BARANGAY COUNCIL FOR THE PROTECTION OF CHILDREN (BCPC)

ACTION PLAN 2020


PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 Strengthening of BCPC through the BARANGAY OFFICIALS


conduct of regular BCPC meeting. CHILDREN COMMITTEE CHAIRMAN MONTHLY Self Help
FOR THE PROTECTION
OF CHILDREN

 Conduct regular updating of master


list and profile of children in the NEW BORN BABIES/ BHW/BNS QUARTERLY Self Help
barangay. CHILDREN

 Assistance in the conduct of


Operation Timbang, Supplemental COMMITTEE CHAIRMAN
Feeding, Immunizations and other CHILDREN FOR THE PROTECTION YEAR ROUND PHP 5,000 BDRRMC
health-related programs for (0-6 YEARS OLD) OF CHILDREN FUND
children. BHW/BNS

 Provisions of potable water supply HOUSEHOLDS BARANGAY OFFICIALS YEAR ROUND SELF HELP
to all households. BHW/BNS
PROGRAM/PROJECT/ACTIVITIE BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
S IMPLEMENTATION AMOUNT SOURCE

 Coordination of other BARANGAY OFFICIALS


agencies/NGO to conduct regular CHILDREN COMMITTEE CHAIRMAN EVERY DECEMBER PHP 6,500 CONTRIBUTION
sports fest/tournament. YOUTH OF GAMES AND &
AMUSEMENT,YOUTH SOLICITATION
AND SPORTS
DEVELOPMENT

 Regular allocation for the purchase CHILDREN


of medicines and other medical & BHW/BNS THIRD QUARTER PHP 16,625 BDRRMC FUND
supplies. CONSTITUENTS 2020

 Conduct of regular clean-up drive to CHILDREN BARANGAY OFFICIALS


maintain a healthy and clean & BHW/BNS MONTHLY SELF HELP
barangay all-year round. CONSTITUENTS

 Conduct of information campaign


for children’s rights and laws
affecting Early Childhood Care and CHILDREN
Development (ECCD) like RA & BARANGAY OFFICIALS YEAR ROUND CONTRIBUTION
9262 (Anti-Violence Against WOMEN COMMITTEE CHAIRMAN PHP 2,000 &
Women & Children), RA 8980 FOR THE PROTECTION SOLICITATION
(ECCD) and other related laws and OF CHILDREN
programs for the protection of
children.

 Provision of assistance in the BARANGAY OFFICIALS


reporting of cases involving women CHILDREN COMMITTEE CHAIRMAN YEAR ROUND SELF HELP
and/or child abuses. & FOR THE PROTECTION
WOMEN OF CHILDREN

 Maintenance of Health Center CHILDREN


& BHW/BNS YEAR ROUND SELF HELP
CONSTITUENTS

 DENGUE BRIGADE ALL RESIDENTS BARANGAY OFFICIALS


BHW/BNS YEAR ROUND PHP 8,000 BDRRMC FUND

PREPARED BY: NOTED BY:

KRISTINE A. PASCUA ARNEL T. JARAMIL


BARANGAY SECRETARY PUNONGBARANGAY
BARANGAY PHYSICAL FITNESS AND SPORTS DEVELOPMENT COUNCIL (BPFSDC)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIE BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
S IMPLEMENTATION AMOUNT SOURCE

 REORGANIZATION OF BPFSDC RESIDENTS PB FERDINAND FIRST QUARTER SELF HELP


TOMACDANG 2020
BCPC MEMBERS

 CONDUCT OF BPFSDC RESIDENTS PB FERDINAND QUARTERLY SELF HELP


MEETINGS BPFSDC MEMBERS TOMACDANG
BCPC MEMBERS

 SPORTS DEVELOPMENT BARANGAY YOUTH AND KAGAWAD BIADO TWICE A YEAR PHP 50,000 10% SK FUND
PROGRAMS I.E: BASKETBALL NEARBY BARANGAYS SALIB-O JUNE AND DECEMBER DONATIONS
TOURNAMENT, VOLLEYBALL TASK FORCE ON YOUTH SOLICITATIONS
TOURNAMENT DEVELOPMENT

 MONITORING & EVALUATION RESIDENTS BARANGAY OFFICIALS DECEMBER SELF HELP


OF SPORTS ACTIVITIES

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


Barangay Secretary Punong Barangay
BARANGAY ECOLOGICAL SOLID WASTE MANAGEMENT COMMITTEE (BESWMC)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 REORGANIZATION OF THE RESIDENTS BARANGAY OFFICIALS FIRST QUARTER SELF HELP


