100% found this document useful (1 vote)
886 views18 pages

Documents List For Calibration Laboratory

The document lists all documents required to maintain an ISO/IEC 17025:2017 compliant calibration laboratory. It includes 4 tiers of documents: quality manual, quality procedures, exhibits and calibration methods (2nd tier), standard operating procedures and formats (3rd tier), and worksheets and calibration reports (4th tier). Over 150 individual documents are referenced across these tiers relating to various laboratory functions including marketing, quality control, systems, training, purchasing and operations.
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
886 views18 pages

Documents List For Calibration Laboratory

The document lists all documents required to maintain an ISO/IEC 17025:2017 compliant calibration laboratory. It includes 4 tiers of documents: quality manual, quality procedures, exhibits and calibration methods (2nd tier), standard operating procedures and formats (3rd tier), and worksheets and calibration reports (4th tier). Over 150 individual documents are referenced across these tiers relating to various laboratory functions including marketing, quality control, systems, training, purchasing and operations.
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

ISO/IEC 17025:2017 Documents list for calibration Labo

S.No. Document No.


Quality Manual (1st Tier document)
QM/01
Quality Procedures (2nd Tier document)
QP/01
QP/02
QP/03
QP/04
QP/05
QP/06
QP/07
QP/09
QP/09
QP/10
QP/11
QP/12
QP/13
QP/14
QP/15
QP/16
QP/17
QP/18
QP/19
QP/20
Exhibits (Reference documents) (3rd Tier document)
E/HRD/01
E/SYS/01
E/SYS/02
E/SYS/03
E/SYS/04
E/SYS/05
E/SYS/06
E/SYS/07
E/SYS/08
Calibration Methods (3rd Tier document)
W/CM/M/01
W/CM/M/02
W/CM/M/03
W/CM/M/04
W/CM/M/05
W/CM/M/06
W/CM/M/07
W/CM/M/08
W/CM/M/09
W/CM/M/10
W/CM/M/11
W/CM/M/12
W/CM/M/13
W/CM/M/14
W/CM/M/15
W/CM/E/01
W/CM/E/02
W/CM/E/03
W/CM/E/04
W/CM/E/05
W/CM/E/06
W/CM/T/01
W/CM/T/02
W/CM/T/03
W/CM/T/04
Standard Operating Procedures (3rd Tier document)
SOP/OPN/01
SOP/OPN/02
Formats (4th Tier document)
F/MKT/01
F/MKT/02
F/MKT/03
F/MKT/04
F/OPN/01
F/OPN/02
F/OPN/03/XX
F/OPN/04
F/OPN/05
F/PUR/01
F/PUR/02
F/PUR/03
F/PUR/04
F/PUR/05
F/PUR/06
F/PUR/07
F/QCD/01
F/QCD/02
F/QCD/03
F/QCD/04/XX
F/QCD/05
F/QCD/06
F/QCD/07
F/SYS/01
F/SYS/02
F/SYS/03
F/SYS/04
F/SYS/05
F/SYS/06
F/SYS/07
F/SYS/08
F/SYS/09
F/SYS/10
F/SYS/11
F/SYS/12
F/SYS/13
F/SYS/14
F/SYS/15
F/TRG/01
F/TRG/02
F/TRG/03
F/TRG/04
F/TRG/05
F/TRG/06
F/TRG/07
F/TRG/08
F/TRG/09
F/TRG/10
F/TRG/11
Work sheets (4th Tier document)
F/WS/M/01
F/WS/M/02
F/WS/M/03
F/WS/M/04
F/WS/M/05
F/WS/M/06
F/WS/M/07
F/WS/M/08
F/WS/M/09
F/WS/M/10
F/WS/M/11
F/WS/M/12
F/WS/M/13
F/WS/M/14
F/WS/M/15
F/WS/E/01
F/WS/E/02
F/WS/E/03
F/WS/E/04
F/WS/E/05
F/WS/E/06
F/WS/T/01
F/WS/T/02
F/WS/T/03
F/WS/T/04
F/CR/M/01
F/CR/M/02
F/CR/M/03
F/CR/M/04
F/CR/M/05
F/CR/M/06
F/CR/M/07
F/CR/M/08
F/CR/M/09
F/CR/M/10
F/CR/M/11
F/CR/M/12
F/CR/M/13
F/CR/M/14
F/CR/M/15
F/CR/E/01
F/CR/E/02
F/CR/E/03
F/CR/E/04
F/CR/E/05
F/CR/E/06
F/CR/T/01
F/CR/T/02
F/CR/T/03
F/CR/T/04
Sample Risk Template
Audit checklist
MKT: Marketing; Quality control (QCD); System (SYS); Training (TRG); Purchase (PUR); Operation (OPN)
/IEC 17025:2017 Documents list for calibration Laboratory
Title of documents
er document)
Quality Manual

