0% found this document useful (0 votes)
357 views63 pages

L3 Schedule Updated 26 January 2020

Uploaded by

Arif Irwansyah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
357 views63 pages

L3 Schedule Updated 26 January 2020

Uploaded by

Arif Irwansyah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 63

RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.

52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
RDMP RU V - Balikpapan Project 27-Feb-19 A 22-Apr-22 27-Feb-19 30-Nov-21 790 563 22-Apr-22, RDMP RU V - Balikpapan Project

Common 08-Apr-19 A 10-Nov-21 08-Apr-19 01-Sep-21 650 450 10-Nov-21, Common

Milestone 10-Nov-21 10-Nov-21 01-Sep-21 01-Sep-21 0 0 10-Nov-21, Milestone


Architectural 10-Nov-21 10-Nov-21 01-Sep-21 01-Sep-21 0 0 10-Nov-21, Architectural
Milestone - Common 10-Nov-21 10-Nov-21 01-Sep-21 01-Sep-21 0 0 10-Nov-21, Milestone - Common
ME000AR0005 Building Completion Marine Area 10-Nov-21 01-Sep-21 0 0 Building Completion Marine Area,
Engineering 08-Apr-19 A 05-Jun-20 08-Apr-19 09-Apr-20 291 91 05-Jun-20, Engineering
Architectural 08-Apr-19 A 10-Dec-19 A 08-Apr-19 06-Sep-19 107 0 10-Dec-19 A, Archit ectural
General & Specification 08-Apr-19 A 10-Dec-19 A 08-Apr-19 06-Sep-19 107 0 10-Dec-19 A, General & Specification
ED000AR00005A Architectural Standard Drawing [IFR] 08-Apr-19 A 13-Jun-19 A 08-Apr-19 19-Jun-19 45 0 Architectural Standard Drawing [IFR]
ED000AR00005B Architectural Standard Drawing [Review/Appr.-IFR] 10-May-19 A 29-Jun-19 A 20-Jun-19 04-Jul-19 15 0 Architectural Standard Drawing [Review/Appr.-IFR]
ED000AR00005G Architectural Standard Drawing [IFC] 27-May-19 A 10-Dec-19 A 05-Jul-19 06-Sep-19 45 0 Architectural Standard Drawing [IFC]
HVAC 31-Oct-19 A 05-Jun-20 31-Oct-19 09-Apr-20 132 91 05-Jun-20, HVAC
Design Basis 31-Oct-19 A 29-Jan-20 31-Oct-19 29-Jan-20 65 2 29-Jan-20, Design Basis
EE000HV05005A MR(HVAC Equipment) [IFQ] [Deleted] 31-Oct-19 A 13-Nov-19 A 31-Oct-19 13-Nov-19 10 0 MR(HVAC Equipment) [IFQ] [Deleted]
EE000HV05005B MR(HVAC Equipment) [Review/Approval] [Deleted] 14-Nov-19 A 28-Nov-19 A 14-Nov-19 28-Nov-19 15 0 MR(HVAC Equipment) [Review/Approval] [Deleted]
EE000HV05005G MR(HVAC Equipment) [IFP] [Deleted] 16-Jan-20 A 29-Jan-20 16-Jan-20 29-Jan-20 10 3 MR(HVAC Equipment) [IFP] [Deleted]
EE000HV05010A TBE(HVAC Equipment) [IFP] [Deleted] 05-Dec-19 A 26-Dec-19 A 05-Dec-19 26-Dec-19 15 0 TBE(HVAC Equipment) [IFP] [Deleted]
EE000HV05010B TBE(HVAC Equipment) [Review/Approval-IFP] [Deleted] 27-Dec-19 A 15-Jan-20 A 27-Dec-19 15-Jan-20 20 0 TBE(HVAC Equipment) [Review/Approval-IFP] [Deleted]
HVAC & Control System 31-Oct-19 A 05-Jun-20 31-Oct-19 09-Apr-20 132 91 05-Jun-20, HVAC & Control System
EE000HV10005A MR(HVAC Control Equipment) [IFQ] [Deleted] 31-Oct-19 A 19-Nov-19 A 31-Oct-19 19-Nov-19 14 0 MR(HVAC Control Equipment) [IFQ] [Deleted]
EE000HV10005B MR(HVAC Control Equipment) [Review/Approval] [Deleted] 20-Nov-19 A 04-Dec-19 A 20-Nov-19 04-Dec-19 15 0 MR(HVAC Control Equipment) [Review/Approval] [Deleted]
EE000HV10005G MR(HVAC Control Equipment) [IFP] [Deleted] 20-Jan-20 A 07-Feb-20 20-Jan-20 31-Jan-20 10 10 MR(HVAC Control Equipment) [IFP] [Deleted]
EE000HV10010A TBE(HVAC Control Equipment) [IFP] [Deleted] 11-Dec-19 A 02-Jan-20 A 11-Dec-19 02-Jan-20 15 0 TBE(HVAC Control Equipment) [IFP] [Deleted]
EE000HV10010B TBE(HVAC Control Equipment) [Review/Approval-IFP] [Deleted] 03-Jan-20 A 17-Jan-20 A 03-Jan-20 17-Jan-20 15 0 TBE(HVAC Control Equipment) [Review/Approval-IFP] [Deleted]
EE323HV10015A HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [IFR] 27-Jan-20 13-Mar-20 09-Dec-19 28-Jan-20 35 35 HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [IFR]
EE323HV10015B HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [Review-IFR] 14-Mar-20 28-Mar-20 29-Jan-20 12-Feb-20 15 15 HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [Review-IFR]
EE323HV10015G HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [IFC] 30-Mar-20 05-Jun-20 13-Feb-20 09-Apr-20 40 40 HVAC Control Cable & Instrument Schedule - Utility Building Berth 6_U323 [IFC]
Procurement 14-Nov-19 A 01-Mar-21 14-Nov-19 22-Feb-21 282 273 01-Mar-21, Procurement
HVAC 14-Nov-19 A 01-Mar-21 14-Nov-19 22-Feb-21 282 273 01-Mar-21, HVAC
Design Basis 14-Nov-19 A 01-Mar-21 14-Nov-19 20-Feb-21 282 259 01-Mar-21, Design Basis
PE000HV05002A HVAC Equipment [RFQ/Bid Close] [Deleted] 14-Nov-19 A 04-Dec-19 A 14-Nov-19 04-Dec-19 15 0 HVAC Equipment [RFQ/Bid Close] [Deleted]
PE000HV05002C HVAC Equipment [Key VDR] [Deleted] 17-Feb-20 17-Mar-20 06-Feb-20 06-Mar-20 22 22 HVAC Equipment [Key VDR] [Deleted]
PE000HV05002D HVAC Equipment [MFG/FOB] [Deleted] 15-Feb-20 12-Aug-20 06-Feb-20 03-Aug-20 180 180 HVAC Equipment [MFG/FOB] [Deleted]
PE000HV05002E HVAC Equipment [DTS] [Deleted] 13-Aug-20 02-Sep-20 04-Aug-20 24-Aug-20 21 21 HVAC Equipment [DTS] [Deleted]
PE000HV05002F HVAC Equipment [Final Doc.] [Deleted] 03-Sep-20 01-Mar-21 25-Aug-20 20-Feb-21 180 180 HVAC Equipment [Final Doc.] [Deleted]
HVAC & Control System 20-Nov-19 A 01-Mar-21 20-Nov-19 22-Feb-21 282 273 01-Mar-21, HVAC & Control System
PE000HV10012A HVAC Control Equipment [RFQ/Bid Close] [Deleted] 20-Nov-19 A 10-Dec-19 A 20-Nov-19 10-Dec-19 15 0 HVAC Control Equipment [RFQ/Bid Close] [Deleted]
PE000HV10012B HVAC Control Equipment [PO] 27-Jan-20 14-Feb-20 20-Jan-20 07-Feb-20 15 15 HVAC Control Equipment [PO]
PE000HV10012C HVAC Control Equipment [Key VDR] 17-Feb-20 17-Mar-20 10-Feb-20 10-Mar-20 22 22 HVAC Control Equipment [Key VDR]
PE000HV10012D HVAC Control Equipment [MFG/FOB] 15-Feb-20 12-Aug-20 08-Feb-20 05-Aug-20 180 180 HVAC Control Equipment [MFG/FOB]
PE000HV10012E HVAC Control Equipment [DTS] 13-Aug-20 02-Sep-20 06-Aug-20 26-Aug-20 21 21 HVAC Control Equipment [DTS]
PE000HV10012F HVAC Control Equipment [Final Doc.] 03-Sep-20 01-Mar-21 27-Aug-20 22-Feb-21 180 180 HVAC Control Equipment [Final Doc.]
341-SWP-001 (in Unit 337 area) 05-Nov-19 A 05-Jun-21 24-Oct-19 19-Mar-21 360 340 05-Jun-21, 341-SWP-001 (in Unit 337 area)

Engineering 05-Nov-19 A 21-Aug-20 24-Oct-19 29-May-20 166 146 21-Aug-20, Engineering


Architectural 05-Nov-19 A 23-Jun-20 24-Oct-19 21-Apr-20 123 103 23-Jun-20, Architectural
Calculation 31-Jan-20 14-May-20 20-Jan-20 21-Apr-20 72 72 14-May-20, Calculation
ED341AR10065A Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [IFR] 31-Jan-20 12-Mar-20 20-Jan-20 28-Feb-20 30 30 Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [IFR]
ED341AR10065B Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [Review-IFR] 13-Mar-20 27-Mar-20 29-Feb-20 14-Mar-20 15 15 Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [Review-IFR]
ED341AR10065G Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [AFD] 07-Apr-20 14-May-20 16-Mar-20 21-Apr-20 25 25 Structural Calculation for Seawater Intake Pump Station (SWP-001)_U341 [AFD]
Architecture Basic 05-Nov-19 A 23-Jun-20 24-Oct-19 13-Mar-20 123 103 23-Jun-20, Architecture Basic
ED341AR20185A Architectural Basic Drawing(SWP-001)_U341 [IFR] 05-Nov-19 A 17-Dec-19 A 24-Oct-19 04-Dec-19 30 0 Architectural Basic Drawing(SWP-001)_U341 [IFR]
ED341AR20185B Architectural Basic Drawing(SWP-001)_U341 [Review-IFR] 18-Dec-19 A 06-Jan-20 A 05-Dec-19 19-Dec-19 15 0 Architectural Basic Drawing(SWP-001)_U341 [Review-IFR]
ED341AR20185G Architectural Basic Drawing(SWP-001)_U341 [IFC] 27-Jan-20 21-Feb-20 26-Dec-19 23-Jan-20 20 20 Architectural Basic Drawing(SWP-001)_U341 [IFC]
ED341AR20190A Foundation/Pile Location Plan(SWP-001)_U341 [IFR] 09-Mar-20 14-Apr-20 12-Dec-19 17-Jan-20 25 25 Foundation/Pile Location Plan(SWP-001)_U341 [IFR]
ED341AR20190B Foundation/Pile Location Plan(SWP-001)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 18-Jan-20 01-Feb-20 15 15 Foundation/Pile Location Plan(SWP-001)_U341 [Review-IFR]
ED341AR20190G Foundation/Pile Location Plan(SWP-001)_U341 [IFC] 30-Apr-20 23-Jun-20 03-Feb-20 13-Mar-20 30 30 Foundation/Pile Location Plan(SWP-001)_U341 [IFC]
ED341AR20195A Structural Basic Drawing(SWP-001)_U341 [IFR] 18-Dec-19 A 30-Jan-20 05-Dec-19 17-Jan-20 30 4 Structural Basic Drawing(SWP-001)_U341 [IFR]
ED341AR20195B Structural Basic Drawing(SWP-001)_U341 [Review-IFR] 31-Jan-20 14-Feb-20 18-Jan-20 01-Feb-20 15 15 Structural Basic Drawing(SWP-001)_U341 [Review-IFR]
ED341AR20195G Structural Basic Drawing(SWP-001)_U341 [IFC] 24-Feb-20 06-Apr-20 03-Feb-20 13-Mar-20 30 30 Structural Basic Drawing(SWP-001)_U341 [IFC]
Architecture Detail - Architectural 18-Dec-19 A 21-Apr-20 14-Nov-19 21-Feb-20 80 60 21-Apr-20, Architecture Detail - Architectural
ED341AR25125A Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [IFR] 18-Dec-19 A 03-Feb-20 14-Nov-19 18-Dec-19 11 6 Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [IFR]
ED341AR25125B Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [Review-IFR] 04-Feb-20 24-Feb-20 19-Dec-19 10-Jan-20 15 15 Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [Review-IFR]
ED341AR25125G Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [IFC] 25-Feb-20 23-Mar-20 13-Jan-20 07-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SWP-001)_U341 [IFC]
ED341AR25130A Architectural Detail Drawing for Misc.(SWP-001)_U341 [IFR] 27-Jan-20 28-Feb-20 28-Nov-19 03-Jan-20 25 25 Architectural Detail Drawing for Misc.(SWP-001)_U341 [IFR]
ED341AR25130B Architectural Detail Drawing for Misc.(SWP-001)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 04-Jan-20 18-Jan-20 15 15 Architectural Detail Drawing for Misc.(SWP-001)_U341 [Review-IFR]
ED341AR25130G Architectural Detail Drawing for Misc.(SWP-001)_U341 [IFC] 16-Mar-20 21-Apr-20 20-Jan-20 21-Feb-20 25 25 Architectural Detail Drawing for Misc.(SWP-001)_U341 [IFC]
Architecture Detail - Structural 27-Jan-20 14-May-20 19-Dec-19 14-Apr-20 75 75 14-May-20, Architecture Detail - Structural
ED341AR30125A Structural Detail Drawing for Framing(SWP-001)_U341 [IFR] 27-Jan-20 06-Mar-20 19-Dec-19 31-Jan-20 30 30 Structural Detail Drawing for Framing(SWP-001)_U341 [IFR]
ED341AR30125B Structural Detail Drawing for Framing(SWP-001)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 01-Feb-20 15-Feb-20 15 15 Structural Detail Drawing for Framing(SWP-001)_U341 [Review-IFR]
ED341AR30125G Structural Detail Drawing for Framing(SWP-001)_U341 [IFC] 23-Mar-20 28-Apr-20 24-Feb-20 30-Mar-20 25 25 Structural Detail Drawing for Framing(SWP-001)_U341 [IFC]
ED341AR30130A Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [IFR] 10-Feb-20 20-Mar-20 06-Jan-20 14-Feb-20 30 30 Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [IFR]
ED341AR30130B Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 15-Feb-20 29-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [Review-IFR]
ED341AR30130G Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [IFC] 07-Apr-20 14-May-20 09-Mar-20 14-Apr-20 25 25 Structural Detail Drawing for FDN, Column, Beam(SWP-001)_U341 [IFC]

Actual Level of Effort Actual Work Critical Remaining Work Page 1 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Electrical 26-Nov-19 A 21-Aug-20 14-Nov-19 29-May-20 166 146 21-Aug-20, Electrical
Power & Control 18-Dec-19 A 05-Aug-20 05-Dec-19 06-May-20 154 134 05-Aug-20, Power & Control
ED341EL45130A Electrical Cable Route Layout(SWP-001)_U341 [IFR] 18-Dec-19 A 30-Jan-20 05-Dec-19 17-Jan-20 30 4 Electrical Cable Route Layout(SWP-001)_U341 [IFR]
ED341EL45130B Electrical Cable Route Layout(SWP-001)_U341 [Review-IFR] 31-Jan-20 14-Feb-20 18-Jan-20 01-Feb-20 15 15 Electrical Cable Route Layout(SWP-001)_U341 [Review-IFR]
ED341EL45130G Electrical Cable Route Layout(SWP-001)_U341 [IFC] 30-Apr-20 30-Jun-20 10-Feb-20 30-Mar-20 35 35 Electrical Cable Route Layout(SWP-001)_U341 [IFC]
ED341EL45135A Power Layout(SWP-001)_U341 [IFR] 27-Jan-20 06-Mar-20 13-Jan-20 21-Feb-20 30 30 Power Layout(SWP-001)_U341 [IFR]
ED341EL45135B Power Layout(SWP-001)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 22-Feb-20 07-Mar-20 15 15 Power Layout(SWP-001)_U341 [Review-IFR]
ED341EL45135G Power Layout(SWP-001)_U341 [IFC] 24-Jun-20 05-Aug-20 23-Mar-20 06-May-20 30 30 Power Layout(SWP-001)_U341 [IFC]
Earthing and Grouding 26-Nov-19 A 06-Apr-20 14-Nov-19 27-Feb-20 70 50 06-Apr-20, Earthing and Grouding
ED341EL50065A Earthing and Lightning Protection Layout(SWP-001)_U341 [IFR] 26-Nov-19 A 20-Feb-20 14-Nov-19 10-Jan-20 40 19 Earthing and Lightning Protection Layout(SWP-001)_U341 [IFR]
ED341EL50065B Earthing and Lightning Protection Layout(SWP-001)_U341 [Review-IFR] 21-Feb-20 06-Mar-20 11-Jan-20 25-Jan-20 15 15 Earthing and Lightning Protection Layout(SWP-001)_U341 [Review-IFR]
ED341EL50065G Earthing and Lightning Protection Layout(SWP-001)_U341 [IFC] 09-Mar-20 06-Apr-20 31-Jan-20 27-Feb-20 20 20 Earthing and Lightning Protection Layout(SWP-001)_U341 [IFC]
Lighting 10-Feb-20 21-Aug-20 27-Jan-20 29-May-20 137 137 21-Aug-20, Lighting
ED341EL60065A Lighting and Small Power Layout(SWP-001)_U341 [IFR] 10-Feb-20 20-Mar-20 27-Jan-20 06-Mar-20 30 30 Lighting and Small Power Layout(SWP-001)_U341 [IFR]
ED341EL60065B Lighting and Small Power Layout(SWP-001)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 07-Mar-20 21-Mar-20 15 15 Lighting and Small Power Layout(SWP-001)_U341 [Review-IFR]
ED341EL60065G Lighting and Small Power Layout(SWP-001)_U341 [IFC] 08-Jul-20 21-Aug-20 07-Apr-20 29-May-20 30 30 Lighting and Small Power Layout(SWP-001)_U341 [IFC]
Communication 11-Dec-19 A 28-Jul-20 11-Dec-19 28-Apr-20 128 128 28-Jul-20, Communication
ED341EL65125A Telecom/Security/PAGA System Layout(SWP-001)_U341 [IFR] 11-Dec-19 A 31-Mar-20 11-Dec-19 14-Feb-20 46 46 Telecom/Security/PAGA System Layout(SWP-001)_U341 [IFR]
ED341EL65125B Telecom/Security/PAGA System Layout(SWP-001)_U341 [Review/Appr.-IFR] 01-Apr-20 15-Apr-20 15-Feb-20 29-Feb-20 15 15 Telecom/Security/PAGA System Layout(SWP-001)_U341 [Review/Appr.-IFR]
ED341EL65125G Telecom/Security/PAGA System Layout(SWP-001)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Telecom/Security/PAGA System Layout(SWP-001)_U341 [IFC]
Construction 30-Sep-20 05-Jun-21 02-Jul-20 19-Mar-21 177 177 05-Jun-21, Construction
Architectural 30-Sep-20 22-Mar-21 02-Jul-20 02-Dec-20 124 124 22-Mar-21, Architectural
Building Foundation 30-Sep-20 12-Nov-20 02-Jul-20 13-Aug-20 36 36 12-Nov-20, Building Foundation
CD341AR35115 Building Foundation(SWP-001)_U341 30-Sep-20 12-Nov-20 02-Jul-20 13-Aug-20 36 36 Building Foundation(SWP-001)_U341
Building Structure 13-Nov-20 21-Jan-21 14-Aug-20 10-Oct-20 48 48 21-Jan-21, Building Structure
CD341AR40145 Steel Structure installation(SWP-001)_U341 13-Nov-20 21-Jan-21 14-Aug-20 10-Oct-20 48 48 Steel Structure installation(SWP-001)_U341
Building Finishing 22-Jan-21 22-Mar-21 12-Oct-20 02-Dec-20 40 40 22-Mar-21, Building Finishing
CD341AR45860 Cladding(SWP-001)_U341 22-Jan-21 19-Feb-21 12-Oct-20 04-Nov-20 20 20 Cladding(SWP-001)_U341
CD341AR45865 Misc. Steel Installation(SWP-001)_U341 22-Feb-21 22-Mar-21 05-Nov-20 02-Dec-20 20 20 Misc. Steel Installation(SWP-001)_U341
Rotating Equipment 11-Jan-21 22-Feb-21 04-Nov-20 15-Dec-20 30 30 22-Feb-21, Rotating Equipment
Material Handling Equipment 11-Jan-21 22-Feb-21 04-Nov-20 15-Dec-20 30 30 22-Feb-21, Material Handling Equipment
CD341MR35005 Installation - Crane & Hoist(TM-337-01)_U341 11-Jan-21 22-Feb-21 04-Nov-20 15-Dec-20 30 30 Installation - Crane & Hoist(TM-337-01)_U341
Electrical 29-Jan-21 05-Jun-21 12-Nov-20 19-Mar-21 88 88 05-Jun-21, Electrical
Cable Race Way 29-Jan-21 01-Apr-21 12-Nov-20 13-Jan-21 43 43 01-Apr-21, Cable Race Way
CD341EL45005- Electrical Cable Tray Installation(SWP-001)_U341 29-Jan-21 10-Mar-21 12-Nov-20 21-Dec-20 28 28 Electrical Cable Tray Installation(SWP-001)_U341
CD341EL45120- Electrical Conduit Pipe(SWP-001)_U341 12-Mar-21 01-Apr-21 22-Dec-20 13-Jan-21 15 15 Electrical Conduit Pipe(SWP-001)_U341
Power & Control 03-Apr-21 05-Jun-21 14-Jan-21 19-Mar-21 45 45 05-Jun-21, Power & Control
CD341EL45110- Termination - Power & Control(SWP-001)_U341 03-May-21 05-Jun-21 18-Feb-21 19-Mar-21 21 21 Termination - Power & Control(SWP-001)_U341
CD341EL45115 Cabling - Power & Control(SWP-001)_U341 03-Apr-21 05-May-21 14-Jan-21 22-Feb-21 27 27 Cabling - Power & Control(SWP-001)_U341
Earthing and Grouding 26-Feb-21 01-Apr-21 09-Dec-20 13-Jan-21 24 24 01-Apr-21, Earthing and Grouding
CD341EL50005 Cabling - Grounding(SWP-001)_U341 26-Feb-21 01-Apr-21 09-Dec-20 13-Jan-21 24 24 Cabling - Grounding(SWP-001)_U341
Lighting 03-Mar-21 12-May-21 14-Dec-20 02-Mar-21 54 54 12-May-21, Lighting
CD341EL60005 Installation - Distribution Panel(SWP-001)_U341 16-Mar-21 16-Apr-21 24-Dec-20 29-Jan-21 25 25 Installation - Distribution Panel(SWP-001)_U341
CD341EL60115 Cabling - Lightening(SWP-001)_U341 09-Apr-21 12-May-21 21-Jan-21 02-Mar-21 28 28 Cabling - Lightening(SWP-001)_U341
CD341EL60120 Lightening work(SWP-001)_U341 17-Apr-21 12-May-21 01-Feb-21 02-Mar-21 21 21 Lightening work(SWP-001)_U341
CD341EL60385 Installation of Lighting Fixture System (SWP-001)_U341 03-Mar-21 10-Apr-21 14-Dec-20 22-Jan-21 28 28 Installation of Lighting Fixture System (SWP-001)_U341
CD341EL60585 Cabling Lighting (SWP-001)_U341 03-Mar-21 10-Apr-21 14-Dec-20 22-Jan-21 28 28 Cabling Lighting (SWP-001)_U341
Communication 08-Apr-21 11-May-21 20-Jan-21 01-Mar-21 28 28 11-May-21, Communication
CD341EL65005 Installation - Communication System(SWP-001)_U341 08-Apr-21 11-May-21 20-Jan-21 01-Mar-21 28 28 Installation - Communication System(SWP-001)_U341
CD341EL65305 Cabling - Communication(SWP-001)_U341 08-Apr-21 11-May-21 20-Jan-21 01-Mar-21 28 28 Cabling - Communication(SWP-001)_U341
Fire Alarm 07-Apr-21 30-Apr-21 19-Jan-21 17-Feb-21 21 21 30-Apr-21, Fire Alarm
CD341EL68005 Installation - Fire Alarm System(SWP-001)_U341 07-Apr-21 30-Apr-21 19-Jan-21 17-Feb-21 21 21 Installation - Fire Alarm System(SWP-001)_U341
CD341EL68250 Cabling - Fire Alarm(SWP-001)_U341 07-Apr-21 30-Apr-21 19-Jan-21 17-Feb-21 21 21 Cabling - Fire Alarm(SWP-001)_U341
Safety & Fire Fighting 25-Mar-21 28-Apr-21 06-Jan-21 15-Feb-21 28 28 28-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 25-Mar-21 28-Apr-21 06-Jan-21 15-Feb-21 28 28 28-Apr-21, Fire Fighting Equipment
CD341SF20005 Installation - F/F Equipment(SWP-001)_U341 25-Mar-21 28-Apr-21 06-Jan-21 15-Feb-21 28 28 Installation - F/F Equipment(SWP-001)_U341
341-STG-001 (in Unit 331 area) 24-Jul-19 A 29-Jun-21 24-Jul-19 15-Apr-21 482 357 29-Jun-21, 341-STG-001 (in Unit 331 area)

Engineering 24-Jul-19 A 28-Aug-20 24-Jul-19 08-Jun-20 276 151 28-Aug-20, Engineering


Architectural 26-Nov-19 A 09-Jun-20 30-Sep-19 23-Mar-20 111 93 09-Jun-20, Architectural
Calculation 16-Dec-19 A 29-May-20 16-Dec-19 23-Mar-20 61 26 29-May-20, Calculation
ED341AR10072A Structural Calculation for STG Building (341-STG-001)_U341 [IFR] 16-Dec-19 A 08-Jan-20 A 16-Dec-19 21-Jan-20 25 0 Structural Calculation for STG Building (341-STG-001)_U341 [IFR]
ED341AR10072B Structural Calculation for STG Building (341-STG-001)_U341 [Review-IFR] 09-Jan-20 A 22-Jan-20 A 22-Jan-20 05-Feb-20 15 0 Structural Calculation for STG Building (341-STG-001)_U341 [Review-IFR]
ED341AR10072G Structural Calculation for STG Building (341-STG-001)_U341 [AFD] 22-Apr-20 29-May-20 25-Feb-20 23-Mar-20 20 20 Structural Calculation for STG Building (341-STG-001)_U341 [AFD]
Architecture Basic 26-Nov-19 A 21-Apr-20 30-Sep-19 24-Feb-20 78 60 21-Apr-20, Architecture Basic
ED341AR20200A Architectural Basic Drawing(STG-001)_U341 [IFR] 26-Nov-19 A 03-Jan-20 A 30-Sep-19 15-Nov-19 35 0 Architectural Basic Drawing(STG-001)_U341 [IFR]
ED341AR20200B Architectural Basic Drawing(STG-001)_U341 [Review-IFR] 04-Jan-20 A 22-Jan-20 A 16-Nov-19 30-Nov-19 15 0 Architectural Basic Drawing(STG-001)_U341 [Review-IFR]
ED341AR20200G Architectural Basic Drawing(STG-001)_U341 [IFC] 27-Jan-20 21-Feb-20 20-Dec-19 20-Jan-20 20 20 Architectural Basic Drawing(STG-001)_U341 [IFC]
ED341AR20205A Foundation/Pile Location Plan(STG-001)_U341 [IFR] 26-Nov-19 A 08-Jan-20 A 28-Oct-19 06-Dec-19 30 0 Foundation/Pile Location Plan(STG-001)_U341 [IFR]
ED341AR20205B Foundation/Pile Location Plan(STG-001)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 07-Dec-19 21-Dec-19 15 0 Foundation/Pile Location Plan(STG-001)_U341 [Review-IFR]
ED341AR20205G Foundation/Pile Location Plan(STG-001)_U341 [IFC] 27-Jan-20 28-Feb-20 23-Dec-19 28-Jan-20 25 25 Foundation/Pile Location Plan(STG-001)_U341 [IFC]
ED341AR20213A Structural Basic Drawing(STG-001)_U341 [IFR] 27-Jan-20 28-Feb-20 11-Nov-19 13-Dec-19 25 25 Structural Basic Drawing(STG-001)_U341 [IFR]
ED341AR20213B Structural Basic Drawing(STG-001)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 14-Dec-19 28-Dec-19 15 15 Structural Basic Drawing(STG-001)_U341 [Review-IFR]
ED341AR20213G Structural Basic Drawing(STG-001)_U341 [IFC] 16-Mar-20 21-Apr-20 21-Jan-20 24-Feb-20 25 25 Structural Basic Drawing(STG-001)_U341 [IFC]
Architecture Detail - Architectural 27-Jan-20 06-May-20 18-Nov-19 16-Mar-20 69 69 06-May-20, Architecture Detail - Architectural
ED341AR25135A Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [IFR] 27-Jan-20 21-Feb-20 18-Nov-19 13-Dec-19 20 20 Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [IFR]
ED341AR25135B Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [Revie w-IFR] 22-Feb-20 07-Mar-20 14-Dec-19 28-Dec-19 15 15 Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [Revie w-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 2 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR25135G Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [IFC] 09-Mar-20 06-Apr-20 21-Jan-20 17-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(STG-001)_U341 [IFC]
ED341AR25140A Architectural Detail Drawing for Misc.(STG-001)_U341 [IFR] 03-Feb-20 06-Mar-20 25-Nov-19 30-Dec-19 25 25 Architectural Detail Drawing for Misc.(STG-001)_U341 [IFR]
ED341AR25140B Architectural Detail Drawing for Misc.(STG-001)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 31-Dec-19 14-Jan-20 15 15 Architectural Detail Drawing for Misc.(STG-001)_U341 [Review-IFR]
ED341AR25140G Architectural Detail Drawing for Misc.(STG-001)_U341 [IFC] 31-Mar-20 06-May-20 11-Feb-20 16-Mar-20 25 25 Architectural Detail Drawing for Misc.(STG-001)_U341 [IFC]
Architecture Detail - Structural 10-Feb-20 09-Jun-20 25-Nov-19 23-Mar-20 84 84 09-Jun-20, Architecture Detail - Structural
ED341AR30135A Structural Detail Drawing for Framing(STG-001)_U341 [IFR] 10-Feb-20 13-Mar-20 25-Nov-19 30-Dec-19 25 25 Structural Detail Drawing for Framing(STG-001)_U341 [IFR]
ED341AR30135B Structural Detail Drawing for Framing(STG-001)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 31-Dec-19 14-Jan-20 15 15 Structural Detail Drawing for Framing(STG-001)_U341 [Review-IFR]
ED341AR30135G Structural Detail Drawing for Framing(STG-001)_U341 [IFC] 07-Apr-20 06-May-20 11-Feb-20 09-Mar-20 20 20 Structural Detail Drawing for Framing(STG-001)_U341 [IFC]
ED341AR30140A Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [IFR] 09-Mar-20 14-Apr-20 23-Dec-19 28-Jan-20 25 25 Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [IFR]
ED341AR30140B Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 29-Jan-20 12-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [Review-IFR]
ED341AR30140G Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [IFC] 30-Apr-20 09-Jun-20 25-Feb-20 23-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(STG-001)_U341 [IFC]
HVAC 27-Jan-20 22-Jun-20 18-Nov-19 15-Apr-20 102 102 22-Jun-20, HVAC
HVAC & Control System 27-Jan-20 22-Jun-20 18-Nov-19 15-Apr-20 102 102 22-Jun-20, HVAC & Control System
ED341HV10190A HVAC System(STG-001)_U341 [IFR] 27-Jan-20 28-Feb-20 18-Nov-19 20-Dec-19 25 25 HVAC System(STG-001)_U341 [IFR]
ED341HV10190B HVAC System(STG-001)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 21-Dec-19 04-Jan-20 15 15 HVAC System(STG-001)_U341 [Review-IFR]
ED341HV10190G HVAC System(STG-001)_U341 [IFC] 16-Mar-20 28-Apr-20 21-Jan-20 02-Mar-20 30 30 HVAC System(STG-001)_U341 [IFC]
ED341HV10195A HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [IFR] [Deleted] 02-Mar-20 06-Apr-20 23-Dec-19 28-Jan-20 25 25 HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [IFR] [Deleted]
ED341HV10195B HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [Review-IFR] [Deleted]
07-Apr-20 21-Apr-20 29-Jan-20 12-Feb-20 15 15 HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [Review-IFR] [Deleted]
ED341HV10195G HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [IFC] [Deleted] 29-Apr-20 22-Jun-20 03-Mar-20 15-Apr-20 30 30 HVAC Control Cable & Instrument Schedule for STG Building (STG-001)_U341 [IFC] [Deleted]
Plumbing 27-Jan-20 22-Jun-20 18-Nov-19 15-Apr-20 102 102 22-Jun-20, Plumbing
ED341HV15125A Duct & Piping(STG-001)_U341 [IFR] 02-Mar-20 06-Apr-20 23-Dec-19 28-Jan-20 25 25 Duct & Piping(STG-001)_U341 [IFR]
ED341HV15125B Duct & Piping(STG-001)_U341 [Review-IFR] 07-Apr-20 21-Apr-20 29-Jan-20 12-Feb-20 15 15 Duct & Piping(STG-001)_U341 [Review-IFR]
ED341HV15125G Duct & Piping(STG-001)_U341 [IFC] 29-Apr-20 22-Jun-20 03-Mar-20 15-Apr-20 30 30 Duct & Piping(STG-001)_U341 [IFC]
ED341HV15130A Plumbing(STG-001)_U341 [IFR] 27-Jan-20 28-Feb-20 18-Nov-19 20-Dec-19 25 25 Plumbing(STG-001)_U341 [IFR]
ED341HV15130B Plumbing(STG-001)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 21-Dec-19 04-Jan-20 15 15 Plumbing(STG-001)_U341 [Review-IFR]
ED341HV15130G Plumbing(STG-001)_U341 [IFC] 16-Mar-20 28-Apr-20 21-Jan-20 02-Mar-20 30 30 Plumbing(STG-001)_U341 [IFC]
Electrical 16-Dec-19 A 28-Aug-20 21-Oct-19 08-Jun-20 151 151 28-Aug-20, Electrical
Power & Control 27-Jan-20 28-Jul-20 18-Nov-19 28-Apr-20 128 128 28-Jul-20, Power & Control
ED341EL45140A Electrical Cable Route Layout(STG-001)_U341 [IFR] 27-Jan-20 13-Mar-20 18-Nov-19 07-Jan-20 35 35 Electrical Cable Route Layout(STG-001)_U341 [IFR]
ED341EL45140B Electrical Cable Route Layout(STG-001)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 08-Jan-20 22-Jan-20 15 15 Electrical Cable Route Layout(STG-001)_U341 [Review-IFR]
ED341EL45140G Electrical Cable Route Layout(STG-001)_U341 [IFC] 30-Apr-20 30-Jun-20 10-Feb-20 30-Mar-20 35 35 Electrical Cable Route Layout(STG-001)_U341 [IFC]
ED341EL45145A Power Layout(STG-001)_U341 [IFR] 02-Mar-20 14-Apr-20 23-Dec-19 04-Feb-20 30 30 Power Layout(STG-001)_U341 [IFR]
ED341EL45145B Power Layout(STG-001)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 05-Feb-20 19-Feb-20 15 15 Power Layout(STG-001)_U341 [Review-IFR]
ED341EL45145G Power Layout(STG-001)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Power Layout(STG-001)_U341 [IFC]
Earthing and Grouding 27-Jan-20 05-May-20 21-Oct-19 17-Feb-20 68 68 05-May-20, Earthing and Grouding
ED341EL50070A Earthing and Lightning Protection Layout(STG-001)_U341 [IFR] 27-Jan-20 20-Mar-20 21-Oct-19 13-Dec-19 40 40 Earthing and Lightning Protection Layout(STG-001)_U341 [IFR]
ED341EL50070B Earthing and Lightning Protection Layout(STG-001)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 14-Dec-19 28-Dec-19 15 15 Earthing and Lightning Protection Layout(STG-001)_U341 [Review-IFR]
ED341EL50070G Earthing and Lightning Protection Layout(STG-001)_U341 [IFC] 06-Apr-20 05-May-20 21-Jan-20 17-Feb-20 20 20 Earthing and Lightning Protection Layout(STG-001)_U341 [IFC]
Lighting 31-Mar-20 28-Aug-20 22-Jan-20 08-Jun-20 106 106 28-Aug-20, Lighting
ED341EL60070A Lighting and Small Power Layout(STG-001)_U341 [IFR] 31-Mar-20 14-May-20 22-Jan-20 03-Mar-20 30 30 Lighting and Small Power Layout(STG-001)_U341 [IFR]
ED341EL60070B Lighting and Small Power Layout(STG-001)_U341 [Review-IFR] 15-May-20 29-May-20 04-Mar-20 18-Mar-20 15 15 Lighting and Small Power Layout(STG-001)_U341 [Review-IFR]
ED341EL60070G Lighting and Small Power Layout(STG-001)_U341 [IFC] 15-Jul-20 28-Aug-20 15-Apr-20 08-Jun-20 30 30 Lighting and Small Power Layout(STG-001)_U341 [IFC]
Communication 16-Dec-19 A 28-Jul-20 16-Dec-19 28-Apr-20 103 128 28-Jul-20, Communication
ED341EL65070A Telecom/Security/PAGA System Layout(STG-001)_U341 [IFR] 16-Dec-19 A 14-Apr-20 16-Dec-19 04-Feb-20 35 55 Telecom/Security/PAGA System Layout(STG-001)_U341 [IFR]
ED341EL65070B Telecom/Security/PAGA System Layout(STG-001)_U341 [Approved-IFR] 15-Apr-20 29-Apr-20 05-Feb-20 19-Feb-20 15 15 Telecom/Security/PAGA System Layout(STG-001)_U341 [Approved-IFR]
ED341EL65070G Telecom/Security/PAGA System Layout(STG-001)_U341 [IFC] 10-Jun-20 28-Jul-20 09-Mar-20 28-Apr-20 35 35 Telecom/Security/PAGA System Layout(STG-001)_U341 [IFC]
Fire Alarm 23-Dec-19 A 28-Jul-20 23-Dec-19 28-Apr-20 98 128 28-Jul-20, Fire Alarm
ED341EL68065A Fire Alarm Layout(STG-001)_U341 [IFR] [Deleted] 23-Dec-19 A 14-Apr-20 23-Dec-19 04-Feb-20 30 55 Fire Alarm Layout(STG-001)_U341 [IFR] [Deleted]
ED341EL68065B Fire Alarm Layout(STG-001)_U341 [Review-IFR] [Deleted] 15-Apr-20 29-Apr-20 05-Feb-20 19-Feb-20 15 15 Fire Alarm Layout(STG-001)_U341 [Review-IFR] [Deleted]
ED341EL68065G Fire Alarm Layout(STG-001)_U341 [IFC] [Deleted] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Fire Alarm Layout(STG-001)_U341 [IFC] [Deleted]
Safety & Fire Fighting 24-Jul-19 A 20-Mar-20 24-Jul-19 17-Feb-20 171 20 20-Mar-20, Safety & Fire Fighting
Fire Fighting Drawing 24-Jul-19 A 20-Mar-20 24-Jul-19 17-Feb-20 171 20 20-Mar-20, Fire Fighting Drawing
ED341SF25011A P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFR] [Deleted] 24-Jul-19 A 04-Sep-19 A 24-Jul-19 04-Sep-19 30 0 P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFR] [Deleted]
ED341SF25011B P&ID and Piping Scheme for F/F System(STG-001)_U341 [Approved-IFR] [Deleted] 05-Sep-19 A 19-Sep-19 A 05-Sep-19 19-Sep-19 15 0 P&ID and Piping Scheme for F/F System(STG-001)_U341 [Approved-IFR] [Deleted]
ED341SF25011E P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFD] [Deleted] 14-Oct-19 A 08-Nov-19 A 14-Oct-19 08-Nov-19 20 0 P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFD] [Deleted]
ED341SF25011F P&ID and Piping Scheme for F/F System(STG-001)_U341 [Approved-IFD] [Deleted] 09-Nov-19 A 23-Nov-19 A 09-Nov-19 23-Nov-19 15 0 P&ID and Piping Scheme for F/F System(STG-001)_U341 [Approved-IFD] [Deleted]
ED341SF25011G P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFC] [Deleted] 24-Feb-20 20-Mar-20 21-Jan-20 17-Feb-20 20 20 P&ID and Piping Scheme for F/F System(STG-001)_U341 [IFC] [Deleted]
ED341SF30125A Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [IFR] 18-Nov-19 A 10-Jan-20 A 18-Nov-19 30-Dec-19 30 0 Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [IFR]
ED341SF30125B Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [Review/Appr.-IFR]
11-Jan-20 A 24-Jan-20 A 31-Dec-19 14-Jan-20 15 0 Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [Review/Appr.-IFR]
ED341SF30125G Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [AFD] 24-Feb-20 20-Mar-20 21-Jan-20 17-Feb-20 20 20 Fire & Safety Equipment Location Plan-Steam Turbin Generator (341-STG-001)_U341 [AFD]
F&G Detection System 05-Sep-19 A 27-Nov-19 A 05-Sep-19 27-Nov-19 43 0 27-Nov-19 A, F&G Detection System
ED341SF30130A Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [IFR] 05-Sep-19
[Deleted] A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [IFR] [Deleted]
ED341SF30130B Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [Review/Appr.-IFR]
17-Oct-19 A [Deleted]
31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [Review/Appr.-IFR] [Deleted]
ED341SF30130G Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [IFD] 31-Oct-19
[Deleted] A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 Fire and Gas Detection System Location Plan - Steam Turbin Generator (STG-001)_U341 [IFD] [Deleted]
Construction 20-Jul-20 29-Jun-21 22-Apr-20 15-Apr-21 256 256 29-Jun-21, Construction
Civil 27-Aug-20 28-Dec-20 08-Jun-20 30-Sep-20 96 96 28-Dec-20, Civil
Foundation - Equipment 27-Aug-20 28-Dec-20 08-Jun-20 30-Sep-20 96 96 28-Dec-20, Foundation - Equipment
CD341CV55010 Equipment Foundation(A-331-01A)_U331 27-Aug-20 21-Oct-20 08-Jun-20 03-Aug-20 48 48 Equipment Foundation(A-331-01A)_U331
CD341CV55011 Equipment Foundation(A-331-01B)_U331 27-Aug-20 21-Oct-20 08-Jun-20 03-Aug-20 48 48 Equipment Foundation(A-331-01B)_U331
CD341CV55012 Equipment Foundation(A-331-01C)_U331 24-Sep-20 23-Nov-20 06-Jul-20 02-Sep-20 48 48 Equipment Foundation(A-331-01C)_U331
CD341CV55013 Equipment Foundation(A-331-01D)_U331 24-Sep-20 23-Nov-20 06-Jul-20 02-Sep-20 48 48 Equipment Foundation(A-331-01D)_U331
CD341CV55014 Equipment Foundation(A-331-01E)_U331 22-Oct-20 28-Dec-20 04-Aug-20 30-Sep-20 48 48 Equipment Foundation(A-331-01E)_U331
Architectural 20-Jul-20 31-Mar-21 22-Apr-20 23-Dec-20 190 190 31-Mar-21, Architectural
Building Foundation 20-Jul-20 28-Oct-20 22-Apr-20 10-Aug-20 84 84 28-Oct-20, Building Foundation
CD341AR35410 Ground Slab(STG-001)_U341 13-Oct-20 28-Oct-20 24-Jul-20 10-Aug-20 14 14 Ground Slab(STG-001)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 3 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341AR35860 Building Foundation(STG-001)_U341 20-Jul-20 12-Oct-20 22-Apr-20 23-Jul-20 70 70 Building Foundation(STG-001)_U341
Building Structure 30-Oct-20 09-Feb-21 11-Aug-20 05-Nov-20 72 72 09-Feb-21, Building Structure
CD341AR40415- Steel Structure installation(STG-001)_U341 30-Oct-20 09-Feb-21 11-Aug-20 05-Nov-20 72 72 Steel Structure installation(STG-001)_U341
Building Finishing 19-Jan-21 31-Mar-21 17-Oct-20 23-Dec-20 50 50 31-Mar-21, Building Finishing
CD341AR45820 Door & Window(STG-001)_U341 12-Mar-21 31-Mar-21 04-Dec-20 23-Dec-20 14 14 Door & Window(STG-001)_U341
CD341AR45825- Water Proofing - Flo or(STG-001)_U341 19-Jan-21 10-Mar-21 17-Oct-20 03-Dec-20 36 36 Water Proofing - Flo or(STG-001)_U341
CD341AR45830 Cladding(STG-001)_U341 10-Feb-21 17-Mar-21 06-Nov-20 09-Dec-20 24 24 Cladding(STG-001)_U341
CD341AR45840 Misc. Steel Installation(STG-001)_U341 08-Feb-21 31-Mar-21 04-Nov-20 23-Dec-20 36 36 Misc. Steel Installation(STG-001)_U341
HVAC 04-Jan-21 15-Apr-21 05-Oct-20 12-Jan-21 73 73 15-Apr-21, HVAC
HVAC & Control System 17-Feb-21 23-Mar-21 12-Nov-20 15-Dec-20 24 24 23-Mar-21, HVAC & Control System
CD341HV10075 HVAC Equipment Installation(STG-001)_U341 17-Feb-21 23-Mar-21 12-Nov-20 15-Dec-20 24 24 HVAC Equipment Installation(STG-001)_U341
Plumbing 04-Jan-21 15-Apr-21 05-Oct-20 12-Jan-21 73 73 15-Apr-21, Plumbing
CD341HV15185 HVAC Duct Erection(STG-001)_U341 04-Jan-21 04-Feb-21 05-Oct-20 02-Nov-20 24 24 HVAC Duct Erection(STG-001)_U341
CD341HV15190 HVAC Piping work(STG-001)_U341 24-Mar-21 15-Apr-21 16-Dec-20 12-Jan-21 18 18 HVAC Piping work(STG-001)_U341
CD341HV15195 Plumbing&Sanitary(STG-001)_U341 24-Mar-21 15-Apr-21 16-Dec-20 12-Jan-21 18 18 Plumbing&Sanitary(STG-001)_U341
Rotating Equipment 10-Feb-21 17-Apr-21 23-Nov-20 29-Jan-21 48 48 17-Apr-21, Rotating Equipment
Material Handling Equipment 10-Feb-21 17-Apr-21 23-Nov-20 29-Jan-21 48 48 17-Apr-21, Material Handling Equipment
CD341MR35010 Installation - Crane & Hoist(TM-331-01)_U341 10-Feb-21 17-Apr-21 23-Nov-20 29-Jan-21 48 48 Installation - Crane & Hoist(TM-331-01)_U341
Electrical 22-Oct-20 29-Jun-21 04-Aug-20 15-Apr-21 178 178 29-Jun-21, Electrical
Cable Race Way 29-Jan-21 30-Mar-21 12-Nov-20 11-Jan-21 41 41 30-Mar-21, Cable Race Way
CD341EL45075- Electrical Cable Tray Installation(STG-001)_U341 29-Jan-21 23-Mar-21 12-Nov-20 04-Jan-21 36 36 Electrical Cable Tray Installation(STG-001)_U341
CD341EL45320- Electrical Conduit Pipe(STG-001)_U341 24-Feb-21 30-Mar-21 07-Dec-20 11-Jan-21 24 24 Electrical Conduit Pipe(STG-001)_U341
Power & Control 01-Mar-21 22-Apr-21 14-Dec-20 09-Feb-21 40 40 22-Apr-21, Power & Control
CD341EL45310- Termination - Power & Control(STG-001)_U341 07-Apr-21 22-Apr-21 21-Jan-21 09-Feb-21 14 14 Termination - Power & Control(STG-001)_U341
CD341EL45315- Cabling - Power & Control(STG-001)_U341 01-Mar-21 08-Apr-21 14-Dec-20 22-Jan-21 28 28 Cabling - Power & Control(STG-001)_U341
Earthing and Grouding 22-Oct-20 14-Jan-21 04-Aug-20 14-Oct-20 60 60 14-Jan-21, Earthing and Grouding
CD341EL50070 Cabling - Grounding(STG-001)_U341 22-Oct-20 14-Jan-21 04-Aug-20 14-Oct-20 60 60 Cabling - Grounding(STG-001)_U341
Lighting 01-Mar-21 26-Apr-21 24-Nov-20 15-Feb-21 43 43 26-Apr-21, Lighting
CD341EL60080 Installation - Distribution Panel(STG-001)_U341 10-Mar-21 26-Apr-21 23-Dec-20 15-Feb-21 36 36 Installation - Distribution Panel(STG-001)_U341
CD341EL60245 Cabling - Lightening(STG-001)_U341 01-Mar-21 08-Apr-21 24-Nov-20 04-Jan-21 28 28 Cabling - Lightening(STG-001)_U341
CD341EL60250 Lightening work(STG-001)_U341 01-Mar-21 08-Apr-21 24-Nov-20 04-Jan-21 28 28 Lightening work(STG-001)_U341
CD341EL60380 Installation of Lighting Fixture System (STG-001)_U341 09-Mar-21 15-Apr-21 18-Dec-20 28-Jan-21 28 28 Installation of Lighting Fixture System (STG-001)_U341
CD341EL60590 Cabling Lighting (STG-001)_U341 09-Mar-21 15-Apr-21 18-Dec-20 28-Jan-21 28 28 Cabling Lighting (STG-001)_U341
Communication 14-Apr-21 29-Jun-21 27-Jan-21 15-Apr-21 56 56 29-Jun-21, Communication
CD341EL65070 Installation - Communication System(STG-001)_U341 14-Apr-21 25-May-21 27-Jan-21 08-Mar-21 28 28 Installation - Communication System(STG-001)_U341
CD341EL65300 Cabling - Communication(STG-001)_U341 27-May-21 29-Jun-21 09-Mar-21 15-Apr-21 28 28 Cabling - Communication(STG-001)_U341
Fire Alarm 12-Mar-21 17-Apr-21 22-Dec-20 01-Feb-21 28 28 17-Apr-21, Fire Alarm
CD341EL68070 Installation - Fire Alarm System(STG-001)_U341 12-Mar-21 17-Apr-21 22-Dec-20 01-Feb-21 28 28 Installation - Fire Alarm System(STG-001)_U341
CD341EL68245 Cabling - Fire Alarm(STG-001)_U341 12-Mar-21 17-Apr-21 22-Dec-20 01-Feb-21 28 28 Cabling - Fire Alarm(STG-001)_U341
Safety & Fire Fighting 10-Feb-21 23-Mar-21 06-Nov-20 15-Dec-20 28 28 23-Mar-21, Safety & Fire Fighting
Fire Fighting Equipment 10-Feb-21 23-Mar-21 06-Nov-20 15-Dec-20 28 28 23-Mar-21, Fire Fighting Equipment
CD341MS40035 Installation - F/F Equipment(STG-001)_U341 10-Feb-21 23-Mar-21 06-Nov-20 15-Dec-20 28 28 Installation - F/F Equipment(STG-001)_U341
341-UCR-001 (in Unit 331 area) 17-Jul-19 A 30-Jun-21 17-Jul-19 01-Apr-21 488 358 30-Jun-21, 341-UCR-001 (in Unit 331 area)

Engineering 17-Jul-19 A 28-Aug-20 17-Jul-19 16-Jun-20 281 151 28-Aug-20, Engineering


Architectural 18-Oct-19 A 18-May-20 26-Sep-19 15-Apr-20 118 77 18-May-20, Architectural
Calculation 12-Dec-19 A 24-Apr-20 12-Dec-19 16-Mar-20 54 20 24-Apr-20, Calculation
ED341AR10055A Structural Calculation for Control Room(341-UCR-001)_U341 [IFR] 12-Dec-19 A 08-Jan-20 A 12-Dec-19 17-Jan-20 25 0 Structural Calculation for Control Room(341-UCR-001)_U341 [IFR]
ED341AR10055B Structural Calculation for Control Room(341-UCR-001)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 18-Jan-20 01-Feb-20 15 0 Structural Calculation for Control Room(341-UCR-001)_U341 [Review-IFR]
ED341AR10055G Structural Calculation for Control Room(341-UCR-001)_U341 [AFD] 27-Mar-20 24-Apr-20 18-Feb-20 16-Mar-20 20 20 Structural Calculation for Control Room(341-UCR-001)_U341 [AFD]
Architecture Basic 18-Oct-19 A 20-Mar-20 26-Sep-19 10-Feb-20 80 39 20-Mar-20, Architecture Basic
ED341AR20155A Architectural Basic Drawing(UCR-001)_U341 [IFR] 18-Oct-19 A 23-Dec-19 A 26-Sep-19 13-Nov-19 35 0 Architectural Basic Drawing(UCR-001)_U341 [IFR]
ED341AR20155B Architectural Basic Drawing(UCR-001)_U341 [Review-IFR] 24-Dec-19 A 13-Jan-20 A 14-Nov-19 28-Nov-19 15 0 Architectural Basic Drawing(UCR-001)_U341 [Review-IFR]
ED341AR20155G Architectural Basic Drawing(UCR-001)_U341 [IFC] 29-Jan-20 25-Feb-20 30-Dec-19 27-Jan-20 20 20 Architectural Basic Drawing(UCR-001)_U341 [IFC]
ED341AR20163A Foundation/Pile Location Plan(UCR-001)_U341 [IFR] 04-Dec-19 A 08-Jan-20 A 28-Oct-19 29-Nov-19 25 0 Foundation/Pile Location Plan(UCR-001)_U341 [IFR]
ED341AR20163B Foundation/Pile Location Plan(UCR-001)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 30-Nov-19 14-Dec-19 15 0 Foundation/Pile Location Plan(UCR-001)_U341 [Review-IFR]
ED341AR20163G Foundation/Pile Location Plan(UCR-001)_U341 [IFC] 11-Feb-20 09-Mar-20 16-Dec-19 14-Jan-20 20 20 Foundation/Pile Location Plan(UCR-001)_U341 [IFC]
ED341AR20165A Structural Basic Drawing(UCR-001)_U341 [IFR] 24-Dec-19 A 07-Feb-20 14-Nov-19 11-Dec-19 11 10 Structural Basic Drawing(UCR-001)_U341 [IFR]
ED341AR20165B Structural Basic Drawing(UCR-001)_U341 [Review-IFR] 08-Feb-20 22-Feb-20 12-Dec-19 26-Dec-19 15 15 Structural Basic Drawing(UCR-001)_U341 [Review-IFR]
ED341AR20165G Structural Basic Drawing(UCR-001)_U341 [IFC] 24-Feb-20 20-Mar-20 14-Jan-20 10-Feb-20 20 20 Structural Basic Drawing(UCR-001)_U341 [IFC]
Architecture Detail - Architectural 21-Nov-19 A 18-May-20 06-Jan-20 15-Apr-20 65 77 18-May-20, Architecture Detail - Architectural
ED341AR25105A Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [IFR] 21-Nov-19 A 07-Feb-20 06-Jan-20 07-Feb-20 25 10 Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [IFR]
ED341AR25105B Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [Revie w-IFR] 24-Dec-19 A 21-Feb-20 08-Feb-20 22-Feb-20 15 27 Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [Revie w-IFR]
ED341AR25105G Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [IFC] 17-Apr-20 18-May-20 17-Mar-20 15-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(UCR-001)_U341 [IFC]
ED341AR25110A Architectural Detail Drawing for Misc.(UCR-001)_U341 [IFR] 24-Feb-20 20-Mar-20 27-Jan-20 21-Feb-20 20 20 Architectural Detail Drawing for Misc.(UCR-001)_U341 [IFR]
ED341AR25110B Architectural Detail Drawing for Misc.(UCR-001)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 22-Feb-20 07-Mar-20 15 15 Architectural Detail Drawing for Misc.(UCR-001)_U341 [Review-IFR]
ED341AR25110G Architectural Detail Drawing for Misc.(UCR-001)_U341 [IFC] 17-Apr-20 18-May-20 17-Mar-20 15-Apr-20 20 20 Architectural Detail Drawing for Misc.(UCR-001)_U341 [IFC]
Architecture Detail - Structural 27-Jan-20 21-Apr-20 28-Nov-19 09-Mar-20 60 60 21-Apr-20, Architecture Detail - Structural
ED341AR30105A Structural Detail Drawing for Framing(UCR-001)_U341 [IFR] 27-Jan-20 21-Feb-20 28-Nov-19 26-Dec-19 20 20 Structural Detail Drawing for Framing(UCR-001)_U341 [IFR]
ED341AR30105B Structural Detail Drawing for Framing(UCR-001)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 27-Dec-19 10-Jan-20 15 15 Structural Detail Drawing for Framing(UCR-001)_U341 [Review-IFR]
ED341AR30105G Structural Detail Drawing for Framing(UCR-001)_U341 [IFC] 16-Mar-20 06-Apr-20 04-Feb-20 24-Feb-20 15 15 Structural Detail Drawing for Framing(UCR-001)_U341 [IFC]
ED341AR30110A Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [IFR] 10-Feb-20 06-Mar-20 12-Dec-19 10-Jan-20 20 20 Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [IFR]
ED341AR30110B Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 11-Jan-20 25-Jan-20 15 15 Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [Review-IFR]
ED341AR30110G Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [IFC] 23-Mar-20 21-Apr-20 11-Feb-20 09-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(UCR-001)_U341 [IFC]
HVAC 24-Dec-19 A 15-Jul-20 14-Nov-19 16-Jun-20 139 119 15-Jul-20, HVAC
HVAC & Control System 24-Dec-19 A 15-Jul-20 14-Nov-19 16-Jun-20 139 119 15-Jul-20, HVAC & Control System
ED341HV10162A HVAC System(UCR-001)_U341 [IFR] 24-Dec-19 A 07-Feb-20 14-Nov-19 18-Dec-19 11 10 HVAC System(UCR-001)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 4 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341HV10162B HVAC System(UCR-001)_U341 [Review-IFR] 08-Feb-20 22-Feb-20 19-Dec-19 02-Jan-20 15 15 HVAC System(UCR-001)_U341 [Review-IFR]
ED341HV10162G HVAC System(UCR-001)_U341 [IFC] 26-Feb-20 08-Apr-20 28-Jan-20 09-Mar-20 30 30 HVAC System(UCR-001)_U341 [IFC]
ED341HV10165A Control System(UCR-001)_U341 [IFR] 16-Mar-20 21-Apr-20 27-Jan-20 28-Feb-20 25 25 Control System(UCR-001)_U341 [IFR]
ED341HV10165B Control System(UCR-001)_U341 [Review-IFR] 22-Apr-20 06-May-20 29-Feb-20 14-Mar-20 15 15 Control System(UCR-001)_U341 [Review-IFR]
ED341HV10165G Control System(UCR-001)_U341 [IFC] 04-Jun-20 15-Jul-20 23-Apr-20 16-Jun-20 30 30 Control System(UCR-001)_U341 [IFC]
Plumbing 24-Dec-19 A 03-Jun-20 14-Nov-19 22-Apr-20 109 89 03-Jun-20, Plumbing
ED341HV15105A Duct & Piping(UCR-001)_U341 [IFR] 10-Feb-20 13-Mar-20 19-Dec-19 24-Jan-20 25 25 Duct & Piping(UCR-001)_U341 [IFR]
ED341HV15105B Duct & Piping(UCR-001)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 25-Jan-20 08-Feb-20 15 15 Duct & Piping(UCR-001)_U341 [Review-IFR]
ED341HV15105G Duct & Piping(UCR-001)_U341 [IFC] 09-Apr-20 03-Jun-20 10-Mar-20 22-Apr-20 30 30 Duct & Piping(UCR-001)_U341 [IFC]
ED341HV15110A Plumbing(UCR-001)_U341 [IFR] 24-Dec-19 A 07-Feb-20 14-Nov-19 18-Dec-19 11 10 Plumbing(UCR-001)_U341 [IFR]
ED341HV15110B Plumbing(UCR-001)_U341 [Review-IFR] 08-Feb-20 22-Feb-20 19-Dec-19 02-Jan-20 15 15 Plumbing(UCR-001)_U341 [Review-IFR]
ED341HV15110G Plumbing(UCR-001)_U341 [IFC] 09-Apr-20 03-Jun-20 27-Feb-20 09-Apr-20 30 30 Plumbing(UCR-001)_U341 [IFC]
Electrical 17-Oct-19 A 28-Aug-20 17-Oct-19 08-Jun-20 192 151 28-Aug-20, Electrical
Power & Control 24-Dec-19 A 12-Aug-20 14-Nov-19 14-May-20 159 139 12-Aug-20, Power & Control
ED341EL45110A Electrical Cable Route Layout(UCR-001_OC4)_U341 [IFR] 24-Dec-19 A 11-Feb-20 14-Nov-19 26-Dec-19 13 12 Electrical Cable Route Layout(UCR-001_OC4)_U341 [IFR]
ED341EL45110B Electrical Cable Route Layout(UCR-001_OC4)_U341 [Review-IFR] 12-Feb-20 26-Feb-20 27-Dec-19 10-Jan-20 15 15 Electrical Cable Route Layout(UCR-001_OC4)_U341 [Review-IFR]
ED341EL45110G Electrical Cable Route Layout(UCR-001_OC4)_U341 [IFC] 30-Apr-20 30-Jun-20 10-Feb-20 30-Mar-20 35 35 Electrical Cable Route Layout(UCR-001_OC4)_U341 [IFC]
ED341EL45115A Power Layout(UCR-001_OC4)_U341 [IFR] 12-Feb-20 24-Mar-20 27-Dec-19 07-Feb-20 30 30 Power Layout(UCR-001_OC4)_U341 [IFR]
ED341EL45115B Power Layout(UCR-001_OC4)_U341 [Review-IFR] 25-Mar-20 08-Apr-20 08-Feb-20 22-Feb-20 15 15 Power Layout(UCR-001_OC4)_U341 [Review-IFR]
ED341EL45115G Power Layout(UCR-001_OC4)_U341 [IFC] 01-Jul-20 12-Aug-20 31-Mar-20 14-May-20 30 30 Power Layout(UCR-001_OC4)_U341 [IFC]
Earthing and Grouding 17-Oct-19 A 24-Mar-20 17-Oct-19 24-Feb-20 82 20 24-Mar-20, Earthing and Grouding
ED341EL50055A Earthing and Lightning Protection Layout(UCR-001)_U341 [IFR] 17-Oct-19 A 18-Dec-19 A 17-Oct-19 11-Dec-19 40 0 Earthing and Lightning Protection Layout(UCR-001)_U341 [IFR]
ED341EL50055B Earthing and Lightning Protection Layout(UCR-001)_U341 [Review-IFR] 19-Dec-19 A 08-Jan-20 A 12-Dec-19 26-Dec-19 15 0 Earthing and Lightning Protection Layout(UCR-001)_U341 [Review-IFR]
ED341EL50055G Earthing and Lightning Protection Layout(UCR-001)_U341 [IFC] 26-Feb-20 24-Mar-20 28-Jan-20 24-Feb-20 20 20 Earthing and Lightning Protection Layout(UCR-001)_U341 [IFC]
Lighting 26-Feb-20 28-Aug-20 13-Jan-20 08-Jun-20 130 130 28-Aug-20, Lighting
ED341EL60055A Lighting and Small Power Layout(UCR-001)_U341 [IFR] 26-Feb-20 08-Apr-20 13-Jan-20 21-Feb-20 30 30 Lighting and Small Power Layout(UCR-001)_U341 [IFR]
ED341EL60055B Lighting and Small Power Layout(UCR-001)_U341 [Review-IFR] 09-Apr-20 23-Apr-20 22-Feb-20 07-Mar-20 15 15 Lighting and Small Power Layout(UCR-001)_U341 [Review-IFR]
ED341EL60055G Lighting and Small Power Layout(UCR-001)_U341 [IFC] 15-Jul-20 28-Aug-20 15-Apr-20 08-Jun-20 30 30 Lighting and Small Power Layout(UCR-001)_U341 [IFC]
Communication 24-Dec-19 A 28-Jul-20 05-Dec-19 28-Apr-20 148 128 28-Jul-20, Communication
ED341EL65061A Telecom/Security/PAGA System Layout(UCR-001)_U341 [IFR] 24-Dec-19 A 10-Mar-20 05-Dec-19 24-Jan-20 35 32 Telecom/Security/PAGA System Layout(UCR-001)_U341 [IFR]
ED341EL65061B Telecom/Security/PAGA System Layout(UCR-001)_U341 [Approved-IFR] 11-Mar-20 25-Mar-20 25-Jan-20 08-Feb-20 15 15 Telecom/Security/PAGA System Layout(UCR-001)_U341 [Approved-IFR]
ED341EL65061G Telecom/Security/PAGA System Layout(UCR-001)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Telecom/Security/PAGA System Layout(UCR-001)_U341 [IFC]
Fire Alarm 29-Jan-20 28-Jul-20 12-Dec-19 28-Apr-20 127 127 28-Jul-20, Fire Alarm
ED341EL68055A Fire Alarm Layout(UCR-001)_U341 [IFR] 29-Jan-20 10-Mar-20 12-Dec-19 24-Jan-20 30 30 Fire Alarm Layout(UCR-001)_U341 [IFR]
ED341EL68055B Fire Alarm Layout(UCR-001)_U341 [Review-IFR] 11-Mar-20 25-Mar-20 25-Jan-20 08-Feb-20 15 15 Fire Alarm Layout(UCR-001)_U341 [Review-IFR]
ED341EL68055G Fire Alarm Layout(UCR-001)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Fire Alarm Layout(UCR-001)_U341 [IFC]
Safety & Fire Fighting 17-Jul-19 A 22-Jun-20 17-Jul-19 24-Feb-20 232 102 22-Jun-20, Safety & Fire Fighting
Fire Fighting Drawing 17-Jul-19 A 22-Jun-20 17-Jul-19 24-Feb-20 232 102 22-Jun-20, Fire Fighting Drawing
ED341SF25201A P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFR] 17-Jul-19 A 14-Feb-20 17-Jul-19 28-Aug-19 30 15 P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFR]
ED341SF25201B P&ID and Piping Scheme for F/F System(UCR-001)_U341 [Review/Appr.-IFR] 15-Feb-20 29-Feb-20 29-Aug-19 12-Sep-19 15 15 P&ID and Piping Scheme for F/F System(UCR-001)_U341 [Review/Appr.-IFR]
ED341SF25201E P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFD] 02-Mar-20 30-Mar-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFD]
ED341SF25201F P&ID and Piping Scheme for F/F System(UCR-001)_U341 [Approved-IFD] 31-Mar-20 14-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(UCR-001)_U341 [Approved-IFD]
ED341SF25201G P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFC] 15-Apr-20 14-May-20 25-Nov-19 20-Dec-19 20 20 P&ID and Piping Scheme for F/F System(UCR-001)_U341 [IFC]
ED341SF30105A Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [IFR] 24-Dec-19 A 10-Jan-20 A 14-Nov-19 26-Dec-19 11 0 Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [IFR]
ED341SF30105B Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [Review/Appr.-IFR]11-Jan-20 A 24-Jan-20 A 27-Dec-19 10-Jan-20 15 0 Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [Review/Appr.-IFR]
ED341SF30105G Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [AFD] 15-May-20 22-Jun-20 28-Jan-20 24-Feb-20 20 20 Fire & Safety Equipment Location Plan-Utility Control Room (UCR-001)_U341 [AFD]
Construction 22-Jul-20 30-Jun-21 24-Apr-20 01-Apr-21 255 255 30-Jun-21, Construction
Architectural 22-Jul-20 25-Jun-21 24-Apr-20 26-Mar-21 251 251 25-Jun-21, Architectural
Building Foundation 22-Jul-20 10-Oct-20 24-Apr-20 22-Jul-20 67 67 10-Oct-20, Building Foundation
CD341AR35105 Building Foundation(UCR-001)_U341 22-Jul-20 26-Sep-20 24-Apr-20 08-Jul-20 55 55 Building Foundation(UCR-001)_U341
CD341AR35185 Ground Slab(UCR-001)_U341 28-Sep-20 10-Oct-20 09-Jul-20 22-Jul-20 12 12 Ground Slab(UCR-001)_U341
Building Structure 12-Oct-20 24-Mar-21 23-Jul-20 16-Dec-20 116 116 24-Mar-21, Building Structure
CD341AR40280 Column/Beam/Girder - Ground Level(UCR-001)_U341 12-Oct-20 16-Nov-20 23-Jul-20 27-Aug-20 28 28 Column/Beam/Girder - Ground Level(UCR-001)_U341
CD341AR40285 1st Floor Slab(UCR-001)_U341 17-Nov-20 07-Jan-21 28-Aug-20 08-Oct-20 36 36 1st Floor Slab(UCR-001)_U341
CD341AR40290 Column/Beam/Girder - 1st Floor(UCR-001)_U341 08-Jan-21 10-Feb-21 09-Oct-20 06-Nov-20 24 24 Column/Beam/Girder - 1st Floor(UCR-001)_U341
CD341AR40295 Roof Slab(UCR-001)_U341 11-Feb-21 24-Mar-21 09-Nov-20 16-Dec-20 28 28 Roof Slab(UCR-001)_U341
Building Finishing 11-Feb-21 25-Jun-21 09-Nov-20 26-Mar-21 96 96 25-Jun-21, Building Finishing
CD341AR45420 Masonry&Plastering(UCR-001)_U341 11-Feb-21 05-Apr-21 09-Nov-20 29-Dec-20 36 36 Masonry&Plastering(UCR-001)_U341
CD341AR45425 Water Proofing(UCR-001)_U341 06-Apr-21 04-May-21 30-Dec-20 02-Feb-21 24 24 Water Proofing(UCR-001)_U341
CD341AR45430 Door & Window(UCR-001)_U341 14-Apr-21 05-May-21 11-Jan-21 03-Feb-21 18 18 Door & Window(UCR-001)_U341
CD341AR45435 Painting-Internal(UCR-001)_U341 10-Mar-21 16-Apr-21 03-Dec-20 13-Jan-21 28 28 Painting-Internal(UCR-001)_U341
CD341AR45440 Interior Finishing(UCR-001)_U341 08-Apr-21 29-May-21 04-Jan-21 23-Feb-21 36 36 Interior Finishing(UCR-001)_U341
CD341AR45875 Exterior Finishing(UCR-001)_U341 05-May-21 25-Jun-21 03-Feb-21 26-Mar-21 36 36 Exterior Finishing(UCR-001)_U341
HVAC 17-Mar-21 18-Jun-21 09-Dec-20 18-Mar-21 68 68 18-Jun-21, HVAC
HVAC & Control System 23-Mar-21 28-Apr-21 15-Dec-20 27-Jan-21 30 30 28-Apr-21, HVAC & Control System
CD341HV10080 HVAC Equipment Installation(UCR-001)_U341 23-Mar-21 28-Apr-21 15-Dec-20 27-Jan-21 30 30 HVAC Equipment Installation(UCR-001)_U341
Plumbing 17-Mar-21 18-Jun-21 09-Dec-20 18-Mar-21 68 68 18-Jun-21, Plumbing
CD341HV15005 HVAC Duct Erection(UCR-001)_U341 17-Mar-21 16-Apr-21 09-Dec-20 13-Jan-21 24 24 HVAC Duct Erection(UCR-001)_U341
CD341HV15010 HVAC Piping work(UCR-001)_U341 29-Apr-21 07-Jun-21 28-Jan-21 03-Mar-21 24 24 HVAC Piping work(UCR-001)_U341
CD341HV15015 Plumbing&Sanitary(UCR-001)_U341 12-May-21 18-Jun-21 11-Feb-21 18-Mar-21 24 24 Plumbing&Sanitary(UCR-001)_U341
Electrical 08-Jan-21 30-Jun-21 09-Oct-20 01-Apr-21 124 124 30-Jun-21, Electrical
Cable Race Way 06-Apr-21 08-May-21 30-Dec-20 08-Feb-21 28 28 08-May-21, Cable Race Way
CD341EL45080 Electrical Cable Tray Installation(UCR-001)_U341 06-Apr-21 08-May-21 30-Dec-20 08-Feb-21 28 28 Electrical Cable Tray Installation(UCR-001)_U341
CD341EL45135- Electrical Conduit Pipe(UCR-001)_U341 22-Apr-21 08-May-21 20-Jan-21 08-Feb-21 14 14 Electrical Conduit Pipe(UCR-001)_U341
Power & Control 14-Apr-21 30-Jun-21 11-Jan-21 01-Apr-21 57 57 30-Jun-21, Power & Control