BRGY. ECOLOGICAL SOLID BHW/BNS 2020
WASTE MANAGEMENT
COUNCIL (BESWMC)

 BESWMC PLAN RESIDENTS BARANGAY OFFICIALS FIRST QUARTER SELF HELP


FORMULATION COMMITTEE CHAIRMAN 2020
ON SOLID WASTE
MANAGEMENT

 CONDUCT OF BESWMC RESIDENTS BARANGAY OFFICIALS EVERY MONTH SELF HELP


MEETINGS BHW/BNS

 MAINTENANCE OF COMPOST RESIDENTS BARANGAY OFFICIALS EVERY MONTH SELF HELP


PITS PER HOUSEHOLD BHW/BNS
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 INFORMATION
CAMPAIGN/ADVOCACY RESIDENTS BARANGAY OFFICIALS YEAR ROUND SELF HELP
ACTIVITIES ON SOLID WASTE BHW/BNS
MANAGEMENT

 WASTE SEGREGATION, BARANGAY OFFICIALS SELF HELP


RECYCLING AND RESIDENTS COMMITTEE CHAIRMAN YEAR ROUND
COMPOSTING ON SOLID WASTE
MANAGEMENT

 OPERATION TAOB RESIDENTS BARANGAY OFFICIALS YEAR ROUND 2,000.00 5% BDRRM


BHW/BNS FUND

 ORGANIZATION OF CLEAN RESIDENTS BARANGAY OFFICIALS FIRST QUARTER SELF HELP


AND GREEN BRIGADE BHW/BNS 2020

 MONITORING, EVALUATION & RESIDENTS BARANGAY OFFICIALS YEAR ROUND SELF HELP
REPORTING OF SEWMC PPA’s BHW/BNS
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 MAINTENANCE OF MRF RESIDENTS BARANGAY OFFICIALS YEAR ROUND PHP 2,000 5% BDRRM
COMMITTEE CHAIRMAN FUND
ON SOLID WASTE
MANAGEMENT

 ESTABLISHMENT AND RESIDENTS BARANGAY OFFICIALS YEAR ROUND PHP 5,000 5% BDRRM
MAINTENANCE OF COMMITTEE CHAIRMAN FUND
COMMUNAL COMPOST PIT ON SOLID WASTE
MANAGEMENT

 ENACTMENT OF BARANGAY RESIDENTS BARANGAY OFFICIALS YEAR ROUND SELF HELP


ORDINANCE PROHIBITING COMMITTEE CHAIRMAN
WASTE BURNING ON SOLID WASTE
MANAGEMENT

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


Barangay Secretary PUNONG BARANGAY
BARANGAY POVERTY REDUCTION ACTION PLAN (BPRAP)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIE BENEFICIARIES PERSON SCHEDULE OF FUNDING REQUIREMENTS
S RESPONSIBLE IMPLEMENTATION AMOUNT SOURCE

 REACTIVATION OF BPRAP RESIDENTS BARANGAY YEAR ROUND SELF HELP


OFFICIALS

 FORMULATION OF BPRAP RESIDENTS BARANGAY YEAR ROUND SELF HELP


PLAN OFFICIALS

 CONDUCT OF BPRAP MEETING RESIDENTS BARANGAY OFFICALS MONTHLY SELF HELP

 PROVISION OF LIVELIHOOD RESIDENTS BARANGAY OFFICALS YEAR ROUND SELF HELP


PROJECTS

 ESTABLISHMENT OF RESIDENTS BARANGAY OFFICALS YEAR ROUND SELF HELP


BACKYARD GARDENING

 Assisstance to municipal gov’t in RESIDENTS BARANGAY OFFICALS YEAR ROUND SELF HELP
the provision to hybrid rice and
corn and rice production program

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


Barangay Secretary PUNONG BARANGAY
BARANGAY ANTI-DRUG ABUSE COUNCIL
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 CONDUCT OF REGULAR RESIDENTS BARANGAY OFFICIALS MONTHLY SELF HELP


