No Rig Description Specification Manufacture Model Serial Number

The documents provide equipment specifications for three drilling rigs - BMS #02, #03, and #03A - including the manufacturer, model, serial number, and planned and actual maintenance from January 2021 to March 2022. Preventative maintenance schedules are outlined for key equipment like blowout preventers, accumulators, choke manifolds, and blowout preventers on each rig.

Uploaded by

Boedi Syafiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views11 pages

No Rig Description Specification Manufacture Model Serial Number

The documents provide equipment specifications for three drilling rigs - BMS #02, #03, and #03A - including the manufacturer, model, serial number, and planned and actual maintenance from January 2021 to March 2022. Preventative maintenance schedules are outlined for key equipment like blowout preventers, accumulators, choke manifolds, and blowout preventers on each rig.

Uploaded by

Boedi Syafiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

EQUIPMENT OF RIG BMS # 02 OPERATION - DURI

PM 2021 2022
Specification
No RIG Description JAN FEB MARET APR MAY JUN JUL AUG SEPT OCTB NOV DEC Jan Feb Mar
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Hydrill GK 62098
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Shaffer LWS 2157
BOPE ACTUAL
PLAN
3 ACCUMULATOR Yancheng Ruihua FKQ480-5 20150501
RIG BMS # 02

ACTUAL
PLAN
4 CHOCKE MANIFOLD Sanyi JG80-52/21 G 1505655
ACTUAL
ZFPF121B 3-1/2" IF PLAN
5 IBOP Tianhe 11141241 1
5000 Psi ACTUAL
XS127F-T51 NC 38 5000 PLAN
Tianhe 0517224 1
PSI ACTUAL
6 FOSV
XS127K10 3-1/2 IF 35 PLAN
Tianhe 1114124 1
Mpa ACTUAL

Prepared by : Approved by : Acknowlaged by :

Wendi. N Jati k Ariyapuji


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 03 OPERATION - DURI

PM 2021 2022
Specification
No RIG Description JAN FEB MARET APR MAY JUN JUL AUG SEPT OCTB NOV DEC Jan Feb Mar
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Hydrill GK MB1025
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Rongsheng LWS K15-020
BOPE ACTUAL
PLAN
3 ACCUMULATOR Yancheng Ruihua FKQ480-5 2015021001
RIG BMS # 03

ACTUAL
PLAN
4 CHOCKE MANIFOLD Sanyi JG80-52/21 G 1505651
ACTUAL
ZFPF121B 3-1/2 IF 5000 PLAN
5 IBOP Tianhe 11141241-2
PSI ACTUAL
XS217G-T57 3-1/2 IF PLAN
Tianhe 1015068 2
5000PSI ACTUAL
6 FOSV
XS127K 3-1/2IF 5000 PLAN
Tianhe 1016449 135
PSI ACTUAL

Prepared by : Approved by : Acknowlaged by :

Wendi. N Jati k Ariyapuji


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 03A OPERATION - DURI

PM 2019 2020
Specification
No RIG Description Okt Jan Feb Mar Apr Mei Jun Jul Ags Sept Oktb Nov Des
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Bolu Tianbao FH28-21 BL170602
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Bolu Tianbao FZ28-21 BL170501
BOPE ACTUAL
PLAN
3 ACCUMULATOR Shenkai FKQ480-5 1313
ACTUAL
RIG BMS # 03A

PLAN
4 CHOCKE MANIFOLD SJ Petro JG80-52/51 G1505651
ACTUAL
XS127K10 NC38 5000 PLAN
Tianhe 0417196-2
PSI ACTUAL
5 FOSV
PLAN
Tianhe XS127K 3-1/2IF 70 MPA 12141366-7
ACTUAL
DK311 MTG 3-1/2 IF 70 PLAN
Tianhe 151202
Mpa ACTUAL
6 IBOP
ZFPF121B 3-1/2IF 5000 PLAN
Tianhe 11141241-3
PSI ACTUAL

Prepared by : Approved by : Acknowlaged by :

Wendi. N Jati k Ariyapuji


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 05 OPERATION - DURI

PM 2021 2022
Specification
No RIG Description JAN FEB MARET APR MAY JUN JUL AUG SEPT OCTB NOV DEC FEB MAR APR
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Tianbao Bolu FH 28-21 BL170602
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Shaffer LWS 15793
BOPE ACTUAL
PLAN
3 ACCUMULATOR Shenkai FKQ480-5 10116
RIG BMS # 05

ACTUAL
PLAN
4 CHOCKE MANIFOLD Sanyi JG80-52/21 1009004
ACTUAL
PLAN
5 IBOP Tianhe 3-1/2 IF DM 9619
ACTUAL
XS127K10 3-1/2 IF 35 PLAN
Tianhe 1114124 11
Mpa ACTUAL
6 FOSV
XS127K10 3-1/2 IF 35 PLAN
Tianhe 0517224-12
Mpa ACTUAL

Prepared by : Approved by : Acknowlaged by :

Satya Jati k Ariyapuji


MTC Planner MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 06 OPERATION - DURI

