List down the control activities that may be useful to any of the following:
Firstly -Their should be proper and complete understanding of the entire construction
technology to all the project construction staff .
As this matter deals with the life factor of bridge and also because this is an initial time
consuming activity. So the soil parameters should be tested in the material testing
laboratory before the starting of the foundation work.
Step 2
In order to determine the shortest path in the project Critical path method should be
used and If required than the latest software technology tool can also be used. should
The working staff should have a Pretraining session regarding the project.
Proper material management and required facilities for servicing and repair must be
established. and all safety measures must be followed.
The revised design should be, if any, updated and clarified without any delay.
The department as well as contractor requires a proper and systematic management of
documents .
The layout is to be framed in such a way that there would be minimum movement of
material, equipment and personnel and also the Stone crusher should be placed that
wherever required suitably located.
Offices, generators, store should not be located at the place of dust. The service road
should be properly maintained. Receipt and dispatch of equipment be kept in proper
format to keep of details of its utilization at site.
Step 1
Power plant maintenance is critical for all power plant activities, both for the protection of plant
workers and to maintain all assets and facilities in proper working conditions.
Step 2
The control activities of the installation of a power plant are as follows:
Electrical and control engineering activity in power plants and nuclear power plants.
Mechanical fitting and maintenance activity in power plants and nuclear power plants.
Power plant technology design activity.
Power plant design activity.
Machining activity.
Manufacturing of power equipment machinery.
Step 3
Electrical and control engineering activity in power plants and nuclear power plants:
Electrical and control engineering projects, as well as reconstruction and maintenance work, are
planned, coordinated, and executed.
Provision for the construction's technological, technical, installation, and commissioning
documentation.
Step 4
Mechanical fitting and maintenance activity in power plants and nuclear power plants:
During the manufacturing of steelwork, assembling and welding are needed.
Pipelines, pipe supports, shut-off, throttle, regulator, and protective valves and fittings all need
mechanical maintenance and repair.
Pulse tubes and valves belonging to transmitters are maintained and repaired.
Mechanical equipment maintenance, installation, reconstruction, revamping, and demolition.
Execution of all types of preparatory and engineering activities required for successful
execution.
Step 5
Power plant technology design activity:
Maintenance technologies and quality management plans are being prepared.
Manufacturing, welding, and heat treatment technologies preparation
Step 6
Machining activity:
Pipe fittings, reducers, flanges, and threaded connectors.
Pressure vessel components.
Anti-corrosive binding materials and high-strength carbon steel
Step 7
Manufacturing of power equipment machinery:
Pressure vessels, heat exchangers, columns, tanks, and other pressure devices for the
mechanical industry are designed, manufactured, delivered, and recorded.
Power plant machinery, boilers, and their parts are designed, manufactured, delivered, and
recorded.
Step 8
The control activities of the installation of a power plant are electrical and control engineering
activity in power plants and nuclear power plants, mechanical fitting and maintenance activity
in power plants and nuclear power plants, power plant technology design activity, power plant
design activity, machining activity, manufacturing of power equipment machinery.
Step 1
The goal of communitarian fabricating is making the cooperative energy impact from the joint effort of
assembling assets. The joint efforts are made among savvy machines; however the cooperation could be
acknowledged among machines and person, just as a shared robot (Cobot) has a place with the last
mentioned.
Step 2
Control activities:
Control activities are the methodology and strategies that guarantee to diminish hazards recognized
during the danger evaluation measure. These exercises are taken to limit chances. At the point when the
appraisal distinguishes a huge danger to the accomplishment of an unbiased, a control action is resolved
and carried out.
The innovation ought to be painstakingly picked for the development of a tricycle to guarantee the
nature of the whole tricycle.
There ought to be legitimate oversight of development to keep away from illicit activities.
There ought to be legitimate administration of materials and development units ought to rigorously
forestall unfit materials.