BADAC-BPOC MEETING. CHAIRMAN COMMITTEE
ON BADAC & BPOC

 CONDUCT OF NIGTH RESIDENTS CHAIRMAN COMMITTEE EVERY NIGTH 20% CLEAN


PATROL/RONDA ON BADAC & BPOC AND GREEN
BARANGAY TANODS

 CONDUCT OF RESIDENTS BARANGAY OFFICIALS YEAR ROUND SELF HELP


ADVOCACY/PULONG-PULONG CHAIRMAN COMMITTEE
SA BARANGAY, ILL EFFECTS ON BADAC & BPOC
OF DRUGS BARANGAY TANODS

 REPORTING OF SUSPECTED RESIDENTS BARANGAY OFFICIALS YEAR ROUND SELF HELP


DRUG USERS & CHAIRMAN COMMITTEE
PUSHERS/TRAFFICKERS TO ON BADAC & BPOC
CONCERNED AUTHORITIES BARANGAY TANODS
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 DISPLAY OF ANTI-DRUG RESIDENTS BARANGAY OFFICIALS YEAR ROUND PHP 1,000 MOOE
SLOGANS/PLACARD IN CHAIRMAN COMMITTEE
CONSPICUOUS PLACES ON BADAC & BPOC

 CONDUCT OF SPORT RESIDENTS CHAIRMAN COMMITTEE YEAR ROUND SELF HELP


ACTIVITIES & OTHER ON BADAC & BPOC
WORTHWHILE ACTIVITIES BARANGAY TANODS
WITH MAXIMUM YOUTH
PARTICIPATION

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


Barangay Secretary PUNONG BARANGAY
COMPREHENSIVE BARANGAY DISASTER RISK REDUCTION MANAGEMENT COUNCIL (CBDRRMC)
ACTION PLAN 2020
PROJECTS/PROGRAMS/ACTIVITIES TIME TABLE PERSON/AGENCY TARGET BUDGET REQUIREMENT REMARKS
RESPONSIBLE BENEFICIARIES
AMOUNT SOURCE
I. PRE-DISASTER
1. Reorganization/Reactivation of 1st quarter Brgy. Official All Brgy. Residents
Disaster Coordination Councils at all levels

2. Identification/designation of DOCs -do- -do- All Brgy. Residents Php 5,000 Brgy. Funds
-do- -do- All Brgy. Residents
3. Identification /designation of evaluation
centers and evaluation routes
-do- -do-
4. Identification of vulnerable areas and
populace most likely to be affected: typhoon, 2nd quarter Brgy. Officials All Brgy. Residents PHP 2,000 Brgy. Funds
flashflood, earthquake, forest fire, fire & All Brgy. Residents
tsunami.

5. Inventory of disaster equipment, relief goods


and medicines -do- Brgy. Officials -do- Php 16,625 Brgy. Funds
a. communication equipments
b. stockpiling of relief goods/medicines
1st-2nd quarter LGU, MDCC,Other BDRRMC Members
c. transportation equipment
d. rescue/relief equipment or paraphernalia concerned NGAs,
NGOs
6. Acquisition of relief goods, equipment &
medicines

7.Capability Building Activities,


Training/Drills of Task Units, Disaster
Brigades, paramedics and volunteers on:
O/B on Disaster Management
Drill on rescue/relief operation
CPR, first aid
PROJECTS/PROGRAMS/ACTIVITIES TIME TABLE PERSON/AGENCY TARGET BUDGET REQUIREMENT REMARKS
RESPONSIBLE BENEFICIARIES
AMOUNT SOURCE
II. DURING DISASTER
1. Activation of Disaster Coordinating As the need arises All Barangay Php 14,000 Brgy. Funds
Center Residents
a. Intensify warning information/warning
signals
All Barangay Php 12,000 Brgy. Funds Warning device
A. Typhoon As the need arises residents used in the
Signal #1 – 2 short peals (3x) barangay is mega
Signal #2 – 4 short peals (3x) phone
Signal #3 – Several slow peals
Signal #4 – Continuous rapid peals Communication
equipment used is
B. Check/Test communication facilities in Within the duration two-way radio
all levels of disaster

C. Make available all disaster As the need arises


tools/equipment at DOCs

D. Preparation of Disaster Operation BDRRMC, Brgy.


Center Shift Rooster of personnel (Be sure Officials PHP 10.,000 5% CF
that the DOC will be manned 24hrs. on a All Affected Brgy.
rotation basis) Residents
PB, Brgy. Sec.
E. Dispatch rescue teams in response to
emergency calls

