User Guide: Emergency Response Planning Module
User Guide: Emergency Response Planning Module
Version 3.65 1
General Information
To keep safety risks at an acceptable level despite the increasing level of air traffic activity, modern
safety management practices are shifting from a reactive and basic proactive mode to a predictive
approach. The ICAO Doc. 9859 (Safety Management Manual) demands a system, which collects,
(risk) analyses and shares safety related data arising from normal operations.
IQSMS (Integrated Quality and Safety Management System) is a web-based solution to implement
SMS (Safety Management System). The software’s modular setup enables ASQS customers to
decide which modules support their company most effectively.
Figure 1: IQSMS main modules: Quality Management, Risk Management and Reporting.
All modules are feeding a common database with standardized event classifications. This way, a
predictive approach for the identification of possible overall company risks by means of risk
assessment and classification is guaranteed.
Currently, a total of 10 modules are available, with a focus on the three main modules: Quality
Management, Risk Management and Reporting.
This document will focus on the features and functionality of the Emergency Response Planning
Module. For more information about other modules, please refer to the respective user guides or
the general features list.
As IQSMS is a highly adaptable tool and ASQS strives to meet the individual needs of every
customer, many standard features can be adapted and customised to the needs of each
organisation. This might lead to some feature described in this user guide to vary from the version
actually used by your organisation. If you do encounter any ambiguity in this guide, please do not
hesitate to contact our support.
Version 3.65 2
Web Access to IQSMS
It is recommended by ASQS to use IQSMS with Internet Explorer 11 and above, Firefox, Google
Chrome and Safari letter size normal. Reports can also be entered on smart phones and Tablet
PCs. Please note that JavaScript must be enabled.
When accessing IQSMS - the login screen appears. Enter your username and password in the
indicated text fields and click on the login button. Remember that the password is case-sensitive.
Version 3.65 3
Emergency Response Planning Module
This module aids your company in ensuring that there is an orderly and efficient transition from
normal to emergency operations.
The ERP Module is a proactive emergency management tool that can be used for incidents and
accidents, but also for any abnormal situation within the organisation that requires complex
decision making, centralised coordination and proper distribution of tasks. It enables the
implementation, development, maintenance and testing of emergency preparedness and response
arrangements. This module allows you to predefine a number of emergency scenarios and to
develop corresponding checklists for all relevant responsible people involved in the emergency
response process.
Its use is not only limited to incidents or accidents, but for any abnormal situation within the
organization that requires centralized coordination and proper distribution of tasks, such as AOG
situations, security threats or aircraft diversions.
Several different user roles can be assigned for the ERP Module. User roles are assigned by the
system administrator in the Administrator Functions.
Administrator ERP Performs administrative tasks and determines the overall settings associated with the use of
Module the ERP Module.
Can initiate an Emergency Response.
Sets up Emergency Response Plans, task lists and assigns ERP Responsibles to the
individual task lists. Can upload ERP manuals.
ERP Responsible Carries out the tasks and scenarios assigned to them by the Administrator ERP Module.
Can download ERP manuals.
Version 3.65 4
Main Screen of the ERP Module
By clicking on Emergency Response Planning Module on the IQSMS initial screen you are directed to
the main screen of the module.
On this screen, you can see the list of documents that you have been assigned to. You can also
access the Administrator Functions through Administration, if you have the corresponding used
role.
Version 3.65 5
Administrator Functions
In the administrator functions, the users with the roles Administrator ERP Module and System
Administrator can manage the existing emergency scenarios or create new scenarios. To enter the
administrator functions, select Administration- ‘Manage Emergencies’ from the main screen.
Begin by entering the emergency and the description into the free text fields at the top.
Version 3.65 6
To add a checklist, select the green Create Checklist button. As you are leaving the page, you will
be asked to first save your changes.
When creating a new checklist, you must assign at least one responsible. You can select them
from the drop-down menu. According to the Responsible Hierarchy, the person you will add first is
going to be the first informed, if that person does not reply in the predefined timeframe, then the
next responsible will be informed.
To enter a task, press the green Add Task button. You can add a title and description to the task. It
is also possible to add an attachment here. If you have created multiple tasks, you can use the
arrows on the left-hand side to reorder the tasks based on hierarchal status.
Please note: You can add or remove an attachment when creating a checklist. To add
attachments, click the button „Add Attachment “. Already attached items can be removed via the
„Delete Attachment “button.
Version 3.65 7
1.2 Edit Emergency Scenarios
To edit an emergency scenario, click on the scenario and a toolbar will appear, as shown in figure
7. Select Edit from the toolbar.
In the top half of the screen, you can edit the title and description of the scenario.
The lower half of the screen deals with the checklists. You can create a new checklist or work on
an existing one. To create a new one, select the green Create Checklist button.
Version 3.65 8
Figure 11: Checklists
To edit a checklist, press Edit Checklist. You will be redirected to the following screen. Here you
can edit the description and checklist name.
In the Responsible Hierarchy, you choose the responsible(s) who are assigned to the checklist. At
least one responsible must be assigned. You can define when the notification is sent out and the
method by which it is sent out.
Under Tasks, you define the procedure that must be followed. This can also include attachments.
Press Save once you have finished.
If you wish to delete the checklist, press delete. You will be asked to confirm the action before
proceeding.
To create a copy of the checklist, select Duplicate. This will duplicate the checklist, then you can
edit and work on it as necessary.
