M/s CUSTOMER proposes to set up two (2) x 5 MW coal based thermal power at LOCATION.
This document intends to provide in brief, the design criteria of Electrical System for the proposed
power plant.
1|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
2|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.3 Purpose
1.3.1 This Design Criteria Document covers the following aspects in brief for the electrical equipment
1.4.1 The electrical equipment will be suitable for installation in hot, humid, tropical, highly polluted
atmosphere with relative humidity of 95%. For the purpose of electrical design, an ambient
temperature of 50 Deg. C will be considered for outdoor and non-air conditioned (non A/C)
indoor areas. Also, for equipment installed in air conditioned areas, design ambient
1.4.2 The derated rating at 50 Deg. C will be considered for all the equipment inside switchgear/
1.4.3 Degree of protection (DOP) for outdoor equipment will be IP 55 unless otherwise indicated in
Degree of protection for indoor, air conditioned equipment will be IP 20 unless otherwise
Degree of protection for indoor, non-air conditioned equipment will be IP 42 unless otherwise
1.4.4 The creep age distance will be 31 mm/kV for all outdoor equipment, 25mm/kV for air-
conditioned indoor area, ventilated non-air conditioned indoor area and bus ducts, unless
1.4.5 Design of all the equipment will be as per relevant IS/ IEC standards, IE rules and Indian grid
code requirement.
1.4.6 For power distribution arrangement, refer the Key Single Line Diagram (Drg. No. xxxxxxxxxx).
3|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.4.7 External paint shade for all the electrical equipment will be Grey- RAL 7032 for indoor and
Dark admiralty Grey – shade no. 631 of IS-5 for outdoor, whereas the internal paint shade for
all the electrical equipment will be Glossy white (epoxy) for indoor and outdoor, unless
4|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
Engineering, design, construction and testing of the equipment will be carried out in
accordance with the following applicable latest standards, codes and/or local regulations.
l) IE Rules
5|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief, the function, general description and design basis of Generator
A generator circuit breaker (GCB) will be provided between the steam turbine generator (STG)
and the Generator Transformer (GT) and it will be located indoor. During the normal
operation, UT(s)/ST will be energized by the STG. However, during the start-up, UT(s)/ST will
be fed from the 400kV grid by back charging the generator transformer by keeping generator
circuit breaker open. STG will be synchronized to the grid by closing GCB.
1.3.1 The generator circuit breaker will be SF6, gang operated, non-draw out type.
1.3.3 The Generator Circuit Breaker (GCB) will be adequately sized to carry the continuous current
fed from STG under all operating conditions including the VWO condition at 95% of generator
voltage without exceeding specified permissible temperature limits specified in IEEE C37.013.
6|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.3.4 The fault rating of the GCB will be based on maximum symmetrical and asymmetrical fault
current.
interrupting capacity rating of the generator circuit breaker will be separately computed
as:
II. Short circuit current contribution from 400kV grid system through generator transformer
(GT) Plus (+) Contribution of 11kV auxiliary system through unit transformers and
Station Transformer.
For calculating generator source asymmetrical short circuit current, DC component will
The interrupting duties mentioned above will be calculated on the basis of breaker
contact separation time of not more than 60ms from the instant of inception of fault.
Further, increase in fault current due to +5 % variation in the system/ Generator voltage
will be considered.
1.4.1 The breaker will comply with the requirements of duty in generator application. The breaker
will be of SF6 type and will comply with IEEE Std. C37.013.
1.4.2 The breaker will be equipped with a series disconnector on the transformer side and with
earthing switches on both sides. The disconnector will have a motor operated actuator for
remote control. The earthing switches will have actuators, as well, but be operable from the
local only.
7|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
a) Surge arresters and protective capacitors (both connected phase to earth) at the
circuit breaker
d) Manual short circuiting facility between circuit breaker and series disconnector along with
grounding link
1.4.3 The earthing switches will be rated to withstand full fault current for one (1) second with no
1.4.5 GCB will be equipped with two trip coils suitable for operation with control voltage up to 70%
1.4.6 GCB will get close permissive from auto synchronizing unit located in the Generator Control
cum Synchronizing Panel (GCP). Auto synchronization ON/OFF signal to GCP will be initiated
from DCS. The GCB will be suitable for test operation from GCB local panel.
1.4.7 Suitable mechanical interlocks between GCB, earthing switches and short circuiting connection
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Isolated
Isolated Phase Bus Duct will serve as interconnection between the Generator and its
associated Generator Circuit Breaker (GCB), Generator Transformer (GT), Unit Transformers
(UT’s), Station Transformer, Excitation transformer, SPVT cubicle and Neutral grounding
transformer (NGT).
