C&M Partners Co. Profile As of JAN 2011
C&M Partners Co. Profile As of JAN 2011
C&M Partners Co. Profile As of JAN 2011
The Firm
resources – financial & technological skills.
Mission
Core Value
services and quality products that are well accepted to the
satisfaction of customers .
Core Values
COMMITMENT
Committed to deliver services that surpass customer expectations
in value and ethnical practices.
PROFESSIONALISM
Implement the utmost standards of principled manners and promote a
work milieu that persuades mutual cost, solidarity and open
communication that emphasizes awareness, initiative and liability.
EXCELLENCE
Strive for distinction with its highest quality services an innovativeness.
INTEGRITY
Principled Work Attitude.
REPUTATION
Respected for contributing and partaking the life and well-being
of the society.
Registered Company Name
C. & M. Partners – Construction Services Co. Ltd.
Information
Company
298-884-857-000
Business Address
# 21 Venus St. Phase 2 Brgy. Pantoc, L.V.D.S.N. Meycauayan
City, Bulacan
Contact No.
Sun – 0922 870 2991 to 92
Smart – 0929 767 7593
Globe – 0916 686 1882
Website
www.cmpartnersco.com
Certification
Pre-Design Services
Feasibility Studies
This service provides clients with information regarding multiple issues for a
possible project.
Design Services
Architectural Design
This service involves the design and creation of the architectural project, and
is consists of multi-step process to create final set of documents to further
allow a project to be constructed.
Conceptual Design Phase
This begins with the review of existing conditions and ideas
about the project. The general scope and goals are also
being established.
Preliminary Design Phase
During this phase, the chosen conceptual design solution is
refined and addresses more complex construction issues. The
goals of the project are maintained as the design solution
becomes more complex and progresses toward completion.
Final Design Phase
This is the process of creating the final documents that will
Services
be used to construct the project. The goal of this phase is to
document the design solution in detail and produce a set of
documents.
Interior Services
The company’s services for interior projects include:
* Space Planning for existing shell buildings
* Complete interior renovations of existing spaces
* Re-Design of existing interior spaces
* Selection of materials and finishes
* Selection of color schemes and color coordination
* Selection and specification of equipment
Construction Phase Service
Basic Services
The company’s services continue until the project if
completed. Regardless of the method of project delivery,
C&M Partners can provide construction contract
administration.
Services
* Review of shop drawings and contractor
submittals
* Verification of contractor requests for
payment
* Response to owner and contractor questions
* Clarifications and modifications due to field
conditions
Consulting Services
The company can readily provide consulting services.
These may be as third party, client representative or various
other reasons.
Pictures after the construction. Creative
Concept walls consist of three colors:
green, orange and yellow. Each color has
its own significance for the different rooms
that is part of the office space.
Project Title:
Creative Concepts Inc. – Office Renovation
Projects
Location: Client:
5/f eurovilla 2, V.A. Rufino st., Legaspi Realform Furniture
Vill. Makati City
Cost of project: Date / Year of Construction:
Php 625,000.00 March to April 2008
Manager’s room -before
IT Area -before
Project Title:
Cognitive IT Solutions Inc. – Office
Renovation (part I)
Projects
Location: Client:
10/f Athenauem bldg. L.P. Leviste St., Realform Furniture
Salcedo Village, Makati City
Cost of project: Date / Year of Construction:
Php 490,000.00 May to June 2008
Pictures after the construction. Cognitive Office
was first renovated in 2008, but some part of the
area was left and only until 2009 that the said
part was to be continued.
Project Title:
Cognitive IT Solutions Inc. – Office
Renovation (part II)
Projects
Location: Client:
10/f Athenauem bldg. L.P. Leviste St., Realform Furniture
Salcedo Village, Makati City
Cost of project: Date / Year of Construction:
Php 93,400 April to may 2009
Pictures after construction (clockwise from top left):
“painted red” kitchen cabinet details; new and
treated comfort room; the pink cabinet that
separates 2 bed; the wooden
staircase treated back wall.
Project Title:
5-Storey Choa Residence
Projects
Location: Client:
524 E.T. Yuchengco St., Binondo, Manila Mr. & Mrs. Erwin Choa
Cost of project: Date / Year of Construction:
Php 4,300,000.00 Sept. 2008 to Feb. 2009
before
During construction
Project Title:
Argosy Advisers Inc.
Projects
Location: Client:
Pacific Star Bldg. Makati City Realform Furniture
Cost of project: Date / Year of Construction:
Php 405,235.70 June to July 2009
Pictures after the construction. This area
houses BPO of the KGJS company.
7th Floor:
6th Floor:
renovation of the KGJS Inc. was held December
2008. It includes the main office of the CEO,
Accounting Area, Secretary Area, plus other
minor spaces.
Project Title:
KGJS Fleet Management manila, Inc.