Actual Level of Effort Actual Work Critical Remaining Work Page 5 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341EL45125- Termination - Power & Control(UCR-001)_U341 07-Jun-21 30-Jun-21 03-Mar-21 01-Apr-21 21 21 Termination - Power & Control(UCR-001)_U341
CD341EL45130- Cabling - Power & Control(UCR-001_OC4)_U341 14-Apr-21 05-Jun-21 11-Jan-21 02-Mar-21 36 36 Cabling - Power & Control(UCR-001_OC4)_U341
Earthing and Grouding 08-Jan-21 01-Mar-21 09-Oct-20 24-Nov-20 36 36 01-Mar-21, Earthing and Grouding
CD341EL50040 Cabling - Grounding(UCR-001)_U341 08-Jan-21 01-Mar-21 09-Oct-20 24-Nov-20 36 36 Cabling - Grounding(UCR-001)_U341
Lighting 02-Mar-21 24-Jun-21 25-Nov-20 25-Mar-21 83 83 24-Jun-21, Lighting
CD341EL60085 Installation - Distribution Panel(UCR-001)_U341 19-Apr-21 10-Jun-21 15-Jan-21 08-Mar-21 36 36 Installation - Distribution Panel(UCR-001)_U341
CD341EL60125 Cabling - Lightening(UCR-001)_U341 21-May-21 24-Jun-21 15-Feb-21 25-Mar-21 28 28 Cabling - Lightening(UCR-001)_U341
CD341EL60130 Lightening work(UCR-001)_U341 02-Mar-21 09-Apr-21 25-Nov-20 05-Jan-21 28 28 Lightening work(UCR-001)_U341
CD341EL60390 Installation of Lighting Fixture System (UCR-001)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Installation of Lighting Fixture System (UCR-001)_U341
CD341EL60570 Cabling Lighting (UCR-001)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Cabling Lighting (UCR-001)_U341
Communication 14-Apr-21 25-May-21 27-Jan-21 08-Mar-21 28 28 25-May-21, Communication
CD341EL65010 Installation - Communication System(UCR-001)_U341 14-Apr-21 25-May-21 27-Jan-21 08-Mar-21 28 28 Installation - Communication System(UCR-001)_U341
CD341EL65255 Cabling - Communication(UCR-001)_U341 14-Apr-21 25-May-21 27-Jan-21 08-Mar-21 28 28 Cabling - Communication(UCR-001)_U341
Fire Alarm 10-May-21 21-Jun-21 09-Feb-21 22-Mar-21 28 28 21-Jun-21, Fire Alarm
CD341EL68010 Installation - Fire Alarm System(UCR-001)_U341 10-May-21 21-Jun-21 09-Feb-21 22-Mar-21 28 28 Installation - Fire Alarm System(UCR-001)_U341
CD341EL68305 Cabling - Fire Alarm(UCR-001)_U341 10-May-21 21-Jun-21 09-Feb-21 22-Mar-21 28 28 Cabling - Fire Alarm(UCR-001)_U341
Safety & Fire Fighting 17-Apr-21 29-May-21 14-Jan-21 23-Feb-21 28 28 29-May-21, Safety & Fire Fighting
Fire Fighting Equipment 17-Apr-21 29-May-21 14-Jan-21 23-Feb-21 28 28 29-May-21, Fire Fighting Equipment
CD341MS40040 Installation - F/F Equipment(UCR-001)_U341 17-Apr-21 29-May-21 14-Jan-21 23-Feb-21 28 28 Installation - F/F Equipment(UCR-001)_U341
341-OCR-001 (in Unit 323 area) 31-Jul-19 A 10-Mar-22 31-Jul-19 02-Oct-21 652 532 10-Mar-22, 341-OCR-001 (in Unit 323 area)

Engineering 31-Jul-19 A 06-Nov-20 31-Jul-19 18-Aug-20 317 197 06-Nov-20, Engineering


Architectural 12-Feb-20 08-Sep-20 24-Oct-19 06-May-20 147 147 08-Sep-20, Architectural
Calculation 04-May-20 30-Jul-20 13-Jan-20 30-Mar-20 63 63 30-Jul-20, Calculation
ED341AR10060A Structural Calculation for Control Room(341-OCR-001)_U341 [IFR] 04-May-20 17-Jun-20 13-Jan-20 14-Feb-20 25 25 Structural Calculation for Control Room(341-OCR-001)_U341 [IFR]
ED341AR10060B Structural Calculation for Control Room(341-OCR-001)_U341 [Review-IFR] 18-Jun-20 02-Jul-20 15-Feb-20 29-Feb-20 15 15 Structural Calculation for Control Room(341-OCR-001)_U341 [Review-IFR]
ED341AR10060G Structural Calculation for Control Room(341-OCR-001)_U341 [AFD] 03-Jul-20 30-Jul-20 02-Mar-20 30-Mar-20 20 20 Structural Calculation for Control Room(341-OCR-001)_U341 [AFD]
Architecture Basic 12-Feb-20 26-Jun-20 24-Oct-19 02-Apr-20 95 95 26-Jun-20, Architecture Basic
ED341AR20173A Architectural Basic Drawing(OCR-001)_U341 [IFR] 12-Feb-20 01-Apr-20 24-Oct-19 11-Dec-19 35 35 Architectural Basic Drawing(OCR-001)_U341 [IFR]
ED341AR20173B Architectural Basic Drawing(OCR-001)_U341 [Review-IFR] 02-Apr-20 16-Apr-20 12-Dec-19 26-Dec-19 15 15 Architectural Basic Drawing(OCR-001)_U341 [Review-IFR]
ED341AR20173G Architectural Basic Drawing(OCR-001)_U341 [IFC] 17-Apr-20 11-May-20 07-Jan-20 27-Jan-20 15 15 Architectural Basic Drawing(OCR-001)_U341 [IFC]
ED341AR20175A Foundation/Pile Location Plan(OCR-001)_U341 [IFR] 31-Mar-20 28-Apr-20 15-Jan-20 11-Feb-20 20 20 Foundation/Pile Location Plan(OCR-001)_U341 [IFR]
ED341AR20175B Foundation/Pile Location Plan(OCR-001)_U341 [Review-IFR] 29-Apr-20 13-May-20 12-Feb-20 26-Feb-20 15 15 Foundation/Pile Location Plan(OCR-001)_U341 [Review-IFR]
ED341AR20175G Foundation/Pile Location Plan(OCR-001)_U341 [IFC] 14-May-20 26-Jun-20 27-Feb-20 02-Apr-20 25 25 Foundation/Pile Location Plan(OCR-001)_U341 [IFC]
ED341AR20180A Structural Basic Drawing(OCR-001)_U341 [IFR] 02-Apr-20 30-Apr-20 12-Dec-19 10-Jan-20 20 20 Structural Basic Drawing(OCR-001)_U341 [IFR]
ED341AR20180B Structural Basic Drawing(OCR-001)_U341 [Review-IFR] 01-May-20 15-May-20 11-Jan-20 25-Jan-20 15 15 Structural Basic Drawing(OCR-001)_U341 [Review-IFR]
ED341AR20180G Structural Basic Drawing(OCR-001)_U341 [IFC] 18-May-20 23-Jun-20 28-Jan-20 24-Feb-20 20 20 Structural Basic Drawing(OCR-001)_U341 [IFC]
Architecture Detail - Architectural 04-Jun-20 08-Sep-20 03-Feb-20 06-May-20 69 69 08-Sep-20, Architecture Detail - Architectural
ED341AR25115A Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [IFR] 04-Jun-20 08-Jul-20 03-Feb-20 06-Mar-20 25 25 Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [IFR]
ED341AR25115B Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [Review-IFR] 09-Jul-20 23-Jul-20 07-Mar-20 21-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [Review-IFR]
ED341AR25115G Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [IFC] 24-Jul-20 25-Aug-20 23-Mar-20 21-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(OCR-001)_U341 [IFC]
ED341AR25120A Architectural Detail Drawing for Misc.(OCR-001)_U341 [IFR] 25-Jun-20 22-Jul-20 24-Feb-20 20-Mar-20 20 20 Architectural Detail Drawing for Misc.(OCR-001)_U341 [IFR]
ED341AR25120B Architectural Detail Drawing for Misc.(OCR-001)_U341 [Review-IFR] 23-Jul-20 06-Aug-20 21-Mar-20 04-Apr-20 15 15 Architectural Detail Drawing for Misc.(OCR-001)_U341 [Review-IFR]
ED341AR25120G Architectural Detail Drawing for Misc.(OCR-001)_U341 [IFC] 18-Aug-20 08-Sep-20 15-Apr-20 06-May-20 15 15 Architectural Detail Drawing for Misc.(OCR-001)_U341 [IFC]
Architecture Detail - Structural 17-Apr-20 21-Jul-20 27-Dec-19 23-Mar-20 66 66 21-Jul-20, Architecture Detail - Structural
ED341AR30115A Structural Detail Drawing for Framing(OCR-001)_U341 [IFR] 17-Apr-20 18-May-20 27-Dec-19 24-Jan-20 20 20 Structural Detail Drawing for Framing(OCR-001)_U341 [IFR]
ED341AR30115B Structural Detail Drawing for Framing(OCR-001)_U341 [Review-IFR] 19-May-20 02-Jun-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for Framing(OCR-001)_U341 [Review-IFR]
ED341AR30115G Structural Detail Drawing for Framing(OCR-001)_U341 [IFC] 17-Jun-20 07-Jul-20 18-Feb-20 09-Mar-20 15 15 Structural Detail Drawing for Framing(OCR-001)_U341 [IFC]
ED341AR30120A Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [IFR] 04-May-20 10-Jun-20 13-Jan-20 07-Feb-20 20 20 Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [IFR]
ED341AR30120B Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [Review-IFR] 11-Jun-20 25-Jun-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [Review-IFR]
ED341AR30120G Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [IFC] 01-Jul-20 21-Jul-20 03-Mar-20 23-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(OCR-001)_U341 [IFC]
HVAC 12-Aug-19 A 27-Aug-20 12-Dec-19 15-Jun-20 224 150 27-Aug-20, HVAC
HVAC & Control System 12-Aug-19 A 27-Aug-20 12-Dec-19 15-Jun-20 192 150 27-Aug-20, HVAC & Control System
ED341HV10175A HVAC System(OCR-001)_U341 [IFR] 02-Apr-20 11-May-20 12-Dec-19 17-Jan-20 25 25 HVAC System(OCR-001)_U341 [IFR]
ED341HV10175B HVAC System(OCR-001)_U341 [Review-IFR] 12-May-20 26-May-20 18-Jan-20 01-Feb-20 15 15 HVAC System(OCR-001)_U341 [Review-IFR]
ED341HV10175G HVAC System(OCR-001)_U341 [IFC] 29-May-20 10-Jul-20 03-Feb-20 13-Mar-20 30 30 HVAC System(OCR-001)_U341 [IFC]
ED341HV10180A Control System(OCR-001)_U341 [IFR] 12-Aug-19 A 29-Jan-20 24-Feb-20 30-Mar-20 25 3 Control System(OCR-001)_U341 [IFR]
ED341HV10180B Control System(OCR-001)_U341 [Review-IFR] 17-Sep-19 A 14-Feb-20 31-Mar-20 14-Apr-20 15 19 Control System(OCR-001)_U341 [Review-IFR]
ED341HV10180G Control System(OCR-001)_U341 [IFC] 07-Oct-19 A 27-Aug-20 22-Apr-20 15-Jun-20 30 2 Control System(OCR-001)_U341 [IFC]
Plumbing 02-Apr-20 25-Aug-20 12-Dec-19 21-Apr-20 101 101 25-Aug-20, Plumbing
ED341HV15115A Duct & Piping(OCR-001)_U341 [IFR] 12-May-20 24-Jun-20 20-Jan-20 21-Feb-20 25 25 Duct & Piping(OCR-001)_U341 [IFR]
ED341HV15115B Duct & Piping(OCR-001)_U341 [Review-IFR] 25-Jun-20 09-Jul-20 22-Feb-20 07-Mar-20 15 15 Duct & Piping(OCR-001)_U341 [Review-IFR]
ED341HV15115G Duct & Piping(OCR-001)_U341 [IFC] 10-Jul-20 25-Aug-20 09-Mar-20 21-Apr-20 30 30 Duct & Piping(OCR-001)_U341 [IFC]
ED341HV15120A Plumbing(OCR-001)_U341 [IFR] 02-Apr-20 11-May-20 12-Dec-19 17-Jan-20 25 25 Plumbing(OCR-001)_U341 [IFR]
ED341HV15120B Plumbing(OCR-001)_U341 [Review-IFR] 12-May-20 26-May-20 18-Jan-20 01-Feb-20 15 15 Plumbing(OCR-001)_U341 [Review-IFR]
ED341HV15120G Plumbing(OCR-001)_U341 [IFC] 29-May-20 10-Jul-20 03-Feb-20 13-Mar-20 30 30 Plumbing(OCR-001)_U341 [IFC]
Electrical 24-Dec-19 A 22-Sep-20 14-Nov-19 08-Jun-20 188 168 22-Sep-20, Electrical
Power & Control 02-Apr-20 08-Sep-20 12-Dec-19 14-May-20 111 111 08-Sep-20, Power & Control
ED341EL45120A Electrical Cable Route Layout(OCR-001_OC4)_U341 [IFR] 02-Apr-20 18-May-20 12-Dec-19 24-Jan-20 30 30 Electrical Cable Route Layout(OCR-001_OC4)_U341 [IFR]
ED341EL45120B Electrical Cable Route Layout(OCR-001_OC4)_U341 [Review-IFR] 19-May-20 02-Jun-20 25-Jan-20 08-Feb-20 15 15 Electrical Cable Route Layout(OCR-001_OC4)_U341 [Review-IFR]
ED341EL45120G Electrical Cable Route Layout(OCR-001_OC4)_U341 [IFC] 03-Jun-20 21-Jul-20 10-Feb-20 30-Mar-20 35 35 Electrical Cable Route Layout(OCR-001_OC4)_U341 [IFC]
ED341EL45125A Power Layout(OCR-001_OC4)_U341 [IFR] 19-May-20 08-Jul-20 27-Jan-20 06-Mar-20 30 30 Power Layout(OCR-001_OC4)_U341 [IFR]
ED341EL45125B Power Layout(OCR-001_OC4)_U341 [Review-IFR] 09-Jul-20 23-Jul-20 07-Mar-20 21-Mar-20 15 15 Power Layout(OCR-001_OC4)_U341 [Review-IFR]
ED341EL45125G Power Layout(OCR-001_OC4)_U341 [IFC] 24-Jul-20 08-Sep-20 31-Mar-20 14-May-20 30 30 Power Layout(OCR-001_OC4)_U341 [IFC]
Earthing and Grouding 04-Mar-20 23-Jun-20 14-Nov-19 24-Feb-20 77 77 23-Jun-20, Earthing and Grouding
ED341EL50061A Earthing and Lightning Protection Layout(OCR-001)_U341 [IFR] 04-Mar-20 30-Apr-20 14-Nov-19 10-Jan-20 40 40 Earthing and Lightning Protection Layout(OCR-001)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 6 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341EL50061B Earthing and Lightning Protection Layout(OCR-001)_U341 [Review-IFR] 01-May-20 15-May-20 11-Jan-20 25-Jan-20 15 15 Earthing and Lightning Protection Layout(OCR-001)_U341 [Review-IFR]
ED341EL50061G Earthing and Lightning Protection Layout(OCR-001)_U341 [IFC] 18-May-20 23-Jun-20 28-Jan-20 24-Feb-20 20 20 Earthing and Lightning Protection Layout(OCR-001)_U341 [IFC]
Lighting 11-Jun-20 22-Sep-20 10-Feb-20 08-Jun-20 74 74 22-Sep-20, Lighting
ED341EL60061A Lighting and Small Power Layout(OCR-001)_U341 [IFR] 11-Jun-20 22-Jul-20 10-Feb-20 20-Mar-20 30 30 Lighting and Small Power Layout(OCR-001)_U341 [IFR]
ED341EL60061B Lighting and Small Power Layout(OCR-001)_U341 [Review-IFR] 23-Jul-20 06-Aug-20 21-Mar-20 04-Apr-20 15 15 Lighting and Small Power Layout(OCR-001)_U341 [Review-IFR]
ED341EL60061G Lighting and Small Power Layout(OCR-001)_U341 [IFC] 10-Aug-20 22-Sep-20 15-Apr-20 08-Jun-20 30 30 Lighting and Small Power Layout(OCR-001)_U341 [IFC]
Communication 02-Apr-20 14-Jul-20 71 71 14-Jul-20, Communication
ED341EL65120A Telecom/Security/PAGA System Layout(OCR-001)_U341 [IFR] [Added] 02-Apr-20 18-May-20 30 30 Telecom/Security/PAGA System Layout(OCR-001)_U341 [IFR] [Added]
ED341EL65120B Telecom/Security/PAGA System Layout(OCR-001)_U341 [Review-IFR] [Added] 19-May-20 02-Jun-20 15 15 Telecom/Security/PAGA System Layout(OCR-001)_U341 [Review-IFR] [Added]
ED341EL65120G Telecom/Security/PAGA System Layout(OCR-001)_U341 [IFC] [Added] 03-Jun-20 14-Jul-20 30 30 Telecom/Security/PAGA System Layout(OCR-001)_U341 [IFC] [Added]
Fire Alarm 24-Dec-19 A 28-Jul-20 20-Nov-19 28-Apr-20 148 128 28-Jul-20, Fire Alarm
ED341EL68070A Fire Alarm Layout(OCR-001)_U341 [IFR] 24-Dec-19 A 10-Mar-20 20-Nov-19 24-Jan-20 46 32 Fire Alarm Layout(OCR-001)_U341 [IFR]
ED341EL68070B Fire Alarm Layout(OCR-001)_U341 [Review/Appr.-IFR] 11-Mar-20 25-Mar-20 25-Jan-20 08-Feb-20 15 15 Fire Alarm Layout(OCR-001)_U341 [Review/Appr.-IFR]
ED341EL68070G Fire Alarm Layout(OCR-001)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Fire Alarm Layout(OCR-001)_U341 [IFC]
Instrumentation & Control 05-Aug-19 A 06-Nov-20 17-Jan-20 18-Aug-20 300 197 06-Nov-20, Instrumentation & Control
Control System 05-Aug-19 A 06-Nov-20 17-Jan-20 18-Aug-20 300 197 06-Nov-20, Control System
ED341IC40016A ICSS Network Drawing (Offsite Control Room)_U341 [IFR] 05-Aug-19 A 23-Aug-19 A 17-Jan-20 27-Feb-20 30 0 ICSS Network Drawing (Offsite Control Room)_U341 [IFR]
ED341IC40016B ICSS Network Drawing (Offsite Control Room)_U341 [Review/Appr.-IFR] 24-Aug-19 A 09-Feb-20 28-Feb-20 13-Mar-20 15 15 ICSS Network Drawing (Offsite Control Room)_U341 [Review/Appr.-IFR]
ED341IC40016G ICSS Network Drawing (Offsite Control Room)_U341 [IFC] 10-Feb-20 06-Apr-20 16-Mar-20 14-May-20 40 40 ICSS Network Drawing (Offsite Control Room)_U341 [IFC]
ED341IC40192A Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [IFR] 18-Mar-20 30-Apr-20 24-Jan-20 05-Mar-20 30 30 Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [IFR]
ED341IC40192B Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [Reviewed-IFR] 01-May-20 15-May-20 06-Mar-20 20-Mar-20 15 15 Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [Reviewed-IFR]
ED341IC40192G Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [IFC] 21-Aug-20 17-Sep-20 29-May-20 26-Jun-20 20 20 Instrument Panels and Console Arrangement Layout(OCR-001)_U341 [IFC]
ED341IC40194A Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [IFR] 29-Apr-20 22-Jun-20 02-Mar-20 14-Apr-20 30 30 Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [IFR]
ED341IC40194B Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [Revie wed-IFR] 23-Jun-20 07-Jul-20 15-Apr-20 29-Apr-20 15 15 Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [Revie wed-IFR]
ED341IC40194G Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [IFC] 09-Oct-20 06-Nov-20 20-Jul-20 18-Aug-20 20 20 Instrument Cable Assignment for Multi Cable Transit(OCR-001)_U341 [IFC]
Cable Race Way 02-Apr-20 01-Oct-20 07-Feb-20 10-Jul-20 126 126 01-Oct-20, Cable Race Way
ED341IC55190A Instrument Cable Tray Layout(OCR-001)_U341 [IFR] 02-Apr-20 18-May-20 07-Feb-20 19-Mar-20 30 30 Instrument Cable Tray Layout(OCR-001)_U341 [IFR]
ED341IC55190B Instrument Cable Tray Layout(OCR-001)_U341 [Reviewed-IFR] 19-May-20 08-Jun-20 20-Mar-20 09-Apr-20 21 21 Instrument Cable Tray Layout(OCR-001)_U341 [Reviewed-IFR]
ED341IC55190G Instrument Cable Tray Layout(OCR-001)_U341 [IFC] 04-Sep-20 01-Oct-20 15-Jun-20 10-Jul-20 20 20 Instrument Cable Tray Layout(OCR-001)_U341 [IFC]
Cable 02-Apr-20 01-Oct-20 07-Feb-20 10-Jul-20 118 118 01-Oct-20, Cable
ED341IC60190A Instrument Cable Wiring Layout(OCR-001)_U341 [IFR] 02-Apr-20 18-May-20 07-Feb-20 19-Mar-20 30 30 Instrument Cable Wiring Layout(OCR-001)_U341 [IFR]
ED341IC60190B Instrument Cable Wiring Layout(OCR-001)_U341 [Reviewed-IFR] 19-May-20 16-Jun-20 20-Mar-20 09-Apr-20 14 14 Instrument Cable Wiring Layout(OCR-001)_U341 [Reviewed-IFR]
ED341IC60190G Instrument Cable Wiring Layout(OCR-001)_U341 [IFC] 04-Sep-20 01-Oct-20 15-Jun-20 10-Jul-20 20 20 Instrument Cable Wiring Layout(OCR-001)_U341 [IFC]
Safety & Fire Fighting 31-Jul-19 A 30-Jun-20 31-Jul-19 06-Mar-20 228 108 30-Jun-20, Safety & Fire Fighting
Fire Fighting Drawing 31-Jul-19 A 30-Jun-20 31-Jul-19 06-Mar-20 228 108 30-Jun-20, Fire Fighting Drawing
ED341SF25191A P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFR] 31-Jul-19 A 10-Feb-20 31-Jul-19 04-Sep-19 25 11 P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFR]
ED341SF25191B P&ID and Piping Scheme for F/F System(OCR-001)_U341 [Review/Appr.-IFR] 11-Feb-20 25-Feb-20 05-Sep-19 19-Sep-19 15 15 P&ID and Piping Scheme for F/F System(OCR-001)_U341 [Review/Appr.-IFR]
ED341SF25191E P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFD] 26-Feb-20 24-Mar-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFD]
ED341SF25191F P&ID and Piping Scheme for F/F System(OCR-001)_U341 [Approved-IFD] 25-Mar-20 08-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(OCR-001)_U341 [Approved-IFD]
ED341SF25191G P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFC] 09-Apr-20 11-May-20 25-Nov-19 20-Dec-19 20 20 P&ID and Piping Scheme for F/F System(OCR-001)_U341 [IFC]
ED341SF30115A Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [IFR] 02-Apr-20 18-May-20 12-Dec-19 24-Jan-20 30 30 Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [IFR]
ED341SF30115B Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [Review/Appr.-IFR]
19-May-20 02-Jun-20 25-Jan-20 08-Feb-20 15 15 Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [Review/Appr.-IFR]
ED341SF30115G Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [AFD] 03-Jun-20 30-Jun-20 10-Feb-20 06-Mar-20 20 20 Fire & Safety Equipment Location Plan-Offsite Control Room (341-OCR-001)_U341 [AFD]
Construction 03-Sep-20 10-Mar-22 01-Oct-20 02-Oct-21 413 413 10-Mar-22, Construction
Architectural 03-Sep-20 17-Apr-21 01-Oct-20 25-May-21 168 168 17-Apr-21, Architectural
Building Foundation 03-Sep-20 26-Sep-20 01-Oct-20 24-Oct-20 21 21 26-Sep-20, Building Foundation
CD341AR35125 Building Foundation(OCR-001)_U341 03-Sep-20 26-Sep-20 01-Oct-20 24-Oct-20 21 21 Building Foundation(OCR-001)_U341
Building Structure 28-Sep-20 08-Mar-21 26-Oct-20 10-Apr-21 117 117 08-Mar-21, Building Structure
CD341AR40300 Column/Beam/Girder - Ground Level(OCR-001)_U341 28-Sep-20 17-Oct-20 26-Oct-20 18-Nov-20 18 18 Column/Beam/Girder - Ground Level(OCR-001)_U341
CD341AR40305 1st Floor Slab(OCR-001)_U341 19-Oct-20 18-Nov-20 19-Nov-20 22-Dec-20 24 24 1st Floor Slab(OCR-001)_U341
CD341AR40310 Column/Beam/Girder - 1st Floor(OCR-001)_U341 19-Nov-20 14-Dec-20 23-Dec-20 19-Jan-21 18 18 Column/Beam/Girder - 1st Floor(OCR-001)_U341
CD341AR40315 2nd Floor Slab(OCR-001)_U341 15-Dec-20 14-Jan-21 20-Jan-21 18-Feb-21 21 21 2nd Floor Slab(OCR-001)_U341
CD341AR40320 Column/Beam/Girder - 2nd Floor(OCR-001)_U341 15-Jan-21 09-Feb-21 19-Feb-21 17-Mar-21 18 18 Column/Beam/Girder - 2nd Floor(OCR-001)_U341
CD341AR40325 Roof Slab(OCR-001)_U341 10-Feb-21 08-Mar-21 18-Mar-21 10-Apr-21 18 18 Roof Slab(OCR-001)_U341
Building Finishing 15-Jan-21 17-Apr-21 19-Feb-21 25-May-21 66 66 17-Apr-21, Building Finishing
CD341AR45460 Masonry&Plastering(OCR-001)_U341 15-Jan-21 02-Mar-21 19-Feb-21 06-Apr-21 32 32 Masonry&Plastering(OCR-001)_U341
CD341AR45465 Water Proofing(OCR-001)_U341 23-Feb-21 03-Apr-21 30-Mar-21 03-May-21 28 28 Water Proofing(OCR-001)_U341
CD341AR45470 Door & Window(OCR-001)_U341 18-Mar-21 13-Apr-21 19-Apr-21 12-May-21 20 20 Door & Window(OCR-001)_U341
CD341AR45475 Painting-Internal(OCR-001)_U341 17-Feb-21 29-Mar-21 24-Mar-21 27-Apr-21 28 28 Painting-Internal(OCR-001)_U341
CD341AR45480 Interior Finishing(OCR-001)_U341 12-Mar-21 13-Apr-21 14-Apr-21 12-May-21 24 24 Interior Finishing(OCR-001)_U341
CD341AR45885 Exterior Finishing(OCR-001)_U341 18-Mar-21 17-Apr-21 19-Apr-21 25-May-21 24 24 Exterior Finishing(OCR-001)_U341
HVAC 16-Mar-21 23-Jun-21 16-Apr-21 22-Jul-21 73 73 23-Jun-21, HVAC
HVAC & Control System 30-Mar-21 12-May-21 28-Apr-21 19-Jun-21 36 36 12-May-21, HVAC & Control System
CD341HV10025 HVAC Equipment Installation(OCR-001)_U341 30-Mar-21 12-May-21 28-Apr-21 19-Jun-21 36 36 HVAC Equipment Installation(OCR-001)_U341
Plumbing 16-Mar-21 23-Jun-21 16-Apr-21 22-Jul-21 73 73 23-Jun-21, Plumbing
CD341HV15020 HVAC Duct Erection(OCR-001)_U341 16-Mar-21 20-Apr-21 16-Apr-21 28-May-21 28 28 HVAC Duct Erection(OCR-001)_U341
CD341HV15025 HVAC Piping work(OCR-001)_U341 05-May-21 16-Jun-21 12-Jun-21 15-Jul-21 28 28 HVAC Piping work(OCR-001)_U341
CD341HV15030 Plumbing&Sanitary(OCR-001)_U341 12-May-21 23-Jun-21 19-Jun-21 22-Jul-21 28 28 Plumbing&Sanitary(OCR-001)_U341
Electrical 14-Sep-20 02-Jun-21 12-Oct-20 26-Jun-21 188 188 02-Jun-21, Electrical
Cable Race Way 05-Mar-21 16-Apr-21 09-Apr-21 24-May-21 31 31 16-Apr-21, Cable Race Way
CD341EL45025 Electrical Cable Tray Installation(OCR-001)_U341 05-Mar-21 13-Apr-21 09-Apr-21 12-May-21 28 28 Electrical Cable Tray Installation(OCR-001)_U341
CD341EL45150- Electrical Conduit Pipe(OCR-001)_U341 22-Mar-21 16-Apr-21 21-Apr-21 24-May-21 21 21 Electrical Conduit Pipe(OCR-001)_U341
Power & Control 30-Mar-21 28-May-21 28-Apr-21 26-Jun-21 42 42 28-May-21, Power & Control
CD341EL45140- Termination - Power & Control(OCR-001)_U341 24-Apr-21 28-May-21 03-Jun-21 26-Jun-21 21 21 Termination - Power & Control(OCR-001)_U341
CD341EL45145 Cabling - Power & Control(OCR-001)_U341 30-Mar-21 12-May-21 28-Apr-21 19-Jun-21 36 36 Cabling - Power & Control(OCR-001)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 7 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Earthing and Grouding 14-Sep-20 10-Oct-20 12-Oct-20 10-Nov-20 24 24 10-Oct-20, Earthing and Grouding
CD341EL50025 Cabling - Grounding(OCR-001)_U341 14-Sep-20 10-Oct-20 12-Oct-20 10-Nov-20 24 24 Cabling - Grounding(OCR-001)_U341
Lighting 12-Mar-21 02-Jun-21 18-Jan-21 08-Jun-21 57 57 02-Jun-21, Lighting
CD341EL60030 Installation - Distribution Panel(OCR-001)_U341 12-Mar-21 27-Apr-21 14-Apr-21 05-Jun-21 36 36 Installation - Distribution Panel(OCR-001)_U341
CD341EL60135 Cabling - Lightening(OCR-001)_U341 26-Mar-21 29-Apr-21 26-Apr-21 08-Jun-21 28 28 Cabling - Lightening(OCR-001)_U341
CD341EL60140 Lightening work(OCR-001)_U341 26-Mar-21 29-Apr-21 26-Apr-21 08-Jun-21 28 28 Lightening work(OCR-001)_U341
CD341EL60395 Installation of Lighting Fixture System (OCR-001)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Installation of Lighting Fixture System (OCR-001)_U341
CD341EL60575 Cabling Lighting (OCR-001)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Cabling Lighting (OCR-001)_U341
Fire Alarm 09-Apr-21 12-May-21 08-May-21 19-Jun-21 28 28 12-May-21, Fire Alarm
CD341EL68015 Installation - Fire Alarm System(OCR-001)_U341 09-Apr-21 12-May-21 08-May-21 19-Jun-21 28 28 Installation - Fire Alarm System(OCR-001)_U341
CD341EL68320 Cabling - Fire Alarm(OCR-001)_U341 09-Apr-21 12-May-21 08-May-21 19-Jun-21 28 28 Cabling - Fire Alarm(OCR-001)_U341
Instrumentation & Control 05-Apr-21 07-Feb-22 04-May-21 08-Sep-21 236 236 07-Feb-22, Instrumentation & Control
Control System 17-Dec-21 07-Feb-22 23-Jul-21 04-Sep-21 36 36 07-Feb-22, Control System
CD341IC700105 Control System - Installation (SLC/PLC)(OCR-001)_U341 17-Dec-21 07-Feb-22 23-Jul-21 04-Sep-21 36 36 Control System - Installation (SLC/PLC)(OCR-001)_U341
Cable Race Way 05-Apr-21 24-Jun-21 04-May-21 23-Jul-21 60 60 24-Jun-21, Cable Race Way
CD341IC550025 Instrument Cable Tray-Ladder(OCR-001)_U341 05-Apr-21 03-May-21 04-May-21 10-Jun-21 24 24 Instrument Cable Tray-Ladder(OCR-001)_U341
CD341IC555015 Instrument Cable Tray-Perforated(OCR-001)_U341 04-May-21 24-Jun-21 11-Jun-21 23-Jul-21 36 36 Instrument Cable Tray-Perforated(OCR-001)_U341
Cable 11-Jun-21 09-Aug-21 10-Jul-21 08-Sep-21 50 50 09-Aug-21, Cable
CD341IC600075 Instrument Cable Pulling Primary(OCR-001)_U341 16-Jun-21 19-Jul-21 15-Jul-21 18-Aug-21 28 28 Instrument Cable Pulling Primary(OCR-001)_U341
CD341IC600085 Instrument Cable Termination Prim ary(OCR-001)_U341 28-Jun-21 09-Aug-21 27-Jul-21 08-Sep-21 36 36 Instrument Cable Termination Prim ary(OCR-001)_U341
CD341IC600115 Instrument Cable Pulling Secondary(OCR-001)_U341 11-Jun-21 23-Jul-21 10-Jul-21 23-Aug-21 36 36 Instrument Cable Pulling Secondary(OCR-001)_U341
CD341IC600125 Instrument Cable Termination secondary(OCR-001)_U341 10-Jul-21 06-Aug-21 07-Aug-21 06-Sep-21 24 24 Instrument Cable Termination secondary(OCR-001)_U341
Safety & Fire Fighting 30-Mar-21 27-Apr-21 28-Apr-21 05-Jun-21 24 24 27-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 30-Mar-21 27-Apr-21 28-Apr-21 05-Jun-21 24 24 27-Apr-21, Fire Fighting Equipment
CD341MS40020 Installation - F/F Equipment(OCR-001)_U341 30-Mar-21 27-Apr-21 28-Apr-21 05-Jun-21 24 24 Installation - F/F Equipment(OCR-001)_U341
Pre-commissioning 08-Feb-22 10-Mar-22 09-Sep-21 02-Oct-21 21 21 10-Mar-22, Pre-commissioning
Loop Test 08-Feb-22 10-Mar-22 09-Sep-21 02-Oct-21 21 21 10-Mar-22, Loop Test
CD341IC700095 Pre-Commissioning - Loop Test(OCR-001)_U341 08-Feb-22 10-Mar-22 09-Sep-21 02-Oct-21 21 21 Pre-Commissioning - Loop Test(OCR-001)_U341
341-TCR-001 (in Unit 323 area) 27-Aug-19 A 29-Sep-21 27-Aug-19 04-Sep-21 502 420 29-Sep-21, 341-TCR-001 (in Unit 323 area)

Engineering 27-Aug-19 A 27-Aug-20 27-Aug-19 06-Jul-20 232 150 27-Aug-20, Engineering


Architectural 27-Aug-19 A 26-Jun-20 27-Aug-19 24-Apr-20 188 106 26-Jun-20, Architectural
Architecture Basic 27-Aug-19 A 23-Apr-20 27-Aug-19 11-Mar-20 144 62 23-Apr-20, Architecture Basic
ED341AR20340A Architectural Basic Drawing(TCR-001)_U341 [IFR] 17-Oct-19 A 10-Feb-20 17-Oct-19 27-Nov-19 30 11 Architectural Basic Drawing(TCR-001)_U341 [IFR]
ED341AR20340B Architectural Basic Drawing(TCR-001)_U341 [Review-IFR] 11-Feb-20 25-Feb-20 28-Nov-19 12-Dec-19 15 15 Architectural Basic Drawing(TCR-001)_U341 [Review-IFR]
ED341AR20340G Architectural Basic Drawing(TCR-001)_U341 [IFC] 26-Feb-20 08-Apr-20 16-Jan-20 26-Feb-20 30 30 Architectural Basic Drawing(TCR-001)_U341 [IFC]
ED341AR20342A Foundation/Pile Location Plan(TCR-001)_U341 [IFR] 27-Aug-19 A 24-Feb-20 27-Aug-19 23-Sep-19 20 21 Foundation/Pile Location Plan(TCR-001)_U341 [IFR]
ED341AR20342B Foundation/Pile Location Plan(TCR-001)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 24-Sep-19 08-Oct-19 15 15 Foundation/Pile Location Plan(TCR-001)_U341 [Review-IFR]
ED341AR20342G Foundation/Pile Location Plan(TCR-001)_U341 [IFC] 11-Mar-20 16-Apr-20 28-Nov-19 03-Jan-20 25 25 Foundation/Pile Location Plan(TCR-001)_U341 [IFC]
ED341AR20345A Structural Basic Drawing(TCR-001)_U341 [IFR] 11-Feb-20 09-Mar-20 28-Nov-19 26-Dec-19 20 20 Structural Basic Drawing(TCR-001)_U341 [IFR]
ED341AR20345B Structural Basic Drawing(TCR-001)_U341 [Review-IFR] 10-Mar-20 24-Mar-20 27-Dec-19 10-Jan-20 15 15 Structural Basic Drawing(TCR-001)_U341 [Review-IFR]
ED341AR20345G Structural Basic Drawing(TCR-001)_U341 [IFC] 26-Mar-20 23-Apr-20 13-Feb-20 11-Mar-20 20 20 Structural Basic Drawing(TCR-001)_U341 [IFC]
Architecture Detail - Architectural 01-Apr-20 26-Jun-20 20-Jan-20 24-Apr-20 60 60 26-Jun-20, Architecture Detail - Architectural
ED341AR25340A Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [IFR] 01-Apr-20 08-May-20 20-Jan-20 21-Feb-20 25 25 Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [IFR]
ED341AR25340B Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [Review-IFR] 09-May-20 23-May-20 22-Feb-20 07-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [Review-IFR]
ED341AR25340G Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [IFC] 29-May-20 26-Jun-20 09-Mar-20 06-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(TCR-001)_U341 [IFC]
ED341AR25345A Architectural Detail Drawing for Misc.(TCR-001)_U341 [IFR] 20-Apr-20 19-May-20 05-Feb-20 03-Mar-20 20 20 Architectural Detail Drawing for Misc.(TCR-001)_U341 [IFR]
ED341AR25345B Architectural Detail Drawing for Misc.(TCR-001)_U341 [Review-IFR] 20-May-20 03-Jun-20 04-Mar-20 18-Mar-20 15 15 Architectural Detail Drawing for Misc.(TCR-001)_U341 [Review-IFR]
ED341AR25345G Architectural Detail Drawing for Misc.(TCR-001)_U341 [IFC] 08-Jun-20 26-Jun-20 03-Apr-20 24-Apr-20 15 15 Architectural Detail Drawing for Misc.(TCR-001)_U341 [IFC]
Architecture Detail - Structural 25-Feb-20 03-Jun-20 12-Dec-19 09-Apr-20 69 69 03-Jun-20, Architecture Detail - Structural
ED341AR30340A Structural Detail Drawing for Framing(TCR-001)_U341 [IFR] 25-Feb-20 23-Mar-20 12-Dec-19 10-Jan-20 20 20 Structural Detail Drawing for Framing(TCR-001)_U341 [IFR]
ED341AR30340B Structural Detail Drawing for Framing(TCR-001)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 11-Jan-20 25-Jan-20 15 15 Structural Detail Drawing for Framing(TCR-001)_U341 [Review-IFR]
ED341AR30340G Structural Detail Drawing for Framing(TCR-001)_U341 [IFC] 17-Apr-20 11-May-20 05-Mar-20 26-Mar-20 15 15 Structural Detail Drawing for Framing(TCR-001)_U341 [IFC]
ED341AR30345A Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [IFR] 10-Mar-20 07-Apr-20 27-Dec-19 24-Jan-20 20 20 Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [IFR]
ED341AR30345B Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [Review-IFR] 08-Apr-20 22-Apr-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [Review-IFR]
ED341AR30345G Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [IFC] 04-May-20 03-Jun-20 19-Mar-20 09-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(TCR-001)_U341 [IFC]
HVAC 11-Feb-20 27-Aug-20 28-Nov-19 06-Jul-20 140 140 27-Aug-20, HVAC
HVAC & Control System 17-Feb-20 29-Jun-20 27-Dec-19 28-Apr-20 93 93 29-Jun-20, HVAC & Control System
EB319HV10015A HVAC System(TCR-001)_U341 [IFR] 17-Feb-20 06-Apr-20 27-Dec-19 14-Feb-20 35 35 HVAC System(TCR-001)_U341 [IFR]
EB319HV10015B HVAC System(TCR-001)_U341 [Review-IFR] 07-Apr-20 21-Apr-20 15-Feb-20 29-Feb-20 15 15 HVAC System(TCR-001)_U341 [Review-IFR]
EB319HV10015G HVAC System(TCR-001)_U341 [IFC] 22-Apr-20 29-Jun-20 02-Mar-20 28-Apr-20 40 40 HVAC System(TCR-001)_U341 [IFC]
Plumbing 11-Feb-20 27-Aug-20 28-Nov-19 06-Jul-20 140 140 27-Aug-20, Plumbing
EB319HV15005A Duct & Piping(TCR-001)_U341 [IFR] 07-Apr-20 08-Jun-20 17-Feb-20 06-Apr-20 35 35 Duct & Piping(TCR-001)_U341 [IFR]
EB319HV15005B Duct & Piping(TCR-001)_U341 [Review-IFR] 09-Jun-20 23-Jun-20 07-Apr-20 21-Apr-20 15 15 Duct & Piping(TCR-001)_U341 [Review-IFR]
EB319HV15005G Duct & Piping(TCR-001)_U341 [IFC] 30-Jun-20 27-Aug-20 29-Apr-20 06-Jul-20 40 40 Duct & Piping(TCR-001)_U341 [IFC]
EB319HV15010A Plumbing(TCR-001)_U341 [IFR] 11-Feb-20 31-Mar-20 28-Nov-19 17-Jan-20 35 35 Plumbing(TCR-001)_U341 [IFR]
EB319HV15010B Plumbing(TCR-001)_U341 [Review-IFR] 01-Apr-20 15-Apr-20 18-Jan-20 01-Feb-20 15 15 Plumbing(TCR-001)_U341 [Review-IFR]
EB319HV15010G Plumbing(TCR-001)_U341 [IFC] 16-Apr-20 23-Jun-20 27-Feb-20 24-Apr-20 40 40 Plumbing(TCR-001)_U341 [IFC]
Construction 30-Sep-20 29-Sep-21 05-Sep-20 04-Sep-21 273 273 29-Sep-21, Construction
Architectural 30-Sep-20 02-Jun-21 05-Sep-20 27-Apr-21 174 174 02-Jun-21, Architectural
Building Foundation 30-Sep-20 10-Dec-20 05-Sep-20 11-Nov-20 56 56 10-Dec-20, Building Foundation
CD341AR35305 Building Foundation(341-TCR-001)_U341 30-Sep-20 02-Nov-20 05-Sep-20 07-Oct-20 28 28 Building Foundation(341-TCR-001)_U341
CD341AR35310 Ground Slab(341-TCR-001)_U341 03-Nov-20 10-Dec-20 08-Oct-20 11-Nov-20 28 28 Ground Slab(341-TCR-001)_U341
Building Structure 11-Dec-20 16-Mar-21 12-Nov-20 11-Feb-21 64 64 16-Mar-21, Building Structure
CD341AR40205 Column/Beam/Girdder - Ground Level(341-TCR-001)_U341 11-Dec-20 21-Jan-21 12-Nov-20 21-Dec-20 28 28 Column/Beam/Girdder - Ground Level(341-TCR-001)_U341
CD341AR40245 Roof Slab(341-TCR-001)_U341 22-Jan-21 16-Mar-21 22-Dec-20 11-Feb-21 36 36 Roof Slab(341-TCR-001)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 8 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Building Finishing 01-Feb-21 02-Jun-21 31-Dec-20 27-Apr-21 84 84 02-Jun-21, Building Finishing
CD341AR45405 Masonry&Plastering(319-TCR-001)_U319 18-Feb-21 09-Apr-21 19-Jan-21 10-Mar-21 36 36 Masonry&Plastering(319-TCR-001)_U319
CD341AR45410 Painting-Internal(319-TCR-001)_U319 13-Apr-21 24-May-21 16-Mar-21 20-Apr-21 28 28 Painting-Internal(319-TCR-001)_U319
CD341AR45445 Water Proofing(319-TCR-001)_U319 01-Feb-21 16-Mar-21 31-Dec-20 11-Feb-21 30 30 Water Proofing(319-TCR-001)_U319
CD341AR45485 Interior Finishing(319-TCR-001)_U319 03-Apr-21 24-May-21 03-Mar-21 20-Apr-21 36 36 Interior Finishing(319-TCR-001)_U319
CD341AR45495 Exterior Finishing(319-TCR-001)_U319 18-Feb-21 09-Apr-21 19-Jan-21 10-Mar-21 36 36 Exterior Finishing(319-TCR-001)_U319
CD341AR45505 Door & Window(319-TCR-001)_U319 28-Apr-21 02-Jun-21 03-Apr-21 27-Apr-21 21 21 Door & Window(319-TCR-001)_U319
HVAC 10-Apr-21 02-Aug-21 12-Mar-21 08-Jul-21 87 87 02-Aug-21, HVAC
HVAC & Control System 10-May-21 23-Jun-21 14-Apr-21 28-May-21 30 30 23-Jun-21, HVAC & Control System
CD341HV10405 HVAC Equipment Installation(319-TCR-001)_U319 10-May-21 23-Jun-21 14-Apr-21 28-May-21 30 30 HVAC Equipment Installation(319-TCR-001)_U319
Plumbing 10-Apr-21 02-Aug-21 12-Mar-21 08-Jul-21 87 87 02-Aug-21, Plumbing
CB319HV15005 Plumbing&Sanitary(319-TCR-001)_U319 06-Jul-21 02-Aug-21 10-Jun-21 08-Jul-21 24 24 Plumbing&Sanitary(319-TCR-001)_U319
CD341HV15405 HVAC Duct Erection(319-TCR-001)_U319 10-Apr-21 08-May-21 12-Mar-21 13-Apr-21 24 24 HVAC Duct Erection(319-TCR-001)_U319
CD341HV15410 HVAC Piping work(319-TCR-001)_U319 24-Jun-21 27-Jul-21 29-May-21 01-Jul-21 28 28 HVAC Piping work(319-TCR-001)_U319
Electrical 17-Mar-21 29-Sep-21 15-Feb-21 04-Sep-21 153 153 29-Sep-21, Electrical
Cable Race Way 25-May-21 04-Aug-21 21-Apr-21 10-Jul-21 59 59 04-Aug-21, Cable Race Way
CD341EL43505 Electrical Cable Tray Installation(319-TCR-001)_U319 25-May-21 23-Jun-21 21-Apr-21 28-May-21 24 24 Electrical Cable Tray Installation(319-TCR-001)_U319
CD341EL43515 Electrical Conduit Pipe(319-TCR-001)_U319 15-Jul-21 04-Aug-21 19-Jun-21 10-Jul-21 18 18 Electrical Conduit Pipe(319-TCR-001)_U319
Power & Control 01-Jul-21 15-Sep-21 07-Jun-21 21-Aug-21 63 63 15-Sep-21, Power & Control
CD341EL45325 Cabling - Power & Control(319-TCR-001)_U319 01-Jul-21 29-Jul-21 07-Jun-21 05-Jul-21 24 24 Cabling - Power & Control(319-TCR-001)_U319
CD341EL45335 Termination - Power & Control(319-TCR-001)_U319 26-Aug-21 15-Sep-21 30-Jul-21 21-Aug-21 18 18 Termination - Power & Control(319-TCR-001)_U319
Earthing and Grouding 17-Mar-21 23-Apr-21 15-Feb-21 29-Mar-21 30 30 23-Apr-21, Earthing and Grouding
CD341EL50215 Cabling - Grounding(319-TCR-001)_U319 17-Mar-21 23-Apr-21 15-Feb-21 29-Mar-21 30 30 Cabling - Grounding(319-TCR-001)_U319
Lighting 20-Apr-21 15-Sep-21 24-Mar-21 21-Aug-21 115 115 15-Sep-21, Lighting
CD341EL60400 Installation of Lighting Fixture System (319-TCR-001)_U319 05-Jun-21 08-Jul-21 30-Apr-21 12-Jun-21 28 28 Installation of Lighting Fixture System (319-TCR-001)_U319
CD341EL60445 Installation - Distribution Panel(319-TCR-001)_U319 03-Aug-21 15-Sep-21 09-Jul-21 21-Aug-21 36 36 Installation - Distribution Panel(319-TCR-001)_U319
CD341EL60465 Lightening work(319-TCR-001)_U319 20-Apr-21 02-Jun-21 24-Mar-21 27-Apr-21 28 28 Lightening work(319-TCR-001)_U319
CD341EL60480 Cabling - Lightening(319-TCR-001)_U319 20-Apr-21 02-Jun-21 24-Mar-21 27-Apr-21 28 28 Cabling - Lightening(319-TCR-001)_U319
CD341EL60580 Cabling Lighting (319-TCR-001)_U319 05-Jun-21 08-Jul-21 30-Apr-21 12-Jun-21 28 28 Cabling Lighting (319-TCR-001)_U319
Communication 28-Aug-21 29-Sep-21 02-Aug-21 04-Sep-21 28 28 29-Sep-21, Communication
CB341EL65005 Installation - Communication System(319-TCR-001)_U319 28-Aug-21 29-Sep-21 02-Aug-21 04-Sep-21 28 28 Installation - Communication System(319-TCR-001)_U319
CB341EL65010 Cabling - Communication(319-TCR-001)_U319 28-Aug-21 29-Sep-21 02-Aug-21 04-Sep-21 28 28 Cabling - Communication(319-TCR-001)_U319
Fire Alarm 13-Aug-21 15-Sep-21 19-Jul-21 21-Aug-21 28 28 15-Sep-21, Fire Alarm
CD341EL68505 Installation - Fire Alarm System(319-TCR-001)_U319 13-Aug-21 15-Sep-21 19-Jul-21 21-Aug-21 28 28 Installation - Fire Alarm System(319-TCR-001)_U319
CD341EL68510 Cabling - Fire Alarm(319-TCR-001)_U319 13-Aug-21 15-Sep-21 19-Jul-21 21-Aug-21 28 28 Cabling - Fire Alarm(319-TCR-001)_U319
Safety & Fire Fighting 25-May-21 28-Jun-21 21-Apr-21 03-Jun-21 28 28 28-Jun-21, Safety & Fire Fighting
Fire Fighting Equipment 25-May-21 28-Jun-21 21-Apr-21 03-Jun-21 28 28 28-Jun-21, Fire Fighting Equipment
CD341SF20105 Installation - F/F Equipment(319-TCR-001)_U319 25-May-21 28-Jun-21 21-Apr-21 03-Jun-21 28 28 Installation - F/F Equipment(319-TCR-001)_U319
341-SS(ISH)-101 (in Unit 331 area) 18-May-19 A 03-Jun-21 10-Jul-19 26-Feb-21 474 339 03-Jun-21, 341-SS(ISH)-101 (in Unit 331 area)

Engineering 18-May-19 A 28-Jul-20 10-Jul-19 04-Jun-20 263 128 28-Jul-20, Engineering


