NG frame) (DC), 525 (PG frame), 525
(PG frame) (DC), EG

Telemecanique GV2 L (3P), GV2 LE (3P), GV2 M (3P), GV2 ME


(3P), GV2 P (3P)
Terasaki E125-NJ, E125-NJ (DC), E400-NJ, E400-NJ (DC),
H125-NJ, H125-NJ (DC), H160-NJ, H160-NJ (DC),
H400-NJ, H400-NJ (DC), S125-NF, S160-NF,
S160-NJ, S160-NJ (DC)

LVSST ABB SACE PR212


Cutler Hammer FDE, RMS 520 Series, RMS1150(lt2),
RMS1150(l4t)
Mitsubishi WB, WM, WS
satinAMERICAN ETC-12 (H1/N1), ETC-12 (H2), ETC-12 (ST
disabled)
Siemens ETU 545 (DG frame), ETU 545 (FG frame), ETU
545 (LG frame), ETU 545 (MG frame), ETU 545
(NG frame), ETU 545 (PG frame), ETU 576 (DG

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
10
frame), ETU 576 (FG frame), ETU 576 (JG frame),
ETU 576 (LG frame), ETU 576 (MG frame), ETU
576 (NG frame), ETU 576 (PG frame)
Square-D GFM100FA, GFM100FI, GFM250

MFR Model
Fuse - ANSI ABB DO-III 143G, DO-III 144G, DO-III 145G
Bussman DFJ, FRN-R(8/00), FWA, FWH, FWJ 35-2000A,
FWP, FWX
Cutler-Hammer LFB Current Limiter
Edison LCL, LCU
Gould Shawmut A100C Type 30, A150C Type 10, A150C Type 20,
(Ferraz) A150C Type 40, A150C Type 50, A200C Type 10,
A200C Type 50, A250C Type 10, A250C Type 30,
A250C Type 50, A300C Type 10, A300C Type 20,
A300C Type 60, A430C Type 15, A430C Type 70,
A430C Type 75, A550C Type 15, A550C Type 70,
A550C Type 75, PSC aR Sizes 70 (350A), PSC aR
Sizes 70 (63A-315A), PSC aR Sizes 71 (160A-
500A), PSC aR Sizes 71 (500A-630A), PSC aR
Sizes 72 (280A-630A), PSC aR Sizes 72 (630A-
800A), PSC aR Sizes 73 (1000A-1400A), PSC aR
Sizes 73 (1400A), PSC aR Sizes 73 (315A-900A),
PSC aR Sizes 73 (800A), PSC aR Sizes 73 (900A-
1100A)

Hi-Tech Fuses Inc FLR, MCLF, Trans-Guard OS Shorty


Littelfuse JLLN, JLLS, JTD_ID
Mersen A240R, A100C - Type 30, A150C - Type 10,
A150C - Type 20, A150C - Type 40, A150C - Type
50, A200C - Type 10, A200C - Type 50, A250C -
Type 10, A250C - Type 30, A250C - Type 50,
A300C - Type 10, A300C - Type 20, A300C - Type
60 , A430C - Type 15, A430C - Type 70, A430C -
Type75, A550C - Type 15, A550C - Type 70,
A550C - Type 75
Southern States AF

Fuse - IEC Areva FDw(T) 7.2, FDw(T) 712, FDw(T) 17.5-x-2,


FDw(T) 17.5-x-3, FDw(T) 17.5-x-4, FDw(T) 24,
FDw(T) 36
Bussman 7.2TDLSJ, 7.2TFLSJ, 12TDLEJ, 12THLEJ,
12TKLEJ, 12TXLEJ, 17.5TDLSJ, 17.5TDMEJ,
17.5TFLSJ, 17.5THMEJ, 17.5TKMEJ, 24TDMEJ,
24TFMEJ, 24THMEJ, 24TXMEJ, AAO, AD, BAO,
BC, BD, CD, CDN, CDS, CEO, DD, DEO, ED, EF,
EFS, ESD, FEE, FF, FG, FMM, GF, GG, GH,
NITD, NSD, OSD, PON
Driescher H 220, H221
GE Power Controls HRC-400 Series, HRC-Standard, HRC-Type NS,

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
11
ES,XS
HRC-Type OS, HRC-Type SS, NH-General
Purpose, NH-Motor Starting, Nit and Net
Gould Shawmut NH (Size 0), NH (Size 00), NH (Size 000), NH
(Ferraz) (Size 1), NH (Size 2), NH (Size 3), PSC aR Sizes 70
(350A), PSC aR Sizes 70 (63A-250A), PSC aR
Sizes 70 (280A-315A), PSC aR Sizes 71 (160A-
450A), PSC aR Sizes 71 (500A-630A),PSC aR
Sizes 72 (280A-630A), PSC aR Sizes 72 (630A-
800A), PSC aR Sizes 72 (700A-800A), PSC aR
Sizes 73 (1000A-1400A), PSC aR Sizes 73
(1100A), PSC aR Sizes 73 (1400A), PSC aR Sizes
73 (315A-800A), PSC aR Sizes 73 (700A-900A),
PSC aR Sizes 73 (800A), PSC aR Sizes 73 (900A-
1100A), PSC aR 2x72(1250A-1400A), PSC aR
2x72 (1600A), PSC aR 2x72 (630A-1100A), PSC
aR 2x73 (1400A-1800A), PSC aR 2x73 (2000A),
PSC aR 2x73 (2200A), PSC aR 2x73 (2500A), PSC
aR 2x73 (2800A), PSC aR 2x73 (800A-1250A)

Hitachi FPLS
L&T HF, HN (Size 0), HN (Size 00), HN (Size 000), HN
(Size 1), HN (Size 2), HN (Size 3)
Merlin Gerin NS80H, MA
Mitsubishi AE630 –SW, AE1000-SW, AE1250-SW, AE1600-
SW, AE2000-SW, AE2000-SWA, AE2500-SW,
AE3200-SW, AE4000-SW, AE4000-SWA,
AE5000-SW, AE6300-SW

MFR Model
Relay ABB DPU

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
12
System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Windows® 8 (Standard, Professional)
Microsoft Windows 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (Home Edition, Professional) (SP 3)
Microsoft Server 2008 R2
Microsoft Server 2008
Microsoft Server 2003 R2 (SP 2)
Microsoft Server 2003 (SP 2)

Other Software Requirements


Internet Explorer® 5.01 or higher (or minimum version level specified by the Operating System)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP2)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading & high speed bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2013 BY OPERATION TECHNOLOGY, INC.
13
ETAP 11.1.1
June 2012

ETAP is pleased to send you the enclosed ETAP 11.1.1 point release. ETAP 11.1.1 is a complete
program and does not require any previous ETAP installation.

ETAP 11.1.1 will utilize the same 36-Digit Activation Code as provided with the ETAP 11 series
release.

ETAP 11.1.1 Update


This point release is the latest in the ETAP 11 series and includes an important update to the earlier
11.1.0 release. ETAP 11.1.1 is issued as a fix to an incident detected in ETAP 11.1.0 release that is
related to the Star – Protection Device Coordination module.

The elements inside Composite Networks become de-energized when a Composite Network is selected
and a Star View (TCC) is generated. This problem does not affect Composite Motor or the data in the
selected Composite Networks.

If this issue is detected in your project, ETAP 11.1.1 will automatically fix the problems with the
disabled Composite Networks upon opening the project file.

The list of fixed Composite Networks is placed in a conversion log located in the converted project
directory.

Note that in ETAP 11.1.0 the elements within the disabled Composite Networks were de-energized and
thus ignored in network analysis. After the project conversion, it is recommended to review any study
involving the listed disabled Composite Networks.

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Library Additions
The following devices were added to ETAP 11.1.1

Device Type Manufacturer Model


SBN-508, SBN-608, SBN-CO8, SBS-608, SBS-C08,
SBN-512, SBN-612, SBN-C12, SBS-612, SBS-C12, SBS-
Low Voltage E12, SBN-516, SBN-616, SBN-C16, SBS-616, SBS-C16,
Circuit Cutler-Hammer SBS-E16, SBN-620, SBN-C20, SBS-620, SBS-C20, SBS-
Breakers E20, SBS-625, SBS-C25, SBS-E25, SBS-630, SBS-C30,
SBS-E30, SBS-840, SBS-C40, SBS-E40, SBS-850, SBS-
C50, SBS-E50, SBS-C60
Hitachi F-400R
Moeller NZMH4-AE1250, NZMH4-AE800
Siemens HMG, HNG, HPG, LMG, LNG, LPG, NMG, NNG, NPG
Square-D HJ, HL, JJ, JL
Terasaki E50-NF, E400-NF, S50-CF, S50-NF, E50-NF

Thermal
Magnetic Trip Hitachi F-400R
Units (TM)
Siemens 525(MG frame), 525(NG frame), 525(PG frame)

Solid State Cutler-Hammer RMS 1150/RMS520


Trip
Moeller AE1250, AE800
Square-D PowerPact H/J

Fuse ANDELI XRNT1


GEC DSLBX, DSSAX
Bussmann FRS-R
Gould Shawmut (Ferraz) HSJ
Mersen HSJ

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (SP 3) Professional or Home Edition
Microsoft Server 2008
Microsoft Server 2008 R2
Microsoft Server 2003 (SP 2)
Microsoft Server 2003 R2 (SP 2)

Other Software Requirements


Internet Explorer 5.01 or higher (or minimum version level as specified by the Operating System in use)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP1)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading Technology with high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading with high speed system bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP 11.1
January 2012

The OTI Research & Development Team is pleased to offer you the enclosed ETAP 11.1 release. ETAP
11.1 is a complete program and does not require any previous ETAP installation.
The first time you run ETAP 11.1, you will need to enter the 36-Digit Activation Code as provided on the
back cover of the ETAP 11.1 installation DVD.
This point release expands on the current release by offering multiple language support. ETAP 11.1 is
completely localized in six languages: English, Spanish, Chinese, Japanese, Portuguese, and Russian.

This release offers new and enhanced features including:

New Modules
 DC Arc Flash Analysis
Enhanced Features
 Conversion tool from Dapper® PTW32 versions 6.0 & 6.5
 Import from PSS®E version 29 & 30

Enhanced Libraries
 Updated cable library based on NEC® 2008
 New cable library based on British Std. 7671

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
DC Arc Flash Analysis
The ETAP DC Arc Flash analysis module uses several methods to determine the level of incident energy
which can be generated by different direct-current electric circuits. The program is fully integrated into
the ETAP DC Short-Circuit calculation program which has been an industry standard for the analysis of
DC equipment faults for many years. The program can be used to determine the arc flash energy for
industrial, nuclear, data centers, electrochemical, petrochemical and any other DC electrical applications.

The DC arc flash incident energy and arc flash boundaries are determined based on the equations and
methodology presented in the following documents

 National Fire Protection Agency (NFPA) 70E-2012


 DC Arc Models and Incident Energy Calculations Paper No. PCIC-2009-07
 Arc Flash Calculation for Exposures to DC Systems, IEEE Transactions on Industry
Applications Vol. 46 NO. 6 November / December 2010

Features
 Incident Energy & Shock Protection Boundary Calculations
 Maximum Power, Stokes & Oppenlander, Paukert Methods
 NFPA 70E 2012 Compliant
 Integrated DC Short Circuit Analysis Software
 DC Arc Flash Result Analyzer
 Incident Energy Plots
 DC Arc Flash Labels
 Integrated DC Protective Device Library
 Determine Fault Clearing Time from DC protective devices
 MS Excel® Export & Report

Data Exchange
ETAP 11.1 brings a new import utility that allows for the automatic conversion of projects created in
SKM. This feature is included as a part of the base module. This data exchange tool allows for direct
import of SKM Dapper® PTW32 versions 6.0 & 6.5. For converting projects in earlier PTW32 versions,
first open and save the projects under ver. 6.0 or 6.5

Features
 Converts Dapper® PTW32 versions 6.0 & 6.5
 Automatic, one click conversion of SKM Dapper projects
 One-line diagram layout conversion per the original project drawing
 Support for multiple one-Line drawing files
 Conversion of AC &DC networks

ETAP Feature enhancements to SKM one-line diagram


 Create nested one-line diagrams by adding composite networks
 Current Transformer (CT) elements automatically generated during conversion, when relays are
found
 Add equipment cables to motors to remove the need for unnecessary buses

Conversion of SKM Captor® will be offered in subsequent ETAP release.

ETAP and ETAP Real Time are trademarks of Operation Technology, Inc. All other trademarks, product names and/or logos are the property of
their respective holders.

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Library Additions
The following devices were added to the ETAP 11.1.

Device Type Manufacturer Model


Low Voltage
Circuit Siemens NGB, NGG
Breakers

Thermal
Magnetic Trip Siemens NGB, NGG
Units (TM)

JHC, JKS (10/02), KRP-C-SP (5/01), MV DIN-ADOSJ,


MV DIN-TDLEJ, MV DIN-TDLSJ, MV DIN-TDMEJ,
MV DIN-TDQSJ, MV DIN-TFLSJ, MV DIN-TFMEJ,
Bussman MV DIN-TFMSJ, MV DIN-TFQSJ, MV DIN-THLEJ,
MV DIN-THMEJ, MV DIN-TKLEJ, MV DIN-TKMEJ,
Fuse MV DIN-TXLEJ, MV DIN-TXMEJ, MV DIN-TXQEJ,
MV DIN-WFOSJ
Edison ECNR, ECSR
Gould Shawmut (Ferraz) CS-3 A825X

HVCB Alstom PKG

Cable Library Additions


ETAP 11.1 has been updated with extensive cable library additions.

Unit Freq. Cond. %


Source System (Hz) Type
Instal. kV
Class
#/C Insulation

NEC English 50 AL Mag. 0.6 100 3/C Rubber


NEC English 50 AL Mag. 0.6 100 1/C Rubber 2
Non-
NEC English 50 AL Mag. 0.6 100 3/C Rubber
Non-
NEC English 50 AL Mag. 0.6 100 1/C Rubber 2
NEC English 50 CU Mag. 0.6 100 3/C Rubber
NEC English 50 CU Mag. 0.6 100 1/C Rubber 2
Non-
NEC English 50 CU Mag. 0.6 100 1/C Rubber 2
NEC English 60 AL Mag. 0.6 100 3/C Rubber
NEC English 60 AL Mag. 0.6 100 1/C Rubber 2
NEC English 60 AL Mag. 1 100 3/C Rubber
NEC English 60 AL Mag. 1 100 1/C Rubber 2
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Unit Freq. Cond. %
Source System (Hz) Type
Instal. kV
Class
#/C Insulation

NEC English 60 AL Mag. 5 133 3/C Rubber


NEC English 60 AL Mag. 15 100 3/C Rubber
Non-
NEC English 60 AL Mag. 0.6 100 3/C Rubber
Non-
NEC English 60 AL Mag. 0.6 100 1/C Rubber 2
Non-
NEC English 60 AL Mag. 1 100 3/C Rubber
Non-
NEC English 60 AL Mag. 1 100 1/C Rubber 2
Non-
NEC English 60 AL Mag. 5 133 3/C Rubber
Non-
NEC English 60 AL Mag. 15 100 3/C Rubber
NEC English 60 CU Mag. 0.6 100 3/C Rubber
NEC English 60 CU Mag. 0.6 100 1/C Ruber 2
NEC English 60 CU Mag. 1 100 3/C Rubber
NEC English 60 CU Mag. 1 100 1/C Rubber 2
NEC English 60 CU Mag. 5 100 3/C Rubber
NEC English 60 CU Mag. 5 133 3/C Rubber
NEC English 60 CU Mag. 15 100 3/C Rubber
NEC English 60 CU Mag. 15 100 3/C Rubber
NEC English 60 CU Mag. 15 133 3/C Rubber
Non-
NEC English 60 CU Mag. 0.6 100 3/C Rubber
Non-
NEC English 60 CU Mag. 0.6 100 1/C Rubber 2
Non-
NEC English 60 CU Mag. 1 100 3/C Rubber
Non-
NEC English 60 CU Mag. 1 100 1/C Rubber 2
Non-
NEC English 60 CU Mag. 5 133 3/C Rubber
Non-
NEC English 60 CU Mag. 15 100 3/C Rubber
Non-
Southwire-PV English 60 CU Mag. 0.6 100 1/C XLPE
Non-
Southwire-PV English 60 CU Mag. 2 100 1/C XLPE
Non-
Southwire-PV English 60 AL Mag. 2 100 1/C XLPE
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Unit Freq. Cond. %
Source System (Hz) Type
Instal. kV
Class
#/C Insulation

Non-
Southwire-PV English 60 CU Mag. 0.6 100 1/C USE2
Non-
Southwire-PV English 60 CU Mag. 2 100 1/C USE2
Non-
Southwire-PV English 60 AL Mag. 2 100 1/C USE2
Non-
Southwire-PV English 60 CU Mag. 0.6 100 1/C RHW2
Non-
Southwire-PV English 60 CU Mag. 2 100 1/C RHW2
Non-
Southwire-PV English 60 AL Mag. 2 100 1/C RHW2
NEC English 60 CU Magn. 0.6 100 1/C UF
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHW
NEC English 60 CU Magn. 0.6 100 1/C THW
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 1/C USE
NEC English 60 CU Magn. 0.6 100 1/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C ZW
NEC English 60 CU Magn. 0.6 100 1/C RHH
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHN
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 3/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C TW
NEC English 60 CU Magn. 0.6 100 1/C UF
NEC English 60 CU Magn. 0.6 100 1/C RHW
NEC English 60 CU Magn. 0.6 100 1/C THHW
NEC English 60 CU Magn. 0.6 100 1/C THW
NEC English 60 CU Magn. 0.6 100 1/C THWN
NEC English 60 CU Magn. 0.6 100 1/C USE
NEC English 60 CU Magn. 0.6 100 1/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C ZW
NEC English 60 CU Magn. 0.6 100 1/C FEP
NEC English 60 CU Magn. 0.6 100 1/C FEPB
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Unit Freq. Cond. %
Source System (Hz) Type
Instal. kV
Class
#/C Insulation

NEC English 60 CU Magn. 0.6 100 1/C MI


NEC English 60 CU Magn. 0.6 100 1/C RHH
NEC English 60 CU Magn. 0.6 100 1/C RHW2
NEC English 60 CU Magn. 0.6 100 1/C SA
NEC English 60 CU Magn. 0.6 100 1/C SIS
NEC English 60 CU Magn. 0.6 100 1/C TBS
NEC English 60 CU Magn. 0.6 100 1/C THHN
NEC English 60 CU Magn. 0.6 100 1/C THHW
NEC English 60 CU Magn. 0.6 100 1/C THW2
NEC English 60 CU Magn. 0.6 100 1/C THWN2
NEC English 60 CU Magn. 0.6 100 1/C USE2
NEC English 60 CU Magn. 0.6 100 1/C XHH
NEC English 60 CU Magn. 0.6 100 1/C XHHW
NEC English 60 CU Magn. 0.6 100 1/C XHHW2
NEC English 60 CU Magn. 0.6 100 3/C XHHW2
NEC English 60 CU Magn. 0.6 100 1/C ZW2

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (SP 3) Professional or Home Edition
Microsoft Server 2008
Microsoft Server 2008 R2
Microsoft Server 2003 (SP 2)
Microsoft Server 2003 R2 (SP 2)

Other Software Requirements


Internet Explorer 5.01 or higher (or minimum version level as specified by the Operating System in use)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP1)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading Technology with high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading with high speed system bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
ETAP 11.0
September 2011

The OTI Research & Development Team is pleased to offer you the enclosed ETAP 11.0 release. ETAP
11 is a complete program and does not require any previous ETAP installation.

This release offers rule-based, automated design and analysis tools that enable engineers and managers to
significantly increase their productivity and reduce the amount of design and review man-hours.

ETAP 11 represents our continued commitment to provide the analytical and operation software tools for
design and development of power systems now, and energy technologies for tomorrow.

New Features
 Data Manager Enhanced Modules
 Project Merge
 Multi-Dimensional Database
New Elements  Data Exchange – Data X
 Theme Manager
 Bus Duct
 Protective Device Coordination
 Single Phase Source
– Star
 Photovoltaic Array
 Arc Flash Analysis
 Switching Devices
 Underground Raceway System
 Open-Delta Transformer
 Cable System
 Variable Frequency Drive -
 Cable Ampacity & Sizing –
VFD
IEEE/NEC
New Modules  Cable Ampacity & Sizing –
IEC/BS
 User-Defined Dynamic Model –
 Load Flow
UDM
 Unbalanced Load Flow
 Protective Conductor Sizing –
IEC/BS  Motor Acceleration
 Electric Shock Calculation –  Harmonics
IEC/BS  Transient Stability
 Power System Monitoring &
Enhanced Elements Simulation
 Induction Machine  Event Playback
 Transformer  Intelligent Fast Load Shedding
 Uninteruptable Power Supply –  Interchange Transaction
UPS Scheduling
 Wind Turbine Generator – WTG Enhanced Libraries
 Relay
 LVCB + trip unit
This document is confidential and proprietary to ETAP/Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of ETAP/Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2012 by
ETAP/Operation Technology, Inc. All Rights Reserved.
Below is a detailed list of new features and capabilities of ETAP 11.

