SIMOPS Checklist

Person in Charge: …………………………. Location: ……………………………………

Subcontractor: ……………………………. Unit: …………………………………………

Activity: ………………….………………. Date: ……………………………………….

Construction: …...………………………….

Commissioning: ……………………………

Production: …………………………………

SIMOPS Checklist Yes No N/A If No, Explain


General

1. Has person-in-charge been assigned for the


SIMOPS?
2. Has supervisory cover been provided?
3. Has SIMOPS work plan been developed?
4. Is copy of permit available?
5. Have all persons involved in the SIMOPS
been instructed in;
5a. SIMOPS procedures
5b. Emergency procedures and alarms.
5c. Muster Point Locations.
5d. Fighting equipment and locations?
6. Is good housekeeping practiced?
7. Is smoking restricted to designated areas?
8. Has electrical equipment been suitable
grounded and inspected?
9. Have all personnel working in the restricted
area registered at the security gate?
10. Are personnel at risk from H2S?
11. Are personnel issued with an H2S escape
mask?
12. Are welding works required?
13. Are all non-essential personnel removed from
the SIMOPS area?

SIMOPS Checklist Yes No N/A If No, Explain


Gas Checking

1|Page https://hsseworld.com
1. Are gas detectors calibrated and tested?
2. Do gas detectors initiate and audible alarm
when LEL is detected?
3. Is gas tested authorized for this activity?
Safety

1. Is adequate PPE being worn?


2. Is fire watch / stand-by man assigned?
3. Are a fire hose and/or fire extinguisher
available?
4. Barriers and warning signs erected?
5. Are gas checks completed and recorded?
6. Is MSDS available?
7. Has emergency response team been
informed?
8. Is radiography required?
9. Are confined space procedures being
followed?
10. Are gas detectors and/or ESD systems
inhibited?
11. Are all sparks being contained?
14. Has JSA been developed?
Construction Work – Naked Flame Works

1. Are daily toolbox meetings held?


2. Is work permit authorized and available?
3. Are conditions of the permit being followed?

4. Are suitable flame retardant materials being


used to contain sparks?
5. Have all necessary isolations been
completed?
6. Are welding machines inspected and
positioned in suitable location?
7. Are welding cables insulated and in good
condition?
8. Are compressed gas cylinders secured, fitted
with flame arrestors and free from grease
and oil?

Construction Works – Rigging and Lifting

1. Are rigging and lifting personnel qualified


and competent?
2. Has risk assessment been undertaken and
addressed with all personnel?

2|Page https://hsseworld.com
SIMOPS Checklist Yes No N/A If No, Explain
3. Are the crane, shackles and slings visually
inspected prior to the start of lifting
operations?
4. Is the rigging and lifting equipment color
coded?
5. Is the crane operation qualified?
6. Are crane inspection records available?
7. Is rigging supervisor clearly identified by
wearing a green work vest?
Construction Works – Blasting and Painting

1. Has toolbox meeting been held?


2. Are paints and thinners stored in safe
location?
3. Have critical lines and vessels been identified,
checked and determined as safe to blast?

4. Is surrounding area sufficiently protected


from blast materials and pain overspray?
Commissioning Works

1. Is all equipment depressurized and/or


isolated?
2. Is equipment purged of gas and/or vapor?
3. Is electrical and/or mechanical equipment
locked-out and tagged?
4. Are open drains and culverts covered?
5. Are all necessary permits to work authorized?

6. Are electrical isolations recorded?


7. Are process/mechanical isolations recorded?
8. Is commissioning Supervisor assigned?

Signed: ………………………………………….
Date: …………………………………………….