EIA Reference Notes
EIA Reference Notes
Development projects in the past were undertaken without any consideration to their
environmental consequences. In view of the colossal damage to the environment,
governments and public are now concerned about the environmental impacts of
developmental activities. Thus, to assess the environmental impacts, the mechanism of EIA
was introduced.
EIA is a tool to anticipate the likely environmental impacts that may arise out of the proposed
developmental activities and suggest mitigation measures and strategies. EIA was introduced
in India in 1978, with respect to river valley projects. Later the EIA legislation was enhanced
to include other developmental sections.
Besides EIA, the Government of India under Environment (Protection) Act 1986 issued a
number of other notifications, which are related to environmental impact assessment.
EIA is now mandatory for more than 30 categories of projects, and these projects get
Environmental Clearance (EC) only after the EIA requirements are fulfilled. Environmental
clearance or the ‘go ahead’ signal is granted by the Impact Assessment Agency in the
Ministry of Environment and Forests, Government of India.
All projects that require clearance from central government can be broadly categorized into
the following:
risk assessment,
environmental management and
post product monitoring.
EIA is to
serve as a primary environmental tool with clear provisions.
apply consistently to all proposals with potential environmental impacts.
use scientific practice and suggest strategies for mitigation.
address all possible factors such as short term, long term, small scale and large scale
effects.
consider sustainable aspects such as capacity for assimilation, carrying capacity,
biodiversity protection.
lay down a flexible approach for public involvement.
have in built mechanism of follow up and feedback.
include mechanisms for monitoring, auditing and evaluation.
The EIA process looks into the following components of the environment.
1. Air environment
2. Quality of ambient air present and predicted.
3. Meteorological data: Wind speed, direction, humidity etc.
4. Quantity of emission likely from project.
5. Impact of the emission on the area.
6. Pollution control desires/air quality standards.
7. Noise
8. Levels of noise present and predicted
9. Strategies for reducing noise pollution.
10. Water environment
11. Existing ground and surface water resources, their quality and quantity within the
zone.
12. Impact of proposed project on water resources.
13. Biological environment
14. Flora and fauna in impact zone.
15. Potential damage (likely) due to project, due to effluents, emissions and landscaping.
16. Biological stress (prediction).
17. Land environment
18. Study of soil characteristics, land use, and drainage pattern, and the likely adverse
impact of the project.
19. Impact on historical monuments and heritage site.
EIA involves the steps mentioned below. However, EIA process is cyclical with interaction
between the various steps.
Screening: The project plan is screened for scale of investment, location and type of
development and if the project needs statutory clearance.
Scoping: The project’s potential impacts, zone of impacts, mitigation possibilities and need
for monitoring.
Collection of baseline data: Baseline data is the environmental status of study area.
Impact prediction: Positive and negative, reversible and irreversible and temporary and
permanent impacts need to be predicted which presupposes a good understanding of the
project by the assessment agency.
Mitigation measures and EIA report: The EIA report should include the actions and steps
for preventing, minimizing or by passing the impacts or else the level of compensation for
probable environmental damage or loss.
Public hearing: On completion of the EIA report, public and environmental groups living
close to project site may be informed and consulted.
Decision making: Impact Assessment Authority along with the experts consult the project-
in-charge along with consultant to take the final decision, keeping in mind EIA and EMP
(Environment Management Plan).
Risk assessment: Inventory analysis and hazard probability and index also form part of EIA
procedures.
Environmental Appraisal
An Appraisal Committee constituted by the Ministry of Environment and Forests will first
scrutinized a project based on the data presented by the project authorities.
If necessary, the MoEF may also hold consultations with the investors and experts on specific
issues as and when necessary.
After considering all the facets of a projects, environmental clearance is accorded subject to
implementation of the stipulated environmental safeguards.
In case of projects where the project proponents have submitted complete information, a
decision is taken within 90 days.
The six regional offices of the Ministry functioning at Shillong, Bhubaneshwar, Chandigarh,
Bangalore, Lucknow and Bhopal undertake monitoring of cleared projects.
EIA of Coasts
Coastal Zone Management Plans (CZMPs) are prepared by coastal states or Union Territories
as per rules set by CRZ notification 1991.
CZMPs are prepared based on identification and categorization of coastal areas for different
activities and then submitted to the MoEF for approval.
The ministry then forms a task force for examining their plans.
When a project requires both environmental clearance as well as approval under the Forest
(Conservation) Act, 1980, proposals for both are required to be given simultaneously to the
concerned divisions of the Ministry.
If the project does not involve diversion of forestland, the case is processed only for
environmental clearance.
EIA applies to public and private sections. The six main players are:
Eco-system management
Air/water pollution control
Water resource management
Flora/fauna conservation and management
Land use planning
Social Sciences/Rehabilitation
Project appraisal
Ecology
Environmental Health
Subject Area Specialists
Representatives of NGOs/persons concerned with environmental issues
The Chairman will be an outstanding and experienced ecologist or environmentalist
or technical professional with wide managerial experience in the relevant
development.
The representative of Impact Assessment Agency will act as a Member-Secretary.
