Architecture & Planning Building Design & Engineering Project & Cost Management Industrial & Process Engineering
Architecture & Planning Building Design & Engineering Project & Cost Management Industrial & Process Engineering
Architecture & Planning Building Design & Engineering Project & Cost Management Industrial & Process Engineering
C A M B O D I A | C H I N A | F R A N C E | I N D I A | I N D O N E S I A | K A ZA K H STA N | L AO S
M O N G O L I A | MYA N M A R | Q ATA R | S I N G A P O R E | S R I L A N K A | T H A I L A N D | V I E T N A M
| DELHI Office | PARIS Office
Estel House, 4th Floor, Plot No – 126 21 rue de Chatillon,
Sector – 44, Institutional Area, 75014 Paris,
Gurgaon, Haryana - 122002, India France
T +91-124 402 7051 T +33 (0)1 43 31 81 81
E [email protected] E [email protected]
FOR
PREPARED BY:
PT ARCHETYPE CONSTRUCTION CONSULTANTS INDONESIA
Menara 165, 12th Floor
Jl. TB Simatupang Kav. 1
Cilandak Timur
Jakarta Selatan (12560)
T: +62-021 2951 6348
www.archetype-group.com
TABLE OF CONTENTS
PROJECT UNDERSTANDING
PT PANCARAN KREASI ADIPRIMA (hereafter the “Client”) would like to build a project named HOTEL
HOLIDAY INN SANUR, Indonesia (hereafter the “Project”).
1. Project Information
Name of project : Hotel Holiday Inn Sanur
Location : Sanur, Bali, Indonesia
Function :
o Hotel operator : Intercontinental Hotel Group (IHG)
o Number of floors : 5 Floors
o Number of rooms : 126 keys
o Room size : approximately 26 sqm
o Facilities : restaurants, swimming pool, gym, and function rooms
o Number of basement : 1 level
Consultants appointed :
o Architect : Airmas Asri
o MEP : Metakom
o Civil & Structure : Ketira Engineering
o Interior Design : HBA
Total GFA : 9,200 sqm (approximately)
Estimated investment cost : n/a
2. Project Schedule
As per client’s Master Schedule, construction is expected to start on April 2018 and to be
completed within 2 years (24 months).
3. Client Request
The Client would like Archetype to revise its quotation for the following services for the Project:
In this context, Archetype is pleased to submit the below quotation for the required services.
Construction Management aims at delivering the Construction Works to the Client within agreed duration,
accident free and in compliance with quality specifications.
The Construction Manager will therefore organize, schedule, mobilize, and coordinate on site the
contractors selected by the Project Manager and the Client. During the construction works, he inspects,
monitors such contractors in order to achieve project targets.
The key areas of management are as follows:
Pre-Construction Phase
Construction Phase
Organization
Monitor and coordinate the general construction program.
Co-ordinate the Contractors mobilization and Safety Induction with regards to the project
requirements and time schedules.
Monitor & Control the construction processes.
Update the Periodic Risk Analysis and monitor the necessary prevention actions and their potential
impacts.
Planning
Review Construction Programmes in accordance with WBS as issued by the Project Manager.
Perform Weekly Progress Measurement and reports.
Follow-up the lists of main equipment/material supply (orders), both for the direct supply of the Client
and for the contractors.
Report on deviations pertaining to the Construction Programmes and delivery schedules.
Safety Coordination
Issue the Project Safety Requirement, review the Contractor’s Safety plan, and inspect the Contractors
Safety Organization.
Perform Hazard assessment on the Project and Monitor the prevention action program.
Inspect the Construction works and manage the Safety Non-Conformities.
Chair the Safety Committee on a monthly basis to review the Safety implementation and issue a Safety
Report to the Project Manager.
Quality Management
Issue the Project Quality Plan, review the Contractors Quality Plan and inspect the Contractors Quality
Organization.
Review the Method statement, and approve the Inspection Test Plan prepared by the Contractors.
Manage the inspections of Construction Works; manage the acceptance records and Non-
Conformities.
Audit the quality of Manufacturers and perform various inspections in accordance with the Contract
conditions.
Coordinate with all necessary material and samples submittal, as submitted by the Contractors for
approval by other consultants, appointed by the Client.
Contractor Payments
Report on any time implication due to changes or variations and gain approval from the Project
Manager prior to the implementation of the change or variation on site.
Assist the Project Manager or the Quantity Surveyor with the preparation of the Contractors interim
payment applications and Contractual Claims.
Assist the Project Manager or Quantity Surveyor in resolving contractual disputes.
CLARIFICATIONS
The commencement date for the performance of the services will be from the signature of Letter of Award
or Contract and Archetype’s receipt of the mobilization fee mentioned in chapter “Services Fees”
hereunder.