IPBD for each unit will comprise of following major parts: Main Run (Generator to GCB, and
GCB to GT) Delta Run (Delta formation at GT LV side) UT Tap-Off connections (Main run to
UT1 & UT2) ST Tap-Off connections (Main run to ST) Tap-Off connection for Excitation
Transformer Neutral connection (Neutral Bus duct from Generator Neutral Terminal box to the
Neutral Grounding Transformer cubicle) Tap-Off connection for Surge Protection & Generator
9|Page
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.4.1 The continuous current rating of the IPBD main run will be arrived at considering maximum
MVA output of the unit and at minimum generation voltage (95% of rated voltage) under VWO
conditions.
1.4.2 The continuous current rating of the Tap-Off bus duct will be considered based on minimum
generation voltage (95% of rated voltage) and equipment to which tap-off is connected being
1.4.3 Continuous current rating considered for the delta run will be 1/ 3 times the rating of main run
of IPBD.
a) Short circuit withstand capacity and momentary current rating of the main run of the bus
i. Higher of the short circuit current contribution from Steam Turbine Generator
(STG) or the short circuit current contribution from 400kV Grid system through
Plus (+)
ii. Contribution of 11kV auxiliary system through Unit Transformers and Station
Transformer.
b) Short circuit withstand capacity of the Tap-off bus duct to Unit Transformers will be
designed for the combined fault current contributions from the Generator, from 400kV
c) Short circuit withstand capacity of the Tap-off bus duct to Station Transformer will be
designed for the combined fault current contributions from the Generator, from 400kV
d) Short circuit withstand capacity of Tap-off Bus duct to Excitation Transformer and Surge
Protection & Voltage Transformer cubicle will be designed for the combined fault current
contributions from the Generator, from 400kV System and from both the UTs and ST.
e) Delta Run short circuit withstand capacity will be designed for summation of generator
fault current contribution, 1/3 times the 400kV System fault current contribution, and
10 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.4.5 In addition to the above, Solar radiation and adverse weather conditions will also be
considered.
1.5.1 The bus duct will be naturally air cooled. Positive air pressurization arrangement will be
provided for the bus duct to prevent dust ingress and accumulation of condensation of
1.5.2 The bus enclosure will be phase isolated and will be continuous bonded type. Wall frame
1.5.3 Seal-off bushing will be provided at the entry of tap-off bus to SPVT cubicle and at the entry of
the bus duct to generator phase terminal, neutral side terminal box, and the neutral grounding
1.5.4 The bus duct will be installed partially indoor and partially outdoor in a hot, humid and tropical
atmosphere.
1.5.5 The electrically continuous bus enclosure will be used as the grounding bus. All the parts of the
1.5.6 The bus duct will be adequately supported and braced to successfully withstand normal
operation, vibrations, thermal expansion, short circuit forces and all design loads.
12 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Neutral
Grounding Transformer (NGT) & secondary loading resistor for the proposed power plant.
NGT with secondary loading resistor will be used to limit stator ground fault current.
1.3.1 Neutral side Isolated Phase bus will be provided upto shorting point and thereafter one bus
upto NGT Cubicle for connection of Generator Neutral Point with NGT.
1.3.2 Loading resistor will be connected across the secondary of this transformer.
1.4.1 The resistive component of the ground fault current must be at least equal to the system three
phase capacitive charging current in order to limit the transient voltage rise due to an arcing
ground fault. Hence, NGT & secondary resistor will be designed to have ohmic value less than
or equal to residual capacitive impedance. However, NGT sizing shall be as per the Generator
Manufacturer’s recommendation.
1.5.1 The transformer and resistor will be located in separate cubicles/compartment adjacent to
each other. The enclosure housing the neutral grounding equipment will be a freestanding
enclosure.
1.5.2 Provision will be made for satisfactorily dissipating the heat rejection of the secondary loading
resistor and transformer when a ground fault occurs. This will include provision for the
expansion and contraction of the high temperature equipment, interconnecting conductors and
enclosure.