New Features

Data Manager
 View & edit Base & Revisions Data differences
 View equipment property differences
 Display & filter study data
 Graphical management of data

Project Merge
 Multi-user management of project merge
 Parallel ETAP project development
 Self-contained snapshots of the parent & branch projects

New Elements

Bus Duct
 Graphical representation on the One-Line Diagram
 Bus duct length, construction type, & material

Single Phase Source


 1-phase power grid modeling
 1-phase inverter modeling

Photovoltaic Array
 Performance adjustment coefficients
 Solar farm modeling
 Solar irradiance based on location & time
 AC & DC system analysis
 Inverter dynamic modeling & operation modes
 Maximum Peak Power Tracking (MPPT)
 Extensive Manufacturer/Model library
 P-V & I-V curves

Switching Devices
 Safety ground switch
 Integrated operation with Switching Management System
 Supervisory control for real-time switching operation

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
12
Variable Frequency Drive - VFD
 Multi-input connection for 6-24 pulse
 Sub-system modeling between VFD & motor
 Rectifier & inverter control models
 Output voltage & frequency control
 Frequency dependent modeling of sub-system
 Adjustable speed drive operation
 Motor acceleration control schemes
 Bypass switch for soft starter operation
 Input PF control

New Modules

User-Defined Dynamic Model - UDM


 Graphical model builder
 Library of pre-defined UDM models to create more complex models
 Compile & test directly from the UDM builder
 Control element toolbars including transfer blocks, input ports, output ports, etc.
 Automatic UDM links to components
 Import & Export to Simulink models
 Create & edit models for Exciter, Governor, Power System Stabilizer, & Lumped Load

Protective Conductor Sizing - IEC/BS


 BS 7671, IEC 60364-5-54
 PE thermal requirements & sizing
 Calculated or user-defined fault current & fault clearing time
 Reports in Crystal Reports & Excel
 Consider leakage current

Electric Shock Calculation - IEC/BS


 BS 7671, IEC 60364-4-41, EN 50122
 TN-C, TN-S, TN-C-S, TT, & IT Earthing types
 Electric shock requirements
 Loop impedance & current calculation
 Touch voltage calculation & evaluation
 Consider resistance to Ground/Earth
 GFCI/RCCB protection
 Reports in Crystal Reports & Excel
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
13
Enhanced Elements

Induction Machine
 PF & EFF at no-load & over-load conditions
 Locked-Rotor current based on NEMA MG1 Code Letter
 Option to calculate Xd” & Xd’ based on machine time constant

Transformer
 Open-Delta transformer
 Three 1-phase transformer
 MVA rating based on first & second stage cooling
 Option to display Vector Group

Uninterruptable Power Supply - UPS


 Parallel UPS connection modeling
 Option to control input PF
 Bypass switch modeling

Wind Turbine Generator - WTG


 WTG Manufacturer / Model library
 New WTG & control models for WECC type 1, 2, 3, & 4

Enhanced Modules

Multi-Dimension Database
 Lock & unlock element properties
 16 States to track equipment conditions
 Local SQL server connectivity

Data Exchange - DataX


 Bi-directional Excel data exchange
 Load Ticket for induction machines
 ArcGIS handling of 1-phase systems
 PSS/E Raw data import
 ETAP-SPEL interface

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
14
Theme Manager
 Display color coding based on:
- User-defined
- Voltage level
- Area
- Grounding (Solid, Low-Z, High-Z, Un-Grounded)
- Earthing (TT, TN, IT, NEC, earthing elements)
 Display faulted buses by symbol or color

Protective Device Coordination - Star


 Automatic detection of protection zones
 Automatic selection of coordination paths
 Protection & coordination zone viewer
 Combine / Integrate multiple device curves
 Ground & Neutral conductors damage curves
 Cumulative Transformer Inrush current
 Enhanced Plot Options

AC Arc Flash Analysis


 Sequence-of-Operation viewer
 Primary protective device identified
 Current Limiting Fuse (CLF) modeling based on:
- IEEE 1584 equations (Class L & RK1)
- Peak let-through curves
- TCC Curve method
 LV transformer arc flash limit based on impedance, voltage & current
 Incident Energy plots for Ia & Ibf
 Enhanced display of results on the one-line diagram

DC Arc Flash Analysis


• DC arc flash calculation based on:
– Maximum Power
– Stokes & Oppenlander
– Paukert
• Arc Flash Result Analyzer
• Arc Flash labels
• Incident Energy plots

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
15
Underground Raceway System
 Intelligent rule-based alignment & spacing tools
 Automatic conduit distribution & spacing
 Uniform & non-uniform conduit arrangements
 Utilize custom, NEC, or standard IEEE rule-based spacing
 Wizard for creating raceways based on rule-book

Cable System
 Cable Library with neutral, grounding/ protective conductor (PE)
 Add auxiliary neutral & PE conductors to cables
 Damage curve for neutral & PE conductors

Cable Ampacity & Sizing - IEEE/NEC


 IEEE 399, NEC 70, ICEA P54
 Cable sizing based on maximum or average phase operating current
 Ampacity & sizing reports in Crystal Reports & Excel
 Grounding conductor selection based on NEC
 Cable ampacity & sizing for U/G installation based on NEC

Cable Ampacity & Sizing - IEC/BS


 BS 7671, IEC 60364-5-52, IEC 60364-4-43
 Model Forms: BS & user-definable
 Cable sizing based on harmonic effect
 Typical overcurrent device curves
 Cable sizing based on maximum or average phase operating current
 Ampacity & sizing reports in Crystal Reports & Excel

Load Flow
 Auto-Run load flow based on system changes
 New toolbar to change & display result units
 Report voltage in %, kV, V
 Report power in MVA, kVA
 Isolated 1-phase source modeling

Unbalanced Load Flow


 Report voltage & power in multi-units
 Open-Delta transformer modeling
 Center-Tap transformer modeling
 Three 1-phase transformer modeling
 Isolated sub-systems with Voltage-Control source modeling
 Isolated 1-phase source & system modeling
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
16
Motor Acceleration
 VFD frequency control for motor starting
 User-defined frequency and Volt/Hz as functions of time
 Simulate voltage-boost effect at low frequency during starting
 Motor acceleration with VFD & soft starter

Harmonics
 VFD harmonic modeling
 Calculate & report I*TB (Balanced) & I*TR (Residual)
 UPS AC input & output modeling for harmonic orders
 PV Array modeling for harmonic orders

Transient Stability
 Lumped Load user-defined dynamic modeling
 New built-in IEEE standard exciters:
- AC2A, AC7B, DC4B, ST1A, ST2A
 VFD dynamic modeling:
- Rectifier, DC link, & inverter models
- Voltage & frequency control models
 - Frequency control acceleration & operation
 UPS parallel operation modeling
 PV Array source modeling
 Inverter source modeling

Power System Monitoring & Simulation


 Generation reserve monitoring
 Multi-state breaker monitoring & control
 Large system handling optimization
 EPICS interface

Event Playback
 Playback of event views
 Historical alarm database

Intelligent Fast Load Shedding


 System islanding generator logic
 VFD load reduction control
 Automatic generation of transient study cases

Interchange Transaction Scheduling


THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
17
 Transaction reports
 Fuel cost schedule reports

Real-Time

OPC Unified Architecture - UA Server


 Monitoring Console communication via WAN
 Thin client application
 Secured access control
 Interface to OPC UA & DA clients

Monitoring & Control Templates


 Thin client application for monitoring & control
 Customizable Web-based interfaces & technology
 Human Machine Interface (HMI) template library
 Web-based customizable HMI:
- SCADA views
- WPF dashboards
- Trending & forecasting
- Alarms & warnings
- Control & supervision
- Energy consumption monitoring
- Reporting & logging
- Geographical monitoring view

Command & Control


 Remote control - enable & disable commands
 Control inhibition based on system operational constraints
 Control inhibition based on switching operations

Data Center Power Management


 Power Panel monitoring
 Parallel UPS operation
 CO2 & energy management system
 PDU monitoring & control templates

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
18
Library Additions
The following devices were added to the ETAP 11.0 library.

Device Type Manufacturer Model


Relay Cutler-Hammer E777
E777-LR
E777-LR (CT)
GE Multilin IAC-11A
IAC-11B
IAC-11C
IAC-11D
IAC-11E
IAC-11F
IAC-11H
IAC-12A
IAC-12B
IAC-12C
IAC-12D
GE Multilin 350
GE Multilin 745
Schweitzer 421
GE Multilin 345
GE Multilin 339
Square-D Sepam Series 40
Merlin Gerin Sepam 40
ABB REF 601
GE Multilin BGFL
Federal Pioneer TLR-3
ABB RADHA
Eaton EDR-5000
Eaton EDR-4000
ABB PCD
Siemens 7SJ62
Siemens 7SJ64
Siemens 7SJ600
Siemens 7SJ602
Eaton EDR-3000
Mitsubishi CMP2 - A02D2
Mitsubishi CMP1 - A02D1
Mitsubishi CMP1 - A02D2
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
19
Device Type Manufacturer Model
Relay Cutler-Hammer FP-6000
Cutler-Hammer MD-3000
Cutler-Hammer IQ-500
Cutler-Hammer DP-300
Schweitzer 700G
Siemens 7SR11
Siemens 7SR12
GE Multilin C70
Siemens 7SJ80
Siemens 7SK80
Siemens 7UM61
Siemens 7UM62
Eaton EMR-3000
Eaton ETR-3000
GE Multilin M60 (5.x)
Startco Engineering
Ltd. SE-125
CEE Relays DTM 7033
CEE Relays ITG 7011
CEE Relays ITG 7111
CEE Relays ITH 7111
CEE Relays ITH 7521
Siemens 7SD52/53
Basler Electric BE1-11f
BE1-11i
BE1-11g
BE1-11m
Siemens 7SJ511
Square-D Motor Logic (Class 9065)
Schweitzer 300G
300G (R328)
Eaton C440
C440 (CT)
XTOE
XTOE (CT)
Eaton EMR-4000
EGR-4000
Schweitzer 751
Eaton C441
C441 (CT)
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
20
Device Type Manufacturer Model
Allen Bradley 825 SMM
Device Type Manufacturer Model
Relay Allen Bradley 825 SMM (CT)
Beckwith M-3310
Beckwith M-3311
Beckwith M-3311A

LVCB + trip
USD-6
unit Federal Pioneer
USD-20
USR
BS 7671 RCD (General Non-Delay)
RCD (Delay'S')
ABB Ekip I (XT4)
Ekip LS/I (XT4)
Ekip LSI (Electronic XT4)
Ekip LSI (Manual XT4)
Ekip LSIG (Electronic XT4)
Ekip LSIG (Manual XT4)
Ekip I (X2)
Ekip LS/I (XT2)
Ekip LSI (Electronic XT2)
Ekip LSI (Manual XT2)
Ekip LSIG (Electronic XT2)
Ekip LSIG (Manual XT2)
Ekip G-LS/I (XT2)
Ekip G-LS/I (XT4)
Ekip G-LS/I (XT2)
Ekip G-LS/I (XT4)
XT1 16-63A TMD
XT1 80-160A TMD
XT2 160 TMA
XT2 160 TMG
XT3 250 TMD
XT3 250 TMG
XT4 250 TMA
S 700 E
S 700 K(16-50A)
S 700 K(63-100A)
S800-B, C, D
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
21
Device Type Manufacturer Model
S800-B, C, D
S800-B, C, D
S800-B, C, D
LVCB + trip
unit S800-B, C, D
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S800-B, C, D, K, KM, UCB, UCK
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
S 200-B, C, D, K, Z (AC, DC)
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T2 160-TMD, T2 160-TMD(125A), T2 160-TMD(160A), T2 160-
TMG
T3 250-TMD, T3 250-TMG
T3 250-TMD, T3 250-TMG

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
22
System Requirements

Operating System (32-bit or 64-bit)


Microsoft® Windows® 7 (Home Premium, Professional, Ultimate) (SP 1)
Microsoft Windows Vista (Home Premium, Business, Enterprise) (SP 2)
Microsoft Windows XP (SP 3) Professional or Home Edition
Microsoft Server 2008
Microsoft Server 2008 R2
Microsoft Server 2003 (SP 2)
Microsoft Server 2003 R2 (SP 2)

Other Software Requirements


Internet Explorer 5.01 or higher (or minimum version level as specified by the Operating System in use)
Microsoft .NET Framework v3.5 (SP 1)
Microsoft SQL Server Compact 3.5 (SP1)

PC Configuration Requirements
USB port (if stand-alone licensing required)
Ethernet port w/ network access (if network licensing required)
DVD Drive
10 to 80 GB hard disk space (based on project size, number of buses)
19" monitors recommended (dual monitors highly recommended)
Recommended display resolution -1280 X 1024

Recommended Hardware Requirements

100 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
2 GB of RAM

500 Bus Projects


Intel Dual/Quad core – 2.0 GHz or better (or equivalent)
4 GB of RAM

1,000 Bus Projects


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading Technology with high speed bus (or equivalent)
8 GB of RAM (high-speed)
64-bit Operating System

10,000 Bus Projects and Higher


Intel Dual/Quad core – 3.0 GHz with Hyper-Threading with high speed system bus (or equivalent)
12 GB RAM - (high-speed)
64-bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
23
ETAP 7.5.2

March 2011

The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.5.2 release. ETAP
7.5.2 is a complete program and does not require any previous ETAP installation.

This point release expands on the current release by offering multiple language support. ETAP 7.5.2 is
completely localized in four languages plus translated output reports in six languages.
Starting with ETAP 7.5.2, ETAP will utilize the ETAP 1600-USB Security key. Please contact sales at
[email protected] or 949-900-1000 for any key replacement. Please note ETAP will no longer support the
black parallel keys and the blue USB-1410 keys.

The first time you run ETAP 7.5.2, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.5.2 installation DVD.

The latest edition of ETAP provides the following new enhancements:

Enhanced

• Exciters AC1, AC2, AC3, AC1A, AC8B and ST2


• Enhanced protective device libraries
• Enhanced PDE Components
• Enhanced Localized Chinese, Spanish and Japanese ETAP versions

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
24
ETAP 7.5.0
June 2010

The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.5.0 release. ETAP
7.5.0 is a complete program and does not require any previous ETAP installation.

This point release expands on the current release by offering multiple language support. ETAP 7.5.0 is
completely localized in four languages plus translated output reports in six languages.

The first time you run ETAP 7.5.0, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.5.0 installation DVD.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
25
Library Additions
The following devices were added to the ETAP 7.5.0 library for protective device coordination.

Device Type Manufacturer Model


Allen Bradley 193-EA, 193-ES
Basler Electric BE1-51 (1976), BE1-51/27 (1976)
Comeca Gemstart 5, Gemstart 5 (CT)
Relays
L&T MC31A
Schweitzer 710 (R304)
Solcon MPS 3000

Thermal General Electric


V-Line B, V-Line B (1P), V-Line B (2, 3P), V-Line C, V-
Magnetic Trip Line C (1P), V-Line C (2, 3P), V-Line D
Units (TM) Siemens 525 (MG Frame)

Bussman Cable Limiters-K Series, FRS-R (10/02)


Cooper Isolation Link , LCL
Fuse
Gould Shawmut (Ferraz) HSRK
Littelfuse LDC

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
26
System Requirements
Operating System (32-bit or 64-bit)
 Microsoft® Windows® 7 (Home Premium, Professional, Ultimate)
 Microsoft® Windows Vista® (SP1) (Home Premium, Business, Enterprise)
 Microsoft® Windows® XP (SP3) (Professional or Home Edition)
 Microsoft® Server 2008 (SP2)
 Microsoft® Server 2003 R2 (SP2), Microsoft Server 2003 (SP2)

Software Requirements
 Microsoft® Internet Explorer® 5.01 or higher
(or minimum version level as specified by the operating system in use)
 Microsoft® .NET Framework v1.1 (SP1)
 Microsoft® .NET Framework v2.0 (SP1)

Hardware Requirements
 USB port (for stand-alone license)
 Ethernet port with network access (for network license)
 DVD drive
 10 to 80 GB hard disk space (based on project size, number of buses)
Note: An additional 5 GB may be required if additional language support is installed
 19” monitors recommended (dual monitors highly recommended)
 Minimum display resolution - 1024x768

Recommended Hardware

100 Bus Projects


 Intel® dual/quad core - 2.0 GHz (or equivalent)
 2 GB RAM

500 Bus Projects


 Intel® dual/quad core - 2.0 GHz (or equivalent)
 4 GB RAM

1,000 Bus Projects


 Intel® dual/quad core - 3.0 GHz with hyper-threading with high speed bus (or equivalent)
 8 GB RAM (high speed)
 64-bit operating system

10,000 Bus Projects and Higher


 Intel® dual/quad core - 3.0 GHz with hyper-threading with high speed bus (or equivalent)
 12 GB RAM (high speed)
 64-bit operating system

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2010 BY OPERATION TECHNOLOGY, INC.
27
ETAP 7.1.0
November 2009

The OTI Research & Development Team is pleased to offer you the enclosed ETAP 7.1.0 release. ETAP
7.1.0 is a complete program and does not require any previous ETAP installation.

This point release is the latest in ETAP 7.0 series that delivers new design and analysis innovations and
carries ETAP to a new level of advancement. ETAP 7.1.0 provides the platform upon which future ETAP
innovations will follow. We recommend that you utilize this latest release in order to take advantage of
the new features and capabilities.

The first time you run ETAP 7.1.0, you will need to enter the 36-Digit Activation Code as provided on
the back cover of the ETAP 7.1.0 installation DVD.

For more information on this new release, please take a few moments to review the information below.

New Features
 IEC Cable Sizing (IEC 60364-4-43)
 IEC Cable Ampacity (IEC 60364-5-52)
 Arc Flash Custom Labels

Enhanced Modules
 Short Circuit
 Arc Flash Analysis
 Transient Stability
 Data Exchange
 Control System Diagram
 Underground Thermal Analysis

Enhanced Libraries
 HVCB
 Relay
 LVCB
 LVSST
 Fuse
 Thermal Magnetic
 Harmonics
 Recloser

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
1
New Features
Arc Flash Custom Labels
Many labels need to be customized according to different regulations or preferences (i.e., CSAZ462,
NFPA 70E, NEC, ANSI Z535, etc.). ETAP 7.1.0 brings the capability to create and print custom arc flash
labels based on different standards and safety requirements. Custom arc flash label templates can be
generated using Microsoft Word® and linked to a Microsoft Excel® spreadsheet database to populate the
label template with results from the arc flash calculation. Utilizing standard tools like Microsoft Excel and
Word allows you to have greater flexibility in customizing labels for your facility in compliance with
safety standards.

IEC Cable Ampacity – IEC 60364-5-52


The IEC cable ampacity calculations were added to allow the sizing process of cables per IEC 60364
(Low voltage electrical installations - Part 5-52: Selection and erection of electrical equipment - Wiring
systems) for additional cable installation types, such as open / ventilated channels, wire mesh, architrave /
window frame, and masonry.

IEC Cable Sizing – IEC 60364-4-43


Cable sizing based on IEC 60364-4-43 (Low-voltage electrical installations - Part 4-43: Protection for
safety - Protection against overcurrent) has been added to the list of sizing standards supported by ETAP.
IEC 60364-4-43 provides rules and regulations for inspecting and installing cables in electrical systems.
Other guidelines like BS 7671 follow this new guideline closely, but with some differences.

Enhanced Modules
Short Circuit
The ETAP Short Circuit module has been enhanced to check the fused and un-fused low voltage circuit
breaker rated kV per ANSI C37.11/ UL489 (Standard Requirements for Electrical Control for AC High
Voltage Breakers Rated on a Symmetrical Basis). This enhancement allows you to easily verify that the
correct voltage rating is used for your application.

Transient Stability
ETAP frequency-dependent modeling option for system component such as subtransient synchronous
machines, induction machines (single- and double-cage) and networks are now included as a standard
feature of the transient stability module. In the past, this option was available only with the purchase of
Generator Start-Up module.

Open Format Excel


ETAP Open Format is used to import data from custom Microsoft Excel® load lists / tabulations to
ETAP. Additional intelligence has been added to automatically handle blank rows, duplicate columns,
etc. Open format also detects if a single voltage value has been included in the load list and can
automatically consider that voltage for the bus and connected equipment.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
2
SmartPlant Electrical Interface
The ETAP-SPEL Data Exchange Interface provides data synchronization between ETAP and Intergraph’s
SmartPlant Electrical (SPEL). In addition to bringing in a list of new connections, ETAP now provides a
list of modified connections based on changes being made in SPEL.

Control System Diagram (CSD)


ETAP has been enhanced to utilize the lower voltage value between two points in a voltage plot profile to
pass to CSD to allow for more conservative results.

Underground Thermal Analysis


Additional materials have been added to existing cable layers in the ETAP cable editor and library. These
additional materials include new cable armor, sheath and concentric wire options. These new materials
are considered by Underground Thermal Analysis. Sheath/Armor options now include all of the following
types:

Sheath/Armor Type
None St Armor/45dg/20w St Armor/45dg/80w Cu Concentric Wire
Lead Sheath St Armor/45dg/25w St Armor/45dg/90w Al Concentric Wire
Aluminum Sheath St Armor/45dg/30w St Armor/45dg/100w Copper Sheath
St Armor/30dg/15w St Armor/45dg/40w St Armor/45dg/9999w
St Armor/30dg/20w St Armor/45dg/50w Copper Armor
St Armor/30dg/25w St Armor/45dg/60w Steel Armor
St Armor/45dg/15w St Armor/45dg/70w Aluminum Armor

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
3
Library Additions
The following devices were added to the ETAP 7.1.0 library for protective device coordination and
harmonic analysis.

