Al Ain Distribution Company (Aadc) : JM 0209 Substation

This document is a contract between AL AIN DISTRIBUTION COMPANY (AADC) and Ferropan Oilfield Services & Supplies LLC for refurbishment work at the JM-0209 Substation. It includes 9 items of work such as removing peeling paint, applying new paint and textures, installing signs and doors, and maintaining emergency lights. The original total amount was AED 11,587.84 plus 5% VAT for a total of AED 12,167.23. All quantities and rates were reviewed and the revised total amount remains AED 12,167.23.

Uploaded by

Ryo Davis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views2 pages

Al Ain Distribution Company (Aadc) : JM 0209 Substation

This document is a contract between AL AIN DISTRIBUTION COMPANY (AADC) and Ferropan Oilfield Services & Supplies LLC for refurbishment work at the JM-0209 Substation. It includes 9 items of work such as removing peeling paint, applying new paint and textures, installing signs and doors, and maintaining emergency lights. The original total amount was AED 11,587.84 plus 5% VAT for a total of AED 12,167.23. All quantities and rates were reviewed and the revised total amount remains AED 12,167.23.

Uploaded by

Ryo Davis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AL 

AIN DISTRIBUTION COMPANY ( AADC)
Contract No         : A‐17356.2 

Contract title      : Refurbishment of Civil Works for Substation, Pumping Station and 
Cables for All Regions ‐ AADC

Contractor           : Ferropan Oilfield Services & Supplies LLC 

Location                : JM‐0209 Substation 

BOQ item  BOQ Line  Original  Original Unit  Original Amount  Revised  Revised  Revised 


NO S/N Description of work Unit Remarks
NO. SUB. Qty. Rate (Dhs) (Dhs) Qauntity Unit Rate Amount

Supply and apply pre‐packed repaired 
1 123 2993 S‐1.7.D 0.5440 SQ MTR 364.00 198.00 1.10 180.00 198.00
mortar with bonding agent

Removal of all peeling off painting and 
loose layers of Tyrolean texture 
coating/painting and apply new texture 
coating matching the existing surface to 
2 83 2950 S‐1.5.A 34.5982 SQ MTR 134.40 4,650.00 93.00 50.00 4,650.00
get a homogenous surface then apply 3 
coats of high quality external pure acrylic 
based painting over one coat of 
penetration cellar, primer coats.

Removal of the peeling off painting and 
3 68 2933 S‐1.4.B.4 apply 3 coats of high quality washable  24.18 SQ MTR 72.80 1,760.00 88.00 20.00 1,760.00
emulsion paint
Removal of all peeling off painting and 
loose layers apply 3 coats
4 86 2953 S‐1.5.D of epoxy painting over one coat of  47.00 SQ MTR 85.12 4,000.64 47.00 85.12 4,000.64
penetration cellar, primer
coats.
Supply and fix of 11 cm thick colored (This Item for supply and
5 42 2904 S‐1.3.A.9 calcium silicate bricks as per details of  1.00 Nos 201.60 201.60 1.00 201.60 201.60 installation of the danger
item S‐1.3 sign)
supply and installation of 4 mm.
thickness 60x80 cm. aluminum name 
6 216 3088 S‐ 1.00 Nos 392.00 392.00 1.00 392.00 392.00 AADC Logo
plate (grave writing) with Transco
Logo
This Price for
Changing the
7 147 3019 S‐1.9.B.3 Single leaf steel doors : Repair door locks 4.00 Nos 50.00 200.00 4.00 50.00 200.00
FLUORESCENT
TUBE Light

8 8 2866 S‐1.1.6 Cut material 0.38 CU Meter 106.40 40.00 1.00 40.00 40.00
AL AIN DISTRIBUTION COMPANY ( AADC)
Contract No         : A‐17356.2 

Contract title      : Refurbishment of Civil Works for Substation, Pumping Station and 
Cables for All Regions ‐ AADC

Contractor           : Ferropan Oilfield Services & Supplies LLC 

Location                : JM‐0209 Substation 

BOQ item  BOQ Line  Original  Original Unit  Original Amount  Revised  Revised  Revised 


NO S/N Description of work Unit Remarks
NO. SUB. Qty. Rate (Dhs) (Dhs) Qauntity Unit Rate Amount

1x8 w. maintained emergency exit 
9 287 3173 S‐1.14.F 1 Nos 145.60 145.60 1 145.60 145.60
light (180 lumen/3 batteries).

AMOUNT 11,587.84 11,587.84


5 % VAT 579.39 579.39
Total Amount 12,167.23 12,167.23