13 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.3 The neutral grounding equipment will be completely assembled, wired and connected to the
1.5.4 The neutral grounding transformer will be cast epoxy resin type natural air-cooled single phase
1.5.5 The loading resistor will be formed of non-aging, corrosion resistant punched stainless steel
grid element provided with necessary insulation and designed for indoor service for a
1.5.7 The resistor will be capable of operation at full current and voltage for the specified time rating
at the site’s maximum temperature without exceeding the resistor’s temperature rise and
14 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief, the function, general description and design basis of Generator
1.2.1 A bank of three (3) nos. single-phase, 420/√3/20kV, outdoor type, YNd1, ONAN/ONAF/OFAF,
Generator Transformer (GT) will be provided for each unit for stepping up the generated
1.3.1 Total seven (6 + 1) nos. of single phase units will be provided. Spare single phase unit
High voltage side of Generator Transformer will be connected to 400kV gas insulated
15 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.4.1 Generator transformer will be sized to deliver the maximum continuous output of the
Generator minus the excitation power and auxiliary power consumptions through IPBD tap-
offs. It has been considered that the MW rating of Generator will be increased at VWO
condition keeping the MVA rating same as MCR. Correspondingly the power factor during VWO
will be changed.
1.4.2 Each Generator transformer will be sized for maximum of the following load cases: -
a) Case 1: Generator is operating at rated output condition and no deduction of auxiliary load.
b) Case 2: Generator is operating at Valve Wide Open (VWO) condition and no deduction of
auxiliary load.
c) Case 3: Generator is operating at its maximum MVA output condition (under VWO) and
excitation transformers and unit transformers are drawing auxiliary power. It is also
1.4.3 The MVA rating so calculated will be the OFAF rating. The GT will have ONAN/ONAF/OFAF
cooling classification. The ONAF rating will be 80% of the OFAF rating and ONAN rating will be
1.5.1 3 x 50 % capacity separately mounted radiator banks will be provided for each single phase
units. Each radiator bank will be provided with suitable number of working fans and oil pump
of adequate ratings, and atleast one no. stand by oil pump and fan. Each radiator bank will be
provided with uni-directional bypass valve to permit oil to bypass the pump in the event of a
pump failure. It will be possible to completely isolate any one of the radiator banks for
1.5.2 The transformer will be so designed that it is capable of operation at 125% rated voltage for a
period of one minute and 140% rated voltage for a period of five seconds due to sudden load
throw off and 1.1 times continuous at the terminals to which the generator is connected.
1.5.3 The thermal ability of generator transformer to withstand short-circuit will be for two (2)
16 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.4 The transformer will be provided with On-load tap changer on HV side.
1.5.5 Continuous operation at rated MVA at any voltage variation within + 10% of the rated voltage
1.5.6 The transformer will be capable of delivering the rated current at a voltage equals to 105% of
17 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Unit
Two (2) nos. of two (2) winding, three (3) phase, 20/11.5kV, outdoor type, ONAN / ONAF,
Dyn11, UT will be provided for each unit to cater respective unit loads.
The High Voltage (HV) winding will be connected to the respective generator through tap-off
run of Isolated Phase Busduct (IPBD). Low Voltage winding will be connected to 11kV unit
switchgear through Segregated Phase Busduct (SPBD). The Low Voltage winding neutral will
18 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
be earthed through Neutral Grounding Resistors (NGR) to limit the earth fault current to the
1.4.1 Each unit transformer will be able to supply 50% of its own unit loads plus largest single load
(either largest stand-by motor or one 11/0.433kV unit service transformer 100% loaded).
1.4.2 An overall design margin of 10% will be considered on the above calculated MVA rating.
1.4.3 The ONAN rating of the UT will be 80% of the ONAF rating.
1.4.4 The impedance of the UT will be selected on base of ONAF rating such as to limit the 11kV
fault level to 40kA, considering Generator and Grid source and motor contribution. Further the
voltage dip at the time of starting the MD BFP on UT will be limited to 20% at the motor
1.5.1 3 x 50 % capacity separately mounted radiator banks will be provided. Each radiator bank will
be provided with suitable number of working fans of adequate ratings, and atleast one no.
stand by fan. It will be possible to completely isolate any one of the radiator banks for
1.5.2 The transformer will be so designed that it is capable of operation at 125% rated voltage for a
period of one minute and 140% rated voltage for a period of five seconds and 1.1 times
continuous at the terminals to which the generator is connected. Transformer shall be capable
1.5.3 The thermal ability of unit transformer to withstand short-circuit will be for two (2) seconds.
1.5.4 Continuous operation at rated MVA at any voltage variation within + 10% of the rated voltage
19 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
20 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
This chapter describes in brief the function, general description and design basis of Station
1.3.1 One (1) Station Transformer will be provided for each unit.
1.3.2 The High Voltage (HV) winding will be connected to the respective generator through tap-off
run of Isolated Phase Busduct (IPBD). Low Voltage windings will be connected to 11kV station
switchgears through Segregated Phase Busduct (SPBD). The Low Voltage winding neutrals will
be earthed through Neutral Grounding Resistors (NGR) to limit the earth fault current to the
1.4.1 Each ST will be sized for the maximum of the following load conditions:-
1.4.4 The percentage impedance of ST will be selected on base of ONAF rating to limit the 11kV fault
21 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.1 3 x 50 % capacity separately mounted radiator banks will be provided. Each radiator bank will
be provided with suitable number of working fans of adequate ratings, and atleast one no.
