3 places / MICROM
3.Wire Dia 0.895 ± 0.005 with coating.
4 hours ETER
GAP
1. Coil OD: 38.0mm Max. 5nos / Hour
GAUGE
Coil OD and Bush GO/NOGO
6
ID checking gauges
2. ID - GO - 19.965±0.005, NOGO - PLUG
5nos / Hour
20.050±0.005 GAUGE
Magmates No Burrs and Lock limb should not
7 --- 5nos / Hour VISUAL
terminal cutting damages
LOAD
3.Pull out Load of H coil magmates 160N 1no/4hours
TESTER
MASTER SURGE
15 Surge testing Surge fail not allowed 5nos / Hour
SAMPLE TESTER
1. Visual defects and damages not
MASTER
16 Final Inspection allowed 5nos / Hour VISUAL
SAMPLE
(Like Damages,Burr,Appearance etc.,)