Projects
Location: Client:
5/F ; 6/f; 7/F VAR Bldg., Ayala Ave. cor. Realform Furniture
Rufino St., makati City
Cost of project: Date / Year of Construction:
Php 223,500.00 ; PHP 115,000.00; Dec. 2008; June to July
Php 194,734.12 2009 ; feb. to mar. 2010
Office after
(Tables are now installed and walls
plus the cabinets were changed to
black and white)
Office before
(walls were painted mint green )
Project Title:
Microgaming technology Corp. – Office renovation
Projects
Location: Client:
18/F Unit 1804 taipan Place, Emerald Ave. Realform Furniture
Ortigas Ctr., Pasig City
Cost of project: Date / Year of Construction:
Php 420,000.00; Php 127,207.60;
June 2009; Sept 2009; march
Php 201,566.04; Php 34,,904.10
2010; june to aug 2010
Office after
Project Title:
WNS Global Services – Office Renovation
Projects
Location: Client:
G/F Superstore Bldg., Times Square St. Group Perspective Inc.
Araneta ctr., Cubao, Quezon City
Cost of project: Date / Year of Construction:
Php 750,000.00 June to July 2009
before
after
Project Title:
Felo II- Street Drainage & Road Construction
Projects
Location: Client:
Felo II st. Brgy. Pasolo, Valenzuela City Congressman rex gatchalian
Cost of project: Date / Year of Construction:
Php 1,520,768.00 March to May 2010
after
before
Project Title:
Medical Plaza Condo. – Interior Revovation
Projects
Location: Client:
Unit 2701 Medical Plaza Condo., Ortigas Atty. Jay Jerota
Ctr., Pasig City
Cost of project: Date / Year of Construction:
Php 524,998.09 March to June 2010
before
after
Project Title:
3-Storey mercado Residence
Projects
Location: Client:
Tangos, baliwag, Bulacan Mrs. Evelyn Mercado
Cost of project: Date / Year of Construction:
Php 1,500,000.00 March to June 2010
before
after
Project Title:
2-Storey tycangco residence
Projects
Location: Client:
San Juan, Metro Manila Mrs. Cora Tycangco
Cost of project: Date / Year of Construction:
Php 5,321.078.00 Dec. 2009 –mar. 2009; June to
Oct. 2010
After shots
Project Title:
Fence of Sto. NiÑo Parish Church
Projects
Location: Client:
El Camino Road, LVDSN, Meyc. Bul Mr. & Mrs. Jun Molano
Cost of project: Date / Year of Construction:
Php 150,000.00 Mar. to April 2010
During Demolition After
and actual construction
Project Title:
Spliethoff Office – Fit Out
Projects
Location: Client:
39/F Rufino Tower Bldg. Ayala Avenue, Archidecs – Archt. Mike Luga
Makati City
Cost of project: Date / Year of Construction:
Php 16,522,954.64 ++ Aug. - Oct. 30, 2010
During Demolition
and actual
construction
Project Title:
Tri-Ohms Engineering Office– Fit Out
Projects
Location: Client:
Quirino H-way Sacred Heart Village, Ms.Jeannet Perey - Owner
Novaliches, Fairview Quezon City
Cost of project: Date / Year of Construction:
Php 890,193.13 Dec. 1 to Dec 30, 2010
(clockwise from top left): Avida Condo I Dining; Avida Condo II Dining; Avida Condo I-
Living; Noel Dumaop Apt.; Avida Condo III Living; Medical Plaza Condo I Entry Area.
Projects
Presents:
Design Conceptualization Projects
(clockwise from top left): Noel Dumaop Façade; Riverfront Condo I Living; CDO
LVDSN Branch; Noel Dumaop Apartment.
Projects
Presents:
Design Conceptualization Projects
(clockwise from top left): Vision X office w/ Red Painted Wall; Baby’s rm. w/ blue closet
from Ng Residence; RCBC Savings Bank – Ortigas Branch; RCBC Savings Bank –
Laguna Branch.
Projects
Presents:
Design Conceptualization Projects
(clockwise from top left): MVU Office; Executive Suite @ Parañaque Doctors; Sagrada
Familia showing the altar; KGJS Office showing the accounting area; Kim Store
Projects
Presents:
Design Conceptualization Projects
Design Proposals (clockwise from top left): Luntiang Kabukiran Ecofarm Hotel; 2-Storey
Apartment of Mr. Amparo; Mr. Henry James Aralan 2-Storey House; Thesis Project of an
Architecture UST student Batch 2009; Bungalow House of Ms. Bernadette Amparo.
Projects
Presents:
Design Conceptualization Projects
***Contact References available only
upon request.
Projects
Date / Year: 2008 Date / Year: 2009
Presents:
Design And Build Projects
***Contact References available only
upon request.
Projects
Date / Year: 2009
Presents:
Design And Build Projects
***Contact References available only
upon request.
Projects
Presents:
Design And Build Projects
***Contact References available only
upon request.
Projects
Presents:
Design And Build Projects