stand by fan. It will be possible to completely isolate any one of the radiator banks for
1.5.2 The transformer will be so designed that it is capable of operation at 125% rated voltage for a
period of one minute and 140% rated voltage for a period of five seconds and 1.1 times
continuous at the terminals to which the generator is connected. Transformer shall be capable
1.5.3 The thermal ability of station transformer to withstand short-circuit will be for two (2) seconds.
1.5.4 Continuous operation at rated MVA at any voltage variation within + 10% of the rated voltage
22 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
23 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Segregated
The segregated phase duct will serve as interconnection between MV switchgear and
transformers, and also tie feeder connection between Unit & Station MV switchgears and
The Segregated Phase Busduct will be used for interconnection of following equipment:- Unit
Transformer and 11kV Unit Switchgears Station Transformer and 11kV Station Switchgears Tie
between 11kV Unit Switchgears and 11kV Station Switchgears Station Swgr#1A To Station
Swgr#2A Tie Station Swgr#1B To Station Swgr#2B Tie Unit Auxiliary Transformers, Station
auxiliary transformer, Ash handling transformers, Coal handling transformers etc. to their
respective 3.3kV switchgears Tie between 3.3kV Unit aux. switchgears and 3.3kV Station aux.
Continuous current rating, short time rating & momentary rating will be same as 11/3.3kV
Switchgears.
1.5.1 The busduct will be natural air cooled. The three phases will be enclosed in a weather and
vermin proof dust tight enclosure with phase barriers of either aluminium or non-hygroscopic
1.5.3 The spacing of the bus support insulators will be considered by giving due factor of safety to
withstand the forces due to the momentary short circuit current assigned for the bus duct.
1.5.4 The busducts will be provided with adequate number of thermostatically controlled space
24 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.5 The bus duct supports will be fabricated from standard steel sections. The support structures
1.5.6 Wall frame assembly and seal off bushings will be provided where the bus duct passes through
1.5.7 Wall frame assembly with four (4) hour rated fire barriers will be provided to prevent passage
of fire and smoke, whenever bus duct passes through the walls designated as “Fire Wall”. Wall
frame assembly with two (2) hour rated fire barriers will be provided at buildings wall where
1.5.8 The busduct will be installed partially indoor and partially outdoor in a hot, humid and tropical
atmosphere.
1.5.9 A continuous galvanized earth bar will be provided along the entire length of each bus duct.
Each section of the busduct enclosure will be bonded to this earth bar at least at both ends of
the enclosure.
25 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of 11kV &
11kV & 3.3kV switchgear (commonly referred as MV switchgear) will cater power supply to
various HV feeders as motors, step-down transformers and other loads for unit and various
BOP facilities. Start push button and Emergency stop pushbutton (in LPBS) for tripping/starting
various drives/equipment from local position will be wired directly to Switchgear. In case of
emergency drives, emergency start PB will be provided, instead of emergency stop PB.
1.3.1 Two (2) nos. of 11kV Unit Switchgears will be provided for each unit to feed 11kV auxiliaries.
Each switchgear will be fed from respective unit transformer (UT) and will have a back-up
1.3.2 In order to feed 11kV station loads, total four (4) nos. of 11kV Station Switchgears will be
provided for two units. Each switchgear will be fed from LV winding of Station Transformer
(ST) and a back-up interconnection with 11kV Station Switchgear fed from other ST.
26 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.3.3 Two (2) no. of 3.3kV Unit Switchgear will be provided for each unit to feed 3.3kV auxiliaries.
Each switchgear will be fed from respective 11/3.45kV Unit Auxiliary Transformers and will
1.3.4 In order to feed 3.3kV station loads, total two (2) nos. of 3.3kV Station Switchgears will be
provided for two units. Each such switchgear will be fed from LV winding of 11/3.45kV Station
Auxiliary Transformer (SAT) and a back-up interconnection with 3.3kV Station Aux. Switchgear
1.3.5 One (1) no. of 3.3kV, double-ended Switchgear for AHP and CHP will also be provided for the
plant. Each such switchgear will be fed from 2x100% auxiliary transformer, with a normally
open bus-coupler.