Architectural 05-Jul-19 A 08-Apr-20 03-Sep-19 06-Mar-20 158 52 08-Apr-20, Architectural
Calculation 13-Nov-19 A 12-Mar-20 28-Nov-19 12-Feb-20 40 20 12-Mar-20, Calculation
ED341AR10005A Structural Calculation for Substation (SS-101)_U341 [IFR] 13-Nov-19 A 12-Dec-19 A 28-Nov-19 26-Dec-19 20 0 Structural Calculation for Substation (SS-101)_U341 [IFR]
ED341AR10005B Structural Calculation for Substation (SS-101)_U341 [Review-IFR] 13-Dec-19 A 31-Dec-19 A 27-Dec-19 10-Jan-20 15 0 Structural Calculation for Substation (SS-101)_U341 [Review-IFR]
ED341AR10005G Structural Calculation for Substation (SS-101)_U341 [AFD] 14-Feb-20 12-Mar-20 16-Jan-20 12-Feb-20 20 20 Structural Calculation for Substation (SS-101)_U341 [AFD]
Architecture Basic 05-Jul-19 A 12-Mar-20 03-Sep-19 12-Feb-20 130 33 12-Mar-20, Architecture Basic
ED341AR20005A Foundation/Pile Location Plan(SS-101)_U341 [IFR] 13-Nov-19 A 16-Dec-19 A 14-Oct-19 15-Nov-19 25 0 Foundation/Pile Location Plan(SS-101)_U341 [IFR]
ED341AR20005B Foundation/Pile Location Plan(SS-101)_U341 [Review-IFR] 17-Dec-19 A 21-Jan-20 A 16-Nov-19 30-Nov-19 15 0 Foundation/Pile Location Plan(SS-101)_U341 [Review-IFR]
ED341AR20005G Foundation/Pile Location Plan(SS-101)_U341 [IFC] 27-Jan-20 21-Feb-20 24-Dec-19 22-Jan-20 20 20 Foundation/Pile Location Plan(SS-101)_U341 [IFC]
ED341AR20010A Architectural Basic Drawing(SS-101)_U341 [IFR] 05-Jul-19 A 17-Sep-19 A 03-Sep-19 30-Oct-19 42 0 Architectural Basic Drawing(SS-101)_U341 [IFR]
ED341AR20010B Architectural Basic Drawing(SS-101)_U341 [Review-IFR] 18-Sep-19 A 30-Sep-19 A 31-Oct-19 14-Nov-19 15 0 Architectural Basic Drawing(SS-101)_U341 [Review-IFR]
ED341AR20010G Architectural Basic Drawing(SS-101)_U341 [IFC] 01-Oct-19 A 13-Feb-20 17-Dec-19 15-Jan-20 20 14 Architectural Basic Drawing(SS-101)_U341 [IFC]
ED341AR20015A Structural Basic Drawing(SS-101)_U341 [IFR] 18-Sep-19 A 14-Jan-20 A 31-Oct-19 27-Nov-19 20 0 Structural Basic Drawing(SS-101)_U341 [IFR]
ED341AR20015B Structural Basic Drawing(SS-101)_U341 [Review-IFR] 15-Jan-20 A 24-Jan-20 A 28-Nov-19 12-Dec-19 15 0 Structural Basic Drawing(SS-101)_U341 [Review-IFR]
ED341AR20015G Structural Basic Drawing(SS-101)_U341 [IFC] 14-Feb-20 12-Mar-20 16-Jan-20 12-Feb-20 20 20 Structural Basic Drawing(SS-101)_U341 [IFC]
Architecture Detail - Architectural 15-Aug-19 A 08-Apr-20 31-Oct-19 04-Mar-20 131 52 08-Apr-20, Architecture Detail - Architectural
ED341AR25005A Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [IFR] 15-Aug-19 A 10-Feb-20 31-Oct-19 04-Dec-19 25 11 Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [IFR]
ED341AR25005B Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [Review-IFR] 19-Sep-19 A 19-Feb-20 05-Dec-19 19-Dec-19 15 24 Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [Review-IFR]
ED341AR25005G Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [IFC] 01-Oct-19 A 27-Feb-20 02-Jan-20 29-Jan-20 20 3 Architectural Detail Drawing for Plan & Wall Section(SS-101)_U341 [IFC]
ED341AR25010A Architectural Detail Drawing for Misc(SS-101)_U341 [IFR] 28-Jan-20 24-Feb-20 12-Dec-19 10-Jan-20 20 20 Architectural Detail Drawing for Misc(SS-101)_U341 [IFR]
ED341AR25010B Architectural Detail Drawing for Misc(SS-101)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 11-Jan-20 25-Jan-20 15 15 Architectural Detail Drawing for Misc(SS-101)_U341 [Review-IFR]
ED341AR25010G Architectural Detail Drawing for Misc(SS-101)_U341 [IFC] 11-Mar-20 08-Apr-20 06-Feb-20 04-Mar-20 20 20 Architectural Detail Drawing for Misc(SS-101)_U341 [IFC]
Architecture Detail - Structural 14-Nov-19 A 06-Apr-20 14-Nov-19 06-Mar-20 51 50 06-Apr-20, Architecture Detail - Structural
ED341AR30005A Structural Detail Drawing for Framing(SS-101)_U341 [IFR] 14-Nov-19 A 14-Jan-20 A 14-Nov-19 11-Dec-19 7 0 Structural Detail Drawing for Framing(SS-101)_U341 [IFR]
ED341AR30005B Structural Detail Drawing for Framing(SS-101)_U341 [Review-IFR] 15-Jan-20 A 24-Jan-20 A 12-Dec-19 26-Dec-19 15 0 Structural Detail Drawing for Framing(SS-101)_U341 [Review-IFR]
ED341AR30005G Structural Detail Drawing for Framing(SS-101)_U341 [IFC] 28-Feb-20 27-Mar-20 30-Jan-20 26-Feb-20 20 20 Structural Detail Drawing for Framing(SS-101)_U341 [IFC]
ED341AR30010A Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [IFR] 28-Nov-19 A 14-Jan-20 A 28-Nov-19 26-Dec-19 20 0 Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [IFR]
ED341AR30010B Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [Review-IFR] 15-Jan-20 A 24-Jan-20 A 27-Dec-19 10-Jan-20 15 0 Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [Review-IFR]
ED341AR30010G Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [IFC] 28-Feb-20 27-Mar-20 30-Jan-20 26-Feb-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS-101)_U341 [IFC]
ED341AR30205A Structural Detail Drawing for Misc.(SS-101)_U341 [IFR] 27-Dec-19 A 21-Feb-20 27-Dec-19 24-Jan-20 20 20 Structural Detail Drawing for Misc.(SS-101)_U341 [IFR]
ED341AR30205B Structural Detail Drawing for Misc.(SS-101)_U341 [Review/Appr.-IFR] 15-Jan-20 A 07-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for Misc.(SS-101)_U341 [Review/Appr.-IFR]
ED341AR30205G Structural Detail Drawing for Misc.(SS-101)_U341 [IFC] 09-Mar-20 06-Apr-20 10-Feb-20 06-Mar-20 20 20 Structural Detail Drawing for Misc.(SS-101)_U341 [IFC]
HVAC 18-May-19 A 28-Apr-20 31-Oct-19 04-Jun-20 136 65 28-Apr-20, HVAC
HVAC & Control System 18-May-19 A 28-Apr-20 31-Oct-19 04-Jun-20 100 65 28-Apr-20, HVAC & Control System
ED341HV10010A HVAC System(SS-101)_U341 [IFR] 18-May-19 A 16-Sep-19 A 31-Oct-19 04-Dec-19 25 0 HVAC System(SS-101)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 9 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341HV10010B HVAC System(SS-101)_U341 [Review-IFR] 17-Sep-19 A 09-Feb-20 05-Dec-19 19-Dec-19 15 15 HVAC System(SS-101)_U341 [Review-IFR]
ED341HV10010G HVAC System(SS-101)_U341 [IFC] 07-Oct-19 A 18-Feb-20 16-Jan-20 26-Feb-20 30 3 HVAC System(SS-101)_U341 [IFC]
ED341HV10015A Control System(SS-101)_U341 [IFR] 18-May-19 A 29-Jan-20 13-Jan-20 14-Feb-20 25 3 Control System(SS-101)_U341 [IFR]
ED341HV10015B Control System(SS-101)_U341 [Review-IFR] 17-Sep-19 A 29-Feb-20 15-Feb-20 29-Feb-20 15 34 Control System(SS-101)_U341 [Review-IFR]
ED341HV10015G Control System(SS-101)_U341 [IFC] 07-Oct-19 A 28-Apr-20 13-Apr-20 04-Jun-20 30 24 Control System(SS-101)_U341 [IFC]
Plumbing 18-May-19 A 23-Mar-20 31-Oct-19 09-Apr-20 136 27 23-Mar-20, Plumbing
ED341HV15005A Duct & Piping(SS-101)_U341 [IFR] 18-May-19 A 16-Sep-19 A 05-Dec-19 10-Jan-20 25 0 Duct & Piping(SS-101)_U341 [IFR]
ED341HV15005B Duct & Piping(SS-101)_U341 [Review-IFR] 17-Sep-19 A 04-Oct-19 A 11-Jan-20 25-Jan-20 15 0 Duct & Piping(SS-101)_U341 [Review-IFR]
ED341HV15005G Duct & Piping(SS-101)_U341 [IFC] 04-Oct-19 A 23-Mar-20 27-Feb-20 09-Apr-20 30 24 Duct & Piping(SS-101)_U341 [IFC]
ED341HV15010A Plumbing(SS-101)_U341 [IFR] 18-May-19 A 16-Sep-19 A 31-Oct-19 04-Dec-19 25 0 Plumbing(SS-101)_U341 [IFR]
ED341HV15010B Plumbing(SS-101)_U341 [Review-IFR] 17-Sep-19 A 04-Oct-19 A 05-Dec-19 19-Dec-19 15 0 Plumbing(SS-101)_U341 [Review-IFR]
ED341HV15010G Plumbing(SS-101)_U341 [IFC] 04-Oct-19 A 18-Feb-20 16-Jan-20 26-Feb-20 30 3 Plumbing(SS-101)_U341 [IFC]
Electrical 03-Oct-19 A 28-Jul-20 03-Oct-19 28-Apr-20 169 128 28-Jul-20, Electrical
Power & Control 10-Oct-19 A 14-Jul-20 10-Oct-19 14-Apr-20 159 118 14-Jul-20, Power & Control
ED341EL45001A Electrical Cable Route Layout(SS-101_OC4)_U341 [IFR] 10-Oct-19 A 12-Feb-20 10-Oct-19 13-Nov-19 25 13 Electrical Cable Route Layout(SS-101_OC4)_U341 [IFR]
ED341EL45001B Electrical Cable Route Layout(SS-101_OC4)_U341 [Review-IFR] 13-Feb-20 27-Feb-20 14-Nov-19 28-Nov-19 15 15 Electrical Cable Route Layout(SS-101_OC4)_U341 [Review-IFR]
ED341EL45001G Electrical Cable Route Layout(SS-101_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS-101_OC4)_U341 [IFC]
ED341EL45004A Power Layout(SS-101_OC4)_U341 [IFR] 03-Feb-20 11-Mar-20 07-Nov-19 11-Dec-19 28 28 Power Layout(SS-101_OC4)_U341 [IFR]
ED341EL45004B Power Layout(SS-101_OC4)_U341 [Review-IFR] 12-Mar-20 26-Mar-20 12-Dec-19 26-Dec-19 15 15 Power Layout(SS-101_OC4)_U341 [Review-IFR]
ED341EL45004G Power Layout(SS-101_OC4)_U341 [IFC] 17-Jun-20 14-Jul-20 16-Mar-20 14-Apr-20 20 20 Power Layout(SS-101_OC4)_U341 [IFC]
Earthing and Grouding 03-Oct-19 A 12-Mar-20 03-Oct-19 12-Feb-20 74 20 12-Mar-20, Earthing and Grouding
ED341EL50005A Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [IFR] 03-Oct-19 A 10-Dec-19 A 03-Oct-19 27-Nov-19 40 0 Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [IFR]
ED341EL50005B Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 28-Nov-19 12-Dec-19 15 0 Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [Review-IFR]
ED341EL50005G Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [IFC] 14-Feb-20 12-Mar-20 16-Jan-20 12-Feb-20 20 20 Earthing and Lightning Protection Layout(SS-101_OC4)_U341 [IFC]
Lighting 14-Nov-19 A 28-Jul-20 14-Nov-19 28-Apr-20 116 30 28-Jul-20, Lighting
ED341EL60001A Lighting and Small Power Layout(SS-101)_U341 [IFR] 14-Nov-19 A 09-Jan-20 A 14-Nov-19 26-Dec-19 30 0 Lighting and Small Power Layout(SS-101)_U341 [IFR]
ED341EL60001B Lighting and Small Power Layout(SS-101)_U341 [Review-IFR] 10-Jan-20 A 22-Jan-20 A 27-Dec-19 10-Jan-20 15 0 Lighting and Small Power Layout(SS-101)_U341 [Review-IFR]
ED341EL60001G Lighting and Small Power Layout(SS-101)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Lighting and Small Power Layout(SS-101)_U341 [IFC]
Communication 19-Nov-19 A 06-Apr-20 19-Nov-19 27-Mar-20 53 50 06-Apr-20, Communication
ED341EL65011A Telecom/Security/PAGA System Layout(SS-101)_U341 [IFR] 19-Nov-19 A 10-Dec-19 A 19-Nov-19 22-Jan-20 45 0 Telecom/Security/PAGA System Layout(SS-101)_U341 [IFR]
ED341EL65011B Telecom/Security/PAGA System Layout(SS-101)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 23-Jan-20 06-Feb-20 15 0 Telecom/Security/PAGA System Layout(SS-101)_U341 [Approved-IFR]
ED341EL65011G Telecom/Security/PAGA System Layout(SS-101)_U341 [IFC] 24-Dec-19 A 06-Apr-20 07-Feb-20 27-Mar-20 35 50 Telecom/Security/PAGA System Layout(SS-101)_U341 [IFC]
Fire Alarm 19-Nov-19 A 12-May-20 19-Nov-19 05-Mar-20 93 36 12-May-20, Fire Alarm
ED341EL68105A Fire Alarm Layout(SS-101)_U341 [IFR] 19-Nov-19 A 17-Jan-20 A 19-Nov-19 15-Jan-20 40 0 Fire Alarm Layout(SS-101)_U341 [IFR]
ED341EL68105B Fire Alarm Layout(SS-101)_U341 [Review/Appr.-IFR] 18-Jan-20 A 02-Apr-20 16-Jan-20 30-Jan-20 15 15 Fire Alarm Layout(SS-101)_U341 [Review/Appr.-IFR]
ED341EL68105G Fire Alarm Layout(SS-101)_U341 [IFC] 03-Apr-20 12-May-20 31-Jan-20 05-Mar-20 25 25 Fire Alarm Layout(SS-101)_U341 [IFC]
Safety & Fire Fighting 10-Jul-19 A 28-Jul-20 10-Jul-19 14-May-20 263 128 28-Jul-20, Safety & Fire Fighting
Fire Fighting Drawing 10-Jul-19 A 02-Jun-20 10-Jul-19 12-Feb-20 223 88 02-Jun-20, Fire Fighting Drawing
ED341SF25021A P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFR] 10-Jul-19 A 14-Feb-20 10-Jul-19 28-Aug-19 35 15 P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFR]
ED341SF25021B P&ID and Piping Scheme for F/F System(SS-101)_U341 [Approved-IFR] 17-Sep-19 A 24-Feb-20 29-Aug-19 12-Sep-19 15 29 P&ID and Piping Scheme for F/F System(SS-101)_U341 [Approved-IFR]
ED341SF25021E P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFD] 18-Dec-19 A 23-Mar-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFD]
ED341SF25021F P&ID and Piping Scheme for F/F System(SS-101)_U341 [Approved-IFD] 24-Mar-20 07-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS-101)_U341 [Approved-IFD]
ED341SF25021G P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFC] 08-Apr-20 08-May-20 02-Jan-20 29-Jan-20 20 20 P&ID and Piping Scheme for F/F System(SS-101)_U341 [IFC]
ED341SF30007A Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [IFR] 18-Sep-19 A 03-Oct-19 A 31-Oct-19 11-Dec-19 30 0 Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [IFR]
ED341SF30007B Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [Review/Appr.-IFR]
04-Oct-19 A 31-Dec-19 A 12-Dec-19 26-Dec-19 15 0 Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [Review/Appr.-IFR]
ED341SF30007G Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [AFD] 23-Apr-20 02-Jun-20 16-Jan-20 12-Feb-20 20 20 Fire & Safety Equipment Location Plan-Main Utilities Substation(341-SS-101)_U341 [AFD]
F&G Detection System 29-Aug-19 A 28-Jul-20 29-Aug-19 14-May-20 169 128 28-Jul-20, F&G Detection System
ED341SF30005A Fire and Gas Detection System Cause & Effect for Substation_U341 [IFR] 31-Oct-19 A 04-Feb-20 31-Oct-19 04-Dec-19 25 7 Fire and Gas Detection System Cause & Effect for Substation_U341 [IFR]
ED341SF30005B Fire and Gas Detection System Cause & Effect for Substation_U341 [Review-IFR] 05-Feb-20 19-Feb-20 05-Dec-19 19-Dec-19 15 15 Fire and Gas Detection System Cause & Effect for Substation_U341 [Review-IFR]
ED341SF30005G Fire and Gas Detection System Cause & Effect for Substation_U341 [AFD] 17-Jun-20 28-Jul-20 31-Mar-20 14-May-20 30 30 Fire and Gas Detection System Cause & Effect for Substation_U341 [AFD]
ED341SF30022A F&G Detection System Location Plan(SS-101)_U341 [IFR] [Deleted] 29-Aug-19 A 09-Oct-19 A 29-Aug-19 09-Oct-19 30 0 F&G Detection System Location Plan(SS-101)_U341 [IFR] [Deleted]
ED341SF30022B F&G Detection System Location Plan(SS-101)_U341 [Approved-IFR] [Deleted] 10-Oct-19 A 24-Oct-19 A 10-Oct-19 23-Oct-19 14 0 F&G Detection System Location Plan(SS-101)_U341 [Approved-IFR] [Deleted]
ED341SF30022G F&G Detection System Location Plan(SS-101)_U341 [IFD] [Deleted] 24-Oct-19 A 20-Nov-19 A 24-Oct-19 20-Nov-19 20 0 F&G Detection System Location Plan(SS-101)_U341 [IFD] [Deleted]
Construction 13-Dec-19 A 03-Jun-21 28-Jan-20 26-Feb-21 384 363 03-Jun-21, Construction
Civil 13-Dec-19 A 02-Oct-20 28-Jan-20 14-Jul-20 212 191 02-Oct-20, Civil
Piling 13-Dec-19 A 03-Aug-20 28-Jan-20 06-May-20 162 141 03-Aug-20, Piling
CD331CV30005A Stone Column(SS-111)_U331 [Added] 13-Dec-19 A 30-Apr-20 75 71 Stone Column(SS-111)_U331 [Added]
CD341CV30050 Piling Work(SS-101)_U331 27-Apr-20 03-Aug-20 28-Jan-20 06-May-20 74 74 Piling Work(SS-101)_U331
Foundation - Equipment 14-Jul-20 02-Oct-20 16-Apr-20 14-Jul-20 67 67 02-Oct-20, Foundation - Equipment
CD341CV55020 Equipment Foundation(SS-101)_U341 14-Jul-20 02-Oct-20 16-Apr-20 14-Jul-20 67 67 Equipment Foundation(SS-101)_U341
Architectural 24-Jun-20 03-Jun-21 24-Mar-20 26-Feb-21 256 256 03-Jun-21, Architectural
Building Foundation 24-Jun-20 16-Nov-20 24-Mar-20 27-Aug-20 119 119 16-Nov-20, Building Foundation
CD341AR35005 Building Foundation(SS-101)_U341 24-Jun-20 04-Sep-20 24-Mar-20 16-Jun-20 60 60 Building Foundation(SS-101)_U341
CD341AR35010 Ground Slab(SS-101)_U341 03-Oct-20 19-Oct-20 15-Jul-20 30-Jul-20 14 14 Ground Slab(SS-101)_U341
CD341AR35905 Tranformer yard(SS-101)_U341 20-Oct-20 16-Nov-20 01-Aug-20 27-Aug-20 21 21 Tranformer yard(SS-101)_U341
Building Structure 20-Oct-20 23-Mar-21 01-Aug-20 15-Dec-20 108 108 23-Mar-21, Building Structure
CD341AR40005 Column/Beam/Girder - Ground Level(SS-101)_U341 20-Oct-20 19-Nov-20 01-Aug-20 31-Aug-20 24 24 Column/Beam/Girder - Ground Level(SS-101)_U341
CD341AR40010 1st Floor Slab(SS-101)_U341 20-Nov-20 12-Jan-21 01-Sep-20 12-Oct-20 36 36 1st Floor Slab(SS-101)_U341
CD341AR40015 Column/Beam/Girder - 1st Floor(SS-101)_U341 13-Jan-21 16-Feb-21 13-Oct-20 11-Nov-20 24 24 Column/Beam/Girder - 1st Floor(SS-101)_U341
CD341AR40020 Roof Slab(SS-101)_U341 17-Feb-21 23-Mar-21 12-Nov-20 15-Dec-20 24 24 Roof Slab(SS-101)_U341
Building Finishing 13-Jan-21 03-Jun-21 13-Oct-20 26-Feb-21 98 98 03-Jun-21, Building Finishing
CD341AR45010 Masonry&Plastering(SS-101)_U341 13-Jan-21 18-Mar-21 13-Oct-20 10-Dec-20 45 45 Masonry&Plastering(SS-101)_U341
CD341AR45015 Water Proofing(SS-101)_U341 24-Mar-21 07-May-21 16-Dec-20 05-Feb-21 36 36 Water Proofing(SS-101)_U341
CD341AR45020 Door & Window(SS-101)_U341 23-Apr-21 25-May-21 21-Jan-21 18-Feb-21 20 20 Door & Window(SS-101)_U341
CD341AR45025 Painting-Internal(SS-101)_U341 09-Mar-21 15-Apr-21 02-Dec-20 12-Jan-21 28 28 Painting-Internal(SS-101)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 10 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341AR45030 Interior Finishing(SS-101)_U341 26-Mar-21 10-May-21 18-Dec-20 09-Feb-21 36 36 Interior Finishing(SS-101)_U341
CD341AR45205 Exterior Finishing(SS-101)_U341 19-Apr-21 03-Jun-21 15-Jan-21 26-Feb-21 30 30 Exterior Finishing(SS-101)_U341
HVAC 19-Mar-21 02-Jun-21 11-Dec-20 25-Feb-21 52 52 02-Jun-21, HVAC
HVAC & Control System 06-Apr-21 04-May-21 30-Dec-20 02-Feb-21 24 24 04-May-21, HVAC & Control System
CD341HV10040 HVAC Equipment Installation(SS-101)_U341 06-Apr-21 04-May-21 30-Dec-20 02-Feb-21 24 24 HVAC Equipment Installation(SS-101)_U341
Plumbing 19-Mar-21 02-Jun-21 11-Dec-20 25-Feb-21 52 52 02-Jun-21, Plumbing
CD341HV15035 HVAC Duct Erection(SS-101)_U341 19-Mar-21 15-Apr-21 11-Dec-20 12-Jan-21 21 21 HVAC Duct Erection(SS-101)_U341
CD341HV15040 HVAC Piping work(SS-101)_U341 28-Apr-21 02-Jun-21 27-Jan-21 25-Feb-21 21 21 HVAC Piping work(SS-101)_U341
CD341HV15045 Plumbing&Sanitary(SS-101)_U341 28-Apr-21 02-Jun-21 27-Jan-21 25-Feb-21 21 21 Plumbing&Sanitary(SS-101)_U341
Electrical 05-Sep-20 02-Jun-21 17-Jun-20 26-Feb-21 195 195 02-Jun-21, Electrical
Cable Race Way 19-Mar-21 11-May-21 11-Dec-20 10-Feb-21 42 42 11-May-21, Cable Race Way
CD341EL45040 Electrical Cable Tray Installation(SS-101)_U341 19-Mar-21 04-May-21 11-Dec-20 02-Feb-21 36 36 Electrical Cable Tray Installation(SS-101)_U341
CD341EL45165- Electrical Conduit Pipe(SS-101)_U341 16-Apr-21 11-May-21 13-Jan-21 10-Feb-21 21 21 Electrical Conduit Pipe(SS-101)_U341
Power & Control 13-Apr-21 31-May-21 08-Jan-21 24-Feb-21 33 33 31-May-21, Power & Control
CD341EL45155- Termination - Power & Control(SS-101)_U341 06-May-21 31-May-21 04-Feb-21 24-Feb-21 14 14 Termination - Power & Control(SS-101)_U341
CD341EL45160- Power & Control Cable Pulling (SS-101)_U341 13-Apr-21 27-May-21 08-Jan-21 19-Feb-21 30 30 Power & Control Cable Pulling (SS-101)_U341
Earthing and Grouding 05-Sep-20 16-Oct-20 17-Jun-20 28-Jul-20 36 36 16-Oct-20, Earthing and Grouding
CD341EL50035 Cabling - Grounding(SS-101)_U341 05-Sep-20 16-Oct-20 17-Jun-20 28-Jul-20 36 36 Cabling - Grounding(SS-101)_U341
Lighting 29-Mar-21 02-Jun-21 21-Dec-20 25-Feb-21 46 46 02-Jun-21, Lighting
CD341EL60045 Installation - Distribution Panel(SS-101)_U341 29-Mar-21 11-May-21 21-Dec-20 10-Feb-21 36 36 Installation - Distribution Panel(SS-101)_U341
CD341EL60145 Cabling - Lightening(SS-101)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Cabling - Lightening(SS-101)_U341
CD341EL60150 Lightening work(SS-101)_U341 20-Apr-21 02-Jun-21 18-Jan-21 25-Feb-21 28 28 Lightening work(SS-101)_U341
CD341EL60330 Installation of Lighting Fixture System (SS-101)_U341 15-Apr-21 27-May-21 12-Jan-21 19-Feb-21 28 28 Installation of Lighting Fixture System (SS-101)_U341
CD341EL60500 Cabling Lighting (SS(ISH)-101)_U341 15-Apr-21 27-May-21 12-Jan-21 19-Feb-21 28 28 Cabling Lighting (SS(ISH)-101)_U341
Communication 05-Apr-21 10-May-21 15-Jan-21 26-Feb-21 30 30 10-May-21, Communication
CD341EL65020 Installation - Communication System(SS-101)_U341 05-Apr-21 10-May-21 15-Jan-21 26-Feb-21 30 30 Installation - Communication System(SS-101)_U341
CD341EL65205 Cabling - Communication(SS-101)_U341 05-Apr-21 10-May-21 15-Jan-21 26-Feb-21 30 30 Cabling - Communication(SS-101)_U341
Fire Alarm 14-Apr-21 25-May-21 11-Jan-21 18-Feb-21 28 28 25-May-21, Fire Alarm
CD341EL68020 Installation - Fire Alarm System(SS-101)_U341 14-Apr-21 25-May-21 11-Jan-21 18-Feb-21 28 28 Installation - Fire Alarm System(SS-101)_U341
CD341EL68265 Cabling - Fire Alarm(SS-101)_U341 14-Apr-21 25-May-21 11-Jan-21 18-Feb-21 28 28 Cabling - Fire Alarm(SS-101)_U341
Safety & Fire Fighting 07-Apr-21 10-May-21 31-Dec-20 09-Feb-21 28 28 10-May-21, Safety & Fire Fighting
Fire Fighting Equipment 07-Apr-21 10-May-21 31-Dec-20 09-Feb-21 28 28 10-May-21, Fire Fighting Equipment
CD341MS40030 Installation - F/F Equipment(SS-101)_U341 07-Apr-21 10-May-21 31-Dec-20 09-Feb-21 28 28 Installation - F/F Equipment(SS-101)_U341
341-SS(ISH)-102 (in Unit 337 area) 24-Jul-19 A 27-May-21 24-Jul-19 26-Apr-21 459 334 27-May-21, 341-SS(ISH)-102 (in Unit 337 area)

Engineering 24-Jul-19 A 28-Aug-20 24-Jul-19 29-Jun-20 276 151 28-Aug-20, Engineering


Architectural 12-Aug-19 A 03-Jun-20 31-Oct-19 14-Apr-20 151 89 03-Jun-20, Architectural
Calculation 25-Feb-20 30-Apr-20 20-Jan-20 20-Mar-20 46 46 30-Apr-20, Calculation
ED341AR10010A Structural Calculation for Substation(341-SS&ISH-102)_U341 [IFR] 25-Feb-20 23-Mar-20 20-Jan-20 14-Feb-20 20 20 Structural Calculation for Substation(341-SS&ISH-102)_U341 [IFR]
ED341AR10010B Structural Calculation for Substation(341-SS&ISH-102)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 15-Feb-20 29-Feb-20 15 15 Structural Calculation for Substation(341-SS&ISH-102)_U341 [Review-IFR]
ED341AR10010G Structural Calculation for Substation(341-SS&ISH-102)_U341 [AFD] 09-Apr-20 30-Apr-20 02-Mar-20 20-Mar-20 15 15 Structural Calculation for Substation(341-SS&ISH-102)_U341 [AFD]
Architecture Basic 12-Aug-19 A 08-Apr-20 31-Oct-19 28-Feb-20 114 52 08-Apr-20, Architecture Basic
ED341AR20020A Architectural Basic Drawing(SS&ISH-102)_U341 [IFR] 12-Aug-19 A 27-Jan-20 31-Oct-19 18-Dec-19 35 1 Architectural Basic Drawing(SS&ISH-102)_U341 [IFR]
ED341AR20020B Architectural Basic Drawing(SS&ISH-102)_U341 [Review-IFR] 30-Oct-19 A 10-Feb-20 19-Dec-19 02-Jan-20 15 15 Architectural Basic Drawing(SS&ISH-102)_U341 [Review-IFR]
ED341AR20020G Architectural Basic Drawing(SS&ISH-102)_U341 [IFC] 11-Feb-20 09-Mar-20 03-Jan-20 30-Jan-20 20 20 Architectural Basic Drawing(SS&ISH-102)_U341 [IFC]
ED341AR20025A Foundation/Pile Location Plan(SS&ISH-102)_U341 [IFR] 27-Jan-20 21-Feb-20 05-Dec-19 03-Jan-20 20 20 Foundation/Pile Location Plan(SS&ISH-102)_U341 [IFR]
ED341AR20025B Foundation/Pile Location Plan(SS&ISH-102)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 04-Jan-20 18-Jan-20 15 15 Foundation/Pile Location Plan(SS&ISH-102)_U341 [Review-IFR]
ED341AR20025G Foundation/Pile Location Plan(SS&ISH-102)_U341 [IFC] 09-Mar-20 06-Apr-20 20-Jan-20 14-Feb-20 20 20 Foundation/Pile Location Plan(SS&ISH-102)_U341 [IFC]
ED341AR20030A Structural Basic Drawing(SS&ISH-102)_U341 [IFR] 28-Jan-20 24-Feb-20 19-Dec-19 17-Jan-20 20 20 Structural Basic Drawing(SS&ISH-102)_U341 [IFR]
ED341AR20030B Structural Basic Drawing(SS&ISH-102)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 18-Jan-20 01-Feb-20 15 15 Structural Basic Drawing(SS&ISH-102)_U341 [Review-IFR]
ED341AR20030G Structural Basic Drawing(SS&ISH-102)_U341 [IFC] 11-Mar-20 08-Apr-20 03-Feb-20 28-Feb-20 20 20 Structural Basic Drawing(SS&ISH-102)_U341 [IFC]
Architecture Detail - Architectural 12-Sep-19 A 03-Jun-20 12-Dec-19 14-Apr-20 121 89 03-Jun-20, Architecture Detail - Architectural
ED341AR25015A Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [IFR] 12-Sep-19 A 24-Feb-20 12-Dec-19 17-Jan-20 25 21 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [IFR]
ED341AR25015B Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [Review-IFR] 30-Oct-19 A 09-Mar-20 18-Jan-20 01-Feb-20 15 44 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [Review-IFR]
ED341AR25015G Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [IFC] 10-Mar-20 07-Apr-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-102)_U341 [IFC]
ED341AR25020A Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [IFR] 10-Mar-20 07-Apr-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [IFR]
ED341AR25020B Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [Review-IFR] 08-Apr-20 22-Apr-20 29-Feb-20 14-Mar-20 15 15 Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [Review-IFR]
ED341AR25020G Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [IFC] 04-May-20 03-Jun-20 23-Mar-20 14-Apr-20 15 15 Architectural Detail Drawing for Misc(SS&ISH-102)_U341 [IFC]
Architecture Detail - Structural 11-Feb-20 03-Jun-20 06-Jan-20 14-Apr-20 79 79 03-Jun-20, Architecture Detail - Structural
ED341AR30015A Structural Detail Drawing for Framing(SS&ISH-102)_U341 [IFR] 11-Feb-20 09-Mar-20 06-Jan-20 31-Jan-20 20 20 Structural Detail Drawing for Framing(SS&ISH-102)_U341 [IFR]
ED341AR30015B Structural Detail Drawing for Framing(SS&ISH-102)_U341 [Review-IFR] 10-Mar-20 24-Mar-20 01-Feb-20 15-Feb-20 15 15 Structural Detail Drawing for Framing(SS&ISH-102)_U341 [Review-IFR]
ED341AR30015G Structural Detail Drawing for Framing(SS&ISH-102)_U341 [IFC] 26-Mar-20 23-Apr-20 17-Feb-20 13-Mar-20 20 20 Structural Detail Drawing for Framing(SS&ISH-102)_U341 [IFC]
ED341AR30020A Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [IFR] 25-Feb-20 23-Mar-20 20-Jan-20 14-Feb-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [IFR]
ED341AR30020B Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 15-Feb-20 29-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [Review-IFR]
ED341AR30020G Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [IFC] 17-Apr-20 11-May-20 09-Mar-20 30-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-102)_U341 [IFC]
ED341AR30215A Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [IFR] 10-Mar-20 07-Apr-20 03-Feb-20 28-Feb-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [IFR]
ED341AR30215B Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [Review/Appr.-IFR] 08-Apr-20 22-Apr-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [Review/Appr.-IFR]
ED341AR30215G Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [IFC] 24-Apr-20 03-Jun-20 16-Mar-20 14-Apr-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-102)_U341 [IFC]
HVAC 26-Aug-19 A 17-Apr-20 19-Dec-19 29-Jun-20 113 58 17-Apr-20, HVAC
HVAC & Control System 26-Aug-19 A 17-Apr-20 19-Dec-19 29-Jun-20 113 28 17-Apr-20, HVAC & Control System
ED341HV10025A HVAC System(SS-102)_U341 [IFR] 26-Aug-19 A 01-Oct-19 A 19-Dec-19 24-Jan-20 25 0 HVAC System(SS-102)_U341 [IFR]
ED341HV10025B HVAC System(SS-102)_U341 [Review-IFR] 02-Oct-19 A 04-Nov-19 A 25-Jan-20 08-Feb-20 15 0 HVAC System(SS-102)_U341 [Review-IFR]
ED341HV10025G HVAC System(SS-102)_U341 [IFC] 05-Nov-19 A 20-Mar-20 10-Feb-20 20-Mar-20 30 9 HVAC System(SS-102)_U341 [IFC]
ED341HV10030A Control System(SS&ISH-102)_U341 [IFR] 26-Aug-19 A 01-Oct-19 A 02-Mar-20 06-Apr-20 25 0 Control System(SS&ISH-102)_U341 [IFR]
ED341HV10030B Control System(SS&ISH-102)_U341 [Review-IFR] 02-Oct-19 A 04-Nov-19 A 07-Apr-20 21-Apr-20 15 0 Control System(SS&ISH-102)_U341 [Review-IFR]
ED341HV10030G Control System(SS&ISH-102)_U341 [IFC] 05-Nov-19 A 17-Apr-20 08-May-20 29-Jun-20 30 9 Control System(SS&ISH-102)_U341 [IFC]

Actual Level of Effort Actual Work Critical Remaining Work Page 11 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Plumbing 26-Aug-19 A 03-Apr-20 19-Dec-19 06-May-20 63 49 03-Apr-20, Plumbing
ED341HV15015A Duct & Piping(SS&ISH-102)_U341 [IFR] 26-Aug-19 A 31-Jan-20 27-Jan-20 28-Feb-20 25 5 Duct & Piping(SS&ISH-102)_U341 [IFR]
ED341HV15015B Duct & Piping(SS&ISH-102)_U341 [Review-IFR] 02-Oct-19 A 17-Feb-20 29-Feb-20 14-Mar-20 15 22 Duct & Piping(SS&ISH-102)_U341 [Review-IFR]
ED341HV15015G Duct & Piping(SS&ISH-102)_U341 [IFC] 05-Nov-19 A 03-Apr-20 23-Mar-20 06-May-20 30 9 Duct & Piping(SS&ISH-102)_U341 [IFC]
ED341HV15020A Plumbing(SS&ISH-102)_U341 [IFR] 26-Aug-19 A 01-Oct-19 A 19-Dec-19 24-Jan-20 25 0 Plumbing(SS&ISH-102)_U341 [IFR]
ED341HV15020B Plumbing(SS&ISH-102)_U341 [Review-IFR] 02-Oct-19 A 05-Nov-19 A 25-Jan-20 08-Feb-20 15 0 Plumbing(SS&ISH-102)_U341 [Review-IFR]
ED341HV15020G Plumbing(SS&ISH-102)_U341 [IFC] 06-Nov-19 A 20-Mar-20 10-Feb-20 20-Mar-20 30 9 Plumbing(SS&ISH-102)_U341 [IFC]
Electrical 13-Oct-19 A 28-Aug-20 21-Nov-19 08-Jun-20 192 151 28-Aug-20, Electrical
Power & Control 12-Dec-19 A 28-Jul-20 12-Dec-19 28-Apr-20 148 128 28-Jul-20, Power & Control
ED341EL45002A Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [IFR] 12-Dec-19 A 24-Feb-20 12-Dec-19 17-Jan-20 25 21 Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [IFR]
ED341EL45002B Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 18-Jan-20 01-Feb-20 15 15 Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [Review-IFR]
ED341EL45002G Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS&ISH-102_OC4)_U341 [IFC]
ED341EL45025A Power Layout(SS&ISH-102_OC4)_U341 [IFR] 18-Feb-20 23-Mar-20 13-Jan-20 14-Feb-20 25 25 Power Layout(SS&ISH-102_OC4)_U341 [IFR]
ED341EL45025B Power Layout(SS&ISH-102_OC4)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 15-Feb-20 29-Feb-20 15 15 Power Layout(SS&ISH-102_OC4)_U341 [Review-IFR]
ED341EL45025G Power Layout(SS&ISH-102_OC4)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Power Layout(SS&ISH-102_OC4)_U341 [IFC]
Earthing and Grouding 21-Nov-19 A 07-Apr-20 21-Nov-19 28-Feb-20 92 21 07-Apr-20, Earthing and Grouding
ED341EL50010A Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [IFR] 21-Nov-19 A 10-Dec-19 A 21-Nov-19 17-Jan-20 40 0 Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [IFR]
ED341EL50010B Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 18-Jan-20 01-Feb-20 15 0 Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [Review-IFR]
ED341EL50010G Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [IFC] 10-Mar-20 07-Apr-20 03-Feb-20 28-Feb-20 20 20 Earthing and Lightning Protection Layout(SS&ISH-102_OC4)_U341 [IFC]
Lighting 10-Mar-20 28-Aug-20 03-Feb-20 08-Jun-20 121 121 28-Aug-20, Lighting
ED341EL60002A Lighting and Small Power Layout(SS&ISH-102)_U341 [IFR] 10-Mar-20 22-Apr-20 03-Feb-20 13-Mar-20 30 30 Lighting and Small Power Layout(SS&ISH-102)_U341 [IFR]
ED341EL60002B Lighting and Small Power Layout(SS&ISH-102)_U341 [Review-IFR] 23-Apr-20 07-May-20 14-Mar-20 28-Mar-20 15 15 Lighting and Small Power Layout(SS&ISH-102)_U341 [Review-IFR]
ED341EL60002G Lighting and Small Power Layout(SS&ISH-102)_U341 [IFC] 15-Jul-20 28-Aug-20 15-Apr-20 08-Jun-20 30 30 Lighting and Small Power Layout(SS&ISH-102)_U341 [IFC]
Communication 13-Oct-19 A 28-Jul-20 12-Dec-19 14-May-20 53 88 28-Jul-20, Communication
ED341EL65016A Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [IFR] 13-Oct-19 A 10-Dec-19 A 12-Dec-19 14-Feb-20 45 0 Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [IFR]
ED341EL65016B Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 15-Feb-20 29-Feb-20 15 0 Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [Approved-IFR]
ED341EL65016G Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [IFC] 24-Dec-19 A 28-Jul-20 02-Mar-20 14-May-20 50 80 Telecom/Security/PAGA System Layout(SS&ISH-102)_U341 [IFC]
Fire Alarm 12-Dec-19 A 28-Jul-20 06-Jan-20 28-Apr-20 137 30 28-Jul-20, Fire Alarm
ED341EL68010A Fire Alarm Layout(SS&ISH-102)_U341 [IFR] 12-Dec-19 A 08-Jan-20 A 06-Jan-20 14-Feb-20 30 0 Fire Alarm Layout(SS&ISH-102)_U341 [IFR]
ED341EL68010B Fire Alarm Layout(SS&ISH-102)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 15-Feb-20 29-Feb-20 15 0 Fire Alarm Layout(SS&ISH-102)_U341 [Review-IFR]
ED341EL68010G Fire Alarm Layout(SS&ISH-102)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Fire Alarm Layout(SS&ISH-102)_U341 [IFC]
Safety & Fire Fighting 24-Jul-19 A 30-Apr-20 24-Jul-19 13-Mar-20 191 66 30-Apr-20, Safety & Fire Fighting
Fire Fighting Drawing 24-Jul-19 A 30-Apr-20 24-Jul-19 13-Mar-20 191 66 30-Apr-20, Fire Fighting Drawing
ED341SF25031A P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFR] 24-Jul-19 A 06-Feb-20 24-Jul-19 04-Sep-19 30 9 P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFR]
ED341SF25031B P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [Review/Appr.-IFR] 17-Sep-19 A 23-Feb-20 05-Sep-19 19-Sep-19 15 28 P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [Review/Appr.-IFR]
ED341SF25031E P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFD] 09-Dec-19 A 17-Mar-20 14-Oct-19 08-Nov-19 20 17 P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFD]
ED341SF25031F P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [Approved-IFD] 18-Mar-20 01-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [Approved-IFD]
ED341SF25031G P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFC] 02-Apr-20 30-Apr-20 17-Jan-20 13-Feb-20 20 20 P&ID and Piping Scheme for F/F System(SS&ISH-102)_U341 [IFC]
ED341SF30015A Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [IFR] 12-Aug-19 A 03-Oct-19 A 19-Dec-19 31-Jan-20 30 0 Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [IFR]
ED341SF30015B Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [Review/Appr.-IFR]
04-Oct-19 A 31-Dec-19 A 01-Feb-20 15-Feb-20 15 0 Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [Review/Appr.-IFR]
ED341SF30015G Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [AFD]02-Apr-20 30-Apr-20 17-Feb-20 13-Mar-20 20 20 Fire & Safety Equipment Location Plan-Water Treatment Substation (341-SS-102)_U341 [AFD]
F&G Detection System 05-Sep-19 A 27-Nov-19 A 05-Sep-19 27-Nov-19 42 0 27-Nov-19 A, F&G Detection System
ED341SF30032A F&G Detection System Location Plan(SS&ISH-102)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(SS&ISH-102)_U341 [IFR] [Deleted]
ED341SF30032B F&G Detection System Location Plan(SS&ISH-102)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(SS&ISH-102)_U341 [Approved-IFR] [Deleted]
ED341SF30032G F&G Detection System Location Plan(SS&ISH-102)_U341 [IFD] [Deleted] 01-Nov-19 A 27-Nov-19 A 31-Oct-19 27-Nov-19 19 0 F&G Detection System Location Plan(SS&ISH-102)_U341 [IFD] [Deleted]
Construction 07-Jul-20 27-May-21 16-Jun-20 26-Apr-21 240 240 27-May-21, Construction
Civil 03-Aug-20 22-Sep-20 11-Jul-20 01-Sep-20 42 42 22-Sep-20, Civil
Foundation - Equipment 03-Aug-20 22-Sep-20 11-Jul-20 01-Sep-20 42 42 22-Sep-20, Foundation - Equipment
CD341CV55025 Equipment Foundation(SS&ISH-102)_U341 03-Aug-20 22-Sep-20 11-Jul-20 01-Sep-20 42 42 Equipment Foundation(SS&ISH-102)_U341
Architectural 07-Jul-20 19-Apr-21 16-Jun-20 26-Mar-21 216 216 19-Apr-21, Architectural
Building Foundation 07-Jul-20 12-Oct-20 16-Jun-20 21-Sep-20 81 81 12-Oct-20, Building Foundation
CD341AR35710 Building Foundation(SS&ISH-102)_U341 07-Jul-20 01-Sep-20 16-Jun-20 08-Aug-20 46 46 Building Foundation(SS&ISH-102)_U341
CD341AR35755 Ground Slab(SS-102)_U341 02-Sep-20 17-Sep-20 10-Aug-20 27-Aug-20 14 14 Ground Slab(SS-102)_U341
CD341AR35910 Tranformer yard(SS-102)_U341 18-Sep-20 12-Oct-20 28-Aug-20 21-Sep-20 21 21 Tranformer yard(SS-102)_U341
Building Structure 18-Sep-20 19-Feb-21 28-Aug-20 25-Jan-21 114 114 19-Feb-21, Building Structure
CD341AR40030 Column/Beam/Girder - Ground Level(SS&ISH-102)_U341 18-Sep-20 08-Oct-20 28-Aug-20 17-Sep-20 18 18 Column/Beam/Girder - Ground Level(SS&ISH-102)_U341
CD341AR40035 1st Floor Slab(SS&ISH-102)_U341 09-Oct-20 03-Nov-20 18-Sep-20 12-Oct-20 21 21 1st Floor Slab(SS&ISH-102)_U341
CD341AR40040 Column/Beam/Girder - 1st Floor(SS&ISH-102)_U341 04-Nov-20 27-Nov-20 13-Oct-20 03-Nov-20 18 18 Column/Beam/Girder - 1st Floor(SS&ISH-102)_U341
CD341AR40045 2nd Floor Slab(SS&ISH-102)_U341 30-Nov-20 29-Dec-20 04-Nov-20 02-Dec-20 21 21 2nd Floor Slab(SS&ISH-102)_U341
CD341AR40050 Column/Beam/Girder - 2nd Floor(SS&ISH-102)_U341 30-Dec-20 25-Jan-21 03-Dec-20 29-Dec-20 18 18 Column/Beam/Girder - 2nd Floor(SS&ISH-102)_U341
CD341AR40055 Roof Slab(SS&ISH-102)_U341 26-Jan-21 19-Feb-21 30-Dec-20 25-Jan-21 18 18 Roof Slab(SS&ISH-102)_U341
Building Finishing 28-Jan-21 19-Apr-21 04-Jan-21 26-Mar-21 58 58 19-Apr-21, Building Finishing
CD341AR45050 Masonry&Plastering(SS&ISH-102)_U341 28-Jan-21 09-Mar-21 04-Jan-21 10-Feb-21 28 28 Masonry&Plastering(SS&ISH-102)_U341
CD341AR45055 Water Proofing(SS&IS H-102)_U341 09-Feb-21 01-Apr-21 14-Jan-21 05-Mar-21 36 36 Water Proofing(SS&IS H-102)_U341
CD341AR45060 Door & Window(SS&ISH-102)_U341 23-Mar-21 14-Apr-21 24-Feb-21 22-Mar-21 18 18 Door & Window(SS&ISH-102)_U341
CD341AR45065 Painting-Internal(SS&ISH-102)_U341 11-Feb-21 26-Mar-21 18-Jan-21 01-Mar-21 30 30 Painting-Internal(SS&ISH-102)_U341
CD341AR45070 Interior Finishing(SS&ISH-102)_U341 08-Mar-21 14-Apr-21 09-Feb-21 22-Mar-21 28 28 Interior Finishing(SS&ISH-102)_U341
CD341AR45210 Exterior Finishing(SS&ISH-102)_U341 19-Mar-21 19-Apr-21 22-Feb-21 26-Mar-21 24 24 Exterior Finishing(SS&ISH-102)_U341
HVAC 05-Mar-21 22-May-21 08-Feb-21 22-Apr-21 54 54 22-May-21, HVAC
HVAC & Control System 24-Mar-21 19-Apr-21 25-Feb-21 26-Mar-21 21 21 19-Apr-21, HVAC & Control System
CD341HV10005 HVAC Equipment Installation(SS&ISH-102)_U341 24-Mar-21 19-Apr-21 25-Feb-21 26-Mar-21 21 21 HVAC Equipment Installation(SS&ISH-102)_U341
Plumbing 05-Mar-21 22-May-21 08-Feb-21 22-Apr-21 54 54 22-May-21, Plumbing
CD341HV15050 HVAC Duct Erection(SS&ISH-102)_U341 05-Mar-21 05-Apr-21 08-Feb-21 09-Mar-21 21 21 HVAC Duct Erection(SS&ISH-102)_U341
CD341HV15055 HVAC Piping work(SS&ISH-102)_U341 16-Apr-21 11-May-21 24-Mar-21 19-Apr-21 21 21 HVAC Piping work(SS&ISH-102)_U341
CD341HV15060 Plumbing&Sanitary(SS&ISH-102)_U341 20-Apr-21 22-May-21 29-Mar-21 22-Apr-21 21 21 Plumbing&Sanitary(SS&ISH-102)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 12 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Electrical 27-Jul-20 27-May-21 04-Jul-20 26-Apr-21 223 223 27-May-21, Electrical
Cable Race Way 15-Mar-21 24-Apr-21 16-Feb-21 03-Apr-21 33 33 24-Apr-21, Cable Race Way
CD341EL45170- Electrical Cable Tray Installation(SS&ISH-102)_U341 15-Mar-21 19-Apr-21 16-Feb-21 26-Mar-21 28 28 Electrical Cable Tray Installation(SS&ISH-102)_U341
CD341EL45185- Electrical Conduit Pipe(SS&ISH-102)_U341 05-Apr-21 24-Apr-21 09-Mar-21 03-Apr-21 18 18 Electrical Conduit Pipe(SS&ISH-102)_U341
Power & Control 29-Mar-21 27-May-21 02-Mar-21 26-Apr-21 42 42 27-May-21, Power & Control
CD341EL45175- Termination - Power & Control(SS&ISH-102)_U341 23-Apr-21 27-May-21 01-Apr-21 26-Apr-21 21 21 Termination - Power & Control(SS&ISH-102)_U341
CD341EL45180- Cabling - Power & Control(SS&ISH-102)_U341 29-Mar-21 11-May-21 02-Mar-21 19-Apr-21 36 36 Cabling - Power & Control(SS&ISH-102)_U341
Earthing and Grouding 27-Jul-20 16-Sep-20 04-Jul-20 25-Aug-20 42 42 16-Sep-20, Earthing and Grouding
CD341EL50010 Cabling - Grounding(SS&ISH-102)_U341 27-Jul-20 16-Sep-20 04-Jul-20 25-Aug-20 42 42 Cabling - Grounding(SS&ISH-102)_U341
Lighting 02-Mar-21 04-May-21 03-Feb-21 12-Apr-21 48 48 04-May-21, Lighting
CD341EL60010 Installation - Distribution Panel(SS&ISH-102)_U341 10-Mar-21 26-Apr-21 11-Feb-21 05-Apr-21 36 36 Installation - Distribution Panel(SS&ISH-102)_U341
CD341EL60155 Cabling - Lightening(SS&ISH-102)_U341 02-Mar-21 09-Apr-21 03-Feb-21 16-Mar-21 28 28 Cabling - Lightening(SS&ISH-102)_U341
CD341EL60160 Lightening work(SS&ISH-102)_U341 02-Mar-21 09-Apr-21 03-Feb-21 16-Mar-21 28 28 Lightening work(SS&ISH-102)_U341
CD341EL60335 Installation of Lighting Fixture System (SS(ISH)-102)_U341 31-Mar-21 04-May-21 04-Mar-21 12-Apr-21 28 28 Installation of Lighting Fixture System (SS(ISH)-102)_U341
CD341EL60505 Cabling Lighting (SS(ISH)-102)_U341 31-Mar-21 04-May-21 04-Mar-21 12-Apr-21 28 28 Cabling Lighting (SS(ISH)-102)_U341
Communication 08-Apr-21 11-May-21 15-Mar-21 19-Apr-21 28 28 11-May-21, Communication
CD341EL65025 Installation - Communication System(SS&ISH-102)_U341 08-Apr-21 11-May-21 15-Mar-21 19-Apr-21 28 28 Installation - Communication System(SS&ISH-102)_U341
CD341EL65210 Cabling - Communication(SS&ISH-102)_U341 08-Apr-21 11-May-21 15-Mar-21 19-Apr-21 28 28 Cabling - Communication(SS&ISH-102)_U341
Fire Alarm 31-Mar-21 04-May-21 04-Mar-21 12-Apr-21 28 28 04-May-21, Fire Alarm
CD341EL68025 Installation - Fire Alarm System(SS&ISH-102)_U341 31-Mar-21 04-May-21 04-Mar-21 12-Apr-21 28 28 Installation - Fire Alarm System(SS&ISH-102)_U341
CD341EL68270 Cabling - Fire Alarm(SS&ISH-102)_U341 31-Mar-21 04-May-21 04-Mar-21 12-Apr-21 28 28 Cabling - Fire Alarm(SS&ISH-102)_U341
Safety & Fire Fighting 23-Mar-21 26-Apr-21 24-Feb-21 05-Apr-21 28 28 26-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 23-Mar-21 26-Apr-21 24-Feb-21 05-Apr-21 28 28 26-Apr-21, Fire Fighting Equipment
CD341MS40005 Installation - F/F Equipment(SS&ISH-102)_U341 23-Mar-21 26-Apr-21 24-Feb-21 05-Apr-21 28 28 Installation - F/F Equipment(SS&ISH-102)_U341
341-SS(ISH)-103 (in Unit 335 E area) 30-Jul-19 A 06-Sep-21 26-Sep-19 26-Feb-21 488 406 06-Sep-21, 341-SS(ISH)-103 (in Unit 335 E area)

Engineering 30-Jul-19 A 28-Jul-20 26-Sep-19 11-Jun-20 210 128 28-Jul-20, Engineering


Architectural 30-Jul-19 A 03-Jun-20 26-Sep-19 20-Mar-20 171 89 03-Jun-20, Architectural
Calculation 25-Feb-20 11-May-20 27-Dec-19 06-Mar-20 52 52 11-May-20, Calculation
ED341AR10015A Structural Calculation for Substation(341-SS&ISH-103)_U341 [IFR] 25-Feb-20 23-Mar-20 27-Dec-19 24-Jan-20 20 20 Structural Calculation for Substation(341-SS&ISH-103)_U341 [IFR]
ED341AR10015B Structural Calculation for Substation(341-SS&ISH-103)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 25-Jan-20 08-Feb-20 15 15 Structural Calculation for Substation(341-SS&ISH-103)_U341 [Review-IFR]
ED341AR10015G Structural Calculation for Substation(341-SS&ISH-103)_U341 [AFD] 09-Apr-20 11-May-20 10-Feb-20 06-Mar-20 20 20 Structural Calculation for Substation(341-SS&ISH-103)_U341 [AFD]
Architecture Basic 30-Jul-19 A 08-Apr-20 26-Sep-19 07-Feb-20 134 52 08-Apr-20, Architecture Basic
ED341AR20035A Architectural Basic Drawing(SS&ISH-103)_U341 [IFR] 30-Jul-19 A 29-Aug-19 A 26-Sep-19 27-Nov-19 45 0 Architectural Basic Drawing(SS&ISH-103)_U341 [IFR]
ED341AR20035B Architectural Basic Drawing(SS&ISH-103)_U341 [Review-IFR] 30-Aug-19 A 03-Oct-19 A 28-Nov-19 12-Dec-19 15 0 Architectural Basic Drawing(SS&ISH-103)_U341 [Review-IFR]
ED341AR20035G Architectural Basic Drawing(SS&ISH-103)_U341 [IFC] 02-Oct-19 A 20-Feb-20 24-Dec-19 22-Jan-20 20 19 Architectural Basic Drawing(SS&ISH-103)_U341 [IFC]
ED341AR20040A Foundation/Pile Location Plan(SS&ISH-103)_U341 [IFR] 27-Jan-20 21-Feb-20 14-Nov-19 11-Dec-19 20 20 Foundation/Pile Location Plan(SS&ISH-103)_U341 [IFR]
ED341AR20040B Foundation/Pile Location Plan(SS&ISH-103)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 12-Dec-19 26-Dec-19 15 15 Foundation/Pile Location Plan(SS&ISH-103)_U341 [Review-IFR]
ED341AR20040G Foundation/Pile Location Plan(SS&ISH-103)_U341 [IFC] 09-Mar-20 06-Apr-20 27-Dec-19 24-Jan-20 20 20 Foundation/Pile Location Plan(SS&ISH-103)_U341 [IFC]
ED341AR20045A Structural Basic Drawing(SS&ISH-103)_U341 [IFR] 28-Nov-19 A 24-Feb-20 28-Nov-19 26-Dec-19 14 21 Structural Basic Drawing(SS&ISH-103)_U341 [IFR]
ED341AR20045B Structural Basic Drawing(SS&ISH-103)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 27-Dec-19 10-Jan-20 15 15 Structural Basic Drawing(SS&ISH-103)_U341 [Review-IFR]
ED341AR20045G Structural Basic Drawing(SS&ISH-103)_U341 [IFC] 11-Mar-20 08-Apr-20 13-Jan-20 07-Feb-20 20 20 Structural Basic Drawing(SS&ISH-103)_U341 [IFC]
Architecture Detail - Architectural 30-Jul-19 A 03-Jun-20 21-Nov-19 20-Mar-20 133 89 03-Jun-20, Architecture Detail - Architectural
ED341AR25025A Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [IFR] 30-Jul-19 A 13-Feb-20 21-Nov-19 26-Dec-19 25 14 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [IFR]
ED341AR25025B Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [Review-IFR] 30-Aug-19 A 23-Feb-20 27-Dec-19 10-Jan-20 15 28 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [Review-IFR]
ED341AR25025G Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [IFC] 24-Feb-20 20-Mar-20 23-Jan-20 19-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-103)_U341 [IFC]
ED341AR25030A Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFR] 10-Mar-20 07-Apr-20 13-Jan-20 07-Feb-20 20 20 Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFR]
ED341AR25030B Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [Review-IFR] 08-Apr-20 22-Apr-20 08-Feb-20 22-Feb-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [Review-IFR]
ED341AR25030G Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFC] 04-May-20 03-Jun-20 02-Mar-20 20-Mar-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFC]
Architecture Detail - Structural 11-Feb-20 03-Jun-20 12-Dec-19 20-Mar-20 79 79 03-Jun-20, Architecture Detail - Structural
ED341AR30025A Structural Detail Drawing for Framing(SS&ISH-103)_U341 [IFR] 11-Feb-20 09-Mar-20 12-Dec-19 10-Jan-20 20 20 Structural Detail Drawing for Framing(SS&ISH-103)_U341 [IFR]
ED341AR30025B Structural Detail Drawing for Framing(SS&ISH-103)_U341 [Review-IFR] 10-Mar-20 24-Mar-20 11-Jan-20 25-Jan-20 15 15 Structural Detail Drawing for Framing(SS&ISH-103)_U341 [Review-IFR]
ED341AR30025G Structural Detail Drawing for Framing(SS&ISH-103)_U341 [IFC] 02-Apr-20 23-Apr-20 03-Feb-20 21-Feb-20 15 15 Structural Detail Drawing for Framing(SS&ISH-103)_U341 [IFC]
ED341AR30030A Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [IFR] 25-Feb-20 23-Mar-20 27-Dec-19 24-Jan-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [IFR]
ED341AR30030B Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [Review-IFR]
ED341AR30030G Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [IFC] 17-Apr-20 11-May-20 17-Feb-20 06-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-103)_U341 [IFC]
ED341AR30225A Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFR] 10-Mar-20 07-Apr-20 13-Jan-20 07-Feb-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFR]
ED341AR30225B Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [Review/Appr.-IFR] 08-Apr-20 22-Apr-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [Review/Appr.-IFR]
ED341AR30225G Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFC] 24-Apr-20 03-Jun-20 24-Feb-20 20-Mar-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-103)_U341 [IFC]
HVAC 28-Nov-19 A 10-Jul-20 28-Nov-19 11-Jun-20 136 98 10-Jul-20, HVAC
HVAC & Control System 28-Nov-19 A 10-Jul-20 28-Nov-19 11-Jun-20 136 98 10-Jul-20, HVAC & Control System
ED341HV10040A HVAC System(SS&ISH-103)_U341 [IFR] 28-Nov-19 A 15-Jan-20 A 28-Nov-19 03-Jan-20 25 0 HVAC System(SS&ISH-103)_U341 [IFR]
ED341HV10040B HVAC System(SS&ISH-103)_U341 [Review-IFR] 16-Jan-20 A 16-Jan-20 A 04-Jan-20 18-Jan-20 15 0 HVAC System(SS&ISH-103)_U341 [Review-IFR]
ED341HV10040G HVAC System(SS&ISH-103)_U341 [IFC] 21-Feb-20 03-Apr-20 23-Jan-20 04-Mar-20 30 30 HVAC System(SS&ISH-103)_U341 [IFC]
ED341HV10045A Control System(SS&ISH-103)_U341 [IFR] 14-Dec-19 A 15-Jan-20 A 10-Feb-20 13-Mar-20 25 0 Control System(SS&ISH-103)_U341 [IFR]
ED341HV10045B Control System(SS&ISH-103)_U341 [Review-IFR] 16-Jan-20 A 16-Jan-20 A 14-Mar-20 28-Mar-20 15 0 Control System(SS&ISH-103)_U341 [Review-IFR]
ED341HV10045G Control System(SS&ISH-103)_U341 [IFC] 29-May-20 10-Jul-20 20-Apr-20 11-Jun-20 30 30 Control System(SS&ISH-103)_U341 [IFC]
Plumbing 28-Nov-19 A 20-May-20 28-Nov-19 17-Apr-20 99 61 20-May-20, Plumbing
ED341HV15025A Duct & Piping(SS&ISH-103)_U341 [IFR] 06-Jan-20 A 15-Jan-20 A 06-Jan-20 07-Feb-20 4 0 Duct & Piping(SS&ISH-103)_U341 [IFR]
ED341HV15025B Duct & Piping(SS&ISH-103)_U341 [Review-IFR] 16-Jan-20 A 16-Jan-20 A 08-Feb-20 22-Feb-20 15 0 Duct & Piping(SS&ISH-103)_U341 [Review-IFR]
ED341HV15025G Duct & Piping(SS&ISH-103)_U341 [IFC] 06-Apr-20 20-May-20 05-Mar-20 17-Apr-20 30 30 Duct & Piping(SS&ISH-103)_U341 [IFC]
ED341HV15030A Plumbing(SS&ISH-103)_U341 [IFR] 28-Nov-19 A 15-Jan-20 A 28-Nov-19 03-Jan-20 25 0 Plumbing(SS&ISH-103)_U341 [IFR]
ED341HV15030B Plumbing(SS&ISH-103)_U341 [Review-IFR] 16-Jan-20 A 16-Jan-20 A 04-Jan-20 18-Jan-20 15 0 Plumbing(SS&ISH-103)_U341 [Review-IFR]
ED341HV15030G Plumbing(SS&ISH-103)_U341 [IFC] 21-Feb-20 03-Apr-20 23-Jan-20 04-Mar-20 30 30 Plumbing(SS&ISH-103)_U341 [IFC]
Electrical 12-Dec-19 A 28-Jul-20 12-Dec-19 28-Apr-20 145 30 28-Jul-20, Electrical
Fire Alarm 12-Dec-19 A 28-Jul-20 12-Dec-19 28-Apr-20 145 30 28-Jul-20, Fire Alarm

Actual Level of Effort Actual Work Critical Remaining Work Page 13 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341EL68015A Fire Alarm Layout(SS&ISH-103)_U341 [IFR] 12-Dec-19 A 02-Jan-20 A 12-Dec-19 24-Jan-20 30 0 Fire Alarm Layout(SS&ISH-103)_U341 [IFR]
ED341EL68015B Fire Alarm Layout(SS&ISH-103)_U341 [Review-IFR] 03-Jan-20 A 22-Jan-20 A 25-Jan-20 08-Feb-20 15 0 Fire Alarm Layout(SS&ISH-103)_U341 [Review-IFR]
ED341EL68015G Fire Alarm Layout(SS&ISH-103)_U341 [IFC] 17-Jun-20 28-Jul-20 16-Mar-20 28-Apr-20 30 30 Fire Alarm Layout(SS&ISH-103)_U341 [IFC]
Construction 22-Sep-20 06-Sep-21 22-Jan-20 26-Feb-21 260 260 06-Sep-21, Construction
Civil 22-Sep-20 10-Feb-21 22-Jan-20 03-Aug-20 105 105 10-Feb-21, Civil
Piling 22-Sep-20 24-Nov-20 22-Jan-20 29-May-20 51 51 24-Nov-20, Piling
CD341CV30035 Stone Column_SS&ISH-103 & U335 22-Sep-20 26-Oct-20 22-Jan-20 20-Feb-20 30 30 Stone Column_SS&ISH-103 & U335
CD341CV30035A Stone Column_(SS&ISH-103)_U341 [Added] 05-Oct-20 26-Oct-20 19 19 Stone Column_(SS&ISH-103)_U341 [Added]
CD341CV30060 Piling Work(SS&ISH-103)_U341 27-Oct-20 24-Nov-20 25-Apr-20 29-May-20 21 21 Piling Work(SS&ISH-103)_U341
Foundation - Equipment 04-Jan-21 10-Feb-21 01-Jul-20 03-Aug-20 28 28 10-Feb-21, Foundation - Equipment
CD341CV55030 Equipment Foundation(SS&ISH-103)_U341 04-Jan-21 10-Feb-21 01-Jul-20 03-Aug-20 28 28 Equipment Foundation(SS&ISH-103)_U341
Architectural 25-Nov-20 26-Aug-21 30-May-20 11-Feb-21 200 200 26-Aug-21, Architectural
Building Foundation 25-Nov-20 04-Mar-21 30-May-20 22-Aug-20 69 69 04-Mar-21, Building Foundation
CD341AR35715 Building Foundation(SS&ISH-103)_U341 25-Nov-20 15-Jan-21 30-May-20 11-Jul-20 36 36 Building Foundation(SS&ISH-103)_U341
CD341AR35785 Ground Slab(SS-103)_U341 18-Jan-21 02-Feb-21 13-Jul-20 25-Jul-20 12 12 Ground Slab(SS-103)_U341
CD341AR35915 Tranformer yard(SS-103)_U341 03-Feb-21 04-Mar-21 27-Jul-20 22-Aug-20 21 21 Tranformer yard(SS-103)_U341
Building Structure 03-Feb-21 10-Jul-21 27-Jul-20 17-Dec-20 114 114 10-Jul-21, Building Structure
CD341AR40065 Column/Beam/Girder - Ground Level(SS&ISH-103)_U341 03-Feb-21 01-Mar-21 27-Jul-20 18-Aug-20 18 18 Column/Beam/Girder - Ground Level(SS&ISH-103)_U341
CD341AR40070 1st Floor Slab(SS&ISH-103)_U341 02-Mar-21 31-Mar-21 19-Aug-20 12-Sep-20 21 21 1st Floor Slab(SS&ISH-103)_U341
CD341AR40105 Column/Beam/Girder - 1st Floor(SS&ISH-103)_U341 01-Apr-21 22-Apr-21 14-Sep-20 03-Oct-20 18 18 Column/Beam/Girder - 1st Floor(SS&ISH-103)_U341
CD341AR40115 2nd Floor Slab(SS&ISH-103)_U341 23-Apr-21 27-May-21 05-Oct-20 28-Oct-20 21 21 2nd Floor Slab(SS&ISH-103)_U341
CD341AR40135 Column/Beam/Girder - 2nd Floor(SS&ISH-103)_U341 28-May-21 18-Jun-21 30-Oct-20 23-Nov-20 18 18 Column/Beam/Girder - 2nd Floor(SS&ISH-103)_U341
CD341AR40225 Roof Slab(SS&ISH-103)_U341 19-Jun-21 10-Jul-21 24-Nov-20 17-Dec-20 18 18 Roof Slab(SS&ISH-103)_U341
Building Finishing 12-Jun-21 26-Aug-21 16-Nov-20 11-Feb-21 62 62 26-Aug-21, Building Finishing
CD341AR45090 Masonry&Plastering(SS&ISH-103)_U341 12-Jun-21 24-Jul-21 16-Nov-20 06-Jan-21 36 36 Masonry&Plastering(SS&ISH-103)_U341
CD341AR45095- Water Proofing(SS&IS H-103)_U341 26-Jun-21 07-Aug-21 02-Dec-20 22-Jan-21 36 36 Water Proofing(SS&IS H-103)_U341
CD341AR45100 Door & Window(SS&ISH-103)_U341 23-Jul-21 13-Aug-21 05-Jan-21 28-Jan-21 18 18 Door & Window(SS&ISH-103)_U341
CD341AR45105- Painting-Internal(SS&ISH-103)_U341 05-Jul-21 05-Aug-21 10-Dec-20 20-Jan-21 28 28 Painting-Internal(SS&ISH-103)_U341
CD341AR45110 Interior Finishing(SS&ISH-103)_U341 23-Jul-21 21-Aug-21 05-Jan-21 05-Feb-21 24 24 Interior Finishing(SS&ISH-103)_U341
CD341AR45215 Exterior Finishing(SS&ISH-103)_U341 31-Jul-21 26-Aug-21 14-Jan-21 11-Feb-21 21 21 Exterior Finishing(SS&ISH-103)_U341
HVAC 22-Jul-21 04-Sep-21 04-Jan-21 24-Feb-21 37 37 04-Sep-21, HVAC
HVAC & Control System 27-Jul-21 21-Aug-21 08-Jan-21 05-Feb-21 21 21 21-Aug-21, HVAC & Control System
CD341HV10020 HVAC Equipment Installation(SS&ISH-103)_U341 27-Jul-21 21-Aug-21 08-Jan-21 05-Feb-21 21 21 HVAC Equipment Installation(SS&ISH-103)_U341
Plumbing 22-Jul-21 04-Sep-21 04-Jan-21 24-Feb-21 37 37 04-Sep-21, Plumbing
CD341HV15065 HVAC Duct Erection(SS&ISH-103)_U341 22-Jul-21 16-Aug-21 04-Jan-21 01-Feb-21 21 21 HVAC Duct Erection(SS&ISH-103)_U341
CD341HV15070 HVAC Piping work(SS&ISH-103)_U341 14-Aug-21 04-Sep-21 29-Jan-21 24-Feb-21 18 18 HVAC Piping work(SS&ISH-103)_U341
CD341HV15075 Plumbing&Sanitary(SS&ISH-103)_U341 14-Aug-21 04-Sep-21 29-Jan-21 24-Feb-21 18 18 Plumbing&Sanitary(SS&ISH-103)_U341
Electrical 21-Dec-20 06-Sep-21 22-Jun-20 26-Feb-21 191 191 06-Sep-21, Electrical
Cable Race Way 16-Jul-21 26-Aug-21 24-Dec-20 11-Feb-21 34 34 26-Aug-21, Cable Race Way
CD341EL45020 Electrical Cable Tray Installation(SS&ISH-103)_U341 16-Jul-21 19-Aug-21 24-Dec-20 03-Feb-21 28 28 Electrical Cable Tray Installation(SS&ISH-103)_U341
CD341EL45200- Electrical Conduit Pipe(SS&ISH-103)_U341 04-Aug-21 26-Aug-21 19-Jan-21 11-Feb-21 18 18 Electrical Conduit Pipe(SS&ISH-103)_U341
Power & Control 30-Jul-21 06-Sep-21 13-Jan-21 25-Feb-21 31 31 06-Sep-21, Power & Control
CD341EL45190- Termination - Power & Control(SS&ISH-103)_U341 16-Aug-21 06-Sep-21 01-Feb-21 25-Feb-21 18 18 Termination - Power & Control(SS&ISH-103)_U341
CD341EL45195- Cabling - Power & Control(SS&ISH-103)_U341 30-Jul-21 02-Sep-21 13-Jan-21 22-Feb-21 28 28 Cabling - Power & Control(SS&ISH-103)_U341
Earthing and Grouding 21-Dec-20 19-Feb-21 22-Jun-20 10-Aug-20 42 42 19-Feb-21, Earthing and Grouding
CD341EL50020 Cabling - Grounding(SS&ISH-103)_U341 21-Dec-20 19-Feb-21 22-Jun-20 10-Aug-20 42 42 Cabling - Grounding(SS&ISH-103)_U341
Lighting 14-Jul-21 04-Sep-21 22-Dec-20 24-Feb-21 44 44 04-Sep-21, Lighting
CD341EL60025 Installation - Distribution Panel(SS&ISH-103)_U341 14-Jul-21 26-Aug-21 22-Dec-20 11-Feb-21 36 36 Installation - Distribution Panel(SS&ISH-103)_U341
CD341EL60165 Cabling - Lightening(SS&ISH-103)_U341 02-Aug-21 04-Sep-21 15-Jan-21 24-Feb-21 28 28 Cabling - Lightening(SS&ISH-103)_U341
CD341EL60170 Lightening work(SS&ISH-103)_U341 02-Aug-21 04-Sep-21 15-Jan-21 24-Feb-21 28 28 Lightening work(SS&ISH-103)_U341
CD341EL60340 Installation of Lighting Fixture System (SS(ISH)-103)_U341 30-Jul-21 02-Sep-21 13-Jan-21 22-Feb-21 28 28 Installation of Lighting Fixture System (SS(ISH)-103)_U341
CD341EL60510 Cabling Lighting (SS(ISH)-103)_U341 30-Jul-21 02-Sep-21 13-Jan-21 22-Feb-21 28 28 Cabling Lighting (SS(ISH)-103)_U341
Communication 07-Aug-21 06-Sep-21 25-Jan-21 26-Feb-21 24 24 06-Sep-21, Communication
CD341EL65030 Installation - Communication System(SS&ISH-103)_U341 07-Aug-21 06-Sep-21 25-Jan-21 26-Feb-21 24 24 Installation - Communication System(SS&ISH-103)_U341
CD341EL65215 Cabling - Communication(SS&ISH-103)_U341 07-Aug-21 06-Sep-21 25-Jan-21 26-Feb-21 24 24 Cabling - Communication(SS&ISH-103)_U341
Fire Alarm 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 01-Sep-21, Fire Alarm
CD341EL68030 Installation - Fire Alarm System(SS&ISH-103)_U341 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 Installation - Fire Alarm System(SS&ISH-103)_U341
CD341EL68275 Cabling - Fire Alarm(SS&ISH-103)_U341 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 Cabling - Fire Alarm(SS&ISH-103)_U341
Safety & Fire Fighting 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 01-Sep-21, Safety & Fire Fighting
Fire Fighting Equipment 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 01-Sep-21, Fire Fighting Equipment
CD341MS40015 Installation - F/F Equipment(SS&ISH-103)_U341 29-Jul-21 01-Sep-21 12-Jan-21 19-Feb-21 28 28 Installation - F/F Equipment(SS&ISH-103)_U341
341-SS(ISH)-104 (in Unit 325 area) 17-Jul-19 A 03-May-21 17-Jul-19 03-Mar-21 448 318 03-May-21, 341-SS(ISH)-104 (in Unit 325 area)