Device Type Manufacturer Model


F-122,F-124-A, F-100, B-20-B, B-22-B, B-28-B, O-111-
A, O-22-B, O-44-C, 150-CAF-500, 150-CA-1000, 150-
High Voltage CA-1500, 150-CA-2500, 345-CAF-500, 345-CA-1500,
345-CA-2500, 690-CA-3500, 690-CA-5000, F022B, 144-
Circuit
Westinghouse G-100, 144-G-250, 144-G-1000, 144-G-1500, 230-G-250,
Breaker 230-G-500, 345-G-500, 345-G-1000, 345-G-1500, 345-G-
(HVCB) 2500, 460-G-500, 460-G-1500, 690-G-1000, 690-G-1500,
690-G-2500, 690-GM-5000, 2300-GW-5000, GO-5-A,
GM-6-A, GM-6, GM-3, GM-5, GM-7, GM-5

HU, HU-1, HU-4, RADSS, COM, MICRO-51/FT,


ABB
RADSS. RET 541, RET 543, RET 545, CO-4
ALSTOM CAG12C, CAG14, CAG34, CAG12
P341, CAG12C, CAG14, CAG34, CTIGM15, CTUM15,
Areva
CAG12
Basler Electric BE1-51A
Cutler-Hammer DT-3000, C396
BDD15B, BDD16B, BDD17B, BDD18B, BDD19B,
GE Multlin
BDD20B, MIB
GEC CAG14, CAG34
Relays Mitsubishi CMP1-A02D1/2, CMP1-A02D2
ZB12-0,16, ZB12-0,24, ZB12-0,4, ZB12-0,6, ZB12-1,
ZB12-1,6, ZB122,4, ZB12-4, ZB12-6, ZB12-10, ZB12-
Moeller 12, ZB12-16, ZB32-0,16, ZB32-0,24, ZB32-0,4, ZB32-
0,6, ZB32-1, ZB32-1,6, ZB322,4, ZB32-4, ZB32-6,
ZB32-10, ZB32-16, ZB32-24, ZB32-32
Schneider Electric Sepam Series 10
Siemens 7SJ531
Telemecanique LR2 k
Thytronic NA10, NA60, SCK

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
4
Device Type Manufacturer Model
Allen-Bradley 1492-GH
LH, LHB-240V, LHB-600V, LS, LSB-240V, LSB-
Cutler-Hammer
600V, FH-6, FS-2, FS-4, FS-6, JH, JS
General Electric EGF, EGH, EGS, EGX
HBE (31 models), HBH (15 models), HBL (30
models), HBS (28 models), HBX (5Models), HBD (6
Hyundai models), HBE (34 models), HBH (15 models), HBL
Low Voltage (30 models), HBS (28 models), HBX (5Models), HBD
(4 models), HBE (22 models), HBH (12 models), HBL
Circuit Breaker (30 models), HBS (19 models), HBX (5Models)
(LVCB) Merlin Gerin C60H, C60L, C60N, CJ 400H, CJ 400L, CJ 400N
NV250-CW, NV250-SW, NV400-CW, NV400-SW,
Mitsubishi
NV630-CW, NV630-SW
NJG, HJG, LJG, NLG, HLG, LLG, NFG, HFG, LFG,
NDG, HDG, LDG, 3RV13 21 (0.16-12.5A), 3RV13 21
Siemens
(16-25A), 3RV13 31, 3RV13 41 (16-75A), 3RV13 41
(90-100A), 3RV13 42 (16-75A), 3RV13 42 (90-100A)
Square D QO, QO-VH

Allen-Bradley 1492-GH

Cutler-Hammer LHE, LLE, LSE, FH, FS, JH, JS


C60N/H - D curve (IEC), C60N/H/L - C curve (IEC),
Thermal Merlin Gerin
CJ 400
Magnetic (TM) NV250, NV250, NV400-CW, NV400-SW, NV630,
Mitsubishi
Trip Units NV630
JG, LG, FG, DG, 3RV1321, 3RV1331, 3RV1341,
Siemens
3RV1342
Square D QO, QO-VH

Low Voltage ABB SACE PR112 (IEC)


Solid State Trip
(LVSST) General Electric Entelliguard

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
5
Device Type Manufacturer Model
Electronic Vista (15.5kV), Vista (27kV), Vista (38kV), Vista
S&C Electric Company
Reclosers (12kV), Vista (24kV), Vista (36kV)
Vista (E Speed), Vista (K Speed), Vista (Main
Electronic
S&C Electric Company Interrupter), Vista (SEL Relay Curves), Vista (Tap
Controller Interrupter)

Device Type Manufacturer Model


LPJ_SP (05/02), KRP-CL, LPJ_SP, SC, 155GXQSJD,
Bussmann 175GDMSJD, 175GFMSJD, 175GXMSJD,
175GXQSJD
Cooper Bay-O-Net (240-46)
Delle FD 3, FD 3M, FD 4, FD 5, FD 6, FD 7, FLR 6
SDSLJ, SFLSJ, WKMSJ, SDMSJ, SFMSJ, SKMSJ,
Edison
CDSC, CDNC, KOS , KON, PONC, JDL
Fuji HF-337, HF-337E, HF-338B, HF-338E, JR-30, SCF-6
Fuse
Gould Shawmut A60X
NH000 - M000gG, NH00 - M00gG, NH1 - M1gG,
Juan Muller
NH2 - M2gG, NH3 - M3gG, NH4a - M4agG
Kearney Dual Element (DEWL)
Littelfuse KLPC, E-Rated Medium Voltage
Siemens 3GD
Std. DIN VDE 0636-2 gG

Library Type Manufacturer Model


Rockwell (Current Source) PWM Rect
G2/3P-FL_LL
G2/3P-FL_LN
G2/3P-NL_LL
Harmonic G2/3P-NL_LN
Typical (Voltage Source)
G5/6P-FL_LL
G5/6P-FL_LN
G5/6P-NL_LL
G5/6P-NL_LN

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
6
System Requirements
Operating System (32-bit or 64-bit)
Microsoft® Windows® 7 (Professional, Ultimate)
Microsoft® Windows Vista® (SP1) (Home Premium, Business, Enterprise)
Microsoft® Windows® XP (SP3) (Professional or Home Edition)
Microsoft® Server 2008 (SP2)
Microsoft® Server 2003 R2 (SP2), Microsoft Server 2003 (SP2)

Software Requirements
Microsoft® Internet Explorer® 5.01 or higher
(or minimum version level as specified by the operating system in use)
Microsoft® .NET Framework v1.1 (SP1)
Microsoft® .NET Framework v2.0 (SP1)

Hardware Requirements
USB port (for stand-alone license)
Ethernet port with network access (for network license)
DVD drive
5 to 80 GB hard disk space (based on project size, number of buses)
19” monitors recommended (dual monitors highly recommended)
Minimum display resolution - 1024x768

Recommended Hardware

100 Bus Projects


Intel® dual/quad core - 2.0 GHz (or equivalent)
2 GB RAM

500 Bus Projects


Intel® dual/quad core - 2.0 GHz (or equivalent)
4 GB RAM

1,000 Bus Projects


Intel® dual/quad core - 3.0 GHz with hyper-threading with high speed bus (or equivalent)
8 GB RAM (high speed)
64-bit operating system

10,000 Bus Projects and Higher


Intel® dual/quad core - 3.0 GHz with hyper-threading with high speed bus (or equivalent)
12 GB RAM (high speed)
64-bit operating system

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
7
ETAP 7.0.0
May 2009

The OTI Development Team is pleased to provide you with the enclosed ETAP 7.0.0 release. ETAP 7.0.0
is a complete program and does not require any previous ETAP installation.

ETAP 7.0.0 is a major r elease that d elivers new design and analy sis innovation to a new level of
advancement and provide s the plat form upon which future ETAP innovatio n will follow. This version
adds new powerful analy sis m odules and tim e-saving capabilities to the ETAP Suite. The new
enhancements and analy sis modules are still develo ped with mathematical precision using our Qualit y
Assured Verification and Validation Procedure.

The first time you run ET AP 7.0.0, you will need t o enter the 36-Digit Activation Code as provided on
the ETAP 7.0.0 installation DVD.

For more information on this new release, please take a few moments to review the information below.

New Features Enhanced Modules


ƒ Arc Flash Analyzer ƒ Base Package
ƒ Arc Flash Work Permit ƒ Load Flow
ƒ Arc Flash Data Sheet ƒ Short-Circuit
ƒ One-Line Templates ƒ Arc Flash Analysis
ƒ Auto-Select ƒ Transient Stability
ƒ Symbol Library ƒ Harmonics
ƒ Keyboard Shortcuts ƒ Star Device Coordination/Selectivity
ƒ Star Sequence of Operation
New Analysis Modules ƒ Data Exchange
ƒ Load Analyzer
ƒ Single-Phase Arc Flash Enhanced Libraries
ƒ Solid State Trip Devices
Enhanced Elements ƒ Cable
ƒ Solid State Trip Devices ƒ Transmission Line
ƒ Relay
ƒ Battery

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
1
1. One-Line Diagram

Templates
This upgrade provides the abilit y to cr eate and recall unlimited graphical tem plates. Create tem plate
versions of common electrical network confi gurations such as breaker-and-a-half, d ouble-ended
substation, and spot network. Utilize templates to quickly construct an entire electrical network faster than
ever before with a single click. Creat e new online diagra m te mplates or sel ect fro m more 40 pre-built
ANSI and IEC templates.

Features
• Create & Utilize unlimited one-line templates
• Share templates created by other ETAP engineers
• Use default project ID or template ID
• Use properties from default project or template
• Instant preview of templates

Auto Select
One of the new innovations to the On e-Line Diagram is the inclusion of the Graphical Auto Selection
tool. Graphical Auto Selection pr ovides the capability to move the associ ated components with a si mple
mouse strok e (shortcut Alt+Click). For exam ple, selecting a Motor Control Center (MCC) bus
automatically select s the l oads and protective device s connected to that bus. These relat ed elements ar e
automatically grouped for quicker one-line layouts.

Features
• Intelligent load & feeder selection designed for electrical systems
• Works with bus, branch, loads, & protective devices
• Auto-grouping & ungrouping

Symbol Library
Substitute default one-line diagram sy mbols with an alternative symbol set for indivi dual device ty pes.
Need a SCADA look for your circuit breakers? Launch the symbol substitution tool and swap symbol sets
with the press of a button. Sy mbol substitution allow s you to store and recall the default sy mbols at any
point in time.

Features
• Instant preview of alternative symbols
• Instantly create a new look on the one-line diagram
• New SCADA and IEC standard symbols

Keyboard Shortcuts
ETAP 7.0 in cludes a large array of k eyboard shor tcuts, which saves ti me a nd effort in creating and
editing.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
2
2. Arc Flash
ETAP 7.0 brings you new and enhanced capabilities which allow for faster and easier perfor mance of arc
flash hazard analysis. Identify and analy ze high risk arc flash areas in your electrical system with greater
flexibility by simulating various incident energy mitigation methods. Arc Flash is a co mpletely integrated
module that solves multiple scenarios to determine worst case incident energy levels and it also produces
professional reports and high quality arc flash labels at a press of a button.

Features
• Automatic consideration of generator AC decay & decrement curve
• AC motor short-circuit current decay handling
• Time varying fault clearing time calculation short-circuit current decay
• Arc flash calculations for 3-phase & 1-phase panel / UPS systems
• Radial & multiple source system handling
• Extended search beyond the point of multiple upstream source
• Automatic or User-defined source protective device search algorithm option
• Modeling of differential relays, maintenance mode switches, & arc flash photo-sensors
• Zone Selective Interlock Protection (ZSIP) representation
• Three phase and single phase systems
• User-Interface for defining hazard categories (NFPA 70E 2000, 2004, & 2009) or customize
based on your safety program requirements
• Generate IEEE 1584 & NFPA 70E l ook-up tabl e results for different working distances &
generate simple summary reports to communicate the results to personnel
• Alerts for PPE ATPV rating violations (maximum allowable PPE arc rating alerts)
• Find the safest mode of operation for maintenance work
• Automatically batch print arc flash lab els based on highest incident energy from all operating
modes

NFPA 2009 Standard


ETAP gives the option of defining your own user-defined categories or to use categories defined
by NFPA 70E-2000, 2004 and now the new 2009 standard.

Single-Phase Arc Flash Calculations


In addition to 3-phase systems, ETAP 7.0 allows you to perform arc flash calculations for 1-phase panel /
UPS systems.

Arc Flash Result Analyzer


The Arc Flash Result Analy zer is a time-saving tool that allows you to com pare and analy ze different
reports coming from different projects, within the s ame directory, in a single displa y. You can co mpare
the results of general info rmation abou t the project or m ore spe cific informa tion such as the results
contained from buses, protective devices, or load terminals in an arc flash study.

Features
• Sort results from different studies by multiple criteria
• Find the worst-case incident energy results
• Quickly isolate & identify arc flash mis-coordination
• Find which protective devices failed to operate

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
3
• Filter out & analyze only the higher hazard category results
• Filter out all equipment with % Ia variation problems
• Locate slow responding protective devices
• Export customized arc flash results to Excel reports
• Analyze the results in Metric or English units
• Color code & filter results by category

Work Permits
According to NFPA 70E guidelines, permits are required when performing work on energized equipment.
Work permits include shock hazard and arc flash anal ysis results. The work permit needs to be generated
or individual bus arc flash results in addition to other pertinent information.

Data Sheets
The Data Sh eet is an enh anced version of the arc flash analy sis report. It gives detailed description of
what selectio ns were made in the Short Circuit st udy case and how the bus results were o btained. Data
sheets can be customized to communicate arc flash study parameters.

Arc Flash Labels


ETAP has a wide variety of professional quality arc flash labels in multiple languages including English,
Spanish, Portuguese, and now French. Automatically batch print arc flash labels based on highest incident
energy from all operating modes.

Motor Contribution and Low Voltage equipment handling


ETAP makes it easier to specify consi derations that should be a pplied t o low voltage equi pment like
motors and transformers based on NFPA 70E 2009 & IEEE 1584.

Features
• Consider motor fault current decay during the arc flash calculation
• Automatically exclude small motor contributions entirely from the simulation
• Automatically identify and exclude transformers with relatively low voltage and kVA
• Assign a hazard category to these types of equipments automatically based on fault current ranges

Global Data Entry


Speed up data entry for your arc flash projects by globally apply ing arc flash analy sis da ta based o n
equipment type and voltage rating.

Features
• Global definition of arc flash analy sis data eliminates the need to specify this information in each
bus
• Global defini tion of work ing distance, bus gaps , ap proach bou ndaries, and voltage-rated glove
classes
• Specify Arc Flash Analysis Data based on IEEE 1584 2002 or user-defined values
• Globally select Shock Hazard Analy sis Data ba sed on NFPA 7 0E 2004 , 20 09 or user-defined
settings
• Globally change the class settings given by ASTM D 120-02a Standard for voltage-rated
protective gloves
• Updates can be made globally wit hout havi ng to modify each bus editor indivi dually

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
4
3. ETAP Star
ETAP 7.0 includes an ext ensive list of enhancements for the ET AP Star module. Using these ne w user-
oriented capabilities, the process of design and ev aluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with new short circuit fault
types: Line-to-Line, Line-to-Line-to-Ground in addition to 3-phase and Line-to-Ground.

Sequence of Operation
Star Sequence-of-Operati on evaluates, verifies, and confirm s the operation and selectivit y of th e
protective devices for vari ous types of faults for a ny location directly from the one-line diagra m and vi a
normalized TCC curve views. Sequence-of-Operation provides a system wide solution for an accurate and
realistic oper ating time an d state of protective devices, such as relay , fuse, circuit breaker, trip devices,
contactor, etc. The operati on time is calculated fo r each protect ive device b ased on its settings, ti me
current chara cteristic, and interlocks for a specifi ed fault location and ty pe. ETAP 7.0 enhances thi s
invaluable tool by including Line-to-Line and Li ne-to-Line-to-Ground Drag-and-Drop Faults in addition
to 3-Phase and Line-to-Ground Faults.

Device Settings Report


Star Device Coordination Report Man ager provide s comprehensive and custom izable device settings
reports. The manager allo ws y ou to preview and prin t the pro tective device settings data, using Cr ystal
Reports format or Microsoft Excel format.

Panel System Protective Device


ETAP 7.0 provides the capabilit y to pl ot the tim e-current curves for the main disconnect circuit breaker
and fuse as well as the branch circuit protective device curves.

Relay Current Summation


Relay element includes a new feature for summing flows through current transformers that can be utilized
in arc flash evaluation and sequence-of-operation analysis. Similar to the differential relay, the summation
function sums up the short circuit contribution vector s through the connected CTs according to the CT’s
polarity and the direction of current flow.

Features
• Partial Differential Relay Modeling
• Ring-Bus Protection
• Multiple Source Systems Protection

Relay Test Set Interface


In addition t o ARTTS-6 relay hardware test set interface, ETA P Star now provides an interface to
Megger MPRT Protective Relay Test System via AVTS software.
®

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
5
4. Data Exchange
ETAP Data Exchange is used to import, export, and sy nchronize data between external data sources and
ETAP. DataX provides many utilities including:

• Legacy data transformation into ETAP


• Interface with external architecture databases
• Customizable data mapping
• Intelligent error checking
• Automatic one-line diagram generation

DataX includes several new conversion programs that allow for conversion of third party electrical power
system databases to ETAP. The conversion program will automatically generate a multi-layered graphical
one-line diagram. A list of available conversion programs are available upon request.

SmartPlant Electrical Interface


The ETAP-SPEL Data Exchange Interface provides data synchronization between ETAP and Intergraph’s
SmartPlant Electrical (SPEL). This bidirectional inte rface allows joint users t o utilize ETAP for design,
analysis and automation, and then i ntegrate that da ta into SPEL t o increase el ectrical efficiency for t he
construction, operation, and maintenance for the life cycle of the plant.

• Import data from a SPEL published XML file


• Export date into a XML file for SPEL importing
• Import cable library data from a SPEL exported MS database
• Export cable library data to a MS database for SPEL importing
• Data mapping between SPEL equipments and ETAP element
• Synchronization of the ETAP cable library with the SPEL cable reference

The SPEL XML file cont ains the electrical data for equipment and connectivity information in the SPEL
project. The ETAP data exchange interface uses information available in SPEL to add, modify, and delete
elements. The interface not onl y auto creates one-line diagrams, it also facilitat es multiple data transfers
(synchronization) between ETAP and SPEL. As a resu lt, data in ETAP and SPEL are kept consistent
without going through the time-cons uming manual process of recording additions and modifications i n
both systems.

The ETAP-SPEL cable library data synchronization is bridged by a Microsoft Access database. Users can
import or export ETAP project cable l ibrary data into or from the Microsoft Access database using the
ETAP Lib Utility. Through the SPEL Lib Utility, users can also export or import cable library data into or
from the Microsoft Access database.

Open Format Excel DataX


Import from an Excel spreadsheet with any input data, layout, format, & field names
• Sync Motor
• Induction Motor
• Lumped Load
• Static Load
• 2-Winding Transformer
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
6
• Cable
• Bus
Intelligent equipment mapping
• Recognize the type of the equipment upfront
• Map equipments as new or existing
Customizable equipment mapping
• Change the default mapping for equipment already mapped
• Skip importing selective equipment in the user-interface
Customizable data mapping
• Change the equipment data mapping in the mapping table
Customizable logic for data dictionary
• Recognize input data based on the default logic provided in XML file
• Add customized logic to the default logic in the XML file for more import flexibility
Add customized captions and headers to the spreadsheet

5. Load Analyzer
The Load A nalyzer m odule is design ed as a genera lized load list to report load schedul es for power
system co mponents such as switchgear , MCC, transformer s, cabl es, lines, panels, etc. Diff erent reports
provide informative data regarding all loads connected downstream to the equipment. Load Analy zer is
an invaluable tool during the design / planning pha se as w ell as analy zing e xisting electrical sy stems
because running sy stem studies like load flow analy sis may not be possible d ue to inco mplete one-line
diagram or data.

Load Analyzer Reports


• Bus Feeder Loading
• Bus Loading Summary
• Equipment Loading
• Equipment Load List
• Loading Schedule
• Cable Schedule
• Transformer Schedule

6. Enhanced Elements

Low Voltage Solid State Trip Device


• Enhanced modeling capabilities
Battery
• Rp value can be given for each size

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
7
7. Enhanced Modules

Short Circuit
ETAP Short-Circuit module has enhan ced duty calculati ons for g enerator circuit breakers per the latest
version of IEEE Std C37.013, “IEEE Standard for AC High-Voltage Generator Circuit Breakers Rated on
a Sy mmetrical Current Basis”. The g enerators are m odeled by the sub-transient dy namic model to
represent AC and DC dec ay of short-circuit contribu tions from the generator. It calculates both s ystem-
source and generator-source short-circuit currents and considers no-load, lagging PF load, and leading-PF
load for pre-fault conditions.

ETAP provi des several options for m ultiplication fa ctor (MF) fo r hig h-voltage circuit breaker and bus
momentary duty calculations. The options include MF calculated based on s ystem X/R, fixe d values at
1.6/2.6, or use of 1.6/2.6 as minimum values. These options allow the user to obtain accurate results a s
well as to ensure conservativeness in short-circuit calculations.

Features
• Generator sub-transient model to represent AC and DC decays
• Generator-source and system-source short-circuit currents with no-load, leading PF, and Lagging
PF
• Symmetrical, asymmetrical, and peak kA at 1/2 cycle
• Symmetrical, asy mmetrical, peak, and DC kA as w ell as degree of asy mmetry at generator CB
contact parting time

Transient Stability
The latest edition of ETA P provides the following ne w capabilities to transient stabilit y, m aking it the
most powerful stability program in the industry hands-down.