1.3.6 Ties will be provided between the various switchgears as shown in the Key single line diagram
1.4.1 The continuous current rating of busbars and incomer circuit breakers of HV switchboards will
be selected, considering secondary winding rated current of their upstream transformer. With
OLTC on GT HV side, bus voltage of 11kV switchgear will be regulated to near 100% of the
rated voltage. Hence, for 11kV switchgear voltage variation will be considered as (-) 5%. As
11/3.45kV auxiliary transformer will be provided with OCTC, for 3.3kV switchgear, in general,
1.4.2 The outgoing breaker/contactor rating will be selected, based on the name plate current rating
1.4.3 The short circuit rating of the switchgear will be selected considering short circuit current
contribution from incomer plus short circuit contribution from motors running on that bus.
1.4.4 Back-up HRC fuse in the contactor feeder will be based on the name plate current rating of the
equipment with 50% margin. Fuse selection will also ensure that fuse doesn’t mal-operate
1.4.5 One (1) no. of spare motor feeder of highest rating will be provided for each MV switchboard
wherever a motor feeder exists. One (1) no. of spare transformer feeder of highest rating will
1.4.6 De-rating factors due to site ambient temp and in panel temp will be considered.
27 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.1 11kV & 3.3kV switchgear will be single front, single tier, and fully compartmentalized, indoor
metal clad construction having a separate vertical panel with distinct compartments for circuit
breaker/contactor truck, cable termination, main busbars and control, metering and relaying
devices.
1.5.2 All switchgears will be natural air cooled. The 11kV circuit breakers will be vacuum type with 2
nos. trip coil for all the feeders. . The 3.3kV circuit breakers will be vacuum type with single
trip coil for all the feeders. As 3.3kV coal handling & ash handling motors require frequent
on/off operations, vacuum contactors backed by HRC fuses will be used for controlling these
1.5.3 Surge arrestor for dry type transformer will not be provided. Confirmation from transformer
1.5.4 Surge arrestor will be provided for all 11kV & 3.3kV motor feeders, and oil filled transformer
feeders. Surge arrestor shall be gapless metal oxide surge arrester with RC unit with 5kA
1.5.5 All the busbars & jumper connections will be of high conductivity aluminium alloy.
1.5.6 The circuit breakers/contactors & bus PT will be mounted on fully withdrawal truck. The truck
1.5.7 All current & voltage transformer will be cast resin type with class of insulation E or better. CT
may be multi or single core type and will be located in the cable compartment. All VT’s will be
1.5.8 Minimum 20% spare terminals for external connections will be provided on each panel.
1.5.9 Each switchgear panel will be equipped with thermostatically controlled space heater.
1.5.10 Each switchgear will be provided with two (2) nos. of 220V DC supply each with 100% rating.
Change-over between the supplies will be provided. In addition, manual change over facility
1.5.11 All 11kV and 3.3kV motor feeders shall be provided with running hour meters. All the breakers
28 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.12 Mechanical locking facility shall be provide to prevent insertion of breaker if breaker is under
permit.
1.5.13 Trip circuit supervision relay will be provided for all the feeders to monitor the circuit
a) Cable earthing – total one (1) no. for 11kV Switchboards and one (1) no. for 3.3kV
Switchboards
b) Bus earthing - total one (1) no. for 11kV Switchboards and one (1) no. for 3.3kV
Switchboards
1.5.15 Switchgear will have facility of extension on both sides. Cable entry will be from bottom and
1.5.16 Each circuit breaker/contactor cubicle will be provided with the following minimum
accessories:-
c) Indicating lamps
f) Anti-pumping relay
g) Lock-out relay
j) Mechanical close push button (shall be accessible only after opening of the front door)
29 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
30 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of 11/3.45kV
1.2.1 Two (2) nos. of Unit Auxiliary Transformers (UATs) will be provided for each unit to cater
1.2.2 Two (2) nos. of Station Auxiliary Transformers (SAT’s) will provided for two units to cater
1.2.3 Two (2) nos. of Auxiliary Transformers for CHP and Two (2) nos. of Auxiliary Transformers for
AHP will also be provided for the complete plant to cater 3.3kV CHP and AHP auxiliary loads
respectively.
1.2.4 These transformers will be two (2) winding, three (3) phase, 11/3.45kV, Dyn11, outdoor type,
and ONAN/ONAF (for transformer having rating >5MVA) or ONAN (for transformers having
1.2.5 These transformers will be provided with OCTC on HV side with tap range, + /- 5% in steps of
2.5%.
