0% found this document useful (0 votes)
80 views1 page

1111111m 11w R L: National Electrification Administration

The National Electrification Administration issued amendments to the Revised Procurement Guidelines and Simplified Bidding Procedures for Electric Cooperatives 2017. The amendments include: (1) requiring observers of bid openings to be invited in writing at least five working days before bid openings; and (2) provisions related to forfeited bid security and performance security under the section on honoraria of the Bids and Awards Committee, Technical Working Group, and Bids and Awards Committee Secretariat. The amendments will take effect 15 days after filing with the University of the Philippines Law Center.

Uploaded by

jjhen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

1111111m 11w R L: National Electrification Administration

The National Electrification Administration issued amendments to the Revised Procurement Guidelines and Simplified Bidding Procedures for Electric Cooperatives 2017. The amendments include: (1) requiring observers of bid openings to be invited in writing at least five working days before bid openings; and (2) provisions related to forfeited bid security and performance security under the section on honoraria of the Bids and Awards Committee, Technical Working Group, and Bids and Awards Committee Secretariat. The amendments will take effect 15 days after filing with the University of the Philippines Law Center.

Uploaded by

jjhen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

=;:'

::r
.,,

NATIONAL ELECTRIFICATION ADMINISTRATION
"The 1 Performance Governance System-Institutionalized National Government Agency"
57 NIA Road. Government Center, Diliman Quezon City
1
1100
-A.
TUVRheln,and
'1

'
Management
System
ISO 9001 :2015

www.tlN.com
10 91 oeo92030
'~-
-
~ -
,,
·~

September 11, 2017

MEMORANDUM No. 2017-019-A

TO All ELECTRIC COOPERATIVES

SUBJECT AMENDMENTS TO THE REVISED PROCUREMENT


GUIDELINES AND SIMPLIFIED BIDDING
PROCEDURES FOR ELECTRIC COOPERATIVES
IRR-RA 10531 (2017)

****************************************************************************************
Amendments to the issued Revised Procurement Guidelines and Simplified
Bidding Procedures for Electric Cooperatives 2017 consisting of the following :

Section V. Public Bidding, Sub-section (P) OBSERVERS .... page 16

"Observers should be invited in writing at least five (5)


working days before opening of bids."

xxx xxx xxx xxx xxx

Section V Public Bidding, Sub-section (S) HONORARIA of the BAC,


TWG and BAC Secretariat.. .. page 17

"ii . Forfeited Bid Security and Performance Security

These amendment$. shall take effect fifteen (15) days after filing with the
University of the Philippines (UP) Law Center pursuant to the Presidential
Memorandum Circular No. 11 , dated October 9, 1992.