This document is an electrical panels installation checklist. It lists inspection items for a project involving the installation of electrical panels. The items cover general requirements, panel location, construction, and installation. Some key points include that work must follow proper guidelines, use approved materials, have correct clearances and locations, adequate protection, proper wiring and termination, and correct labeling and identification. Upon inspection, the status of the overall work is noted along with any additional remarks.

Uploaded by

Alvin Badz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
5K views2 pages

Electrical Panels Installation Checklist

This document is an electrical panels installation checklist. It lists inspection items for a project involving the installation of electrical panels. The items cover general requirements, panel location, construction, and installation. Some key points include that work must follow proper guidelines, use approved materials, have correct clearances and locations, adequate protection, proper wiring and termination, and correct labeling and identification. Upon inspection, the status of the overall work is noted along with any additional remarks.

Uploaded by

Alvin Badz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Electrical Panels Installation Checklist

Project Name / Owner: ……………………………………………………………………….…….………………………………


Contractor: ……………………………………………………………… Consultant: ………………………………………….
Description of work to be inspected (Area Name / Room ID / System Part Name):
…………………………………………………………………………….……………………………………………………………………
Reference drawing number / Name – “Drawing Copy to Be Attached with Work Highlighted”:
…………………………………………………………………………….……………………………………………………………………

Evaluation Notes

with NotesApproved
Approved

Rejected
Sr. Inspection Items

General

1. Work is following Kahramaa guide lines for internal wiring.


Material used of acceptable quality and matching specification &
1.
vendor list (Brand, Type, Size, Fittings).
Installation accepted (Level, location, coordination with other
2.
services).
2. Work is carried out by approved contractor by Kahramaa.

Location
Level Between 2200 mm Top & 900 mm Bottom for wall
1. mounted panels & location is accessible & free of obstacles with
front clearance not less than 900 mm.
2. Panels are in permitted locations as per KM rules.

Construction

1. Panel ingress protection (IP) is suitable for installation location.


Minimum cribbage distance maintained with live parts of panels
2.
and between exposed phased during wiring and termination.
Panels internal form of separation is following specification and
3.
for LV-Panel it’s Form 2B Type 2.
Exposed bus bars and live parts in panels are covered by
4.
internal insulating screen.
No double cables connected inside breakers terminals, For
5. multiple incomings/outgoings from barkers to be connected
using proper sized copper terminals extensions or spreaders.
No double lug connection done to single terminal in bars, bars
6. to have enough length and holes to match incoming/outgoing
cables numbers including spares.
Metering and signaling instruments power supply is protected
7.
by fuse.
8. Control circuits power supply is protected by fuse.
All components short circuit rating to match panel short circuit
9.
level as per KM regulation.

EGEC-QA-CS-R-30 16-Jul-18 Rev. 00


1/2
For earth leakage protection neutral line is monitored for both 1-
10.
phase and 3-phase systems.
Installation

1. No extra holes exist in boxes & trays/trunks.


Glanding is done by double compression metal glands for
armored and screened cables.
2.
Gland earthing lug is bolted to panel body by copper tinned
bolts.
Outgoings trays/trunks are connected to earth bar by Y/G
3. conductor of cross section equal to biggest cable of tray/trunk
earthing conductor size
4. All fixing holes are used in mounting
Where fixed to structure element, to be done using anchor bolt
5.
system.
Panels to be fixed to single surface only, to avoid surfaces
6. cracks due to different shrinkage/expansion directions and
factors. (either wall or floor fixed)
Labeling and identification done following drawings for panel
7.
and breakers.
8. Drawings installed inside panels

Over All Work Status

Notes & Remarks:


..................................................................................................................................................................................................
..................................................................................................................................................................................................
..................................................................................................................................................................................................
..................................................................................................................................................................................................
..................................................................................................................................................................................................
..................................................................................................................................................................................................
..................................................................................................................................................................................................

Supervision
Engineer
Name:
…………………………………………
Signature:
…………………………………………

EGEC-QA-CS-R-30 16-Jul-18 Rev. 00