Hydrostatic Test Instruction: PT - Agincourt Resources Cyanide Adsortption Tank TK-011
Hydrostatic Test Instruction: PT - Agincourt Resources Cyanide Adsortption Tank TK-011
Hydrostatic Test Instruction: PT - Agincourt Resources Cyanide Adsortption Tank TK-011
Date of Test :
Test Media : Fresh Water Fresh water < 50 Fresh water with
ppm cl additional
Note :
3 Planning and finishing testing please contact Quality Control personal for Witnessing.
Name : Name :
Date : Date :
Witnessed / Reviewed by
PT. Agincourt Resources
Name :
Date :
HYDROSTATIC TEST REPORT
001/HT/TK011/IMN-AR/VIII/2020
Report No. :
DATA PEMAKAI:
Volume : 234.35 M3
Contractor Name : PT. EMK/IMN Test Medium / Media untuk Pengujian : Fresh Water
Client Name : PT. Agincourt Resources Holding Time / Lama Pengujian : 24 Hours
Location : Recyn Plant Projevt, Martabe Test Condition / Hasil Uji : Acceptable
Tank No : TK-011 Date of Testing / Tanggal Pengujian : 10/08/2019
Holding
10/08/2020 15.00 31° 0% Start
Time
33%
11/08/2020 09.00 34° 33% 1 hours
Fill of water no leaks detected
66%
13/12/2019 15.00 32° 66% 1 hours
Fill of water no leaks detected
100% 1st before holding 24 hour
15/12/2019 08.00 28° 100% 24 hours
Fill of water no leaks detected
100% 2nd after holding 24 hour
16/12/2019 13.15 36° 100% 24 hours
Fill of water no leaks detected
66%
17/12/2019 15.30 31° 66% 1 hours
Dewatering no leaks detected
33%
22/12/2019 10.30 34° 33% 1 hours
Dewatering no leaks detected
Dewatering 0%
23/12/2019 11.00 34° 0% 1 hours
Dewatering complete no leaks detected
Name : Name :
Date : Date :
Witnessed / Reviewed by
PT. Agincourt Resources
Name :
Date :
4 of 3
HYDROSTATIC TEST DOCUMENTATION
1. Make sure nozzle (N2 & N4) in shell has been closed properly
2. Make sure nozzle (N8 & N9) in shell has been closed properly
3. Make sure manhole (M1) in shell has been 4. Check temperature TK01A (0%)
closed properly
5 of 3
HYDROSTATIC TEST DOCUMENTATION
9. Check temperature TK01A (100%) after 10. Check temperature TK01A (Dewatering75%)
holding
6 of 3
HYDROSTATIC TEST DOCUMENTATION
11. Check temperature TK01A (Dewatering 50%) 12. Check temperature TK01A (Dewatering 25%)
13. Check temperature TK01A (Dewatering 0%) 14. Survey verticality TK01A