Engineering 17-Jul-19 A 05-Aug-20 17-Jul-19 06-Aug-20 264 134 05-Aug-20, Engineering


Architectural 12-Aug-19 A 18-May-20 03-Oct-19 06-Aug-20 127 77 18-May-20, Architectural
Calculation 25-Feb-20 11-May-20 27-Dec-19 12-Mar-20 52 52 11-May-20, Calculation
ED341AR10020A Structural Calculation for Substation(341-SS&ISH-104)_U341 [IFR] 25-Feb-20 23-Mar-20 27-Dec-19 24-Jan-20 20 20 Structural Calculation for Substation(341-SS&ISH-104)_U341 [IFR]
ED341AR10020B Structural Calculation for Substation(341-SS&ISH-104)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 25-Jan-20 08-Feb-20 15 15 Structural Calculation for Substation(341-SS&ISH-104)_U341 [Review-IFR]
ED341AR10020G Structural Calculation for Substation(341-SS&ISH-104)_U341 [AFD] 09-Apr-20 11-May-20 14-Feb-20 12-Mar-20 20 20 Structural Calculation for Substation(341-SS&ISH-104)_U341 [AFD]
Architecture Basic 12-Aug-19 A 14-Apr-20 03-Oct-19 13-Feb-20 106 56 14-Apr-20, Architecture Basic
ED341AR20050A Architectural Basic Drawing(SS&ISH-104)_U341 [IFR] 12-Aug-19 A 30-Oct-19 A 03-Oct-19 27-Nov-19 40 0 Architectural Basic Drawing(SS&ISH-104)_U341 [IFR]
ED341AR20050B Architectural Basic Drawing(SS&ISH-104)_U341 [Review-IFR] 31-Oct-19 A 15-Nov-19 A 28-Nov-19 12-Dec-19 15 0 Architectural Basic Drawing(SS&ISH-104)_U341 [Review-IFR]
ED341AR20050G Architectural Basic Drawing(SS&ISH-104)_U341 [IFC] 18-Nov-19 A 21-Feb-20 18-Dec-19 16-Jan-20 20 20 Architectural Basic Drawing(SS&ISH-104)_U341 [IFC]
ED341AR20055A Foundation/Pile Location Plan(SS&ISH-104)_U341 [IFR] 27-Jan-20 28-Feb-20 11-Nov-19 13-Dec-19 25 25 Foundation/Pile Location Plan(SS&ISH-104)_U341 [IFR]
ED341AR20055B Foundation/Pile Location Plan(SS&ISH-104)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 14-Dec-19 28-Dec-19 15 15 Foundation/Pile Location Plan(SS&ISH-104)_U341 [Review-IFR]
ED341AR20055G Foundation/Pile Location Plan(SS&ISH-104)_U341 [IFC] 16-Mar-20 14-Apr-20 30-Dec-19 27-Jan-20 20 20 Foundation/Pile Location Plan(SS&ISH-104)_U341 [IFC]
ED341AR20060A Structural Basic Drawing(SS&ISH-104)_U341 [IFR] 28-Nov-19 A 24-Feb-20 28-Nov-19 26-Dec-19 14 21 Structural Basic Drawing(SS&ISH-104)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 14 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR20060B Structural Basic Drawing(SS&ISH-104)_U341 [Review-IFR] 25-Feb-20 10-Mar-20 27-Dec-19 10-Jan-20 15 15 Structural Basic Drawing(SS&ISH-104)_U341 [Review-IFR]
ED341AR20060G Structural Basic Drawing(SS&ISH-104)_U341 [IFC] 11-Mar-20 08-Apr-20 17-Jan-20 13-Feb-20 20 20 Structural Basic Drawing(SS&ISH-104)_U341 [IFC]
Architecture Detail - Architectural 01-Oct-19 A 06-Apr-20 28-Nov-19 28-Feb-20 91 50 06-Apr-20, Architecture Detail - Architectural
ED341AR25035A Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [IFR] 01-Oct-19 A 30-Jan-20 28-Nov-19 03-Jan-20 25 4 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [IFR]
ED341AR25035B Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [Review-IFR] 31-Oct-19 A 13-Feb-20 04-Jan-20 18-Jan-20 15 19 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [Review-IFR]
ED341AR25035G Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [IFC] 24-Feb-20 20-Mar-20 20-Jan-20 14-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-104)_U341 [IFC]
ED341AR25040A Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFR] 19-Dec-19 A 17-Feb-20 19-Dec-19 17-Jan-20 20 16 Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFR]
ED341AR25040B Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [Review-IFR] 18-Feb-20 03-Mar-20 18-Jan-20 01-Feb-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [Review-IFR]
ED341AR25040G Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFC] 16-Mar-20 06-Apr-20 10-Feb-20 28-Feb-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFC]
Architecture Detail - Structural 11-Feb-20 18-May-20 12-Dec-19 06-Aug-20 67 67 18-May-20, Architecture Detail - Structural
ED341AR30035A Structural Detail Drawing for Framing(SS&ISH-104)_U341 [IFR] 11-Feb-20 09-Mar-20 12-Dec-19 10-Jan-20 20 20 Structural Detail Drawing for Framing(SS&ISH-104)_U341 [IFR]
ED341AR30035B Structural Detail Drawing for Framing(SS&ISH-104)_U341 [Review-IFR] 10-Mar-20 24-Mar-20 11-Jan-20 25-Jan-20 15 15 Structural Detail Drawing for Framing(SS&ISH-104)_U341 [Review-IFR]
ED341AR30035G Structural Detail Drawing for Framing(SS&ISH-104)_U341 [IFC] 02-Apr-20 23-Apr-20 07-Feb-20 27-Feb-20 15 15 Structural Detail Drawing for Framing(SS&ISH-104)_U341 [IFC]
ED341AR30040A Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [IFR] 25-Feb-20 23-Mar-20 27-Dec-19 24-Jan-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [IFR]
ED341AR30040B Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [Review-IFR] 24-Mar-20 07-Apr-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [Review-IFR]
ED341AR30040G Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [IFC] 09-Apr-20 11-May-20 14-Feb-20 12-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-104)_U341 [IFC]
ED341AR30235A Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFR] 10-Mar-20 07-Apr-20 13-Jan-20 07-Feb-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFR]
ED341AR30235B Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [Review/Appr.-IFR] 08-Apr-20 22-Apr-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [Review/Appr.-IFR]
ED341AR30235G Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFC] 17-Apr-20 18-May-20 09-Jul-20 06-Aug-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-104)_U341 [IFC]
HVAC 02-Sep-19 A 06-May-20 28-Nov-19 11-Jun-20 136 51 06-May-20, HVAC
HVAC & Control System 02-Sep-19 A 06-May-20 28-Nov-19 11-Jun-20 133 51 06-May-20, HVAC & Control System
ED341HV10055A HVAC System(SS&ISH-104)_U341 [IFR] 02-Sep-19 A 08-Oct-19 A 28-Nov-19 03-Jan-20 25 0 HVAC System(SS&ISH-104)_U341 [IFR]
ED341HV10055B HVAC System(SS&ISH-104)_U341 [Review-IFR] 09-Oct-19 A 29-Oct-19 A 04-Jan-20 18-Jan-20 15 0 HVAC System(SS&ISH-104)_U341 [Review-IFR]
ED341HV10055G HVAC System(SS&ISH-104)_U341 [IFC] 30-Oct-19 A 25-Feb-20 23-Jan-20 04-Mar-20 30 3 HVAC System(SS&ISH-104)_U341 [IFC]
ED341HV10060A Control System(SS&ISH-104)_U341 [IFR] 02-Sep-19 A 08-Oct-19 A 10-Feb-20 13-Mar-20 25 0 Control System(SS&ISH-104)_U341 [IFR]
ED341HV10060B Control System(SS&ISH-104)_U341 [Review-IFR] 09-Oct-19 A 30-Oct-19 A 14-Mar-20 28-Mar-20 15 0 Control System(SS&ISH-104)_U341 [Review-IFR]
ED341HV10060G Control System(SS&ISH-104)_U341 [IFC] 30-Oct-19 A 06-May-20 20-Apr-20 11-Jun-20 30 24 Control System(SS&ISH-104)_U341 [IFC]
Plumbing 02-Sep-19 A 31-Mar-20 28-Nov-19 17-Apr-20 112 27 31-Mar-20, Plumbing
ED341HV15035A Duct & Piping(SS&ISH-104)_U341 [IFR] 02-Sep-19 A 08-Oct-19 A 06-Jan-20 07-Feb-20 25 0 Duct & Piping(SS&ISH-104)_U341 [IFR]
ED341HV15035B Duct & Piping(SS&ISH-104)_U341 [Review-IFR] 09-Oct-19 A 29-Oct-19 A 08-Feb-20 22-Feb-20 15 0 Duct & Piping(SS&ISH-104)_U341 [Review-IFR]
ED341HV15035G Duct & Piping(SS&ISH-104)_U341 [IFC] 30-Oct-19 A 31-Mar-20 05-Mar-20 17-Apr-20 30 24 Duct & Piping(SS&ISH-104)_U341 [IFC]
ED341HV15040A Plumbing(SS&ISH-104)_U341 [IFR] 02-Sep-19 A 08-Oct-19 A 28-Nov-19 03-Jan-20 25 0 Plumbing(SS&ISH-104)_U341 [IFR]
ED341HV15040B Plumbing(SS&ISH-104)_U341 [Review-IFR] 09-Oct-19 A 24-Oct-19 A 04-Jan-20 18-Jan-20 15 0 Plumbing(SS&ISH-104)_U341 [Review-IFR]
ED341HV15040G Plumbing(SS&ISH-104)_U341 [IFC] 25-Oct-19 A 26-Feb-20 20-Jan-20 28-Feb-20 30 3 Plumbing(SS&ISH-104)_U341 [IFC]
Electrical 19-Dec-19 A 05-Aug-20 19-Dec-19 06-May-20 146 31 05-Aug-20, Electrical
Fire Alarm 19-Dec-19 A 05-Aug-20 19-Dec-19 06-May-20 146 31 05-Aug-20, Fire Alarm
ED341EL68020A Fire Alarm Layout(SS&ISH-104)_U341 [IFR] 19-Dec-19 A 08-Jan-20 A 19-Dec-19 31-Jan-20 30 0 Fire Alarm Layout(SS&ISH-104)_U341 [IFR]
ED341EL68020B Fire Alarm Layout(SS&ISH-104)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 01-Feb-20 15-Feb-20 15 0 Fire Alarm Layout(SS&ISH-104)_U341 [Review-IFR]
ED341EL68020G Fire Alarm Layout(SS&ISH-104)_U341 [IFC] 24-Jun-20 05-Aug-20 23-Mar-20 06-May-20 30 30 Fire Alarm Layout(SS&ISH-104)_U341 [IFC]
Safety & Fire Fighting 17-Jul-19 A 23-Apr-20 17-Jul-19 21-Feb-20 192 62 23-Apr-20, Safety & Fire Fighting
Fire Fighting Drawing 17-Jul-19 A 23-Apr-20 17-Jul-19 21-Feb-20 192 62 23-Apr-20, Fire Fighting Drawing
ED341SF25051A P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFR] 17-Jul-19 A 14-Feb-20 17-Jul-19 28-Aug-19 30 15 P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFR]
ED341SF25051B P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [Review/Appr.-IFR] 12-Sep-19 A 14-Feb-20 29-Aug-19 12-Sep-19 15 19 P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [Review/Appr.-IFR]
ED341SF25051E P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFD] 18-Dec-19 A 24-Feb-20 14-Oct-19 08-Nov-19 20 6 P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFD]
ED341SF25051F P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [Approved-IFD] 25-Feb-20 10-Mar-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [Approved-IFD]
ED341SF25051G P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFC] 11-Mar-20 08-Apr-20 09-Jan-20 05-Feb-20 20 20 P&ID and Piping Scheme for F/F System(SS&ISH-104)_U341 [IFC]
ED341SF30035A Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [IFR] 12-Aug-19 A 03-Oct-19 A 28-Nov-19 10-Jan-20 30 0 Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [IFR]
ED341SF30035B Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [Review/Appr.-IFR]
04-Oct-19 A 31-Dec-19 A 11-Jan-20 25-Jan-20 15 0 Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [Review/Appr.-IFR]
ED341SF30035G Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [AFD]26-Mar-20 23-Apr-20 27-Jan-20 21-Feb-20 20 20 Fire & Safety Equipment Location Plan-Common Facilities SS-4 (ISH 341-SS-104)_U341 [AFD]
Construction 06-Jul-20 03-May-21 04-May-20 03-Mar-21 228 228 03-May-21, Construction
Civil 03-Sep-20 14-Oct-20 09-Jul-20 22-Aug-20 36 36 14-Oct-20, Civil
Foundation - Equipment 03-Sep-20 14-Oct-20 09-Jul-20 22-Aug-20 36 36 14-Oct-20, Foundation - Equipment
CD341CV55035 Equipment Foundation(SS&ISH-104)_U341 03-Sep-20 14-Oct-20 09-Jul-20 22-Aug-20 36 36 Equipment Foundation(SS&ISH-104)_U341
Architectural 06-Jul-20 20-Apr-21 04-May-20 17-Feb-21 218 218 20-Apr-21, Architectural
Building Foundation 06-Jul-20 13-Oct-20 04-May-20 21-Aug-20 83 83 13-Oct-20, Building Foundation
CD341AR35720 Building Foundation(SS&ISH-104)_U341 06-Jul-20 02-Sep-20 04-May-20 08-Jul-20 48 48 Building Foundation(SS&ISH-104)_U341
CD341AR35790 Ground Slab(SS-104)_U341 03-Sep-20 18-Sep-20 09-Jul-20 24-Jul-20 14 14 Ground Slab(SS-104)_U341
CD341AR35920 Tranformer yard(SS-104)_U341 19-Sep-20 13-Oct-20 25-Jul-20 21-Aug-20 21 21 Tranformer yard(SS-104)_U341
Building Structure 19-Sep-20 22-Feb-21 25-Jul-20 16-Dec-20 114 114 22-Feb-21, Building Structure
CD341AR40100 Column/Beam/Girder - Ground Level(SS&ISH-104)_U341 19-Sep-20 09-Oct-20 25-Jul-20 15-Aug-20 18 18 Column/Beam/Girder - Ground Level(SS&ISH-104)_U341
CD341AR40105- 1st Floor Slab(SS&ISH-104)_U341 10-Oct-20 04-Nov-20 18-Aug-20 11-Sep-20 21 21 1st Floor Slab(SS&ISH-104)_U341
CD341AR40110 Column/Beam/Girder - 1st Floor(SS&ISH-104)_U341 05-Nov-20 30-Nov-20 12-Sep-20 02-Oct-20 18 18 Column/Beam/Girder - 1st Floor(SS&ISH-104)_U341
CD341AR40115- 2nd Floor Slab(SS&ISH-104)_U341 01-Dec-20 30-Dec-20 03-Oct-20 27-Oct-20 21 21 2nd Floor Slab(SS&ISH-104)_U341
CD341AR40120 Column/Beam/Girder - 2nd Floor(SS&ISH-104)_U341 31-Dec-20 26-Jan-21 28-Oct-20 20-Nov-20 18 18 Column/Beam/Girder - 2nd Floor(SS&ISH-104)_U341
CD341AR40125- Roof Slab(SS&ISH-104)_U341 27-Jan-21 22-Feb-21 23-Nov-20 16-Dec-20 18 18 Roof Slab(SS&ISH-104)_U341
Building Finishing 19-Jan-21 20-Apr-21 13-Nov-20 17-Feb-21 66 66 20-Apr-21, Building Finishing
CD341AR45135- Masonry&Plastering(SS&ISH-104)_U341 19-Jan-21 10-Mar-21 13-Nov-20 05-Jan-21 36 36 Masonry&Plastering(SS&ISH-104)_U341
CD341AR45140 Water Proofing(SS&IS H-104)_U341 01-Feb-21 24-Mar-21 26-Nov-20 18-Jan-21 36 36 Water Proofing(SS&IS H-104)_U341
CD341AR45145- Door & Window(SS&ISH-104)_U341 26-Mar-21 20-Apr-21 20-Jan-21 17-Feb-21 20 20 Door & Window(SS&ISH-104)_U341
CD341AR45150 Painting-Internal(SS&ISH-104)_U341 23-Feb-21 29-Mar-21 17-Dec-20 21-Jan-21 24 24 Painting-Internal(SS&ISH-104)_U341
CD341AR45155- Interior Finishing(SS&ISH-104)_U341 05-Mar-21 13-Apr-21 30-Dec-20 08-Feb-21 28 28 Interior Finishing(SS&ISH-104)_U341
CD341AR45225 Exterior Finishing(SS&ISH-104)_U341 22-Mar-21 20-Apr-21 14-Jan-21 17-Feb-21 24 24 Exterior Finishing(SS&ISH-104)_U341
HVAC 26-Feb-21 29-Apr-21 22-Dec-20 01-Mar-21 47 47 29-Apr-21, HVAC
HVAC & Control System 09-Mar-21 10-Apr-21 04-Jan-21 04-Feb-21 24 24 10-Apr-21, HVAC & Control System
CD341HV10010 HVAC Equipment Installation(SS&ISH-104)_U341 09-Mar-21 10-Apr-21 04-Jan-21 04-Feb-21 24 24 HVAC Equipment Installation(SS&ISH-104)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 15 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Plumbing 26-Feb-21 29-Apr-21 22-Dec-20 01-Mar-21 47 47 29-Apr-21, Plumbing
CD341HV15080 HVAC Duct Erection(SS&ISH-104)_U341 26-Feb-21 29-Mar-21 22-Dec-20 21-Jan-21 21 21 HVAC Duct Erection(SS&ISH-104)_U341
CD341HV15085 HVAC Piping work(SS&ISH-104)_U341 01-Apr-21 29-Apr-21 26-Jan-21 01-Mar-21 24 24 HVAC Piping work(SS&ISH-104)_U341
CD341HV15090 Plumbing&Sanitary(SS&ISH-104)_U341 01-Apr-21 29-Apr-21 26-Jan-21 01-Mar-21 24 24 Plumbing&Sanitary(SS&ISH-104)_U341
Electrical 11-Aug-20 03-May-21 18-Jun-20 03-Mar-21 198 198 03-May-21, Electrical
Cable Race Way 05-Mar-21 16-Apr-21 30-Dec-20 11-Feb-21 31 31 16-Apr-21, Cable Race Way
CD341EL45010 Electrical Cable Tray Installation(SS&ISH-104)_U341 05-Mar-21 13-Apr-21 30-Dec-20 08-Feb-21 28 28 Electrical Cable Tray Installation(SS&ISH-104)_U341
CD341EL45215- Electrical Conduit Pipe(SS&ISH-104)_U341 22-Mar-21 16-Apr-21 14-Jan-21 11-Feb-21 21 21 Electrical Conduit Pipe(SS&ISH-104)_U341
Power & Control 24-Mar-21 30-Apr-21 18-Jan-21 02-Mar-21 31 31 30-Apr-21, Power & Control
CD341EL45205- Termination - Power & Control(SS&ISH-104)_U341 07-Apr-21 30-Apr-21 01-Feb-21 02-Mar-21 21 21 Termination - Power & Control(SS&ISH-104)_U341
CD341EL45210- Cabling - Power & Control(SS&ISH-104)_U341 24-Mar-21 27-Apr-21 18-Jan-21 25-Feb-21 28 28 Cabling - Power & Control(SS&ISH-104)_U341
Earthing and Grouding 11-Aug-20 23-Sep-20 18-Jun-20 29-Jul-20 36 36 23-Sep-20, Earthing and Grouding
CD341EL50015 Cabling - Grounding(SS&ISH-104)_U341 11-Aug-20 23-Sep-20 18-Jun-20 29-Jul-20 36 36 Cabling - Grounding(SS&ISH-104)_U341
Lighting 12-Mar-21 03-May-21 06-Jan-21 03-Mar-21 40 40 03-May-21, Lighting
CD341EL60015 Installation - Distribution Panel(SS&ISH-104)_U341 30-Mar-21 27-Apr-21 22-Jan-21 25-Feb-21 24 24 Installation - Distribution Panel(SS&ISH-104)_U341
CD341EL60175 Cabling - Lightening(SS&ISH-104)_U341 12-Mar-21 17-Apr-21 06-Jan-21 15-Feb-21 28 28 Cabling - Lightening(SS&ISH-104)_U341
CD341EL60180 Lightening work(SS&ISH-104)_U341 12-Mar-21 17-Apr-21 06-Jan-21 15-Feb-21 28 28 Lightening work(SS&ISH-104)_U341
CD341EL60345 Installation of Lighting Fixture System (SS(ISH)-104)_U341 30-Mar-21 03-May-21 22-Jan-21 03-Mar-21 28 28 Installation of Lighting Fixture System (SS(ISH)-104)_U341
CD341EL60515 Cabling Lighting (SS(ISH)-104)_U341 30-Mar-21 03-May-21 22-Jan-21 03-Mar-21 28 28 Cabling Lighting (SS(ISH)-104)_U341
Communication 26-Mar-21 24-Apr-21 27-Jan-21 02-Mar-21 24 24 24-Apr-21, Communication
CD341EL65035 Installation - Communication System(SS&ISH-104)_U341 26-Mar-21 24-Apr-21 27-Jan-21 02-Mar-21 24 24 Installation - Communication System(SS&ISH-104)_U341
CD341EL65220 Cabling - Communication(SS&ISH-104)_U341 26-Mar-21 24-Apr-21 27-Jan-21 02-Mar-21 24 24 Cabling - Communication(SS&ISH-104)_U341
Fire Alarm 24-Mar-21 27-Apr-21 18-Jan-21 25-Feb-21 28 28 27-Apr-21, Fire Alarm
CD341EL68035 Installation - Fire Alarm System(SS&ISH-104)_U341 24-Mar-21 27-Apr-21 18-Jan-21 25-Feb-21 28 28 Installation - Fire Alarm System(SS&ISH-104)_U341
CD341EL68280 Cabling - Fire Alarm(SS&ISH-104)_U341 24-Mar-21 27-Apr-21 18-Jan-21 25-Feb-21 28 28 Cabling - Fire Alarm(SS&ISH-104)_U341
Safety & Fire Fighting 30-Mar-21 03-May-21 22-Jan-21 03-Mar-21 28 28 03-May-21, Safety & Fire Fighting
Fire Fighting Equipment 30-Mar-21 03-May-21 22-Jan-21 03-Mar-21 28 28 03-May-21, Fire Fighting Equipment
CD341MS40010 Installation - F/F Equipment(SS&ISH-104)_U341 30-Mar-21 03-May-21 22-Jan-21 03-Mar-21 28 28 Installation - F/F Equipment(SS&ISH-104)_U341
341-SS(ISH)-105 (in Unit 337 area) 12-Aug-19 A 08-Sep-21 24-Oct-19 03-May-21 470 408 08-Sep-21, 341-SS(ISH)-105 (in Unit 337 area)

Engineering 12-Aug-19 A 15-Jun-20 24-Oct-19 29-Jun-20 159 97 15-Jun-20, Engineering


Architectural 01-Oct-19 A 08-May-20 24-Oct-19 06-Apr-20 118 71 08-May-20, Architectural
Calculation 20-Jan-20 A 28-Apr-20 20-Jan-20 30-Mar-20 50 50 28-Apr-20, Calculation
ED341AR10025A Structural Calculation for Substation(341-SS&ISH-105)_U341 [IFR] 20-Jan-20 A 21-Jan-20 A 20-Jan-20 14-Feb-20 20 0 Structural Calculation for Substation(341-SS&ISH-105)_U341 [IFR]
ED341AR10025B Structural Calculation for Substation(341-SS&ISH-105)_U341 [Review-IFR] 22-Jan-20 A 29-Feb-20 15-Feb-20 29-Feb-20 15 12 Structural Calculation for Substation(341-SS&ISH-105)_U341 [Review-IFR]
ED341AR10025G Structural Calculation for Substation(341-SS&ISH-105)_U341 [AFD] 31-Mar-20 28-Apr-20 02-Mar-20 30-Mar-20 20 20 Structural Calculation for Substation(341-SS&ISH-105)_U341 [AFD]
Architecture Basic 01-Oct-19 A 28-Apr-20 24-Oct-19 27-Feb-20 112 65 28-Apr-20, Architecture Basic
ED341AR20065A Architectural Basic Drawing(SS&ISH-105)_U341 [IFR] 01-Oct-19 A 30-Oct-19 A 24-Oct-19 18-Dec-19 40 0 Architectural Basic Drawing(SS&ISH-105)_U341 [IFR]
ED341AR20065B Architectural Basic Drawing(SS&ISH-105)_U341 [Review-IFR] 31-Oct-19 A 16-Nov-19 A 19-Dec-19 02-Jan-20 15 0 Architectural Basic Drawing(SS&ISH-105)_U341 [Review-IFR]
ED341AR20065G Architectural Basic Drawing(SS&ISH-105)_U341 [IFC] 18-Nov-19 A 28-Feb-20 03-Jan-20 30-Jan-20 20 25 Architectural Basic Drawing(SS&ISH-105)_U341 [IFC]
ED341AR20073A Foundation/Pile Location Plan(SS&ISH-105)_U341 [IFR] 05-Dec-19 A 22-Jan-20 A 05-Dec-19 03-Jan-20 20 0 Foundation/Pile Location Plan(SS&ISH-105)_U341 [IFR]
ED341AR20073B Foundation/Pile Location Plan(SS&ISH-105)_U341 [Review-IFR] 23-Jan-20 A 21-Mar-20 04-Jan-20 18-Jan-20 15 15 Foundation/Pile Location Plan(SS&ISH-105)_U341 [Review-IFR]
ED341AR20073G Foundation/Pile Location Plan(SS&ISH-105)_U341 [IFC] 23-Mar-20 28-Apr-20 20-Jan-20 21-Feb-20 25 25 Foundation/Pile Location Plan(SS&ISH-105)_U341 [IFC]
ED341AR20075A Structural Basic Drawing(SS&ISH-105)_U341 [IFR] 19-Dec-19 A 17-Feb-20 19-Dec-19 17-Jan-20 20 16 Structural Basic Drawing(SS&ISH-105)_U341 [IFR]
ED341AR20075B Structural Basic Drawing(SS&ISH-105)_U341 [Review-IFR] 18-Feb-20 03-Mar-20 18-Jan-20 01-Feb-20 15 15 Structural Basic Drawing(SS&ISH-105)_U341 [Review-IFR]
ED341AR20075G Structural Basic Drawing(SS&ISH-105)_U341 [IFC] 02-Mar-20 30-Mar-20 31-Jan-20 27-Feb-20 20 20 Structural Basic Drawing(SS&ISH-105)_U341 [IFC]
Architecture Detail - Architectural 01-Oct-19 A 08-May-20 19-Dec-19 06-Apr-20 112 71 08-May-20, Architecture Detail - Architectural
ED341AR25045A Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [IFR] 01-Oct-19 A 30-Jan-20 19-Dec-19 24-Jan-20 25 4 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [IFR]
ED341AR25045B Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [Review-IFR] 31-Oct-19 A 13-Feb-20 31-Jan-20 14-Feb-20 15 19 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [Review-IFR]
ED341AR25045G Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [IFC] 02-Mar-20 30-Mar-20 17-Feb-20 13-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS&ISH-105)_U341 [IFC]
ED341AR25050A Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFR] 03-Mar-20 31-Mar-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFR]
ED341AR25050B Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [Review-IFR] 01-Apr-20 15-Apr-20 29-Feb-20 14-Mar-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [Review-IFR]
ED341AR25050G Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFC] 16-Apr-20 08-May-20 16-Mar-20 06-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFC]
Architecture Detail - Structural 04-Feb-20 08-May-20 06-Jan-20 06-Apr-20 66 66 08-May-20, Architecture Detail - Structural
ED341AR30045A Structural Drawing for Framing(SS&ISH-105)_U341 [IFR] 04-Feb-20 02-Mar-20 06-Jan-20 31-Jan-20 20 20 Structural Drawing for Framing(SS&ISH-105)_U341 [IFR]
ED341AR30045B Structural Drawing for Framing(SS&ISH-105)_U341 [Review-IFR] 03-Mar-20 17-Mar-20 01-Feb-20 15-Feb-20 15 15 Structural Drawing for Framing(SS&ISH-105)_U341 [Review-IFR]
ED341AR30045G Structural Drawing for Framing(SS&ISH-105)_U341 [IFC] 23-Mar-20 14-Apr-20 21-Feb-20 12-Mar-20 15 15 Structural Drawing for Framing(SS&ISH-105)_U341 [IFC]
ED341AR30050A Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341[IFR] 18-Feb-20 16-Mar-20 20-Jan-20 14-Feb-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341[IFR]
ED341AR30050B Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341 [Review-IFR] 17-Mar-20 31-Mar-20 15-Feb-20 29-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341 [Review-IFR]
ED341AR30050G Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341 [IFC] 01-Apr-20 22-Apr-20 02-Mar-20 20-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS&ISH-105)_U341 [IFC]
ED341AR30245A Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFR] 03-Mar-20 31-Mar-20 03-Feb-20 28-Feb-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFR]
ED341AR30245B Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [Review/Appr.-IFR] 01-Apr-20 15-Apr-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [Review/Appr.-IFR]
ED341AR30245G Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFC] 08-Apr-20 08-May-20 09-Mar-20 06-Apr-20 20 20 Structural Detail Drawing for Misc.(SS&ISH-105)_U341 [IFC]
HVAC 02-Sep-19 A 03-Apr-20 19-Dec-19 29-Jun-20 135 31 03-Apr-20, HVAC
HVAC & Control System 02-Sep-19 A 03-Apr-20 19-Dec-19 29-Jun-20 133 31 03-Apr-20, HVAC & Control System
ED341HV10070A HVAC System(SS&ISH-105)_U341 [IFR] 02-Sep-19 A 09-Oct-19 A 19-Dec-19 24-Jan-20 25 0 HVAC System(SS&ISH-105)_U341 [IFR]
ED341HV10070B HVAC System(SS&ISH-105)_U341 [Review-IFR] 10-Oct-19 A 30-Oct-19 A 25-Jan-20 08-Feb-20 15 0 HVAC System(SS&ISH-105)_U341 [Review-IFR]
ED341HV10070G HVAC System(SS&ISH-105)_U341 [IFC] 30-Oct-19 A 25-Feb-20 10-Feb-20 20-Mar-20 30 3 HVAC System(SS&ISH-105)_U341 [IFC]
ED341HV10075A Control System(SS&ISH-105)_U341 [IFR] 02-Sep-19 A 09-Oct-19 A 02-Mar-20 06-Apr-20 25 0 Control System(SS&ISH-105)_U341 [IFR]
ED341HV10075B Control System(SS&ISH-105)_U341 [Review-IFR] 10-Oct-19 A 30-Oct-19 A 07-Apr-20 21-Apr-20 15 0 Control System(SS&ISH-105)_U341 [Review-IFR]
ED341HV10075G Control System(SS&ISH-105)_U341 [IFC] 30-Oct-19 A 03-Apr-20 08-May-20 29-Jun-20 30 24 Control System(SS&ISH-105)_U341 [IFC]
Plumbing 02-Sep-19 A 04-Mar-20 19-Dec-19 06-May-20 111 6 04-Mar-20, Plumbing
ED341HV15045A Duct & Piping(SS&ISH-105)_U341 [IFR] 02-Sep-19 A 09-Oct-19 A 27-Jan-20 28-Feb-20 25 0 Duct & Piping(SS&ISH-105)_U341 [IFR]
ED341HV15045B Duct & Piping(SS&ISH-105)_U341 [Review-IFR] 10-Oct-19 A 29-Oct-19 A 29-Feb-20 14-Mar-20 15 0 Duct & Piping(SS&ISH-105)_U341 [Review-IFR]
ED341HV15045G Duct & Piping(SS&ISH-105)_U341 [IFC] 30-Oct-19 A 28-Feb-20 23-Mar-20 06-May-20 30 3 Duct & Piping(SS&ISH-105)_U341 [IFC]
ED341HV15050A Plumbing(SS&ISH-105)_U341 [IFR] 02-Sep-19 A 09-Oct-19 A 19-Dec-19 24-Jan-20 25 0 Plumbing(SS&ISH-105)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 16 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341HV15050B Plumbing(SS&ISH-105)_U341 [Review-IFR] 10-Oct-19 A 25-Oct-19 A 25-Jan-20 08-Feb-20 15 0 Plumbing(SS&ISH-105)_U341 [Review-IFR]
ED341HV15050G Plumbing(SS&ISH-105)_U341 [IFC] 28-Oct-19 A 04-Mar-20 10-Feb-20 20-Mar-20 30 3 Plumbing(SS&ISH-105)_U341 [IFC]
Electrical 12-Dec-19 A 06-May-20 06-Jan-20 14-Apr-20 74 30 06-May-20, Electrical
Fire Alarm 12-Dec-19 A 06-May-20 06-Jan-20 14-Apr-20 74 30 06-May-20, Fire Alarm
ED341EL68025A Fire Alarm Layout(SS&ISH-105)_U341 [IFR] 12-Dec-19 A 08-Jan-20 A 06-Jan-20 14-Feb-20 30 0 Fire Alarm Layout(SS&ISH-105)_U341 [IFR]
ED341EL68025B Fire Alarm Layout(SS&ISH-105)_U341 [Review-IFR] 09-Jan-20 A 21-Jan-20 A 15-Feb-20 29-Feb-20 15 0 Fire Alarm Layout(SS&ISH-105)_U341 [Review-IFR]
ED341EL68025G Fire Alarm Layout(SS&ISH-105)_U341 [IFC] 23-Mar-20 06-May-20 02-Mar-20 14-Apr-20 30 30 Fire Alarm Layout(SS&ISH-105)_U341 [IFC]
Safety & Fire Fighting 12-Aug-19 A 15-Jun-20 19-Dec-19 13-Mar-20 129 27 15-Jun-20, Safety & Fire Fighting
Fire Fighting Drawing 12-Aug-19 A 15-Jun-20 19-Dec-19 13-Mar-20 129 27 15-Jun-20, Fire Fighting Drawing
ED341SF30045A Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [IF
12-Aug-19
R] A 03-Oct-19 A 19-Dec-19 31-Jan-20 30 0 Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [IFR]
ED341SF30045B Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [Review/Appr.-IFR]
04-Oct-19 A 31-Dec-19 A 01-Feb-20 15-Feb-20 15 0 Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [Review/Appr.-IFR]
ED341SF30045G Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [AFD]
08-May-20 15-Jun-20 17-Feb-20 13-Mar-20 20 20 Fire & Safety Equipment Location Plan-Sea Water Intake Substatio n (IS H 341-SS-105)_U341 [AFD]
Construction 30-Sep-20 08-Sep-21 04-Jun-20 03-May-21 255 255 08-Sep-21, Construction
Civil 06-Oct-20 19-Nov-20 10-Jun-20 21-Jul-20 36 36 19-Nov-20, Civil
Foundation - Equipment 06-Oct-20 19-Nov-20 10-Jun-20 21-Jul-20 36 36 19-Nov-20, Foundation - Equipment
CD341CV55040 Equipment Foundation(SS&ISH-105)_U341 06-Oct-20 19-Nov-20 10-Jun-20 21-Jul-20 36 36 Equipment Foundation(SS&ISH-105)_U341
Architectural 30-Sep-20 02-Aug-21 04-Jun-20 25-Mar-21 225 225 02-Aug-21, Architectural
Building Foundation 30-Sep-20 11-Jan-21 04-Jun-20 03-Sep-20 76 76 11-Jan-21, Building Foundation
CD341AR35025 Building Foundation(SS&ISH-105)_U341 30-Sep-20 12-Nov-20 04-Jun-20 15-Jul-20 36 36 Building Foundation(SS&ISH-105)_U341
CD341AR35030 Ground Slab(SS-105)_U341 20-Nov-20 09-Dec-20 22-Jul-20 07-Aug-20 14 14 Ground Slab(SS-105)_U341
CD341AR35035 Tranformer yard(SS-105)_U341 10-Dec-20 11-Jan-21 08-Aug-20 03-Sep-20 21 21 Tranformer yard(SS-105)_U341
Building Structure 13-Nov-20 05-May-21 16-Jul-20 17-Dec-20 123 123 05-May-21, Building Structure
CD341AR40135- Column/Beam/Girder - Ground Level(SS&ISH-105)_U341 13-Nov-20 08-Dec-20 16-Jul-20 06-Aug-20 18 18 Column/Beam/Girder - Ground Level(SS&ISH-105)_U341
CD341AR40140 1st Floor Slab(SS&ISH-105)_U341 09-Dec-20 13-Jan-21 07-Aug-20 05-Sep-20 24 24 1st Floor Slab(SS&ISH-105)_U341
CD341AR40145- Column/Beam/Girder - 1st Floor(SS&ISH-105)_U341 14-Jan-21 08-Feb-21 07-Sep-20 26-Sep-20 18 18 Column/Beam/Girder - 1st Floor(SS&ISH-105)_U341
CD341AR40150 2nd Floor Slab(SS&ISH-105)_U341 09-Feb-21 16-Mar-21 28-Sep-20 24-Oct-20 24 24 2nd Floor Slab(SS&ISH-105)_U341
CD341AR40155- Column/Beam/Girder - 2nd Floor(SS&ISH-105)_U341 17-Mar-21 09-Apr-21 26-Oct-20 18-Nov-20 18 18 Column/Beam/Girder - 2nd Floor(SS&ISH-105)_U341
CD341AR40160 Roof Slab(SS&ISH-105)_U341 10-Apr-21 05-May-21 19-Nov-20 17-Dec-20 21 21 Roof Slab(SS&ISH-105)_U341
Building Finishing 23-Apr-21 02-Aug-21 04-Dec-20 25-Mar-21 76 76 02-Aug-21, Building Finishing
CD341AR45175- Masonry&Plastering(SS&ISH-105)_U341 23-Apr-21 05-Jun-21 04-Dec-20 14-Jan-21 28 28 Masonry&Plastering(SS&ISH-105)_U341
CD341AR45180 Water Proofing(SS&IS H-105)_U341 06-May-21 26-Jun-21 18-Dec-20 09-Feb-21 36 36 Water Proofing(SS&IS H-105)_U341
CD341AR45185- Door & Window(SS&ISH-105)_U341 13-Jul-21 02-Aug-21 01-Mar-21 25-Mar-21 18 18 Door & Window(SS&ISH-105)_U341
CD341AR45190 Painting-Internal(SS&ISH-105)_U341 21-May-21 26-Jun-21 29-Dec-20 09-Feb-21 30 30 Painting-Internal(SS&ISH-105)_U341
CD341AR45195- Interior Finishing(SS&ISH-105)_U341 16-Jun-21 19-Jul-21 27-Jan-21 08-Mar-21 28 28 Interior Finishing(SS&ISH-105)_U341
CD341AR45235 Exterior Finishing(SS&ISH-105)_U341 21-Jun-21 19-Jul-21 02-Feb-21 08-Mar-21 24 24 Exterior Finishing(SS&ISH-105)_U341
HVAC 28-May-21 26-Aug-21 06-Jan-21 19-Apr-21 74 74 26-Aug-21, HVAC
HVAC & Control System 28-Jun-21 22-Jul-21 10-Feb-21 12-Mar-21 21 21 22-Jul-21, HVAC & Control System
CD341HV10100 HVAC Equipment Installation(SS&ISH-105)_U341 28-Jun-21 22-Jul-21 10-Feb-21 12-Mar-21 21 21 HVAC Equipment Installation(SS&ISH-105)_U341
Plumbing 28-May-21 26-Aug-21 06-Jan-21 19-Apr-21 74 74 26-Aug-21, Plumbing
CD341HV15095 HVAC Duct Erection(SS&ISH-105)_U341 28-May-21 22-Jun-21 06-Jan-21 03-Feb-21 21 21 HVAC Duct Erection(SS&ISH-105)_U341
CD341HV15100 HVAC Piping work(SS&ISH-105)_U341 24-Jul-21 23-Aug-21 16-Mar-21 15-Apr-21 24 24 HVAC Piping work(SS&ISH-105)_U341
CD341HV15105 Plumbing&Sanitary(SS&ISH-105)_U341 28-Jul-21 26-Aug-21 19-Mar-21 19-Apr-21 24 24 Plumbing&Sanitary(SS&ISH-105)_U341
Electrical 14-Oct-20 08-Sep-21 18-Jun-20 03-May-21 243 243 08-Sep-21, Electrical
Cable Race Way 14-Jun-21 22-Jul-21 25-Jan-21 12-Mar-21 33 33 22-Jul-21, Cable Race Way
CD341EL45100- Electrical Cable Tray Installation(SS&ISH-105)_U341 14-Jun-21 19-Jul-21 25-Jan-21 08-Mar-21 30 30 Electrical Cable Tray Installation(SS&ISH-105)_U341
CD341EL45230- Electrical Conduit Pipe(SS&ISH-105)_U341 24-Jun-21 22-Jul-21 05-Feb-21 12-Mar-21 24 24 Electrical Conduit Pipe(SS&ISH-105)_U341
Power & Control 20-Jul-21 08-Sep-21 09-Mar-21 03-May-21 42 42 08-Sep-21, Power & Control
CD341EL45220- Termination - Power & Control(SS&ISH-105)_U341 14-Aug-21 08-Sep-21 08-Apr-21 03-May-21 21 21 Termination - Power & Control(SS&ISH-105)_U341
CD341EL45225- Cabling - Power & Control(SS&ISH-105)_U341 20-Jul-21 01-Sep-21 09-Mar-21 24-Apr-21 36 36 Cabling - Power & Control(SS&ISH-105)_U341
Earthing and Grouding 14-Oct-20 30-Nov-20 18-Jun-20 29-Jul-20 36 36 30-Nov-20, Earthing and Grouding
CD341EL50060 Cabling - Grounding(SS&ISH-105)_U341 14-Oct-20 30-Nov-20 18-Jun-20 29-Jul-20 36 36 Cabling - Grounding(SS&ISH-105)_U341
Lighting 18-Jun-21 23-Aug-21 29-Jan-21 15-Apr-21 54 54 23-Aug-21, Lighting
CD341EL60105 Installation - Distribution Panel(SS&ISH-105)_U341 18-Jun-21 02-Aug-21 29-Jan-21 25-Mar-21 38 38 Installation - Distribution Panel(SS&ISH-105)_U341
CD341EL60185 Cabling - Lightening(SS&ISH-105)_U341 20-Jul-21 23-Aug-21 09-Mar-21 15-Apr-21 28 28 Cabling - Lightening(SS&ISH-105)_U341
CD341EL60190 Lightening work(SS&ISH-105)_U341 20-Jul-21 23-Aug-21 09-Mar-21 15-Apr-21 28 28 Lightening work(SS&ISH-105)_U341
CD341EL60350 Installation of Lighting Fixture System (SS(ISH)-105)_U341 08-Jul-21 09-Aug-21 23-Feb-21 03-Apr-21 28 28 Installation of Lighting Fixture System (SS(ISH)-105)_U341
CD341EL60520 Cabling Lighting SS(ISH)-105)_U341 08-Jul-21 09-Aug-21 23-Feb-21 03-Apr-21 28 28 Cabling Lighting SS(ISH)-105)_U341
Communication 16-Jul-21 28-Aug-21 04-Mar-21 21-Apr-21 36 36 28-Aug-21, Communication
CD341EL65040 Installation - Communication System(SS&ISH-105)_U341 16-Jul-21 28-Aug-21 04-Mar-21 21-Apr-21 36 36 Installation - Communication System(SS&ISH-105)_U341
CD341EL65225 Cabling - Communication(SS&ISH-105)_U341 16-Jul-21 28-Aug-21 04-Mar-21 21-Apr-21 36 36 Cabling - Communication(SS&ISH-105)_U341
Fire Alarm 13-Jul-21 14-Aug-21 01-Mar-21 08-Apr-21 28 28 14-Aug-21, Fire Alarm
CD341EL68040 Installation - Fire Alarm System(SS&ISH-105)_U341 13-Jul-21 14-Aug-21 01-Mar-21 08-Apr-21 28 28 Installation - Fire Alarm System(SS&ISH-105)_U341
CD341EL68285 Cabling - Fire Alarm(SS&ISH-105)_U341 13-Jul-21 14-Aug-21 01-Mar-21 08-Apr-21 28 28 Cabling - Fire Alarm(SS&ISH-105)_U341
Safety & Fire Fighting 28-Jun-21 30-Jul-21 10-Feb-21 23-Mar-21 28 28 30-Jul-21, Safety & Fire Fighting
Fire Fighting Equipment 28-Jun-21 30-Jul-21 10-Feb-21 23-Mar-21 28 28 30-Jul-21, Fire Fighting Equipment
CD341MS40060 Installation - F/F Equipment(SS&ISH-105)_U341 28-Jun-21 30-Jul-21 10-Feb-21 23-Mar-21 28 28 Installation - F/F Equipment(SS&ISH-105)_U341
341-SS-110 (in Unit 332 area) 31-Jul-19 A 17-Jun-21 31-Jul-19 15-Jun-21 469 349 17-Jun-21, 341-SS-110 (in Unit 332 area)

Engineering 31-Jul-19 A 12-Aug-20 31-Jul-19 27-Jul-20 259 139 12-Aug-20, Engineering


Architectural 01-Nov-19 A 14-May-20 28-Nov-19 06-May-20 124 75 14-May-20, Architectural
Calculation 10-Feb-20 06-May-20 03-Feb-20 28-Apr-20 60 60 06-May-20, Calculation
ED341AR10030A Structural Calculation(SS-110)_U341 [IFR] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Structural Calculation(SS-110)_U341 [IFR]
ED341AR10030B Structural Calculation(SS-110)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 29-Feb-20 14-Mar-20 15 15 Structural Calculation(SS-110)_U341 [Review-IFR]
ED341AR10030G Structural Calculation(SS-110)_U341 [AFD] 07-Apr-20 06-May-20 31-Mar-20 28-Apr-20 20 20 Structural Calculation(SS-110)_U341 [AFD]
Architecture Basic 01-Nov-19 A 12-May-20 28-Nov-19 30-Mar-20 99 73 12-May-20, Architecture Basic
ED341AR20080A Architectural Basic Drawing(SS-110)_U341 [IFR] 01-Nov-19 A 18-Dec-19 A 28-Nov-19 17-Jan-20 35 0 Architectural Basic Drawing(SS-110)_U341 [IFR]
ED341AR20080B Architectural Basic Drawing(SS-110)_U341 [Review-IFR] 23-Nov-19 A 06-Jan-20 A 18-Jan-20 01-Feb-20 15 0 Architectural Basic Drawing(SS-110)_U341 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 17 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR20080G Architectural Basic Drawing(SS-110)_U341 [IFC] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Architectural Basic Drawing(SS-110)_U341 [IFC]
ED341AR20085A Foundation/Pile Location Plan(SS-110)_U341 [IFR] 20-Feb-20 18-Mar-20 19-Dec-19 17-Jan-20 20 20 Foundation/Pile Location Plan(SS-110)_U341 [IFR]
ED341AR20085B Foundation/Pile Location Plan(SS-110)_U341 [Review-IFR] 19-Mar-20 02-Apr-20 18-Jan-20 01-Feb-20 15 15 Foundation/Pile Location Plan(SS-110)_U341 [Review-IFR]
ED341AR20085G Foundation/Pile Location Plan(SS-110)_U341 [IFC] 03-Apr-20 12-May-20 03-Feb-20 06-Mar-20 25 25 Foundation/Pile Location Plan(SS-110)_U341 [IFC]
ED341AR20090A Structural Basic Drawing(SS-110)_U341 [IFR] 27-Jan-20 21-Feb-20 20-Jan-20 14-Feb-20 20 20 Structural Basic Drawing(SS-110)_U341 [IFR]
ED341AR20090B Structural Basic Drawing(SS-110)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 15-Feb-20 29-Feb-20 15 15 Structural Basic Drawing(SS-110)_U341 [Review-IFR]
ED341AR20090G Structural Basic Drawing(SS-110)_U341 [IFC] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Structural Basic Drawing(SS-110)_U341 [IFC]
Architecture Detail - Architectural 01-Nov-19 A 11-May-20 20-Jan-20 30-Apr-20 95 72 11-May-20, Architecture Detail - Architectural
ED341AR25055A Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [IFR] 01-Nov-19 A 21-Feb-20 20-Jan-20 21-Feb-20 25 20 Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [IFR]
ED341AR25055B Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [Review-IFR] 23-Nov-19 A 03-Mar-20 18-Feb-20 03-Mar-20 15 38 Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [Review-IFR]
ED341AR25055G Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [IFC] 09-Mar-20 06-Apr-20 04-Mar-20 01-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS-110)_U341 [IFC]
ED341AR25060A Architectural Detail Drawing for Misc.(SS-110)_U341 [IFR] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Architectural Detail Drawing for Misc.(SS-110)_U341 [IFR]
ED341AR25060B Architectural Detail Drawing for Misc.(SS-110)_U341 [Review-IFR] 02-Apr-20 16-Apr-20 25-Mar-20 08-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-110)_U341 [Review-IFR]
ED341AR25060G Architectural Detail Drawing for Misc.(SS-110)_U341 [IFC] 17-Apr-20 11-May-20 09-Apr-20 30-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-110)_U341 [IFC]
Architecture Detail - Structural 10-Feb-20 14-May-20 03-Feb-20 06-May-20 66 66 14-May-20, Architecture Detail - Structural
ED341AR30055A Structural Detail Drawing for Framing(SS-110)_U341 [IFR] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Structural Detail Drawing for Framing(SS-110)_U341 [IFR]
ED341AR30055B Structural Detail Drawing for Framing(SS-110)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for Framing(SS-110)_U341 [Review-IFR]
ED341AR30055G Structural Detail Drawing for Framing(SS-110)_U341 [IFC] 23-Mar-20 14-Apr-20 16-Mar-20 06-Apr-20 15 15 Structural Detail Drawing for Framing(SS-110)_U341 [IFC]
ED341AR30060A Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [IFR] 24-Feb-20 20-Mar-20 17-Feb-20 13-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [IFR]
ED341AR30060B Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 14-Mar-20 28-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [Review-IFR]
ED341AR30060G Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [IFC] 07-Apr-20 28-Apr-20 31-Mar-20 21-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-110)_U341 [IFC]
ED341AR30255A Structural Detail Drawing for Misc.(SS-110)_U341 [IFR] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Structural Detail Drawing for Misc.(SS-110)_U341 [IFR]
ED341AR30255B Structural Detail Drawing for Misc.(SS-110)_U341 [Review/Appr.-IFR] 07-Apr-20 21-Apr-20 31-Mar-20 14-Apr-20 15 15 Structural Detail Drawing for Misc.(SS-110)_U341 [Review/Appr.-IFR]
ED341AR30255G Structural Detail Drawing for Misc.(SS-110)_U341 [IFC] 22-Apr-20 14-May-20 15-Apr-20 06-May-20 15 15 Structural Detail Drawing for Misc.(SS-110)_U341 [IFC]
HVAC 01-Oct-19 A 07-Jul-20 20-Jan-20 27-Jul-20 171 84 07-Jul-20, HVAC
HVAC & Control System 01-Oct-19 A 16-Apr-20 20-Jan-20 27-Jul-20 152 28 16-Apr-20, HVAC & Control System
ED341HV10085A HVAC System(SS-110)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 20-Jan-20 21-Feb-20 25 0 HVAC System(SS-110)_U341 [IFR]
ED341HV10085B HVAC System(SS-110)_U341 [Review-IFR] 30-Oct-19 A 11-Dec-19 A 22-Feb-20 07-Mar-20 15 0 HVAC System(SS-110)_U341 [Review-IFR]
ED341HV10085G HVAC System(SS-110)_U341 [IFC] 12-Dec-19 A 19-Mar-20 09-Mar-20 21-Apr-20 30 9 HVAC System(SS-110)_U341 [IFC]
ED341HV10090A Control System(SS-110)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 31-Mar-20 06-May-20 25 0 Control System(SS-110)_U341 [IFR]
ED341HV10090B Control System(SS-110)_U341 [Review-IFR] 30-Oct-19 A 11-Dec-19 A 07-May-20 21-May-20 15 0 Control System(SS-110)_U341 [Review-IFR]
ED341HV10090G Control System(SS-110)_U341 [IFC] 12-Dec-19 A 16-Apr-20 16-Jun-20 27-Jul-20 30 9 Control System(SS-110)_U341 [IFC]
Plumbing 01-Oct-19 A 07-Jul-20 20-Jan-20 15-Jun-20 144 84 07-Jul-20, Plumbing
ED341HV15055A Duct & Piping(SS-110)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 24-Feb-20 30-Mar-20 25 0 Duct & Piping(SS-110)_U341 [IFR]
ED341HV15055B Duct & Piping(SS-110)_U341 [Review-IFR] 30-Oct-19 A 11-Dec-19 A 31-Mar-20 14-Apr-20 15 0 Duct & Piping(SS-110)_U341 [Review-IFR]
ED341HV15055G Duct & Piping(SS-110)_U341 [IFC] 12-Dec-19 A 02-Apr-20 22-Apr-20 15-Jun-20 30 9 Duct & Piping(SS-110)_U341 [IFC]
ED341HV15060A Plumbing(SS-110)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 20-Jan-20 21-Feb-20 25 0 Plumbing(SS-110)_U341 [IFR]
ED341HV15060B Plumbing(SS-110)_U341 [Review-IFR] 30-Oct-19 A 14-Nov-19 A 22-Feb-20 07-Mar-20 15 0 Plumbing(SS-110)_U341 [Review-IFR]
ED341HV15060G Plumbing(SS-110)_U341 [IFC] 15-Nov-19 A 07-Jul-20 09-Mar-20 21-Apr-20 30 76 Plumbing(SS-110)_U341 [IFC]
Electrical 13-Oct-19 A 12-Aug-20 19-Dec-19 19-Jun-20 160 139 12-Aug-20, Electrical
Power & Control 27-Jan-20 28-Jul-20 13-Jan-20 28-Apr-20 128 128 28-Jul-20, Power & Control
ED341EL45061A Electrical Cable Route Layout(SS-110_OC4)_U341 [IFR] 27-Jan-20 28-Feb-20 13-Jan-20 14-Feb-20 25 25 Electrical Cable Route Layout(SS-110_OC4)_U341 [IFR]
ED341EL45061B Electrical Cable Route Layout(SS-110_OC4)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 15-Feb-20 29-Feb-20 15 15 Electrical Cable Route Layout(SS-110_OC4)_U341 [Review-IFR]
ED341EL45061G Electrical Cable Route Layout(SS-110_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS-110_OC4)_U341 [IFC]
ED341EL45066A Power Layout(SS-110_OC4)_U341 [IFR] 24-Feb-20 30-Mar-20 10-Feb-20 13-Mar-20 25 25 Power Layout(SS-110_OC4)_U341 [IFR]
ED341EL45066B Power Layout(SS-110_OC4)_U341 [Review-IFR] 31-Mar-20 14-Apr-20 14-Mar-20 28-Mar-20 15 15 Power Layout(SS-110_OC4)_U341 [Review-IFR]
ED341EL45066G Power Layout(SS-110_OC4)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Power Layout(SS-110_OC4)_U341 [IFC]
Earthing and Grouding 13-Oct-19 A 06-Apr-20 19-Dec-19 30-Mar-20 135 21 06-Apr-20, Earthing and Grouding
ED341EL50030A Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [IFR] 13-Oct-19 A 10-Dec-19 A 19-Dec-19 14-Feb-20 40 0 Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [IFR]
ED341EL50030B Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 15-Feb-20 29-Feb-20 15 0 Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [Review-IFR]
ED341EL50030G Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [IFC] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Earthing and Lightning Protection Layout(SS-110_OC4)_U341 [IFC]
Lighting 02-Mar-20 12-Aug-20 17-Feb-20 08-Jun-20 115 115 12-Aug-20, Lighting
ED341EL60030A Lighting and Small Power Layout(SS-110)_U341 [IFR] 02-Mar-20 14-Apr-20 17-Feb-20 30-Mar-20 30 30 Lighting and Small Power Layout(SS-110)_U341 [IFR]
ED341EL60030B Lighting and Small Power Layout(SS-110)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 31-Mar-20 14-Apr-20 15 15 Lighting and Small Power Layout(SS-110)_U341 [Review-IFR]
ED341EL60030G Lighting and Small Power Layout(SS-110)_U341 [IFC] 01-Jul-20 12-Aug-20 15-Apr-20 08-Jun-20 30 30 Lighting and Small Power Layout(SS-110)_U341 [IFC]
Communication 13-Oct-19 A 28-Jul-20 13-Jan-20 19-Jun-20 156 83 28-Jul-20, Communication
ED341EL65035A Telecom/Security/PAGA System Layout(SS-110)_U341 [IFR] 13-Oct-19 A 10-Dec-19 A 13-Jan-20 13-Mar-20 45 0 Telecom/Security/PAGA System Layout(SS-110)_U341 [IFR]
ED341EL65035B Telecom/Security/PAGA System Layout(SS-110)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 14-Mar-20 28-Mar-20 15 0 Telecom/Security/PAGA System Layout(SS-110)_U341 [Approved-IFR]
ED341EL65035G Telecom/Security/PAGA System Layout(SS-110)_U341 [IFC] 24-Dec-19 A 28-Jul-20 30-Mar-20 19-Jun-20 50 76 Telecom/Security/PAGA System Layout(SS-110)_U341 [IFC]
Fire Alarm 09-Dec-19 A 28-Jul-20 03-Feb-20 13-May-20 114 83 28-Jul-20, Fire Alarm
ED341EL68030A Fire Alarm Layout(SS-110)_U341 [IFR] 09-Dec-19 A 17-Jan-20 A 03-Feb-20 13-Mar-20 30 0 Fire Alarm Layout(SS-110)_U341 [IFR]
ED341EL68030B Fire Alarm Layout(SS-110)_U341 [Review-IFR] 18-Jan-20 A 14-Apr-20 14-Mar-20 28-Mar-20 15 15 Fire Alarm Layout(SS-110)_U341 [Review-IFR]
ED341EL68030G Fire Alarm Layout(SS-110)_U341 [IFC] 17-Jun-20 28-Jul-20 30-Mar-20 13-May-20 30 30 Fire Alarm Layout(SS-110)_U341 [IFC]
Safety & Fire Fighting 31-Jul-19 A 05-May-20 31-Jul-19 14-Apr-20 188 68 05-May-20, Safety & Fire Fighting
Fire Fighting Drawing 31-Jul-19 A 05-May-20 31-Jul-19 14-Apr-20 188 68 05-May-20, Fire Fighting Drawing
ED341SF25101A P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFR] 31-Jul-19 A 14-Feb-20 31-Jul-19 04-Sep-19 25 15 P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFR]
ED341SF25101B P&ID and Piping Scheme for F/F System(SS-110)_U341 [Review/Appr.-IFR] 01-Oct-19 A 20-Feb-20 05-Sep-19 19-Sep-19 15 26 P&ID and Piping Scheme for F/F System(SS-110)_U341 [Review/Appr.-IFR]
ED341SF25101E P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFD] 21-Feb-20 19-Mar-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFD]
ED341SF25101F P&ID and Piping Scheme for F/F System(SS-110)_U341 [Approved-IFD] 20-Mar-20 03-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS-110)_U341 [Approved-IFD]
ED341SF25101G P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFC] 06-Apr-20 05-May-20 17-Feb-20 13-Mar-20 20 20 P&ID and Piping Scheme for F/F System(SS-110)_U341 [IFC]
ED341SF30055A Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [IFR] 05-Sep-19 A 21-Oct-19 A 20-Jan-20 28-Feb-20 30 0 Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [IFR]
ED341SF30055B Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [Review/Appr.-IFR]
22-Oct-19 A 10-Jan-20 A 29-Feb-20 14-Mar-20 15 0 Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [Review/Appr.-IFR]
ED341SF30055G Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [AFD] 09-Mar-20 06-Apr-20 16-Mar-20 14-Apr-20 20 20 Fire & Safety Equipment Location Plan-Common Facilities SS-3 (341-SS-110)_U341 [AFD]
Construction 08-Jul-20 17-Jun-21 06-Jul-20 15-Jun-21 256 256 17-Jun-21, Construction
Civil 08-Jul-20 05-Nov-20 06-Jul-20 03-Nov-20 100 100 05-Nov-20, Civil