(2nd Tier document)


Personnel and training
Maintain laboratory environmental condition
Handling, transport, storage, use and planned maintenance of equipment
Intermediate checks
Measurement traceability and calibration
Procurement of externally provided products and services
Review of requests, tenders and contracts
Method validation
Transportation, receipt, handling, protection, storage, retention, and disposal or return of test items
Evaluation of measurement uncertainty and statistical techniques for analysis of data
Assuring and monitoring of validity of result
Receive, evaluate and make decisions on complaints
Control of non–conforming work
Control of data
Document and data control
Control of records
Risk assessment
Corrective action
Internal audit
Management review
documents) (3rd Tier document)
Skill Requirements
Codification System
Calibration Periodicity
Secrecy rules
Communication process
Impartiality policy
Instrument receipt checklist
Acceptance norms for internal quality checks
Intermediate check frequency
s (3rd Tier document)
Calibration method for micrometer
Calibration method for caliper
Calibration method for dial gauge / indicator
Calibration method for thickness gauge
Calibration method for height gauge
Calibration method for plug gauge
Calibration method for ring gauge
Calibration method for thread plug gauge
Calibration method for thread ring gauge
Calibration method for pressure gauge
Calibration method for vacuum gauge
Calibration method for measuring scale / tape
Calibration method for bevel protractor
Calibration method for torque wrench
Calibration method for weighing balance
Calibration method for AC / DC volt
Calibration method for AC / DC ampere
Calibration method for resistance (by 2 wire and 4 wire method)
Calibration method for frequency
Calibration method for Power and energy
Calibration method for temperature indicator / controller by simulation
Calibration method for glass thermometer
Calibration method for digital temperature indicator / controller with sensor and temperature gauge
Calibration method for oven / furnace
Calibration method for humidity chamber
Procedures (3rd Tier document)
Intermediate checks – Weighing Balance
Intermediate checks – Oven / Furnace / Humidity chamber
ocument)
Calibration service request and instrument receipt report
Customer Feedback Form
Complaint Report
Inward Register
Equipment History Card
Preventive Maintenance Schedule
Equipment Wise Preventive Maintenance Checkpoints
Disposal Of Non–Conforming Work
Gate Pass
Purchase Order
Indent – Purchase Requisition
Approved Vendor List Cum Open Purchase Order
Supplier Registration Form
Open Purchase Order
Supplier Evaluation Report
Inspection Report
Four Year Plan for Quality assurance
IQC Analysis report (Re–calibration and replicate calibration analysis)
En Value calculation Report
Intermediate check report – Equipment (reference standard) wise
Environment condition monitoring report – Temperature and Humidity
Illumination, noise and power supply monitoring report
Housekeeping checklist
Master List and Distribution List of Documents
Change Note
Corrective Action Report
Master List of Records
Quality Objectives
Audit plan / schedule
Internal Audit Non–Conformity Report
Clausewise Documentwise Audit Review Report
Risk Assessment sheet
Calibration Status of Equipment
Clausewise audit report – Quality Manager
Clausewise audit report – Technical Manager
Circular
Minutes of Meeting
Improvement log
Training Calendar
Training Report
Induction Training Report
Job Description And Specification
Skill Matrix
Confidentiality Agreement
Appointment Letter
Employees Competence Report
ISO/IEC 17025 Effectiveness Check Report
Technical Training Effectiveness check report
Interview report
er document)
Work sheet – micrometer
Work sheet – caliper
Work sheet – dial gauge / indicator
Work sheet – thickness gauge
Work sheet – height gauge
Work sheet – plug gauge
Work sheet – ring gauge
Work sheet – thread plug gauge
Work sheet – thread ring gauge
Work sheet – pressure gauge
Work sheet – vacuum gauge
Work sheet – measuring scale / tape
Work sheet – bevel protractor
Work sheet – torque wrench
Work sheet – weighing balance
Work sheet – AC / DC volt
Work sheet – AC / DC ampere
Work sheet – resistance (by 2 wire and 4 wire method)
Work sheet – frequency
Work sheet – Power and energy
Work sheet – temperature indicator / controller by simulation
Work sheet – glass thermometer
Work sheet – Work sheet – digital temperature indicator / controller with sensor and temperature gauge
Work sheet – oven / furnace
Work sheet – humidity chamber
Calibration report – micrometer
Calibration report – caliper
Calibration report – dial gauge / indicator
Calibration report – thickness gauge
Calibration report – height gauge
Calibration report – plug gauge
Calibration report – ring gauge
Calibration report – thread plug gauge
Calibration report – thread ring gauge
Calibration report – pressure gauge
Calibration report – vacuum gauge
Calibration report – measuring scale / tape
Calibration report – bevel protractor
Calibration report – torque wrench
Calibration report – weighing balance
Calibration report – Multimeter
Calibration report – Clamp meter
Calibration report – resistance meter / decade
Calibration report – frequency meter
Calibration report – Power and energy meter
Calibration report – temperature indicator / controller by simulation
Calibration report – glass thermometer
Calibration report – digital temperature indicator / controller with sensor and temperature gauge
Calibration report – oven / furnace
Calibration report – humidity chamber

