Inspection and Test Plan: Flow Chart Start Incoming

The document is an inspection and test plan for fabricating steel structures for 150 kV open book disconnecting supports. It outlines the process which includes: 1) receiving raw materials and checking certificates, 2) temporary storage, 3) production steps like cutting, welding, and finishing, 4) in-process quality checks, 5) trial assembly, 6) galvanizing, 7) final quality checks, and 8) packing for storage. The goal is to fabricate the steel structures according to specifications and standards.

Uploaded by

Sinden Ayu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Inspection and Test Plan: Flow Chart Start Incoming

The document is an inspection and test plan for fabricating steel structures for 150 kV open book disconnecting supports. It outlines the process which includes: 1) receiving raw materials and checking certificates, 2) temporary storage, 3) production steps like cutting, welding, and finishing, 4) in-process quality checks, 5) trial assembly, 6) galvanizing, 7) final quality checks, and 8) packing for storage. The goal is to fabricate the steel structures according to specifications and standards.

Uploaded by

Sinden Ayu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT ANUGERAH PERKASA KONTRUKSI PLUS

INSPECTION AND TEST PLAN


Date : 21.02.2019
Document Number FABRICATION STEEL STRUCTURE 150 KV OPEN BOOK Rev : -
KIP 16 /2019 DISCONECTING SUPPORT - PT ABB SAKTI INDUSTRI Page : 1

Flow Chart

START

Logistic Raw Material PO . Mill Certificate


incoming
Report Test Profile

Complaint to Supplier no
QC Incoming Check by QC
Procurement
yes
Logistic Raw Material
temporary Storage

Logistic Raw Material material supplay to Daftar Permintaan Material


production

Production production process

cutting
Production ,marking,punching,bendi
ng,fit up,welding,
finishing

no Report :
QC Inprocess Repair or Reject Check by QC Member List Inspection
Fabrication Inpection
yes
Production Trial Assembly

Report
QC Inprocess no Factory Test Inspection
Repair or Reject Check by QC

yes
Production
Dismantle

Production Galvanish Process

no
QC Inprocess Repair or Reject Check by QC

yes
Production Setting packing Packing List Material

no
QC Inprocess Repair or Reject Check by QC

yes
Logistic
Storage Finish Good

End