F. Conduct of relief operations based on


Reports from barangays

G. Preparation/Submission of initial reports


PROJECTS/PROGRAMS/ACTIVITIES TIME TABLE PERSON/AGENCY TARGET BUDGET REQUIREMENT REMARKS
RESPONSIBLE BENEFICIARIES
AMOUNT SOURCE
III. POST DISASTER
1. Assessment of damages/damage control As the need arises BDRRMC, Brgy. All Affected Brgy. PHP 19,125
Officials Residents
2. Location missing person 30% of 5% CF
As the need arises BDRRMC, Brgy. Disaster affected
3. Undertake relief and rehabilitation Officials populace
PB, Brgy. Sec.
4. Monitoring and reporting

Prepared By: Noted By:


AGUSTINO L. MARCELO FERDINAND N. TOMACDANG
Barangay Secretary Punong Barangay
BARANGAY NUTRITION ACTION PLAN (BNAP)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE

 COMMUNAL GARDEN RESIDENTS BARANGAY OFFICIALS/ FIRST QUARTER SELF HELP


PUROK LEADERS 2020

 HERBARY AND NURSERY RESIDENTS BARANGAY OFFICIALS/ FIRST QUARTER SELF HELP
PUROK LEADERS 2020

 FEEDING PROGRAM RESIDENTS BARANGAY OFFICIALS THIRD QUARTER PHP 3,000 SOLICITATION
BHW & BNS 2020 DONATIONS
CONTRIBUTIONS

 OPERATION TIMBANG CHILDREN COMMITTEE CHAIRMAN MONTHLY SELF HELP


ON HEALTH
BHW & BNS

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


Barangay Secretary Punong Barangay
BARANGAY INTEGRATED AREA/COMMUNITY PUBLIC SAFETY PLAN
ACTION PLAN 2020
STRATEGIES PROGRAMS/PROJECTS/ACTIVITIES TIME FUND LEAD AGENCY/ REMARKS
(KEY RESULT AREAS FRAME AMOUNT/SOURCE SUPPORT
GROUPS

CRIME PREVENTION  IEC on the anti-crime prevention efforts of the YEAR PHP 10,000
government ROUND
 Identification of crime prone areas and intensification of
police/brgy. tanod visibility.
 Conduct of the regular purok/sitio dialogue re: peace
and order
 Regular updating of the census on barangay inhabitants
list of residents and household members

LAW ENFORCEMENT  Campaign against illegal gambling


 Campaign against illegal drugs YEAR PHP 10,000
ROUND
HEALTH AND  Maternal Health
SANITATION  Child Care YEAR PHP 45,000
1. IEC on projects re: Child Care ROUND
2.Vaccination/Immunization of babies
3. Operation Timbang
4. IEC on proper child care
5. Supplemental Feeding
 Dengue Control
1. IEC on the Prevention and control of dengue
2. Fumigation
3. Cleanliness Drive
4. Operation Taob
 Rabies Control
1. IEC on the prevention and control of rabies
2. Anti-rabies vaccination
3. Proper care of dogs
 Family Planning
1. IEC on Family Planning and responsible parenthood
 Protection and Control of other Communicable Diseases
1. IEC on the prevention and control of:
a. Hepatitis B
b. TB
c. Cholera
2. Vaccination
3. Deworming
 Prevention of HIV/AIDS and other Sexually
Transmitted Diseases
1. IEC on HIV/AIDS

ENVIRONMENTAL  Land Protection


PROTECTION 1. Clean up Drive YEAR PHP 30,000
2. Tree Planting and ornamental planting ROUND
3. IEC on proper garbage segregation., recycling,
collection and disposal

FIRE PROTECTION  YEAR


AND SUPRESSION ROUND
CIVIL DEFENSE AND  Skills training of the BDCC YEAR PHP 25,000
DISASTER ROUND
PREPARATION
INSURGENCY  YEAR
ROUND
PROSECUTION AND  YEAR
COURTS ROUND
CORRECTION  YEAR
ROUND
SENIOR CITIZEN (SC)/ PERSONS WITH DISABILITIES (PWD)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE
1. Updating SC & PWD Officers SC & PWD Members SC & PWD Members
FIRST QUARTER Self Help

2. Social Welfare Protection Program to 1 Social Welfare program to


Sangguniang Barangay Year Round 10,000
Senior Citizen senior citizen maintained 5% GAD

3. Social Welfare Protection Program for 1 Social Welfare program to 5% GAD


Sangguniang Barangay Year Round
Persons with Disabilities (PWDs) PWD’s 10,000

4. Quarterly Meeting with all members of


SC & PWD Members SC & PWD Members
SC & PWD Quarterly Self Help

5. Distributions of Vitamins and Monitoring Donations &


SC & PWD Members Sangguniang Barangay Year Round
of Blood Pressure to all SC & PWD Self Help