1.3.1 The High Voltage (HV) winding of Auxiliary transformer will be connected to respective 11kV
indoor unit/station switchgear through HV cable and the Low Voltage (LV) winding will be
connected to respective 3.3kV indoor switchgear through Segregated Phase Busduct (SPBD) or
cable.
1.3.2 The LV Neutral (LVN) will be earthed through Neutral Grounding Resistor (NGR) to limit earth
31 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.4.1 Each unit auxiliary transformer (UAT) will be able to supply 50% of 3.3kV unit auxiliary loads.
1.4.2 Each SAT will be sized for the maximum of the following load conditions:-
100% of the load connected to 3.3kV station aux. switchgear for two (2) units
I. 50% of 3.3kV Station aux. loads of 2 units (both SATs are available).
II. Plus (+) 50% of 3.3kV unit auxiliary load of one (1) unit.
1.4.3 Each AT for CHP and AHP, will be sized to meet 100% of the load requirement connected to
1.4.6 The impedance will be selected such as to limit the 3.3kV fault level to 40kA and maintain
minimum permissible voltage at motor terminals during starting of the largest motor when all
1.5.1 2 x 60% capacity separately mounted/tank mounted radiator will be provided. Each radiator
banks will be provided with suitable number of working fans, and atleast one standby fan.
1.5.2 The transformer will be so designed that it is capable of operation at 125% rated voltage for a
period of one minute and 140% rated voltage for a period of five seconds and 1.1 times
continuous at the terminals to which the generator is connected. Transformer shall be capable
1.5.3 The thermal ability of AT to withstand short-circuit will be for two (2) seconds.
1.5.4 The transformer will be operated at its rated MVA at any voltage within + 10% of the rated
1.5.5 The transformer will be provided with off circuit tap changer on HV side for maintaining
voltage on LV side.
1.5.6 Air insulated HV cable box for terminating HV cables will have degree of protection as IP 55.
32 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
33 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of 11/0.433kV
and 3.3/0.433kV Service Transformer (ST) for the proposed power plant.
Two (2) winding, three (3) phase, dry type/oil filled, Dyn11, Service Transformers will be
1.3.1 The transformers feeding the load centers in the power house building will be of dry type. All
1.3.2 Service transformer (ST) will step down the voltage from 11kV (or 3.3kV) to 433V. The High
Voltage (HV) winding of ST will be connected to respective 11kV (or 3.3kV) switchgear
through HV cable and the Low Voltage (LV) winding will be connected to respective 415V
indoor switchgear through Non Segregated Phase Busduct (cable will be provided if Service
1.3.3 Dry type transformers will be indoor and will be closely coupled with switchgear / PMCC’s.
1.4.1 The quantity and rating of the 11000 or (3300)/ 433 V service Transformers will be based on
the actual load figures and 100% redundancy. The maximum rating of the 11000/ 433V
transformers will be limited to 2.5MVA. In case the 11000 (or 3300)/ 433V transformer rating
Transformers will be provided. Each transformer will be rated to take care of the entire load on
34 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
the respective switchgear considering the outage of the other transformer. An appropriate load
factor with a minimum of 0.9 for continuously running loads and 0.2 for intermittent loads like
valve actuators, dampers, cranes, plug points, elevator etc., will be considered. Diversity factor
will be considered as 0.9 for each transformer. Standby and spare feeder loads will not be
1.4.2 The impedance of the transformers will be chosen such that the fault level does not exceed 50
kA on 415V switchgear including the motor contributions and also voltage dip at the Motor
terminals, while starting any auxiliary does not exceed the limit acceptable for the equipment
1.5.1 The thermal ability of ST to withstand short-circuit will be for two (2) seconds.
1.5.2 Transformer will operate without injurious heating, at rated MVA at any voltage within 110%
1.5.3 Transformers will be capable of delivering the rated current, at a voltage equals to 115% of
1.5.4 Transformer will operate below the knee of the saturation curve at 110% voltage to preclude
1.5.5 The transformer will be provided with off circuit tap changer on HV side for maintaining
voltage on LV side.
1.5.7 The transformers will be designed with particular attention to suppress harmonic voltage,
1.5.8 Air insulated HV cable box for terminating HV cables will have degree of protection as IP 55.
1.5.9 LVN bushing will be provided with neutral CT’s for Stand-by Earth fault protection.
1.5.10 Oil filled transformer will be provided with tank mounted detachable radiator banks.
1.5.11 Dry type transformer will be housed in enclosure fabricated from sheet steel conforming to
36 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Neutral
The Neutral Grounding resistor (NGR ) will be used to limit magnitude of earth fault current of
11kV & 3.3kV switchgear so that damage of electrical equipment is reduced, safety of
personnel is increased and sensitive & selective earth fault protection can be provided.