Features
• State-of-the art Governor-Turbine models used in the majority of large industrial power systems
• Isochronous / Droop switching capabilit y for Gas Go vernor-Turbine with GE Mark IV, V & VI
model (GGOV3)
• Solar Gas Governor-Turbine with DLN combustion system model (SGOV1)
• Westinghouse Gas Governor-Turbine with jump rate limiter model (WGOV1)
• Ability to sim ulate the n ew Governor-Turbi ne dynam ics including m anufacturer unpublished
details
• Governor-Turbine m odels are fully verified a nd validated by field measurements / benc hmark
tests
• Higher order integration solution method for synchronous machine swing equation
• Synchronous machine typical data

Harmonics
The Newton-Raphson method for initia l load flow p rovides an improved conve rgence for larger sy stems
with small impedances.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
8
8. System Requirements

Operating System (32-bit or 64-bit)


• Microsoft® Windows Vista (Home Premium, Business, Enterprise)
• Microsoft® Windows® XP (Service Pack 3) Professional or Home Edition
• Microsoft® Server 2003 (Service Pack 2), Microsoft Server 2003 R2 (Service Pack 2)
• Microsoft® Server 2008

Other Software Requirements


• Internet Explorer 5.01 or higher (or minimum version level as sp ecified by the Operating System
in use)
• Microsoft® .NET Framework v1.1, Service pack 1
• Microsoft® .NET Framework v2.0, Service pack 1

PC Configuration Requirements
• USB port (if stand-alone licensing required)
• Ethernet port w/network access (if network licensing required)
• DVD Drive
• 5 to 80 GB hard disk space (based on project size, number of buses)
• 19" monitors recommended (dual monitors highly recommended)
• Minimum display resolution -1024x768

Recommended Hardware Requirements

100 Bus Projects


• Intel Dual/Quad core– 2.0 GHz (or equivalent)
• 2 GB of RAM

500 Bus Projects


• Intel Dual/Quad core – 2.0 GHz (or equivalent)
• 4 GB of RAM

1,000 Bus Projects


• Intel Dual/Quad core – 3.0 GHz with Hyper-Threading with high speed bus (or equivalent)
• 8 GB RAM (high-speed)
• 64-Bit Operating System

10,000 Bus Projects and Higher


• Intel Dual/Quad core – 3.0 GHz with Hyper-Threading with high speed bus (or equivalent)
• 12 GB RAM (high-speed)
• 64-Bit Operating System

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
9
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
ABB 121PM20, 121PM40, 121PM50, 121PM63, 145PM20,
HVCB 145PM40, 145PM50, 145PM63, 169PM20, 169PM40
Toshiba V K-10M25A2,VK-10M40A, VK-10M40AH, VK-
10M50, VK -10P25A2, VK -10P40A, VK -10P40AH, VK-
10P50, VK-10Q40, VK-10Q40H, VK-10Q50, VK-20J13,
VK-6M32A, VK -6M40A, VK -6M50, V K-6P32A , V K-
6P40A, VK -6P50, VK -6Q50, VK -8M40A, VK -8P40A,
VK-8Q40, VY -20M25A, V Y-20P25A, V Y-30M25A,
VY-30P25A

RELAY ABB 50B, COQ, KAB, IRC, IRD, IRP, SSC-T, REX 521,
Areva CAG17, CAG37, CTU12, CTU22, CTU32, CTU62
BBC ISM2, ISM 21
Cooper iD P-210
Cutler-Hammer IQ-1000 II, FP-4000, FP-5000
Eaton MP4 000
Federal Pioneer GFR
GE Multlin MIF II, MIF-P, IAC-99AY, T35, MM300, MIF-P, MIF-N,
B90
Merlin Gerin SEPAM 20, SEPAM 40
Mitsubishi CMP2 - A02D2, COC4-A02D1
P&B Engineering Advanced Feedervision II, Advanced Motorvision II,
Feedervision II, Microfeeder Plus, Microvision Plus,
Motorvision II, MPC 2000+, MPC 2000D, MPR 10, MPR
2500, MPR 3E5, MPR 3E5 (Vision 100), PBSJ 120, PBSJ
140C (SPCJ 4D29), PBSJ 3E5 N11
Reyrolle Rh o3
S&C Electric Co. ZSD
Schweitzer Rho 3 , 3 87A, 75 1A, 7 10, 48 7B, 4 87E, 99 95A, 787,
MGFR-1-ZB, MG FR-2-ZB, MG FR-20-ZB, MGFR-200-
ZB, MGFR-1200-ZB, MGFR-SE-ZB, 587Z
Siemens 3UF7
Square D SEPAM SERIES 40, SEPAM SERIES 80
Startco Engineering MPU-16A, SE-701, MPS, MPU-32, FPU-16, FPU-32, SE-
Ltd. 134C
Thytronic D IG 5200
TMT&D CAC1-A01D2 , COC1-A01D1
Vamp Vamp 230, Vamp, 245, VAMP 255, VAMP 257
Westinghouse IT, ITH, ITH-T
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
10
Fuse Bussman LPS-R K_SPI (12/00)
GEC CC, CCP, CF, CFP, CIA, CIS, CLM, CM, CMF
Gould Shawmut A25Z-2, CRN, CRS, NRN, NRS
Hi-Tech Fuses Inc Trans-Guard OS, Trans-Guard OS Shorty
Littelfuse CCMR, KLLU
Reproel FH-15, FH-17, FH-18, FH-25, FH-27, FH-28, FH-35, FH-
37, FH-38, FH-45, FH-47, FH-48, FH-55, FH-57, FH-S40,
FH-S50

MFR Model
LVCB Cutler-Hammer MH , MS

TM Cutler-Hammer CC, CCH, MH, MS,

MCP General Electric TEC (02/04), TFC (03/97), TJC (03/97), TKC (03/97),

LVSST Square D ET1.0 (MG), ET1.0 (MJ), ET1.0 (PG), ET1.0 (PK), ET1.0
(PL), ET1.0 (RG), ET1.0 (RJ), ET1.0 (RK), ET1.0 (RL)
Terasaki AGR-L (LT Curve), AGR-R (LT Curve)

Source Conductor Type


Transmission Southwire AAAC, AAC, AAC/W, AACSR, ACAR, ACSR/COMP,
Line ACSR/TW, ACSS, ACSS/AW, ACSS/TW, CU, CW,
CWC, VR
Southwire/M. Layer ACSR, ACSR/AW

Southwire/S. Layer ACSR, ACSR/AW


Southwire/SL. HST ACSR, ACSR/AW

MFR Model
Electronic Cooper VFI (5kV), VFI (15kV), VFI (25kV), VFI (35kV)
Reclosers

MFR Model
Overload General Electric CR124
Heater

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2009 BY OPERATION TECHNOLOGY, INC.
11
ETAP 6.0.0
March 2008

The OTI Development Team is pleased to provide you with the enclosed ETAP 6.0.0 release. ETAP 6.0.0
is a complete program and does not require any previous ETAP installation.

ETAP 6.0.0 is a major release that deli vers new cap abilities to si gnificantly enhance y our power system
analysis experience while making the process faster and easier. This version is enhanced with easy to use
features that allow you t o easily create and organize a one-line di agram with one click oper ations. The
new enhancements and analy sis m odules are still developed w ith m athematical precisio n using our
Quality Assured Verification and Validation Procedure.

The first time you r un ETAP 6.0.0, you will need t o enter the 36-Digit CD Activation Code as provided
on the ETAP 6.0.0 installation CD.

For more information on this new release, please take a few moments to review the information below.

New Features
ƒ Graphical Undo & Redo Enhanced Modules
ƒ Graphical Alignment Tools ƒ Load Flow
ƒ Group Rotation ƒ Arc Flash Analysis
ƒ Element Mirroring & Polarity ƒ Transient Stability
ƒ Coloring Based on Voltage Level ƒ Star TCC
ƒ Voltage Propagation (Single-Phase) ƒ Star Sequence of Operation
ƒ User-Defined Symbol Text ƒ Motor Starting & Acceleration
ƒ Ground Grid System
New Analysis Modules ƒ GIS Map
ƒ Cable Ampacity & Sizing - BS 7671 ƒ Data Exchange
ƒ Single Phase Duty Calculation
ƒ Panel Systems Duty Calculation New Libraries
ƒ Reclosers
New Elements ƒ Differential Relays
ƒ Reclosers ƒ Maintenance Mode Setting
ƒ Differential Relays
ƒ In-Line Overload Relay New Tools
ƒ Motor-Generator Set ƒ Study Result Comparator

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
1
1. One Line Diagram

Undo/Redo
ETAP One-Line Diagram now remem bers unlimited gr aphical actions with the help of graphical
undo/redo feature also widely known as the Oops command. You can now backtrack single or multiple
steps to correct mistakes or reverse the effect of the undo command by using redo.

Features
• Unlimited Undo / Redo Actions within Individual Presentations
• Undo/Redo Actions within composite networks
• Undo/Redo show/hide protective devices
• Undo/Redo movement of any device
• Undo/Redo moving, adding or deleting a connection
• Standard Keyboard Shortcuts (Undo - CTRL+Z, Redo - CTRL+Y)

Graphical Alignment Tools


ETAP One-Line Diagram just got a lot m ore intelligent with the help of graphical align ment tools. Select
a portion of the one-line diagram and use any of t he 10 available alignment features to automatically
arrange elements.

Features
• Straight & Space Alignment
• Horizontal Alignment (Middle, Top, Bottom)
• Vertical Alignment (Left, Center, Right)
• Distribute Spacing (Horizontal, Vertical)

Coloring Based on Voltage Level


The The me Manager allo ws y ou to create and rec all te mplates f or the graphical display of ele ments,
connectors, annotatio ns, results, alerts and background colors on t he one-line d iagram. The ETAP one-
line diagram can now be automatically color coded based on nominal sy stem voltages. Up to 20 user-
defined voltage levels and colors can be used to tu rn any one-line diagram into an intuitive and easy to
understand system model.

Features
• Up to 20 user-defined voltage levels and colors
• Instantly create or switch between multiple color schemes using theme templates
• Set different themes for individual one-line diagrams

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
2
Relay & Current Transformer Mirroring

• Mirror Current Transformer and Connected Relays with One Click


• Improve one-line diagram layout and make your one-line diagrams more professional.
• Simply selec t a curr ent transfor mer or relay and use right-clic k context menu to mirror the
component

Relay & Current Transformer Polarity


• Reverse Current Transformer Polarity based on Directional Settings
• Set correct polarity for current sensing for differential, directional and reverse power relays
• Simply select a current transformer and use right-click

User Defined Symbol Text


• User-defined symbol text, size and font style
• Mark protective devices with device number in case of multi-function relays

Group Rotation
• Rotate selected elements or single elements by 90, -90 180 degrees.

Voltage Propagation
In addition to the existing voltage propagation on th ree phase networks, the vo ltage propagation is no w
capable of detecting single-phase connections and propagating voltage through single-phase two wire and
three wire systems as well as panel systems.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
3
2. Enhanced Modules

Load Flow
The Load Fl ow Result Analy zer is a tim e saving to ol that allows you t o compare and analyze different
reports coming from different projects, within the s ame directory, in a single displa y. You can co mpare
the results of general info rmation abou t the project or m ore spe cific informa tion such as the results
contained from buses, branches, loads or sources in a load flow study.

Features
• Compare and View Multiple Load Flow Results in One View
• Analyze and Compare Reports from Multiple Projects
• Create a base line report and quickly identify deviations for all cases
• View Multiple Bus, Branch, Loads and Source Results at a glance
• Advanced Alert and Warning feature identifies and highlights components that are overstressed
and need your attention
• Quickly find components on the one-line diagram from the analyzer view
• Export summary view into MS Excel for maximum data flexibility

Short Circuit
The highl y c apable Short Circuit Analy sis is m ore diverse and, in addition to ANSI/IEEE and IEC
methods for 3-Phase short circuit current calculation, can now perform 1-Phase device duty short circuit
study. ANSI and IEC 60909 Standards are available for calculating short circuit current for a main panel,
sub-panel, UPS and phase adapter. Si ngle phase devi ce duty calculation com pares the c alculated faul t
current for evaluation of protective devices and gene rates critical and marginal alerts based on user-
defined limits. Loads and motors, even if they have protective devices, monitoring devices and a cable,
do not need t heir own buses/nodes. And yes, load terminal voltages and voltage drops are calculated and
displayed on the one-line diagram s. ETAP 6.0 ta kes this functionalit y t o t he next level by not onl y
calculating but also display ing and reporting the s hort circuit c urrent at all load term inals that have
equipment cables. The benefits include is faster calculation time, de-cluttered one-line diagram and more
concise reporting.

Features
• Include all panel subsystems in device duty calculations
• Include all UPS systems in device duty calculations
• Include all Single phase systems in device duty calculations
• Calculate the load terminal fault current for Motor, MOV, Static Load and Capacitor
• IEC compound excitation modeling for Ikmin based on IEC 60909-0 2000.
• Enhanced display options to allow display of 3-Phase and 1-Phase SC results from the same study
• Enhanced modeling of synchronous machines impedance values like R2/X2 and R0/X0
• Positive tolerance adjustment for calculating minimum short-circuit currents
• Enhanced detection of 1-Phase connections for short-circuit load terminal faults
• Calculate device short-circuit duty for ANSI/IEC reclosers

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
4
Arc Flash
ETAP Arc Flash Analysis estimates the arc flash incident energy under a bolted 3-phase short circuit fault
and determ ines the flash protective bo undary to li ve parts for shock protecti on. Design safer po wer
systems by i nsuring com pliance with OSHA 29 CFR 1910 .132(d) 19 90, NFPA 70E-20 04, and IEEE
1584-2002 Standards. Arc Flash no w provides the flex ibility to calculate arc flash results at load
terminals that are fed via equipment cables.

Features
• Motor / Load Terminal Arc Fault Calculation
• Maintenance Mode Switch for Low Voltage Solid State Trip device
• Relay actions (79, 87, 49, 27, 59, 67) in arc fault calculation
• Enhanced search capabilities for source protective devices
• New arc flash label templates (English, Spanish & Portuguese) with user-defined text fields
• Enhanced user-defined fixed fault clearing time

ETAP STAR
ETAP 6.0 includes an ext ensive list of enhancements for the ET AP Star module. Using these ne w user-
oriented capabilities, the process of design and ev aluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with enhanced handling of
protective devices such as differential relay (87), directional relay (67) and voltage relay (27).

Generator Decrement Curve


ETAP 6.0 now allows yo u to plot a g enerator decrem ent curve on a Star Vi ew and displ ay both, t he
symmetrical and asy mmetrical decr ement curve based on generator no-load or full-load conditions.
Excitation system field forcing capabilit y used to speed up the response of the generator is also
considered when plotting the generator decrement curve.

Motor Starting Curve Based on Multiple Starting Voltage


A motor starting curve can be plotted on a Star View for the purpose of determining overload settings for
motor protection devices. Constant Terminal Voltage can be used to plot the m otor starting curve base d
on a constant voltage at the motor terminal. ETAP 6. 0 now allow s y ou to create multiple approxim ate
motor starting curves. A constant 100% terminal voltage is given with the opti on of specifying two more
%terminal voltage values.
Stator Damage Curve
The motor curves have been enhanced by including stator damage curve or ru nning overload curve into
ETAP Star. Stator curves can be plotted based on multiples of machine full load am ps or actual amp
values.
Reference kV
STAR will plot the TCC curve based on the calculated B ase kV o r User-Defined kV in reference to the
STAR view plot kV.

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
5
Transient Stability
The latest edition of ETA P provi des the following new capabilities to transient stabilit y making it the
most powerful stability program in the industry hands-down:

Features
• Initial Load Flow using Newton Raphson Method in addition to Accelerated Gauss Siedel
• Faster Calculation Time by providing option to skip tabulated plots
• New transient event - Line to Ground Fault
• New GE Turbine-Governor Model (GGOV3)
• New Exciter IEEE ST4B
• Auto Sync-Check Action
• Enhanced Synchronous Machine Saturation Factor
• Enhanced Synchronous Machine Salient-Pole Model

Output Report Comparator


ETAP provides a ti me-saving capability to autom atically run multiple scenarios with different project
files and verify their study results against benchmark reports. Once set up, you can compare hundreds of
study reports together with one action. This is also a great tool for the internal verification and validation
of a new version of ETAP after initial installation.

Cable Sizing and Ampacity


ETAP 6.0 is the only program to offer cable sizing and ampacity calculation based on:
• IEEE 399, The Brown Book
• ICEA P-54-440
• NEC
• British Standard 7671
Sizing based on:
• Vd
• Size based on Motor Terminal Voltage at Setting

Installation Type
• Trenches
• Embedded Direct
• Brackets
• Cleats
• Ladder
• Open and Clipped Direct
• Building Voids
• Trunking

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
6
Motor Starting
• Faster Calculation Time by providing option to skip tabulated plots

Ground Grid Systems


• Added sorting capability for conductors

Data Exchange
• Enhanced user interface for data synchronization
• Added Sequence (.seq) and Dynamic (.dyr) data with Raw data import

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
7
3. New and Enhanced Elements

Recloser
• Hydraulic
• Electronic with Static Controller
• Electronic with Microprocessor Controller
• Device Coordination (Star) - Star SQOP
• ANSI/IEC Short-Circuit Duty Evaluation
• Overload alerts in Load Flow Analysis
• Comprehensive library of old and new reclosers / controllers
• Detailed modeling of reclosing device

Differential Relay
• Partial-Bus, Total Bus, Transformer, Line & Cable
• Percentage and High Impedance Types
• Device Coordination (Star) - Star SQOP
• Considered in Arc Flash Analysis
• Library of differential relays
• Please note that checker functions for multifunction differential relays may show the relay as
unchecked if you remove other functions like overload or overcurrent.

In-Line Overload Relay


• Library of in-line overload relays
• Automatic voltage
 
Synchronous Motor Capabilities
• Enhanced Model page

Synchronous Generator Capabilities


• Enhanced Imp/Model page

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
8
Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
Electronic ABB OVR-1 Series Rs14x-RS28x, OVR-3 Series R111x-
Reclosers R378x, VR-3S Series V115x-V378x
Cooper NOVA1-15 400-800A, NOVA1-27 400-800A, NOVA15,
NOVA27, NOVA38, NOVA-TS-15 400-800A, NOVA-
TS-27 400-800A, PWE, PWVE, RXE, VSA12, VSA12B,
VSA16, VSA20, VSA20A, VSO12, VSO16, VWE,
VWVE27, VWVE38X, WE, WVE27, VWVE38X, WE,
WVE27, WVE38X, VXE15, VXE27
FKI Switchgear GVR15, GVR27, GVR38
G&W Electric Viper-G 15.5kV – 38kV, Viper-S 15.5kV-38kV, Viper-ST
15.5kV-38kV

Joslyn TriMod 100 (115-xxx-630),TriMod 100 (115-xxx-


800),TriMod 100 (127-xxx-630),TriMod 100 (127-xxx-
800), TriMod 300 (315-xxx-630), TriMod 300 (315-xxx-
800), TriMod 300 (327-xxx-630), TriMod 300 (327-xxx-
800), TriMod 300R (315R-xxx-630), TriMod 300R
(315R-xxx-800), TriMod 300R (327R-xxx-630), TriMod
300R (327R-xxx-800), TriMod 600R (615R-xxx-630),
TriMod 600R (615R-xxx-800), TriMod 600R (627R-xxx-
630), TriMod 600R (627R-xxx-800)

S&C Electric TripSaver (15.5kV 100A), TripSaver (15.5kV 50A),


Company TripSaver (27kV 100A), TripSaver (27kV 50A)

Hydraulic Cooper 4E Series 50A-280A Coils, 6H Series 5A-100A Coils,


Reclosers V6H Series 5A-200A Coils, D Series 100A-560A Coil
400X-560X Coil, DV Series 100A-560A Coil 400X-560X
Coil, E Series 5A -100A Coil, H 5-50A Coil, L Series
50A-200A Coil, V4E, V4L, VW Series 50A-560A Coil
280X-560X Coil, VWV27 Series 50A-560A Coil 280X-
560X Coil, VWV38X Series 50A-560A Coil 280X-560X
Coil, W Series 50A-560A Coil 280X-560X Coil, WV27
Series 50A-560A Coil 280X-560X Coil, WV38X 50A-
560A Coil 280X-560X Coil, 4H Series 5A-100A Coil,
V4H Series 5A-140A

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
9
MFR Model
Microprocessor ABB ICD
   Cooper Form 4C, Form 5, Form 5 Triple-Single, Form 6, Form 6
Triple-Single, FXA, FXA/FXB, NOVA1 Control, VXE
Control
   FKI Switchgear Panacea (SEL-351P)
   Joslyn 351J, Faultmaster 2500, PowerMAX 100
   Nu-Lec AD VC
   Schweitzer 3 51R, 651R
Static  Cooper Form 3A, Form 3A (RE, RVE, RXE), Form 3A (Type
VSA), Form 3A (Type VSO), Form 3A (W-group)

   S&C Electric TripSaver (100K), TripSaver (50K)


Company

RELAY ABB REA 101, REM543, SC, SC-1, REF 545, REL 561
Allen Bradley SMP1, SMP3, 825-P
Areva P- 132
GE Multilin G650, C60, F650, 735/737
P&B Engineering MREF
Schweitzer 710 (R100), 701 (R106-R113)
Square D Sepam Series 20, GC-200

Combined X-Limiter (E rated)


Fuse Technologies
Cooper GMA
Cutler Hammer CLS, CLS(07/03)
ETI VV
Gould Shawmut A051B
Kearney Ty pe Q
Siemens 3NA3 1..-6, 3NA3 2..-6, 3NA3 3..-7, 3NA3 8..-6

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
10
MFR Model
LVCB Cutler-Hammer MDS-C xx
Federal Pioneer CE-B, CE-E, CE-E4, CE-H, CE-N, CJM-E, CJM-H, CJM-
N, CK-E, CK-H, CK-N, CMH, FKD, FKG, HEW, HEZ,
TH1, TH4, TH8, CJL-E, CJL-N, CJL-H
Merlin Gerin C60N Series, C60H, C60L
Square-D QB, QD, QG, QJ, QE-VH
Nikko SK202, SK203, SK204
Siemens HEG , NEG

TM Federal Pioneer CMH, CJM, CE-B, CE-E, CE-E4, CE-H, CE-N, FK-D,
FK-G, HEW, HEZ, TH1, TH4, TH8, CJL-E, CJL-N, CJL-
H
Merlin Gerin C60N C-Curve, C60N/H D-Curve, C60N/H/L C-Curve,
C60N/H/L B-Curve
Nikko SK2 25
Square-D QB (50 Hz) (60Hz), QD (50 Hz) (60Hz), QG (50 Hz)
(60Hz), QJ (50 Hz) (60Hz)
Siemens HEG , NEG

LVSST Cutler-Hammer MDS-C xx


Federal Pioneer LES3600LS/LSG, LES3600LSI/LSIG, STR45SP,
STR55UP, KES3125LS/LSG, KES3250LS/LSG,
KES3400LS/LSG, KES3125LSI/LSIG,
KES3250LSI/LSIG, KES3400LSI/LSIG
Square D GC-100

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
11
ETAP 5.5.6
March 2007

The OTI Development Team is pleased to provide you with the enclosed ETAP 5.5.6 release. ETAP 5.5.6
is a complete program and does not require any previous ETAP installation.