PREPARED BY: NOTED BY:

AGUSTINO L. MARCELO FERDINAND N. TOMACDANG


BARANGAY SECRETARY Punong Barangay
SENIOR CITIZEN (SC)/ PERSONS WITH DISABILITIES (PWD)
ACTION PLAN 2020
PROGRAM/PROJECT/ACTIVITIES BENEFICIARIES PERSON RESPONSIBLE SCHEDULE OF FUNDING REQUIREMENTS
IMPLEMENTATION AMOUNT SOURCE
1. Updating SC & PWD Officers SC & PWD Members SC & PWD Members
FIRST QUARTER Self Help

2. Social Welfare Protection Program to 1 Social Welfare program to


Sangguniang Barangay Year Round 15,000
Senior Citizen senior citizen maintained 5% Gender

3. Social Welfare Protection Program for 1 Social Welfare program to 5% Gender


Sangguniang Barangay Year Round
Persons with Disabilities (PWDs) PWD’s 10,000

4. Quarterly Meeting with all members of


SC & PWD Members SC & PWD Members
SC & PWD Quarterly Self Help

5. Distributions of Vitamins and Monitoring Donations &


SC & PWD Members Sangguniang Barangay Year Round
of Blood Pressure to all SC & PWD Self Help

PREPARED BY: NOTED BY:

AGUSTINO L.MARCELO FERDINAND N. TOMACDANG


BARANGAY SECRETARY Punong Barangay
BARANGAY DEVELOPMENT INVESTMENT PROGRAM PROJECT
ACTION PLAN 2020
BARANGAY: BARACBAC
MUNICIPALITY: GALIMUYOD

FINDING
PERSON SCHEDULE OF
PROJECT/ PROGRAM/ ACTIVITY LOCATION BENEFICIARIES RESOURCES
RESPONSIBLE IMPLEMENTATION
AMOUNT/ SOURCE
A. Economic Services Farm to Market All Constituents Barangay Officials/ BDC 1st- 4th Quarter 100,000.00
Road
Rehabilitation - Infrastructure Assets
1. Road Networks Barangay Road All Constituents Barangay Officials/ BDC 1st- 4th Quarter 15,000.00
Concreted
2. Flood Control Systems N/A All Constituents Barangay Officials/ BDC 1st- 4th Quarter 0.00
3. Sewer Systems Irrigation Canal All Constituents Barangay Officials/ BDC 1st- 4th Quarter 10,000.00
4. Water Supply Systems N/A All Constituents Barangay Officials/ BDC 1st- 4th Quarter 0.00
5. Other Infrastructure Assets N/A All Constituents Barangay Officials/ BDC 1st- 4th Quarter 0.00
Machinery and Equipment
1. Agricultural and Forestry Equipment Barangay Farmers Barangay Officials/ BDC 1st- 4th Quarter 13,000.00
2. Communication Equipment Barangay Barangay Officials Barangay Officials/ BDC 1st- 4th Quarter 0.00
B. Social Services
Rehabilitations - Building and Other Structures
1. Buildings Multi-purpose All Constituents Barangay Officials/ BDC 1st- 4th Quarter 20,000.00
Halls
Rehabilitated
2. Other Structures Multi-purpose All Constituents Barangay Officials/ BDC 1st- 4th Quarter 20,158.00
Halls
Rehabilitated
3. Street Electrification Program Barangay All Constituents Barangay Officials/ BDC 1st- 4th Quarter 26,198.00
4. Water Supply System Program Barangay All Constituents Barangay Officials/ BDC 1st- 4th Quarter 7,800.00
5. Medical, Dental, Laboratory Equipment Barangay All Constituents Barangay Officials/ BDC 1st- 4th Quarter 5,000.00
C. Environmental Services
Waste Management Program Barangay All Constituents Barangay Officials/ BDC 1st- 4th Quarter 31,500.00
Clean and Green Program Barangay All Constituents Barangay Officials/ BDC 1st- 4th Quarter 94,500.00

PREPARED BY: ATTESTED BY:

AGUSTINO L. MARCELO EDEN ROSE CABAYA FERDINAND N. TOMACDANG


BARANGAY SECRETARY BARANGAY TREASURER PUNONG BARANGAY