This document provides installation instructions for applying a liquid flashing membrane around rough openings like windows and doors. The instructions specify cleaning and preparing the surface, filling cracks, applying the membrane in two coats to the opening and extending onto the wall, and allowing it to dry before continuing construction.
This document provides installation instructions for applying a liquid flashing membrane around rough openings like windows and doors. The instructions specify cleaning and preparing the surface, filling cracks, applying the membrane in two coats to the opening and extending onto the wall, and allowing it to dry before continuing construction.
This document provides installation instructions for applying a liquid flashing membrane around rough openings like windows and doors. The instructions specify cleaning and preparing the surface, filling cracks, applying the membrane in two coats to the opening and extending onto the wall, and allowing it to dry before continuing construction.
This document provides installation instructions for applying a liquid flashing membrane around rough openings like windows and doors. The instructions specify cleaning and preparing the surface, filling cracks, applying the membrane in two coats to the opening and extending onto the wall, and allowing it to dry before continuing construction.
AIR SHIELD LIQUID FLASHING is INSTALLATION INSTRUCTIONS
high-quality, gun-grade, low-odor, elastomeric, polyether liquid- 1. Inspect rough opening and ensure that all areas to applied flashing and detailing receive AIR-SHIELD LIQUID FLASHING are clean, membrane that is compatible with dry, smooth, and free from all bond-breaking the entire line of AIR-SHIELD contaminants. air, vapor, and liquid moisture barriers. This general-purpose, wet flashing membrane is used to seal rough openings and detail joints 2. Remove and replace any damaged structural wall and bonds to most construction components. materials, such as aluminum, brick, concrete, wood, and vinyl and exterior gypsum board.
This document has been created
as an addendum to our AIR- SHIELD technical data sheets to 3. Apply a coat of MEL-PRIME™ on the raw edges of provide information regarding exterior gypsum board. the application of AIR SHIELD LIQUID FLASHING for rough openings, such as windows and doors. Following are the typical installation instructions 4. Prefill any joints or cracks that are larger than ¼” recommended by W. R. MEADOWS. (6.35 mm) and less than ½” (12.7 mm) with AIR- It is important to review each SHIELD LIQUID FLASHING. Apply a generous application as there may be bead of material over the joint, press, and spread situations that may require this into the joint. Allow material to skin over prior to procedure to be modified based on full application of AIR-SHIELD LIQUID FLASHING. the project requirements. If this situation arises, please contact W. R. MEADOWS Technical Service. 5. Prefill any joints or cracks larger than ½” (12.7 mm) with AIR-SHIELD LIQUID FLASHING. Install KOOL-ROD™ into the joint to control sealant depth and apply AIR-SHIELD LIQUID FLASHING. Smooth out using a W. R. MEADOWS SPREADER TOOL or putty knife and allow to cure prior to full application of AIR-SHIELD LIQUID FLASHING.
W. R. MEADOWS, INC. | P.O. Box 338 | HAMPSHIRE, IL 60140-0338
Phone: 847/214-2100 | Fax: 847/683-4544 | www.wrmeadows.com I NSTALLATION I NSTRUCTIONS AIR-SHIELD LIQUID FLASHING ®
6. Starting at the top of the rough opening,
apply a bead of AIR-SHIELD LIQUID FLASHING in the rough opening to be sealed and spread the material using a W. R. MEADOWS SPREADER TOOL or putty knife across the rough opening surface at an even consistency. Test the thickness of the material and ensure that it has a thickness of 12-15 mils using a wet mil gauge.
7. Apply a generous bead of AIR-SHIELD
LIQUID FLASHING to the vertical surface around the rough opening and spread this material with a W. R. MEADOWS SPREADER TOOL or putty knife in an even, monolithic manner 4” – 6” (100 – 152 mm) onto the vertical surface around the rough opening. Make sure material contains no pinholes and is void-free. Again, make sure material is even, monolithic, and undamaged. Test the thickness to ensure the material has a thickness of 12-15 mils.
8. Allow AIR-SHIELD LIQUID FLASHING to
dry before installing windows, doors, wall assembly, and the specific AIR-SHIELD membrane being applied.