Chairman and members will serve in their individual capacities except those
specifically nominated as representatives.
The membership of a committee shall not exceed 15 members.
‘Category A’ projects are appraised at national level by Impact Assessment Agency (IAA)
and the Expert Appraisal Committee (EAC) and Category B projects are apprised at state
level.
State Level Environment Impact Assessment Authority (SEIAA) and State Level Expert
Appraisal Committee (SEAC) are constituted to provide clearance to Category B process.
Screening
Scoping
Public hearing
Appraisal
Category A projects require mandatory environmental clearance and thus they do not undergo
the screening process.
Category B projects undergoes screening process and they are classified into two types.
Thus, Category A projects and Category B, projects undergo the complete EIA process
whereas Category B2 projects are excluded from complete EIA process.
Benefits of EIA
EIA links environment with development for environmentally safe and sustainable
development.
EIA provides a cost effective method to eliminate or minimize the adverse impact of
developmental projects.
EIA enables the decision makers to analyse the effect of developmental activities on the
environment well before the developmental project is implemented.
EIA makes sure that the developmental plan is environmentally sound and within limits of
the capacity of assimilation and regeneration of the ecosystem.
Applicability
There are several projects with significant environmental impacts that are exempted from the
notification either because they are not listed in schedule I, or their investments are less than
what is provided for in the notification.
It is being found that the team formed for conducting EIA studies is lacking the expertise in
various fields such as environmentalists, wild life experts, Anthropologists and Social
Scientists (to study the social impact of the project).
Public hearing
Public comments are not considered at the early stage, which often leads to conflict at the
later stage of project clearance.
A number of projects with significant environmental and social impacts have been excluded
from the mandatory public hearing process.
The documents which the public are entitled to are seldom available on time.
The data collectors do not pay respect to the indigenous knowledge of local people.
Quality of EIA
One of the biggest concerns with the environmental clearance process is related to the quality
of EIA report that are being carried out.
The reports are generally incomplete and provided with false data.
The EIA document in itself is so bulky and technical, which makes it very difficult to
decipher so as to aid in the decision making process.
Lack of Credibility
It is the responsibility of the project proponent to commission the preparation of the EIA for
its project.
The EIA is actually funded by an agency or individual whose primary interest is to procure
clearance for the project proposed.
There is little chance that the final assessment presented is un biased, even if the consultant
may provide an unbiased assessment that is critical of the proposed project.
There are so many cases of fraudulent EIA studies where erroneous data has been used, same
facts used for two totally different places etc.
There is no accreditation of EIA consultants, therefore any such consultant with a track
record of fraudulent cases cannot be held liable for discrepancies.
It is hard to imagine any consultant after being paid lakh of rupees, preparing a report for the
project proponents, indicating that the project is not viable.
Case Study
The MoEF constituted the Western Ghats Experts Ecology Panel (WGEEP) in 2010 under
the Chairmanship of Prof. Madhav Gadgil.
The Panel submitted its report in 2011 but it was not made public immediately due to its
stringent assessment of the condition of Western Ghats.
The report suggested many radical changes that needs to be brought to conserve Western
Ghats.
The recommendation if implemented would adversely affect mining mafia, sand mafia and
local encroachers.
Under pressure from various stakeholders, MoEF set up the High Level Working Group
(HLWG) under the Chairmanship of Dr. K. Kasturirangan to study recommendations of
WGEEP.
The HLWG had diluted many recommendations of WGEEP to satisfy the interests of various
mafia.
Often, and more so for strategic industries such as nuclear energy projected, the EMPs are
kept confidential for political and administrative reasons.
Details regarding the effectiveness and implementation of mitigation measures are often not
provided.
Emergency preparedness plans are not discussed in sufficient details and the information not
disseminated to the communities.
Applicability
Public hearing
Public hearings should be applicable to all hitherto exempt categories of projects which have
environmental impacts.
Quality
The focus of EIA needs to shift from utilization and exploitation of natural resources
to conservation of natural resources.
At present EIA reports are extremely weak when it comes to assessment of biological
diversity of a project area and the consequent impacts on it. This gap needs to be
plugged.
All EIA reports should clearly state what are the adverse impacts that a proposed
project will have. This should be a separate chapter and not hidden within technical
details.
It is critical that the preparation of an EIA is completely independent of the project
proponent.
Grant of clearance
The notification needs to make it clear that the provision for site clearance does not imply any
commitment on the part of the impact Assessment agency to grant full environmental
clearance.
The present executive committees should be replaced by expert’s people from various
stakeholder groups, who are reputed in environmental and other relevant fields.
Monitoring, compliance and institutional arrangements
The EIA notification needs to build within it an automatic withdrawal of clearance if the
conditions of clearance are being violated and introduce more stringent punishment for
noncompliance. At present the EIA notification limits itself to the stage when environmental
clearance is granted.
Redressal
The composition of the NGT needs to be changed to include more judicials from the
field of environment.
Citizen should be able to access the authority for redressal of all violation of the EIA
notification as well as issues relating to non-compliance.
Capacity building
NGOs, civil society groups and local communities need to build their capacities to use the
EIA notification towards better decision making on projects.