0% found this document useful (0 votes)
2K views2 pages

Staircase Pressurization Test QCDD Form

This document summarizes the results of a staircase pressurization test. It includes information on the project name and location, test equipment used, design criteria for pressure differences and air velocities, fan details, measured pressure and airflow readings across doors, and certification of the contractor and consultant. Performance readings are compared to the design criteria.

Uploaded by

Ronie Padua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Staircase Pressurization Test QCDD Form

This document summarizes the results of a staircase pressurization test. It includes information on the project name and location, test equipment used, design criteria for pressure differences and air velocities, fan details, measured pressure and airflow readings across doors, and certification of the contractor and consultant. Performance readings are compared to the design criteria.

Uploaded by

Ronie Padua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

STAIRCASE PRESSURIZATION TEST QCDD FORM

Pin No. Date


Location Application Number
Project Name
Owner

Staircase No. Acceptable Criteria +/- 10% of Design Volume


QCDD Approved
Drawing Ref. No. Test Status  Passed
Date

Test Equipment Design Criteria (As per CDD Approved Drawing)


Instrument/s Used 0-Door Open Pa
Serial Nos. Pressure 1-Door Open Pa
Calibration Certificate/s Difference 2-Door Open Pa
Calibration Date 3-Door Open Pa
Smoke Stop Lobby / Fire Fighting Lobby Open Door Air Velocity m/s
 Yes  No Door Force N

Fan No. 1 Details Fan No. 2 Details


Unit No. Unit No.
Area Served Area Served
Fan Type Fan Type
Make Make
Serial No. Serial No.
Power
Power Capacity KW KW
Capacity
Fan Performance
Design
Design Airflow L/s L/s
Airflow
Actual
Actual Airflow L/s L/s
Airflow
Performance % Performance %

Air Balance Pressure Difference Across Barrier Door Force


Door Force
Airflow to Open
Ref. Floor Level/ 0-Door 1-Door 2-Door 3-Door to Release
Design Actual % of Velocity Door
No. Description Open Open Open Open Door Latch
(L/s) (L/s) Design (m/s) @ 900
(Pa) (Pa) (Pa) (Pa) (N)
(N)
1
2
3
4
5

Page 1 of 2
STAIRCASE PRESSURIZATION TEST QCDD FORM

Air Balance Pressure Difference Across Barrier Door Force


Door Force
Airflow to Open
Ref. Floor Level/ 0-Door 1-Door 2-Door 3-Door to Release
Design Actual % of Velocity Door
No. Description Open Open Open Open Door Latch
(L/s) (L/s) Design (m/s) @ 900
(Pa) (Pa) (Pa) (Pa) (N)
(N)
7
8
9
10
11
12
13

CERTIFICATION
The system as specified above has been installed and tested, in accordance with latest edition of NFPA, QCDD FSS and QCDD
approved drawings

________________________________ _______________________________________________
Contractor (ID No. / Mobile No.)
(Signature over Printed Name with Stamp)

CERTIFICATION
The undersigned accepted the testing report for the system as specified herein.

________________________________ _______________________________________________
Consultant (UPDA No. / ID No. / Mobile No.)
(Signature over Printed Name with Stamp)