Actual Level of Effort Actual Work Critical Remaining Work Page 18 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Piling 08-Jul-20 03-Aug-20 06-Jul-20 30-Jul-20 22 22 03-Aug-20, Piling
CD341CV30045 Piling Work(SS-110)_U332 08-Jul-20 03-Aug-20 06-Jul-20 30-Jul-20 22 22 Piling Work(SS-110)_U332
Foundation - Equipment 01-Oct-20 05-Nov-20 29-Sep-20 03-Nov-20 30 30 05-Nov-20, Foundation - Equipment
CD341CV55045 Equipment Foundation(SS-110)_U341 01-Oct-20 05-Nov-20 29-Sep-20 03-Nov-20 30 30 Equipment Foundation(SS-110)_U341
Architectural 19-Aug-20 03-May-21 15-Aug-20 29-Apr-21 192 192 03-May-21, Architectural
Building Foundation 19-Aug-20 18-Nov-20 15-Aug-20 16-Nov-20 75 75 18-Nov-20, Building Foundation
CD341AR35730 Building Foundation(SS-110)_U341 19-Aug-20 30-Sep-20 15-Aug-20 28-Sep-20 36 36 Building Foundation(SS-110)_U341
CD341AR35925 Ground Slab(SS-110)_U341 01-Oct-20 21-Oct-20 29-Sep-20 19-Oct-20 18 18 Ground Slab(SS-110)_U341
CD341AR35930 Tranformer yard(SS-110)_U341 22-Oct-20 18-Nov-20 20-Oct-20 16-Nov-20 21 21 Tranformer yard(SS-110)_U341
Building Structure 22-Oct-20 15-Feb-21 20-Oct-20 10-Feb-21 81 81 15-Feb-21, Building Structure
CD341AR40170 Column/Beam/Girder - Ground Level(SS-110)_U341 22-Oct-20 13-Nov-20 20-Oct-20 11-Nov-20 18 18 Column/Beam/Girder - Ground Level(SS-110)_U341
CD341AR40175- 1st Floor Slab(SS-110)_U341 16-Nov-20 17-Dec-20 12-Nov-20 15-Dec-20 24 24 1st Floor Slab(SS-110)_U341
CD341AR40180 Column/Beam/Girder - 1st Floor(SS-110)_U341 18-Dec-20 14-Jan-21 16-Dec-20 12-Jan-21 18 18 Column/Beam/Girder - 1st Floor(SS-110)_U341
CD341AR40185- Roof Slab(SS-110)_U341 15-Jan-21 15-Feb-21 13-Jan-21 10-Feb-21 21 21 Roof Slab(SS-110)_U341
Building Finishing 01-Feb-21 03-May-21 28-Jan-21 29-Apr-21 67 67 03-May-21, Building Finishing
CD341AR45215- Masonry&Plastering(SS-110)_U341 01-Feb-21 12-Mar-21 28-Jan-21 09-Mar-21 28 28 Masonry&Plastering(SS-110)_U341
CD341AR45220 Water Proofing(SS-110)_U341 16-Feb-21 07-Apr-21 11-Feb-21 05-Apr-21 36 36 Water Proofing(SS-110)_U341
CD341AR45225- Door & Window(SS-110)_U341 29-Mar-21 19-Apr-21 25-Mar-21 16-Apr-21 18 18 Door & Window(SS-110)_U341
CD341AR45230 Painting-Internal(SS-110)_U341 04-Mar-21 07-Apr-21 02-Mar-21 05-Apr-21 24 24 Painting-Internal(SS-110)_U341
CD341AR45235- Interior Finishing(SS-110)_U341 17-Mar-21 21-Apr-21 15-Mar-21 19-Apr-21 28 28 Interior Finishing(SS-110)_U341
CD341AR45240 Exterior Finishing(SS-110)_U341 05-Apr-21 03-May-21 01-Apr-21 29-Apr-21 24 24 Exterior Finishing(SS-110)_U341
HVAC 09-Mar-21 14-Jun-21 05-Mar-21 11-Jun-21 69 69 14-Jun-21, HVAC
HVAC & Control System 08-Apr-21 03-May-21 06-Apr-21 29-Apr-21 21 21 03-May-21, HVAC & Control System
CD341HV10035 HVAC Equipment Installation(SS-110)_U341 08-Apr-21 03-May-21 06-Apr-21 29-Apr-21 21 21 HVAC Equipment Installation(SS-110)_U341
Plumbing 09-Mar-21 14-Jun-21 05-Mar-21 11-Jun-21 69 69 14-Jun-21, Plumbing
CD341HV15110 HVAC Duct Erection(SS-110)_U341 09-Mar-21 07-Apr-21 05-Mar-21 05-Apr-21 21 21 HVAC Duct Erection(SS-110)_U341
CD341HV15115 HVAC Piping work(SS-110)_U341 04-May-21 07-Jun-21 30-Apr-21 04-Jun-21 21 21 HVAC Piping work(SS-110)_U341
CD341HV15120 Plumbing&Sanitary(SS-110)_U341 11-May-21 14-Jun-21 08-May-21 11-Jun-21 21 21 Plumbing&Sanitary(SS-110)_U341
Electrical 03-Sep-20 17-Jun-21 01-Sep-20 15-Jun-21 210 210 17-Jun-21, Electrical
Cable Race Way 25-Mar-21 05-May-21 23-Mar-21 03-May-21 33 33 05-May-21, Cable Race Way
CD341EL45035 Electrical Cable Tray Installation(SS-110)_U341 25-Mar-21 28-Apr-21 23-Mar-21 26-Apr-21 28 28 Electrical Cable Tray Installation(SS-110)_U341
CD341EL45245- Electrical Conduit Pipe(SS-110)_U341 10-Apr-21 05-May-21 08-Apr-21 03-May-21 21 21 Electrical Conduit Pipe(SS-110)_U341
Power & Control 12-Apr-21 17-Jun-21 09-Apr-21 15-Jun-21 48 48 17-Jun-21, Power & Control
CD341EL45235- Termination - Power & Control(SS-110)_U341 22-May-21 17-Jun-21 12-May-21 15-Jun-21 21 21 Termination - Power & Control(SS-110)_U341
CD341EL45240- Cabling - Power & Control(SS-110)_U341 12-Apr-21 03-Jun-21 09-Apr-21 31-May-21 36 36 Cabling - Power & Control(SS-110)_U341
Earthing and Grouding 03-Sep-20 14-Oct-20 01-Sep-20 12-Oct-20 36 36 14-Oct-20, Earthing and Grouding
CD341EL50030 Cabling - Grounding(SS-110)_U341 03-Sep-20 14-Oct-20 01-Sep-20 12-Oct-20 36 36 Cabling - Grounding(SS-110)_U341
Lighting 04-Mar-21 29-May-21 02-Mar-21 27-May-21 60 60 29-May-21, Lighting
CD341EL60040 Installation - Distribution Panel(SS-110)_U341 31-Mar-21 21-May-21 29-Mar-21 11-May-21 36 36 Installation - Distribution Panel(SS-110)_U341
CD341EL60195 Cabling - Lightening(SS-110)_U341 04-Mar-21 12-Apr-21 02-Mar-21 09-Apr-21 28 28 Cabling - Lightening(SS-110)_U341
CD341EL60200 Lightening work(SS-110)_U341 04-Mar-21 12-Apr-21 02-Mar-21 09-Apr-21 28 28 Lightening work(SS-110)_U341
CD341EL60355 Installation of Lighting Fixture System (SS-110)_U341 17-Apr-21 29-May-21 15-Apr-21 27-May-21 28 28 Installation of Lighting Fixture System (SS-110)_U341
CD341EL60525 Cabling Lighting (SS-110)_U341 17-Apr-21 29-May-21 15-Apr-21 27-May-21 28 28 Cabling Lighting (SS-110)_U341
Communication 21-Apr-21 03-Jun-21 19-Apr-21 31-May-21 28 28 03-Jun-21, Communication
CD341EL65045 Installation - Communication System(SS-110)_U341 21-Apr-21 03-Jun-21 19-Apr-21 31-May-21 28 28 Installation - Communication System(SS-110)_U341
CD341EL65230 Cabling - Communication(SS-110)_U341 21-Apr-21 03-Jun-21 19-Apr-21 31-May-21 28 28 Cabling - Communication(SS-110)_U341
Fire Alarm 10-Apr-21 21-May-21 08-Apr-21 11-May-21 28 28 21-May-21, Fire Alarm
CD341EL68045 Installation - Fire Alarm System(SS-110)_U341 10-Apr-21 21-May-21 08-Apr-21 11-May-21 28 28 Installation - Fire Alarm System(SS-110)_U341
CD341EL68290 Cabling - Fire Alarm(SS-110)_U341 10-Apr-21 21-May-21 08-Apr-21 11-May-21 28 28 Cabling - Fire Alarm(SS-110)_U341
Safety & Fire Fighting 25-Mar-21 28-Apr-21 23-Mar-21 26-Apr-21 28 28 28-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 25-Mar-21 28-Apr-21 23-Mar-21 26-Apr-21 28 28 28-Apr-21, Fire Fighting Equipment
CD341MS40025 Installation - F/F Equipment(SS-110)_U341 25-Mar-21 28-Apr-21 23-Mar-21 26-Apr-21 28 28 Installation - F/F Equipment(SS-110)_U341
341-ISH-110 (in Unit 332 area) 14-Dec-19 A 14-Jul-21 05-Dec-19 08-Jun-21 357 357 14-Jul-21, 341-ISH-110 (in Unit 332 area)

Engineering 14-Dec-19 A 23-Sep-20 05-Dec-19 27-Jul-20 158 158 23-Sep-20, Engineering


Architectural 12-Feb-20 09-Jul-20 05-Dec-19 28-Apr-20 104 104 09-Jul-20, Architectural
Calculation 24-Feb-20 21-Apr-20 17-Feb-20 14-Apr-20 41 41 21-Apr-20, Calculation
ED341AR10050A Structural Calculation(ISH-110)_U341 [IFR] 24-Feb-20 13-Mar-20 17-Feb-20 06-Mar-20 15 15 Structural Calculation(ISH-110)_U341 [IFR]
ED341AR10050B Structural Calculation(ISH-110)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 07-Mar-20 21-Mar-20 15 15 Structural Calculation(ISH-110)_U341 [Review-IFR]
ED341AR10050G Structural Calculation(ISH-110)_U341 [AFD] 31-Mar-20 21-Apr-20 23-Mar-20 14-Apr-20 15 15 Structural Calculation(ISH-110)_U341 [AFD]
Architecture Basic 12-Feb-20 16-Jun-20 05-Dec-19 30-Mar-20 87 87 16-Jun-20, Architecture Basic
ED341AR20140A Architectural Basic Drawing(ISH-110)_U341 [IFR] 12-Feb-20 24-Mar-20 05-Dec-19 17-Jan-20 30 30 Architectural Basic Drawing(ISH-110)_U341 [IFR]
ED341AR20140B Architectural Basic Drawing(ISH-110)_U341 [Review-IFR] 25-Mar-20 08-Apr-20 18-Jan-20 01-Feb-20 15 15 Architectural Basic Drawing(ISH-110)_U341 [Review-IFR]
ED341AR20140G Architectural Basic Drawing(ISH-110)_U341 [IFC] 14-Apr-20 05-May-20 17-Feb-20 06-Mar-20 15 15 Architectural Basic Drawing(ISH-110)_U341 [IFC]
ED341AR20145A Foundation/Pile Location Plan(ISH-110)_U341 [IFR] 26-Mar-20 23-Apr-20 20-Jan-20 14-Feb-20 20 20 Foundation/Pile Location Plan(ISH-110)_U341 [IFR]
ED341AR20145B Foundation/Pile Location Plan(ISH-110)_U341 [Review-IFR] 24-Apr-20 08-May-20 15-Feb-20 29-Feb-20 15 15 Foundation/Pile Location Plan(ISH-110)_U341 [Review-IFR]
ED341AR20145G Foundation/Pile Location Plan(ISH-110)_U341 [IFC] 11-May-20 16-Jun-20 02-Mar-20 30-Mar-20 20 20 Foundation/Pile Location Plan(ISH-110)_U341 [IFC]
Architecture Detail - Architectural 26-Mar-20 30-Jun-20 20-Jan-20 14-Apr-20 66 66 30-Jun-20, Architecture Detail - Architectural
ED341AR25095A Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [IFR] 26-Mar-20 23-Apr-20 20-Jan-20 14-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [IFR]
ED341AR25095B Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [Review-IFR] 24-Apr-20 08-May-20 15-Feb-20 29-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [Review-IFR]
ED341AR25095G Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [IFC] 11-May-20 16-Jun-20 02-Mar-20 30-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(IS H-110)_U341 [IFC]
ED341AR25101A Architectural Detail Drawing for Misc.(ISH-110)_U341 [IFR] 09-Apr-20 11-May-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Misc.(ISH-110)_U341 [IFR]
ED341AR25101B Architectural Detail Drawing for Misc.(ISH-110)_U341 [Review-IFR] 12-May-20 26-May-20 29-Feb-20 14-Mar-20 15 15 Architectural Detail Drawing for Misc.(ISH-110)_U341 [Review-IFR]
ED341AR25101G Architectural Detail Drawing for Misc.(ISH-110)_U341 [IFC] 10-Jun-20 30-Jun-20 23-Mar-20 14-Apr-20 15 15 Architectural Detail Drawing for Misc.(ISH-110)_U341 [IFC]
Architecture Detail - Structural 09-Apr-20 09-Jul-20 03-Feb-20 28-Apr-20 63 63 09-Jul-20, Architecture Detail - Structural
ED341AR30095A Structural Detail Drawing for Framing(ISH-110)_U341 [IFR] 09-Apr-20 11-May-20 03-Feb-20 28-Feb-20 20 20 Structural Detail Drawing for Framing(ISH-110)_U341 [IFR]
ED341AR30095B Structural Detail Drawing for Framing(ISH-110)_U341 [Review-IFR] 12-May-20 26-May-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for Framing(ISH-110)_U341 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 19 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR30095G Structural Detail Drawing for Framing(ISH-110)_U341 [IFC] 03-Jun-20 23-Jun-20 23-Mar-20 14-Apr-20 15 15 Structural Detail Drawing for Framing(ISH-110)_U341 [IFC]
ED341AR30103A Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [IFR] 24-Apr-20 03-Jun-20 17-Feb-20 13-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [IFR]
ED341AR30103B Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [Review-IFR] 04-Jun-20 18-Jun-20 14-Mar-20 28-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [Review-IFR]
ED341AR30103G Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [IFC] 19-Jun-20 09-Jul-20 07-Apr-20 28-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(ISH-110)_U341 [IFC]
HVAC 16-Dec-19 A 23-Sep-20 20-Jan-20 27-Jul-20 127 128 23-Sep-20, HVAC
HVAC & Control System 16-Dec-19 A 23-Sep-20 20-Jan-20 27-Jul-20 127 128 23-Sep-20, HVAC & Control System
ED341HV10145A HVAC System(ISH-110)_U341 [IFR] 20-Jan-20 A 21-Jan-20 A 20-Jan-20 21-Feb-20 25 0 HVAC System(ISH-110)_U341 [IFR]
ED341HV10145B HVAC System(ISH-110)_U341 [Review-IFR] 22-Jan-20 A 15-Apr-20 22-Feb-20 07-Mar-20 15 22 HVAC System(ISH-110)_U341 [Review-IFR]
ED341HV10145G HVAC System(ISH-110)_U341 [IFC] 06-May-20 26-Jun-20 09-Mar-20 21-Apr-20 30 30 HVAC System(ISH-110)_U341 [IFC]
ED341HV10150A Control System(ISH-110)_U341 [IFR] 16-Dec-19 A 23-Jun-20 31-Mar-20 06-May-20 25 54 Control System(ISH-110)_U341 [IFR]
ED341HV10150B Control System(ISH-110)_U341 [Review-IFR] 22-Jan-20 A 08-Jul-20 07-May-20 21-May-20 15 15 Control System(ISH-110)_U341 [Review-IFR]
ED341HV10150G Control System(ISH-110)_U341 [IFC] 11-Aug-20 23-Sep-20 16-Jun-20 27-Jul-20 30 30 Control System(ISH-110)_U341 [IFC]
Plumbing 17-Dec-19 A 10-Aug-20 20-Jan-20 15-Jun-20 95 96 10-Aug-20, Plumbing
ED341HV15095A Duct & Piping(ISH-110)_U341 [IFR] 17-Dec-19 A 21-Jan-20 A 24-Feb-20 30-Mar-20 25 0 Duct & Piping(ISH-110)_U341 [IFR]
ED341HV15095B Duct & Piping(ISH-110)_U341 [Review-IFR] 22-Jan-20 A 23-May-20 31-Mar-20 14-Apr-20 15 60 Duct & Piping(ISH-110)_U341 [Review-IFR]
ED341HV15095G Duct & Piping(ISH-110)_U341 [IFC] 29-Jun-20 10-Aug-20 22-Apr-20 15-Jun-20 30 30 Duct & Piping(ISH-110)_U341 [IFC]
ED341HV15100A Plumbing(ISH-110)_U341 [IFR] 26-Mar-20 30-Apr-20 20-Jan-20 21-Feb-20 25 25 Plumbing(ISH-110)_U341 [IFR]
ED341HV15100B Plumbing(ISH-110)_U341 [Review-IFR] 01-May-20 15-May-20 22-Feb-20 07-Mar-20 15 15 Plumbing(ISH-110)_U341 [Review-IFR]
ED341HV15100G Plumbing(ISH-110)_U341 [IFC] 18-May-20 07-Jul-20 09-Mar-20 21-Apr-20 30 30 Plumbing(ISH-110)_U341 [IFC]
Electrical 14-Dec-19 A 05-Aug-20 03-Feb-20 29-May-20 82 31 05-Aug-20, Electrical
Fire Alarm 14-Dec-19 A 05-Aug-20 03-Feb-20 29-May-20 82 31 05-Aug-20, Fire Alarm
ED341EL68050A Fire Alarm Layout(ISH-110)_U341 [IFR] 14-Dec-19 A 22-Jan-20 A 03-Feb-20 13-Mar-20 30 0 Fire Alarm Layout(ISH-110)_U341 [IFR]
ED341EL68050B Fire Alarm Layout(ISH-110)_U341 [Revie w-IFR] 23-Jan-20 A 23-Jan-20 A 14-Mar-20 28-Mar-20 15 0 Fire Alarm Layout(ISH-110)_U341 [Revie w-IFR]
ED341EL68050G Fire Alarm Layout(ISH-110)_U341 [IFC] 24-Jun-20 05-Aug-20 07-Apr-20 29-May-20 30 30 Fire Alarm Layout(ISH-110)_U341 [IFC]
Construction 17-Sep-20 14-Jul-21 15-Sep-20 08-Jun-21 220 220 14-Jul-21, Construction
Architectural 19-Sep-20 09-Mar-21 17-Sep-20 05-Mar-21 125 125 09-Mar-21, Architectural
Building Foundation 19-Sep-20 05-Nov-20 17-Sep-20 03-Nov-20 40 40 05-Nov-20, Building Foundation
CD341AR35265 Building Foundation(ISH-110)_U341 19-Sep-20 21-Oct-20 17-Sep-20 19-Oct-20 28 28 Building Foundation(ISH-110)_U341
CD341AR35270 Ground Slab(ISH-110)_U341 22-Oct-20 05-Nov-20 20-Oct-20 03-Nov-20 12 12 Ground Slab(ISH-110)_U341
Building Structure 06-Nov-20 31-Dec-20 04-Nov-20 29-Dec-20 39 39 31-Dec-20, Building Structure
CD341AR40355 Column/Beam/Girder(ISH-110)_U341 06-Nov-20 01-Dec-20 04-Nov-20 27-Nov-20 18 18 Column/Beam/Girder(ISH-110)_U341
CD341AR40365 Roof Slab(ISH-110)_U341 02-Dec-20 31-Dec-20 30-Nov-20 29-Dec-20 21 21 Roof Slab(ISH-110)_U341
Building Finishing 04-Jan-21 09-Mar-21 30-Dec-20 05-Mar-21 46 46 09-Mar-21, Building Finishing
CD341AR45285 Exterior Finishing (ISH-110)_U341 08-Feb-21 09-Mar-21 04-Feb-21 05-Mar-21 21 21 Exterior Finishing (ISH-110)_U341
CD341AR45380 Masonry&Plastering(ISH-110)_U341 04-Jan-21 27-Jan-21 30-Dec-20 25-Jan-21 18 18 Masonry&Plastering(ISH-110)_U341
CD341AR45385- Water Proofing(ISH-110)_U341 04-Jan-21 10-Feb-21 30-Dec-20 08-Feb-21 28 28 Water Proofing(ISH-110)_U341
CD341AR45390 Door & Window(ISH-110)_U341 11-Feb-21 01-Mar-21 09-Feb-21 25-Feb-21 12 12 Door & Window(ISH-110)_U341
CD341AR45395- Painting-Internal(ISH-110)_U341 20-Jan-21 15-Feb-21 18-Jan-21 10-Feb-21 18 18 Painting-Internal(ISH-110)_U341
CD341AR45400 Interior Finishing(ISH-110)_U341 02-Feb-21 03-Mar-21 29-Jan-21 01-Mar-21 21 21 Interior Finishing(ISH-110)_U341
HVAC 22-Jan-21 28-Apr-21 20-Jan-21 03-Apr-21 70 70 28-Apr-21, HVAC
HVAC & Control System 05-Apr-21 28-Apr-21 01-Mar-21 30-Mar-21 21 21 28-Apr-21, HVAC & Control System
CD341HV10105 HVAC Equipment Installation(ISH-110)_U341 05-Apr-21 28-Apr-21 01-Mar-21 30-Mar-21 21 21 HVAC Equipment Installation(ISH-110)_U341
Plumbing 22-Jan-21 28-Apr-21 20-Jan-21 03-Apr-21 70 70 28-Apr-21, Plumbing
CD341HV15155 HVAC Duct Erection(ISH-110)_U341 22-Jan-21 25-Feb-21 20-Jan-21 23-Feb-21 24 24 HVAC Duct Erection(ISH-110)_U341
CD341HV15160 HVAC Piping work(ISH-110)_U341 26-Feb-21 29-Mar-21 24-Feb-21 25-Mar-21 21 21 HVAC Piping work(ISH-110)_U341
CD341HV15165 Plumbing&Sanitary(ISH-110)_U341 31-Mar-21 28-Apr-21 01-Mar-21 03-Apr-21 24 24 Plumbing&Sanitary(ISH-110)_U341
Electrical 17-Sep-20 14-Jul-21 15-Sep-20 08-Jun-21 220 220 14-Jul-21, Electrical
Cable Race Way 29-Jan-21 13-Apr-21 26-Jan-21 09-Apr-21 52 52 13-Apr-21, Cable Race Way
CD341EL45105 Electrical Cable Tray Installation(ISH-110)_U341 29-Jan-21 10-Mar-21 26-Jan-21 05-Mar-21 28 28 Electrical Cable Tray Installation(ISH-110)_U341
CD341EL45290- Electrical Conduit Pipe(ISH-110)_U341 12-Mar-21 13-Apr-21 08-Mar-21 09-Apr-21 24 24 Electrical Conduit Pipe(ISH-110)_U341
Power & Control 01-Mar-21 14-Jul-21 15-Jan-21 08-Jun-21 100 100 14-Jul-21, Power & Control
CD341EL45280- Termination - Power & Control(ISH-110)_U341 06-May-21 14-Jul-21 30-Mar-21 08-Jun-21 50 50 Termination - Power & Control(ISH-110)_U341
CD341EL45285- Cabling - Power & Control(ISH-110)_U341 01-Mar-21 05-May-21 15-Jan-21 29-Mar-21 50 50 Cabling - Power & Control(ISH-110)_U341
Earthing and Grouding 17-Sep-20 28-Oct-20 15-Sep-20 26-Oct-20 36 36 28-Oct-20, Earthing and Grouding
CD341EL50065 Cabling - Grounding(ISH-110)_U341 17-Sep-20 28-Oct-20 15-Sep-20 26-Oct-20 36 36 Cabling - Grounding(ISH-110)_U341
Lighting 04-Jan-21 29-Mar-21 30-Dec-20 24-Mar-21 59 59 29-Mar-21, Lighting
CD341EL60110 Installation - Distribution Panel(ISH-110)_U341 28-Jan-21 03-Mar-21 26-Jan-21 01-Mar-21 24 24 Installation - Distribution Panel(ISH-110)_U341
CD341EL60225 Cabling - Lightening(ISH-110)_U341 04-Jan-21 01-Feb-21 30-Dec-20 28-Jan-21 21 21 Cabling - Lightening(ISH-110)_U341
CD341EL60230 Lightening work(ISH-110)_U341 04-Jan-21 01-Feb-21 30-Dec-20 28-Jan-21 21 21 Lightening work(ISH-110)_U341
CD341EL60375 Installation of Lighting Fixture System (ISH-110)_U341 17-Feb-21 29-Mar-21 11-Feb-21 24-Mar-21 28 28 Installation of Lighting Fixture System (ISH-110)_U341
CD341EL60545 Cabling Lighting (ISH-110)_U341 17-Feb-21 29-Mar-21 11-Feb-21 24-Mar-21 28 28 Cabling Lighting (ISH-110)_U341
Communication 04-May-21 07-Jun-21 30-Apr-21 04-Jun-21 21 21 07-Jun-21, Communication
CD341EL65060 Installation - Communication System(ISH-110)_U341 04-May-21 07-Jun-21 30-Apr-21 04-Jun-21 21 21 Installation - Communication System(ISH-110)_U341
CD341EL65250 Cabling - Communication(ISH-110)_U341 04-May-21 07-Jun-21 30-Apr-21 04-Jun-21 21 21 Cabling - Communication(ISH-110)_U341
Fire Alarm 29-Jan-21 01-Mar-21 27-Jan-21 25-Feb-21 21 21 01-Mar-21, Fire Alarm
CD341EL68060 Installation - Fire Alarm System(ISH-110)_U341 29-Jan-21 01-Mar-21 27-Jan-21 25-Feb-21 21 21 Installation - Fire Alarm System(ISH-110)_U341
CD341EL68310 Cabling - Fire Alarm(ISH-110)_U341 29-Jan-21 01-Mar-21 27-Jan-21 25-Feb-21 21 21 Cabling - Fire Alarm(ISH-110)_U341
Safety & Fire Fighting 19-Mar-21 23-Apr-21 11-Feb-21 24-Mar-21 28 28 23-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 19-Mar-21 23-Apr-21 11-Feb-21 24-Mar-21 28 28 23-Apr-21, Fire Fighting Equipment
CD341MS40065 Installation - F/F Equipment(ISH-110)_U341 19-Mar-21 23-Apr-21 11-Feb-21 24-Mar-21 28 28 Installation - F/F Equipment(ISH-110)_U341
341-SS-111 (in Unit 331 E area) 31-Jul-19 A 03-May-21 31-Jul-19 17-Mar-21 438 318 03-May-21, 341-SS-111 (in Unit 331 E area)

Engineering 31-Jul-19 A 12-Aug-20 31-Jul-19 25-Jun-20 259 139 12-Aug-20, Engineering


Architectural 13-Oct-19 A 14-May-20 21-Oct-19 07-Apr-20 75 75 14-May-20, Architectural
Calculation 24-Feb-20 05-May-20 15-Jan-20 26-Mar-20 49 49 05-May-20, Calculation
ED341AR10035A Structural Calculation for Substation(341-SS-111)_U341 [IFR] 24-Feb-20 20-Mar-20 15-Jan-20 11-Feb-20 20 20 Structural Calculation for Substation(341-SS-111)_U341 [IFR]
ED341AR10035B Structural Calculation for Substation(341-SS-111)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 12-Feb-20 26-Feb-20 15 15 Structural Calculation for Substation(341-SS-111)_U341 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 20 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR10035G Structural Calculation for Substation(341-SS-111)_U341 [AFD] 06-Apr-20 05-May-20 27-Feb-20 26-Mar-20 20 20 Structural Calculation for Substation(341-SS-111)_U341 [AFD]
Architecture Basic 13-Oct-19 A 14-Apr-20 21-Oct-19 02-Mar-20 56 56 14-Apr-20, Architecture Basic
ED341AR20095A Architectural Basic Drawing(SS-111)_U341 [IFR] 13-Oct-19 A 06-Dec-19 A 21-Oct-19 13-Dec-19 40 0 Architectural Basic Drawing(SS-111)_U341 [IFR]
ED341AR20095B Architectural Basic Drawing(SS-111)_U341 [Review-IFR] 07-Dec-19 A 24-Dec-19 A 14-Dec-19 28-Dec-19 15 0 Architectural Basic Drawing(SS-111)_U341 [Review-IFR]
ED341AR20095G Architectural Basic Drawing(SS-111)_U341 [IFC] 27-Jan-20 21-Feb-20 07-Jan-20 03-Feb-20 20 20 Architectural Basic Drawing(SS-111)_U341 [IFC]
ED341AR20103A Foundation/Pile Location Plan(SS-111)_U341 [IFR] 27-Jan-20 28-Feb-20 11-Nov-19 13-Dec-19 25 25 Foundation/Pile Location Plan(SS-111)_U341 [IFR]
ED341AR20103B Foundation/Pile Location Plan(SS-111)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 14-Dec-19 28-Dec-19 15 15 Foundation/Pile Location Plan(SS-111)_U341 [Review-IFR]
ED341AR20103G Foundation/Pile Location Plan(SS-111)_U341 [IFC] 16-Mar-20 14-Apr-20 07-Jan-20 03-Feb-20 20 20 Foundation/Pile Location Plan(SS-111)_U341 [IFC]
ED341AR20105A Structural Basic Drawing(SS-111)_U341 [IFR] 27-Jan-20 21-Feb-20 16-Dec-19 14-Jan-20 20 20 Structural Basic Drawing(SS-111)_U341 [IFR]
ED341AR20105B Structural Basic Drawing(SS-111)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 15-Jan-20 29-Jan-20 15 15 Structural Basic Drawing(SS-111)_U341 [Review-IFR]
ED341AR20105G Structural Basic Drawing(SS-111)_U341 [IFC] 09-Mar-20 06-Apr-20 04-Feb-20 02-Mar-20 20 20 Structural Basic Drawing(SS-111)_U341 [IFC]
Architecture Detail - Architectural 30-Oct-19 A 23-Apr-20 16-Dec-19 07-Apr-20 71 62 23-Apr-20, Architecture Detail - Architectural
ED341AR25065A Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [IFR] 30-Oct-19 A 31-Jan-20 16-Dec-19 21-Jan-20 25 5 Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [IFR]
ED341AR25065B Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [Review-IFR] 07-Dec-19 A 09-Feb-20 22-Jan-20 05-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [Review-IFR]
ED341AR25065G Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [IFC] 27-Jan-20 21-Feb-20 10-Mar-20 07-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS-111)_U341 [IFC]
ED341AR25072A Architectural Detail Drawing for Misc.(SS-111)_U341 [IFR] 19-Feb-20 17-Mar-20 10-Jan-20 06-Feb-20 20 20 Architectural Detail Drawing for Misc.(SS-111)_U341 [IFR]
ED341AR25072B Architectural Detail Drawing for Misc.(SS-111)_U341 [Review-IFR] 18-Mar-20 01-Apr-20 07-Feb-20 21-Feb-20 15 15 Architectural Detail Drawing for Misc.(SS-111)_U341 [Review-IFR]
ED341AR25072G Architectural Detail Drawing for Misc.(SS-111)_U341 [IFC] 02-Apr-20 23-Apr-20 17-Mar-20 07-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-111)_U341 [IFC]
Architecture Detail - Structural 03-Feb-20 14-May-20 23-Dec-19 07-Apr-20 71 71 14-May-20, Architecture Detail - Structural
ED341AR30065A Structural Detail Drawing for Framing(SS-111)_U341 [IFR] 03-Feb-20 28-Feb-20 23-Dec-19 21-Jan-20 20 20 Structural Detail Drawing for Framing(SS-111)_U341 [IFR]
ED341AR30065B Structural Detail Drawing for Framing(SS-111)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 22-Jan-20 05-Feb-20 15 15 Structural Detail Drawing for Framing(SS-111)_U341 [Review-IFR]
ED341AR30065G Structural Detail Drawing for Framing(SS-111)_U341 [IFC] 31-Mar-20 21-Apr-20 25-Feb-20 16-Mar-20 15 15 Structural Detail Drawing for Framing(SS-111)_U341 [IFC]
ED341AR30073A Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [IFR] 12-Feb-20 10-Mar-20 03-Jan-20 30-Jan-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [IFR]
ED341AR30073B Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [Review-IFR] 11-Mar-20 25-Mar-20 31-Jan-20 14-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [Review-IFR]
ED341AR30073G Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [IFC] 15-Apr-20 06-May-20 10-Mar-20 31-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-111)_U341 [IFC]
ED341AR30265A Structural Detail Drawing for Misc.(SS-111)_U341 [IFR] 19-Feb-20 17-Mar-20 10-Jan-20 06-Feb-20 20 20 Structural Detail Drawing for Misc.(SS-111)_U341 [IFR]
ED341AR30265B Structural Detail Drawing for Misc.(SS-111)_U341 [Review/Appr.-IFR] 18-Mar-20 01-Apr-20 07-Feb-20 21-Feb-20 15 15 Structural Detail Drawing for Misc.(SS-111)_U341 [Review/Appr.-IFR]
ED341AR30265G Structural Detail Drawing for Misc.(SS-111)_U341 [IFC] 22-Apr-20 14-May-20 17-Mar-20 07-Apr-20 15 15 Structural Detail Drawing for Misc.(SS-111)_U341 [IFC]
HVAC 01-Oct-19 A 01-Apr-20 16-Dec-19 25-Jun-20 164 28 01-Apr-20, HVAC
HVAC & Control System 01-Oct-19 A 01-Apr-20 16-Dec-19 25-Jun-20 145 28 01-Apr-20, HVAC & Control System
ED341HV10100A HVAC System(SS-111)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 16-Dec-19 21-Jan-20 25 0 HVAC System(SS-111)_U341 [IFR]
ED341HV10100B HVAC System(SS-111)_U341 [Review-IFR] 30-Oct-19 A 11-Dec-19 A 22-Jan-20 05-Feb-20 15 0 HVAC System(SS-111)_U341 [Review-IFR]
ED341HV10100G HVAC System(SS-111)_U341 [IFC] 12-Dec-19 A 05-Mar-20 06-Feb-20 18-Mar-20 30 9 HVAC System(SS-111)_U341 [IFC]
ED341HV10105A Control System(SS-111)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 26-Feb-20 01-Apr-20 25 0 Control System(SS-111)_U341 [IFR]
ED341HV10105B Control System(SS-111)_U341 [Review-IFR] 30-Oct-19 A 11-Dec-19 A 02-Apr-20 16-Apr-20 15 0 Control System(SS-111)_U341 [Review-IFR]
ED341HV10105G Control System(SS-111)_U341 [IFC] 12-Dec-19 A 01-Apr-20 05-May-20 25-Jun-20 30 9 Control System(SS-111)_U341 [IFC]
Plumbing 01-Oct-19 A 23-Mar-20 16-Dec-19 04-May-20 139 21 23-Mar-20, Plumbing
ED341HV15065A Duct & Piping(SS-111)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 22-Jan-20 25-Feb-20 25 0 Duct & Piping(SS-111)_U341 [IFR]
ED341HV15065B Duct & Piping(SS-111)_U341 [Review-IFR] 30-Oct-19 A 27-Dec-19 A 26-Feb-20 11-Mar-20 15 0 Duct & Piping(SS-111)_U341 [Review-IFR]
ED341HV15065G Duct & Piping(SS-111)_U341 [IFC] 12-Dec-19 A 18-Mar-20 19-Mar-20 04-May-20 30 9 Duct & Piping(SS-111)_U341 [IFC]
ED341HV15070A Plumbing(SS-111)_U341 [IFR] 01-Oct-19 A 29-Oct-19 A 16-Dec-19 21-Jan-20 25 0 Plumbing(SS-111)_U341 [IFR]
ED341HV15070B Plumbing(SS-111)_U341 [Revie w-IFR] 30-Oct-19 A 14-Nov-19 A 22-Jan-20 05-Feb-20 15 0 Plumbing(SS-111)_U341 [Revie w-IFR]
ED341HV15070G Plumbing(SS-111)_U341 [IFC] 15-Nov-19 A 23-Mar-20 06-Feb-20 18-Mar-20 30 21 Plumbing(SS-111)_U341 [IFC]
Electrical 21-Oct-19 A 12-Aug-20 18-Nov-19 14-May-20 139 139 12-Aug-20, Electrical
Power & Control 27-Jan-20 28-Jul-20 09-Dec-19 28-Apr-20 128 128 28-Jul-20, Power & Control
ED341EL45070A Electrical Cable Route Layout(SS-111_OC4)_U341 [IFR] 27-Jan-20 28-Feb-20 09-Dec-19 14-Jan-20 25 25 Electrical Cable Route Layout(SS-111_OC4)_U341 [IFR]
ED341EL45070B Electrical Cable Route Layout(SS-111_OC4)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 15-Jan-20 29-Jan-20 15 15 Electrical Cable Route Layout(SS-111_OC4)_U341 [Review-IFR]
ED341EL45070G Electrical Cable Route Layout(SS-111_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS-111_OC4)_U341 [IFC]
ED341EL45075A Power Layout(SS-111_OC4)_U341 [IFR] 24-Feb-20 30-Mar-20 08-Jan-20 11-Feb-20 25 25 Power Layout(SS-111_OC4)_U341 [IFR]
ED341EL45075B Power Layout(SS-111_OC4)_U341 [Review-IFR] 31-Mar-20 14-Apr-20 12-Feb-20 26-Feb-20 15 15 Power Layout(SS-111_OC4)_U341 [Review-IFR]
ED341EL45075G Power Layout(SS-111_OC4)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Power Layout(SS-111_OC4)_U341 [IFC]
Earthing and Grouding 21-Oct-19 A 20-Mar-20 18-Nov-19 02-Mar-20 47 20 20-Mar-20, Earthing and Grouding
ED341EL50035A Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [IFR] 21-Oct-19 A 18-Dec-19 A 18-Nov-19 14-Jan-20 40 0 Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [IFR]
ED341EL50035B Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [Revie w-IFR] 19-Dec-19 A 08-Jan-20 A 15-Jan-20 29-Jan-20 15 0 Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [Revie w-IFR]
ED341EL50035G Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [IFC] 24-Feb-20 20-Mar-20 04-Feb-20 02-Mar-20 20 20 Earthing and Lightning Protection Layout(SS-111_OC4)_U341 [IFC]
Lighting 02-Mar-20 12-Aug-20 15-Jan-20 14-May-20 115 115 12-Aug-20, Lighting
ED341EL60035A Lighting and Small Power Layout(SS-111)_U341 [IFR] 02-Mar-20 14-Apr-20 15-Jan-20 25-Feb-20 30 30 Lighting and Small Power Layout(SS-111)_U341 [IFR]
ED341EL60035B Lighting and Small Power Layout(SS-111)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 26-Feb-20 11-Mar-20 15 15 Lighting and Small Power Layout(SS-111)_U341 [Review-IFR]
ED341EL60035G Lighting and Small Power Layout(SS-111)_U341 [IFC] 01-Jul-20 12-Aug-20 31-Mar-20 14-May-20 30 30 Lighting and Small Power Layout(SS-111)_U341 [IFC]
Communication 10-Feb-20 28-Jul-20 23-Dec-19 28-Apr-20 119 119 28-Jul-20, Communication
ED341EL65040A Telecom/Security/PAGA System Layout(SS-111)_U341 [IFR] 10-Feb-20 30-Mar-20 23-Dec-19 11-Feb-20 35 35 Telecom/Security/PAGA System Layout(SS-111)_U341 [IFR]
ED341EL65040B Telecom/Security/PAGA System Layout(SS-111)_U341 [Approved-IFR] 31-Mar-20 14-Apr-20 12-Feb-20 26-Feb-20 15 15 Telecom/Security/PAGA System Layout(SS-111)_U341 [Approved-IFR]
ED341EL65040G Telecom/Security/PAGA System Layout(SS-111)_U341 [IFC] 10-Jun-20 28-Jul-20 09-Mar-20 28-Apr-20 35 35 Telecom/Security/PAGA System Layout(SS-111)_U341 [IFC]
Fire Alarm 07-Dec-19 A 03-Jul-20 30-Jan-20 12-May-20 76 46 03-Jul-20, Fire Alarm
ED341EL68035A Fire Alarm Layout(SS-111)_U341 [IFR] 07-Dec-19 A 17-Jan-20 A 30-Jan-20 11-Mar-20 30 0 Fire Alarm Layout(SS-111)_U341 [IFR]
ED341EL68035B Fire Alarm Layout(SS-111)_U341 [Review-IFR] 18-Jan-20 A 13-May-20 12-Mar-20 26-Mar-20 15 15 Fire Alarm Layout(SS-111)_U341 [Review-IFR]
ED341EL68035G Fire Alarm Layout(SS-111)_U341 [IFC] 14-May-20 03-Jul-20 27-Mar-20 12-May-20 30 30 Fire Alarm Layout(SS-111)_U341 [IFC]
Safety & Fire Fighting 31-Jul-19 A 14-May-20 31-Jul-19 11-Mar-20 195 75 14-May-20, Safety & Fire Fighting
Fire Fighting Drawing 31-Jul-19 A 14-May-20 31-Jul-19 11-Mar-20 195 75 14-May-20, Fire Fighting Drawing
ED341SF25121A P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFR] 31-Jul-19 A 14-Feb-20 31-Jul-19 04-Sep-19 25 15 P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFR]
ED341SF25121B P&ID and Piping Scheme for F/F System(SS-111)_U341 [Review/Appr.-IFR] 01-Oct-19 A 28-Feb-20 05-Sep-19 19-Sep-19 15 33 P&ID and Piping Scheme for F/F System(SS-111)_U341 [Review/Appr.-IFR]
ED341SF25121E P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFD] 02-Mar-20 30-Mar-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFD]
ED341SF25121F P&ID and Piping Scheme for F/F System(SS-111)_U341 [Approved-IFD] 31-Mar-20 14-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS-111)_U341 [Approved-IFD]
ED341SF25121G P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFC] 15-Apr-20 14-May-20 21-Jan-20 17-Feb-20 20 20 P&ID and Piping Scheme for F/F System(SS-111)_U341 [IFC]
ED341SF30065A Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [IFR]
05-Sep-19 A 21-Oct-19 A 16-Dec-19 28-Jan-20 30 0 Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 21 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341SF30065B Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [Revi
22-Oct-19
e w/Appr.-IFR]
A 10-Jan-20 A 29-Jan-20 12-Feb-20 15 0 Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [Revie w/Appr.-IFR]
ED341SF30065G Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [AFD]
24-Feb-20 20-Mar-20 13-Feb-20 11-Mar-20 20 20 Fire & Safety Equipment Location Plan-New BPP-1 & 2 Main Sub-Station (341-SS-111)_U341 [AFD]
Construction 30-May-20 03-May-21 08-May-20 17-Mar-21 258 258 03-May-21, Construction
Civil 02-Jun-20 17-Jul-20 09-May-20 03-Jul-20 40 40 17-Jul-20, Civil
Foundation - Equipment 02-Jun-20 17-Jul-20 09-May-20 03-Jul-20 40 40 17-Jul-20, Foundation - Equipment
CD341CV55065 Equipment Foundation(SS-111)_U341 02-Jun-20 17-Jul-20 09-May-20 03-Jul-20 40 40 Equipment Foundation(SS-111)_U341
Architectural 30-May-20 03-Feb-21 08-May-20 18-Jan-21 194 194 03-Feb-21, Architectural
Building Foundation 30-May-20 25-Aug-20 08-May-20 08-Aug-20 71 71 25-Aug-20, Building Foundation
CD341AR35735 Building Foundation(SS-111)_U341 30-May-20 11-Jul-20 08-May-20 27-Jun-20 36 36 Building Foundation(SS-111)_U341
CD341AR35750 Ground Slab(SS-111)_U341 13-Jul-20 28-Jul-20 29-Jun-20 14-Jul-20 14 14 Ground Slab(SS-111)_U341
CD341AR35780 Tranformer yard(SS-111)_U341 29-Jul-20 25-Aug-20 15-Jul-20 08-Aug-20 21 21 Tranformer yard(SS-111)_U341
Building Structure 29-Jul-20 23-Nov-20 15-Jul-20 05-Nov-20 94 94 23-Nov-20, Building Structure
CD341AR40195- Column/Beam/Girder - Ground Level(SS-111)_U341 29-Jul-20 25-Aug-20 15-Jul-20 08-Aug-20 21 21 Column/Beam/Girder - Ground Level(SS-111)_U341
CD341AR40200 1st Floor Slab(SS-111)_U341 26-Aug-20 26-Sep-20 10-Aug-20 12-Sep-20 28 28 1st Floor Slab(SS-111)_U341
CD341AR40205- Column/Beam/Girder - 1st Floor(SS-111)_U341 28-Sep-20 21-Oct-20 14-Sep-20 07-Oct-20 21 21 Column/Beam/Girder - 1st Floor(SS-111)_U341
CD341AR40210 Roof Slab(SS-111)_U341 22-Oct-20 23-Nov-20 08-Oct-20 05-Nov-20 24 24 Roof Slab(SS-111)_U341
Building Finishing 22-Oct-20 03-Feb-21 08-Oct-20 18-Jan-21 74 74 03-Feb-21, Building Finishing
CD341AR45245 Exterior Finishing(SS-111)_U341 24-Dec-20 03-Feb-21 08-Dec-20 18-Jan-21 28 28 Exterior Finishing(SS-111)_U341
CD341AR45255- Masonry&Plastering(SS-111)_U341 22-Oct-20 09-Dec-20 08-Oct-20 23-Nov-20 36 36 Masonry&Plastering(SS-111)_U341
CD341AR45260 Water Proofing(SS-111)_U341 12-Nov-20 23-Dec-20 27-Oct-20 07-Dec-20 30 30 Water Proofing(SS-111)_U341
CD341AR45265- Door & Window(SS-111)_U341 29-Dec-20 22-Jan-21 10-Dec-20 06-Jan-21 18 18 Door & Window(SS-111)_U341
CD341AR45270 Painting-Internal(SS-111)_U341 24-Nov-20 28-Dec-20 06-Nov-20 09-Dec-20 24 24 Painting-Internal(SS-111)_U341
CD341AR45275- Interior Finishing(SS-111)_U341 10-Dec-20 14-Jan-21 24-Nov-20 28-Dec-20 24 24 Interior Finishing(SS-111)_U341
HVAC 10-Dec-20 23-Feb-21 24-Nov-20 04-Feb-21 51 51 23-Feb-21, HVAC
HVAC & Control System 29-Dec-20 22-Jan-21 10-Dec-20 06-Jan-21 18 18 22-Jan-21, HVAC & Control System
CD341HV10085 HVAC Equipment Installation(SS-111)_U341 29-Dec-20 22-Jan-21 10-Dec-20 06-Jan-21 18 18 HVAC Equipment Installation(SS-111)_U341
Plumbing 10-Dec-20 23-Feb-21 24-Nov-20 04-Feb-21 51 51 23-Feb-21, Plumbing
CD341HV15170 HVAC Duct Erection(SS-111)_U341 10-Dec-20 06-Jan-21 24-Nov-20 17-Dec-20 18 18 HVAC Duct Erection(SS-111)_U341
CD341HV15175 HVAC Piping work(SS-111)_U341 25-Jan-21 23-Feb-21 07-Jan-21 04-Feb-21 21 21 HVAC Piping work(SS-111)_U341
CD341HV15180 Plumbing&Sanitary(SS-111)_U341 25-Jan-21 23-Feb-21 07-Jan-21 04-Feb-21 21 21 Plumbing&Sanitary(SS-111)_U341
Electrical 27-Jul-20 03-May-21 30-May-20 17-Mar-21 210 210 03-May-21, Electrical
Cable Race Way 29-Jan-21 22-Mar-21 24-Nov-20 13-Jan-21 35 35 22-Mar-21, Cable Race Way
CD341EL45085- Electrical Cable Tray Installation(SS-111)_U341 29-Jan-21 15-Mar-21 24-Nov-20 06-Jan-21 30 30 Electrical Cable Tray Installation(SS-111)_U341
CD341EL45305- Electrical Conduit Pipe(SS-111)_U341 16-Feb-21 22-Mar-21 09-Dec-20 13-Jan-21 24 24 Electrical Conduit Pipe(SS-111)_U341
Power & Control 01-Mar-21 29-Apr-21 22-Dec-20 26-Feb-21 46 46 29-Apr-21, Power & Control
CD341EL45295- Termination - Power & Control(SS-111)_U341 09-Apr-21 29-Apr-21 02-Feb-21 26-Feb-21 18 18 Termination - Power & Control(SS-111)_U341
CD341EL45300- Cabling - Power & Control(SS-111)_U341 01-Mar-21 08-Apr-21 22-Dec-20 01-Feb-21 28 28 Cabling - Power & Control(SS-111)_U341
Earthing and Grouding 27-Jul-20 09-Sep-20 30-May-20 11-Jul-20 36 36 09-Sep-20, Earthing and Grouding
CD341EL50045 Cabling - Grounding(SS-111)_U341 27-Jul-20 09-Sep-20 30-May-20 11-Jul-20 36 36 Cabling - Grounding(SS-111)_U341
Lighting 10-Dec-20 31-Mar-21 24-Nov-20 22-Jan-21 76 76 31-Mar-21, Lighting
CD341EL60090 Installation - Distribution Panel(SS-111)_U341 17-Feb-21 31-Mar-21 10-Dec-20 22-Jan-21 30 30 Installation - Distribution Panel(SS-111)_U341
CD341EL60235 Cabling - Lightening(SS-111)_U341 10-Dec-20 20-Jan-21 24-Nov-20 04-Jan-21 28 28 Cabling - Lightening(SS-111)_U341
CD341EL60240 Lightening work(SS-111)_U341 10-Dec-20 20-Jan-21 24-Nov-20 04-Jan-21 28 28 Lightening work(SS-111)_U341
CD341EL60360 Installation of Lighting Fixture System (SS-111)_U341 19-Feb-21 31-Mar-21 14-Dec-20 22-Jan-21 28 28 Installation of Lighting Fixture System (SS-111)_U341
CD341EL60530 Cabling Lighting (SS-111)_U341 19-Feb-21 31-Mar-21 14-Dec-20 22-Jan-21 28 28 Cabling Lighting (SS-111)_U341
Communication 18-Dec-20 09-Feb-21 25-Jan-21 17-Mar-21 36 36 09-Feb-21, Communication
CD341EL65065 Installation - Communication System(SS-111)_U341 18-Dec-20 09-Feb-21 25-Jan-21 17-Mar-21 36 36 Installation - Communication System(SS-111)_U341
CD341EL65235 Cabling - Communication(SS-111)_U341 18-Dec-20 09-Feb-21 25-Jan-21 17-Mar-21 36 36 Cabling - Communication(SS-111)_U341
Fire Alarm 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 03-May-21, Fire Alarm
CD341EL68065 Installation - Fire Alarm System(SS-111)_U341 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 Installation - Fire Alarm System(SS-111)_U341
CD341EL68293 Cabling - Fire Alarm(SS-111)_U341 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 Cabling - Fire Alarm(SS-111)_U341
Safety & Fire Fighting 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 03-May-21, Safety & Fire Fighting
Fire Fighting Equipment 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 03-May-21, Fire Fighting Equipment
CD341MS40045 Installation - F/F Equipment(SS-111)_U341 30-Mar-21 03-May-21 21-Jan-21 02-Mar-21 28 28 Installation - F/F Equipment(SS-111)_U341
341-SS-113 (in Unit 320 S area) 31-Jul-19 A 12-Apr-21 31-Jul-19 27-Apr-21 423 303 12-Apr-21, 341-SS-113 (in Unit 320 S area)

Engineering 31-Jul-19 A 21-Aug-20 31-Jul-19 27-Jul-20 266 146 21-Aug-20, Engineering


Architectural 26-Nov-19 A 22-Jun-20 28-Nov-19 21-Apr-20 121 102 22-Jun-20, Architectural
Calculation 24-Feb-20 27-Apr-20 17-Feb-20 21-Apr-20 45 45 27-Apr-20, Calculation
ED341AR10040A Structural Calculation for Substation(341-SS-113)_U341 [IFR] 24-Feb-20 20-Mar-20 17-Feb-20 13-Mar-20 20 20 Structural Calculation for Substation(341-SS-113)_U341 [IFR]
ED341AR10040B Structural Calculation for Substation(341-SS-113)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 14-Mar-20 28-Mar-20 15 15 Structural Calculation for Substation(341-SS-113)_U341 [Review-IFR]
ED341AR10040G Structural Calculation for Substation(341-SS-113)_U341 [AFD] 06-Apr-20 27-Apr-20 31-Mar-20 21-Apr-20 15 15 Structural Calculation for Substation(341-SS-113)_U341 [AFD]
Architecture Basic 26-Nov-19 A 22-Jun-20 28-Nov-19 30-Mar-20 118 102 22-Jun-20, Architecture Basic
ED341AR20110A Architectural Basic Drawing(SS-113)_U341 [IFR] 26-Nov-19 A 26-Dec-19 A 28-Nov-19 17-Jan-20 35 0 Architectural Basic Drawing(SS-113)_U341 [IFR]
ED341AR20110B Architectural Basic Drawing(SS-113)_U341 [Review-IFR] 27-Dec-19 A 14-Jan-20 A 18-Jan-20 01-Feb-20 15 0 Architectural Basic Drawing(SS-113)_U341 [Review-IFR]
ED341AR20110G Architectural Basic Drawing(SS-113)_U341 [IFC] 03-Feb-20 28-Feb-20 03-Feb-20 28-Feb-20 20 20 Architectural Basic Drawing(SS-113)_U341 [IFC]
ED341AR20115A Foundation/Pile Location Plan(SS-113)_U341 [IFR] 23-Mar-20 21-Apr-20 08-Jan-20 04-Feb-20 20 20 Foundation/Pile Location Plan(SS-113)_U341 [IFR]
ED341AR20115B Foundation/Pile Location Plan(SS-113)_U341 [Review-IFR] 22-Apr-20 06-May-20 05-Feb-20 19-Feb-20 15 15 Foundation/Pile Location Plan(SS-113)_U341 [Review-IFR]
ED341AR20115G Foundation/Pile Location Plan(SS-113)_U341 [IFC] 08-May-20 22-Jun-20 20-Feb-20 26-Mar-20 25 25 Foundation/Pile Location Plan(SS-113)_U341 [IFC]
ED341AR20120A Structural Basic Drawing(SS-113)_U341 [IFR] 27-Jan-20 21-Feb-20 20-Jan-20 14-Feb-20 20 20 Structural Basic Drawing(SS-113)_U341 [IFR]
ED341AR20120B Structural Basic Drawing(SS-113)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 15-Feb-20 29-Feb-20 15 15 Structural Basic Drawing(SS-113)_U341 [Review-IFR]
ED341AR20120G Structural Basic Drawing(SS-113)_U341 [IFC] 02-Mar-20 30-Mar-20 02-Mar-20 30-Mar-20 20 20 Structural Basic Drawing(SS-113)_U341 [IFC]
Architecture Detail - Architectural 26-Nov-19 A 27-Apr-20 20-Jan-20 21-Apr-20 83 64 27-Apr-20, Architecture Detail - Architectural
ED341AR25075A Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [IFR] 26-Nov-19 A 20-Feb-20 20-Jan-20 21-Feb-20 25 19 Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [IFR]
ED341AR25075B Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [Review-IFR] 27-Dec-19 A 06-Mar-20 22-Feb-20 07-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [Review-IFR]
ED341AR25075G Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [IFC] 09-Mar-20 06-Apr-20 09-Mar-20 06-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS-113)_U341 [IFC]

