No. 4

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

2.

) Draper Company
Product Zcosts from Activity Based Costing System

Overhead Rates:
$300,000 setup related cost divided by 60 setups = $5,000 per setup
$900,000 design - related costs divided by 15,000 design hours = $60 per design hour
$3,300,000 other overhead divided by $3,000,000 DL Cost = 110% of direct labor cost

Standard Custom Total


Direct Materials $882,000 $12,500 $894,500
Direct Labor $2,910,000 $90,000 $3,000,000
Overhead
$5000 x 30 setups $150,000
$5000 x 30 setups $150,000 $300,000
$60 x 12,000 redesign hrs $720,000
$60 x 12,000 redesign hrs $180,000 $900,000
110% x $2,910,000 $3,201,000
110% x $90,000 $99,000 $3,300,000
Total Cost $7,863,000 $531,500 $8,394,500
Unit Produced ÷ 73,500 ÷ 125
$ 106.98 $4,252

3.)

Cost of Custom from traditional system, Total Per Unit


as calculated (required 1) $237,500 $1,900

Adjustments for:
Understatement of setup - related
costs, $300,000 x (50% - 3%) $141,000
Understatement of setup - related
costs, $900,000 x (20% - 3%) $153,000
Total Adjustements $294,000 $2,352
Cost of Custom from ABC system, as
calculated (required 2) $531,500 $4,252
$3,000,000

$3,300,000
$8,394,500

You might also like