This point release is the latest in the ETAP 5.5 serie s and includes sev eral enhanc ements and
modifications from the ear lier 5.5.5 rele ase. We re commend that you utilize this latest release in order
to take advantage of the n ew features and capabilities. Note that network users must also u pdate their
ETAP License Manager. The updated License Manager is compatible with earlier releases.

ETAP 5.5.6 will utilize the same 36-Digit Key Code as provided with the ETAP 5.5.5 release.

For more information on this new release, please take a few moments to review the information below.

1. Library Additions
The following protective device manufacturers and models are added to the library.

MFR Model
RELAY Startco Engineering SE-320, 325
ABB REJ 525, REF 610, REM 610
GE Multilin MM3, TMC14B, IAC-60T, IAC-80T, IAC-90T
VA TECH Argus 1, 2, 4, 6

TM ABB BQD, CQD, S1 125 Series

HVCB Siemens GMI Series

Fuse Siba HHD Series, 7.2 to 38.5 kV


Cooper ELF-LR Series, 13.2 to 23 kV
General Electric 55A21 Series, 2.54 to 5.08 kV
General Electric 218A4293 Series, 2.54 to 5.08 kV
Littelfuse KLKD, 0.6 kV

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
1
2. Protective Device Library Information Exporting Tool
An ETAP tool is added to this version to extract library information for all protective devices in an
ETAP project. The extracted inform ation is exported to a Microsoft Excel file which is placed in the
ETAP project directory. The extracted information includes device ID, Ty pe, Manufacturer, Model,
etc. This ha ndy tool can be used to ea sily determine protective devices that utilize specific device
libraries.

Once you install ETAP 5.5.6, a tool na med “PD Lib rary Export” will automatically be adde d to the
ETAP Tools menu. To use this tool, open ETAP Tools menu an d click on the PD Library Export
tool. A Mic rosoft Excel file will be generated in the ETAP project director y with a fi le name
“PDLibExport-XXX.xls”, where XXX will be replaced by the ETAP project file name.

You can change the Excel filena me fr om the ETA PS.INI file. To change th e filename, open the
ETAPS.INI file from your application directory (by default installation C:\ETAP 556) an d locate the
statement for the tool in the [AppVari ables] se ction, which sho uld be sim ilar to the fol lowing.
Change the b lue section “ PDLibExport” to the nam e you prefer. Note that if the ETAPS.INI file is
not in the application directory then use the ETAPS.INI located in your windows directory.

Tool1=PD Lib Export|<etaps.exe folder>\FIGDBExtractConsoleApp.exe|%p.MDB|%d


\PDLibExport-%P.XLS|OpenXLS

3. Arc Flash
In ETAP 5.5. 5, under a set of very spe cial cond itions (Low Voltage Solid State Trip LVSST with
Short-Time I 2t delay band set to “IN” while the library is set to zero), the cal culated fault clearing
time is differ ent from the actual clearin g time if the Source Protective Device is one of the libraries
listed below. ETAP 5.5.6 has been enhanced in this version to handle these special conditions.

Siemens 3WN6 D/E/F/H/J/K/N/P, ETU 45B/55B/745/745/76B


Merlin Gerin MICROLOGIC 5.0/ 6.0, STR 35/38/45/53/55/58
Moeller IZM-U
Square-D MICROLOGIC 5.0/ 6.0, RMS 510/610/810
Westinghouse/Cutler-
Hammer Digitrip 310+, RMS 500 Series 510/520
General Electric Entelliguard

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY TO OPERATION TECHNOLOGY, INC AND MAY NOT BE REPRODUCED PUBLISHED OR DISCLOSED TO OTHERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRUGHT © 2007 BY OPERATION TECHNOLOGY, INC.
2
ETAP 5.5.5
December 20, 2006

The OTI Development Team is pleased to provide you with the enclosed ETAP 5.5.5 release. ETAP 5.5.5 is a
complete program and does not require any previous ETAP installation.

This point release i s the latest in the ETAP 5.5 seri es and includes sever al en hancements and modifications
from the earlier 5.5.0 release. We recommend that you utilize this latest release in order to take advantage of
the new features and cap abilities. Note that network users must also update their ETAP License M anager.
The updated License Manager is compatible with earlier releases.

ETAP 5.5.5 will utilize the same 36-Digit Key Code as provided with the ETAP 5.5.0 release.

ETAP 5.5.5 allows y ou to explore the ETAP Real-Ti me capabilities including Power Sy stem Monitoring &
Simulation (PSMS), Energy Management Sy stem (EMS ), and Intelligent Load Shedding (ILS). A sam ple
system is pro vided along with the ETAP Real-Time in stallation which allows y ou to take ETAP online and
experience the power of ETAP Real-Time enterprise. For more information, please contact [email protected] or
visit our web site at etap.com.

For more information on this new release, please take a few moments to review the information below.

1. Library
• Cable library
Added Olex Cable library

• Fuse library
Added the following models:

MFR Model
Bussmann OEF, OHF, OLG, OEG, OHG, NH Series
Cooper Bay-O-Net (High Ampere), ELSP, X-Limiter
Cutler-Hammer CLS (07/03), CLE (0703)
Little Fuse FLSR (01/03)
Siemens 3NA Series
Gould Shawmut (Ferraz) A50P

• Low Voltage Circuit-Breaker library


Added the following models:

MFR Model
Square-D HD, HG, HJ, HL, JD, JG, JJ, JL, GJL
Cutler-Hammer PA, T4 and T5 Series, HFA, HMDL-DC, ELFD, ELFDC, ELHFD, ELHJD,
ELHKD, ELJD, ELJDC, ELKD, ELKDC
ABB S500 Series
Westinghouse PA, T4 and T5 Series, HFA

• Low Voltage Solid State Trip library


Added the following model:

MFR Model
ABB SACE PR221, SACE PR121, SACE PR122, SACE PR123

THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
1
• Thermal Magnetic Circuit-Breaker library
Added the following models:

MFR Model
ABB T4, T5 Series
Federal Pacific HEF, NE, NEF Series
Cutler-Hammer HMDL-DC, NH, NS, HFA, PA
Square-D Powerpact H and J frame Series, GJL Series

• Relay library
Added the following models:

MFR Model
ABB REF 543, REF 541,
SPAJ 110C, SPAJ 111C, SPAJ 115C, SPAJ 135C, SPAJ 141C, SPAJ 142C,
SPAJ 144C, RAMDE, REM 545, SPAD 346C, SPAJ 1B1 J3
Schweitzer 311L
AREVA P4 41
VAMP VAMP 130, VAMP 140, VAMP 265
Beckwith Electric M-3425
Siemens 7UM 62
GE Multilin G30
Orion Italia IPR-A, SMPR
Startco Engineering SE 105, SE 135

2. Localization
• Enhanced the program to handle period (.) or comma (,) decimal separators for float numbers.

3. GIS
• Upgraded ETAP GIS Map to interface with ArcGIS Version 9.1
• Enhanced ETAP GIS interface to work with ArcGIS run time engine

4. Short-Circuit
• For ANSI De vice Duty of generator circuit-breaker, an automatic search is added to deter mine a
single path between a generator and the genera tor circuit-breaker. For a generator and the
associated circuit-breaker with a single path, the ci rcuit-breaker duty is calculated by the s ystem-
only contribution or generator-only contribution.

• Added a new preference option to allow the user to decide if machine FLA to be included in duty
calculations when the opt ion of “Based on Maxim um Through Fault Current” is select ed for
machine protective device duty.

5. DC Motor, DC Static Load, UPS, and Inverted Editors


The following options are added to the Duty cycle page for DC motor, DC static load, UPS and inverter.

Based on Amp / %Loading


This option specifies how the duty c ycle is entered. When the Am p option is selected, the duty cycle is
specified as amperes and the %Load will be calculate d. When the %Load option is selected, the dut y
cycle is specified as percentage of FLA and the ampere values will be calculated

6. ETAP License Manager


The ETAP License Manager (LM) is updated for ETAP 5.5.5 release. This License Manager is
compatible with earlier versions of ETAP.

THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
2
The ETAP LM service may not start automatically after rebooting the ETAP LM server if virtual machine
software exists on the sa me machine. If virtual machine software is present on LM server machine, it is
recommended to verif y t hat the ' ETAP Lic Mgr' se rvice is running or start the service manually u nder
System Services.

THIS DOC UMENT IS CONFIDENTIAL AN D P ROPRIETARY TO O PERATION TEC HNOLOGY, INC. AND MAY NOT BE R EPRODUCED P UBLISHED OR DISCLOSED TO OTH ERS
WITHOUT THE WRITTEN AUTHORIZATION OF OPERATION TECHNOLOGY, INC. COPYRIGHT © 2006 BY OPERATION TECHNOLOGY, INC.
3
ETAP 5.5.0
June 19, 2006

Graphical Animation of System Response for


Protective Device Operation
Control System Logic Sequence
Dynamic Behavior Operation

ETAP 5.5.0 is a major release that delivers new capabilities to significantly enhance
your power system analysis experience while making the process faster and easier.
Contributing to this objective includes the addition of new features to graphically
animate the system response for Protective Device Operation, Control System Logic
Sequence, and Dynamic Response Operation with more flexible configuration options
and greater display.

Enhancing Your Power System in English, Chinese, and Japanese

New Features Enhanced Modules


. Configuration Manager . Advanced Relay Testing & Transient Simulator
. ETAP Preferences . Arc Flash Analysis
. License Administrator . Battery Discharge & Sizing
. Theme Manager . Control System Diagram
. Wind Turbine Generator . Data Exchange
. Energy Management System
New Elements . GIS Map
. Doubly-Fed Induction Generator . Ground Grid Systems
. Tag-Link . Harmonic Analysis
. Intelligent Load Shedding
New Capabilities . Optimal Capacitor Placement
. Cable Sizing Based on Short-Circuit . Panel Systems
. Configuration Checker . Power System Monitoring & Simulation
. Get-Set Property Defaults . Protective Device & Selectivity Coordination
. Output Report Navigation . Short-Circuit Analysis
. MOV Voltage Limit . Transient Stability Analysis
. Sag & Tension for Unequal Towers
. Text Box Default
Wind Turbine Generator
The Wind Turbine Generator (WTG) module allows you to design and analyze wind farms via a highly
flexible graphic interface optimized for steady-state and dynamic simulation. The WTG module is fully
integrated with all ETAP calculation modules such as Load Flow, Short-Circuit, Transient Stability,
Optimal Capacitor Placement, Harmonic Analysis, Protective Device Coordination, and ETAP Real-
Time. User-defined actions may be added to simulate disturbances like wind variation, UGS electrical
faults, and relay operations. It also predicts the dynamic response of each individual wind turbine
generator. Analysis results may be utilized to evaluate alternative turbine placement, tuning of control
parameters, selection and placement of protective devices, and sizing associated equipment.

The ETAP WTG module comes to market with proven utility. It is currently being used for real-time
monitoring of power exchange between wind turbines and the power grid at one of the largest wind farms
in the United States.

Features
• Ability to model unlimited wind turbine generators individually, or in groups
• Detailed modeling of turbine dynamics including aerodynamics & power coefficients
• Model doubly-fed induction generators with pitch & converter controller characteristics
• Simulate transient wind conditions with ramp, gust, & noise disturbances & calculate dynamic impact
on wind machines
• Create multiple wind categories for predictive “what if” studies & scenarios
• Perform transient stability analysis with individual or zone-based disturbances
• Run one instance or continuous steady-state calculations in analysis mode

Advanced Relay Testing & Transient Simulator


ARTTS is a powerful combination of relay test-set hardware and protective device evaluation software
that is seamlessly integrated to provide a complete relay testing and simulation package. With ARTTS
Interface, you can simulate the actual relay response under steady-state and transient fault currents
and compare the captured relay response with that of the manufacturer’s published curve. Observe and
analyze deviations from nominal values and relay mis-operations. The graphical interface makes setup
easy and all historical tests can be retrieved for plotting and comparison.

New Capabilities
• Test relays & import the test results into ETAP Star
• Test, simulate, & calibrate overcurrent, differential, & distance relays
• Fully integrated interface with ETAP Star & Short-Circuit modules
• Compare actual steady-state & transient responses of relays with published manufacturer specifications
• Playback transient waveforms for evaluation
• Archive relay test data for historical reference & retrieval
• Customizable test reports

ETAP 5.5 includes an extensive list of enhancements for the ETAP Star module. Using these new user-
oriented capabilities, the process of design and evaluation of protective device coordination is
significantly faster and easier. Among them is the Star Sequence-of-Operation with enhanced graphical
animation of the operation of protective devices on the one-line diagram.
Graphical Animation of Protective Device Operation

New Features
• Virtual animation of sequence-of-operation playback on the one-line diagram
• Normalized TCC plots with shifted curves based on fault contributions
• User-definable curves & fault arrows
• Batch print TCC plots & diagrams for various paper sizes
• Automated color sequencing of TCC curves
• Enhanced print options & functionality
• Flexible user-definable display & plot options
• Star library Merge Manager
• Intelligent alert view for troubleshooting
• Enhanced relay library interface
• Acceleration curve for overload relays
• Transformer inrush curve
• Graphical TCC curve tracker with cross lines
• Expanded verified & validated device library
• New Relay Test-Set Interface for evaluating steady-state & transient relay response

Power System Monitoring & Simulation


The ETAP PSMS upgrade builds on its already solid capabilities in system management and simulation
by providing these useful new features:

• OPC alarms & remote notification of events


• Place tag-link elements on one-line diagrams to display any digital & analog data
• Real-time data plotting & trending
• Create customizable reports for energy & power demands

Tag-Link Element
The new Tag-Link element brings measurements from metering systems, PLC, and SCADA into ETAP
using a graphic element in the one-line diagram.

• Monitor electrical & non-electrical measurements


• User-definable alerts for both analog & digital measurements
• Specify alert sounds & colors for alarms & disturbance triggers
Energy Management System
EMS is a robust, flexible, and powerful system for data control and automation of industrial, commercial,
distribution, and transmission systems. This intelligent energy management system is designed to reduce
energy consumption, improve the utilization of the electrical system, increase electrical reliability, and
predict electrical system performance, as well as optimize energy usage and reducing its cost. One of
the significant functionalities included in EMS is a state-of-the-art load management application that
provides intelligent load flow solutions to minimize operating costs and maximize system performance.

New Features
• New Programmable Logic Editor (PLE) for user-defined control commands
• User-defined macro-based logic without hardware installation
• System optimization & automation
• Automatic generation control
• Security control
• Intelligent feeder & demand management
• Peak shaving
• Cost allocation
• Operator training simulator
• Supervisory & advisory control
• Intelligent inhibition & permissive control

Intelligent Load Shedding


ILS has been improved with many new features, making it faster; less than 90 ms total response
time from the initiation of a disturbance. With the new PLE, custom logic compiled and combined with
artificial intelligence is easily created. This combination of logics and intelligence provides an optimal
load shedding solution that achieves maximum load conservation during transient conditions.

Special handling techniques have been incorporated for islanded systems and power exchange between
subsystems. The user interface has been enhanced to enable logic switching and/or load priority schedules
without interrupting operations or re-programming devices. Operators can now easily switch schedules
based on operating requirements such as summer and winter demands. In addition, specific monitor
windows have been added to allow one view to provide a complete status of the system. The Priority
Schedule editor has been enhanced to easily define factors that specify significance of individual loads,
feeders, etc.

New Capabilities
• Programmable Logic Editor to add user-defined control logics (simple & complex) such as limits,
interlocks, permissions, inhibitions, etc.
• New user-friendly editors to define associations & interlocks
• Multiple priority schedules with user-defined sensitivity factors
• User-definable group numbers for optimal breaker selection
• Simultaneous display of the real-time operation & local simulation results
• Easily simulate & validate load shedding commands
• OPC alarm & notification
• Monitor & respond automatically to electrical & non-electrical disturbances
• New user-friendly editors for setting up ILS
• View & print customizable full-color reports
• Monitor “Live” load shedding operation in XML on web page
• Full security access control
Arc Flash
Arc Flash now provides the flexibility to print customizable labels on either Avery® labels or high-end
Brady® label printers using new label templates and printing capabilities.

New Features
• Capability to limit incident energy based on maximum Fault Clearing Time (FCT)
• Automatic application of calculated & user-defined FCT simultaneously
• Algorithm for automatic detection of the primary protective device in complex looped networks
• Export results to Excel spreadsheets for interface with third party software & label printers
• New user-interface for defining PPE requirements for each risk category
• Coordinate protective devices using the arc flash incident energy plotted on the TCCs
• New arc flash label templates with user-defined text fields
• New incident energy summary reports

Short-Circuit Analysis
For both ANSI and IEC standards, determine short circuit duty of tie circuit breakers based on the
“Maximum Through Fault Current.”

Panel Systems
The Panel Systems module, an intuitive graphical user interface for the design and analysis of low voltage
distribution systems, can now export panel data and schedules to third party CAD systems and
Microsoft® Excel. The new features include:
• User-definable ground wire fields per branch circuit
• User-definable conduit size field per branch circuit
• Export panel schedules to Excel worksheets
• Five new panel schedule & report templates
• Export panel report & schedule to CAD systems

Harmonic Analysis
A new option has been added that allows you to use long-line model for transmission lines and cables.

Data Exchange
DataX represents a rich set of customizable ETAP interfaces that can be used to bridge gaps between
ETAP and other databases.

DataX - Base
The new import tools added to the base package allow you to:
• Import IEEE format files
• Import RAW data files
• Import & export configurations
• Import ground grids from AutoCAD
DataX - Microsoft® Access & Excel
This new module provides the ability to import and synchronize data from Microsoft Excel and Microsoft
Access into ETAP.
• Import data from a Microsoft Access table
• Import data from Microsoft Excel worksheets
• Customize data mapping through the graphical user interface
• Automatic data range checking with library data substitution
• Automatic one-line diagram generation
• Intelligent data validation & consistency checking
• Automatic modify & delete actions for existing elements
• View modifications & accept or reject actions

SmartPlant® Interface
The ETAP-SmartPlant interface has been enhanced to allow modification of existing project files from
SmartPlant. Major enhancements include:
• Automatic add, modify, & delete actions of elements
• Enhanced one-line diagram generation
• Enhanced element mapping

e-DPP® Interface
The ETAP e-DPP interface now provides:
• Automatic one-line diagram generation
• Enhanced element mapping
• Automatic add, modify, & delete actions of elements

GIS Map
Modify the display of load flow and short circuit results on GIS maps using the new ETAP display
options.

Ground Grid Systems


Import ground grid systems from AutoCAD files and automatically set up conductor and grid layouts.
Copy and paste grid systems. Calculate touch and step potential outside boundaries.

Get-Set Defaults
The new capability to set and obtain parameters to-and-from element defaults enables parameters to be
passed from one element to another.

ETAP Preferences
Now you can apply new preference settings directly from ETAP. Adjust settings in the INI file to
customize your ETAP application behavior. These settings are categorized alphabetically or based on an
analysis module.
Control System Diagram
The highly capable CSD module streamlines the modeling and simulation of control systems by using
a unique state-dependent process that allows you to easily evaluate control logic of new and existing
systems. The sequence-of-operation animates the operation of control systems with associated interlocks
and controlled devices. This includes elements such as control relays, solenoids, controlled contacts,
multi-sequence contacts, push buttons, switches, and actuators. You can select from a large library of
control devices to quickly determine pickup and dropout voltages, losses and current flows at various
time instances including inrush current. As control devices go through the time sequence and various
states, the program provides marginal and critical alerts.

Graphically Animate Control System Operations

New Features
• Graphical animation of complex control logic with or without voltage drop calculation
• Include time-dependent loads of control systems in battery discharge & sizing calculation
• Operator initiated control actions and/or auto-run mode
• Display and alert overloading as well as pickup/dropout voltage violations
• Flexible device modeling with user-defined duty cycle or actual inrush/burden rating
• Validate the voltage requirements of controlling devices
• Generate automatic alerts for pickup & dropout voltage
• View detailed operating states of the devices with the new Event Viewer

Battery Discharge & Sizing


This latest release provides the following new capabilities:
• Automatic simulation of the control system diagrams along with the DC system for battery discharging
& sizing calculations
• New option to use a one-minute load span for the battery & load or for the battery alone In addition to
the existing ampacity and voltage

Cable Sizing
In addition to the existing ampacity and voltage drop requirements, a new capability has been
added to size cables based on short circuit current.

Transmission Line
ETAP 5.5 determines sag and tension for transmission lines on towers with different elevations.
Automatic alerts notify when power interchange exceeds derated ampacity of the line.
Transient Stability
The Transient Stability module has been upgraded to present a graphically animated display of the system
dynamic response after disturbances. The program is also enhanced for faster calculation speed and plot
generations. You can simulate system disturbances and events while performing load shedding, fast bus
transfer, critical clearing time, generator start-up studies, and the acceleration or re-acceleration of
motors, etc.

New Features
• New sequence-of-operation with interactive time-slider & action list
• New wind turbine generator dynamic models
• New action commands for wind gust, ramp, & noise disturbances
• Apply voltage limits to MOV open & close stages

Motor Operated Valve


Specify critical and marginal voltage limits for motor operated valves (MOVs) for increased control over
the simulation process.
• User-defined voltage limits during start, seating/unseating, and travel time
• Select the MOV voltage alert based on MOV rated voltage or voltage limits for different stages

Optimal Capacitor Placement


The Optimal Capacitor Placement module is a sophisticated enhancement to ETAP 5.5 with the capability
to strategically place capacitors for voltage support and power factor correction. OCP provides
performance and cost analysis that can substantially minimize installation and long-term operation
expenses. The advanced graphical interface allows for quick creation and modification of your capacitor
placement design. The precise calculation approach automatically determines the best locations and bank
sizes. You can view and present results in an easy-to-understand visual format.