- The proposed fee including allowances (transportation, accommodation, food) for Site Staff
during construction period.
- All Quantity Survey activities (Bill of Quantity, Tender Preparation, Tender Organization, Tender
Evaluation, Contract negotiation, Contract management, Contractor Payment Claim) which are
managed by Client or Consultant appointed by Client.
- Archetype shall not be held liable for any part of the works which has been performed whether
wholly or partially up to the time of Archetype’s services commencement; and/or for associated
any error, default, omission, consequence, penalty, damages and/or the like in any form(s). For
avoidance of doubt, a specific report on the status of the works shall be done for such purpose
upon Archetype’s receipt of the mobilization fee as provided in the payment schedule herein.
- Client to provide car and driver for Senior Project Staff (one car and driver to be shared).
Apr-18 Mei-18 Jun-18 Jul-18 Agu-18 Sep-18 Okt-18 Nov-18 Des-18 Jan-19 Feb-19 Mar-19 Apr-19 Mei-19 Jun-19 Jul-19 Agu-19 Sep-19 Okt-19 Nov-19 Des-19 Jan-20 Feb-20 Mar-20
PLANNING SUMMARY
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24
Procurement
Groundworks
Arch & Structure
ID Works
MEP
T&C / Handover phase
Total
Manpower Deployment Plan M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 man-
months
CONSTRUCTION MANAGEMENT
Sr Project Manager E 25% 25% 25% 25% 25% 25% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 2.4
Doc. Controller/Project Asst. I 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 24.0
Construction Manager I 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 24.0
Civil/Structural Supervisor I 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 18.0
Finishing Supervisor I 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 20.0
M&E Supervisor I 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 20.0
Total 3.25 3.25 3.25 3.25 5.25 5.25 5.05 5.05 5.05 5.05 5.05 5.05 5.05 5.05 5.05 5.05 5.05 5.05 4.05 4.05 4.05 4.05 4.05 4.05 108.4
SERVICES FEE
1. Services Fees
Archetype will carry out the services described here-above for the fee of:
This fee is excluding the value added tax (VAT) but including the withholding income tax (PPh), and shall be
made by T/T to the bank account as designated by the Project Director/ Project Manager:
Please note: Value Engineering services is included in this proposal (no additional fee – based on
percentage sharing of Net Saving); detail is provided in Page 12 and in Appendix 1. In this exercise, we
would target to reduce costs in the region of 5% for each package budget (Civil/Structure and Mechanical
& Electrical).
2. Payment Schedules
The services provided by Archetype will be paid by the Client on the basis of percentage of the Services fees
specified in the chapter 1 here-above according to the following schedules:
Amount Sub-total
Milestone Months
(%) (%)
Total 100%
1. Our fees proposal assumes an inflation not exceed 6% year over year. Shall this rate be higher; the
balance of our fees would have to be adjusted proportionally.
2. Travel costs shall be reimbursed at cost based on invoices/receipts. Local or International travel
shall be economy class with reputable airlines. Would travel exceed 6 hours’ flight, business ticket
will be provided. Hotels shall be 4 stars minimum for Director and Managers position.
3. The Client shall pay the mobilization fee of the 1st payment above within seven (7) days from the
date that the Letter of Award or Contract is signed. Other payments for the Services Fee shall be
paid within seven (7) days from receipt of the Payment Request that will be submitted in
accordance with the above schedule. The Client shall pay 2% of the sum overdue, per month, in
case of delay.
4. Monthly payment (including site allowances) shall be invoiced on the 3rd day of each month.
5. Payments shall be made in IDR.
6. The proposed fees exclude expenses for:
o Costs involved with obtaining Administrative approvals.
o Duplicating & Printing beyond the above indicated number of copies.
o Translation of drawings and documents into Indonesian (if required).
o Travelling, Accommodation and Subsistence Expenses outside of Indonesia (except as
mentioned in “Clarifications” section above
o Progress Photographs, Video Conferencing and Special Electronic Data Transfer.
o International calls, mails and messengers.
o Permit and approval fees required during the Project.
o On site or laboratory quality control testing if necessary.
o Any other services not specifically included in this proposal.
o Direct involvement in any litigation or arbitration in respect of claims or contractual disputes
between the consultants and Client or the Contractors and the Client.
- This proposal is based on Construction Supervision period of 24 months.
- In case of extension of the scope of services and/or the period of service required by the Client,
monthly rate will be charged and paid by the Client. The party responsible for the delay will bear
the cost of the fee for extended services/scope.
- Any additional works required will be charged against the following daily charge rates, excluding
taxes:
Position of staff Status Daily rate-IDR
Sr Project Manager E 8,420,000
Doc. Controller/Project Asst. I 660,000
Construction Manager I 2,350,000
Civil/Structural Supervisor I 1,110,000
Finishing Supervisor I 1,110,000
M&E Supervisor I 1,110,000
Archetype shall use its best efforts to ensure that the actual construction cost of the project is below the
preliminary construction budget.
