Glenfield Station and Bus/Rail Interchange public and enable excavation for the realignment of
the East Hills Line, construction of the southern
Installation of the new concrete platform culverts on flyover and installation of new retaining walls
Platform 1 and piling on Platform 1/2 has been
street parking on the rail side of Railway Parade,
completed.
south of Glenfield Station, will be removed to
Construction of the new Platform 4 (adjacent to Railway enable the civil and rail works to occur
Parade) has commenced behind the hoarding on night work and weekend work is scheduled to occur
Platform 3 and piling for the new station concourse and along Railway Parade between Seddon Park and
temporary footbridge footings are underway. Hosking Crescent to install a new storm water drain.
Work will occur on Monday, Tuesday and
Night and weekend work are scheduled to enable works Wednesday nights in March between 6.00pm and
on Platform 1/2 and adjacent to the track. For more 7.00am and on Saturdays and Sundays between
information please go to the “Weekend and Out of 7.00am and 6.00pm
Hours Work” section over the page. trimming and removal of trees and vegetation along
Railway Parade and within the rail corridor
Railway Parade
underground service investigations
Installation and commissioning of the new power poles underground utility relocations including water and
and lights along the eastern side of Railway Parade will sewer services. Night work and service disruptions
be completed by mid March 2011. This work may may occur. Details will be provided to residents in
require power outages at various times. Notice of any advance of the work.
outages will be issued to residents and businesses by
Integral Energy and the SWRL Glenfield Transport Traffic control and temporary lane closures will be in
Interchange project. place at various times on Railway Parade, Trafalgar
Street, Hosking Crescent, Magee Lane, Belmont Road,
Other activities to occur along Railway Parade in March Salisbury Avenue, Roy Watts Road and Newtown Road.
include: Traffic controllers and signage will direct motorists and
excavation and piling for the station structure pedestrians around work areas.
works and the temporary footbridge. The bus stops
on Railway Parade, adjacent to Glenfield Station, Drainage works in Seddon and Kennett Parks
will be relocated at different times to accommodate Installation of a new storm water drain in Seddon Park
the works. Signs will direct bus passengers to the is complete.
relocated bus stops when this occurs
installation of temporary fencing adjacent to the In March, work will continue around the Kennett Park
kerb along Railway Parade, between Bunbury outflow area and revegetation will commence at the
Curran Creek and Foreman Street. The fencing will completion of the pipe works.
separate the rail corridor and work areas from the
Work on the stormwater drain and pits will continue on Weekend and night work activities
the Railway Parade side of Seddon Park in March, Weekend and Night works in March
requiring the temporary removal of fence panels along
Excavation and installation of the storm water drain
the park perimeter and installation of a temporary
under the northbound lane on Railway Parade will occur
pedestrian route around the work area.
between Seddon Park and Glenfield Station. The
Roy Watts Road following weekend and night work will occur to enable
the drain to be installed:
Excavation and installation of a cable route is underway Monday to Wednesday 6pm to 7am
in the footpath on Roy Watts Road, adjacent to the rail
Saturday and Sunday 7am to 6pm
corridor. Traffic controllers and barriers will direct
pedestrians around the work areas. A road lane closure and traffic control will be in place for
these works.
Glenfield Junction rail flyovers Weekend and Night works will occur on Platform 1 /2 at
Northern flyover Glenfield Station:
With the bulk of the northern flyover structure now 8pm to 7am - Monday 21 and Tuesday 22 March
complete, piling for the access ramps and embankment 5pm Saturday 26 March to 10pm Sunday 27 March
earthworks are under way.
Additional night work may be required at various times
Installation of overhead wire structures, overhead wires to safely carry out some of the construction activities.
and construction of electrical and signal cable routes Notification of these works will be provided to the
are also ongoing. community prior to the works commencing.
On the Railway Parade side of the flyover, concrete General work activities
jersey kerbs are being installed along the kerb to A number of regular investigation and construction
separate the flyover construction area from the public. activities occur as part of the project works, including:
Excavation and earthworks are also under way. tree and vegetation trimming and / or removal
temporary removal of road parking spaces
Glenfield rail works underground service investigations
Track works, assembly of a track turnout, installation of deliveries of plant, materials and equipment
overhead wires, installation and relocation of signalling residents close to the tracks are advised that
and communication services, civil works and drainage audible safety devices (detonators) are placed on
works will occur within the rail corridor. the track to warn workers of oncoming trains. GJA
apologises for any inconvenience this may cause.