PM 2019 2020 2021


Specification
No RIG Description Jul Okt Nov Jan Feb Mar Apr Mei Jun Jul Ags Sept Oktb Jan Apr
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Bolu Tianbao FH 28-21 5008
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Shaffer LWS 15941
BOPE ACTUAL
PLAN
3 ACCUMULATOR Shenkai FKQ480-5 10125
ACTUAL
RIG BMS # 06

PLAN
4 CHOCKE MANIFOLD Sanyi JG80-52/51 G1505651
ACTUAL
ZFPF121B 3-1/2 IF 5000 PLAN
Tianhe 0415373-1
PSI ACTUAL
5 IBOP
DK311 MTG 3-1/2 IF 70 PLAN
Helliongjiang 151201
Mpa ACTUAL
XS127F-T551 NC38 PLAN
Tianhe 1118609-4
5000 PSI ACTUAL
6 FOSV
ZFPF121B 3-1/2 IF 5000 PLAN
Tianhe 1118609-2
PSI ACTUAL

Prepared by : Approved by : Acknowlaged by :

Wendi. N Jati k Ariyapuji


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 08 OPERATION - DURI

PM 2021 2022
Specification
No RIG Description FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN
1 11"-3M PSI ANNULAR BOPE Hydrill GK MB1024
ACTUAL
11"-3M PSI DOUBLE RAM PLAN
2 Shaffer LWS 6448
BOPE ACTUAL
PLAN
3 ACCUMULATOR Shenkai FKQ480-5 10115
RIG BMS # 08

ACTUAL
PLAN
4 CHOCKE MANIFOLD Sanyi JG80-52/21 G1702089
ACTUAL
PLAN
5 IBOP TIANHE 3-1/2" DM 6436
ACTUAL
XS127K10 3-1/2 IF 35 PLAN
TIANHE
Mpa 10151068-3
ACTUAL
6 FOSV
XS127K10 3-1/2 IF 35 PLAN
TIANHE
Mpa 10164491 36
ACTUAL

Prepared by : Approved by : Acknowlaged by :

Satya Jati k Ariyapuji


Planner MTC MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 09 OPERATION - DURI

PM 2020 PERIODE OF 2021 2022


Specification
No RIG Description MAY OCT JAN FEB MAR APR MAY JUN JUL AUG SEPT OCTB NOV DEC JAN
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

Rongsheng FZ 28-21 K15-010


PLAN JAN JAN
1 11"-3M PSI SINGLE RAM BOPE
ACTUAL JAN
Tianbao Bolu FZ 28-21 BL170501
PLAN OCTB OCTB
ACTUAL OCTB
Rongsheng FH 28-21 K15-001
PLAN JAN JAN
2 11"-3M PSI ANNULAR BOPE
ACTUAL JAN
Rongsheng FH 28-21 K15-004
PLAN JAN JAN
ACTUAL JAN
Shenkai FKQ480-5 1461
PLAN JAN JAN
3 ACCUMULATOR
ACTUAL JAN
Shenkai FKQ480-5 15024
PLAN JAN JAN
ACTUAL JAN
JAN JAN
RIG BMS # 09

PLAN
SJ PETRO JG80-52/51 1009005
4 CHOCKE MANIFOLD
ACTUAL JAN
Sanyi JG80-52/51 G 1303061
PLAN JAN JAN
ACTUAL JAN
Mashburn 3-1/2" EUE DM 5255
PLAN JAN JAN
5 IBOP
ACTUAL JAN
Tianhe 0417196 4
PLAN JAN JAN
ZFPF121B 3 1/2EUE"5000PSI
ACTUAL JAN
Mashburn 3-1/2" EUE DM 9614
PLAN JAN JAN
ACTUAL JAN
PLAN JAN JAN
Mashburn 3-1/2" EUE DM 9615
ACTUAL JAN
6 FOSV
Tianhe XS127F-T51-NC38 5000 PSI 1118609-4
PLAN JAN JAN
ACTUAL JAN
PLAN JAN JAN
Mashburn 3-1/2" EUE DM 9618
ACTUAL JAN

= Schedule = = Realization PM .

Prepared by : Approved by : Acknowlaged by :

Satya' Jati k Firman


Coord Mntc MTC Supt Ops. Manager
Mashburn
EQUIPMENT OF RIG BMS # 10 OPERATION - DURI

PM 2020 PERIODE OF 2021


Specification
No RIG Description APR OCT DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT OCTB NOV DEC
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

Bolu Tianbao FZ28-21 BL170601


PLAN APR APR
1 11"-3M PSI SINGLE RAM BOPE
ACTUAL APR
Townsend Type 82 SHA 2212
PLAN OCT
ACTUAL OCT
Townsend Town 1 1181 1-FF SM 3765
PLAN DEC OCT
2 11"-3M PSI ANNULAR BOPE
ACTUAL DEC
Hydrill GK 5008
PLAN DEC DEC
ACTUAL DEC
Shenkai FKQ480-5 13-82
PLAN DEC DEC
3 ACCUMULATOR
ACTUAL DEC
Shenkai FKQ480-5 10126
PLAN DEC DEC
ACTUAL DEC
DEC DEC
RIG BMS # 10