New Features
• Calculate the most cost-effective installation locations & bank size
• Calculate return on investment for the entire planning period
• Consider voltage support & power factor correction objectives
• Generate reports & plots of capacitor operating profit
• Handle unlimited network configurations
• Options to constrain installation locations with user-defined parameters
• Option to constrain the maximum number of capacitors installed at any location
• Use both individual & global constraints
• Utilize individual source or global energy costs
• Evaluate the capacitor installation for various system loadings
Configuration Manager
The Configuration Manager provides a tabular view of individual device status and allows you to view,
control, and manage the status of all elements from one editor. This dynamic new feature adds increased
flexibility to change, track changes, and compare status of devices. For example, intelligent filtering
isolates specific open protective devices making it easy to locate on the one-line diagram. Additional
filtering exposes differences between configurations in a fraction of the time normally associated with
one-line diagram monitoring.

New Features
• Manage & view configuration status of devices at a glance
• Identify differences between configurations for better visual understanding
• Option to filter & display specific configurations & device types
• Options to customize display status
• Directly modify the status of multiple devices
• Create, copy, delete, & rename commands
• Export configurations to Microsoft Access tables for further queries & reporting

Configuration Checking
In addition to the In addition to the properties (elements in the project) and library data, you now can
check and validate configuration status of elements.

Theme Manager
The Theme Manager allows you to create and recall templates for the graphic display of elements,
connectors, annotations, results, alerts, and background colors. You can graphically distinguish phase
connections (such as A, C, D, 1-phase, 2-phase, 3-phase, 2W, 3W, 4W, etc.) by changing the connector
style and colors. This highly versatile interface permits customization at nearly every level. This includes
the flexibility to select from existing templates, Microsoft Windows environment, or personalized themes.
A significant advantage of the Theme Manager is that unlimited project-independent custom styles may
be stored on a computer and are readily available when you switch from one ETAP project to another.

New Features
• Instantly create or switch between multiple color schemes using theme templates
• Pick a background color for the best contrast when viewing one-lines, performing system studies, or
real-time monitoring
• Set different themes for individual one-line diagrams
• Flexible coloring for AC & DC elements, annotations, & composite networks
• Assign highly visible colors for alerts, alarms, & warnings
• Easily differentiate between 1-phase, 2-phase, & 3-phase systems
• Modify the element, grid, & background colors for specific presentations
• Easily set colors based on voltage levels
License Administrator & Wizard
Maintain optimal productivity and receive the greatest value from ETAP resources by monitoring and
administering access to your ETAP license. This new tool provides an at-a-glance view of all the
computers and users online with ETAP. It even keeps track of how long they’ve been logged online. The
License Wizard can switch access to different ETAP License Managers. Productivity bottlenecks can be
avoided by scheduling user access when demand exceeds the number of
• Identify all users logged onto ETAP
• Minimize accessibility conflicts
• Manage ETAP licenses via License Wizard

Output Reports
Viewing output reports and plots is now even easier. The new Find feature allows you to locate specific
information fast. Simply select an element type from a listing of element IDs, then choose the ID you
wish to review and search the report for occurrences of the selected ID. Examine the report electronically
in the viewer or save the data in a format that can be opened by a spreadsheet program. Experience faster
operation and easier access to your report data. Other enhancements include:
• Find elements or text
• Reports can be exported in five common spreadsheet & word processing formats

Text Box
• Add text in user-defined areas on one-line & control system diagrams
• Select the font, size, & color of text
• Modify the shape & opacity of a text box
• Edit appearance of text boxes for print output or electronic presentations
• Default text box settings

ETAP License Option - Advantage


The new license option “ETAP Advantage” is now available in response to the increased demand
from customers and consultants in a variety of industries requesting additional quality assurance
documentation.

With the “ETAP Advantage” option, you receive the following additional documentation and services:

1. Verification & Validation Certification Letter which states that ETAP is verified and validated
per the requirements of ISO 9001:2000, Title 10 CFR 50, Appendix B, Title 10 CFR Part 21,
ANSI/ASME N45.2, ASME NQA-1, ANSI/IEEE Std 730.1, CAN/CSA-Q 396.1.2, and ANSI N45.22.

2. Performance Reporting will keep you updated with program deviations, limitations, and detailed
listing of changes from one release to the next. Deviations are reported within five working
days from discovery. Reporting includes minor deviations in calculations, library data, program
interface, output reports, plots, project database, etc. Major/substantial errors are reported to all
ETAP users.

ETAP Advantage is beneficial for all types of industries and consulting firms

• Eliminate man-hours & expense of internal software verification & validation


• Take advantage of a well established & credible QA program (since 1991)
• Gain proof of software & library accuracy with minimal investment
• Receive formal notification of program & library deviations & limitations
• Receive a complete listing of program enhancements & changes with each new release
Operation Technology, Inc.
17 Goodyear, Suite 100
Irvine, CA 92618-1812
(949) 462-0100
Fax: (949) 462-0200
Support: (949) 462-0400
Email: [email protected]
www.etap.com
ETAP 5.0.3
August 17, 2005

The OTI Engineering and Development Teams are pleased to present you with the latest ETAP 5.0.3
release. ETAP 5.0.3 is a point release, which includes a number of fixes for the ETAP 5.0.2 release.
ETAP 5.0.3 CD is a complete program and does not require any previous ETAP installation.

We recommend that you utilize this latest release in order to take advantage of the new features and
capabilities. We strive to provide our customers with advanced features and industry standard
engineering tools.

 2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.

1
Operation Technology, Inc.
17 Goodyear, Suite 100
Irvine, CA 92618-1812
(949) 462-0100
Fax: (949) 462-0200
Support: (949) 462-0400
Email: [email protected]
www.etap.com

ETAP 5.0.2
May 24, 2005

The OTI Engineering and Development Teams are pleased to present you with the latest ETAP 5.0.2
release.

ETAP 5.0.2 is a point release, which includes several enhancements and corrections for the earlier 5.0.1
and 5.0.0 releases. ETAP 5.0.2 is a complete program and does not require any previous ETAP
installation. We recommend that you utilize this latest release in order to take advantage of the new
features and capabilities. We strive to provide our customers with advanced features and industry
standard engineering tools.

For more information about this new release, please take a few moments to read and review the
information below.

Arc Flash Module - IEEE 1584


1) Automatic determination of all the Source and Load Protective Devices (PDs) for a faulted bus.
Source PDs are defined as PDs that are upstream to a faulted bus, through which fault current
contributions flow from generators and/or power grids. The program searches all radial branches
connected to the faulted bus, up to three bus levels away until multiple source branches are found.
The default number of ‘bus levels away’ can be changed to a maximum of 20 levels in the
etaps.ini file.
2) Enhanced Arc Flash page of Bus editor with new layout and features.
3) Added user-defined Source PDs capability to each bus. This allows more flexibility for the
determination of the fault clearing time.
4) Enhanced one-line diagram for display of results and the output reports to include the working
distance and warning flags.

IEC Short-Circuit Module – IEC 60909-0


1) Added capability to the two-winding transformers to select a unit generator to form a power
station unit.

 2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.

1
Before performing calculation, users need to identify the unit transformers for power station
units. By doing this ETAP then automatically determines all the elements within the power
station units including their auxiliary systems, as well as network elements as defined by IEC
60909 Standard.
2) Enhanced the calculation of the breaking current (Ib) according to the adjustments described in
equation (75), page 115 of IEC 60909-0. The effect of equation (75) will reduce the breaking
current slightly. Note that this adjustment is considered optional and applies only to near
generators faults in mesh systems.

Device Coordination / Selectivity – Star


1) Enhanced the Star view interface for speed and printing compatibilities.
2) Enhanced the data conversion program from PowerPlot to ETAP Star.

Library – etaplib502.lib
1) Released etaplib502 library including new protective device library models.
2) Validated and Verified (V&V) library data per OTI’s Quality Assurance program.
3) Changed Kerite Cable library data (cable reactance for magnetic installation).
4) Added Kerite Cable library data for non-magnetic installation.
5) MV Solid State Trip Relay (Long Time Curve) has been updated.
Manufacturer: Westinghouse, Models: DigiTrip 3000, DigiTrip MV.
6) Implemented a library release number (versioning) for newly issued libraries for the purpose of
library merge.
7) Enhanced library copy and paste capabilities.
8) The following time-current characteristics fuse curves were enhanced by digitizing the
manufacturer curves:

Manufacturer Model Size


Fuse Link (K), Fast speed All
Chance Fuse Link (T), Slow speed All
Fuse Link (SloFast), Slow speed All
Cooper NXC (8.3, 15.5, 23 kV) All
Siemens FM (2.54 kV, 5.08 kV) All
9F60 EJO-1 (2.75 kV, 5.5 kV) All
General Electric
9F60 EJ-1 (2.75 kV, 5.5kV)
Gould Shawmut (Ferraz) A2D ( 0.25kV), Speed: Time Delay 70R, 80R, 90R, 100R
Mitsubishi CLS (Style R) (2.75 kV, 3.6 kV, 5.5 kV, 7.2 kV) All
(IEC Fuse)

 2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
2
9) Corrected the interrupting ratings for the following fuses:

Model (kV) Manufacturer Data


Manufacturer (All Sizes & Speeds) Interrupting Rating
(kA Sym.)
Bussmann
LP-CC (150 V, 300 V), Time Delay speed 20
(DC Fuse)
FL23R (7.2 kV), FL8R (7.2 kV) 3.5
Cooper FL8R (14.4 kV) 1.8
Tandem ELF (27 kV) 43
Cutler-Hammer CLE (1/03) (8.3 kV), sizes 150E and 175E only 50
Driescher DRK 07 (7.2 kV) 40
Gould Shawmut
FESF (460 V) 40
(Ferraz) (DC Fuse)
Fault Fiter (Uni-Rupter) (29 kV) 12.5
S&C
SMD-1A (48.3 kV), Size 1A, Standard speed only 13.1
A500 (2.54 kV, 5.08 kV)
Siemens A720 (7.2 kV) 50
FM (2.54 kV, 5.08 kV)

 2005 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.
3
Operation Technology, Inc.
17 Goodyear
Irvine, CA 92618-1812
(949) 462-0100
Fax: (949) 462-0200
Support: (949) 462-0400
E-mail: [email protected]
www.etap.com

ETAP 5.0
September 2004
The OTI Development Team is pleased to provide you with the latest ETAP 5.0 release. ETAP 5.0 is a
major upgrade to ETAP 4.7.6.

The new 5.0 release includes major enhancements to existing modules as well as several new analysis
modules, including ETAP Star, which is a new concept for protective device coordination and protection.
ETAP Star has been in design and development for the last two years, and we are very excited about
sharing its features and benefits with our users.

ETAP 5.0 – System Requirements


Operating System System Configuration
• Microsoft Windows 2000 (Service Pack 3 or higher) Projects Less Than 500 Bus
Professional or Server • Intel Pentium IV – 2.0 GHz
• Microsoft Windows XP (Service Pack 1 or Higher) • 512 MB of RAM
• Microsoft Server 2003
Projects Less Than 2,000 Bus
Software Requirements • Intel Pentium IV – 2.2 GHz with 512 KB L2
• Internet Explorer 5.01 or higher Cache, or
• Microsoft .NET Framework v1.1 Intel Pentium IV – 3.0 GHz with Hyper-
Threading Technology
PC Configuration Requirements • 1 GB of RAM (RDRAM or High-Speed DDR
• Parallel Port, USB Port, or Serial Port (for Stand-Alone RAM)
Licensing only)
• CD-ROM or DVD Drive Projects Over 2,000 Buses
• 5 to 80 GB Hard Disk Space (Based on Project Size, (10,000/20,000/30,000/Unlimited Buses)
Number of Buses) • Intel Pentium IV Xeon – 3.0 GHz with
• 19” Monitors Recommended (Dual Monitors Highly Symmetrical Multi-Processing (Dual)
Recommended) • Hyper-Threading Technology & 533 MHz
System Bus
Real-Time Application - PSMS Server • 2 to 8 GB RAM - (RD RAM or High-Speed
• Intel Pentium IV Xeon – 3.0 GHz with Symmetrical DDR RAM)
Multi-Processing (Dual)
• Hyper-Threading Technology & 533 MHz System Bus
• 2 to 8 GB RAM - (RDRAM or High-Speed DDR
RAM)

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and Crystal Reports® is a registered
trademark of Seagate Software.

1
w
ETAP Star
Ne ule
Mo
d ENHANCED MODULES
(Device Coordination/Selectivity)
Transient Stability Harmonics
ETAP Star is an advanced concept in performing steady-state and
ETAP Star Features Include: The Transient Stability module has been dramatically expanded to The new Harmonic Analysis module
dynamic coordination and selectivity of protective devices. This is increase the type of transient actions (disturbances, load and generation helps you quickly identify problems,
achieved by utilizing intelligent one-line diagrams, comprehensive • Graphically Adjustable Device Settings changes, relay actions, etc.) you can place on the system. reduce nuisance trips, design and test
device libraries, and an integrated three-dimensional database. • Sequence-of-Operation of Protective Devices Among the many added features are SVC, multi-mass shaft modeling, filters, and distortion limit violations
Designed and developed by OTI, Star is a fully integrated module • Embedded Fault & Motor Acceleration Analyses synchronous motor acceleration with discharge resistor, and alerts. The module provides
within ETAP, with built-in analyses such as short-circuit and motor • Extensive Device Library (Verified & Validated) automatic assignment of reference machine for each isolated subsystem. comprehensive load flow and
acceleration. • Phase & Ground Coordination Modes frequency scan calculations using
• Multi-Function Universal Relays • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters detailed harmonic models and non-
• (50/51 P, N, G, SG, 51V, 67, 46, & more)
• Motor Point-by-Point Load Model • HVDC Transmission Link integer harmonic filters.
• Built-In Interface with Relay Hardware
• Dynamic Model for Lumped Load • Universal Relay Actions
• Display Actual Relay Transient Response
• SVC (Steady-State & Transient Response) • New Harmonic Filters
• User-Definable Device Library Database
• Transformer LTC Initial & Operating Time Delays • Transformer k Factor Rating
• Fixed Point / Damage Curve Modeling
• Enhanced General Models for Lumped Load • Alerts for VTHD, VIHD, Transformer, Filter, Capacitor, & Cable
• Graphical Time-Difference Calculator
• Synchronous Motor Acceleration with Discharge Resistor • Report Resonance Frequencies & Magnitudes
• Automatic Current & Voltage Scaling of TCC View
• & Pull-in Process • Enhanced General Models for Lumped Load
• Advanced Curve-Fitting Algorithms
• Step & Ramp Changes of Generation Level, and AVR Reference • One-Line Display of Capacitor & Filter Current
• Auto Clipping for All Protective Devices
• Voltage • Generation of Harmonic Sources Based on Device Parameters for
• Click & Drag Curves to Adjust Settings
• Step & Ramp Changes of Synchronous & Induction Motor Loading • VFD, UPS, Charger, & Inverter
• Automatic Layout of the One-Line Diagram in Star View
• Enhanced Fractional Branch Faults
• Print or Plot on Multiple Pages
• (Transmission Line, Cable, & Impedance)
• Automatically Shrink to Fit on a Single Page
• System Zoning & Automatic Reference Machine Assignment
Libraries (New & Enhanced)
• Print or Plot to Various Paper Sizes, Including Full Size Plotters
• for Each Islanded Subsystem OTI has enhanced and created many new libraries with data locking
• Print Comprehensive Reports of Input Data & Study Results
• New Plots and checker capabilities. Also for ETAP 5.0, all libraries related to
• Customizable Print Functionality, Legends, & Device Labeling
• - Absolute Power Angle for Synchronous Generators & Motors protective devices are combined (short-circuit ratings and time current
• Display Input Data & Study Results on the Drawing
• - Generator & Motor Mvar Flows characteristics) into one ETAP library. The new library has been
w • - Terminal Voltage for Synchronous & Induction Motors validated and verified based on published manufacturer data per
Ne cept
Star Sequence-of-Operation C o n • - Difference of Variables for Fast Bus Transfer ETAP’s qaulity assurance program.
• Contactor Open & Close Action
ETAP Star Sequence-of-Operation provides a system wide solution • Control Relay • Solenoid
• Start Synchronous & Induction Motors by Starting Category
for accurate and realistic operating times and states of protective • LV Circuit Breaker • Fuse
• Multi-Mass Shaft Model for Generators & Motors
devices, such as relay, fuse, circuit breaker, trip devices, contactor, • Overload Relay & Heater
• New Bus Frequency Calculations using Electrical Distance Method
etc. The operation time is calculated for each protective device based • Point-by-Point Motor Load
on its settings, time current characteristics, and interlocks for a • Characteristics
specified fault location and type. • Transmission Line Library
ETAP Real-Time (PSMS) • (Phase & Ground Conductors)
With ETAP Star, not only can you work with the time-current curves, • Trip Devices (Solid State, Thermal-
Built on ETAP, the world-leading power system analysis software,
you can also determine the operating time of protective devices • Magnetic, Electro-Mechanical, & Motor Circuit Protector)
ETAP Real-Time is a real-time energy management system used by
simply by placing a fault on the one-line diagram. • Multi-Function (Universal) Relay (50/51 P, N, G, SG, 51V, 67, 46, …)
operators and managers to monitor, control, and optimize power
systems. New Protective Device Library
• Automatically calculate and display the fault current • ABB (BBC) • Federal Pioneer • Protecta
• contributions on the one-line diagram • AEG • Fuji Electric • RTE
• Enhanced State Estimator • Allen Bradley • G&W • S&C
• Graphically place a fault anywhere on the one-line diagram • Allis-Chalmers • GE Multilin • Schlumberger
• & Load Distribution • Alstom • GEC Alsthom • Schweitzer (SEL)
• Determine the operating time and state of all protective • Basler Electric • General Electric • Siba
• PF Meters • Brush • Gould Shawmut (Ferraz) • Siemens
• devices based on the actual fault current contribution • Bussmann • Heinemann • Snemo
• New Real-Time Simulation • Carriere • ITE (BBC) • Southern States
• flowing through each individual device • CEE • Joslyn • SPD Technologies
• Modules • Chance • K Moeller • Square D
• Globally view post fault actions • Combined Technologies • Kearney • Sure-Trip
• Enhanced Intelligent Load • Cooper • KyongBo Electric • Sylvania
• and associated operating time via a tabulated Event Viewer Coordinate via One-Line Diagram • Shedding
• Cooper (Edison) • L&T • Sytek
• Cutler-Hammer • LG • Terasaki
• Graphically examine the operation of protective devices via the • Deesys • McGraw-Edison • Toshiba
• Extended Communication • Dorman Smith • Merlin Gerin • Universal
• one-line diagram • Driescher • MicroelettricaScientifica • Utility Relay
• Protocols • Enertec • Mitsubishi • Westinghouse
• English Electric • Moeller • Xelpower
1 • Federal Pacific • P&B Engineering • ZIV 6
ENHANCED MODULES
w
Ne ule
Added Features to all Modules Motor Acceleration Optimal Capacitor Placement Mo
d