Magee Lane car park
Translations
Excavation and piling for the temporary footbridge This document contains important information about public transport projects in
extension has commenced in the Magee Lane Car Park, your area. If you require the services of an interpreter, please contact the
behind the bus stop. Translating and Interpreting Service on 131 450 and ask them to call the
Transport Construction Authority (TCA) on (02) 9200 0200. The interpreter will
The Magee Lane car park is restricted to Two Hour then assist you with translation.
Parking for shop customers. Commuter car parking is إذا آﻨﺖ.ﺗﺤﺘﻮي هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻣﻬﻤﺔ ﻋﻦ ﻣﺸﺎرﻳﻊ اﻟﻨﻘﻞ اﻟﻌﺎم ﻓﻲ ﻣﻨﻄﻘﺘﻚ
available at either Seddon Park Car Park or at the Multi- ﻳُﺮﺟﻰ اﻻﺗﺼﺎل ﺑﺨﺪﻣﺔ اﻟﺘﺮﺟﻤﺔ اﻟﺨﻄﻴﺔ واﻟﺸﻔﻬﻴﺔ ﻋﻠﻰ،ﺑﺤﺎﺟﺔ إﻟﻰ ﺧﺪﻣﺎت ﻣﺘﺮﺟﻢ
Storey car park on Roy Watts Road. اﻟﺮﻗﻢ131 450 واﻃﻠﺐ ﻣﻨﻬﻢ اﻻﺗﺼﺎل ﺑﺴﻠﻄﺔ اﻹﻧﺸﺎء اﻟﺨﺎﺻﺔ ﺑﺎﻟﻨﻘﻞ واﻟﻤﻌﺮوﻓﺔ ﺑـ
(TCA) ( ﻋﻠﻰ اﻟﺮﻗﻢ02) 9200 0200 ﻳﺘﻮﻟﻰ اﻟﻤﺘﺮﺟﻢ ﻣﺴﺎﻋﺪﺗﻚ ﻓﻲ، ﻋﻨﺪهﺎ.
Glenfield south substation .ﺗﺮﺟﻤﺔ ﻣﺎ ﺗﺮﻳﺪ ﻗﻮﻟﻪ
Ang dokumentong ito ay naglalaman ng mahalagang impormasyon
The substation is being constructed on Railway Parade, tungkol sa mga proyekto ng riles sa inyong lugar. Kung kinakailangan
ninyo ng serbisyo ng isang tagapagsaling-wika (interpreter) tawagan
on the south side of the Bunbury Curran Creek. It will po ang Translating and Interpreting Service sa 131 450 at makisuyo
provide power to the upgraded Glenfield Transport sa kanilang tawagan ang Korporasyon sa Pagpapaunlad ng
Interchange and South West Rail Link. Inprastraktura sa Transporte (TCA) sa (02) 9200 0200. Ang
interpreter ang siyang tutulong sa inyo na umintindi sa pag-uusapan.
Site establishment is scheduled to commence in late Este documento contiene información importante sobre proyectos de
February with installation of a fence around the work transporte público en el área donde usted vive. Si necesita la ayuda
area. Excavation of the substation footprint and de un intérprete, llame al Servicio de Traducción e Interpretación al
131 450 y pídales que se comuniquen con la Autoridad de
concrete pours for the floor slabs will occur in March. Construcción para el Transporte (Transport Construction
Authority/TCA) al (02) 9200 0200. El intérprete le ayudará en la
Night work to complete the concrete pour of the floor traducción de la información.
slabs will also occur in March. Residents near the work O lenei pepa o loo iai ni faamatalaga taua I galuega fuafuaina o poloketi o
area may hear some low level noise during the fela fela’uaigafaitele loupitonu’u. A e mana’omia le tautua a se
concreting works. Notifications will be issued prior to faamatala’upu, faamolemole vala’au le Translating and Interpreting Service i
le 131450, ma fai iai e faafesoota’i oe i le Transport Construction
these works occurring. Authority (TCA) i le (02) 9200 0200. Ona fesoasoani atu lea o se
faamatala’upu i le faaliliuina o le gagana.
For further information please contact the Project Infoline on 1800 684 490,
email [email protected] or visit www.tca.nsw.gov.au. For urgent enquiries relating to construction
activities please call the 24-hour Construction Response Line on 1800 775 465.