PLAN
SJ Petro JG80-52/51 G1412564
4 CHOCKE MANIFOLD
ACTUAL DEC
Sanyi JG80-52/51 G 1706026
PLAN DEC DEC
ACTUAL DEC
Mashburn 13332
PLAN DEC DEC
ZFPF121B 3 1/2IF"5000PSI
5 IBOP
ACTUAL DEC
Mashburn DM 9618
PLAN DEC DEC
ZFPF121B 3 1/2IF"5000PSI
ACTUAL DEC
Tianhe XS127K10- 3-1/2 IF 35 Mpa 0115060-25
PLAN DEC DEC
ACTUAL DEC
PLAN DEC DEC
Tianhe XS127K10- 3-1/2 IF 35 Mpa 0815601-2
ACTUAL DEC
6 FOSV
Tianhe XS127K10- 3-1/2 IF 35 Mpa 12141366-3
PLAN DEC DEC
ACTUAL DEC
PLAN DEC DEC
Tianhe XS127K10- NC38 5000 Psi 0417196-1
ACTUAL DEC

= Schedule PM . = Realization PM .

Prepared by : Approved by : Acknowlaged by :

Satya Jati k Firman


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 16 OPERATION - DURI

PM PERIODE OF 2020 PERIODE OF 2020


Specification
No RIG Description SEPT OCTB NOV DEC MAY JUN JUL AUG SEPT OCTB NOV DEC
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
PLAN PLAN
Hydril GK10-900 10372
ACTUAL ACTUAL
1 11"-3M PSI ANNULAR BOPE
PLAN PLAN
Hydril GK10-900 6447
ACTUAL ACTUAL
PLAN PLAN
Rongsheng FZ28-21 K15-008
ACTUAL ACTUAL
2 11"-3M PSI BSR BOPE
PLAN PLAN
Rongsheng FZ28-21 K15-009
ACTUAL ACTUAL
PLAN PLAN
Shanghai Shenkai FKQ480-5 10121
ACTUAL ACTUAL
3 ACCUMULATOR
PLAN PLAN
Shanghai Shenkai FKQ480-5 10123
ACTUAL ACTUAL
RIG BMS # 16

3-1/8"x 3000 PSI - 2-1/16"x PLAN PLAN


SJ Petro 1009003
3000 PSI ACTUAL ACTUAL
4 CHOCKE MANIFOLD
PLAN PLAN
Tianhe ZFPF121B 3 1/2 IF 5000PSI 111412413
ACTUAL ACTUAL
PLAN PLAN
Tianhe DK 311 3-1/2 IF 5000 Psi 151204
ACTUAL ACTUAL
5 IBOP
3-1/8"x 3000 PSI - 2-1/16"x PLAN PLAN
Sanyi 021105001
3000 PSI ACTUAL ACTUAL
PLAN PLAN
Tianhe XS127K10 3-1/2 IF 35 Mpa 12141366-7
ACTUAL ACTUAL
PLAN PLAN
Tianhe XS127K10 3-1/2 IF 35 Mpa 0517224 5
ACTUAL ACTUAL
6 FOSV
PLAN PLAN
Tianhe XS127F-T51 NC38 5000Psi 1118609 2
ACTUAL ACTUAL
PLAN PLAN
Tianhe XS127K10 NC38 5000Psi 0417196 2
ACTUAL ACTUAL

= Schedule PM . = Realization PM .

Prepared by : Approved by : Acknowlaged by :

Satya Jati k Firman


Coord Mntc MTC Supt Ops. Manager
EQUIPMENT OF RIG BMS # 11 OPERATION - DURI

PM 2022 2023
Specification
No RIG Description 2021 JAN FEB MAR APR MAY JUN JUL AUG SEPT OCTB NOV DEC APR
Manufacture Model Serial Number I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
11"-3M PSI DOUBLE RAM PLAN Apr
1 Rongsheng 2FZ28-21 K15-019
BOPE ACTUAL Apr
PLAN Apr
2 11"-3M PSI ANNULAR BOPE Rongsheng FH 28-21 K15-002
ACTUAL Apr
PLAN Apr
3 ACCUMULATOR Shangai Senkai FKQ320-4 14-18
ACTUAL Apr
RIG BMS # 11

PLAN Apr
4 CHOCKE MANIFOLD Yancheng Sanyi JG80-52/21 G1505655
ACTUAL Apr
PLAN Apr
Tianhe DK311 3-1/2 IF 5000 PSI 11141241-2
ACTUAL Apr
5 IBOP
PLAN Apr
Tianhe DK311 3-1/2 IF 5000 PSI 11141241-3
ACTUAL Apr
PLAN Apr
Tianhe XS127K10 NC38 5000 PSI 0117006-5
ACTUAL Apr
6 FOSV
PLAN Apr
Tianhe XS127K10 3-1/2 IF 35 Mpa 0517224 4
ACTUAL Apr

= Schedule PM . = Realization PM .

Prepared by : Approved by : Acknowlaged by :

Satya Jati k Ariyapuji


Coord Mntc MTC Supt Ops. Manager