Actual Level of Effort Actual Work Critical Remaining Work Page 22 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR25080A Architectural Detail Drawing for Misc.(SS-113)_U341 [IFR] 02-Mar-20 20-Mar-20 24-Feb-20 13-Mar-20 15 15 Architectural Detail Drawing for Misc.(SS-113)_U341 [IFR]
ED341AR25080B Architectural Detail Drawing for Misc.(SS-113)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 14-Mar-20 28-Mar-20 15 15 Architectural Detail Drawing for Misc.(SS-113)_U341 [Review-IFR]
ED341AR25080G Architectural Detail Drawing for Misc.(SS-113)_U341 [IFC] 06-Apr-20 27-Apr-20 31-Mar-20 21-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-113)_U341 [IFC]
Architecture Detail - Structural 03-Feb-20 27-Apr-20 27-Jan-20 21-Apr-20 60 60 27-Apr-20, Architecture Detail - Structural
ED341AR30075A Structural Detail Drawing for Framing(SS-113)_U341 [IFR] 03-Feb-20 28-Feb-20 27-Jan-20 21-Feb-20 20 20 Structural Detail Drawing for Framing(SS-113)_U341 [IFR]
ED341AR30075B Structural Detail Drawing for Framing(SS-113)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 22-Feb-20 07-Mar-20 15 15 Structural Detail Drawing for Framing(SS-113)_U341 [Review-IFR]
ED341AR30075G Structural Detail Drawing for Framing(SS-113)_U341 [IFC] 16-Mar-20 06-Apr-20 16-Mar-20 06-Apr-20 15 15 Structural Detail Drawing for Framing(SS-113)_U341 [IFC]
ED341AR30080A Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [IFR] 17-Feb-20 13-Mar-20 10-Feb-20 06-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [IFR]
ED341AR30080B Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 07-Mar-20 21-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [Review-IFR]
ED341AR30080G Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [IFC] 30-Mar-20 20-Apr-20 23-Mar-20 14-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-113)_U341 [IFC]
ED341AR30275A Structural Detail Drawing for Misc.(SS-113)_U341 [IFR] 02-Mar-20 20-Mar-20 24-Feb-20 13-Mar-20 15 15 Structural Detail Drawing for Misc.(SS-113)_U341 [IFR]
ED341AR30275B Structural Detail Drawing for Misc.(SS-113)_U341 [Review/Appr.-IFR] 21-Mar-20 04-Apr-20 14-Mar-20 28-Mar-20 15 15 Structural Detail Drawing for Misc.(SS-113)_U341 [Review/Appr.-IFR]
ED341AR30275G Structural Detail Drawing for Misc.(SS-113)_U341 [IFC] 06-Apr-20 27-Apr-20 31-Mar-20 21-Apr-20 15 15 Structural Detail Drawing for Misc.(SS-113)_U341 [IFC]
HVAC 16-Nov-19 A 20-Jul-20 20-Jan-20 27-Jul-20 105 122 20-Jul-20, HVAC
HVAC & Control System 16-Nov-19 A 20-Jul-20 20-Jan-20 27-Jul-20 105 98 20-Jul-20, HVAC & Control System
ED341HV10115A HVAC System(SS-113)_U341 [IFR] 20-Nov-19 A 23-Dec-19 A 20-Jan-20 21-Feb-20 25 0 HVAC System(SS-113)_U341 [IFR]
ED341HV10115B HVAC System(SS-113)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 22-Feb-20 07-Mar-20 15 0 HVAC System(SS-113)_U341 [Review-IFR]
ED341HV10115G HVAC System(SS-113)_U341 [IFC] 02-Mar-20 14-Apr-20 09-Mar-20 21-Apr-20 30 30 HVAC System(SS-113)_U341 [IFC]
ED341HV10120A Control System(SS-113)_U341 [IFR] 16-Nov-19 A 23-Dec-19 A 31-Mar-20 06-May-20 25 0 Control System(SS-113)_U341 [IFR]
ED341HV10120B Control System(SS-113)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 07-May-20 21-May-20 15 0 Control System(SS-113)_U341 [Review-IFR]
ED341HV10120G Control System(SS-113)_U341 [IFC] 09-Jun-20 20-Jul-20 16-Jun-20 27-Jul-20 30 30 Control System(SS-113)_U341 [IFC]
Plumbing 18-Nov-19 A 08-Jun-20 20-Jan-20 15-Jun-20 75 92 08-Jun-20, Plumbing
ED341HV15075A Duct & Piping(SS-113)_U341 [IFR] 18-Nov-19 A 05-Mar-20 24-Feb-20 30-Mar-20 25 29 Duct & Piping(SS-113)_U341 [IFR]
ED341HV15075B Duct & Piping(SS-113)_U341 [Review-IFR] 24-Dec-19 A 19-Mar-20 31-Mar-20 14-Apr-20 15 54 Duct & Piping(SS-113)_U341 [Review-IFR]
ED341HV15075G Duct & Piping(SS-113)_U341 [IFC] 15-Apr-20 08-Jun-20 22-Apr-20 15-Jun-20 30 30 Duct & Piping(SS-113)_U341 [IFC]
ED341HV15080A Plumbing(SS-113)_U341 [IFR] 20-Nov-19 A 23-Dec-19 A 20-Jan-20 21-Feb-20 25 0 Plumbing(SS-113)_U341 [IFR]
ED341HV15080B Plumbing(SS-113)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 22-Feb-20 07-Mar-20 15 0 Plumbing(SS-113)_U341 [Review-IFR]
ED341HV15080G Plumbing(SS-113)_U341 [IFC] 02-Mar-20 14-Apr-20 09-Mar-20 21-Apr-20 30 30 Plumbing(SS-113)_U341 [IFC]
Electrical 21-Oct-19 A 21-Aug-20 19-Dec-19 15-Jun-20 147 146 21-Aug-20, Electrical
Power & Control 30-Oct-19 A 05-Aug-20 13-Jan-20 14-May-20 134 134 05-Aug-20, Power & Control
ED341EL45078A Electrical Cable Route Layout(SS-113_OC3)_U341 [IFR] 30-Oct-19 A 27-Nov-19 A 20-Jan-20 21-Feb-20 25 0 Electrical Cable Route Layout(SS-113_OC3)_U341 [IFR]
ED341EL45078B Electrical Cable Route Layout(SS-113_OC3)_U341 [Review-IFR] 28-Nov-19 A 19-Dec-19 A 22-Feb-20 07-Mar-20 15 0 Electrical Cable Route Layout(SS-113_OC3)_U341 [Review-IFR]
ED341EL45078G Electrical Cable Route Layout(SS-113_OC3)_U341 [IFC] 03-Jun-20 30-Jun-20 09-Mar-20 06-Apr-20 20 20 Electrical Cable Route Layout(SS-113_OC3)_U341 [IFC]
ED341EL45080A Electrical Cable Route Layout(SS-113_OC4)_U341 [IFR] 27-Jan-20 28-Feb-20 13-Jan-20 14-Feb-20 25 25 Electrical Cable Route Layout(SS-113_OC4)_U341 [IFR]
ED341EL45080B Electrical Cable Route Layout(SS-113_OC4)_U341 [Review-IFR] 29-Feb-20 14-Mar-20 15-Feb-20 29-Feb-20 15 15 Electrical Cable Route Layout(SS-113_OC4)_U341 [Review-IFR]
ED341EL45080G Electrical Cable Route Layout(SS-113_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS-113_OC4)_U341 [IFC]
ED341EL45083A Power Layout(SS-113_OC3)_U341 [IFR] 27-Jan-20 21-Feb-20 02-Mar-20 30-Mar-20 20 20 Power Layout(SS-113_OC3)_U341 [IFR]
ED341EL45083B Power Layout(SS-113_OC3)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 31-Mar-20 14-Apr-20 15 15 Power Layout(SS-113_OC3)_U341 [Review-IFR]
ED341EL45083G Power Layout(SS-113_OC3)_U341 [IFC] 08-Jul-20 05-Aug-20 15-Apr-20 14-May-20 20 20 Power Layout(SS-113_OC3)_U341 [IFC]
ED341EL45085A Power Layout(SS-113_OC4)_U341 [IFR] 02-Mar-20 06-Apr-20 17-Feb-20 20-Mar-20 25 25 Power Layout(SS-113_OC4)_U341 [IFR]
ED341EL45085B Power Layout(SS-113_OC4)_U341 [Review-IFR] 07-Apr-20 21-Apr-20 21-Mar-20 04-Apr-20 15 15 Power Layout(SS-113_OC4)_U341 [Review-IFR]
ED341EL45085G Power Layout(SS-113_OC4)_U341 [IFC] 08-Jul-20 05-Aug-20 07-Apr-20 06-May-20 20 20 Power Layout(SS-113_OC4)_U341 [IFC]
Earthing and Grouding 21-Oct-19 A 30-Mar-20 19-Dec-19 30-Mar-20 49 21 30-Mar-20, Earthing and Grouding
ED341EL50040A Earthing and Lightning Protection Layout(SS-113)_U341 [IFR] 21-Oct-19 A 18-Dec-19 A 19-Dec-19 14-Feb-20 40 0 Earthing and Lightning Protection Layout(SS-113)_U341 [IFR]
ED341EL50040B Earthing and Lightning Protection Layout(SS-113)_U341 [Review-IFR] 19-Dec-19 A 08-Jan-20 A 15-Feb-20 29-Feb-20 15 0 Earthing and Lightning Protection Layout(SS-113)_U341 [Review-IFR]
ED341EL50040G Earthing and Lightning Protection Layout(SS-113)_U341 [IFC] 02-Mar-20 30-Mar-20 02-Mar-20 30-Mar-20 20 20 Earthing and Lightning Protection Layout(SS-113)_U341 [IFC]
Lighting 09-Mar-20 21-Aug-20 24-Feb-20 15-Jun-20 117 117 21-Aug-20, Lighting
ED341EL60040A Lighting and Small Power Layout(SS-113)_U341 [IFR] 09-Mar-20 21-Apr-20 24-Feb-20 06-Apr-20 30 30 Lighting and Small Power Layout(SS-113)_U341 [IFR]
ED341EL60040B Lighting and Small Power Layout(SS-113)_U341 [Review-IFR] 22-Apr-20 06-May-20 07-Apr-20 21-Apr-20 15 15 Lighting and Small Power Layout(SS-113)_U341 [Review-IFR]
ED341EL60040G Lighting and Small Power Layout(SS-113)_U341 [IFC] 08-Jul-20 21-Aug-20 22-Apr-20 15-Jun-20 30 30 Lighting and Small Power Layout(SS-113)_U341 [IFC]
Communication 03-Feb-20 28-Jul-20 20-Jan-20 05-Jun-20 124 124 28-Jul-20, Communication
ED341EL65045A Telecom/Security/PAGA System Layout(SS-113)_U341 [IFR] 03-Feb-20 30-Mar-20 20-Jan-20 13-Mar-20 40 40 Telecom/Security/PAGA System Layout(SS-113)_U341 [IFR]
ED341EL65045B Telecom/Security/PAGA System Layout(SS-113)_U341 [Approved-IFR] 31-Mar-20 14-Apr-20 14-Mar-20 28-Mar-20 15 15 Telecom/Security/PAGA System Layout(SS-113)_U341 [Approved-IFR]
ED341EL65045G Telecom/Security/PAGA System Layout(SS-113)_U341 [IFC] 03-Jun-20 28-Jul-20 30-Mar-20 05-Jun-20 40 40 Telecom/Security/PAGA System Layout(SS-113)_U341 [IFC]
Fire Alarm 12-Dec-19 A 28-Jul-20 03-Feb-20 13-May-20 114 83 28-Jul-20, Fire Alarm
ED341EL68040A Fire Alarm Layout(SS-113)_U341 [IFR] 12-Dec-19 A 20-Jan-20 A 03-Feb-20 13-Mar-20 30 0 Fire Alarm Layout(SS-113)_U341 [IFR]
ED341EL68040B Fire Alarm Layout(SS-113)_U341 [Review-IFR] 21-Jan-20 A 14-Apr-20 14-Mar-20 28-Mar-20 15 15 Fire Alarm Layout(SS-113)_U341 [Review-IFR]
ED341EL68040G Fire Alarm Layout(SS-113)_U341 [IFC] 17-Jun-20 28-Jul-20 30-Mar-20 13-May-20 30 30 Fire Alarm Layout(SS-113)_U341 [IFC]
Safety & Fire Fighting 31-Jul-19 A 15-Jun-20 31-Jul-19 14-Apr-20 217 97 15-Jun-20, Safety & Fire Fighting
Fire Fighting Drawing 31-Jul-19 A 15-Jun-20 31-Jul-19 14-Apr-20 217 97 15-Jun-20, Fire Fighting Drawing
ED341SF25131A P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFR] 31-Jul-19 A 21-Feb-20 31-Jul-19 04-Sep-19 25 20 P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFR]
ED341SF25131B P&ID and Piping Scheme for F/F System(SS-113)_U341 [Review/Appr.-IFR] 01-Oct-19 A 06-Mar-20 05-Sep-19 19-Sep-19 15 40 P&ID and Piping Scheme for F/F System(SS-113)_U341 [Review/Appr.-IFR]
ED341SF25131E P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFD] 09-Mar-20 06-Apr-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFD]
ED341SF25131F P&ID and Piping Scheme for F/F System(SS-113)_U341 [Approved-IFD] 07-Apr-20 21-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS-113)_U341 [Approved-IFD]
ED341SF25131G P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFC] 22-Apr-20 29-May-20 17-Feb-20 13-Mar-20 20 20 P&ID and Piping Scheme for F/F System(SS-113)_U341 [IFC]
ED341SF30075A Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [IFR] 05-Sep-19 A 21-Oct-19 A 20-Jan-20 28-Feb-20 30 0 Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [IFR]
ED341SF30075B Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [Review/Appr.-IFR]
22-Oct-19 A 10-Jan-20 A 29-Feb-20 14-Mar-20 15 0 Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [Review/Appr.-IFR]
ED341SF30075G Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [AFD] 08-May-20 15-Jun-20 16-Mar-20 14-Apr-20 20 20 Fire & Safety Equipment Location Plan-Tankage Substation (341-SS-113)_U341 [AFD]
Construction 11-Jul-20 12-Apr-21 04-Aug-20 27-Apr-21 206 206 12-Apr-21, Construction
Civil 21-Aug-20 22-Sep-20 12-Sep-20 14-Oct-20 28 28 22-Sep-20, Civil
Foundation - Equipment 21-Aug-20 22-Sep-20 12-Sep-20 14-Oct-20 28 28 22-Sep-20, Foundation - Equipment
CD341CV55050 Equipment Foundation(SS-113)_U341 21-Aug-20 22-Sep-20 12-Sep-20 14-Oct-20 28 28 Equipment Foundation(SS-113)_U341
Architectural 11-Jul-20 24-Feb-21 04-Aug-20 24-Mar-21 173 173 24-Feb-21, Architectural
Building Foundation 11-Jul-20 28-Oct-20 04-Aug-20 24-Nov-20 91 91 28-Oct-20, Building Foundation
CD341AR35740 Building Foundation(SS-113)_U341 11-Jul-20 25-Aug-20 04-Aug-20 16-Sep-20 36 36 Building Foundation(SS-113)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 23 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341AR35765 Ground Slab(SS-113)_U341 10-Sep-20 03-Oct-20 02-Oct-20 26-Oct-20 21 21 Ground Slab(SS-113)_U341
CD341AR35770 Tranformer yard(SS-113)_U341 05-Oct-20 28-Oct-20 27-Oct-20 24-Nov-20 21 21 Tranformer yard(SS-113)_U341
Building Structure 28-Aug-20 07-Dec-20 19-Sep-20 05-Jan-21 81 81 07-Dec-20, Building Structure
CD341AR40220 Column/Beam/Girder - Ground Level(SS-113)_U341 28-Aug-20 17-Sep-20 19-Sep-20 09-Oct-20 18 18 Column/Beam/Girder - Ground Level(SS-113)_U341
CD341AR40225- 1st Floor Slab(SS-113)_U341 18-Sep-20 15-Oct-20 10-Oct-20 09-Nov-20 24 24 1st Floor Slab(SS-113)_U341
CD341AR40230 Column/Beam/Girder - 1st Floor(SS-113)_U341 16-Oct-20 06-Nov-20 10-Nov-20 03-Dec-20 18 18 Column/Beam/Girder - 1st Floor(SS-113)_U341
CD341AR40235- Roof Slab(SS-113)_U341 09-Nov-20 07-Dec-20 04-Dec-20 05-Jan-21 21 21 Roof Slab(SS-113)_U341
Building Finishing 08-Dec-20 24-Feb-21 06-Jan-21 24-Mar-21 54 54 24-Feb-21, Building Finishing
CD341AR45250 Exterior Finishing(SS-113)_U341 19-Jan-21 22-Feb-21 16-Feb-21 22-Mar-21 24 24 Exterior Finishing(SS-113)_U341
CD341AR45295- Masonry&Plastering(SS-113)_U341 08-Dec-20 12-Jan-21 06-Jan-21 08-Feb-21 24 24 Masonry&Plastering(SS-113)_U341
CD341AR45300 Water Proofing(SS-113)_U341 08-Dec-20 18-Jan-21 06-Jan-21 15-Feb-21 28 28 Water Proofing(SS-113)_U341
CD341AR45305- Door & Window(SS-113)_U341 29-Jan-21 24-Feb-21 26-Feb-21 24-Mar-21 18 18 Door & Window(SS-113)_U341
CD341AR45310 Painting-Internal(SS-113)_U341 24-Dec-20 28-Jan-21 22-Jan-21 25-Feb-21 24 24 Painting-Internal(SS-113)_U341
CD341AR45315- Interior Finishing(SS-113)_U341 13-Jan-21 16-Feb-21 09-Feb-21 16-Mar-21 24 24 Interior Finishing(SS-113)_U341
HVAC 13-Jan-21 05-Apr-21 09-Feb-21 27-Apr-21 57 57 05-Apr-21, HVAC
HVAC & Control System 21-Jan-21 24-Feb-21 18-Feb-21 24-Mar-21 24 24 24-Feb-21, HVAC & Control System
CD341HV10090 HVAC Equipment Installation(SS-113)_U341 21-Jan-21 24-Feb-21 18-Feb-21 24-Mar-21 24 24 HVAC Equipment Installation(SS-113)_U341
Plumbing 13-Jan-21 05-Apr-21 09-Feb-21 27-Apr-21 57 57 05-Apr-21, Plumbing
CD341HV15125 HVAC Duct Erection(SS-113)_U341 13-Jan-21 10-Feb-21 09-Feb-21 10-Mar-21 21 21 HVAC Duct Erection(SS-113)_U341
CD341HV15130 HVAC Piping work(SS-113)_U341 25-Feb-21 26-Mar-21 25-Mar-21 20-Apr-21 21 21 HVAC Piping work(SS-113)_U341
CD341HV15135 Plumbing&Sanitary(SS-113)_U341 05-Mar-21 05-Apr-21 03-Apr-21 27-Apr-21 21 21 Plumbing&Sanitary(SS-113)_U341
Electrical 27-Jul-20 12-Apr-21 19-Aug-20 23-Apr-21 193 193 12-Apr-21, Electrical
Cable Race Way 29-Jan-21 19-Mar-21 09-Feb-21 30-Mar-21 34 34 19-Mar-21, Cable Race Way
CD341EL45090 Electrical Cable Tray Installation(SS-113)_U341 29-Jan-21 10-Mar-21 09-Feb-21 22-Mar-21 28 28 Electrical Cable Tray Installation(SS-113)_U341
CD341EL45260- Electrical Conduit Pipe(SS-113)_U341 23-Feb-21 19-Mar-21 04-Mar-21 30-Mar-21 18 18 Electrical Conduit Pipe(SS-113)_U341
Power & Control 01-Mar-21 12-Apr-21 03-Mar-21 14-Apr-21 31 31 12-Apr-21, Power & Control
CD341EL45250- Termination - Power & Control(SS-113)_U341 19-Mar-21 12-Apr-21 23-Mar-21 14-Apr-21 18 18 Termination - Power & Control(SS-113)_U341
CD341EL45255- Cabling - Power & Control(SS-113)_U341 01-Mar-21 08-Apr-21 03-Mar-21 10-Apr-21 28 28 Cabling - Power & Control(SS-113)_U341
Earthing and Grouding 27-Jul-20 09-Sep-20 19-Aug-20 30-Sep-20 36 36 09-Sep-20, Earthing and Grouding
CD341EL50050 Cabling - Grounding(SS-113)_U341 27-Jul-20 09-Sep-20 19-Aug-20 30-Sep-20 36 36 Cabling - Grounding(SS-113)_U341
Lighting 24-Dec-20 06-Apr-21 22-Jan-21 14-Apr-21 70 70 06-Apr-21, Lighting
CD341EL60095 Installation - Distribution Panel(SS-113)_U341 13-Jan-21 16-Feb-21 09-Feb-21 16-Mar-21 24 24 Installation - Distribution Panel(SS-113)_U341
CD341EL60205 Cabling - Lightening(SS-113)_U341 24-Dec-20 03-Feb-21 22-Jan-21 03-Mar-21 28 28 Cabling - Lightening(SS-113)_U341
CD341EL60210 Lightening work(SS-113)_U341 24-Dec-20 03-Feb-21 22-Jan-21 03-Mar-21 28 28 Lightening work(SS-113)_U341
CD341EL60365 Installation of Lighting Fixture System (SS-113)_U341 25-Feb-21 06-Apr-21 08-Mar-21 14-Apr-21 28 28 Installation of Lighting Fixture System (SS-113)_U341
CD341EL60535 Cabling Lighting (SS-113)_U341 25-Feb-21 06-Apr-21 08-Mar-21 14-Apr-21 28 28 Cabling Lighting (SS-113)_U341
Communication 11-Jan-21 02-Mar-21 08-Mar-21 23-Apr-21 36 36 02-Mar-21, Communication
CD341EL65050 Installation - Communication System(SS-113)_U341 11-Jan-21 02-Mar-21 08-Mar-21 23-Apr-21 36 36 Installation - Communication System(SS-113)_U341
CD341EL65240 Cabling - Communication(SS-113)_U341 11-Jan-21 02-Mar-21 08-Mar-21 23-Apr-21 36 36 Cabling - Communication(SS-113)_U341
Fire Alarm 15-Feb-21 25-Mar-21 15-Mar-21 19-Apr-21 28 28 25-Mar-21, Fire Alarm
CD341EL68050 Installation - Fire Alarm System(SS-113)_U341 15-Feb-21 25-Mar-21 15-Mar-21 19-Apr-21 28 28 Installation - Fire Alarm System(SS-113)_U341
CD341EL68295 Cabling - Fire Alarm(SS-113)_U341 15-Feb-21 25-Mar-21 15-Mar-21 19-Apr-21 28 28 Cabling - Fire Alarm(SS-113)_U341
Safety & Fire Fighting 24-Feb-21 05-Apr-21 05-Mar-21 13-Apr-21 28 28 05-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 24-Feb-21 05-Apr-21 05-Mar-21 13-Apr-21 28 28 05-Apr-21, Fire Fighting Equipment
CD341MS40050 Installation - F/F Equipment(SS-113)_U341 24-Feb-21 05-Apr-21 05-Mar-21 13-Apr-21 28 28 Installation - F/F Equipment(SS-113)_U341
341-SS-114 (in Unit 320 E area) 31-Jul-19 A 30-Apr-21 31-Jul-19 10-May-21 437 317 30-Apr-21, 341-SS-114 (in Unit 320 E area)

Engineering 31-Jul-19 A 16-Sep-20 31-Jul-19 27-Jul-20 284 164 16-Sep-20, Engineering


Architectural 27-Jan-20 10-Jul-20 28-Nov-19 05-May-20 116 116 10-Jul-20, Architectural
Calculation 15-Apr-20 10-Jul-20 17-Feb-20 05-May-20 60 60 10-Jul-20, Calculation
ED341AR10045A Structural Calculation for Substation(341-SS-114)_U341 [IFR] 15-Apr-20 29-May-20 17-Feb-20 20-Mar-20 25 25 Structural Calculation for Substation(341-SS-114)_U341 [IFR]
ED341AR10045B Structural Calculation for Substation(341-SS-114)_U341 [Review-IFR] 30-May-20 13-Jun-20 21-Mar-20 04-Apr-20 15 15 Structural Calculation for Substation(341-SS-114)_U341 [Review-IFR]
ED341AR10045G Structural Calculation for Substation(341-SS-114)_U341 [AFD] 15-Jun-20 10-Jul-20 06-Apr-20 05-May-20 20 20 Structural Calculation for Substation(341-SS-114)_U341 [AFD]
Architecture Basic 27-Jan-20 02-Jun-20 28-Nov-19 20-Mar-20 88 88 02-Jun-20, Architecture Basic
ED341AR20125A Architectural Basic Drawing(SS-114)_U341 [IFR] 27-Jan-20 13-Mar-20 28-Nov-19 17-Jan-20 35 35 Architectural Basic Drawing(SS-114)_U341 [IFR]
ED341AR20125B Architectural Basic Drawing(SS-114)_U341 [Review-IFR] 14-Mar-20 28-Mar-20 18-Jan-20 01-Feb-20 15 15 Architectural Basic Drawing(SS-114)_U341 [Review-IFR]
ED341AR20125G Architectural Basic Drawing(SS-114)_U341 [IFC] 30-Mar-20 27-Apr-20 03-Feb-20 28-Feb-20 20 20 Architectural Basic Drawing(SS-114)_U341 [IFC]
ED341AR20130A Foundation/Pile Location Plan(SS-114)_U341 [IFR] 24-Feb-20 20-Mar-20 09-Dec-19 07-Jan-20 20 20 Foundation/Pile Location Plan(SS-114)_U341 [IFR]
ED341AR20130B Foundation/Pile Location Plan(SS-114)_U341 [Review-IFR] 21-Mar-20 04-Apr-20 08-Jan-20 22-Jan-20 15 15 Foundation/Pile Location Plan(SS-114)_U341 [Review-IFR]
ED341AR20130G Foundation/Pile Location Plan(SS-114)_U341 [IFC] 06-Apr-20 13-May-20 27-Jan-20 28-Feb-20 25 25 Foundation/Pile Location Plan(SS-114)_U341 [IFC]
ED341AR20135A Structural Basic Drawing(SS-114)_U341 [IFR] 16-Mar-20 14-Apr-20 20-Jan-20 14-Feb-20 20 20 Structural Basic Drawing(SS-114)_U341 [IFR]
ED341AR20135B Structural Basic Drawing(SS-114)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 15-Feb-20 29-Feb-20 15 15 Structural Basic Drawing(SS-114)_U341 [Review-IFR]
ED341AR20135G Structural Basic Drawing(SS-114)_U341 [IFC] 30-Apr-20 02-Jun-20 02-Mar-20 20-Mar-20 15 15 Structural Basic Drawing(SS-114)_U341 [IFC]
Architecture Detail - Architectural 09-Mar-20 03-Jul-20 13-Jan-20 27-Apr-20 82 82 03-Jul-20, Architecture Detail - Architectural
ED341AR25085A Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [IFR] 09-Mar-20 14-Apr-20 13-Jan-20 14-Feb-20 25 25 Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [IFR]
ED341AR25085B Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 15-Feb-20 29-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [Review-IFR]
ED341AR25085G Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [IFC] 30-Apr-20 09-Jun-20 02-Mar-20 30-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(SS-114)_U341 [IFC]
ED341AR25090A Architectural Detail Drawing for Misc.(SS-114)_U341 [IFR] 22-Apr-20 29-May-20 24-Feb-20 20-Mar-20 20 20 Architectural Detail Drawing for Misc.(SS-114)_U341 [IFR]
ED341AR25090B Architectural Detail Drawing for Misc.(SS-114)_U341 [Review-IFR] 30-May-20 13-Jun-20 21-Mar-20 04-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-114)_U341 [Review-IFR]
ED341AR25090G Architectural Detail Drawing for Misc.(SS-114)_U341 [IFC] 15-Jun-20 03-Jul-20 06-Apr-20 27-Apr-20 15 15 Architectural Detail Drawing for Misc.(SS-114)_U341 [IFC]
Architecture Detail - Structural 23-Mar-20 03-Jul-20 27-Jan-20 28-Apr-20 72 72 03-Jul-20, Architecture Detail - Structural
ED341AR30085A Structural Detail Drawing for Framing(SS-114)_U341 [IFR] 23-Mar-20 21-Apr-20 27-Jan-20 21-Feb-20 20 20 Structural Detail Drawing for Framing(SS-114)_U341 [IFR]
ED341AR30085B Structural Detail Drawing for Framing(SS-114)_U341 [Review-IFR] 22-Apr-20 06-May-20 22-Feb-20 07-Mar-20 15 15 Structural Detail Drawing for Framing(SS-114)_U341 [Review-IFR]
ED341AR30085G Structural Detail Drawing for Framing(SS-114)_U341 [IFC] 11-May-20 09-Jun-20 09-Mar-20 30-Mar-20 15 15 Structural Detail Drawing for Framing(SS-114)_U341 [IFC]
ED341AR30090A Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [IFR] 07-Apr-20 06-May-20 10-Feb-20 06-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [IFR]
ED341AR30090B Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [Review-IFR] 07-May-20 21-May-20 07-Mar-20 21-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 24 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341AR30090G Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [IFC] 29-May-20 19-Jun-20 23-Mar-20 14-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(SS-114)_U341 [IFC]
ED341AR30285A Structural Detail Drawing for Misc.(SS-114)_U341 [IFR] 15-Apr-20 14-May-20 17-Feb-20 13-Mar-20 20 20 Structural Detail Drawing for Misc.(SS-114)_U341 [IFR]
ED341AR30285B Structural Detail Drawing for Misc.(SS-114)_U341 [Review/Appr.-IFR] 15-May-20 29-May-20 14-Mar-20 28-Mar-20 15 15 Structural Detail Drawing for Misc.(SS-114)_U341 [Review/Appr.-IFR]
ED341AR30285G Structural Detail Drawing for Misc.(SS-114)_U341 [IFC] 08-Jun-20 03-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Detail Drawing for Misc.(SS-114)_U341 [IFC]
HVAC 16-Nov-19 A 16-Sep-20 20-Jan-20 27-Jul-20 147 130 16-Sep-20, HVAC
HVAC & Control System 16-Nov-19 A 16-Sep-20 20-Jan-20 27-Jul-20 147 100 16-Sep-20, HVAC & Control System
ED341HV10130A HVAC System(SS-114)_U341 [IFR] 20-Nov-19 A 23-Dec-19 A 20-Jan-20 21-Feb-20 25 0 HVAC System(SS-114)_U341 [IFR]
ED341HV10130B HVAC System(SS-114)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 22-Feb-20 07-Mar-20 15 0 HVAC System(SS-114)_U341 [Review-IFR]
ED341HV10130G HVAC System(SS-114)_U341 [IFC] 28-Apr-20 19-Jun-20 09-Mar-20 21-Apr-20 30 30 HVAC System(SS-114)_U341 [IFC]
ED341HV10135A Control System(SS-114)_U341 [IFR] 16-Nov-19 A 23-Dec-19 A 31-Mar-20 06-May-20 25 0 Control System(SS-114)_U341 [IFR]
ED341HV10135B Control System(SS-114)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 07-May-20 21-May-20 15 0 Control System(SS-114)_U341 [Review-IFR]
ED341HV10135G Control System(SS-114)_U341 [IFC] 04-Aug-20 16-Sep-20 16-Jun-20 27-Jul-20 30 30 Control System(SS-114)_U341 [IFC]
Plumbing 18-Nov-19 A 03-Aug-20 20-Jan-20 15-Jun-20 115 98 03-Aug-20, Plumbing
ED341HV15085A Duct & Piping(SS-114)_U341 [IFR] 18-Nov-19 A 16-Apr-20 24-Feb-20 30-Mar-20 25 22 Duct & Piping(SS-114)_U341 [IFR]
ED341HV15085B Duct & Piping(SS-114)_U341 [Review-IFR] 24-Dec-19 A 30-Apr-20 31-Mar-20 14-Apr-20 15 15 Duct & Piping(SS-114)_U341 [Review-IFR]
ED341HV15085G Duct & Piping(SS-114)_U341 [IFC] 22-Jun-20 03-Aug-20 22-Apr-20 15-Jun-20 30 30 Duct & Piping(SS-114)_U341 [IFC]
ED341HV15090A Plumbing(SS-114)_U341 [IFR] 20-Nov-19 A 23-Dec-19 A 20-Jan-20 21-Feb-20 25 0 Plumbing(SS-114)_U341 [IFR]
ED341HV15090B Plumbing(SS-114)_U341 [Review-IFR] 24-Dec-19 A 14-Jan-20 A 22-Feb-20 07-Mar-20 15 0 Plumbing(SS-114)_U341 [Review-IFR]
ED341HV15090G Plumbing(SS-114)_U341 [IFC] 28-Apr-20 19-Jun-20 09-Mar-20 21-Apr-20 30 30 Plumbing(SS-114)_U341 [IFC]
Electrical 21-Oct-19 A 04-Sep-20 19-Dec-19 29-Jun-20 157 127 04-Sep-20, Electrical
Power & Control 09-Mar-20 05-Aug-20 13-Jan-20 06-May-20 105 105 05-Aug-20, Power & Control
ED341EL45091A Electrical Cable Route Layout(SS-114_OC4)_U341 [IFR] 09-Mar-20 14-Apr-20 13-Jan-20 14-Feb-20 25 25 Electrical Cable Route Layout(SS-114_OC4)_U341 [IFR]
ED341EL45091B Electrical Cable Route Layout(SS-114_OC4)_U341 [Review-IFR] 15-Apr-20 29-Apr-20 15-Feb-20 29-Feb-20 15 15 Electrical Cable Route Layout(SS-114_OC4)_U341 [Review-IFR]
ED341EL45091G Electrical Cable Route Layout(SS-114_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS-114_OC4)_U341 [IFC]
ED341EL45096A Power Layout(SS-114_OC4)_U341 [IFR] 15-Apr-20 29-May-20 17-Feb-20 20-Mar-20 25 25 Power Layout(SS-114_OC4)_U341 [IFR]
ED341EL45096B Power Layout(SS-114_OC4)_U341 [Review-IFR] 30-May-20 13-Jun-20 21-Mar-20 04-Apr-20 15 15 Power Layout(SS-114_OC4)_U341 [Review-IFR]
ED341EL45096G Power Layout(SS-114_OC4)_U341 [IFC] 08-Jul-20 05-Aug-20 07-Apr-20 06-May-20 20 20 Power Layout(SS-114_OC4)_U341 [IFC]
Earthing and Grouding 21-Oct-19 A 05-Jun-20 19-Dec-19 30-Mar-20 92 27 05-Jun-20, Earthing and Grouding
ED341EL50045A Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [IFR] 21-Oct-19 A 18-Dec-19 A 19-Dec-19 14-Feb-20 40 0 Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [IFR]
ED341EL50045B Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [Review-IFR] 19-Dec-19 A 08-Jan-20 A 15-Feb-20 29-Feb-20 15 0 Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [Review-IFR]
ED341EL50045G Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [IFC] 28-Apr-20 05-Jun-20 02-Mar-20 30-Mar-20 20 20 Earthing and Lightning Protection Layout(SS-114_OC4)_U341 [IFC]
Lighting 08-May-20 04-Sep-20 09-Mar-20 29-Jun-20 86 86 04-Sep-20, Lighting
ED341EL60045A Lighting and Small Power Layout(SS-114)_U341 [IFR] 08-May-20 29-Jun-20 09-Mar-20 21-Apr-20 30 30 Lighting and Small Power Layout(SS-114)_U341 [IFR]
ED341EL60045B Lighting and Small Power Layout(SS-114)_U341 [Review-IFR] 30-Jun-20 14-Jul-20 22-Apr-20 06-May-20 15 15 Lighting and Small Power Layout(SS-114)_U341 [Review-IFR]
ED341EL60045G Lighting and Small Power Layout(SS-114)_U341 [IFC] 22-Jul-20 04-Sep-20 08-May-20 29-Jun-20 30 30 Lighting and Small Power Layout(SS-114)_U341 [IFC]
Communication 16-Mar-20 28-Jul-20 20-Jan-20 05-Jun-20 94 94 28-Jul-20, Communication
ED341EL65050A Telecom/Security/PAGA System Layout(SS-114)_U341 [IFR] 16-Mar-20 14-May-20 20-Jan-20 13-Mar-20 40 40 Telecom/Security/PAGA System Layout(SS-114)_U341 [IFR]
ED341EL65050B Telecom/Security/PAGA System Layout(SS-114)_U341 [Approved-IFR] 15-May-20 29-May-20 14-Mar-20 28-Mar-20 15 15 Telecom/Security/PAGA System Layout(SS-114)_U341 [Approved-IFR]
ED341EL65050G Telecom/Security/PAGA System Layout(SS-114)_U341 [IFC] 03-Jun-20 28-Jul-20 30-Mar-20 05-Jun-20 40 40 Telecom/Security/PAGA System Layout(SS-114)_U341 [IFC]
Fire Alarm 14-Dec-19 A 28-Jul-20 03-Feb-20 13-May-20 79 30 28-Jul-20, Fire Alarm
ED341EL68045A Fire Alarm Layout(SS-114)_U341 [IFR] 14-Dec-19 A 22-Jan-20 A 03-Feb-20 13-Mar-20 30 0 Fire Alarm Layout(SS-114)_U341 [IFR]
ED341EL68045B Fire Alarm Layout(SS-114)_U341 [Review-IFR] 23-Jan-20 A 23-Jan-20 A 14-Mar-20 28-Mar-20 15 0 Fire Alarm Layout(SS-114)_U341 [Review-IFR]
ED341EL68045G Fire Alarm Layout(SS-114)_U341 [IFC] 17-Jun-20 28-Jul-20 30-Mar-20 13-May-20 30 30 Fire Alarm Layout(SS-114)_U341 [IFC]
Safety & Fire Fighting 31-Jul-19 A 15-Jun-20 31-Jul-19 14-Apr-20 217 97 15-Jun-20, Safety & Fire Fighting
Fire Fighting Drawing 31-Jul-19 A 15-Jun-20 31-Jul-19 14-Apr-20 217 97 15-Jun-20, Fire Fighting Drawing
ED341SF25090A P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFR] 31-Jul-19 A 21-Feb-20 31-Jul-19 04-Sep-19 25 20 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFR]
ED341SF25090B P&ID and Piping Scheme for F/F System(SS-114)_U341 [Review/Appr.-IFR] 22-Feb-20 07-Mar-20 05-Sep-19 19-Sep-19 15 15 P&ID and Piping Scheme for F/F System(SS-114)_U341 [Review/Appr.-IFR]
ED341SF25090E P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFD] 09-Mar-20 06-Apr-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFD]
ED341SF25090F P&ID and Piping Scheme for F/F System(SS-114)_U341 [Approved-IFD] 07-Apr-20 21-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS-114)_U341 [Approved-IFD]
ED341SF25090G P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFC] 22-Apr-20 29-May-20 17-Feb-20 13-Mar-20 20 20 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFC]
ED341SF30085A Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [IFR] 05-Sep-19 A 21-Oct-19 A 20-Jan-20 28-Feb-20 30 0 Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [IFR]
ED341SF30085B Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [Review/Appr.-IFR]
22-Oct-19 A 10-Jan-20 A 29-Feb-20 14-Mar-20 15 0 Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [Review/Appr.-IFR]
ED341SF30085G Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [AFD] 08-May-20 15-Jun-20 16-Mar-20 14-Apr-20 20 20 Fire & Safety Equipment Location Plan-East Tank Farm Substation (341-SS-114)_U341 [AFD]
Construction 04-Jul-20 30-Apr-21 13-Jul-20 10-May-21 228 228 30-Apr-21, Construction
Civil 04-Jul-20 01-Sep-20 13-Jul-20 09-Sep-20 48 48 01-Sep-20, Civil
Foundation - Equipment 04-Jul-20 01-Sep-20 13-Jul-20 09-Sep-20 48 48 01-Sep-20, Foundation - Equipment
CD341CV55055 Equipment Foundation(SS-114)_U341 04-Jul-20 01-Sep-20 13-Jul-20 09-Sep-20 48 48 Equipment Foundation(SS-114)_U341
Architectural 04-Jul-20 26-Mar-21 13-Jul-20 06-Apr-21 200 200 26-Mar-21, Architectural
Building Foundation 04-Jul-20 12-Oct-20 13-Jul-20 20-Oct-20 83 83 12-Oct-20, Building Foundation
CD341AR35745 Building Foundation(SS-114)_U341 04-Jul-20 15-Aug-20 13-Jul-20 26-Aug-20 36 36 Building Foundation(SS-114)_U341
CD341AR35775 Ground Slab(SS-114)_U341 02-Sep-20 17-Sep-20 10-Sep-20 25-Sep-20 14 14 Ground Slab(SS-114)_U341
CD341AR35795 Tranformer yard(SS-114)_U341 18-Sep-20 12-Oct-20 26-Sep-20 20-Oct-20 21 21 Tranformer yard(SS-114)_U341
Building Structure 18-Sep-20 04-Jan-21 26-Sep-20 13-Jan-21 81 81 04-Jan-21, Building Structure
CD341AR40245- Column/Beam/Girder - Ground Level(SS-114)_U341 18-Sep-20 12-Oct-20 26-Sep-20 20-Oct-20 21 21 Column/Beam/Girder - Ground Level(SS-114)_U341
CD341AR40250 1st Floor Slab(SS-114)_U341 14-Oct-20 12-Nov-20 22-Oct-20 23-Nov-20 24 24 1st Floor Slab(SS-114)_U341
CD341AR40255- Column/Beam/Girder - 1st Floor(SS-114)_U341 12-Nov-20 10-Dec-20 23-Nov-20 21-Dec-20 21 21 Column/Beam/Girder - 1st Floor(SS-114)_U341
CD341AR40260 Roof Slab(SS-114)_U341 08-Dec-20 04-Jan-21 17-Dec-20 13-Jan-21 18 18 Roof Slab(SS-114)_U341
Building Finishing 18-Dec-20 26-Mar-21 30-Dec-20 06-Apr-21 67 67 26-Mar-21, Building Finishing
CD341AR45605 Masonry&Plastering(SS-114)_U341 18-Dec-20 28-Jan-21 30-Dec-20 08-Feb-21 28 28 Masonry&Plastering(SS-114)_U341
CD341AR45615 Painting-Internal(SS-114)_U341 26-Jan-21 24-Feb-21 04-Feb-21 05-Mar-21 21 21 Painting-Internal(SS-114)_U341
CD341AR45625 Water Proofing(SS-114)_U341 05-Jan-21 24-Feb-21 14-Jan-21 05-Mar-21 36 36 Water Proofing(SS-114)_U341
CD341AR45635 Interior Finishing(SS-114)_U341 02-Feb-21 15-Mar-21 11-Feb-21 24-Mar-21 28 28 Interior Finishing(SS-114)_U341
CD341AR45640 Exterior Finishing(SS-114)_U341 22-Feb-21 26-Mar-21 03-Mar-21 06-Apr-21 24 24 Exterior Finishing(SS-114)_U341
CD341AR45645 Door & Window(SS-114)_U341 25-Feb-21 23-Mar-21 08-Mar-21 01-Apr-21 18 18 Door & Window(SS-114)_U341
HVAC 03-Feb-21 30-Apr-21 15-Feb-21 10-May-21 64 64 30-Apr-21, HVAC

Actual Level of Effort Actual Work Critical Remaining Work Page 25 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
HVAC & Control System 25-Feb-21 26-Mar-21 08-Mar-21 06-Apr-21 21 21 26-Mar-21, HVAC & Control System
CD341HV10095 HVAC Equipment Installation(SS-114)_U341 25-Feb-21 26-Mar-21 08-Mar-21 06-Apr-21 21 21 HVAC Equipment Installation(SS-114)_U341
Plumbing 03-Feb-21 30-Apr-21 15-Feb-21 10-May-21 64 64 30-Apr-21, Plumbing
CD341HV15140 HVAC Duct Erection(SS-114)_U341 03-Feb-21 01-Mar-21 15-Feb-21 10-Mar-21 18 18 HVAC Duct Erection(SS-114)_U341
CD341HV15145 HVAC Piping work(SS-114)_U341 29-Mar-21 19-Apr-21 07-Apr-21 27-Apr-21 18 18 HVAC Piping work(SS-114)_U341
CD341HV15150 Plumbing&Sanitary(SS-114)_U341 07-Apr-21 30-Apr-21 15-Apr-21 10-May-21 21 21 Plumbing&Sanitary(SS-114)_U341
Electrical 28-Jul-20 29-Apr-21 06-Aug-20 08-May-21 207 207 29-Apr-21, Electrical
Cable Race Way 10-Feb-21 06-Apr-21 22-Feb-21 14-Apr-21 38 38 06-Apr-21, Cable Race Way
CD341EL45095 Electrical Cable Tray Installation(SS-114)_U341 10-Feb-21 23-Mar-21 22-Feb-21 01-Apr-21 28 28 Electrical Cable Tray Installation(SS-114)_U341
CD341EL45275- Electrical Conduit Pipe(SS-114)_U341 08-Mar-21 06-Apr-21 18-Mar-21 14-Apr-21 21 21 Electrical Conduit Pipe(SS-114)_U341
Power & Control 12-Mar-21 29-Apr-21 23-Mar-21 08-May-21 38 38 29-Apr-21, Power & Control
CD341EL45265- Termination - Power & Control(SS-114)_U341 09-Apr-21 29-Apr-21 17-Apr-21 08-May-21 18 18 Termination - Power & Control(SS-114)_U341
CD341EL45270- Cabling - Power & Control(SS-114)_U341 12-Mar-21 17-Apr-21 23-Mar-21 26-Apr-21 28 28 Cabling - Power & Control(SS-114)_U341
Earthing and Grouding 28-Jul-20 01-Sep-20 06-Aug-20 09-Sep-20 28 28 01-Sep-20, Earthing and Grouding
CD341EL50055 Cabling - Grounding(SS-114)_U341 28-Jul-20 01-Sep-20 06-Aug-20 09-Sep-20 28 28 Cabling - Grounding(SS-114)_U341
Lighting 29-Jan-21 13-Apr-21 09-Feb-21 21-Apr-21 52 52 13-Apr-21, Lighting
CD341EL60100 Installation - Distribution Panel(SS-114)_U341 29-Jan-21 23-Mar-21 09-Feb-21 01-Apr-21 36 36 Installation - Distribution Panel(SS-114)_U341
CD341EL60215 Cabling - Lightening(SS-114)_U341 29-Jan-21 10-Mar-21 09-Feb-21 22-Mar-21 28 28 Cabling - Lightening(SS-114)_U341
CD341EL60220 Lightening work(SS-114)_U341 29-Jan-21 10-Mar-21 09-Feb-21 22-Mar-21 28 28 Lightening work(SS-114)_U341
CD341EL60370 Installation of Lighting Fixture System (SS-114)_U341 05-Mar-21 13-Apr-21 17-Mar-21 21-Apr-21 28 28 Installation of Lighting Fixture System (SS-114)_U341
CD341EL60540 Cabling Lighting (SS-114)_U341 05-Mar-21 13-Apr-21 17-Mar-21 21-Apr-21 28 28 Cabling Lighting (SS-114)_U341
Communication 16-Mar-21 15-Apr-21 25-Mar-21 23-Apr-21 24 24 15-Apr-21, Communication
CD341EL65055 Installation - Communication System(SS-114)_U341 16-Mar-21 15-Apr-21 25-Mar-21 23-Apr-21 24 24 Installation - Communication System(SS-114)_U341
CD341EL65245 Cabling - Communication(SS-114)_U341 16-Mar-21 15-Apr-21 25-Mar-21 23-Apr-21 24 24 Cabling - Communication(SS-114)_U341
Fire Alarm 01-Mar-21 08-Apr-21 10-Mar-21 16-Apr-21 28 28 08-Apr-21, Fire Alarm
CD341EL68055 Installation - Fire Alarm System(SS-114)_U341 01-Mar-21 08-Apr-21 10-Mar-21 16-Apr-21 28 28 Installation - Fire Alarm System(SS-114)_U341
CD341EL68300 Cabling - Fire Alarm(SS-114)_U341 01-Mar-21 08-Apr-21 10-Mar-21 16-Apr-21 28 28 Cabling - Fire Alarm(SS-114)_U341
Safety & Fire Fighting 25-Feb-21 06-Apr-21 08-Mar-21 14-Apr-21 28 28 06-Apr-21, Safety & Fire Fighting
Fire Fighting Equipment 25-Feb-21 06-Apr-21 08-Mar-21 14-Apr-21 28 28 06-Apr-21, Fire Fighting Equipment
CD341MS40055 Installation - F/F Equipment(SS-114)_U341 25-Feb-21 06-Apr-21 08-Mar-21 14-Apr-21 28 28 Installation - F/F Equipment(SS-114)_U341
OP-004 (in Unit 315 E area) 12-Nov-20 18-Jun-21 24-Sep-20 21-Apr-21 153 153 18-Jun-21, OP-004 (in Unit 315 E area)

Construction 12-Nov-20 18-Jun-21 24-Sep-20 21-Apr-21 153 153 18-Jun-21, Construction


Architectural 12-Nov-20 04-May-21 24-Sep-20 12-Mar-21 123 123 04-May-21, Architectural
Building Foundation 12-Nov-20 08-Jan-21 24-Sep-20 11-Nov-20 40 40 08-Jan-21, Building Foundation
CD341AR35805 Building Foundation(OP-004)_U341 12-Nov-20 21-Dec-20 24-Sep-20 26-Oct-20 28 28 Building Foundation(OP-004)_U341
CD341AR35895 Ground Slab(OP-004)_U341 22-Dec-20 08-Jan-21 27-Oct-20 11-Nov-20 12 12 Ground Slab(OP-004)_U341
Building Structure 11-Jan-21 05-Mar-21 12-Nov-20 07-Jan-21 39 39 05-Mar-21, Building Structure
CD341AR40330 Column/Beam/Girder - Ground Level(OP-004)_U341 11-Jan-21 03-Feb-21 12-Nov-20 07-Dec-20 18 18 Column/Beam/Girder - Ground Level(OP-004)_U341
CD341AR40335- Roof Slab(OP-004)_U341 04-Feb-21 05-Mar-21 08-Dec-20 07-Jan-21 21 21 Roof Slab(OP-004)_U341
Building Finishing 26-Feb-21 04-May-21 30-Dec-20 12-Mar-21 50 50 04-May-21, Building Finishing
CD341AR45490 Masonry&Plastering(OP-004)_U341 26-Feb-21 01-Apr-21 30-Dec-20 02-Feb-21 24 24 Masonry&Plastering(OP-004)_U341
CD341AR45495- Water Proofing(OP-004)_U341 08-Mar-21 14-Apr-21 08-Jan-21 17-Feb-21 28 28 Water Proofing(OP-004)_U341
CD341AR45500 Door & Window(OP-004)_U341 17-Apr-21 04-May-21 22-Feb-21 12-Mar-21 14 14 Door & Window(OP-004)_U341
CD341AR45505- Painting-Internal(OP-004)_U341 29-Mar-21 19-Apr-21 28-Jan-21 23-Feb-21 18 18 Painting-Internal(OP-004)_U341
HVAC 10-Apr-21 18-Jun-21 11-Feb-21 21-Apr-21 50 50 18-Jun-21, HVAC
HVAC & Control System 20-Apr-21 11-May-21 24-Feb-21 22-Mar-21 18 18 11-May-21, HVAC & Control System
CD341HV10055 HVAC Equipment Installation(OP-004)_U341 20-Apr-21 11-May-21 24-Feb-21 22-Mar-21 18 18 HVAC Equipment Installation(OP-004)_U341
Plumbing 10-Apr-21 18-Jun-21 11-Feb-21 21-Apr-21 50 50 18-Jun-21, Plumbing
CD341HV15200 HVAC Duct Erection(OP-004)_U341 10-Apr-21 30-Apr-21 11-Feb-21 09-Mar-21 18 18 HVAC Duct Erection(OP-004)_U341
CD341HV15205 HVAC Piping work(OP-004)_U341 12-May-21 11-Jun-21 23-Mar-21 14-Apr-21 18 18 HVAC Piping work(OP-004)_U341
CD341HV15210 Plumbing&Sanitary(OP-004)_U341 28-May-21 18-Jun-21 31-Mar-21 21-Apr-21 18 18 Plumbing&Sanitary(OP-004)_U341
Electrical 30-Nov-20 18-Jun-21 08-Oct-20 21-Apr-21 141 141 18-Jun-21, Electrical
Cable Race Way 03-Apr-21 05-May-21 03-Feb-21 15-Mar-21 27 27 05-May-21, Cable Race Way
CD341EL45055- Electrical Cable Tray Installation(OP-004)_U341 03-Apr-21 30-Apr-21 03-Feb-21 09-Mar-21 24 24 Electrical Cable Tray Installation(OP-004)_U341
CD341EL45335- Electrical Conduit Pipe(OP-004)_U341 17-Apr-21 05-May-21 22-Feb-21 15-Mar-21 15 15 Electrical Conduit Pipe(OP-004)_U341
Power & Control 06-May-21 18-Jun-21 16-Mar-21 21-Apr-21 29 29 18-Jun-21, Power & Control
CD341EL45325- Termination - Power & Control(OP-004)_U341 28-May-21 18-Jun-21 31-Mar-21 21-Apr-21 18 18 Termination - Power & Control(OP-004)_U341
CD341EL45330- Cabling - Power & Control(OP-004)_U341 06-May-21 09-Jun-21 16-Mar-21 12-Apr-21 21 21 Cabling - Power & Control(OP-004)_U341
Earthing and Grouding 30-Nov-20 29-Dec-20 08-Oct-20 02-Nov-20 21 21 29-Dec-20, Earthing and Grouding
CD341EL50075 Cabling - Grounding(OP-004)_U341 30-Nov-20 29-Dec-20 08-Oct-20 02-Nov-20 21 21 Cabling - Grounding(OP-004)_U341
Lighting 15-Apr-21 02-Jun-21 18-Feb-21 05-Apr-21 32 32 02-Jun-21, Lighting
CD341EL60060 Installation - Distribution Panel(OP-004)_U341 15-Apr-21 10-May-21 18-Feb-21 19-Mar-21 21 21 Installation - Distribution Panel(OP-004)_U341
CD341EL60255 Cabling - Lightening(OP-004)_U341 17-Apr-21 12-May-21 22-Feb-21 23-Mar-21 21 21 Cabling - Lightening(OP-004)_U341
CD341EL60260 Lightening work(OP-004)_U341 17-Apr-21 12-May-21 22-Feb-21 23-Mar-21 21 21 Lightening work(OP-004)_U341
CD341EL60405 Installation of Lighting Fixture System (341-OP-004)_U341 03-May-21 02-Jun-21 10-Mar-21 05-Apr-21 18 18 Installation of Lighting Fixture System (341-OP-004)_U341
CD341EL60605 Cabling Lighting (341-OP-004)_U341 03-May-21 02-Jun-21 10-Mar-21 05-Apr-21 18 18 Cabling Lighting (341-OP-004)_U341
Communication 06-May-21 09-Jun-21 16-Mar-21 12-Apr-21 21 21 09-Jun-21, Communication
CD341EL65075 Installation - Communication System(OP-004)_U341 06-May-21 09-Jun-21 16-Mar-21 12-Apr-21 21 21 Installation - Communication System(OP-004)_U341
CD341EL65260 Cabling - Communication(OP-004)_U341 06-May-21 09-Jun-21 16-Mar-21 12-Apr-21 21 21 Cabling - Communication(OP-004)_U341
Fire Alarm 30-Apr-21 31-May-21 09-Mar-21 03-Apr-21 18 18 31-May-21, Fire Alarm
CD341EL68075 Installation - Fire Alarm System(OP-004)_U341 30-Apr-21 31-May-21 09-Mar-21 03-Apr-21 18 18 Installation - Fire Alarm System(OP-004)_U341
CD341EL68205 Cabling - Fire Alarm(OP-004)_U341 30-Apr-21 31-May-21 09-Mar-21 03-Apr-21 18 18 Cabling - Fire Alarm(OP-004)_U341
OP-006 (in Unit 325 W area) 11-Jul-20 21-May-21 22-Oct-20 18-Jun-21 232 232 21-May-21, OP-006 (in Unit 325 W area)

Construction 11-Jul-20 21-May-21 22-Oct-20 18-Jun-21 232 232 21-May-21, Construction


Architectural 11-Jul-20 30-Dec-20 22-Oct-20 28-Apr-21 135 135 30-Dec-20, Architectural
Building Foundation 11-Jul-20 29-Aug-20 22-Oct-20 15-Dec-20 40 40 29-Aug-20, Building Foundation

Actual Level of Effort Actual Work Critical Remaining Work Page 26 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341AR35810 Building Foundation(OP-006)_U341 11-Jul-20 13-Aug-20 22-Oct-20 27-Nov-20 28 28 Building Foundation(OP-006)_U341
CD341AR35850 Ground Slab(OP-006)_U341 14-Aug-20 29-Aug-20 30-Nov-20 15-Dec-20 12 12 Ground Slab(OP-006)_U341
Building Structure 31-Aug-20 26-Oct-20 16-Dec-20 25-Feb-21 49 49 26-Oct-20, Building Structure
CD341AR40340 Column/Beam/Girder - Ground Level(OP-006)_U341 31-Aug-20 23-Sep-20 16-Dec-20 15-Jan-21 21 21 Column/Beam/Girder - Ground Level(OP-006)_U341
CD341AR40385 Roof Slab(OP-006)_U341 24-Sep-20 26-Oct-20 18-Jan-21 25-Feb-21 28 28 Roof Slab(OP-006)_U341
Building Finishing 24-Sep-20 30-Dec-20 18-Jan-21 28-Apr-21 74 74 30-Dec-20, Building Finishing
CD341AR45530 Masonry&Plastering(OP-006)_U341 24-Sep-20 26-Oct-20 18-Jan-21 25-Feb-21 28 28 Masonry&Plastering(OP-006)_U341
CD341AR45535- Water Proofing(OP-006)_U341 09-Oct-20 24-Nov-20 04-Feb-21 29-Mar-21 36 36 Water Proofing(OP-006)_U341
CD341AR45540 Door & Window(OP-006)_U341 09-Dec-20 30-Dec-20 12-Apr-21 28-Apr-21 15 15 Door & Window(OP-006)_U341
CD341AR45545- Painting-Internal(OP-006)_U341 31-Oct-20 08-Dec-20 03-Mar-21 10-Apr-21 28 28 Painting-Internal(OP-006)_U341
HVAC 27-Oct-20 18-Feb-21 26-Feb-21 18-Jun-21 80 80 18-Feb-21, HVAC
HVAC & Control System 09-Dec-20 05-Jan-21 12-Apr-21 03-May-21 18 18 05-Jan-21, HVAC & Control System
CD341HV10045 HVAC Equipment Installation(OP-006)_U341 09-Dec-20 05-Jan-21 12-Apr-21 03-May-21 18 18 HVAC Equipment Installation(OP-006)_U341
Plumbing 27-Oct-20 18-Feb-21 26-Feb-21 18-Jun-21 80 80 18-Feb-21, Plumbing
CD341HV15215 HVAC Duct Erection(OP-006)_U341 27-Oct-20 24-Nov-20 26-Feb-21 29-Mar-21 21 21 HVAC Duct Erection(OP-006)_U341
CD341HV15220 HVAC Piping work(OP-006)_U341 06-Jan-21 03-Feb-21 04-May-21 07-Jun-21 21 21 HVAC Piping work(OP-006)_U341
CD341HV15225 Plumbing&Sanitary(OP-006)_U341 25-Jan-21 18-Feb-21 28-May-21 18-Jun-21 18 18 Plumbing&Sanitary(OP-006)_U341
Electrical 06-Aug-20 21-May-21 19-Nov-20 09-Jun-21 211 211 21-May-21, Electrical
Cable Race Way 29-Jan-21 03-Mar-21 26-Feb-21 31-Mar-21 23 23 03-Mar-21, Cable Race Way
CD341EL45045- Electrical Cable Tray Installation(OP-006)_U341 29-Jan-21 24-Feb-21 26-Feb-21 24-Mar-21 18 18 Electrical Cable Tray Installation(OP-006)_U341
CD341EL45350- Electrical Conduit Pipe(OP-006)_U341 10-Feb-21 03-Mar-21 10-Mar-21 31-Mar-21 15 15 Electrical Conduit Pipe(OP-006)_U341
Power & Control 01-Mar-21 30-Mar-21 22-Mar-21 16-Apr-21 21 21 30-Mar-21, Power & Control
CD341EL45340- Termination - Power & Control(OP-006)_U341 10-Mar-21 30-Mar-21 31-Mar-21 16-Apr-21 14 14 Termination - Power & Control(OP-006)_U341
CD341EL45345- Cabling - Power & Control(OP-006)_U341 01-Mar-21 30-Mar-21 22-Mar-21 16-Apr-21 21 21 Cabling - Power & Control(OP-006)_U341
Earthing and Grouding 06-Aug-20 01-Sep-20 19-Nov-20 17-Dec-20 21 21 01-Sep-20, Earthing and Grouding
CD341EL50080 Cabling - Grounding(OP-006)_U341 06-Aug-20 01-Sep-20 19-Nov-20 17-Dec-20 21 21 Cabling - Grounding(OP-006)_U341
Lighting 12-Nov-20 24-Apr-21 17-Mar-21 12-May-21 116 116 24-Apr-21, Lighting
CD341EL60050 Installation - Distribution Panel(OP-006)_U341 26-Mar-21 24-Apr-21 14-Apr-21 12-May-21 24 24 Installation - Distribution Panel(OP-006)_U341
CD341EL60265 Cabling - Lightening(OP-006)_U341 12-Nov-20 10-Dec-20 17-Mar-21 13-Apr-21 21 21 Cabling - Lightening(OP-006)_U341
CD341EL60270 Lightening work(OP-006)_U341 12-Nov-20 10-Dec-20 17-Mar-21 13-Apr-21 21 21 Lightening work(OP-006)_U341
CD341EL60410 Installation of Lighting Fixture System (341-OP-006)_U341 17-Feb-21 15-Mar-21 17-Mar-21 09-Apr-21 18 18 Installation of Lighting Fixture System (341-OP-006)_U341
CD341EL60610 Cabling Lighting (341-OP-006)_U341 17-Feb-21 15-Mar-21 17-Mar-21 09-Apr-21 18 18 Cabling Lighting (341-OP-006)_U341
Communication 19-Apr-21 21-May-21 06-May-21 09-Jun-21 21 21 21-May-21, Communication
CD341EL65080 Installation - Communication System(OP-006)_U341 19-Apr-21 21-May-21 06-May-21 09-Jun-21 21 21 Installation - Communication System(OP-006)_U341
CD341EL65265 Cabling - Communication(OP-006)_U341 19-Apr-21 21-May-21 06-May-21 09-Jun-21 21 21 Cabling - Communication(OP-006)_U341
Fire Alarm 19-Apr-21 10-May-21 06-May-21 05-Jun-21 18 18 10-May-21, Fire Alarm
CD341EL68080 Installation - Fire Alarm System(OP-006)_U341 19-Apr-21 10-May-21 06-May-21 05-Jun-21 18 18 Installation - Fire Alarm System(OP-006)_U341
CD341EL68210 Cabling - Fire Alarm(OP-006)_U341 19-Apr-21 10-May-21 06-May-21 05-Jun-21 18 18 Cabling - Fire Alarm(OP-006)_U341
OP-007 (in Unit 085 N area) 03-Nov-20 03-Aug-21 03-Nov-20 03-Aug-21 198 198 03-Aug-21, OP-007 (in Unit 085 N area)

Construction 03-Nov-20 03-Aug-21 03-Nov-20 03-Aug-21 198 198 03-Aug-21, Construction


Architectural 03-Nov-20 10-Jun-21 03-Nov-20 10-Jun-21 153 153 10-Jun-21, Architectural
Building Foundation 03-Nov-20 29-Dec-20 03-Nov-20 29-Dec-20 40 40 29-Dec-20, Building Foundation
CD341AR35815 Building Foundation(OP-007)_U341 03-Nov-20 10-Dec-20 03-Nov-20 10-Dec-20 28 28 Building Foundation(OP-007)_U341
CD341AR35885 Ground Slab(OP-007)_U341 11-Dec-20 29-Dec-20 11-Dec-20 29-Dec-20 12 12 Ground Slab(OP-007)_U341
Building Structure 30-Dec-20 10-Mar-21 30-Dec-20 10-Mar-21 49 49 10-Mar-21, Building Structure
CD341AR40350 Column/Beam/Girder - Ground Level(OP-007)_U341 30-Dec-20 28-Jan-21 30-Dec-20 28-Jan-21 21 21 Column/Beam/Girder - Ground Level(OP-007)_U341
CD341AR40355- Roof Slab(OP-007)_U341 29-Jan-21 10-Mar-21 29-Jan-21 10-Mar-21 28 28 Roof Slab(OP-007)_U341
Building Finishing 25-Feb-21 10-Jun-21 25-Feb-21 10-Jun-21 74 74 10-Jun-21, Building Finishing
CD341AR45570 Masonry&Plastering(OP-007)_U341 25-Feb-21 06-Apr-21 25-Feb-21 06-Apr-21 28 28 Masonry&Plastering(OP-007)_U341
CD341AR45575- Water Proofing(OP-007)_U341 12-Mar-21 27-Apr-21 12-Mar-21 27-Apr-21 36 36 Water Proofing(OP-007)_U341
CD341AR45580 Door & Window(OP-007)_U341 11-May-21 10-Jun-21 11-May-21 10-Jun-21 18 18 Door & Window(OP-007)_U341
CD341AR45585- Painting-Internal(OP-007)_U341 07-Apr-21 10-May-21 07-Apr-21 10-May-21 28 28 Painting-Internal(OP-007)_U341
HVAC 07-Apr-21 17-Jul-21 07-Apr-21 17-Jul-21 77 77 17-Jul-21, HVAC
HVAC & Control System 11-May-21 14-Jun-21 11-May-21 14-Jun-21 21 21 14-Jun-21, HVAC & Control System
CD341HV10065 HVAC Equipment Installation(OP-007)_U341 11-May-21 14-Jun-21 11-May-21 14-Jun-21 21 21 HVAC Equipment Installation(OP-007)_U341
Plumbing 07-Apr-21 17-Jul-21 07-Apr-21 17-Jul-21 77 77 17-Jul-21, Plumbing
CD341HV15230 HVAC Duct Erection(OP-007)_U341 07-Apr-21 27-Apr-21 07-Apr-21 27-Apr-21 18 18 HVAC Duct Erection(OP-007)_U341
CD341HV15235 HVAC Piping work(OP-007)_U341 15-Jun-21 06-Jul-21 15-Jun-21 06-Jul-21 18 18 HVAC Piping work(OP-007)_U341
CD341HV15240 Plumbing&Sanitary(OP-007)_U341 26-Jun-21 17-Jul-21 26-Jun-21 17-Jul-21 18 18 Plumbing&Sanitary(OP-007)_U341
Electrical 03-Nov-20 03-Aug-21 03-Nov-20 03-Aug-21 198 198 03-Aug-21, Electrical
Cable Race Way 11-May-21 23-Jun-21 11-May-21 23-Jun-21 29 29 23-Jun-21, Cable Race Way
CD341EL45065- Electrical Cable Tray Installation(OP-007)_U341 11-May-21 17-Jun-21 11-May-21 17-Jun-21 24 24 Electrical Cable Tray Installation(OP-007)_U341
CD341EL45365- Electrical Conduit Pipe(OP-007)_U341 07-Jun-21 23-Jun-21 07-Jun-21 23-Jun-21 15 15 Electrical Conduit Pipe(OP-007)_U341
Power & Control 08-Jun-21 20-Jul-21 08-Jun-21 20-Jul-21 36 36 20-Jul-21, Power & Control
CD341EL45355- Termination - Power & Control(OP-007)_U341 25-Jun-21 20-Jul-21 25-Jun-21 20-Jul-21 21 21 Termination - Power & Control(OP-007)_U341
CD341EL45360- Cabling - Power & Control(OP-007)_U341 08-Jun-21 06-Jul-21 08-Jun-21 06-Jul-21 24 24 Cabling - Power & Control(OP-007)_U341
Earthing and Grouding 03-Nov-20 01-Dec-20 03-Nov-20 01-Dec-20 21 21 01-Dec-20, Earthing and Grouding
CD341EL50085 Cabling - Grounding(OP-007)_U341 03-Nov-20 01-Dec-20 03-Nov-20 01-Dec-20 21 21 Cabling - Grounding(OP-007)_U341
Lighting 30-Mar-21 22-Jul-21 30-Mar-21 22-Jul-21 87 87 22-Jul-21, Lighting
CD341EL60070 Installation - Distribution Panel(OP-007)_U341 19-Jun-21 22-Jul-21 19-Jun-21 22-Jul-21 28 28 Installation - Distribution Panel(OP-007)_U341
CD341EL60275 Cabling - Lightening(OP-007)_U341 30-Mar-21 23-Apr-21 30-Mar-21 23-Apr-21 21 21 Cabling - Lightening(OP-007)_U341
CD341EL60280 Lightening work(OP-007)_U341 30-Mar-21 23-Apr-21 30-Mar-21 23-Apr-21 21 21 Lightening work(OP-007)_U341
CD341EL60415 Installation of Lighting Fixture System (341-OP-007)_U341 11-Jun-21 01-Jul-21 11-Jun-21 01-Jul-21 18 18 Installation of Lighting Fixture System (341-OP-007)_U341
CD341EL60615 Cabling Lighting (341-OP-007)_U341 11-Jun-21 01-Jul-21 11-Jun-21 01-Jul-21 18 18 Cabling Lighting (341-OP-007)_U341
Communication 06-Jul-21 29-Jul-21 06-Jul-21 29-Jul-21 21 21 29-Jul-21, Communication
CD341EL65085 Installation - Communication System(OP-007)_U341 06-Jul-21 29-Jul-21 06-Jul-21 29-Jul-21 21 21 Installation - Communication System(OP-007)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 27 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341EL65270 Cabling - Communication(OP-007)_U341 06-Jul-21 29-Jul-21 06-Jul-21 29-Jul-21 21 21 Cabling - Communication(OP-007)_U341
Fire Alarm 14-Jul-21 03-Aug-21 14-Jul-21 03-Aug-21 18 18 03-Aug-21, Fire Alarm
CD341EL68085 Installation - Fire Alarm System(OP-007)_U341 14-Jul-21 03-Aug-21 14-Jul-21 03-Aug-21 18 18 Installation - Fire Alarm System(OP-007)_U341
CD341EL68215 Cabling - Fire Alarm(OP-007)_U341 14-Jul-21 03-Aug-21 14-Jul-21 03-Aug-21 18 18 Cabling - Fire Alarm(OP-007)_U341
OP-012 (in Unit 332 area) 04-Nov-20 08-Jul-21 07-Dec-20 04-Aug-21 175 175 08-Jul-21, OP-012 (in Unit 332 area)

Construction 04-Nov-20 08-Jul-21 07-Dec-20 04-Aug-21 175 175 08-Jul-21, Construction