Should Archetype be successful in reducing the actual construction cost below the preliminary construction
budget, he will be compensated in the sum of twenty-five percent (25%) of the actual net savings on the
construction budget, and such compensation would be paid by the Client to Archetype no later than thirty
(30) days after completion of the Services.
APPENDICES
1. Value Engineering Scope of Services
VALUE ENGINEERING
SCOPE OF SERVICE
The VE shall include study of design documents, cost data, and other information furnished as the
basis of the design. The VE study shall develop alternate designs to achieve the required mission(s)
or function(s) at the lowest overall cost consistent with performance for structures, structure or
facility sitting, site development, equipment, electrical and materials or methods. The study
includes examination of high cost including anticipated construction time and conservation of
energy. Design details and analysis will be considered and alternatives developed as appropriate.
The VE team shall consider the latest technology in development of alternatives to achieve
maximum results for energy conservation, functional use, and first cost (construction) savings.
- Review drawings:
a. Electric diagram; Light control system; Electric equipment; Video phone
system.
b. Air condition system; Gas system; water supply diagram; equipment list,
pipe’s size
The Value Engineering approach would aim to make savings to the Civil/Structural Design and MEP
packages that would not compromise the performance of the project. We have quickly performed
a review of the provided designs and have identified areas where we would look to improve the
design. We would target to reduce costs in the region of 5% for each package budget (meaning 5%
reduction for Civil/Structural budget, and 5% reduction for MEP budget).
These savings cannot be guaranteed but, at this point they remain our most promising option to
cover the additional costs on the project through the Civil and Structural design related issues.
1.4 VE Report
The results of the study shall be prepared and submitted to Client. Back-up data and detailed
estimates shall be included. Report will include as a minimum:
- Transmittal letter.
- Cover Sheet.
- Table of Contents.
- Summary of the existing and proposed alternative design systems with an
indication if the change is minor of major and a recommendation highlighting the
most efficient way to accomplish each change.
- Provide detailed description of proposed changes with advantages and
disadvantages of each proposed changes in relation to the existing design. The
proposed changes will take into consideration first cost savings, operations and
maintenance costs, workability, performance and energy savings.
- Appropriate sketch drawings or drawing mark up for each proposed change
showing the comparison between the existing conditions and proposed
alternatives.
- Estimates comparing the existing design with each proposed alternative.
- Results and conclusions.
We would also recommend in addition to the above scope an option that Archetype conducts a
workshop with the Team that includes the Client, Project Management team and the original design
team in order to present the full findings of the VE study.
2. Re-Design Services (fee for this will be confirmed upon approved VE Report)
- Preparation of construction design drawings of all parts that reflected all items of
approved VE report.
- Preparation of new cost estimation based on redesign drawings
CLARIFICATIONS
The commencement date for the performance of the services will be from the signature of Letter
of Award or Contract and Archetype’s receipt of the mobilization fee mentioned in chapter
“Services Fees” hereunder.
Archetype shall prepare and provide a VE Presentation for the Project at the location required by
Client.
The Client may approve or reject, in whole or in part, any of the proposed VE changes.
All approved or adopted Value Engineered changes will be incorporated into the Project design by
the appropriate original designers.
PROJECT SCHEDULE
The duration for the services described here above can be estimated as follows:
(W=Week)
For Re-design:
Schedule for re-design services will be confirmed upon receipt of the full original set of AutoCAD drawings
from Client and upon agreement of the VE items to be incorporated as the outcome from Stage 1 of this
VE scope.
Notes:
The Client shall provide Archetype with the necessary data, documents and information relating to the
Project, including but not limited to:
The Client shall retain the services of other consultancy companies for the execution of these surveys in
order to allow Archetype to make use of data.
The Client remains fully responsible for the provision of exact and accurate surveys and hereby releases
Archetype from any responsibility in relation with the results of these surveys.
In case the documents and information provided by the Client contains errors, omissions or inaccurate
information, Archetype would be entitled to fee and or time variations if, as a result of the use of these
documents and information, Archetype has to redo any part of his work.
SERVICES FEE
1. Services Fee
Archetype will carry out the services described here-above at the fee excluding all kinds of tax as follows:
- twenty five percent (25%) of the actual net savings on the construction budget should Archetype
be successful in reducing the actual construction cost below the preliminary construction budget.
The proposed fees exclude Travels and accommodation costs for the trips outside Vietnam if required,
which are to be charged at cost.
Fee for Re-Design services based on approved VE Report will be confirmed after Client approves the VE
Report.