eting; Quality control (QCD); System (SYS); Training (TRG); Purchase (PUR); Operation (OPN)
ISO/IEC 17025:2017 Documents list for TESTING Laborato
S.No. Document No.
st
Quality Manual (1 Tier document)
QM/01

Quality Procedures (2nd Tier document)


QP/01
QP/02
QP/03
QP/04
QP/05
QP/06
QP/07
QP/09
QP/09
QP/10
QP/11
QP/12
QP/13
QP/14
QP/15
QP/16
QP/17
QP/18
QP/19
QP/20

Exhibits (Reference documents) (3rd Tier document)


E/HRD/01
E/SYS/01
E/SYS/02
E/SYS/03
E/SYS/04
E/SYS/05
E/SYS/06
E/SYS/07
E/SYS/08

EQMS05
Work Instructions (3rd Tier document)
W/OPN/01
W/OPN/02
W/OPN/03
W/OPN/04
W/OPN/05
W/OPN/06 to W/OPN/
Standard Operating Procedures (3rd Tier document)
SOP/OPN/01
SOP/OPN/02

Formats (4th Tier document)


F/MKT/01/xx
F/MKT/02
F/MKT/03
F/MKT/04
F/OPN/01
F/OPN/02
F/OPN/03/XX
F/OPN/04
F/OPN/05
F/OPN/06/xx
F/OPN/01
F/OPN/01
F/PUR/01
F/PUR/02
F/PUR/03
F/PUR/04
F/PUR/05
F/PUR/06
F/PUR/07
F/QCD/01
F/QCD/02
F/QCD/03
F/QCD/04
F/QCD/05
F/QCD/06
F/QCD/07
F/QCD/08
F/QCD/09
F/QCD/10
F/QCD/11
F/QCD/12
F/SYS/01
F/SYS/02
F/SYS/03
F/SYS/04
F/SYS/05
F/SYS/06
F/SYS/07
F/SYS/08
F/SYS/09
F/SYS/10/XX
F/SYS/11
F/SYS/12
F/SYS/13
F/SYS/14
F/SYS/15
F/TRG/01
F/TRG/02
F/TRG/03
F/TRG/04
F/TRG/05
F/TRG/06
F/TRG/07
F/TRG/08
F/TRG/09
F/TRG/10
F/TRG/11
Sample Risk Template
Audit checklist
MKT: Marketing; Quality control (QCD); System (SYS); Training (TRG); Purchase (PUR); Operation (OPN)
25:2017 Documents list for TESTING Laboratory
Title of documents
nt)
Quality Manual

document)
Personnel and training
Maintain laboratory environmental condition
Handling, transport, storage, use and planned maintenance of equipment
Intermediate checks
Measurement traceability and calibration
Procurement of externally provided products and services
Review of requests, tenders and contracts
Method validation
Transportation, receipt, handling, protection, storage, retention, and disposal or return of test items
Evaluation of measurement uncertainty and statistical techniques for analysis of data
Assuring and monitoring of validity of result
Receive, evaluate and make decisions on complaints
Control of non–conforming work
Control of data
Document and data control
Control of records
Risk assessment
Corrective action
Internal audit
Management review
Equipment And Reference Materials
Purchasing
Complaint Handling
Handling Of Test Items
Preparation, Review And Issue Of Test Certificates/ Reports
Quality Control / Verification
nts) (3rd Tier document)
Skill Requirements
Codification System
Calibration Periodicity
Secrecy rules
Communication process
Impartiality policy
Instrument receipt checklist
Acceptance norms for internal quality checks
Intermediate check frequency
Exhibit for abbreviation used in system
Sample Receipt Checklist
Chemicals, Reagents, Certified Reference Material, Primary Standards Checklist
Exhibit For Out Of Limit Checklist or OOS
cument)
Operating Instruction – Weighing balance
Operating Instruction – Hot Air Oven
Work instruction for Sample receipt
Operating Instruction – Water bath
Operating Instruction – Compression Testing Machine
Industry specific test parameter test method- Technical areas
res (3rd Tier document)
Intermediate checks – Weighing Balance
Intermediate checks – Oven / Furnace / Humidity chamber
Storage and retention of sample in retain sample room
SOP for sampling procedure
Results reporting
Verify Accuracy of Laboratory results
Reporting, Distribution, Recording and Storage of Analytical Results
Actions taken on abnormal results
Follow–up of secrecy rules in Laboratory
SOP for action taken on abnormal results
SOP for release of finished products
SOP for preparation and monitoring of control charts
SOP for the schedule for routine sampling and laboratory testing
SOP for acceptance testing of non–routine sampling by the laboratory
SOP for responsibility for sampling
SOP for receipt of samples by the laboratory
SOP for storage of laboratory chemicals and apparatus and spare parts
SOP for use of logbooks
SOP for change of test methods