Architectural 04-Nov-20 02-Jun-21 07-Dec-20 29-Jun-21 145 145 02-Jun-21, Architectural
Building Foundation 04-Nov-20 30-Dec-20 07-Dec-20 02-Feb-21 40 40 30-Dec-20, Building Foundation
CD341AR35820 Building Foundation(OP-012)_U341 04-Nov-20 11-Dec-20 07-Dec-20 15-Jan-21 28 28 Building Foundation(OP-012)_U341
CD341AR45895 Ground Slab(OP-012)_U341 14-Dec-20 30-Dec-20 18-Jan-21 02-Feb-21 12 12 Ground Slab(OP-012)_U341
Building Structure 31-Dec-20 12-Mar-21 03-Feb-21 13-Apr-21 49 49 12-Mar-21, Building Structure
CD341AR40360 Column/Beam/Girder - Ground Level(OP-012)_U341 31-Dec-20 29-Jan-21 03-Feb-21 04-Mar-21 21 21 Column/Beam/Girder - Ground Level(OP-012)_U341
CD341AR40365- Roof Slab(OP-012)_U341 01-Feb-21 12-Mar-21 05-Mar-21 13-Apr-21 28 28 Roof Slab(OP-012)_U341
Building Finishing 03-Mar-21 02-Jun-21 06-Apr-21 29-Jun-21 63 63 02-Jun-21, Building Finishing
CD341AR45610 Masonry&Plastering(OP-012)_U341 03-Mar-21 10-Apr-21 06-Apr-21 08-May-21 28 28 Masonry&Plastering(OP-012)_U341
CD341AR45615- Water Proofing(OP-012)_U341 15-Mar-21 21-Apr-21 14-Apr-21 28-May-21 30 30 Water Proofing(OP-012)_U341
CD341AR45620 Door & Window(OP-012)_U341 03-May-21 02-Jun-21 09-Jun-21 29-Jun-21 18 18 Door & Window(OP-012)_U341
CD341AR45625- Painting-Internal(OP-012)_U341 03-Apr-21 06-May-21 30-Apr-21 12-Jun-21 28 28 Painting-Internal(OP-012)_U341
HVAC 10-Apr-21 08-Jul-21 08-May-21 04-Aug-21 66 66 08-Jul-21, HVAC
HVAC & Control System 04-May-21 07-Jun-21 10-Jun-21 05-Jul-21 21 21 07-Jun-21, HVAC & Control System
CD341HV10050 HVAC Equipment Installation(OP-012)_U341 04-May-21 07-Jun-21 10-Jun-21 05-Jul-21 21 21 HVAC Equipment Installation(OP-012)_U341
Plumbing 10-Apr-21 08-Jul-21 08-May-21 04-Aug-21 66 66 08-Jul-21, Plumbing
CD341HV15245 HVAC Duct Erection(OP-012)_U341 10-Apr-21 05-May-21 08-May-21 11-Jun-21 21 21 HVAC Duct Erection(OP-012)_U341
CD341HV15250 HVAC Piping work(OP-012)_U341 08-Jun-21 01-Jul-21 06-Jul-21 29-Jul-21 21 21 HVAC Piping work(OP-012)_U341
CD341HV15255 Plumbing&Sanitary(OP-012)_U341 14-Jun-21 08-Jul-21 12-Jul-21 04-Aug-21 21 21 Plumbing&Sanitary(OP-012)_U341
Electrical 01-Dec-20 06-Jul-21 05-Jan-21 02-Aug-21 154 154 06-Jul-21, Electrical
Cable Race Way 12-Apr-21 14-Jun-21 10-May-21 12-Jul-21 45 45 14-Jun-21, Cable Race Way
CD341EL45050 Electrical Cable Tray Installation(OP-012)_U341 12-Apr-21 25-May-21 10-May-21 23-Jun-21 30 30 Electrical Cable Tray Installation(OP-012)_U341
CD341EL45380- Electrical Conduit Pipe(OP-012)_U341 27-May-21 14-Jun-21 24-Jun-21 12-Jul-21 15 15 Electrical Conduit Pipe(OP-012)_U341
Power & Control 07-May-21 06-Jul-21 14-Jun-21 02-Aug-21 42 42 06-Jul-21, Power & Control
CD341EL45370- Termination - Power & Control(OP-012)_U341 15-Jun-21 06-Jul-21 13-Jul-21 02-Aug-21 18 18 Termination - Power & Control(OP-012)_U341
CD341EL45375- Cabling - Power & Control(OP-012)_U341 07-May-21 14-Jun-21 14-Jun-21 12-Jul-21 24 24 Cabling - Power & Control(OP-012)_U341
Earthing and Grouding 01-Dec-20 30-Dec-20 05-Jan-21 02-Feb-21 21 21 30-Dec-20, Earthing and Grouding
CD341EL50090 Cabling - Grounding(OP-012)_U341 01-Dec-20 30-Dec-20 05-Jan-21 02-Feb-21 21 21 Cabling - Grounding(OP-012)_U341
Lighting 31-Mar-21 10-Jun-21 28-Apr-21 08-Jul-21 51 51 10-Jun-21, Lighting
CD341EL60055 Installation - Distribution Panel(OP-012)_U341 23-Apr-21 02-Jun-21 31-May-21 29-Jun-21 25 25 Installation - Distribution Panel(OP-012)_U341
CD341EL60285 Cabling - Lightening(OP-012)_U341 31-Mar-21 24-Apr-21 28-Apr-21 02-Jun-21 21 21 Cabling - Lightening(OP-012)_U341
CD341EL60290 Lightening work(OP-012)_U341 31-Mar-21 24-Apr-21 28-Apr-21 02-Jun-21 21 21 Lightening work(OP-012)_U341
CD341EL60420 Installation of Lighting Fixture System (341-OP-012)_U341 11-May-21 10-Jun-21 17-Jun-21 08-Jul-21 18 18 Installation of Lighting Fixture System (341-OP-012)_U341
CD341EL60620 Cabling Lighting (341-OP-012)_U341 11-May-21 10-Jun-21 17-Jun-21 08-Jul-21 18 18 Cabling Lighting (341-OP-012)_U341
Communication 03-Jun-21 26-Jun-21 30-Jun-21 24-Jul-21 21 21 26-Jun-21, Communication
CD341EL65090 Installation - Communication System(OP-012)_U341 03-Jun-21 26-Jun-21 30-Jun-21 24-Jul-21 21 21 Installation - Communication System(OP-012)_U341
CD341EL65275 Cabling - Communication(OP-012)_U341 03-Jun-21 26-Jun-21 30-Jun-21 24-Jul-21 21 21 Cabling - Communication(OP-012)_U341
Fire Alarm 03-Jun-21 23-Jun-21 30-Jun-21 21-Jul-21 18 18 23-Jun-21, Fire Alarm
CD341EL68090 Installation - Fire Alarm System(OP-012)_U341 03-Jun-21 23-Jun-21 30-Jun-21 21-Jul-21 18 18 Installation - Fire Alarm System(OP-012)_U341
CD341EL68220 Cabling - Fire Alarm(OP-012)_U341 03-Jun-21 23-Jun-21 30-Jun-21 21-Jul-21 18 18 Cabling - Fire Alarm(OP-012)_U341
OP-013 (in Unit 337 area) 13-Nov-20 16-Jul-21 21-Oct-20 24-Jun-21 175 175 16-Jul-21, OP-013 (in Unit 337 area)

Construction 13-Nov-20 16-Jul-21 21-Oct-20 24-Jun-21 175 175 16-Jul-21, Construction


Architectural 13-Nov-20 15-Jun-21 21-Oct-20 22-May-21 149 149 15-Jun-21, Architectural
Building Foundation 13-Nov-20 11-Jan-21 21-Oct-20 14-Dec-20 40 40 11-Jan-21, Building Foundation
CD341AR35830 Building Foundation(OP-013)_U341 13-Nov-20 22-Dec-20 21-Oct-20 26-Nov-20 28 28 Building Foundation(OP-013)_U341
CD341AR45905 Ground Slab(OP-013)_U341 23-Dec-20 11-Jan-21 27-Nov-20 14-Dec-20 12 12 Ground Slab(OP-013)_U341
Building Structure 12-Jan-21 23-Mar-21 15-Dec-20 24-Feb-21 49 49 23-Mar-21, Building Structure
CD341AR40370 Column/Beam/Girder - Ground Level(OP-013)_U341 12-Jan-21 09-Feb-21 15-Dec-20 14-Jan-21 21 21 Column/Beam/Girder - Ground Level(OP-013)_U341
CD341AR40375- Roof Slab(OP-013)_U341 10-Feb-21 23-Mar-21 15-Jan-21 24-Feb-21 28 28 Roof Slab(OP-013)_U341
Building Finishing 15-Mar-21 15-Jun-21 16-Feb-21 22-May-21 67 67 15-Jun-21, Building Finishing
CD341AR45650 Masonry&Plastering(OP-013)_U341 15-Mar-21 19-Apr-21 16-Feb-21 26-Mar-21 28 28 Masonry&Plastering(OP-013)_U341
CD341AR45655- Water Proofing(OP-013)_U341 24-Mar-21 29-Apr-21 25-Feb-21 08-Apr-21 30 30 Water Proofing(OP-013)_U341
CD341AR45660 Door & Window(OP-013)_U341 24-May-21 15-Jun-21 23-Apr-21 22-May-21 18 18 Door & Window(OP-013)_U341
CD341AR45665- Painting-Internal(OP-013)_U341 16-Apr-21 22-May-21 24-Mar-21 22-Apr-21 24 24 Painting-Internal(OP-013)_U341
HVAC 19-Apr-21 16-Jul-21 26-Mar-21 24-Jun-21 66 66 16-Jul-21, HVAC
HVAC & Control System 24-May-21 15-Jun-21 23-Apr-21 22-May-21 18 18 15-Jun-21, HVAC & Control System
CD341HV10060 HVAC Equipment Installation(OP-013)_U341 24-May-21 15-Jun-21 23-Apr-21 22-May-21 18 18 HVAC Equipment Installation(OP-013)_U341
Plumbing 19-Apr-21 16-Jul-21 26-Mar-21 24-Jun-21 66 66 16-Jul-21, Plumbing
CD341HV15260 HVAC Duct Erection(OP-013)_U341 19-Apr-21 21-May-21 26-Mar-21 21-Apr-21 21 21 HVAC Duct Erection(OP-013)_U341
CD341HV15265 HVAC Piping work(OP-013)_U341 16-Jun-21 10-Jul-21 24-May-21 18-Jun-21 21 21 HVAC Piping work(OP-013)_U341
CD341HV15270 Plumbing&Sanitary(OP-013)_U341 22-Jun-21 16-Jul-21 31-May-21 24-Jun-21 21 21 Plumbing&Sanitary(OP-013)_U341
Electrical 07-Dec-20 10-Jul-21 11-Nov-20 18-Jun-21 154 154 10-Jul-21, Electrical
Cable Race Way 20-Apr-21 08-Jun-21 29-Mar-21 07-May-21 33 33 08-Jun-21, Cable Race Way
CD341EL45060 Electrical Cable Tray Installation(OP-013)_U341 20-Apr-21 04-Jun-21 29-Mar-21 04-May-21 30 30 Electrical Cable Tray Installation(OP-013)_U341
CD341EL45395- Electrical Conduit Pipe(OP-013)_U341 05-May-21 08-Jun-21 13-Apr-21 07-May-21 21 21 Electrical Conduit Pipe(OP-013)_U341
Power & Control 09-Jun-21 10-Jul-21 08-May-21 18-Jun-21 27 27 10-Jul-21, Power & Control
CD341EL45385- Termination - Power & Control(OP-013)_U341 19-Jun-21 10-Jul-21 28-May-21 18-Jun-21 18 18 Termination - Power & Control(OP-013)_U341
CD341EL45390- Cabling - Power & Control(OP-013)_U341 09-Jun-21 03-Jul-21 08-May-21 11-Jun-21 21 21 Cabling - Power & Control(OP-013)_U341
Earthing and Grouding 07-Dec-20 11-Jan-21 11-Nov-20 14-Dec-20 24 24 11-Jan-21, Earthing and Grouding
CD341EL50095 Cabling - Grounding(OP-013)_U341 07-Dec-20 11-Jan-21 11-Nov-20 14-Dec-20 24 24 Cabling - Grounding(OP-013)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 28 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Lighting 23-Apr-21 18-Jun-21 01-Apr-21 27-May-21 39 39 18-Jun-21, Lighting
CD341EL60065 Installation - Distribution Panel(OP-013)_U341 03-May-21 10-Jun-21 10-Apr-21 10-May-21 25 25 Installation - Distribution Panel(OP-013)_U341
CD341EL60425 Installation of Lighting Fixture System (341-OP-013)_U341 28-May-21 18-Jun-21 27-Apr-21 27-May-21 18 18 Installation of Lighting Fixture System (341-OP-013)_U341
CD341EL60460 Cabling - Lightening(OP-013)_U341 23-Apr-21 27-May-21 01-Apr-21 26-Apr-21 21 21 Cabling - Lightening(OP-013)_U341
CD341EL60470 Lightening work(OP-013)_U341 23-Apr-21 27-May-21 01-Apr-21 26-Apr-21 21 21 Lightening work(OP-013)_U341
CD341EL60630 Cabling Lighting (341-OP-013)_U341 28-May-21 18-Jun-21 27-Apr-21 27-May-21 18 18 Cabling Lighting (341-OP-013)_U341
Communication 10-Jun-21 05-Jul-21 10-May-21 12-Jun-21 21 21 05-Jul-21, Communication
CD341EL65095 Installation - Communication System(OP-013)_U341 10-Jun-21 05-Jul-21 10-May-21 12-Jun-21 21 21 Installation - Communication System(OP-013)_U341
CD341EL65280 Cabling - Communication(OP-013)_U341 10-Jun-21 05-Jul-21 10-May-21 12-Jun-21 21 21 Cabling - Communication(OP-013)_U341
Fire Alarm 11-Jun-21 01-Jul-21 11-May-21 10-Jun-21 18 18 01-Jul-21, Fire Alarm
CD341EL68095 Installation - Fire Alarm System(OP-013)_U341 11-Jun-21 01-Jul-21 11-May-21 10-Jun-21 18 18 Installation - Fire Alarm System(OP-013)_U341
CD341EL68225 Cabling - Fire Alarm(OP-013)_U341 11-Jun-21 01-Jul-21 11-May-21 10-Jun-21 18 18 Cabling - Fire Alarm(OP-013)_U341
OP-014 (in Unit 337 area) 14-Jan-21 25-Sep-21 05-Oct-20 28-Jun-21 192 192 25-Sep-21, OP-014 (in Unit 337 area)

Construction 14-Jan-21 25-Sep-21 05-Oct-20 28-Jun-21 192 192 25-Sep-21, Construction


Architectural 14-Jan-21 20-Aug-21 05-Oct-20 12-May-21 161 161 20-Aug-21, Architectural
Building Foundation 14-Jan-21 12-Mar-21 05-Oct-20 24-Nov-20 40 40 12-Mar-21, Building Foundation
CD341AR35835 Building Foundation(OP-014)_U341 14-Jan-21 23-Feb-21 05-Oct-20 06-Nov-20 28 28 Building Foundation(OP-014)_U341
CD341AR45915 Ground Slab(OP-014)_U341 24-Feb-21 12-Mar-21 09-Nov-20 24-Nov-20 12 12 Ground Slab(OP-014)_U341
Building Structure 15-Mar-21 22-May-21 25-Nov-20 03-Feb-21 49 49 22-May-21, Building Structure
CD341AR40380 Column/Beam/Girder - Ground Level(OP-014)_U341 15-Mar-21 10-Apr-21 25-Nov-20 23-Dec-20 21 21 Column/Beam/Girder - Ground Level(OP-014)_U341
CD341AR40385- Roof Slab(OP-014)_U341 12-Apr-21 22-May-21 24-Dec-20 03-Feb-21 28 28 Roof Slab(OP-014)_U341
Building Finishing 07-May-21 20-Aug-21 26-Jan-21 12-May-21 79 79 20-Aug-21, Building Finishing
CD341AR45690 Masonry&Plastering(OP-014)_U341 07-May-21 18-Jun-21 26-Jan-21 05-Mar-21 28 28 Masonry&Plastering(OP-014)_U341
CD341AR45695- Water Proofing(OP-014)_U341 09-Jun-21 14-Jul-21 23-Feb-21 06-Apr-21 30 30 Water Proofing(OP-014)_U341
CD341AR45700 Door & Window(OP-014)_U341 29-Jul-21 20-Aug-21 21-Apr-21 12-May-21 18 18 Door & Window(OP-014)_U341
CD341AR45705- Painting-Internal(OP-014)_U341 25-Jun-21 28-Jul-21 16-Mar-21 20-Apr-21 28 28 Painting-Internal(OP-014)_U341
HVAC 19-Jun-21 25-Sep-21 08-Mar-21 28-Jun-21 82 82 25-Sep-21, HVAC
HVAC & Control System 29-Jul-21 24-Aug-21 21-Apr-21 24-May-21 21 21 24-Aug-21, HVAC & Control System
CD341HV10015 HVAC Equipment Installation(OP-014)_U341 29-Jul-21 24-Aug-21 21-Apr-21 24-May-21 21 21 HVAC Equipment Installation(OP-014)_U341
Plumbing 19-Jun-21 25-Sep-21 08-Mar-21 28-Jun-21 82 82 25-Sep-21, Plumbing
CD341HV15275 HVAC Duct Erection(OP-014)_U341 19-Jun-21 14-Jul-21 08-Mar-21 06-Apr-21 21 21 HVAC Duct Erection(OP-014)_U341
CD341HV15280 HVAC Piping work(OP-014)_U341 25-Aug-21 14-Sep-21 25-May-21 16-Jun-21 18 18 HVAC Piping work(OP-014)_U341
CD341HV15285 Plumbing&Sanitary(OP-014)_U341 06-Sep-21 25-Sep-21 08-Jun-21 28-Jun-21 18 18 Plumbing&Sanitary(OP-014)_U341
Electrical 05-Feb-21 27-Aug-21 23-Oct-20 28-May-21 151 151 27-Aug-21, Electrical
Cable Race Way 09-Jun-21 31-Jul-21 23-Feb-21 23-Apr-21 45 45 31-Jul-21, Cable Race Way
CD341EL45015- Electrical Cable Tray Installation(OP-014)_U341 09-Jun-21 14-Jul-21 23-Feb-21 06-Apr-21 30 30 Electrical Cable Tray Installation(OP-014)_U341
CD341EL45410- Electrical Conduit Pipe(OP-014)_U341 15-Jul-21 31-Jul-21 07-Apr-21 23-Apr-21 15 15 Electrical Conduit Pipe(OP-014)_U341
Power & Control 05-Jul-21 27-Aug-21 25-Mar-21 28-May-21 45 45 27-Aug-21, Power & Control
CD341EL45400- Termination - Power & Control(OP-014)_U341 02-Aug-21 27-Aug-21 24-Apr-21 28-May-21 21 21 Termination - Power & Control(OP-014)_U341
CD341EL45405- Cabling - Power & Control(OP-014)_U341 05-Jul-21 31-Jul-21 25-Mar-21 23-Apr-21 24 24 Cabling - Power & Control(OP-014)_U341
Earthing and Grouding 05-Feb-21 12-Mar-21 23-Oct-20 24-Nov-20 24 24 12-Mar-21, Earthing and Grouding
CD341EL50100 Cabling - Grounding(OP-014)_U341 05-Feb-21 12-Mar-21 23-Oct-20 24-Nov-20 24 24 Cabling - Grounding(OP-014)_U341
Lighting 21-Jun-21 26-Aug-21 23-Feb-21 20-Apr-21 55 55 26-Aug-21, Lighting
CD341EL60020 Installation - Distribution Panel(OP-014)_U341 21-Jun-21 20-Jul-21 09-Mar-21 12-Apr-21 25 25 Installation - Distribution Panel(OP-014)_U341
CD341EL60300 Cabling - Lightening(OP-014)_U341 31-Jul-21 26-Aug-21 23-Feb-21 24-Mar-21 21 21 Cabling - Lightening(OP-014)_U341
CD341EL60305 Lightening work(OP-014)_U341 31-Jul-21 26-Aug-21 23-Feb-21 24-Mar-21 21 21 Lightening work(OP-014)_U341
CD341EL60430 Installation of Lighting Fixture System (341-OP-014)_U341 08-Jul-21 28-Jul-21 30-Mar-21 20-Apr-21 18 18 Installation of Lighting Fixture System (341-OP-014)_U341
CD341EL60635 Cabling Lighting (341-OP-014)_U341 08-Jul-21 28-Jul-21 30-Mar-21 20-Apr-21 18 18 Cabling Lighting (341-OP-014)_U341
Communication 20-Jul-21 13-Aug-21 12-Apr-21 06-May-21 21 21 13-Aug-21, Communication
CD341EL65100 Installation - Communication System(OP-014)_U341 20-Jul-21 13-Aug-21 12-Apr-21 06-May-21 21 21 Installation - Communication System(OP-014)_U341
CD341EL65285 Cabling - Communication(OP-014)_U341 20-Jul-21 13-Aug-21 12-Apr-21 06-May-21 21 21 Cabling - Communication(OP-014)_U341
Fire Alarm 12-Jul-21 31-Jul-21 03-Apr-21 23-Apr-21 18 18 31-Jul-21, Fire Alarm
CD341EL68100 Installation - Fire Alarm System(OP-014)_U341 12-Jul-21 31-Jul-21 03-Apr-21 23-Apr-21 18 18 Installation - Fire Alarm System(OP-014)_U341
CD341EL68230 Cabling - Fire Alarm(OP-014)_U341 12-Jul-21 31-Jul-21 03-Apr-21 23-Apr-21 18 18 Cabling - Fire Alarm(OP-014)_U341
OP-015 (in Unit 332 area) 08-Dec-20 07-Aug-21 12-Jan-21 06-Sep-21 177 177 07-Aug-21, OP-015 (in Unit 332 area)

Construction 08-Dec-20 07-Aug-21 12-Jan-21 06-Sep-21 177 177 07-Aug-21, Construction


Architectural 08-Dec-20 28-Jun-21 12-Jan-21 26-Jul-21 143 143 28-Jun-21, Architectural
Building Foundation 08-Dec-20 03-Feb-21 12-Jan-21 09-Mar-21 40 40 03-Feb-21, Building Foundation
CD341AR35840 Building Foundation(OP-015)_U341 08-Dec-20 18-Jan-21 12-Jan-21 19-Feb-21 28 28 Building Foundation(OP-015)_U341
CD341AR35875 Ground Slab(OP-015)_U341 19-Jan-21 03-Feb-21 22-Feb-21 09-Mar-21 12 12 Ground Slab(OP-015)_U341
Building Structure 04-Feb-21 14-Apr-21 10-Mar-21 12-May-21 49 49 14-Apr-21, Building Structure
CD341AR40390 Column/Beam/Girder - Ground Level(OP-015)_U341 04-Feb-21 05-Mar-21 10-Mar-21 08-Apr-21 21 21 Column/Beam/Girder - Ground Level(OP-015)_U341
CD341AR40395- Roof Slab(OP-015)_U341 08-Mar-21 14-Apr-21 09-Apr-21 12-May-21 28 28 Roof Slab(OP-015)_U341
Building Finishing 12-Apr-21 28-Jun-21 10-May-21 26-Jul-21 57 57 28-Jun-21, Building Finishing
CD341AR45730 Masonry&Plastering(OP-015)_U341 12-Apr-21 10-May-21 10-May-21 16-Jun-21 24 24 Masonry&Plastering(OP-015)_U341
CD341AR45735- Water Proofing(OP-015)_U341 15-Apr-21 29-May-21 21-May-21 26-Jun-21 30 30 Water Proofing(OP-015)_U341
CD341AR45740 Door & Window(OP-015)_U341 08-Jun-21 28-Jun-21 06-Jul-21 26-Jul-21 18 18 Door & Window(OP-015)_U341
CD341AR45745- Painting-Internal(OP-015)_U341 03-May-21 14-Jun-21 09-Jun-21 12-Jul-21 28 28 Painting-Internal(OP-015)_U341
HVAC 11-May-21 07-Aug-21 17-Jun-21 06-Sep-21 67 67 07-Aug-21, HVAC
HVAC & Control System 11-Jun-21 06-Jul-21 09-Jul-21 02-Aug-21 21 21 06-Jul-21, HVAC & Control System
CD341HV10070 HVAC Equipment Installation(OP-015)_U341 11-Jun-21 06-Jul-21 09-Jul-21 02-Aug-21 21 21 HVAC Equipment Installation(OP-015)_U341
Plumbing 11-May-21 07-Aug-21 17-Jun-21 06-Sep-21 67 67 07-Aug-21, Plumbing
CD341HV15290 HVAC Duct Erection(OP-015)_U341 11-May-21 14-Jun-21 17-Jun-21 12-Jul-21 21 21 HVAC Duct Erection(OP-015)_U341
CD341HV15295 HVAC Piping work(OP-015)_U341 07-Jul-21 30-Jul-21 03-Aug-21 28-Aug-21 21 21 HVAC Piping work(OP-015)_U341
CD341HV15300 Plumbing&Sanitary(OP-015)_U341 15-Jul-21 07-Aug-21 12-Aug-21 06-Sep-21 21 21 Plumbing&Sanitary(OP-015)_U341
Electrical 06-Jan-21 13-Jul-21 08-Feb-21 09-Aug-21 136 136 13-Jul-21, Electrical

Actual Level of Effort Actual Work Critical Remaining Work Page 29 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Cable Race Way 11-May-21 06-Jul-21 17-Jun-21 02-Aug-21 39 39 06-Jul-21, Cable Race Way
CD341EL45070 Electrical Cable Tray Installation(OP-015)_U341 11-May-21 17-Jun-21 17-Jun-21 15-Jul-21 24 24 Electrical Cable Tray Installation(OP-015)_U341
CD341EL45425- Electrical Conduit Pipe(OP-015)_U341 18-Jun-21 06-Jul-21 16-Jul-21 02-Aug-21 15 15 Electrical Conduit Pipe(OP-015)_U341
Power & Control 08-Jun-21 13-Jul-21 06-Jul-21 09-Aug-21 30 30 13-Jul-21, Power & Control
CD341EL45415- Termination - Power & Control(OP-015)_U341 22-Jun-21 13-Jul-21 20-Jul-21 09-Aug-21 18 18 Termination - Power & Control(OP-015)_U341
CD341EL45420- Cabling - Power & Control(OP-015)_U341 08-Jun-21 06-Jul-21 06-Jul-21 02-Aug-21 24 24 Cabling - Power & Control(OP-015)_U341
Earthing and Grouding 06-Jan-21 03-Feb-21 08-Feb-21 09-Mar-21 21 21 03-Feb-21, Earthing and Grouding
CD341EL50105 Cabling - Grounding(OP-015)_U341 06-Jan-21 03-Feb-21 08-Feb-21 09-Mar-21 21 21 Cabling - Grounding(OP-015)_U341
Lighting 29-Apr-21 01-Jul-21 07-Jun-21 29-Jul-21 45 45 01-Jul-21, Lighting
CD341EL60075 Installation - Distribution Panel(OP-015)_U341 25-May-21 24-Jun-21 23-Jun-21 22-Jul-21 25 25 Installation - Distribution Panel(OP-015)_U341
CD341EL60310 Cabling - Lightening(OP-015)_U341 29-Apr-21 03-Jun-21 07-Jun-21 30-Jun-21 21 21 Cabling - Lightening(OP-015)_U341
CD341EL60315 Lightening work(OP-015)_U341 29-Apr-21 03-Jun-21 07-Jun-21 30-Jun-21 21 21 Lightening work(OP-015)_U341
CD341EL60435 Installation of Lighting Fixture System (341-OP-015)_U341 11-Jun-21 01-Jul-21 09-Jul-21 29-Jul-21 18 18 Installation of Lighting Fixture System (341-OP-015)_U341
CD341EL60640 Cabling Lighting (341-OP-015)_U341 11-Jun-21 01-Jul-21 09-Jul-21 29-Jul-21 18 18 Cabling Lighting (341-OP-015)_U341
Communication 12-Jun-21 07-Jul-21 10-Jul-21 03-Aug-21 21 21 07-Jul-21, Communication
CD341EL65105 Installation - Communication System(OP-015)_U341 12-Jun-21 07-Jul-21 10-Jul-21 03-Aug-21 21 21 Installation - Communication System(OP-015)_U341
CD341EL65290 Cabling - Communication(OP-015)_U341 12-Jun-21 07-Jul-21 10-Jul-21 03-Aug-21 21 21 Cabling - Communication(OP-015)_U341
Fire Alarm 16-Jun-21 07-Jul-21 14-Jul-21 03-Aug-21 18 18 07-Jul-21, Fire Alarm
CD341EL68105 Installation - Fire Alarm System(OP-015)_U341 16-Jun-21 07-Jul-21 14-Jul-21 03-Aug-21 18 18 Installation - Fire Alarm System(OP-015)_U341
CD341EL68235 Cabling - Fire Alarm(OP-015)_U341 16-Jun-21 07-Jul-21 14-Jul-21 03-Aug-21 18 18 Cabling - Fire Alarm(OP-015)_U341
OP-016 (in Unit 320 N area) 02-Oct-20 05-Jun-21 11-Nov-20 14-Jul-21 175 175 05-Jun-21, OP-016 (in Unit 320 N area)

Construction 02-Oct-20 05-Jun-21 11-Nov-20 14-Jul-21 175 175 05-Jun-21, Construction


Architectural 02-Oct-20 21-Apr-21 11-Nov-20 09-Jun-21 146 146 21-Apr-21, Architectural
Building Foundation 02-Oct-20 20-Nov-20 11-Nov-20 07-Jan-21 40 40 20-Nov-20, Building Foundation
CD341AR35845 Building Foundation(OP-016)_U341 02-Oct-20 04-Nov-20 11-Nov-20 18-Dec-20 28 28 Building Foundation(OP-016)_U341
CD341AR35935 Ground Slab(OP-016)_U341 05-Nov-20 20-Nov-20 21-Dec-20 07-Jan-21 12 12 Ground Slab(OP-016)_U341
Building Structure 23-Nov-20 04-Feb-21 08-Jan-21 24-Mar-21 52 52 04-Feb-21, Building Structure
CD341AR40400 Column/Beam/Girder - Ground Level(OP-016)_U341 23-Nov-20 24-Dec-20 08-Jan-21 10-Feb-21 24 24 Column/Beam/Girder - Ground Level(OP-016)_U341
CD341AR40405- Roof Slab(OP-016)_U341 28-Dec-20 04-Feb-21 11-Feb-21 24-Mar-21 28 28 Roof Slab(OP-016)_U341
Building Finishing 22-Jan-21 21-Apr-21 10-Mar-21 09-Jun-21 64 64 21-Apr-21, Building Finishing
CD341AR45770 Masonry&Plastering(OP-016)_U341 22-Jan-21 03-Mar-21 10-Mar-21 16-Apr-21 28 28 Masonry&Plastering(OP-016)_U341
CD341AR45775- Water Proofing(OP-016)_U341 05-Feb-21 22-Mar-21 25-Mar-21 30-Apr-21 30 30 Water Proofing(OP-016)_U341
CD341AR45780 Door & Window(OP-016)_U341 31-Mar-21 21-Apr-21 10-May-21 09-Jun-21 18 18 Door & Window(OP-016)_U341
CD341AR45785- Painting-Internal(OP-016)_U341 04-Mar-21 07-Apr-21 17-Apr-21 24-May-21 24 24 Painting-Internal(OP-016)_U341
HVAC 30-Mar-21 05-Jun-21 08-May-21 14-Jul-21 48 48 05-Jun-21, HVAC
HVAC & Control System 30-Mar-21 23-Apr-21 08-May-21 11-Jun-21 21 21 23-Apr-21, HVAC & Control System
CD341HV10030 HVAC Equipment Installation(OP-016)_U341 30-Mar-21 23-Apr-21 08-May-21 11-Jun-21 21 21 HVAC Equipment Installation(OP-016)_U341
Plumbing 12-Apr-21 05-Jun-21 29-May-21 14-Jul-21 38 38 05-Jun-21, Plumbing
CD341HV15305 HVAC Duct Erection(OP-016)_U341 12-Apr-21 06-May-21 29-May-21 23-Jun-21 21 21 HVAC Duct Erection(OP-016)_U341
CD341HV15310 HVAC Piping work(OP-016)_U341 24-Apr-21 28-May-21 12-Jun-21 07-Jul-21 21 21 HVAC Piping work(OP-016)_U341
CD341HV15315 Plumbing&Sanitary(OP-016)_U341 03-May-21 05-Jun-21 19-Jun-21 14-Jul-21 21 21 Plumbing&Sanitary(OP-016)_U341
Electrical 24-Oct-20 21-May-21 08-Dec-20 30-Jun-21 145 145 21-May-21, Electrical
Cable Race Way 04-Mar-21 24-Apr-21 17-Apr-21 12-Jun-21 39 39 24-Apr-21, Cable Race Way
CD341EL45030 Electrical Cable Tray Installation(OP-016)_U341 04-Mar-21 07-Apr-21 17-Apr-21 24-May-21 24 24 Electrical Cable Tray Installation(OP-016)_U341
CD341EL45440- Electrical Conduit Pipe(OP-016)_U341 08-Apr-21 24-Apr-21 25-May-21 12-Jun-21 15 15 Electrical Conduit Pipe(OP-016)_U341
Power & Control 26-Mar-21 03-May-21 06-May-21 19-Jun-21 30 30 03-May-21, Power & Control
CD341EL45430- Termination - Power & Control(OP-016)_U341 12-Apr-21 03-May-21 29-May-21 19-Jun-21 18 18 Termination - Power & Control(OP-016)_U341
CD341EL45435- Cabling - Power & Control(OP-016)_U341 26-Mar-21 24-Apr-21 06-May-21 12-Jun-21 24 24 Cabling - Power & Control(OP-016)_U341
Earthing and Grouding 24-Oct-20 20-Nov-20 08-Dec-20 07-Jan-21 21 21 20-Nov-20, Earthing and Grouding
CD341EL50110 Cabling - Grounding(OP-016)_U341 24-Oct-20 20-Nov-20 08-Dec-20 07-Jan-21 21 21 Cabling - Grounding(OP-016)_U341
Lighting 24-Feb-21 21-Apr-21 10-Apr-21 09-Jun-21 42 42 21-Apr-21, Lighting
CD341EL60035 Installation - Distribution Panel(OP-016)_U341 19-Mar-21 19-Apr-21 29-Apr-21 07-Jun-21 24 24 Installation - Distribution Panel(OP-016)_U341
CD341EL60320 Cabling - Lightening(OP-016)_U341 24-Feb-21 25-Mar-21 10-Apr-21 05-May-21 21 21 Cabling - Lightening(OP-016)_U341
CD341EL60325 Lightening work(OP-016)_U341 24-Feb-21 25-Mar-21 10-Apr-21 05-May-21 21 21 Lightening work(OP-016)_U341
CD341EL60440 Installation of Lighting Fixture System (341-OP-016)_U341 31-Mar-21 21-Apr-21 10-May-21 09-Jun-21 18 18 Installation of Lighting Fixture System (341-OP-016)_U341
CD341EL60645 Cabling Lighting (341-OP-016)_U341 31-Mar-21 21-Apr-21 10-May-21 09-Jun-21 18 18 Cabling Lighting (341-OP-016)_U341
Communication 19-Apr-21 21-May-21 07-Jun-21 30-Jun-21 21 21 21-May-21, Communication
CD341EL65110 Installation - Communication System(OP-016)_U341 19-Apr-21 21-May-21 07-Jun-21 30-Jun-21 21 21 Installation - Communication System(OP-016)_U341
CD341EL65295 Cabling - Communication(OP-016)_U341 19-Apr-21 21-May-21 07-Jun-21 30-Jun-21 21 21 Cabling - Communication(OP-016)_U341
Fire Alarm 10-Apr-21 30-Apr-21 28-May-21 18-Jun-21 18 18 30-Apr-21, Fire Alarm
CD341EL68110 Installation - Fire Alarm System(OP-016)_U341 10-Apr-21 30-Apr-21 28-May-21 18-Jun-21 18 18 Installation - Fire Alarm System(OP-016)_U341
CD341EL68240 Cabling - Fire Alarm(OP-016)_U341 10-Apr-21 30-Apr-21 28-May-21 18-Jun-21 18 18 Cabling - Fire Alarm(OP-016)_U341
323-JET-001 07-Oct-19 A 21-Jul-21 07-Oct-19 14-Apr-21 414 373 21-Jul-21, 323-JET-001

Engineering 07-Oct-19 A 17-Sep-20 07-Oct-19 20-Jul-20 206 165 17-Sep-20, Engineering


Architectural 07-Oct-19 A 20-Jul-20 07-Oct-19 14-May-20 163 122 20-Jul-20, Architectural
Calculation 19-Feb-20 06-Jul-20 23-Dec-19 28-Apr-20 96 96 06-Jul-20, Calculation
EE323AR10005A Structural Calculation for Utility building birth 6 (323-JET-001)_U323 [IFR] 19-Feb-20 17-Mar-20 23-Dec-19 21-Jan-20 20 20 Structural Calculation for Utility building birth 6 (323-JET-001)_U323 [IFR]
EE323AR10005B Structural Calculation for utility building birth 6 (323-JET-001)_U323 [Review-IFR] 18-Mar-20 01-Apr-20 22-Jan-20 05-Feb-20 15 15 Structural Calculation for utility building birth 6 (323-JET-001)_U323 [Review-IFR]
EE323AR10005G Structural Calculation for utility building birth 6 (323-JET-001)_U323 [AFD] 09-Jun-20 06-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Calculation for utility building birth 6 (323-JET-001)_U323 [AFD]
Architecture Basic 07-Oct-19 A 08-Jun-20 07-Oct-19 30-Mar-20 133 92 08-Jun-20, Architecture Basic
EE323AR20005A Architectural Basic Drawing(323-JET-001)_U323 [IFR] 07-Oct-19 A 19-Dec-19 A 07-Oct-19 22-Nov-19 35 0 Architectural Basic Drawing(323-JET-001)_U323 [IFR]
EE323AR20005B Architectural Basic Drawing(323-JET-001)_U323 [Review-IFR] 20-Dec-19 A 09-Jan-20 A 23-Nov-19 07-Dec-19 15 0 Architectural Basic Drawing(323-JET-001)_U323 [Review-IFR]
EE323AR20005G Architectural Basic Drawing(323-JET-001)_U323 [IFC] 15-Apr-20 14-May-20 17-Feb-20 13-Mar-20 20 20 Architectural Basic Drawing(323-JET-001)_U323 [IFC]
EE323AR20015A Structural Basic Drawing(323-JET-001)_U323 [IFR] 20-Dec-19 A 18-Feb-20 25-Nov-19 20-Dec-19 20 17 Structural Basic Drawing(323-JET-001)_U323 [IFR]
EE323AR20015B Structural Basic Drawing(323-JET-001)_U323 [Review-IFR] 19-Feb-20 04-Mar-20 21-Dec-19 04-Jan-20 15 15 Structural Basic Drawing(323-JET-001)_U323 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 30 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323AR20015G Structural Basic Drawing(323-JET-001)_U323 [IFC] 08-May-20 08-Jun-20 09-Mar-20 30-Mar-20 15 15 Structural Basic Drawing(323-JET-001)_U323 [IFC]
Architecture Detail - Architectural 21-Nov-19 A 22-Jun-20 09-Dec-19 14-Apr-20 75 102 22-Jun-20, Architecture Detail - Architectural
EE323AR25010A Foundation/Pile Location Plan(323-JET-001)_U323 [IFR] 16-Mar-20 06-Apr-20 09-Dec-19 30-Dec-19 15 15 Foundation/Pile Location Plan(323-JET-001)_U323 [IFR]
EE323AR25010B Foundation/Pile Location Plan(323-JET-001)_U323 [Review-IFR] 07-Apr-20 21-Apr-20 31-Dec-19 14-Jan-20 15 15 Foundation/Pile Location Plan(323-JET-001)_U323 [Review-IFR]
EE323AR25010G Foundation/Pile Location Plan(323-JET-001)_U323 [IFC] 22-Apr-20 29-May-20 17-Feb-20 13-Mar-20 20 20 Foundation/Pile Location Plan(323-JET-001)_U323 [IFC]
EE323AR25020A Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [IFR] 21-Nov-19 A 13-Feb-20 15-Jan-20 11-Feb-20 20 14 Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [IFR]
EE323AR25020B Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [Review-IFR] 20-Dec-19 A 27-Feb-20 12-Feb-20 26-Feb-20 15 33 Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [Review-IFR]
EE323AR25020G Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [IFC] 15-May-20 22-Jun-20 16-Mar-20 14-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(323-JET-001)_U323 [IFC]
Architecture Detail - Structural 12-Feb-20 20-Jul-20 16-Dec-19 14-May-20 111 111 20-Jul-20, Architecture Detail - Structural
EE323AR25005A Architectural Detail Drawing for Misc.(323-JET-001)_U323 [IFR] 04-Mar-20 01-Apr-20 29-Jan-20 25-Feb-20 20 20 Architectural Detail Drawing for Misc.(323-JET-001)_U323 [IFR]
EE323AR25005B Architectural Detail Drawing for Misc.(323-JET-001)_U323 [Review-IFR] 02-Apr-20 16-Apr-20 26-Feb-20 11-Mar-20 15 15 Architectural Detail Drawing for Misc.(323-JET-001)_U323 [Review-IFR]
EE323AR25005G Architectural Detail Drawing for Misc.(323-JET-001)_U323 [IFC] 23-Jun-20 20-Jul-20 15-Apr-20 14-May-20 20 20 Architectural Detail Drawing for Misc.(323-JET-001)_U323 [IFC]
EE323AR30005A Structural Detail Drawing for Framing(323-JET-001)_U323 [IFR] 12-Feb-20 03-Mar-20 16-Dec-19 07-Jan-20 15 15 Structural Detail Drawing for Framing(323-JET-001)_U323 [IFR]
EE323AR30005B Structural Detail Drawing for Framing(323-JET-001)_U323 [Review-IFR] 04-Mar-20 18-Mar-20 08-Jan-20 22-Jan-20 15 15 Structural Detail Drawing for Framing(323-JET-001)_U323 [Review-IFR]
EE323AR30005G Structural Detail Drawing for Framing(323-JET-001)_U323 [IFC] 15-May-20 22-Jun-20 16-Mar-20 14-Apr-20 20 20 Structural Detail Drawing for Framing(323-JET-001)_U323 [IFC]
EE323AR30010A Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [IFR] 26-Feb-20 17-Mar-20 31-Dec-19 21-Jan-20 15 15 Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [IFR]
EE323AR30010B Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [Review-IFR] 18-Mar-20 01-Apr-20 22-Jan-20 05-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [Review-IFR]
EE323AR30010G Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [IFC] 09-Jun-20 06-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Detail Drawing for FDN, Column, Beam(323-JET-001)_U323 [IFC]
HVAC 20-Dec-19 A 17-Sep-20 25-Nov-19 20-Jul-20 185 165 17-Sep-20, HVAC
HVAC & Control System 20-Dec-19 A 20-Jul-20 25-Nov-19 14-May-20 142 122 20-Jul-20, HVAC & Control System
EE323HV10010A HVAC System(323-JET-001)_U323 [IFR] 20-Dec-19 A 10-Feb-20 25-Nov-19 14-Jan-20 35 11 HVAC System(323-JET-001)_U323 [IFR]
EE323HV10010B HVAC System(323-JET-001)_U323 [Review-IFR] 11-Feb-20 25-Feb-20 15-Jan-20 29-Jan-20 15 15 HVAC System(323-JET-001)_U323 [Review-IFR]
EE323HV10010G HVAC System(323-JET-001)_U323 [IFC] 15-May-20 20-Jul-20 16-Mar-20 14-May-20 40 40 HVAC System(323-JET-001)_U323 [IFC]
Plumbing 20-Dec-19 A 17-Sep-20 25-Nov-19 20-Jul-20 185 165 17-Sep-20, Plumbing
EE323HV15005A Duct & Piping(323-JET-001)_U323 [IFR] 11-Feb-20 31-Mar-20 15-Jan-20 03-Mar-20 35 35 Duct & Piping(323-JET-001)_U323 [IFR]
EE323HV15005B Duct & Piping(323-JET-001)_U323 [Review-IFR] 01-Apr-20 15-Apr-20 04-Mar-20 18-Mar-20 15 15 Duct & Piping(323-JET-001)_U323 [Review-IFR]
EE323HV15005G Duct & Piping(323-JET-001)_U323 [IFC] 21-Jul-20 17-Sep-20 15-May-20 20-Jul-20 40 40 Duct & Piping(323-JET-001)_U323 [IFC]
EE323HV15010A Plumbing(323-JET-001)_U323 [IFR] 20-Dec-19 A 10-Feb-20 25-Nov-19 14-Jan-20 35 11 Plumbing(323-JET-001)_U323 [IFR]
EE323HV15010B Plumbing(323-JET-001)_U323 [Review-IFR] 11-Feb-20 25-Feb-20 15-Jan-20 29-Jan-20 15 15 Plumbing(323-JET-001)_U323 [Review-IFR]
EE323HV15010G Plumbing(323-JET-001)_U323 [IFC] 15-May-20 20-Jul-20 16-Mar-20 14-May-20 40 40 Plumbing(323-JET-001)_U323 [IFC]
Construction 10-Dec-20 21-Jul-21 09-Sep-20 14-Apr-21 160 160 21-Jul-21, Construction
Architectural 10-Dec-20 25-Jun-21 09-Sep-20 17-Mar-21 139 139 25-Jun-21, Architectural
Building Foundation 10-Dec-20 09-Feb-21 09-Sep-20 27-Oct-20 42 42 09-Feb-21, Building Foundation
CE323AR35005 Building Foundation(323-JET-001)_U323 10-Dec-20 20-Jan-21 09-Sep-20 10-Oct-20 28 28 Building Foundation(323-JET-001)_U323
CE323AR35010 Ground Slab(323-JET-001)_U323 21-Jan-21 09-Feb-21 12-Oct-20 27-Oct-20 14 14 Ground Slab(323-JET-001)_U323
Building Structure 10-Feb-21 07-Apr-21 28-Oct-20 21-Dec-20 39 39 07-Apr-21, Building Structure
CE323AR40010 Column/Beam/Girder(323-JET-001)_U323 10-Feb-21 08-Mar-21 28-Oct-20 20-Nov-20 18 18 Column/Beam/Girder(323-JET-001)_U323
CE323AR40015 Roof Slab (323-JET-001)_U323 09-Mar-21 07-Apr-21 23-Nov-20 21-Dec-20 21 21 Roof Slab (323-JET-001)_U323
Building Finishing 23-Mar-21 25-Jun-21 04-Dec-20 17-Mar-21 70 70 25-Jun-21, Building Finishing
CE323AR45010 Masonry&Plastering(323-JET-001)_U323 23-Mar-21 21-Apr-21 04-Dec-20 08-Jan-21 24 24 Masonry&Plastering(323-JET-001)_U323
CE323AR45015 Door & Window(323-JET-001)_U323 27-May-21 12-Jun-21 09-Feb-21 01-Mar-21 14 14 Door & Window(323-JET-001)_U323
CE323AR45020 Water Proofing(323-JET-001)_U323 22-Apr-21 04-Jun-21 11-Jan-21 18-Feb-21 28 28 Water Proofing(323-JET-001)_U323
CE323AR45025 Painting-Internal(323-JET-001)_U323 22-Apr-21 25-May-21 11-Jan-21 08-Feb-21 21 21 Painting-Internal(323-JET-001)_U323
CE323AR45030 Interior Finishing(323-JET-001)_U323 30-Apr-21 12-Jun-21 20-Jan-21 01-Mar-21 28 28 Interior Finishing(323-JET-001)_U323
CE323AR45040 Exterior Finishing (323-JET-001)_U323 02-Jun-21 25-Jun-21 16-Feb-21 17-Mar-21 21 21 Exterior Finishing (323-JET-001)_U323
HVAC 22-Apr-21 21-Jul-21 11-Jan-21 14-Apr-21 67 67 21-Jul-21, HVAC
HVAC & Control System 07-May-21 14-Jun-21 27-Jan-21 02-Mar-21 24 24 14-Jun-21, HVAC & Control System
CC323HV10005 HVAC Equipment Installation(323-JET-001)_U323 07-May-21 14-Jun-21 27-Jan-21 02-Mar-21 24 24 HVAC Equipment Installation(323-JET-001)_U323
Plumbing 22-Apr-21 21-Jul-21 11-Jan-21 14-Apr-21 67 67 21-Jul-21, Plumbing
CE323HV15005 HVAC Duct Erection(323-JET-001)_U323 22-Apr-21 25-May-21 11-Jan-21 08-Feb-21 21 21 HVAC Duct Erection(323-JET-001)_U323
CE323HV15010 HVAC Piping work(323-JET-001)_U323 15-Jun-21 09-Jul-21 03-Mar-21 01-Apr-21 21 21 HVAC Piping work(323-JET-001)_U323
CE323HV15015 Plumbing&Sanitary(323-JET-001)_U323 26-Jun-21 21-Jul-21 18-Mar-21 14-Apr-21 21 21 Plumbing&Sanitary(323-JET-001)_U323
Electrical 11-May-21 10-Jun-21 01-Feb-21 25-Feb-21 18 18 10-Jun-21, Electrical
Lighting 11-May-21 10-Jun-21 01-Feb-21 25-Feb-21 18 18 10-Jun-21, Lighting
CE323EL60060 Installation of Lighting Fixture System (323-JET-001)_U323 11-May-21 10-Jun-21 01-Feb-21 25-Feb-21 18 18 Installation of Lighting Fixture System (323-JET-001)_U323
CE323EL60090 Cabling Lighting (323-JET-001)_323 11-May-21 10-Jun-21 01-Feb-21 25-Feb-21 18 18 Cabling Lighting (323-JET-001)_323
323-JET-002 07-Nov-19 A 10-Nov-21 07-Nov-19 01-Sep-21 470 450 10-Nov-21, 323-JET-002

Engineering 07-Nov-19 A 20-Jul-20 07-Nov-19 29-May-20 142 122 20-Jul-20, Engineering


Architectural 07-Nov-19 A 20-Jul-20 07-Nov-19 29-May-20 142 122 20-Jul-20, Architectural
Calculation 25-Feb-20 06-Jul-20 27-Jan-20 28-Apr-20 92 92 06-Jul-20, Calculation
EE323AR10105A Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [IFR] 25-Feb-20 24-Mar-20 27-Jan-20 24-Feb-20 21 21 Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [IFR]
EE323AR10105B Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [Review/Appr.-IFR] 25-Mar-20 08-Apr-20 25-Feb-20 10-Mar-20 15 15 Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [Review/Appr.-IFR]
EE323AR10105G Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [AFD] 09-Jun-20 06-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Calculation for 323-JET-002 Operator Shelter Berth 1_U323 [AFD]
Architecture Basic 07-Nov-19 A 15-Jun-20 07-Nov-19 30-Mar-20 117 97 15-Jun-20, Architecture Basic
EE323AR20105A Foundation/Pile Location Plan(323-JET-002)_U323 [IFR] 19-Dec-19 A 17-Jan-20 A 19-Dec-19 17-Jan-20 20 0 Foundation/Pile Location Plan(323-JET-002)_U323 [IFR]
EE323AR20105B Foundation/Pile Location Plan(323-JET-002)_U323 [Review/Appr.-IFR] 18-Jan-20 A 06-May-20 18-Jan-20 01-Feb-20 15 15 Foundation/Pile Location Plan(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR20105G Foundation/Pile Location Plan(323-JET-002)_U323 [IFC] 08-May-20 15-Jun-20 03-Feb-20 28-Feb-20 20 20 Foundation/Pile Location Plan(323-JET-002)_U323 [IFC]
EE323AR20115A Architectural Basic Drawing(323-JET-002)_U323 [IFR] [Deleted] 07-Nov-19 A 18-Dec-19 A 07-Nov-19 18-Dec-19 30 0 Architectural Basic Drawing(323-JET-002)_U323 [IFR] [Deleted]
EE323AR20115B Architectural Basic Drawing(323-JET-002)_U323 [Review/Appr.-IFR] [Dele ted] 19-Dec-19 A 02-Feb-20 19-Dec-19 02-Jan-20 15 8 Architectural Basic Drawing(323-JET-002)_U323 [Review/Appr.-IFR] [Dele ted]
EE323AR20115G Architectural Basic Drawing(323-JET-002)_U323 [IFC] [Deleted] 14-Apr-20 14-May-20 17-Feb-20 13-Mar-20 20 20 Architectural Basic Drawing(323-JET-002)_U323 [IFC] [Deleted]
EE323AR20215A Structural Basic Drawing(323-JET-002)_U323 [IFR] 19-Dec-19 A 24-Feb-20 19-Dec-19 24-Jan-20 25 21 Structural Basic Drawing(323-JET-002)_U323 [IFR]
EE323AR20215B Structural Basic Drawing(323-JET-002)_U323 [Review/Appr.-IFR] 25-Feb-20 10-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Basic Drawing(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR20215G Structural Basic Drawing(323-JET-002)_U323 [IFC] 29-Apr-20 08-Jun-20 02-Mar-20 30-Mar-20 20 20 Structural Basic Drawing(323-JET-002)_U323 [IFC]
Architecture Detail - Architectural 10-Mar-20 20-Jul-20 10-Feb-20 29-May-20 92 92 20-Jul-20, Architecture Detail - Architectural
EE323AR25105A Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [IFR] 10-Mar-20 15-Apr-20 10-Feb-20 13-Mar-20 25 25 Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 31 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323AR25105B Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [Review/Appr.-IFR] 16-Apr-20 30-Apr-20 14-Mar-20 28-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR25105G Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [IFC] 15-May-20 22-Jun-20 30-Mar-20 27-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(323-JET-002)_U323 [IFC]
EE323AR25110A Architectural Detail Drawing for Misc.(323-JET-002)_U323 [IFR] 24-Mar-20 29-Apr-20 24-Feb-20 30-Mar-20 25 25 Architectural Detail Drawing for Misc.(323-JET-002)_U323 [IFR]
EE323AR25110B Architectural Detail Drawing for Misc.(323-JET-002)_U323 [Review/Appr.-IFR] 30-Apr-20 14-May-20 31-Mar-20 14-Apr-20 15 15 Architectural Detail Drawing for Misc.(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR25110G Architectural Detail Drawing for Misc.(323-JET-002)_U323 [IFC] 16-Jun-20 20-Jul-20 15-Apr-20 29-May-20 25 25 Architectural Detail Drawing for Misc.(323-JET-002)_U323 [IFC]
Architecture Detail - Structural 28-Jan-20 06-Jul-20 27-Dec-19 28-Apr-20 112 112 06-Jul-20, Architecture Detail - Structural
EE323AR30105A Structural Detail Drawing for Framing(323-JET-002)_U323 [IFR] 28-Jan-20 09-Mar-20 27-Dec-19 07-Feb-20 30 30 Structural Detail Drawing for Framing(323-JET-002)_U323 [IFR]
EE323AR30105B Structural Detail Drawing for Framing(323-JET-002)_U323 [Review/Appr.-IFR] 10-Mar-20 24-Mar-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for Framing(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR30105G Structural Detail Drawing for Framing(323-JET-002)_U323 [IFC] 08-May-20 22-Jun-20 09-Mar-20 14-Apr-20 25 25 Structural Detail Drawing for Framing(323-JET-002)_U323 [IFC]
EE323AR30110A Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [IFR] 18-Feb-20 23-Mar-20 20-Jan-20 21-Feb-20 25 25 Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [IFR]
EE323AR30110B Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [Review/Appr.-IFR] 24-Mar-20 07-Apr-20 22-Feb-20 07-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [Review/Appr.-IFR]
EE323AR30110G Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [IFC] 09-Jun-20 06-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Detail Drawing for FDN, Column, Beam(323-JET-002)_U323 [IFC]
Construction 24-Jun-21 10-Nov-21 06-Apr-21 01-Sep-21 115 115 10-Nov-21, Construction
Architectural 24-Jun-21 08-Nov-21 06-Apr-21 30-Aug-21 113 113 08-Nov-21, Architectural
Building Foundation 24-Jun-21 03-Aug-21 06-Apr-21 24-May-21 34 34 03-Aug-21, Building Foundation
CE323AR35025 Building Foundation(323-JET-002)_U323 24-Jun-21 22-Jul-21 06-Apr-21 04-May-21 24 24 Building Foundation(323-JET-002)_U323
CE323AR35030 Ground Slab(323-JET-002)_U323 23-Jul-21 03-Aug-21 05-May-21 24-May-21 10 10 Ground Slab(323-JET-002)_U323
Building Structure 04-Aug-21 11-Sep-21 25-May-21 03-Jul-21 32 32 11-Sep-21, Building Structure
CE323AR40030 Column/Beam/Girder(323-JET-002)_U323 04-Aug-21 26-Aug-21 25-May-21 16-Jun-21 18 18 Column/Beam/Girder(323-JET-002)_U323
CE323AR40035 Roof Slab(323-JET-002)_U323 27-Aug-21 11-Sep-21 17-Jun-21 03-Jul-21 14 14 Roof Slab(323-JET-002)_U323
Building Finishing 03-Sep-21 08-Nov-21 24-Jun-21 30-Aug-21 55 55 08-Nov-21, Building Finishing
CE323AR45050 Masonry&Plastering(323-JET-002)_U323 03-Sep-21 23-Sep-21 24-Jun-21 15-Jul-21 18 18 Masonry&Plastering(323-JET-002)_U323
CE323AR45055 Door & Window(323-JET-002)_U323 08-Oct-21 22-Oct-21 30-Jul-21 13-Aug-21 12 12 Door & Window(323-JET-002)_U323
CE323AR45060 Water Proofing(323-JET-002)_U323 27-Sep-21 21-Oct-21 19-Jul-21 12-Aug-21 21 21 Water Proofing(323-JET-002)_U323
CE323AR45065 Painting-Internal(323-JET-002)_U323 17-Sep-21 07-Oct-21 09-Jul-21 29-Jul-21 18 18 Painting-Internal(323-JET-002)_U323
CE323AR45070 Interior Finishing(323-JET-002)_U323 08-Oct-21 29-Oct-21 30-Jul-21 21-Aug-21 18 18 Interior Finishing(323-JET-002)_U323
CE323AR45080 Exterior-Finishing(323-JET-002)_U323 22-Oct-21 08-Nov-21 13-Aug-21 30-Aug-21 14 14 Exterior-Finishing(323-JET-002)_U323
HVAC 17-Sep-21 10-Nov-21 09-Jul-21 01-Sep-21 45 45 10-Nov-21, HVAC
HVAC & Control System 08-Oct-21 25-Oct-21 30-Jul-21 16-Aug-21 14 14 25-Oct-21, HVAC & Control System
CE323HV10020 HVAC Equipment Installation(323-JET-002)_U323 08-Oct-21 25-Oct-21 30-Jul-21 16-Aug-21 14 14 HVAC Equipment Installation(323-JET-002)_U323
Plumbing 17-Sep-21 10-Nov-21 09-Jul-21 01-Sep-21 45 45 10-Nov-21, Plumbing
CE323HV15025 HVAC Duct Erection(323-JET-002)_U323 17-Sep-21 07-Oct-21 09-Jul-21 29-Jul-21 18 18 HVAC Duct Erection(323-JET-002)_U323
CE323HV15030 HVAC Piping work(323-JET-002)_U323 15-Oct-21 05-Nov-21 06-Aug-21 28-Aug-21 18 18 HVAC Piping work(323-JET-002)_U323
CE323HV15035 Plumbing&Sanitary(323-JET-002)_U323 20-Oct-21 10-Nov-21 11-Aug-21 01-Sep-21 18 18 Plumbing&Sanitary(323-JET-002)_U323
Electrical 19-Oct-21 09-Nov-21 09-Aug-21 31-Aug-21 18 18 09-Nov-21, Electrical
Lighting 19-Oct-21 09-Nov-21 09-Aug-21 31-Aug-21 18 18 09-Nov-21, Lighting
CE323EL60055 Installation of Lighting Fixture System (323-JET-002)_U323 19-Oct-21 09-Nov-21 09-Aug-21 31-Aug-21 18 18 Installation of Lighting Fixture System (323-JET-002)_U323
CE323EL60080 Cabling Lighting (323-JET-002)_323 19-Oct-21 09-Nov-21 09-Aug-21 31-Aug-21 18 18 Cabling Lighting (323-JET-002)_323
334-WWT-001 10-Dec-19 A 29-Mar-21 07-Nov-19 23-Jul-21 313 293 29-Mar-21, 334-WWT-001

Engineering 10-Dec-19 A 05-Jun-20 07-Nov-19 21-Apr-20 111 91 05-Jun-20, Engineering


Architectural 10-Dec-19 A 05-Jun-20 07-Nov-19 21-Apr-20 111 91 05-Jun-20, Architectural
Calculation 27-Feb-20 13-May-20 27-Jan-20 06-Apr-20 52 52 13-May-20, Calculation
EC334AR10005A Structural Calculation Building_U334 [IFR] 27-Feb-20 26-Mar-20 27-Jan-20 21-Feb-20 20 20 Structural Calculation Building_U334 [IFR]
EC334AR10005B Structural Calculation Building_U334 [Review-IFR] 27-Mar-20 10-Apr-20 22-Feb-20 07-Mar-20 15 15 Structural Calculation Building_U334 [Review-IFR]
EC334AR10005G Structural Calculation Building_U334 [AFD] 14-Apr-20 13-May-20 09-Mar-20 06-Apr-20 20 20 Structural Calculation Building_U334 [AFD]
Architecture Basic 10-Dec-19 A 13-Apr-20 07-Nov-19 06-Mar-20 75 55 13-Apr-20, Architecture Basic
EC334AR20005A Foundation/Pile Location Plan(334-WWT-001&002)_U334 [IFR] 27-Jan-20 21-Feb-20 12-Dec-19 10-Jan-20 20 20 Foundation/Pile Location Plan(334-WWT-001&002)_U334 [IFR]
EC334AR20005B Foundation/Pile Location Plan(334-WWT-001&002)_U334 [Review-IFR] 22-Feb-20 07-Mar-20 11-Jan-20 25-Jan-20 15 15 Foundation/Pile Location Plan(334-WWT-001&002)_U334 [Review-IFR]
EC334AR20005G Foundation/Pile Location Plan(334-WWT-001&002)_U334 [IFC] 09-Mar-20 30-Mar-20 27-Jan-20 14-Feb-20 15 15 Foundation/Pile Location Plan(334-WWT-001&002)_U334 [IFC]
EC334AR20010A Architectural Basic Drawing(334-WWT-001&002)_U334 [IFR] 10-Dec-19 A 29-Jan-20 07-Nov-19 26-Dec-19 35 3 Architectural Basic Drawing(334-WWT-001&002)_U334 [IFR]
EC334AR20010B Architectural Basic Drawing(334-WWT-001&002)_U334 [Review-IFR] 30-Jan-20 13-Feb-20 27-Dec-19 10-Jan-20 15 15 Architectural Basic Drawing(334-WWT-001&002)_U334 [Review-IFR]
EC334AR20010G Architectural Basic Drawing(334-WWT-001&002)_U334 [IFC] 14-Feb-20 12-Mar-20 13-Jan-20 07-Feb-20 20 20 Architectural Basic Drawing(334-WWT-001&002)_U334 [IFC]
EC334AR20015A Structural Basic Drawing(334-WWT-001&002)_U334 [IFR] 30-Jan-20 26-Feb-20 27-Dec-19 24-Jan-20 20 20 Structural Basic Drawing(334-WWT-001&002)_U334 [IFR]
EC334AR20015B Structural Basic Drawing(334-WWT-001&002)_U334 [Review-IFR] 27-Feb-20 12-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Basic Drawing(334-WWT-001&002)_U334 [Review-IFR]
EC334AR20015G Structural Basic Drawing(334-WWT-001&002)_U334 [IFC] 13-Mar-20 13-Apr-20 10-Feb-20 06-Mar-20 20 20 Structural Basic Drawing(334-WWT-001&002)_U334 [IFC]
Architecture Detail - Architectural 20-Feb-20 05-Jun-20 20-Jan-20 21-Apr-20 74 74 05-Jun-20, Architecture Detail - Architectural
EC334AR25005A Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [IFR] 20-Feb-20 18-Mar-20 20-Jan-20 14-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [IFR]
EC334AR25005B Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [Review-IFR] 19-Mar-20 02-Apr-20 15-Feb-20 29-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [Review-IFR]
EC334AR25005G Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [IFC] 14-Apr-20 13-May-20 09-Mar-20 06-Apr-20 20 20 Architectural Detail Drawing for Plan & Wall Section(334-WWT-001&002)_U334 [IFC]
EC334AR25010A Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [IFR] 05-Mar-20 02-Apr-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [IFR]
EC334AR25010B Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [Review-IFR] 03-Apr-20 17-Apr-20 29-Feb-20 14-Mar-20 15 15 Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [Review-IFR]
EC334AR25010G Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [IFC] 28-Apr-20 05-Jun-20 23-Mar-20 21-Apr-20 20 20 Architectural Detail Drawing for Misc.(334-WWT-001&002)_U334 [IFC]
Architecture Detail - Structural 20-Feb-20 13-May-20 20-Jan-20 06-Apr-20 57 57 13-May-20, Architecture Detail - Structural
EC334AR30005A Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [IFR] 20-Feb-20 11-Mar-20 20-Jan-20 07-Feb-20 15 15 Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [IFR]
EC334AR30005B Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [Review-IFR] 12-Mar-20 26-Mar-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [Review-IFR]
EC334AR30005G Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [IFC] 06-Apr-20 27-Apr-20 02-Mar-20 20-Mar-20 15 15 Structural Detail Drawing for Framing(334-WWT-001&002)_U334 [IFC]
EC334AR30010A Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [IFR] 05-Mar-20 26-Mar-20 03-Feb-20 21-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [IFR]
EC334AR30010B Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [Review-IFR] 27-Mar-20 10-Apr-20 22-Feb-20 07-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [Review-IFR]
EC334AR30010G Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [IFC] 21-Apr-20 13-May-20 16-Mar-20 06-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-WWT-001&002)_U334 [IFC]
Construction 08-Oct-20 29-Mar-21 08-Feb-21 23-Jul-21 122 122 29-Mar-21, Construction
Architectural 08-Oct-20 29-Mar-21 08-Feb-21 23-Jul-21 122 122 29-Mar-21, Architectural
Building Foundation 08-Oct-20 27-Nov-20 08-Feb-21 06-Apr-21 40 40 27-Nov-20, Building Foundation
CC334AR35105 Building Foundation(334-WWT-001)_U334 08-Oct-20 11-Nov-20 08-Feb-21 19-Mar-21 28 28 Building Foundation(334-WWT-001)_U334
CC334AR45100 Ground Slab(334-WWT-001)_U334 12-Nov-20 27-Nov-20 22-Mar-21 06-Apr-21 12 12 Ground Slab(334-WWT-001)_U334
Building Structure 30-Nov-20 25-Jan-21 07-Apr-21 02-Jun-21 39 39 25-Jan-21, Building Structure