Thanks to user feedback, significant additions and improvements The Motor Acceleration module has been enhanced to reduce the Optimal Capacitor Placement allows engineers to strategically place capacitors for voltage support and power factor correction while
have been made to enhance all network analyses modules. These time it takes to conduct single and group motor acceleration studies. minimizing installation and long-term operation costs. The advanced graphical interface gives users the flexibility to control the capacitor
enhancements include various study options to globally change and Major enhancements include the new soft starters (control motor placement process and graphically view the results. The precise calculation approach automatically determines the best locations and bank
adjust system parameters and topology with a click of the mouse to voltage, current, or torque), alerts (report various violation for motors, sizes. In addition, it reports the branch capacity release and the estimated savings during the planning period due to var loss reduction.
increase your productivity. buses, generators, and engines), unlimited time events, and user-
defined point-by-point motor load modeling features. • Best Location & Bank Size
• Individual and/or Global Tolerance (Length and/or Impedance) for • Minimum Total Installation & Operation Cost
• Cables, Transmission Lines, OLH, Transformers, & Reactors • Partial-Winding, Y-•, Rotor • Voltage Support & Power Factor Correction
• Isolated Subsystem Index • External Impedance, & Soft • Branch Capacity Release & Cost Savings
• Parameter Adjustment Report • Starters • Capacitor Control Method
• Generation Category • Comprehensive Alert View • Review Capacitor Impact on the System
• Transmission Line Coupling • Unlimited Number of Events
• Protection Page (Cable, Transmission Line, Transformer, Generator, • Point-by-Point Motor Load w
Ne ule
• Model
• Induction Motor, Synchronization Motor)
Unbalanced Load Flow Mo
d
• Charging Current for Single-End Open Branches • Plots for Static Loads & Buses
• (Cable, Transmission Line, & Impedance Branch) • Source Voltage Sequencing A robust and efficient power flow solution method must be able to model special features of distribution systems with sufficient accuracy.
• New One-Line Diagram Zoom With ETAP's Unbalanced Load Flow module, you can easily model your unbalanced system with detailed representation of component
• Enhanced Connection Logic for One-Line Diagram unsymmetrical characteristics. Accurate and reliable per-phase results are available to describe your system’s unbalanced operating conditions.
• UPS Output Connection Arc Flash Automatic alarms/warnings and advanced features such as the automatic line constant calculator make it the most advanced Unbalanced
Load Flow program available today.
ETAP Arc Flash Analysis estimates the arc flash
Short-Circuit incident energy under a bolted 3-phase short
• Advanced Current-Injection Method
circuit fault and determines the flash protective
We have enhanced the IEC • Looped & Radial Systems
boundary to live parts for shock protection.
Standard for device evaluation • 1-Phase, 2-Phase, & 3-Phase Unbalanced Load Flow
Design safer power systems by insuring
based on maximum fault current • Unbalanced Branch & Load Modeling
compliance with OSHA 29 CFR 1910.132(d)
through protection devices, and • Transmission Line Coupling
1990, NFPA 70E-2004, and IEEE 1584-2002 Standards.
reporting of braking current • Charging Current for Open-End Branches
as a function breaker time • Phase & Sequence Voltage, Current, & Unbalanced Rates
• System Calculated or User-Defined Fault Current
delay. ETAP 5.0 also • Multiple Demand Factor Non-Linear Loads
• System Calculated or User-Defined Arcing Fault Clearing Time
provides detailed • Real & Reactive Power Losses & Voltage Drop Calculation
• (Interface with ETAP Star)
reports and graphical • Line & Cable Temperature Correction
• System Calculated or User-Defined System Grounding
display of line-to- • Automatic Alert for Device Evaluation
• Arcing Current Variation
ground, line-to-line, • Automatic Determination of Hazard/Risk Category for PPE w
Ne ule
and line-to-line-to- • Create Regulation Arc Flash Hazard Labels for Every Bus Control System Diagram Mo
d
ground fault currents. • Different Label Templates Available for Each Faulted Equipment
• Quick Incident Energy Calculator (Bus Arc Flash Page) ETAP seamlessly integrates power and control systems within one electrical analysis program. The Control System Diagram (CSD) simulates
• User-Defined Equipment Gap Between Conductors & X Factors the sequence-of-operation of control devices such as solenoids, relays, controlled contacts, multi-sequence contacts, and actuators including
• Limited Approach inrush conditions. CSD has the capability to determine pickup and dropout voltages, losses, and current flows at any time instance as well
Load Flow • Boundary Based on NFPA as overall marginal and critical alerts. A large library of equipment enables engineers to quickly model and simulate the action of relays
• 70E Table 2-1.3.4 associated with control interlocks after time delays.
ETAP’s advanced Load • Drag & Drop Control Relays, Solenoids, Contacts, Cables, etc.
• Added Arc Flash
Flow module includes • Control Logic Simulation (Relays, Circuit Breakers, Contacts, etc.)
• Calculation Icons to the
features such as • Voltage Drop Calculation including Inrush Currents
• Short-Circuit Toolbars
automatic device • Battery Discharge Calculations using Actual Control Logics
• Automatically Update Arc
evaluation, summary • Automatic Alert for Pickup & Dropout Voltages
• Flash Analysis Results to
alarms/warnings, and • Automatic Overloading Alerts
• Every Bus
intelligent graphics. Already a robust Simulate Control • Fully Integrated with One-Line Diagrams
power calculation tool, the module has Actions just like • Comprehensive Device Library (Verified & Validated)
enhanced device evaluation, alerts, and reporting. in Real Systems
5 2
NEW Elements Enhanced Elements
w
Ne ule
GIS Map Mo
d
(Geographic Information System) Static Var Compensator (SVC) Generator
ETAP GIS Map superimposes electrical one-line diagrams with the corresponding geographical maps of power generation, transmission, and • Capacitive & Inductive Characteristics • Generation Category • PF Control Mode
distribution systems. Synchronize relevant electrical equipment information from GIS into ETAP and maintain the relationship between them. • Modeling Within & Outside Control Range • MW-Mvar Capability Curve • Xd” Tolerance
• Full Controller Dynamic Modeling • Inertia Calculator (Prime Mover, Coupling Gear, & Generator)
• Data Synchronization with GIS • Several Typical Control Models • Shaft Torsion Parameters • Engine Rating
• Embedded Load Flow & Fault Analyses • Grounding Through Distribution Transformer
• Display Analysis Results on GIS Maps • Graphical Grounding Elements on One-Line Diagram
• Display Unlimited GIS Presentations High Voltage DC
• Perform Add, Modify, or Delete Actions Transmission Link (HVDC)
• View ESRI ArcGIS® Maps in ETAP Power Grid
• Use Map Tools – Zoom In, Zoom • Load Flow Modeling
• Different Combination of Operating Modes for Rectifier & Inverter • Generation Category
• Out, Full Extent, Pan, etc.
• Full AC/DC Controllers Dynamic Modeling • PF Control Mode
• Fully Control Analysis Results
• Displayed on the GIS Map • Current, Power, & Voltage Controllers for Rectifier & Inverter
• Map GIS Equipment Attributes to • Voltage-Dependent Current-Order Limits (VDCOL) Control Model
• Shut-Off & Re-Start Models
Bus
• ETAP Element Attributes
• Perform Data Consistency Checks • Arc Flash Parameters Based on Normal kV
Multi-Function (Universal) Relay • Unbalanced Initial Voltage
• Arc Flash Calculator with Embedded Fault Analysis
• Multi Level & Function • & Protective Device Clearing Time
w
Ne ule
w
Ne ule • Overcurrent (50/51)
Transmission Line Mo
d
ETAP Wizard Mo
d
(Added to Base Modules) • Voltage Control/Restraint (51V)

ETAP 5.0 includes a time saving project management tool known as


• Phase, Neutral, Ground, Sensitive Ground, & Negative Sequence Lumped Load
The new Transmission Line editor provides new configuration templates
• Directional Overcurrent (67)
for automatic calculations of line constants. You can enter the line the ETAP Wizard, which enables you to record and automatically • Unbalanced Loading
• Overload (49)
data or select from the newly-added transmission line library, for run hundreds of different studies at any time. The ETAP Wizard consists • Dynamic Model
• Multiple CT & PT Connections
phase conductors and ground wires. The editor calculates conductor of a Scenario Wizard, a Study Wizard, and a Project Wizard. • Voltage & Frequency Dependent Models
• Multiple Circuit Breaker Interlocks
ampacity-temperature relationships, and sag and tension-temperature • (Exponential, Polynomial, & Comprehensive)
relationships of overhead transmission lines.
Overload Heater & Relay
w
Ne ule Induction & Synchronous Motors
Line Ampacity M o d • In-Line, CT Connected, & Solid State
• Minimum & Maximum Resistances • Inertia Calculator (Motor, Coupling Gear, & Load)
• Line Ampacity Derating • Automatic Voltage Drop Calculation for Connected Loads • Shaft Torsion Parameters
• Conductor Operating Temperature • Resistance Tolerance • Point-by-Point Load Model
• Calculation • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters
• Wind Speed & Direction Elevation, • (Current, Voltage, & Torque Control)
Latitude, Sun, & Solar Effects
Text Box
• Absorpitivity & Emissivty • Graphically Display Text & Element Properties
• Ambient & Operating Temperatures • Automatic Updates with Change of Properties Transmission Line
• Display on One-Line Diagrams, Underground Raceway Systems, • Multi-Distance & Multi-Line Coupling
w • Control System Diagrams, Star Views, etc.
Ne ule • Tower Arrangement with Multiple Templates
Sag & Tension Mo
d
• User-Defined Conductor Configurations
• Multiple Suspension Spans Between Grounding • Transposition & Multi-Layer Earth
• Dead-End Structures
• Multiple Spans of Unequal Lengths Elements
• Wind, Temperature, Ice, & k Factor Effects • Manage & Automate Studies for Multiple Projects • Intelligent One-Line Diagrams
• Save Study Parameters & Settings • Generators, 2W & 3W Transformers
Transformer (2W & 3W)
• Run Multiple Scenarios On-Demand • Connect Instrument Transformers, Relays, & Meters • Grounding Through Distribution Transformer
• Use Macros to Automate & Repeat Studies • Hide & Show On-Demand per Presentation • Graphical Grounding Elements on One-Line Diagram

3 4
NEW Elements Enhanced Elements
w
Ne ule
GIS Map Mo
d
(Geographic Information System) Static Var Compensator (SVC) Generator
ETAP GIS Map superimposes electrical one-line diagrams with the corresponding geographical maps of power generation, transmission, and • Capacitive & Inductive Characteristics • Generation Category • PF Control Mode
distribution systems. Synchronize relevant electrical equipment information from GIS into ETAP and maintain the relationship between them. • Modeling Within & Outside Control Range • MW-Mvar Capability Curve • Xd” Tolerance
• Full Controller Dynamic Modeling • Inertia Calculator (Prime Mover, Coupling Gear, & Generator)
• Data Synchronization with GIS • Several Typical Control Models • Shaft Torsion Parameters • Engine Rating
• Embedded Load Flow & Fault Analyses • Grounding Through Distribution Transformer
• Display Analysis Results on GIS Maps • Graphical Grounding Elements on One-Line Diagram
• Display Unlimited GIS Presentations High Voltage DC
• Perform Add, Modify, or Delete Actions Transmission Link (HVDC)
• View ESRI ArcGIS® Maps in ETAP Power Grid
• Use Map Tools – Zoom In, Zoom • Load Flow Modeling
• Different Combination of Operating Modes for Rectifier & Inverter • Generation Category
• Out, Full Extent, Pan, etc.
• Full AC/DC Controllers Dynamic Modeling • PF Control Mode
• Fully Control Analysis Results
• Displayed on the GIS Map • Current, Power, & Voltage Controllers for Rectifier & Inverter
• Map GIS Equipment Attributes to • Voltage-Dependent Current-Order Limits (VDCOL) Control Model
• Shut-Off & Re-Start Models
Bus
• ETAP Element Attributes
• Perform Data Consistency Checks • Arc Flash Parameters Based on Normal kV
Multi-Function (Universal) Relay • Unbalanced Initial Voltage
• Arc Flash Calculator with Embedded Fault Analysis
• Multi Level & Function • & Protective Device Clearing Time
w
Ne ule
w
Ne ule • Overcurrent (50/51)
Transmission Line Mo
d
ETAP Wizard Mo
d
(Added to Base Modules) • Voltage Control/Restraint (51V)

ETAP 5.0 includes a time saving project management tool known as


• Phase, Neutral, Ground, Sensitive Ground, & Negative Sequence Lumped Load
The new Transmission Line editor provides new configuration templates
• Directional Overcurrent (67)
for automatic calculations of line constants. You can enter the line the ETAP Wizard, which enables you to record and automatically • Unbalanced Loading
• Overload (49)
data or select from the newly-added transmission line library, for run hundreds of different studies at any time. The ETAP Wizard consists • Dynamic Model
• Multiple CT & PT Connections
phase conductors and ground wires. The editor calculates conductor of a Scenario Wizard, a Study Wizard, and a Project Wizard. • Voltage & Frequency Dependent Models
• Multiple Circuit Breaker Interlocks
ampacity-temperature relationships, and sag and tension-temperature • (Exponential, Polynomial, & Comprehensive)
relationships of overhead transmission lines.
Overload Heater & Relay
w
Ne ule Induction & Synchronous Motors
Line Ampacity M o d • In-Line, CT Connected, & Solid State
• Minimum & Maximum Resistances • Inertia Calculator (Motor, Coupling Gear, & Load)
• Line Ampacity Derating • Automatic Voltage Drop Calculation for Connected Loads • Shaft Torsion Parameters
• Conductor Operating Temperature • Resistance Tolerance • Point-by-Point Load Model
• Calculation • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters
• Wind Speed & Direction Elevation, • (Current, Voltage, & Torque Control)
Latitude, Sun, & Solar Effects
Text Box
• Absorpitivity & Emissivty • Graphically Display Text & Element Properties
• Ambient & Operating Temperatures • Automatic Updates with Change of Properties Transmission Line
• Display on One-Line Diagrams, Underground Raceway Systems, • Multi-Distance & Multi-Line Coupling
w • Control System Diagrams, Star Views, etc.
Ne ule • Tower Arrangement with Multiple Templates
Sag & Tension Mo
d
• User-Defined Conductor Configurations
• Multiple Suspension Spans Between Grounding • Transposition & Multi-Layer Earth
• Dead-End Structures
• Multiple Spans of Unequal Lengths Elements
• Wind, Temperature, Ice, & k Factor Effects • Manage & Automate Studies for Multiple Projects • Intelligent One-Line Diagrams
• Save Study Parameters & Settings • Generators, 2W & 3W Transformers
Transformer (2W & 3W)
• Run Multiple Scenarios On-Demand • Connect Instrument Transformers, Relays, & Meters • Grounding Through Distribution Transformer
• Use Macros to Automate & Repeat Studies • Hide & Show On-Demand per Presentation • Graphical Grounding Elements on One-Line Diagram

3 4
ENHANCED MODULES
w
Ne ule
Added Features to all Modules Motor Acceleration Optimal Capacitor Placement Mo
d

Thanks to user feedback, significant additions and improvements The Motor Acceleration module has been enhanced to reduce the Optimal Capacitor Placement allows engineers to strategically place capacitors for voltage support and power factor correction while
have been made to enhance all network analyses modules. These time it takes to conduct single and group motor acceleration studies. minimizing installation and long-term operation costs. The advanced graphical interface gives users the flexibility to control the capacitor
enhancements include various study options to globally change and Major enhancements include the new soft starters (control motor placement process and graphically view the results. The precise calculation approach automatically determines the best locations and bank
adjust system parameters and topology with a click of the mouse to voltage, current, or torque), alerts (report various violation for motors, sizes. In addition, it reports the branch capacity release and the estimated savings during the planning period due to var loss reduction.
increase your productivity. buses, generators, and engines), unlimited time events, and user-
defined point-by-point motor load modeling features. • Best Location & Bank Size
• Individual and/or Global Tolerance (Length and/or Impedance) for • Minimum Total Installation & Operation Cost
• Cables, Transmission Lines, OLH, Transformers, & Reactors • Partial-Winding, Y-•, Rotor • Voltage Support & Power Factor Correction
• Isolated Subsystem Index • External Impedance, & Soft • Branch Capacity Release & Cost Savings
• Parameter Adjustment Report • Starters • Capacitor Control Method
• Generation Category • Comprehensive Alert View • Review Capacitor Impact on the System
• Transmission Line Coupling • Unlimited Number of Events
• Protection Page (Cable, Transmission Line, Transformer, Generator, • Point-by-Point Motor Load w
Ne ule
• Model
• Induction Motor, Synchronization Motor)
Unbalanced Load Flow Mo
d
• Charging Current for Single-End Open Branches • Plots for Static Loads & Buses
• (Cable, Transmission Line, & Impedance Branch) • Source Voltage Sequencing A robust and efficient power flow solution method must be able to model special features of distribution systems with sufficient accuracy.
• New One-Line Diagram Zoom With ETAP's Unbalanced Load Flow module, you can easily model your unbalanced system with detailed representation of component
• Enhanced Connection Logic for One-Line Diagram unsymmetrical characteristics. Accurate and reliable per-phase results are available to describe your system’s unbalanced operating conditions.
• UPS Output Connection Arc Flash Automatic alarms/warnings and advanced features such as the automatic line constant calculator make it the most advanced Unbalanced
Load Flow program available today.
ETAP Arc Flash Analysis estimates the arc flash
Short-Circuit incident energy under a bolted 3-phase short
• Advanced Current-Injection Method
circuit fault and determines the flash protective
We have enhanced the IEC • Looped & Radial Systems
boundary to live parts for shock protection.
Standard for device evaluation • 1-Phase, 2-Phase, & 3-Phase Unbalanced Load Flow
Design safer power systems by insuring
based on maximum fault current • Unbalanced Branch & Load Modeling
compliance with OSHA 29 CFR 1910.132(d)
through protection devices, and • Transmission Line Coupling
1990, NFPA 70E-2004, and IEEE 1584-2002 Standards.
reporting of braking current • Charging Current for Open-End Branches
as a function breaker time • Phase & Sequence Voltage, Current, & Unbalanced Rates
• System Calculated or User-Defined Fault Current
delay. ETAP 5.0 also • Multiple Demand Factor Non-Linear Loads
• System Calculated or User-Defined Arcing Fault Clearing Time
provides detailed • Real & Reactive Power Losses & Voltage Drop Calculation
• (Interface with ETAP Star)
reports and graphical • Line & Cable Temperature Correction
• System Calculated or User-Defined System Grounding
display of line-to- • Automatic Alert for Device Evaluation
• Arcing Current Variation
ground, line-to-line, • Automatic Determination of Hazard/Risk Category for PPE w
Ne ule
and line-to-line-to- • Create Regulation Arc Flash Hazard Labels for Every Bus Control System Diagram Mo
d
ground fault currents. • Different Label Templates Available for Each Faulted Equipment
• Quick Incident Energy Calculator (Bus Arc Flash Page) ETAP seamlessly integrates power and control systems within one electrical analysis program. The Control System Diagram (CSD) simulates
• User-Defined Equipment Gap Between Conductors & X Factors the sequence-of-operation of control devices such as solenoids, relays, controlled contacts, multi-sequence contacts, and actuators including
• Limited Approach inrush conditions. CSD has the capability to determine pickup and dropout voltages, losses, and current flows at any time instance as well
Load Flow • Boundary Based on NFPA as overall marginal and critical alerts. A large library of equipment enables engineers to quickly model and simulate the action of relays
• 70E Table 2-1.3.4 associated with control interlocks after time delays.
ETAP’s advanced Load • Drag & Drop Control Relays, Solenoids, Contacts, Cables, etc.
• Added Arc Flash
Flow module includes • Control Logic Simulation (Relays, Circuit Breakers, Contacts, etc.)
• Calculation Icons to the
features such as • Voltage Drop Calculation including Inrush Currents
• Short-Circuit Toolbars
automatic device • Battery Discharge Calculations using Actual Control Logics
• Automatically Update Arc
evaluation, summary • Automatic Alert for Pickup & Dropout Voltages
• Flash Analysis Results to
alarms/warnings, and • Automatic Overloading Alerts
• Every Bus
intelligent graphics. Already a robust Simulate Control • Fully Integrated with One-Line Diagrams
power calculation tool, the module has Actions just like • Comprehensive Device Library (Verified & Validated)
enhanced device evaluation, alerts, and reporting. in Real Systems
5 2
w
ETAP Star
Ne ule
Mo
d ENHANCED MODULES
(Device Coordination/Selectivity)
Transient Stability Harmonics
ETAP Star is an advanced concept in performing steady-state and
ETAP Star Features Include: The Transient Stability module has been dramatically expanded to The new Harmonic Analysis module
dynamic coordination and selectivity of protective devices. This is increase the type of transient actions (disturbances, load and generation helps you quickly identify problems,
achieved by utilizing intelligent one-line diagrams, comprehensive • Graphically Adjustable Device Settings changes, relay actions, etc.) you can place on the system. reduce nuisance trips, design and test
device libraries, and an integrated three-dimensional database. • Sequence-of-Operation of Protective Devices Among the many added features are SVC, multi-mass shaft modeling, filters, and distortion limit violations
Designed and developed by OTI, Star is a fully integrated module • Embedded Fault & Motor Acceleration Analyses synchronous motor acceleration with discharge resistor, and alerts. The module provides
within ETAP, with built-in analyses such as short-circuit and motor • Extensive Device Library (Verified & Validated) automatic assignment of reference machine for each isolated subsystem. comprehensive load flow and
acceleration. • Phase & Ground Coordination Modes frequency scan calculations using
• Multi-Function Universal Relays • Partial-Winding, Y-•, Rotor External Impedance, & Soft Starters detailed harmonic models and non-
• (50/51 P, N, G, SG, 51V, 67, 46, & more)
• Motor Point-by-Point Load Model • HVDC Transmission Link integer harmonic filters.
• Built-In Interface with Relay Hardware
• Dynamic Model for Lumped Load • Universal Relay Actions
• Display Actual Relay Transient Response
• SVC (Steady-State & Transient Response) • New Harmonic Filters
• User-Definable Device Library Database
• Transformer LTC Initial & Operating Time Delays • Transformer k Factor Rating
• Fixed Point / Damage Curve Modeling
• Enhanced General Models for Lumped Load • Alerts for VTHD, VIHD, Transformer, Filter, Capacitor, & Cable
• Graphical Time-Difference Calculator
• Synchronous Motor Acceleration with Discharge Resistor • Report Resonance Frequencies & Magnitudes
• Automatic Current & Voltage Scaling of TCC View
• & Pull-in Process • Enhanced General Models for Lumped Load
• Advanced Curve-Fitting Algorithms
• Step & Ramp Changes of Generation Level, and AVR Reference • One-Line Display of Capacitor & Filter Current
• Auto Clipping for All Protective Devices
• Voltage • Generation of Harmonic Sources Based on Device Parameters for
• Click & Drag Curves to Adjust Settings
• Step & Ramp Changes of Synchronous & Induction Motor Loading • VFD, UPS, Charger, & Inverter
• Automatic Layout of the One-Line Diagram in Star View
• Enhanced Fractional Branch Faults
• Print or Plot on Multiple Pages
• (Transmission Line, Cable, & Impedance)
• Automatically Shrink to Fit on a Single Page
• System Zoning & Automatic Reference Machine Assignment
Libraries (New & Enhanced)
• Print or Plot to Various Paper Sizes, Including Full Size Plotters
• for Each Islanded Subsystem OTI has enhanced and created many new libraries with data locking
• Print Comprehensive Reports of Input Data & Study Results
• New Plots and checker capabilities. Also for ETAP 5.0, all libraries related to
• Customizable Print Functionality, Legends, & Device Labeling
• - Absolute Power Angle for Synchronous Generators & Motors protective devices are combined (short-circuit ratings and time current
• Display Input Data & Study Results on the Drawing
• - Generator & Motor Mvar Flows characteristics) into one ETAP library. The new library has been
w • - Terminal Voltage for Synchronous & Induction Motors validated and verified based on published manufacturer data per
Ne cept
Star Sequence-of-Operation C o n • - Difference of Variables for Fast Bus Transfer ETAP’s qaulity assurance program.
• Contactor Open & Close Action
ETAP Star Sequence-of-Operation provides a system wide solution • Control Relay • Solenoid
• Start Synchronous & Induction Motors by Starting Category
for accurate and realistic operating times and states of protective • LV Circuit Breaker • Fuse
• Multi-Mass Shaft Model for Generators & Motors
devices, such as relay, fuse, circuit breaker, trip devices, contactor, • Overload Relay & Heater
• New Bus Frequency Calculations using Electrical Distance Method
etc. The operation time is calculated for each protective device based • Point-by-Point Motor Load
on its settings, time current characteristics, and interlocks for a • Characteristics
specified fault location and type. • Transmission Line Library
ETAP Real-Time (PSMS) • (Phase & Ground Conductors)
With ETAP Star, not only can you work with the time-current curves, • Trip Devices (Solid State, Thermal-
Built on ETAP, the world-leading power system analysis software,
you can also determine the operating time of protective devices • Magnetic, Electro-Mechanical, & Motor Circuit Protector)
ETAP Real-Time is a real-time energy management system used by
simply by placing a fault on the one-line diagram. • Multi-Function (Universal) Relay (50/51 P, N, G, SG, 51V, 67, 46, …)
operators and managers to monitor, control, and optimize power
systems. New Protective Device Library
• Automatically calculate and display the fault current • ABB (BBC) • Federal Pioneer • Protecta
• contributions on the one-line diagram • AEG • Fuji Electric • RTE
• Enhanced State Estimator • Allen Bradley • G&W • S&C
• Graphically place a fault anywhere on the one-line diagram • Allis-Chalmers • GE Multilin • Schlumberger
• & Load Distribution • Alstom • GEC Alsthom • Schweitzer (SEL)
• Determine the operating time and state of all protective • Basler Electric • General Electric • Siba
• PF Meters • Brush • Gould Shawmut (Ferraz) • Siemens
• devices based on the actual fault current contribution • Bussmann • Heinemann • Snemo
• New Real-Time Simulation • Carriere • ITE (BBC) • Southern States
• flowing through each individual device • CEE • Joslyn • SPD Technologies
• Modules • Chance • K Moeller • Square D
• Globally view post fault actions • Combined Technologies • Kearney • Sure-Trip
• Enhanced Intelligent Load • Cooper • KyongBo Electric • Sylvania
• and associated operating time via a tabulated Event Viewer Coordinate via One-Line Diagram • Shedding
• Cooper (Edison) • L&T • Sytek
• Cutler-Hammer • LG • Terasaki
• Graphically examine the operation of protective devices via the • Deesys • McGraw-Edison • Toshiba
• Extended Communication • Dorman Smith • Merlin Gerin • Universal
• one-line diagram • Driescher • MicroelettricaScientifica • Utility Relay
• Protocols • Enertec • Mitsubishi • Westinghouse
• English Electric • Moeller • Xelpower
1 • Federal Pacific • P&B Engineering • ZIV 6
ETAP PowerStation 4.7.6
January 2004

The OTI Development Team is pleased to present you with the latest ETAP PowerStation 4.7.6 and
PowerPlot v2.5, Release 167. ETAP PowerStation 4.7.6 is a point release, which includes some
enhancements and corrections for earlier releases.