Test Request and Sample Receipt Report – Area wise


Customer Feedback Form
Complaint Report format/ Register
Inward Register
Equipment History Card
Preventive Maintenance Schedule
Equipment Wise Preventive Maintenance Checkpoints
Disposal Of Non–Conforming Work
Gate Pass
Technical records-Work sheet – Parameter wise
Performance acceptance certificate
Mechanical Completion Certificate
Purchase Order
Indent – Purchase Requisition
Approved Vendor List Cum Open Purchase Order
Supplier Registration Form
Open Purchase Order
Supplier Evaluation Report
Inspection Report
Four Year Plan for Quality Control
Re–test plan / execution report
Z Score Analysis Report (Standard Deviation Method)
Uncertainty Of Measurement
Re–test Analysis Report
Intermediate check report – Weighing Balance
Intermediate check report – Oven
Curing Tank Temperature Monitoring Report
Area1- Environment Monitoring Report
Area2 Temperature Monitoring Report
Intermediate check report – Humidity chamber
Housekeeping checklist
Master List and Distribution List of Documents
Change Note
Corrective Action Report
Master List of Records
Quality Objectives
Audit plan / schedule
Internal Audit Non–Conformity Report
Clausewise Document wise Audit Review Report
Risk Assessment sheet
Calibration Status of Equipment
Clausewise audit report – Quality Manager
Clausewise audit report – Technical Manager
Circular
Minutes of Meeting
Improvement log
Training Calendar
Training Report
Induction Training Report
Job Description And Specification
Skill Matrix
Confidentiality Agreement
Appointment Letter
Employees Competence Report
ISO/IEC 17025 Effectiveness Check Report
Technical Training Effectiveness check report
Interview report
Subcontracting work register
CRM Consumption report
Method validation report
Uncertainty Of Measurement
Uncertainty Of Measurement
F/TRG/01 Training Details Form
Non–Conforming Work Register
Purchase Request
Supplier Registration Form
Calibration Reference Material
Calibration/Validation Certificate
Validation Status Indicator
Calibration Status Indicator
Customer Complaint register
Non-Routine Analysis Request / Results Sheet
Investigation / Study Lab Form
Request for Lab test
Customer / visitor visit feedback register
Stock Register
Project Sample Retain Record
QC Checklist for Control man
Approved Vendor List
Preservation Assessment Checklist

QCD); System (SYS); Training (TRG); Purchase (PUR); Operation (OPN)


Purchase related Formats
F/PUR/01 Purchase Request
F/PUR/02 Supplier Registration Form
F/PUR/02/01 Direct purchase requisition
F/PUR/02/02 Purchase request for services

F/PUR/03 Approved Vendor List


F/PUR/04 Purchase Order
F/PUR/05 Requesting material form
F/QCD/01 QC Checklist for Control man

F/LIM/01 LIMS – Re–Configure request form


F/LIM/02 LIMS – Re–schedule request form
F/LIM/03 LIMS – Operation target

F/QMS/01 Master List Cum Distribution List of Documents


F/QMS/02 Change Note
F/QMS/05 Quality Objectives

F/CSD/01 Non–Routine analysis request / Result sheet


F/CSD/04 Investigation study lab form / Request form
F/CSD/05 Calibration Service Request Cum Instrument Receipt Challan
F/CSD/04 Subcontracting the Tests

F/NCP/01 Non conforming work register


F/NCP/02 Waiver request form

F/CAL/01/01 Calibration / Validation certificate–Physical


F/CAL/01/01A Calibration / Validation certificate–RON
F/CAL/01/02 Conductivity Meter Calibration Report
F/CAL/02 standard Reference material Record
F/CAL/03 Calibration Status of Equipment
F/CAL/04 Calibration Status Indicator
F/CAL/05 Calibration Card

F/RRC/01/03 Project sample retain report

You might also like