11kV and 3.3kV systems will be medium resistance earthed. The neutral of the Unit
Transformers, Station Transformers, Unit Aux Transformers and Station Aux Transformers will
The Neutral Grounding Resistor ohmic value for Unit Transformers, Station Transformers, Unit
Aux Transformers and Station Aux Transformers will be such that earth fault current is limited
37 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.1 The NGR will be natural air-cooled type. The resistor will be made of stainless steel grid. The
resistor will be enclosed in Aluminium enclosure of not less than 2mm, having degree of
1.5.2 The resistor cubicle will be located outdoor near to transformer. NGR will be placed on
mounting structure, so that any part of NGR is 2500mm above ground/plinth. If located at
ground level the resistor & transformer area will be fenced separately, even though located
1.5.3 Cable boxes will be provided for receiving the cables from the transformers. The resistors will
be provided with taps at 25%, 50% & 75%. The resistor cubicle will be mounted on suitably
rated insulators.
1.1 Introduction
38 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
This chapter describes in brief the function, general description and design basis of Non-
1.1kV class non-segregated phase bus duct and accessories will be provided for connection
The Non-Segregated Phase Bus duct serves interconnection between service transformers and
1.4.1 Continuous current rating will be same as rated current of respective switchgear.
1.4.2 Short circuit Current rating: The bus duct will be designed to withstand the short circuit
39 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.1 Introduction
This chapter describes in brief the function, general description and design basis of Power cum
Motor Control Center (PMCC), Motor Control Center (MCC), Distribution Boards (DB), Local
pushbutton stations (LPBS), Local control panel (LCP) for the proposed power plant.
Adequate number of 415V switchgear/PMCC/MCC/DB will be provided. Start push button and
Emergency stop pushbutton (in LPBS) for tripping/starting various drives/equipment from local
position will be wired directly to MCC. In case of emergency drives, emergency start PB will be
provided, instead of emergency stop PB. Local control cum starter panel (LCP) is envisaged for
controlling various isolated drives/equipment from local position with status monitoring in the
PLC/DCS where MCC/DB will not be considered due to smaller quantity of drives.
1.3.1 In general 415 V, 50 Hz, 3 phase, 3 wire indoor Switchgear/PMCC will have two incomers (2 x
100%) & one bus coupler and each bus section will be fed from low voltage side of the service
40 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
transformer. Oil cooled Service transformer will be connected to switchgear/PMCC through Non
Segregated Phase Busduct (NSPBD) and dry type transformers will be indoor and will be
1.3.2 Emergency PMCC/MCC’s will be with three incomers (two from Unit service switchboards and
1.3.3 Distribution boards will be 415V, 50Hz, 3 phase, 3 wire indoor / outdoor (as required).
Essential 415V DB’s shall have two incomers with one bus-coupler. 240V DB’s may have single
incomers.
1.3.4 MCC will also be 415V, 50 Hz, 3 phase, 3 wire with two incomers and one bus-coupler.
1.4.1 The continuous current rating of busbars and incomer circuit breakers of LV switchboards /
PMCC will be selected, considering secondary winding rated current of their upstream
1.4.2 The continuous current rating of busbars and incomer circuit breakers of LV MCC/DB will be
selected at minimum permissible MCC/DB voltage, considering maximum operating loads plus
1.4.3 Outgoing feeders will be sized based on the loads connected plus 10% margin rounded off to
the next higher rating. Standardization will be done to avoid too many ratings of outgoing
feeders.
1.4.4 The short circuit rating of the switchgear/PMCC/MCC/DB will be selected considering short
circuit current contribution from the incomer plus short circuit contribution from motors
running on that bus and will be limited to 50kA including 10% margin.
1.5.1 LV switchgear/PMCC will be indoor, free-standing, and metal enclosed, floor mounted, dust
and vermin proof of uniform height of not more than 2450mm construction, fully draw-out
type construction with dual breakers per vertical section. LV Switchgear will be single front
1.5.2 The MCC will be indoor, free standing, metal enclosed, floor mounted, modular type dust and
vermin proof of uniform height of not more than 2450mm construction, easily extendible on
one side, having feeder designation indicating labels. MCC will be draw out, double front type.
41 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
The DB’s will be fixed, compartmentalized, single front type. 240V DBs may be non-
compartmentalized.