ETAP PowerStation 4.7.6 release is a complete program and does not require an earlier program
installation.

ETAP PowerStation 4.7.4


June 2003
Continuing our tradition of providing quality products, the OTI Development Team is pleased to present
you with the latest ETAP PowerStation 4.7.4 and PowerPlot v2.5, Release 134. ETAP PowerStation
4.7.4 includes minor enhancements and corrections from our 4.7.0 release and incorporates the following
new module and features:

• Arc Flash Analysis using IEEE Std. 1584-2002 method


• Hyperlink
• Auto Project Backup

We encourage you to install this latest release to take advantage of the new features and capabilities.
Please contact OTI sales to purchase the new Arch Flash IEEE 1584 module. We are excited about
providing our customers with advanced features and industry standard engineering tools.

For more information, please take a few moments to read and review the information below:

Arc Flash IEEE 1584 Analysis NEW MODULE


The new ETAP module Arc Flash Analysis uses the IEEE Std. 1584-2002 method to estimate the arc
flash incident energy under a three-phase short-circuit fault and determines the flash protective boundary
to live parts for shock protection. The flash protection boundary is the distance a worker without wearing
flame-resistant personal protective equipment (PPE) must keep from equipment, which may cause
hazardous arc flash.

In the IEEE Std. 1584-2002 method, the empirically derived model is used for voltages in the range of
0.208-15kV. The theoretically derived Lee Model is used for voltage levels above 15kV. The
empirically derived model has a bolted fault current range of 0.7- 106kA. ETAP Arc Flash is available
for both ANSI and IEC Standards.

Arc Flash Analysis with NFPA 70E-2000 Standard continues to be an integral part of the ETAP Short
Circuit Analysis module.

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
2
Hyperlink NEW FEATURE
˙ Drag and drop the hyperlink on any device on the one-line diagram, raceway, or presentation
including composite motors and networks.

˙ Hyperlinks Editor opens automatically after dropping link onto an element or one-line diagram.
o Description
o Web or network address of file
o Tooltip (Roll-over)

˙ Multiple links per element are possible. Hyperlinks are easy to edit and remove.

Auto Project Backup NEW FEATURE


In order to maximize protection of your PowerStation projects and prevent loss of data due to hardware or
network failure, PowerStation is enhanced to maintain backup copies of project files. These backup files
are created when any of the following actions are performed:

˙ Conversion creates a back-up copy of current database prior to conversion.


˙ Opening a project: creates a temporary back-up copy after opening a project session.
˙ Closing a project: auto-saves backup file when closing a project session.

The auto backup feature can be turned off in the ETAPS.INI file. The default setting is set to “1” to
create backup. To stop auto-backup functions, set the INI file value to “0”.

[ETAP PowerStation]
CreateBackupFile=0

Data Exchange
DXF file format is optimized. File size for each DXF file is considerably less if the file contains minimal
information.

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
3
System Requirements
Minimum Hardware Requirements
Your computer must meet the following minimum hardware requirements to run PowerStation 4.7.4:
• Intel Pentium III
• 256 MB of RAM
• 500 MB available hard disk space
• Parallel, USB*, or Serial* Ports (*PowerPlot licensing not available for these ports)
• CD ROM Drive – Stand Alone Licensing only

Operating System
Your computer must meet the following Operating System and software requirements to use
PowerStation 4.7.4:
Microsoft Windows
• 98SE (Second Edition) • 2000 (Service Pack 2)
• NT 4.0 (Service Pack 6 or higher) • Me
• XP • Internet Explorer 5.0 or higher
Recommended Hardware Requirements
For projects less than 500 busses
• Intel Pentium IV or higher – 2.0 GHz or higher
• 512 MB of RAM
• 20 GB disk space
• Dual 21" monitor with 1024x768 resolution
• Microsoft Windows 2000 Professional, XP Professional, XP Home

For projects less than 2,000 busses


• Intel Pentium IV or higher – 2.2 GHz or higher with 512 kb L2 cache. Intel Pentium IV
w/Hyper-Threading technology recommended (3.0 GHz or higher).
• 1 GB of RAM (RD RAM or High-speed DDR RAM)
• 40 GB disk space.
• Dual 21" monitor with 1024x768 resolution, or higher
• Microsoft Windows 2000 Professional, XP Professional

For projects over 2,000 buses (10,000, 20,000, 30,000, or unlimited busses)
• Intel Pentium IV Xeon (3.0 GHz or higher) w/Symmetrical Multi-Processing (Dual) and Hyper-
Threading Technology. 533 MHz System Bus.
• 2-8 GB RAM, depending on maximum number of busses - (RD RAM or High-speed DDR RAM)
• 80 GB disk space
• Dual 21" monitor with 1024x768 resolution, or higher
• Microsoft Windows 2000 Professional, XP Professional

Future Software Requirements


The ETAP 4.7.4 series will be the final release supported in the Windows 98, ME, and NT operating
systems. Future releases will require either Windows XP or 2000. In addition, ETAP will require that
Microsoft .NET runtime package be installed.

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
4
ETAP PowerStation 4.7.0
October 2002
This release incorporates Cable Pulling, Transformer MVA Sizing, Transformer Tap Optimization, IEC
287 temperature analysis (Underground Raceway Systems), and Motor Parameter Estimation modules
into ETAP, making ETAP completely integrated within the Windows environment. In addition, hundreds
of enhancements have been added to the existing modules.

Following the tradition of ETAP integration of electrical and physical properties, the newly added
modules have been designed to fully integrate with existing modules to eliminate multiple instances of the
similar data. For example, the Cable Pulling module uses the data from the existing cables in your ETAP
project files. Thus, the data for a single cable can be used for:

Network analyses such as load flow, short-circuit, etc.


Cable raceway thermal analyses for temperature and sizing calculations
Cable I2t curve for protective device coordination
Cable pulling analyses for tensions and sidewall pressure calculations

With ETAP, you can model, design, analyze, and optimize your electrical systems. This integration of
data provides consistency throughout the project and eliminates repetitive data entry for the same
element. This in turn reduces the time required to model and analyze a power system in its entirety,
which results in time and cost savings.

Analysis Capabilities
ETAP PowerStation 4.7 is a major upgrade to ETAP PowerStation 4.0.4. The analysis capabilities
available to you will depend on the configuration of modules purchased.

Cable Pulling NEW MODULE


• 3-D isometric view
• Pull multiple cables with different sizes
• Create straight segments & bends in any direction
• Checks for NEC requirements
• Forward & reverse tensions including sidewall pressures
• Includes Crystal Reports® & Microsoft Access® output databases

Motor Parameter Estimation NEW MODULE


• Estimate dynamic parameters of induction machines
• Include parameter variations due to speed and/or deep-bar effects
• Requires most readily-available characteristics published by manufacturers
• Calculate input parameters using estimated results & report any deviations

Transformer MVA Sizing NEW MODULE


• Sizing based on the actual connected or operating load
• Includes ANSI & IEC standard types, classes, & ratings

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
5
• Considers ambient temperature, altitude, load growth, diversity factors, etc.

Transformer Tap Optimization NEW MODULE


• IEEE CSF.116 Standard
• Optimizes transformer’s tap setting and/or turns ratio
• Considers transformer’s primary & secondary side feeders
• Considers system voltage variation, connected generation, & auxiliary loads
• Plots generator Mvar output vs. system voltage

Load Flow
• Unbalanced load flow calculations for panel systems & single-phase networks
• Alert view for panel systems & single-phase networks
• Voltage drop calculation for panel systems & single-phase networks
• Added an option to display load terminal voltages using Load Rated kV or Bus Nominal kV
• Enhanced Equipment Cable Losses Summary Report
• Added option to display bus angles

Short-Circuit
• Graphical plots of transient short circuit currents (IEC 363)
• Generator circuit breaker interrupting duty calculation (ANSI C37.010 – 1999)
• User-definable contact parting time & time constant for HV circuit breakers
• Ith & Ik calculations (IEC 909)
• Expanded arc duration range for Arc Flash Hazard calculations

Motor Acceleration
• New plots & graphical display of power flows for MOVs, generators, & power grids
• New enhanced plots of accelerating motors
• Added an option to display load terminal voltage based on Load Rated kV or Bus Nominal kV

Transient Stability
• Expanded Crystal Reports®
• Expanded calculations to handle frequency-dependent models for induction machines
• Expanded calculations to handle non-windup limiters for exciter types ST2 and ST3 models

User-Defined Dynamic Models


• Enhanced control blocks for exciter, governor, & stabilizer circuits
• Enhanced library of pre-configured models

Optimal Power Flow


• Crystal Reports® & Microsoft Access output databases

Reliability Assessment
• Enhanced program to handle double contingency or multi-stage failure analyses

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
6
Protective Device Coordination
• Motor Operated Valves (MOV)
• Expanded Device Library

Underground Cable Raceway Systems


• Conductor temperature calculations (IEC 287)
• Includes Crystal Reports® & Microsoft Access output databases
• Added automatic scrolling for UGS graphics
• Enhanced armor options & includes wire quantities up to 9999
• Enhanced Neher-McGrath to utilize various β angles for armor

Ground Grid Systems


• Enhanced printing functions
• Added calculation progress window
• Boundary extension limitation is increased from 3 ft/m to 99 ft/m
• Enhanced program to handle zero surface material for IEEE 80 and IEEE 65

Generator Fuel Cost


• Incremental cost curves
• Generator heat rate curves
• User-defined fuel cost profiles

One-Line Diagram
• Display of load flow results for single-phase networks
• Display of unbalanced three-phase load flow results for Panel Systems
• Wheel-mouse compatible panning/auto-scrolling
• Drag and drop between the one-line diagrams, composite networks, and Dumpster
• Long output report names (64 characters)
• Detailed display of license information in the About ETAP dialog box

Data Exchange
• DXF export of ETAP project files including graphical annotations, results, etc.
• Enhanced database conversion/synchronizations from common database formats, CSV, XML, IEEE,
GIS & most third party applications
• Enhanced XML export of ETAP project data including nested or flat layout of the one-line diagram
• One-click zip (compress) & e-mail an ETAP project with options to include reports and/or libraries
• XML - Duty cycles for DC elements are added to the XML file export

General
• USB key and serial printer port keys are available to license stand-alone copies
• Enhanced the Help/About PowerStation screen to include detailed license information for
PowerStation keys
• PowerStation projects (MS Access database®) created with earlier versions of ETAP PowerStation
are automatically converted to Microsoft Access 2000 upon opening
• Output filename length is increased from 8 to 64 alphanumeric characters

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
7
• Manufacturer data is added to fuse, cable, battery, and harmonics libraries
• Phase connections are added for Motor Nameplate reports for the Schedule Manager

Real-Time Monitoring (PSMS)


• Enhanced ActiveX support for non-electrical measurements (such as temperature, pressure, etc.) for
Man-Machine Interface (MMI)
• New Comparator View of the estimated voltages & flows vs. real-time data

Real-Time Simulation (PSMS)


• Predict real-time system response based on remote power generator control signals
• New Comparator View of the simulated load flow results vs. real-time data

Operating Systems & Software Requirements


Microsoft Windows with Internet Explorer 5.0 or higher
· 98 (Second Edition)
· NT 4.0 (Service Pack 6 or higher)
· 2000 (Service Pack 2 or higher)
· Me
· XP (Home or Professional)

Minimum PC Requirements
· Intel Pentium II
· 128 MB of RAM
· 500 MB available hard drive space
· 1024x768 resolution
· Parallel Port
· Optional - USB Port (stand-alone licensing only)
· Optional - Serial Port (stand-alone licensing only)

Recommended PC Configuration
· Intel Pentium IV or higher
· 512 MB of RAM
· 2 GB available hard drive space
· 21" monitor with 1024x768 resolution
· Internet Explorer 5.0 or higher
· Parallel Port
· Optional - USB Port (stand-alone licensing only)
· Optional - Serial Port (stand-alone licensing only)
· Microsoft Windows 2000 Professional or XP Professional

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
8
ETAP PowerStation 4.0.4
April 2002

ETAP PowerStation is the most sophisticated engineering power system analysis tool on the market
today. Thousands of hours of design and engineering experience have gone into the overall development
of this software. We have combined state-of-the-art software development experience with real-life,
practical engineering know-how to create an intelligent, yet user-friendly, engineering software.

Analysis Capabilities
ETAP PowerStation 4.0.4 is a minor upgrade to ETAP PowerStation 4.0.0. The analysis capabilities
available to you will depend on the configuration of modules purchased.

Load Flow
• New double-precision Newton-Raphson method with current injection
• Phase-shifting transformer
• New summary output report on bus loadings and overload conditions
• New Alert View to display critical and marginal limit violations

Short-Circuit
• CB Duty calculation based on the maximum-through fault current (ANSI)
• Phase-shifting transformer for ANSI unbalanced faults
• New Alert View to display critical and marginal limit violations
• New Arc Flash analysis program for determining incident energy and flash protective boundary
(ANSI and IEC)

Harmonics
• Filter Overloading
• I*T Index
• Phase-shifting transformer
• Customizable output reports using Crystal Reports format

Transient Stability
• Synchronous motor exciter/AVR system
• Automatic CB operation based on instantaneous relay settings
Overcurrent (50/50G)
Directional Overcurrent (67)
Reverse Power (32)
Motor Overcurrent (50M)
Solid State Trip (SST)
• Loss of excitation action
• New plots for machine terminal impedance (for out-of-step relay setting)
• New plots for branch flows (MW, Mvar, MVA, and Amps)
• IEEE models for Power System Stabilizers (PSS)
• New manufacture models for exciters and governors

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
9
• User-defined Dynamic Models (UDM) interface for:
Exciter/AVR
Governor - Turbine
Power System Stabilizer
• Complete integration with UDM for the Generator Start-Up program
• Phase-shifting transformer
• Segment (fractional) faults for cables and transmission lines
• Remote voltage control bus for all exciters

Libraries
• Reliability Index Library
• Interruption Cost Library
• Expanded existing library data

Reliability Assessment Analysis – NEW MODULE


• Analysis includes protective device effects on fault isolation and load restoration such as replacement
and alternative supply
• Radial, looped, and multiple isolated system configurations
• Model each component with its own reliability characteristics
• Implements the user-defined parameters and settings
• Calculate load point and bus reliability indices:
Average Failure Rate [λ]
Average Outage Duration [r]
Annual Outage Duration [µ]
• Calculate system reliability indices:
System Average Interruption Frequency Index [SAIFI]
System Average Interruption Duration Index [SAIDI]
Customer Average Interruption Duration Index [CAIDI]
Average Service Availability Index [ASAI]
Average Service Unavailability Index [ASUI]
• Calculate reliability cost/worth indices for load points, buses, and system:
Expected Energy Not Supplied [EENS]
Expected Interruption Cost [ECOST]
Interrupted Energy Assessment Rate [IEAR]
• Rank element contributions to the cost/worth indices
• Sensitivity analyses for EENS’s and ECOST’s:
Element contributions to the EENS and their rankings
Element contributions to the ECOST and their rankings
• Customizable output reports using Crystal Reports format

Cable Ampacity
• ICEA P-55-440 cable tray ampacity calculator (Stolpe Method)

User-Defined Dynamic Models (UDM) – NEW MODULE


• Build your own governor/turbine, exciter/AVR, and Power System Stabilizer control block diagrams
for Transient Stability analysis
• Large selection of control blocks and elementary functions

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
10
• Stand-alone test model performance including isolated step response
• Complete integration with Generator Start-Up analysis
• Run-time compile within ETAP PowerStation
• Utilize models within the Transient Stability Program
• Select user-built models within generator editors
• Utilizes block diagrams generated by Simulink®
• Implement system-wide operations such as load shedding, fast bus transfer, islanding, etc.

Motor Starting
• Phase-shifting transformer

Ground Grid Systems – NEW MODULE


• Analysis includes four different methods
IEEE 80 - 1986
IEEE 80 – 2000
IEEE 665 – 1995
Finite Element
• Graphic user interface for conductors and rods
• Graphic Soil View
• Handles irregular configurations of any shape
• Allows a two-layer soil model in addition to the surface material
• Unlimited conductors and rods
• Conductor segments can be oriented in any possible 3-D direction
• Complete integration with one-line diagram for elements placed on the grid and short-circuit values
• Calculates tolerable step and touch potentials
• Compares calculated step and touch potentials with tolerable limits
• Optimizes number of conductors with fixed rods
• Optimizes number of conductors and rods based on cost
• Calculate the maximum allowable current for conductors
• Compares allowable currents against fault currents
• Calculates ground system resistance
• Calculates ground potential rise (GPR)
• User-expandable conductor library
• Tabulates absolute, step, and touch potentials throughout the grid
• 3-D plot of grid configuration showing conductors and rods
• 3-D plots of absolute, step, and touch potentials
• Customizable output reports using Crystal Reports format

Battery Discharge Analysis – NEW MODULE


• Calculate battery discharge using an existing battery or using a battery that is automatically sized by
ETAP
• Battery discharge using DC Load Flow method or load summation method
• Generate plots and reports using Crystal Reports
• Use different diversity and correction factors such as, temperature, aging, initial capacity, and initial
conditions
• Plots for battery duty cycle, voltage, capacity, current, power and characteristics
• Plots for branch flow, bus voltage, and bus loading

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
11
Optimal Power Flow
• Generator fuel cost minimization
• Utility electricity cost minimization

Panel Systems – NEW MODULE


• 3-phase 3-wire and 4-wire panels
• 1-phase 2-wire and 3-wire panels
• Graphic user interface
• Unlimited circuits with or without external connections
• Unlimited sub-panel connections
• External (graphical) load and branch connections
• Spreadsheet load modeling
• Column and standard layouts
• ANSI and IEC standard panels
• Extensive switching device libraries
• Comprehensive circuit feeder/cable libraries
• User-configurable defaults and layouts
• Dynamic sub-panel and main-panel schedule updates
• User selectable load types (LCL, NCL, warehouse, receptacle, hospitals, etc.)
• User modifiable demand and diversity factors (NEC and others)
• Ten loading categories per circuit
• Customizable panel schedules using Crystal Reports format
• Intelligent panel calculations
• Detailed panel loading summary

One-Line Diagrams
• Single-Phase System (2 and 3 wires)
• Remote Connector
• Panel Systems
• Phase Adapter
• Ground Grid Systems
• New Relays
• Active X (Programmable Objects)
• XML Data Exchange

 2004 Operation Technology, Inc. All rights reserved. Disclosure, use, or reproduction without written authorization by Operation Technology,
Inc. is strictly prohibited. Certain names and/or logos used in this document may constitute trademarks, servicemarks, or tradenames of
Operation Technology, Inc. or other entities. Simulink® is a registered trademark of The Mathworks, Inc., and CrystalTM Reports is a registered
trademark of Seagate Software.
12

You might also like