To view all the revisions to the checklists, press Show Revisions from the tool bar. Here you will see
an overlay showing all the changes to the document. You have the option of reverting back to
changes by choosing Restore.
Version 3.65 9
Figure 13: Checklist Revisions
Furthermore, there is the option to copy Checklist in order to copy a checklist to another scenario.
To do so, click „Copy To “and define the target scenario in the overlay menu:
Once you have saved a scenario, it will be activated automatically. To activate scenarios that have
been deleted, select Show inactive scenarios. The old scenarios will appear in the list and by
clicking on them, you will have the option to activate them.
Version 3.65 10
Figure 15: Activate Emergency Scenario
This page shows the log of emergency notifications sent out and the details about each. In the
upper right-hand corner, the total ERP and QMS Notification costs are shown.
You can upload or remove manuals here. Simply choose the required file and then select Upload
Manual.
Version 3.65 11
Figure 17: ERP Manual Upload
Version 3.65 12
ERP Module- User View
Details of the emergency, the aircraft involved and the number of checklists and tasked needed to
be completed are shown here. Clicking on the emergency will bring up a toolbar.
Clicking on Emergency Management will bring up the page shown in figure 18. Here you can decide
on the course of action to be taken during an emergency. On the left-hand tab, you can choose
between setting up a hotline, scheduling a conference and calling the CAA.
Version 3.65 13
2.2 Initiate Emergency Response
To initiate an emergency response, go to the corresponding page via the main menu. Select the
emergency from the drop-down list and the checklists related to that emergency will automatically
appear on the right-hand side. Further details about the emergency can be defined under
Emergency Details. The notification that the assigned responsible receives can also be written out
under Responsible Notification. Once you are ready to begin the procedure, press Start Emergency
Procedure.
Version 3.65 14
After pressing yes, you will enter the emergency procedure screen. A countdown will be triggered
in the very top right-hand corner and the page will automatically refresh at regular short intervals.
The checklist status shows which notifications have been sent out to what responsibles and
whether they have already started taking action. The tasks yet to be completed are shown here
too. Below this, you can change the responsibles and add a custom notification for them to
receive.
If you wish to cancel the emergency procedure, you can do so at any time with the button at the
bottom of the screen.
Version 3.65 15
2.3 Closed Emergencies
With this button, you can view an overlay with all the closed emergencies in the system, including
details of whether they were completed or cancelled or closed.
To print a PDF of a closed emergency, select the necessary scenario and the toolbar will appear,
with the Print button.
Version 3.65 16
List of Figures
Figure 1: IQSMS main modules: Quality Management, Risk Management and Reporting. .......................... 2
Figure 2:Login Screen. ......................................................................................................................... 3
Figure 3: Example of a Main Menu of IQSMS. ........................................................................................ 3
Figure 4: Main Screen ......................................................................................................................... 5
Figure 5: Administrator Functions ........................................................................................................ 6
Figure 6: Create Emergency Response .................................................................................................. 6
Figure 7: Add a checklist ...................................................................................................................... 7
Figure 8 Add or remove attachments.................................................................................................... 7
Figure 9: Edit Scenarios ....................................................................................................................... 8
Figure 10: Edit Scenarios 2 ................................................................................................................... 8
Figure 11: Checklists ........................................................................................................................... 9
Figure 12: Edit Checklists ..................................................................................................................... 9
Figure 13: Checklist Revisions ............................................................................................................ 10
Figure 14: Copy Checklist to another scenario ..................................................................................... 10
Figure 15: Activate Emergency Scenario.............................................................................................. 11
Figure 16: Notification costs .............................................................................................................. 11
Figure 17: ERP Manual Upload ........................................................................................................... 12
Figure 18: Emergency Management ................................................................................................... 13
Figure 19: Emergency Management ................................................................................................... 13
Figure 20: Initiate Emergency Response .............................................................................................. 14
Figure 21: Emergency Procedure ........................................................................................................ 14
Figure 22: Starting an Emergency Procedure ....................................................................................... 15
Figure 23: Closed Emergencies ........................................................................................................... 16
Figure 24: Print Closed Emergencies ................................................................................................... 16
Version 3.65 17
© Aviation Safety and Quality Solutions S.à r.L.
Disclaimer
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or
otherwise, without prior written permission of Aviation Safety & Quality Solutions S.à r.L.
The information contained in this document is general in nature and provided as reference
material only. Although we aim to work with the highest levels of accuracy, we cannot guarantee
that there are no spelling errors or minor inaccuracies in this document. If you do encounter any
problems with the content of this document, please contact the ASQS Support (see below).
This user guide describes the use of the IQSMS version 3.65. The current IQSMS version number
can be identified by clicking on the icon in the upper part of the screen.
Support
The ASQS team is dedicated to provide comprehensive support to users of the program. This
includes not only problem solving and bug-fixes, but also general assistance to facilitate the use of
the program.
In case you encounter any problems while using the program, please first refer to the IQSMS User
Guide. If the available documentation does not adequately address your problem, please contact
ASQS Support via e-mail: [email protected] anytime, and expect a reply within the next business
day.
Credits
The IQSMS software was created by Aviation Safety & Quality Solutions S.à r.L, Luxembourg.
Gender Disclaimer
To ensure best readability, we use a generic masculine form throughout this document. It does
however refer equally to both sexes.
Version 3.65 18