1.5.3 All air circuit breakers (ACBs) and molded case circuit breakers will be of short circuit
1.5.4 The maximum operating height for switchgear/PMCC will not exceed 1800mm and for
MCC/DB’s will not exceed 1950 mm. Minimum operating height will not be less than 300mm
1.5.5 The 415V switchgear/ PMCC/ MCC/critical ACDB’s having two incomers and a bus-coupler and
having ACB in the incomer & bus-coupler, will be provided with slow bus change-over scheme.
1.5.6 MCC incomers having rating 630A & above will be provided with ACB. MCCs/boards having
rating below 630A will be provided with MCCBs or isolators in incomer & bus-coupler. However
all incomer/bus couplers of MCCs /boards directly related to process loads will be provided with
Air circuit breakers even if they are rated less than 630A.
1.5.7 Outgoing power feeders of Switchgear/PMCC’s having rating 630A & above will be provided
with ACB but if rating is less than 630A then MCCB will be provided.
1.5.8 Motors above 150kW, will be provided with remote controlled Air circuit breakers, and motors
having rating less than or equal to 150kW will be provided with DOL starters.
1.5.9 Motor starter modules will be provided with air-break electromagnetic type contactor and
Heater starter modules will be provided with air-break electromagnetic type contactor, isolating switches
1.5.10 Breaker will be air break three pole with neutral link, draw-out type spring charged, trip coil
supervision relay, anti-pumping feature. Mechanical tripping through red trip pushbutton will
also be provided.
1.5.11 The utilization category of contactor will be AC-3 for unidirectional motor, AC-4 for bi-
directional motor and for heater feeders will be AC-1. The starter will meet the requirement of
Type-II co-ordination.
1.5.12 Protections for LV motor feeders shall be provided as per the following
42 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
a) Up to 50 KW:-MPCB +Contactor (MPCB shall be provided with adjustable S/C current and O/L
protection)
1.5.13 Overload relay will have built in single phase protection and flag indicator for relay tripping.
The relay will have manual reset facility. Thermal overload relay will also co-ordinate with
1.5.15 415V Switchgear will be provided with minimum (1) no. spare feeder of highest rating of each
type on each bus section. For PMCC/MCC/DB outgoing feeders, minimum 20% spare of each
type (minimum 1 no.) and rating will be provided on each bus section.
1.5.16 The draw-out breaker/Starter/power feeder modules will have service, test and isolated
positions.
1.5.18 Motors feeders rated 30kW and above will be provided with space heater.
1.5.19 Motor feeders rated above 30kW will be provided with CT, ammeter (in Y-phase) and
transducer with remote metering in DCS. Some of the motor feeders though rated less than 30
KW will be provided with CT, Ammeter and transducer considering its importance.
1.5.20 Analog/Digital Indicating meters of atleast 96 sq.mm will be provided on the panel front.
Analog meter will have 90 deg. linear scale. All Meters will have accuracy class in line with
1.5.21 Auxiliary powered transducers with dual 4-20mA output will be provided.
1.5.22 Paralleling required for 415V supply derived from 11/0.433kV transformer and 3.3/0.433kV
1.5.23 Motors will be provided with emergency stop pushbutton near the drive as per process
requirement. Local Stop push button stations will have metal enclosure of die cast aluminium
or rolled sheet steel of 1.6mm thickness & will be of Degree of protection IP55. Stop Push
43 | P a g e
Project : Doc. No: RIBO-E&CI-DCE-001
Document : Design Criteria For Electrical
Rev. No: NIL
System
Contractor : RIBO Industries Pvt Ltd Date:
1.5.24 Control supply for breaker feeders will be 220V DC. Two numbers DC feeders will be provided
with automatic change-over facility. Provision of manual changeover will also be provided.
Necessary voltage monitoring contactors (for remote alarm) and indication lamps will.
1.5.25 2 x 100%, 415/240V, single phase, cast resin type space heater supply transformer in
Switchgear/PMCC/MCC will be provided for deriving 240V AC supply for feeding motor and
panel space heaters & panel illumination. Space heater supply transformer will be provided on
each incomer feeder of Switchgear/PMCC/MCC, before breaker towards line side transformer
and transformer rating will be selected based on the expected heating loads + 30% margin.
1.5.26 2x100%, single phase, cast resin type control supply transformers in each PMCC/MCC’s will be
provided for deriving 110V AC control supply. Control supply transformer will be provided one
1.5.27 Control supply transformer will have a facility to extend the supply to the other bus in case of
1.5.28 The space heater supply transformer will be backed by fuses on primary and secondary side.