Actual Level of Effort Actual Work Critical Remaining Work Page 32 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CC334AR40005 Column/Beam/Girder - Ground Level(334-WWT-001)_U334 30-Nov-20 23-Dec-20 07-Apr-21 27-Apr-21 18 18 Column/Beam/Girder - Ground Level(334-WWT-001)_U334
CC334AR40015 Roof Slab(334-WWT-001)_U334 24-Dec-20 25-Jan-21 28-Apr-21 02-Jun-21 21 21 Roof Slab(334-WWT-001)_U334
Building Finishing 24-Dec-20 29-Mar-21 28-Apr-21 23-Jul-21 64 64 29-Mar-21, Building Finishing
CC334AR45010 Masonry&Plastering(334-WWT-001)_U334 24-Dec-20 03-Feb-21 28-Apr-21 10-Jun-21 28 28 Masonry&Plastering(334-WWT-001)_U334
CC334AR45015 Door & Window(334-WWT-001)_U334 01-Mar-21 29-Mar-21 30-Jun-21 23-Jul-21 20 20 Door & Window(334-WWT-001)_U334
CC334AR45020 Painting-Internal(334-WWT-001)_U334 01-Feb-21 05-Mar-21 08-Jun-21 06-Jul-21 24 24 Painting-Internal(334-WWT-001)_U334
CC334AR45030 Water Proofing(334-WWT-001)_U334 04-Feb-21 10-Mar-21 11-Jun-21 09-Jul-21 24 24 Water Proofing(334-WWT-001)_U334
Electrical 08-Feb-21 19-Mar-21 14-Jun-21 16-Jul-21 28 28 19-Mar-21, Electrical
Lighting 08-Feb-21 19-Mar-21 14-Jun-21 16-Jul-21 28 28 19-Mar-21, Lighting
CC334EL60120 Installation of Lighting Fixture System (334-WWT-001)_U334 08-Feb-21 19-Mar-21 14-Jun-21 16-Jul-21 28 28 Installation of Lighting Fixture System (334-WWT-001)_U334
CC334EL60205 Cabling Lighting(334-WWT-001)_U334 18-Feb-21 19-Mar-21 22-Jun-21 16-Jul-21 21 21 Cabling Lighting(334-WWT-001)_U334
334-WWT-002 30-Jan-20 25-May-21 27-Dec-19 10-Sep-21 330 330 25-May-21, 334-WWT-002

Engineering 30-Jan-20 07-Aug-20 27-Dec-19 06-Jul-20 134 134 07-Aug-20, Engineering


HVAC 30-Jan-20 07-Aug-20 27-Dec-19 06-Jul-20 134 134 07-Aug-20, HVAC
HVAC & Control System 30-Jan-20 11-Jun-20 27-Dec-19 28-Apr-20 93 93 11-Jun-20, HVAC & Control System
EC334HV10010A HVAC System(334-WWT-002)_U334 [IFR] 30-Jan-20 18-Mar-20 27-Dec-19 14-Feb-20 35 35 HVAC System(334-WWT-002)_U334 [IFR]
EC334HV10010B HVAC System(334-WWT-002)_U334 [Review-IFR] 19-Mar-20 02-Apr-20 15-Feb-20 29-Feb-20 15 15 HVAC System(334-WWT-002)_U334 [Review-IFR]
EC334HV10010G HVAC System(334-WWT-002)_U334 [IFC] 03-Apr-20 11-Jun-20 02-Mar-20 28-Apr-20 40 40 HVAC System(334-WWT-002)_U334 [IFC]
Plumbing 30-Jan-20 07-Aug-20 27-Dec-19 06-Jul-20 134 134 07-Aug-20, Plumbing
EC334HV15005A Duct & Piping(334-WWT-002)_U334 [IFR] 19-Mar-20 12-May-20 17-Feb-20 06-Apr-20 35 35 Duct & Piping(334-WWT-002)_U334 [IFR]
EC334HV15005B Duct & Piping(334-WWT-002)_U334 [Review-IFR] 13-May-20 27-May-20 07-Apr-20 21-Apr-20 15 15 Duct & Piping(334-WWT-002)_U334 [Review-IFR]
EC334HV15005G Duct & Piping(334-WWT-002)_U334 [IFC] 12-Jun-20 07-Aug-20 29-Apr-20 06-Jul-20 40 40 Duct & Piping(334-WWT-002)_U334 [IFC]
EC334HV15010A Plumbing(334-WWT-002)_U334 [IFR] 30-Jan-20 18-Mar-20 27-Dec-19 14-Feb-20 35 35 Plumbing(334-WWT-002)_U334 [IFR]
EC334HV15010B Plumbing(334-WWT-002)_U334 [Review-IFR] 19-Mar-20 02-Apr-20 15-Feb-20 29-Feb-20 15 15 Plumbing(334-WWT-002)_U334 [Review-IFR]
EC334HV15010G Plumbing(334-WWT-002)_U334 [IFC] 03-Apr-20 11-Jun-20 02-Mar-20 28-Apr-20 40 40 Plumbing(334-WWT-002)_U334 [IFC]
Construction 11-Aug-20 25-May-21 30-Nov-20 10-Sep-21 210 210 25-May-21, Construction
Architectural 11-Aug-20 24-May-21 30-Nov-20 09-Sep-21 209 209 24-May-21, Architectural
Building Foundation 11-Aug-20 21-Oct-20 30-Nov-20 24-Feb-21 60 60 21-Oct-20, Building Foundation
CC334AR35110 Building Foundation(334-WWT-002)_U334 11-Aug-20 07-Oct-20 30-Nov-20 05-Feb-21 48 48 Building Foundation(334-WWT-002)_U334
CC334AR45110 Ground Slab(334-WWT-002)_U334 08-Oct-20 21-Oct-20 08-Feb-21 24-Feb-21 12 12 Ground Slab(334-WWT-002)_U334
Building Structure 22-Oct-20 01-Mar-21 25-Feb-21 30-Jun-21 91 91 01-Mar-21, Building Structure
CC334AR40020 Column/Beam/Girder - Ground Level(334-WWT-002)_U334 22-Oct-20 18-Nov-20 25-Feb-21 26-Mar-21 21 21 Column/Beam/Girder - Ground Level(334-WWT-002)_U334
CC334AR40025 1st Floor Slab(334-WWT-002)_U334 19-Nov-20 29-Dec-20 29-Mar-21 30-Apr-21 28 28 1st Floor Slab(334-WWT-002)_U334
CC334AR40030 Column/Beam/Girder - 1st Floor(334-WWT-002)_U334 30-Dec-20 28-Jan-21 03-May-21 05-Jun-21 21 21 Column/Beam/Girder - 1st Floor(334-WWT-002)_U334
CC334AR40035 Roof Slab(334-WWT-002)_U334 29-Jan-21 01-Mar-21 07-Jun-21 30-Jun-21 21 21 Roof Slab(334-WWT-002)_U334
Building Finishing 29-Jan-21 24-May-21 07-Jun-21 09-Sep-21 79 79 24-May-21, Building Finishing
CC334AR45050 Masonry&Plastering(334-WWT-002)_U334 29-Jan-21 15-Mar-21 07-Jun-21 12-Jul-21 30 30 Masonry&Plastering(334-WWT-002)_U334
CC334AR45055 Door & Window(334-WWT-002)_U334 21-Apr-21 24-May-21 16-Aug-21 09-Sep-21 21 21 Door & Window(334-WWT-002)_U334
CC334AR45065 Painting-Internal(334-WWT-002)_U334 23-Feb-21 03-Apr-21 25-Jun-21 28-Jul-21 28 28 Painting-Internal(334-WWT-002)_U334
CC334AR45070 Water Proofing(334-WWT-002)_U334 02-Mar-21 19-Apr-21 01-Jul-21 13-Aug-21 36 36 Water Proofing(334-WWT-002)_U334
CC334AR45080 Interior Finishing(334-WWT-002)_U334 25-Mar-21 08-May-21 21-Jul-21 02-Sep-21 36 36 Interior Finishing(334-WWT-002)_U334
CC334AR45090 Exterior Finishing(334-WWT-002)_U334 29-Mar-21 04-May-21 23-Jul-21 28-Aug-21 30 30 Exterior Finishing(334-WWT-002)_U334
HVAC 10-Mar-21 08-May-21 09-Jul-21 02-Sep-21 46 46 08-May-21, HVAC
HVAC & Control System 23-Mar-21 17-Apr-21 19-Jul-21 12-Aug-21 21 21 17-Apr-21, HVAC & Control System
CC334HV10005 HVAC Equipment Installation(334-WWT-002)_U334 23-Mar-21 17-Apr-21 19-Jul-21 12-Aug-21 21 21 HVAC Equipment Installation(334-WWT-002)_U334
Plumbing 10-Mar-21 08-May-21 09-Jul-21 02-Sep-21 46 46 08-May-21, Plumbing
CC334HV15005 HVAC Duct Erection(334-WWT-002)_U334 10-Mar-21 08-Apr-21 09-Jul-21 02-Aug-21 21 21 HVAC Duct Erection(334-WWT-002)_U334
CC334HV15010 HVAC Piping work(334-WWT-002)_U334 07-Apr-21 05-May-21 31-Jul-21 30-Aug-21 24 24 HVAC Piping work(334-WWT-002)_U334
CC334HV15015 Plumbing&Sanitary(334-WWT-002)_U334 10-Apr-21 08-May-21 04-Aug-21 02-Sep-21 24 24 Plumbing&Sanitary(334-WWT-002)_U334
Electrical 14-Apr-21 25-May-21 07-Aug-21 10-Sep-21 28 28 25-May-21, Electrical
Lighting 14-Apr-21 25-May-21 07-Aug-21 10-Sep-21 28 28 25-May-21, Lighting
CC334EL60125 Installation of Lighting Fixture System (334-WWT-002)_U334 14-Apr-21 25-May-21 07-Aug-21 10-Sep-21 28 28 Installation of Lighting Fixture System (334-WWT-002)_U334
337-SWR-002 30-Sep-20 06-Jul-21 14-Aug-20 10-Sep-21 202 202 06-Jul-21, 337-SWR-002

Construction 30-Sep-20 06-Jul-21 14-Aug-20 10-Sep-21 202 202 06-Jul-21, Construction


Architectural 30-Sep-20 30-Apr-21 14-Aug-20 12-Mar-21 156 156 30-Apr-21, Architectural
Building Foundation 30-Sep-20 22-Dec-20 14-Aug-20 30-Oct-20 64 64 22-Dec-20, Building Foundation
CC337AR35005 Ground Slab(337-SWR-002)_U337 13-Nov-20 22-Dec-20 28-Sep-20 30-Oct-20 28 28 Ground Slab(337-SWR-002)_U337
CC337AR35120 Building Foundation(337-SWR-002)_U337 30-Sep-20 12-Nov-20 14-Aug-20 26-Sep-20 36 36 Building Foundation(337-SWR-002)_U337
Building Structure 23-Dec-20 03-Mar-21 31-Oct-20 07-Jan-21 48 48 03-Mar-21, Building Structure
CC337AR40010 Steel Structure installation(337-SWR-002)_U337 23-Dec-20 03-Mar-21 31-Oct-20 07-Jan-21 48 48 Steel Structure installation(337-SWR-002)_U337
Building Finishing 04-Mar-21 30-Apr-21 08-Jan-21 12-Mar-21 44 44 30-Apr-21, Building Finishing
CC337AR45015 Cladding(337-SWR-002)_U337 04-Mar-21 07-Apr-21 08-Jan-21 10-Feb-21 24 24 Cladding(337-SWR-002)_U337
CC337AR45020 Misc. Steel Installation(337-SWR-002)_U337 29-Mar-21 30-Apr-21 01-Feb-21 12-Mar-21 28 28 Misc. Steel Installation(337-SWR-002)_U337
Electrical 22-Apr-21 06-Jul-21 19-Mar-21 10-Sep-21 54 54 06-Jul-21, Electrical
Lighting 22-Apr-21 06-Jul-21 19-Mar-21 10-Sep-21 54 54 06-Jul-21, Lighting
CC334EL60210 Cabling Lighting(334-WWT-002)_U334 22-Apr-21 25-May-21 18-Aug-21 10-Sep-21 21 21 Cabling Lighting(334-WWT-002)_U334
CC337EL60075 Installation of Lighting Fixture System (337-SWR-002)_U337 07-May-21 10-Jun-21 19-Mar-21 15-Apr-21 21 21 Installation of Lighting Fixture System (337-SWR-002)_U337
CC337EL60205 Cabling Lighting(337-SWR-002)_U337 11-Jun-21 06-Jul-21 16-Apr-21 11-May-21 21 21 Cabling Lighting(337-SWR-002)_U337
337-SWR-003 16-Sep-20 31-Aug-21 30-Jul-20 15-Jul-21 260 260 31-Aug-21, 337-SWR-003

Construction 16-Sep-20 31-Aug-21 30-Jul-20 15-Jul-21 260 260 31-Aug-21, Construction


Architectural 16-Sep-20 24-Jul-21 30-Jul-20 09-Jun-21 230 230 24-Jul-21, Architectural
Building Foundation 16-Sep-20 22-Dec-20 30-Jul-20 30-Oct-20 76 76 22-Dec-20, Building Foundation
CC337AR35015 Ground Slab(337-SWR-003)_U337 13-Nov-20 22-Dec-20 28-Sep-20 30-Oct-20 28 28 Ground Slab(337-SWR-003)_U337
CC337AR35125 Building Foundation(337-SWR-003)_U337 16-Sep-20 12-Nov-20 30-Jul-20 26-Sep-20 48 48 Building Foundation(337-SWR-003)_U337
Building Structure 23-Dec-20 03-Mar-21 31-Oct-20 07-Jan-21 48 48 03-Mar-21, Building Structure

Actual Level of Effort Actual Work Critical Remaining Work Page 33 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CC337AR40020 Steel Structure installation(337-SWR-003)_U337 23-Dec-20 03-Mar-21 31-Oct-20 07-Jan-21 48 48 Steel Structure installation(337-SWR-003)_U337
Building Finishing 19-Feb-21 24-Jul-21 24-Dec-20 09-Jun-21 115 115 24-Jul-21, Building Finishing
CC337AR45030 Door & Window(337-SWR-003)_U337 (tbd) 05-Apr-21 27-Apr-21 08-Feb-21 08-Mar-21 20 20 Door & Window(337-SWR-003)_U337 (tbd)
CC337AR45035 Water Proofing - Flo or(337-SWR-003)_U337 (tbd) 19-Feb-21 03-Apr-21 24-Dec-20 05-Feb-21 30 30 Water Proofing - Flo or(337-SWR-003)_U337 (tbd)
CC337AR45040 Cladding(337-SWR-003)_U337 27-May-21 29-Jun-21 01-Apr-21 05-May-21 28 28 Cladding(337-SWR-003)_U337
CC337AR45045 Misc. Steel Installation(337-SWR-003)_U337 22-Jun-21 24-Jul-21 27-Apr-21 09-Jun-21 28 28 Misc. Steel Installation(337-SWR-003)_U337
Electrical 12-Jul-21 31-Aug-21 25-May-21 15-Jul-21 42 42 31-Aug-21, Electrical
Lighting 12-Jul-21 31-Aug-21 25-May-21 15-Jul-21 42 42 31-Aug-21, Lighting
CC337EL60080 Installation of Lighting Fixture System (337-SWR-003)_U337 12-Jul-21 04-Aug-21 25-May-21 19-Jun-21 21 21 Installation of Lighting Fixture System (337-SWR-003)_U337
CC337EL60210 Cabling Lighting(337-SWR-003)_U337 05-Aug-21 31-Aug-21 21-Jun-21 15-Jul-21 21 21 Cabling Lighting(337-SWR-003)_U337
337-SWR-004 19-Oct-20 04-Aug-21 04-Sep-20 19-Jun-21 211 211 04-Aug-21, 337-SWR-004

Construction 19-Oct-20 04-Aug-21 04-Sep-20 19-Jun-21 211 211 04-Aug-21, Construction


Architectural 19-Oct-20 03-Jun-21 04-Sep-20 08-Apr-21 159 159 03-Jun-21, Architectural
Building Foundation 19-Oct-20 02-Feb-21 04-Sep-20 08-Dec-20 76 76 02-Feb-21, Building Foundation
CC337AR35025 Ground Slab(337-SWR-004)_U337 23-Dec-20 02-Feb-21 31-Oct-20 08-Dec-20 28 28 Ground Slab(337-SWR-004)_U337
CC337AR35130 Building Foundation(337-SWR-004)_U337 19-Oct-20 22-Dec-20 04-Sep-20 30-Oct-20 48 48 Building Foundation(337-SWR-004)_U337
Building Structure 03-Feb-21 12-Apr-21 09-Dec-20 17-Feb-21 48 48 12-Apr-21, Building Structure
CC337AR40030 Steel Structure installation(337-SWR-004)_U337 03-Feb-21 12-Apr-21 09-Dec-20 17-Feb-21 48 48 Steel Structure installation(337-SWR-004)_U337
Building Finishing 24-Mar-21 03-Jun-21 27-Jan-21 08-Apr-21 50 50 03-Jun-21, Building Finishing
CC337AR45055 Door & Window(337-SWR-004)_U337 26-Apr-21 28-May-21 05-Mar-21 03-Apr-21 20 20 Door & Window(337-SWR-004)_U337
CC337AR45060 Water Proofing - Flo or(337-SWR-004)_U337 24-Mar-21 07-May-21 27-Jan-21 19-Mar-21 36 36 Water Proofing - Flo or(337-SWR-004)_U337
CC337AR45065 Cladding(337-SWR-004)_U337 08-Apr-21 06-May-21 11-Feb-21 18-Mar-21 24 24 Cladding(337-SWR-004)_U337
CC337AR45070 Misc. Steel Installation(337-SWR-004)_U337 21-Apr-21 03-Jun-21 01-Mar-21 08-Apr-21 28 28 Misc. Steel Installation(337-SWR-004)_U337
Electrical 16-Jun-21 04-Aug-21 21-Apr-21 19-Jun-21 42 42 04-Aug-21, Electrical
Lighting 16-Jun-21 04-Aug-21 21-Apr-21 19-Jun-21 42 42 04-Aug-21, Lighting
CC337EL60085 Installation of Lighting Fixture System (337-SWR-004A/B/C/D/E)_U337 16-Jun-21 10-Jul-21 21-Apr-21 24-May-21 21 21 Installation of Lighting Fixture System (337-SWR-004A/B/C/D/E)_U337
CC337EL60215 Cabling Lighting(337-SWR-004A/B/C/D/E)_U337 12-Jul-21 04-Aug-21 25-May-21 19-Jun-21 21 21 Cabling Lighting(337-SWR-004A/B/C/D/E)_U337
337-SWR-005 19-Oct-20 14-Aug-21 04-Sep-20 29-Jun-21 219 219 14-Aug-21, 337-SWR-005

Construction 19-Oct-20 14-Aug-21 04-Sep-20 29-Jun-21 219 219 14-Aug-21, Construction


Architectural 19-Oct-20 25-Jun-21 04-Sep-20 30-Apr-21 178 178 25-Jun-21, Architectural
Building Foundation 19-Oct-20 15-Feb-21 04-Sep-20 18-Dec-20 84 84 15-Feb-21, Building Foundation
CC337AR35035 Ground Slab(337-SWR-005)_U337 23-Dec-20 15-Feb-21 31-Oct-20 18-Dec-20 36 36 Ground Slab(337-SWR-005)_U337
CC337AR35135 Building Foundation(337-SWR-005)_U337 19-Oct-20 22-Dec-20 04-Sep-20 30-Oct-20 48 48 Building Foundation(337-SWR-005)_U337
Building Structure 16-Feb-21 21-Apr-21 21-Dec-20 01-Mar-21 48 48 21-Apr-21, Building Structure
CC337AR40040 Steel Structure installation(337-SWR-005)_U337 16-Feb-21 21-Apr-21 21-Dec-20 01-Mar-21 48 48 Steel Structure installation(337-SWR-005)_U337
Building Finishing 16-Feb-21 25-Jun-21 21-Dec-20 30-Apr-21 94 94 25-Jun-21, Building Finishing
CC337AR45080 Door & Window(337-SWR-005)_U337 08-Apr-21 30-Apr-21 11-Feb-21 12-Mar-21 20 20 Door & Window(337-SWR-005)_U337
CC337AR45085 Water Proofing - Flo or(337-SWR-005)_U337 16-Feb-21 07-Apr-21 21-Dec-20 10-Feb-21 36 36 Water Proofing - Flo or(337-SWR-005)_U337
CC337AR45095 Cladding(337-SWR-005)_U337 22-Apr-21 04-Jun-21 02-Mar-21 09-Apr-21 28 28 Cladding(337-SWR-005)_U337
CC337AR45100 Misc. Steel Installation(337-SWR-005)_U337 22-May-21 25-Jun-21 29-Mar-21 30-Apr-21 28 28 Misc. Steel Installation(337-SWR-005)_U337
Electrical 25-Jun-21 14-Aug-21 30-Apr-21 29-Jun-21 42 42 14-Aug-21, Electrical
Lighting 25-Jun-21 14-Aug-21 30-Apr-21 29-Jun-21 42 42 14-Aug-21, Lighting
CC337EL60090 Installation of Lighting Fixture System (337-SWR-005A/B/C/D/E)_U337 25-Jun-21 20-Jul-21 30-Apr-21 04-Jun-21 21 21 Installation of Lighting Fixture System (337-SWR-005A/B/C/D/E)_U337
CC337EL60220 Cabling Lighting(337-SWR-005A/B/C/D/E)_U337 21-Jul-21 14-Aug-21 05-Jun-21 29-Jun-21 21 21 Cabling Lighting(337-SWR-005A/B/C/D/E)_U337
A-335-01 30-May-20 17-Jun-21 07-Sep-20 21-Apr-21 288 288 17-Jun-21, A-335-01

Construction 30-May-20 17-Jun-21 07-Sep-20 21-Apr-21 288 288 17-Jun-21, Construction


Architectural 30-May-20 17-Jun-21 07-Sep-20 21-Apr-21 288 288 17-Jun-21, Architectural
Building Foundation 30-May-20 28-Jul-20 07-Sep-20 04-Nov-20 50 50 28-Jul-20, Building Foundation
CC335AR35005 Ground Slab(A-335-01)_U335 (TBD) 13-Jul-20 28-Jul-20 19-Oct-20 04-Nov-20 14 14 Ground Slab(A-335-01)_U335 (TBD)
CC335AR35105 Building Foundation(A-335-01)_U335 (TBD) 30-May-20 11-Jul-20 07-Sep-20 17-Oct-20 36 36 Building Foundation(A-335-01)_U335 (TBD)
Building Structure 31-Dec-20 10-Mar-21 05-Nov-20 13-Jan-21 48 48 10-Mar-21, Building Structure
CC335AR40010 Steel Structure installation(A-335-01)_U335 (TBD) 31-Dec-20 10-Mar-21 05-Nov-20 13-Jan-21 48 48 Steel Structure installation(A-335-01)_U335 (TBD)
Building Finishing 15-Apr-21 17-Jun-21 19-Feb-21 21-Apr-21 45 45 17-Jun-21, Building Finishing
CC335AR45010 Cladding(A-335-01)_U335 (TBD) 15-Apr-21 21-May-21 19-Feb-21 25-Mar-21 24 24 Cladding(A-335-01)_U335 (TBD)
CC335AR45015 Water Proofing - Flo or(A-335-01)_U335 (TBD) 19-Apr-21 10-Jun-21 24-Feb-21 14-Apr-21 36 36 Water Proofing - Flo or(A-335-01)_U335 (TBD)
CC335AR45025 Misc. Steel Installation(A-335-01)_U335 (TBD) 06-May-21 17-Jun-21 17-Mar-21 21-Apr-21 28 28 Misc. Steel Installation(A-335-01)_U335 (TBD)
A-335-02 30-May-20 21-May-21 07-Sep-20 25-Mar-21 267 267 21-May-21, A-335-02

Construction 30-May-20 21-May-21 07-Sep-20 25-Mar-21 267 267 21-May-21, Construction


Architectural 30-May-20 21-May-21 07-Sep-20 25-Mar-21 267 267 21-May-21, Architectural
Building Foundation 30-May-20 28-Jul-20 07-Sep-20 04-Nov-20 50 50 28-Jul-20, Building Foundation
CC335AR35015 Ground Slab(A-335-02)_U335 (TBD) 13-Jul-20 28-Jul-20 19-Oct-20 04-Nov-20 14 14 Ground Slab(A-335-02)_U335 (TBD)
CC335AR35110 Building Foundation(A-335-02)_U335 (TBD) 30-May-20 11-Jul-20 07-Sep-20 17-Oct-20 36 36 Building Foundation(A-335-02)_U335 (TBD)
Building Structure 31-Dec-20 10-Mar-21 05-Nov-20 13-Jan-21 48 48 10-Mar-21, Building Structure
CC335AR40020 Steel Structure installation(A-335-02)_U335 (TBD) 31-Dec-20 10-Mar-21 05-Nov-20 13-Jan-21 48 48 Steel Structure installation(A-335-02)_U335 (TBD)
Building Finishing 12-Mar-21 21-May-21 14-Jan-21 25-Mar-21 49 49 21-May-21, Building Finishing
CC335AR45035 Cladding(A-335-02)_U335 (TBD) 12-Mar-21 17-Apr-21 14-Jan-21 23-Feb-21 28 28 Cladding(A-335-02)_U335 (TBD)
CC335AR45040 Water Proofing - Flo or(A-335-02)_U335 (TBD) 23-Mar-21 06-May-21 25-Jan-21 17-Mar-21 36 36 Water Proofing - Flo or(A-335-02)_U335 (TBD)
CC335AR45050 Misc. Steel Installation(A-335-02)_U335 (TBD) 10-Apr-21 21-May-21 15-Feb-21 25-Mar-21 28 28 Misc. Steel Installation(A-335-02)_U335 (TBD)
A-335-03 30-Jun-20 24-Jun-21 06-Oct-20 08-Jun-21 269 269 24-Jun-21, A-335-03

Construction 30-Jun-20 24-Jun-21 06-Oct-20 08-Jun-21 269 269 24-Jun-21, Construction


Architectural 30-Jun-20 24-Jun-21 06-Oct-20 08-Jun-21 269 269 24-Jun-21, Architectural
Building Foundation 30-Jun-20 29-Aug-20 06-Oct-20 09-Dec-20 50 50 29-Aug-20, Building Foundation
CC335AR35025 Ground Slab(A-335-03)_U335 (TBD) 12-Aug-20 29-Aug-20 20-Nov-20 09-Dec-20 14 14 Ground Slab(A-335-03)_U335 (TBD)
CC335AR35115 Building Foundation(A-335-03)_U335 (TBD) 30-Jun-20 11-Aug-20 06-Oct-20 19-Nov-20 36 36 Building Foundation(A-335-03)_U335 (TBD)
Building Structure 31-Dec-20 10-Mar-21 10-Dec-20 18-Feb-21 48 48 10-Mar-21, Building Structure

Actual Level of Effort Actual Work Critical Remaining Work Page 34 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CC335AR40030 Steel Structure installation(A-335-03)_U335 (TBD) 31-Dec-20 10-Mar-21 10-Dec-20 18-Feb-21 48 48 Steel Structure installation(A-335-03)_U335 (TBD)
Building Finishing 14-Apr-21 24-Jun-21 26-Mar-21 08-Jun-21 52 52 24-Jun-21, Building Finishing
CC335AR45060 Cladding(A-335-03)_U335 (TBD) 14-Apr-21 12-May-21 26-Mar-21 24-Apr-21 24 24 Cladding(A-335-03)_U335 (TBD)
CC335AR45065 Water Proofing - Flo or(A-335-03)_U335(TBD) 17-Apr-21 09-Jun-21 31-Mar-21 21-May-21 36 36 Water Proofing - Flo or(A-335-03)_U335(TBD)
CC335AR45075 Misc. Steel Installation(A-335-03)_U335 (TBD) 21-May-21 24-Jun-21 26-Apr-21 08-Jun-21 28 28 Misc. Steel Installation(A-335-03)_U335 (TBD)
A-335-05 30-Jun-20 21-May-21 06-Oct-20 26-Apr-21 242 242 21-May-21, A-335-05

Construction 30-Jun-20 21-May-21 06-Oct-20 26-Apr-21 242 242 21-May-21, Construction


Architectural 30-Jun-20 21-May-21 06-Oct-20 26-Apr-21 242 242 21-May-21, Architectural
Building Foundation 30-Jun-20 29-Aug-20 06-Oct-20 09-Dec-20 50 50 29-Aug-20, Building Foundation
CC335AR35035 Ground Slab(A-335-05)_U335 (TBD) 12-Aug-20 29-Aug-20 20-Nov-20 09-Dec-20 14 14 Ground Slab(A-335-05)_U335 (TBD)
CC335AR35120 Building Foundation(A-335-05)_U335 (TBD) 30-Jun-20 11-Aug-20 06-Oct-20 19-Nov-20 36 36 Building Foundation(A-335-05)_U335 (TBD)
Building Structure 31-Dec-20 10-Mar-21 10-Dec-20 18-Feb-21 48 48 10-Mar-21, Building Structure
CC335AR40040 Steel Structure installation(A-335-05)_U335 (TBD) 31-Dec-20 10-Mar-21 10-Dec-20 18-Feb-21 48 48 Steel Structure installation(A-335-05)_U335 (TBD)
Building Finishing 12-Mar-21 21-May-21 19-Feb-21 26-Apr-21 49 49 21-May-21, Building Finishing
CC335AR45085 Water Proofing - Flo or(A-335-05)_U335 (TBD) 23-Mar-21 06-May-21 02-Mar-21 19-Apr-21 36 36 Water Proofing - Flo or(A-335-05)_U335 (TBD)
CC335AR45090 Cladding(A-335-05)_U335 (TBD) 12-Mar-21 17-Apr-21 19-Feb-21 31-Mar-21 28 28 Cladding(A-335-05)_U335 (TBD)
CC335AR45100 Misc. Steel Installation(A-335-05)_U335 (TBD) 10-Apr-21 21-May-21 23-Mar-21 26-Apr-21 28 28 Misc. Steel Installation(A-335-05)_U335 (TBD)
G-320-23 16-Nov-20 24-May-21 16-Nov-20 24-May-21 131 131 24-May-21, G-320-23

Construction 16-Nov-20 24-May-21 16-Nov-20 24-May-21 131 131 24-May-21, Construction


Architectural 16-Nov-20 24-May-21 16-Nov-20 24-May-21 131 131 24-May-21, Architectural
Building Foundation 16-Nov-20 20-Jan-21 16-Nov-20 20-Jan-21 46 46 20-Jan-21, Building Foundation
CB320AR35005 Ground Slab(G-320-23A/B)_U320 [Deleted] 24-Dec-20 20-Jan-21 24-Dec-20 20-Jan-21 18 18 Ground Slab(G-320-23A/B)_U320 [Deleted]
CB320AR35365 Building Foundation(G-320-23A/B)_U320 [Deleted] 16-Nov-20 23-Dec-20 16-Nov-20 23-Dec-20 28 28 Building Foundation(G-320-23A/B)_U320 [Deleted]
Building Structure 21-Jan-21 26-Mar-21 21-Jan-21 26-Mar-21 45 45 26-Mar-21, Building Structure
CB320AR40010 Steel Structure installation(G-320-23A/B)_U320 [Deleted] 21-Jan-21 26-Mar-21 21-Jan-21 26-Mar-21 45 45 Steel Structure installation(G-320-23A/B)_U320 [Deleted]
Building Finishing 29-Mar-21 24-May-21 29-Mar-21 24-May-21 40 40 24-May-21, Building Finishing
CB320AR45020 Cladding(G-320-23A/B)_U320 [Deleted] 29-Mar-21 21-Apr-21 29-Mar-21 21-Apr-21 20 20 Cladding(G-320-23A/B)_U320 [Deleted]
CB320AR45025 Misc. Steel Installation(G-320-23A/B)_U320 [Deleted] 22-Apr-21 24-May-21 22-Apr-21 24-May-21 20 20 Misc. Steel Installation(G-320-23A/B)_U320 [Deleted]
G-320-13/16 04-Nov-20 04-May-21 04-Nov-20 04-May-21 129 129 04-May-21, G-320-13/16

Construction 04-Nov-20 04-May-21 04-Nov-20 04-May-21 129 129 04-May-21, Construction


Architectural 04-Nov-20 04-May-21 04-Nov-20 04-May-21 129 129 04-May-21, Architectural
Building Foundation 04-Nov-20 08-Jan-21 04-Nov-20 08-Jan-21 46 46 08-Jan-21, Building Foundation
CB320AR35015 Ground Slab(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 14-Dec-20 08-Jan-21 14-Dec-20 08-Jan-21 18 18 Ground Slab(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
CB320AR35350 Building Foundation(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 04-Nov-20 11-Dec-20 04-Nov-20 11-Dec-20 28 28 Building Foundation(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
Building Structure 11-Jan-21 16-Mar-21 11-Jan-21 16-Mar-21 45 45 16-Mar-21, Building Structure
CB320AR40020 Steel Structure installation(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 11-Jan-21 16-Mar-21 11-Jan-21 16-Mar-21 45 45 Steel Structure installation(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
Building Finishing 17-Mar-21 04-May-21 17-Mar-21 04-May-21 38 38 04-May-21, Building Finishing
CB320AR45045 Cladding(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 17-Mar-21 12-Apr-21 17-Mar-21 12-Apr-21 20 20 Cladding(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
CB320AR45055 Misc. Steel Installation(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 10-Apr-21 04-May-21 10-Apr-21 04-May-21 20 20 Misc. Steel Installation(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
G-320-08/09/18/19 14-Dec-20 23-Jun-21 14-Dec-20 23-Jun-21 135 135 23-Jun-21, G-320-08/09/18/19

Construction 14-Dec-20 23-Jun-21 14-Dec-20 23-Jun-21 135 135 23-Jun-21, Construction


Architectural 14-Dec-20 23-Jun-21 14-Dec-20 23-Jun-21 135 135 23-Jun-21, Architectural
Building Foundation 14-Dec-20 18-Feb-21 14-Dec-20 18-Feb-21 46 46 18-Feb-21, Building Foundation
CB320AR35025 Ground Slab(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 25-Jan-21 18-Feb-21 25-Jan-21 18-Feb-21 18 18 Ground Slab(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
CB320AR35340 Building Foundation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 14-Dec-20 22-Jan-21 14-Dec-20 22-Jan-21 28 28 Building Foundation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
Building Structure 19-Feb-21 21-Apr-21 19-Feb-21 21-Apr-21 45 45 21-Apr-21, Building Structure
CB320AR40030 Steel Structure installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
19-Feb-21 21-Apr-21 19-Feb-21 21-Apr-21 45 45 Steel Structure installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
Building Finishing 22-Apr-21 23-Jun-21 22-Apr-21 23-Jun-21 44 44 23-Jun-21, Building Finishing
CB320AR45075 Cladding(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 22-Apr-21 29-May-21 22-Apr-21 29-May-21 24 24 Cladding(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
CB320AR45080 Misc. Steel Installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 31-May-21 23-Jun-21 31-May-21 23-Jun-21 20 20 Misc. Steel Installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
G-320-20/22 14-Dec-20 18-Jun-21 14-Dec-20 18-Jun-21 131 131 18-Jun-21, G-320-20/22

Construction 14-Dec-20 18-Jun-21 14-Dec-20 18-Jun-21 131 131 18-Jun-21, Construction


Architectural 14-Dec-20 18-Jun-21 14-Dec-20 18-Jun-21 131 131 18-Jun-21, Architectural
Building Foundation 14-Dec-20 18-Feb-21 14-Dec-20 18-Feb-21 46 46 18-Feb-21, Building Foundation
CB320AR35035 Ground Slab(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 25-Jan-21 18-Feb-21 25-Jan-21 18-Feb-21 18 18 Ground Slab(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
CB320AR35360 Building Foundation(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 14-Dec-20 22-Jan-21 14-Dec-20 22-Jan-21 28 28 Building Foundation(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
Building Structure 19-Feb-21 21-Apr-21 19-Feb-21 21-Apr-21 45 45 21-Apr-21, Building Structure
CB320AR40040 Steel Structure installation(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 19-Feb-21 21-Apr-21 19-Feb-21 21-Apr-21 45 45 Steel Structure installation(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
Building Finishing 22-Apr-21 18-Jun-21 22-Apr-21 18-Jun-21 40 40 18-Jun-21, Building Finishing
CB320AR45100 Cladding(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 22-Apr-21 24-May-21 22-Apr-21 24-May-21 20 20 Cladding(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
CB320AR45105 Misc. Steel Installation(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 25-May-21 18-Jun-21 25-May-21 18-Jun-21 20 20 Misc. Steel Installation(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
G-320-14/24 14-Dec-20 14-Jul-21 14-Dec-20 14-Jul-21 152 152 14-Jul-21, G-320-14/24

Construction 14-Dec-20 14-Jul-21 14-Dec-20 14-Jul-21 152 152 14-Jul-21, Construction


Architectural 14-Dec-20 14-Jul-21 14-Dec-20 14-Jul-21 152 152 14-Jul-21, Architectural
Building Foundation 14-Dec-20 19-Mar-21 14-Dec-20 19-Mar-21 66 66 19-Mar-21, Building Foundation
CB320AR35045 Ground Slab(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 23-Feb-21 19-Mar-21 23-Feb-21 19-Mar-21 18 18 Ground Slab(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
CB320AR35355 Building Foundation(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 14-Dec-20 22-Jan-21 14-Dec-20 22-Jan-21 28 28 Building Foundation(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
Building Structure 22-Mar-21 24-May-21 22-Mar-21 24-May-21 45 45 24-May-21, Building Structure
CB320AR40050 Steel Structure installation(G-320-14A/B/C, G-320-24A/B/C)_U320 22-Mar-21 24-May-21 22-Mar-21 24-May-21 45 45 Steel Structure installation(G-320-14A/B/C, G-320-24A/B/C)_U320
Building Finishing 25-May-21 14-Jul-21 25-May-21 14-Jul-21 41 41 14-Jul-21, Building Finishing
CB320AR45125 Cladding(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 25-May-21 18-Jun-21 25-May-21 18-Jun-21 20 20 Cladding(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
CB320AR45135 Misc. Steel Installation(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 21-Jun-21 14-Jul-21 21-Jun-21 14-Jul-21 20 20 Misc. Steel Installation(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
G-320-02/05/06/12 01-Oct-20 08-Apr-21 01-Oct-20 08-Apr-21 136 136 08-Apr-21, G-320-02/05/06/12

Construction 01-Oct-20 08-Apr-21 01-Oct-20 08-Apr-21 136 136 08-Apr-21, Construction


Architectural 01-Oct-20 08-Apr-21 01-Oct-20 08-Apr-21 136 136 08-Apr-21, Architectural

Actual Level of Effort Actual Work Critical Remaining Work Page 35 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Building Foundation 01-Oct-20 27-Nov-20 01-Oct-20 27-Nov-20 46 46 27-Nov-20, Building Foundation
CB320AR35055 Ground Slab(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 04-Nov-20 27-Nov-20 04-Nov-20 27-Nov-20 18 18 Ground Slab(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
CB320AR35345 Building Foundation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 01-Oct-20* 03-Nov-20 01-Oct-20 03-Nov-20 28 28 Building Foundation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
Building Structure 30-Nov-20 02-Feb-21 30-Nov-20 02-Feb-21 45 45 02-Feb-21, Building Structure
CB320AR40060 Steel Structure installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
30-Nov-20 02-Feb-21 30-Nov-20 02-Feb-21 45 45 Steel Structure installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
Building Finishing 03-Feb-21 08-Apr-21 03-Feb-21 08-Apr-21 45 45 08-Apr-21, Building Finishing
CB320AR45155 Cladding(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 03-Feb-21 09-Mar-21 03-Feb-21 09-Mar-21 24 24 Cladding(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
CB320AR45160 Misc. Steel Installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 10-Mar-21 08-Apr-21 10-Mar-21 08-Apr-21 21 21 Misc. Steel Installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
G-320-01 22-Oct-20 21-Apr-21 22-Oct-20 21-Apr-21 129 129 21-Apr-21, G-320-01

Construction 22-Oct-20 21-Apr-21 22-Oct-20 21-Apr-21 129 129 21-Apr-21, Construction


Architectural 22-Oct-20 21-Apr-21 22-Oct-20 21-Apr-21 129 129 21-Apr-21, Architectural
Building Foundation 22-Oct-20 23-Dec-20 22-Oct-20 23-Dec-20 46 46 23-Dec-20, Building Foundation
CB320AR35085 Ground Slab(G-320-01A/B/C)_U320 [Deleted] 30-Nov-20 23-Dec-20 30-Nov-20 23-Dec-20 18 18 Ground Slab(G-320-01A/B/C)_U320 [Deleted]
CB320AR35320 Building Foundation(G-320-01A/B/C)_U320 [Deleted] 22-Oct-20 27-Nov-20 22-Oct-20 27-Nov-20 28 28 Building Foundation(G-320-01A/B/C)_U320 [Deleted]
Building Structure 24-Dec-20 01-Mar-21 24-Dec-20 01-Mar-21 45 45 01-Mar-21, Building Structure
CB320AR40090 Steel Structure installation(G-320-01A/B/C)_U320 [Deleted] 24-Dec-20 01-Mar-21 24-Dec-20 01-Mar-21 45 45 Steel Structure installation(G-320-01A/B/C)_U320 [Deleted]
Building Finishing 02-Mar-21 21-Apr-21 02-Mar-21 21-Apr-21 38 38 21-Apr-21, Building Finishing
CB320AR45230 Cladding(G-320-01A/B/C)_U320 [Deleted] 02-Mar-21 30-Mar-21 02-Mar-21 30-Mar-21 20 20 Cladding(G-320-01A/B/C)_U320 [Deleted]
CB320AR45235 Misc. Steel Installation(G-320-01A/B/C)_U320 [Deleted] 17-Mar-21 21-Apr-21 17-Mar-21 21-Apr-21 28 28 Misc. Steel Installation(G-320-01A/B/C)_U320 [Deleted]
G-320-07 16-Nov-20 09-Jun-21 16-Nov-20 09-Jun-21 143 143 09-Jun-21, G-320-07

Construction 16-Nov-20 09-Jun-21 16-Nov-20 09-Jun-21 143 143 09-Jun-21, Construction


Architectural 16-Nov-20 09-Jun-21 16-Nov-20 09-Jun-21 143 143 09-Jun-21, Architectural
Building Foundation 16-Nov-20 20-Jan-21 16-Nov-20 20-Jan-21 46 46 20-Jan-21, Building Foundation
CB320AR35065 Ground Slab(G-320-07A/B)_U320 [Deleted] 24-Dec-20 20-Jan-21 24-Dec-20 20-Jan-21 18 18 Ground Slab(G-320-07A/B)_U320 [Deleted]
CB320AR35335 Building Foundation(G-320-07A/B)_U320 [Deleted] 16-Nov-20 23-Dec-20 16-Nov-20 23-Dec-20 28 28 Building Foundation(G-320-07A/B)_U320 [Deleted]
Building Structure 21-Jan-21 26-Mar-21 21-Jan-21 26-Mar-21 45 45 26-Mar-21, Building Structure
CB320AR40070 Steel Structure installation(G-320-07A/B)_U320 [Deleted] 21-Jan-21 26-Mar-21 21-Jan-21 26-Mar-21 45 45 Steel Structure installation(G-320-07A/B)_U320 [Deleted]
Building Finishing 29-Mar-21 09-Jun-21 29-Mar-21 09-Jun-21 52 52 09-Jun-21, Building Finishing
CB320AR45180 Cladding(G-320-07A/B)_U320 [Deleted] 29-Mar-21 26-Apr-21 29-Mar-21 26-Apr-21 24 24 Cladding(G-320-07A/B)_U320 [Deleted]
CB320AR45185 Misc. Steel Installation(G-320-07A/B)_U320 [Deleted] 27-Apr-21 09-Jun-21 27-Apr-21 09-Jun-21 28 28 Misc. Steel Installation(G-320-07A/B)_U320 [Deleted]
G-320-25 22-Oct-20 28-May-21 22-Oct-20 28-May-21 152 152 28-May-21, G-320-25

Construction 22-Oct-20 28-May-21 22-Oct-20 28-May-21 152 152 28-May-21, Construction


Architectural 22-Oct-20 28-May-21 22-Oct-20 28-May-21 152 152 28-May-21, Architectural
Building Foundation 22-Oct-20 22-Jan-21 22-Oct-20 22-Jan-21 66 66 22-Jan-21, Building Foundation
CB320AR35095 Ground Slab(G-320-025A/B/C)_U320 [Deleted] 29-Dec-20 22-Jan-21 29-Dec-20 22-Jan-21 18 18 Ground Slab(G-320-025A/B/C)_U320 [Deleted]
CB320AR35325 Building Foundation(G-320-025A/B/C)_U320 [Deleted] 22-Oct-20 27-Nov-20 22-Oct-20 27-Nov-20 28 28 Building Foundation(G-320-025A/B/C)_U320 [Deleted]
Building Structure 25-Jan-21 30-Mar-21 25-Jan-21 30-Mar-21 45 45 30-Mar-21, Building Structure
CB320AR40100 Steel Structure installation(G-320-025A/B/C)_U320 [Deleted] 25-Jan-21 30-Mar-21 25-Jan-21 30-Mar-21 45 45 Steel Structure installation(G-320-025A/B/C)_U320 [Deleted]
Building Finishing 31-Mar-21 28-May-21 31-Mar-21 28-May-21 41 41 28-May-21, Building Finishing
CB320AR45255 Cladding(G-320-025A/B/C)_U320 [Deleted] 31-Mar-21 23-Apr-21 31-Mar-21 23-Apr-21 20 20 Cladding(G-320-025A/B/C)_U320 [Deleted]
CB320AR45260 Misc. Steel Installation(G-320-025A/B/C)_U320 [Deleted] 26-Apr-21 28-May-21 26-Apr-21 28-May-21 20 20 Misc. Steel Installation(G-320-025A/B/C)_U320 [Deleted]
G-320-03 01-Oct-20 16-Apr-21 01-Oct-20 16-Apr-21 143 143 16-Apr-21, G-320-03

Construction 01-Oct-20 16-Apr-21 01-Oct-20 16-Apr-21 143 143 16-Apr-21, Construction


Architectural 01-Oct-20 16-Apr-21 01-Oct-20 16-Apr-21 143 143 16-Apr-21, Architectural
Building Foundation 01-Oct-20 27-Nov-20 01-Oct-20 27-Nov-20 46 46 27-Nov-20, Building Foundation
CB320AR35075 Ground Slab(G-320-03A/B)_U320 [Deleted] 04-Nov-20 27-Nov-20 04-Nov-20 27-Nov-20 18 18 Ground Slab(G-320-03A/B)_U320 [Deleted]
CB320AR35330 Building Foundation(G-320-03A/B)_U320 [Deleted] 01-Oct-20 03-Nov-20 01-Oct-20 03-Nov-20 28 28 Building Foundation(G-320-03A/B)_U320 [Deleted]
Building Structure 30-Nov-20 02-Feb-21 30-Nov-20 02-Feb-21 45 45 02-Feb-21, Building Structure
CB320AR40080 Steel Structure installation(G-320-03A/B)_U320 [Deleted] 30-Nov-20 02-Feb-21 30-Nov-20 02-Feb-21 45 45 Steel Structure installation(G-320-03A/B)_U320 [Deleted]
Building Finishing 03-Feb-21 16-Apr-21 03-Feb-21 16-Apr-21 52 52 16-Apr-21, Building Finishing
CB320AR45205 Cladding(G-320-03A/B)_U320 [Deleted] 03-Feb-21 09-Mar-21 03-Feb-21 09-Mar-21 24 24 Cladding(G-320-03A/B)_U320 [Deleted]
CB320AR45210 Misc. Steel Installation(G-320-03A/B)_U320 [Deleted] 10-Mar-21 16-Apr-21 10-Mar-21 16-Apr-21 28 28 Misc. Steel Installation(G-320-03A/B)_U320 [Deleted]
MS-323-01/02 04-Nov-20 15-Jun-21 04-Nov-20 15-Jun-21 156 156 15-Jun-21, MS-323-01/02

Construction 04-Nov-20 15-Jun-21 04-Nov-20 15-Jun-21 156 156 15-Jun-21, Construction


Architectural 04-Nov-20 15-Jun-21 04-Nov-20 15-Jun-21 156 156 15-Jun-21, Architectural
Building Foundation 04-Nov-20 08-Jan-21 04-Nov-20 08-Jan-21 46 46 08-Jan-21, Building Foundation
CB320AR35105 Ground Slab(MS-323-01/02)_U320 14-Dec-20 08-Jan-21 14-Dec-20 08-Jan-21 18 18 Ground Slab(MS-323-01/02)_U320
CB320AR35370 Building Foundation(MS-323-01/02)_U320 04-Nov-20 11-Dec-20 04-Nov-20 11-Dec-20 28 28 Building Foundation(MS-323-01/02)_U320
Building Structure 11-Jan-21 16-Mar-21 11-Jan-21 16-Mar-21 45 45 16-Mar-21, Building Structure
CB320AR40110 Steel Structure installation(MS-323-01/02)_U320 [Deleted] 11-Jan-21 16-Mar-21 11-Jan-21 16-Mar-21 45 45 Steel Structure installation(MS-323-01/02)_U320 [Deleted]
Building Finishing 24-Apr-21 15-Jun-21 24-Apr-21 15-Jun-21 35 35 15-Jun-21, Building Finishing
CB320AR45275 Cladding(MS-323-01/02)_U320 24-Apr-21 27-May-21 24-Apr-21 27-May-21 20 20 Cladding(MS-323-01/02)_U320
CB320AR45280 Misc. Steel Installation(MS-323-01/02)_U320 21-May-21 15-Jun-21 21-May-21 15-Jun-21 20 20 Misc. Steel Installation(MS-323-01/02)_U320
Shelter-MS-323-05/06 (next to TCR-001) 15-Jan-20 A 05-Aug-21 28-Nov-19 22-Jun-21 375 384 05-Aug-21, Shelter-MS-323-05/06 (next to TCR-001)

Engineering 15-Jan-20 A 29-May-20 28-Nov-19 30-Mar-20 77 86 29-May-20, Engineering


Architectural 15-Jan-20 A 29-May-20 28-Nov-19 30-Mar-20 77 86 29-May-20, Architectural
Architecture Basic 15-Jan-20 A 22-Apr-20 28-Nov-19 28-Feb-20 52 61 22-Apr-20, Architecture Basic
EB319AR20005A Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [IFR] 25-Feb-20 16-Mar-20 12-Dec-19 03-Jan-20 15 15 Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [IFR]
EB319AR20005B Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [Review-IFR] 17-Mar-20 31-Mar-20 04-Jan-20 18-Jan-20 15 15 Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [Review-IFR]
EB319AR20005G Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [IFC] 01-Apr-20 22-Apr-20 20-Jan-20 07-Feb-20 15 15 Foundation/Pile Location Plan(Shelter-MS-323-05/06)_U323 [IFC]
EB319AR20010A Architectural Basic Drawing(Shelter-MS-323-05/06)_U319 [IFR] 15-Jan-20 A 14-Feb-20 28-Nov-19 26-Dec-19 20 15 Architectural Basic Drawing(Shelter-MS-323-05/06)_U319 [IFR]
EB319AR20010B Architectural Basic Drawing(Shelter-MS-323-05/06)_U323 [Review-IFR] 15-Feb-20 29-Feb-20 27-Dec-19 10-Jan-20 15 15 Architectural Basic Drawing(Shelter-MS-323-05/06)_U323 [Review-IFR]
EB319AR20010G Architectural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFC] 02-Mar-20 30-Mar-20 13-Jan-20 07-Feb-20 20 20 Architectural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFC]
EB319AR20015A Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFR] 10-Feb-20 28-Feb-20 19-Dec-19 10-Jan-20 15 15 Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFR]
EB319AR20015B Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [Review-IFR] 29-Feb-20 14-Mar-20 11-Jan-20 25-Jan-20 15 15 Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 36 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EB319AR20015G Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFC] 31-Mar-20 21-Apr-20 10-Feb-20 28-Feb-20 15 15 Structural Basic Drawing(Shelter-MS-323-05/06)_U323 [IFC]
Architecture Detail - Architectural 10-Feb-20 28-Apr-20 19-Dec-19 06-Mar-20 56 56 28-Apr-20, Architecture Detail - Architectural
EB319AR25005A Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [IFR] 10-Feb-20 28-Feb-20 19-Dec-19 10-Jan-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [IFR]
EB319AR25005B Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [Revie w-IFR] 29-Feb-20 14-Mar-20 11-Jan-20 25-Jan-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [Revie w-IFR]
EB319AR25005G Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [IFC] 07-Apr-20 28-Apr-20 17-Feb-20 06-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Shelt er-MS-323-05/06)_U323 [IFC]
EB319AR25010A Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [IFR] 24-Feb-20 13-Mar-20 06-Jan-20 24-Jan-20 15 15 Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [IFR]
EB319AR25010B Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [Review-IFR] 14-Mar-20 28-Mar-20 25-Jan-20 08-Feb-20 15 15 Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [Review-IFR]
EB319AR25010G Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [IFC] 07-Apr-20 28-Apr-20 17-Feb-20 06-Mar-20 15 15 Architectural Detail Drawing for Misc.(Shelter-MS-323-05/06)_U323 [IFC]
Architecture Detail - Structural 24-Feb-20 29-May-20 06-Jan-20 30-Mar-20 67 67 29-May-20, Architecture Detail - Structural
EB319AR30005A Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [IFR] 24-Feb-20 13-Mar-20 06-Jan-20 24-Jan-20 15 15 Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [IFR]
EB319AR30005B Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [Review-IFR] 14-Mar-20 28-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [Review-IFR]
EB319AR30005G Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [IFC] 15-Apr-20 06-May-20 24-Feb-20 13-Mar-20 15 15 Structural Detail Drawing for Framing(Shelter-MS-323-05/06)_U323 [IFC]
EB319AR30010A Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [IFR] 09-Mar-20 30-Mar-20 20-Jan-20 07-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [IFR]
EB319AR30010B Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [Review-IFR] 31-Mar-20 14-Apr-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [Review-IFR]
EB319AR30010G Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [IFC] 29-Apr-20 29-May-20 09-Mar-20 30-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter-MS-323-05/06)_U323 [IFC]
Construction 15-Dec-20 05-Aug-21 16-Nov-20 22-Jun-21 170 170 05-Aug-21, Construction
Architectural 15-Dec-20 05-Aug-21 16-Nov-20 22-Jun-21 170 170 05-Aug-21, Architectural
Building Foundation 15-Dec-20 10-Feb-21 16-Nov-20 12-Jan-21 40 40 10-Feb-21, Building Foundation
CB319AR35110 Building Foundation(MS-323-05A/B, MS-323-06A/B)_U319 15-Dec-20 25-Jan-21 16-Nov-20 23-Dec-20 28 28 Building Foundation(MS-323-05A/B, MS-323-06A/B)_U319
CB319AR35115 Ground Slab(MS-323-05A/B, MS-323-06A/B)_U319 26-Jan-21 10-Feb-21 24-Dec-20 12-Jan-21 12 12 Ground Slab(MS-323-05A/B, MS-323-06A/B)_U319
Building Structure 08-Mar-21 08-May-21 13-Jan-21 23-Mar-21 48 48 08-May-21, Building Structure
CB319AR40020 Steel Structure installation(MS-323-05A/B, MS-323-06A/B)_U319 08-Mar-21 08-May-21 13-Jan-21 23-Mar-21 48 48 Steel Structure installation(MS-323-05A/B, MS-323-06A/B)_U319
Building Finishing 24-Jun-21 05-Aug-21 30-Apr-21 22-Jun-21 36 36 05-Aug-21, Building Finishing
CB319AR45060 Misc. Steel Installation(MS-323-05A/B, MS-323-06A/B)_U319 05-Jul-21 05-Aug-21 11-May-21 22-Jun-21 28 28 Misc. Steel Installation(MS-323-05A/B, MS-323-06A/B)_U319
CB319AR45290 Cladding(MS-323-05A/B, MS-323-06A/B)_U320 24-Jun-21 22-Jul-21 30-Apr-21 08-Jun-21 24 24 Cladding(MS-323-05A/B, MS-323-06A/B)_U320
334-CHM-001 27-Jan-20 29-Mar-21 05-Dec-19 19-Mar-21 293 293 29-Mar-21, 334-CHM-001

Engineering 27-Jan-20 26-Jun-20 05-Dec-19 27-Apr-20 106 106 26-Jun-20, Engineering


Architectural 27-Jan-20 26-Jun-20 05-Dec-19 27-Apr-20 106 106 26-Jun-20, Architectural
Calculation 23-Mar-20 02-Jun-20 03-Feb-20 30-Mar-20 49 49 02-Jun-20, Calculation
EC334AR10205A Structural Calculation Building(334-CHM-001)_U334 [IFR] 23-Mar-20 14-Apr-20 03-Feb-20 21-Feb-20 15 15 Structural Calculation Building(334-CHM-001)_U334 [IFR]
EC334AR10205B Structural Calculation Building(334-CHM-001)_U334 [Review-IFR] 15-Apr-20 29-Apr-20 22-Feb-20 07-Mar-20 15 15 Structural Calculation Building(334-CHM-001)_U334 [Review-IFR]
EC334AR10205G Structural Calculation Building(334-CHM-001)_U334 [AFD] 30-Apr-20 02-Jun-20 09-Mar-20 30-Mar-20 15 15 Structural Calculation Building(334-CHM-001)_U334 [AFD]
Architecture Basic 27-Jan-20 28-Apr-20 05-Dec-19 06-Mar-20 65 65 28-Apr-20, Architecture Basic
EC334AR20105A Foundation/Pile Location Plan(334-CHM-001)_U334 [IFR] 10-Feb-20 28-Feb-20 19-Dec-19 10-Jan-20 15 15 Foundation/Pile Location Plan(334-CHM-001)_U334 [IFR]
EC334AR20105B Foundation/Pile Location Plan(334-CHM-001)_U334 [Review-IFR] 29-Feb-20 14-Mar-20 11-Jan-20 25-Jan-20 15 15 Foundation/Pile Location Plan(334-CHM-001)_U334 [Review-IFR]
EC334AR20105G Foundation/Pile Location Plan(334-CHM-001)_U334 [IFC] 16-Mar-20 06-Apr-20 27-Jan-20 14-Feb-20 15 15 Foundation/Pile Location Plan(334-CHM-001)_U334 [IFC]
EC334AR20115A Structural Basic Drawing(334-CHM-001)_U334 [IFR] 02-Mar-20 20-Mar-20 13-Jan-20 31-Jan-20 15 15 Structural Basic Drawing(334-CHM-001)_U334 [IFR]
EC334AR20115B Structural Basic Drawing(334-CHM-001)_U334 [Review-IFR] 21-Mar-20 04-Apr-20 01-Feb-20 15-Feb-20 15 15 Structural Basic Drawing(334-CHM-001)_U334 [Review-IFR]
EC334AR20115G Structural Basic Drawing(334-CHM-001)_U334 [IFC] 07-Apr-20 28-Apr-20 17-Feb-20 06-Mar-20 15 15 Structural Basic Drawing(334-CHM-001)_U334 [IFC]
EC334AR20210A Architectural Basic Drawing(334-CHM-001)_U334 [IFR] 27-Jan-20 28-Feb-20 05-Dec-19 10-Jan-20 25 25 Architectural Basic Drawing(334-CHM-001)_U334 [IFR]
EC334AR20210B Architectural Basic Drawing(334-CHM-001)_U334 [Review-IFR] 29-Feb-20 14-Mar-20 11-Jan-20 25-Jan-20 15 15 Architectural Basic Drawing(334-CHM-001)_U334 [Review-IFR]
EC334AR20210G Architectural Basic Drawing(334-CHM-001)_U334 [IFC] 16-Mar-20 06-Apr-20 27-Jan-20 14-Feb-20 15 15 Architectural Basic Drawing(334-CHM-001)_U334 [IFC]
Architecture Detail - Architectural 02-Mar-20 26-Jun-20 13-Jan-20 27-Apr-20 82 82 26-Jun-20, Architecture Detail - Architectural
EC334AR25210A Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [IFR] 22-Apr-20 06-May-20 02-Mar-20 13-Mar-20 10 10 Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [IFR]
EC334AR25210B Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [Review-IFR] 07-May-20 21-May-20 14-Mar-20 28-Mar-20 15 15 Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [Review-IFR]
EC334AR25210G Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [IFC] 29-May-20 26-Jun-20 30-Mar-20 27-Apr-20 20 20 Architectural Detail Drawing for Misc.(334-CHM-001)_U334 [IFC]
EC334AR25215A Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [IFR] 02-Mar-20 20-Mar-20 13-Jan-20 31-Jan-20 15 15 Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [IFR]
EC334AR25215B Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [Review-IFR] 21-Mar-20 04-Apr-20 01-Feb-20 15-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [Review-IFR]
EC334AR25215G Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [IFC] 07-Apr-20 28-Apr-20 17-Feb-20 06-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(334-CHM-001)_U334 [IFC]
Architecture Detail - Structural 23-Mar-20 08-Jun-20 03-Feb-20 06-Apr-20 53 53 08-Jun-20, Architecture Detail - Structural
EC334AR30080A Structural Detail Drawing for Framing(334-CHM-001)_U334 [IFR] 23-Mar-20 06-Apr-20 03-Feb-20 14-Feb-20 10 10 Structural Detail Drawing for Framing(334-CHM-001)_U334 [IFR]
EC334AR30080B Structural Detail Drawing for Framing(334-CHM-001)_U334 [Review-IFR] 07-Apr-20 21-Apr-20 15-Feb-20 29-Feb-20 15 15 Structural Detail Drawing for Framing(334-CHM-001)_U334 [Review-IFR]
EC334AR30080G Structural Detail Drawing for Framing(334-CHM-001)_U334 [IFC] 22-Apr-20 14-May-20 02-Mar-20 20-Mar-20 15 15 Structural Detail Drawing for Framing(334-CHM-001)_U334 [IFC]
EC334AR30085A Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [IFR] 31-Mar-20 21-Apr-20 10-Feb-20 28-Feb-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [IFR]
EC334AR30085B Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [Review-IFR] 22-Apr-20 06-May-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [Review-IFR]
EC334AR30085G Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [IFC] 08-May-20 08-Jun-20 16-Mar-20 06-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(334-CHM-001)_U334 [IFC]
Construction 06-Jul-20 29-Mar-21 02-Sep-20 19-Mar-21 200 200 29-Mar-21, Construction
Architectural 06-Jul-20 02-Dec-20 02-Sep-20 09-Feb-21 121 121 02-Dec-20, Architectural
Building Foundation 06-Jul-20 24-Aug-20 02-Sep-20 17-Oct-20 40 40 24-Aug-20, Building Foundation
CC334AR35150 Building Foundation(334-CHM-001)_U334 06-Jul-20 07-Aug-20 02-Sep-20 03-Oct-20 28 28 Building Foundation(334-CHM-001)_U334
CC334AR35155 Ground Slab(334-CHM-001)_U334 08-Aug-20 24-Aug-20 05-Oct-20 17-Oct-20 12 12 Ground Slab(334-CHM-001)_U334
Building Structure 25-Aug-20 08-Oct-20 19-Oct-20 09-Dec-20 39 39 08-Oct-20, Building Structure
CC334AR40135 Column/Beam/Girder - Ground Level(334-CHM-001)_U334 25-Aug-20 14-Sep-20 19-Oct-20 10-Nov-20 18 18 Column/Beam/Girder - Ground Level(334-CHM-001)_U334
CC334AR40140 Roof Slab(334-CHM-001)_U334 15-Sep-20 08-Oct-20 11-Nov-20 09-Dec-20 21 21 Roof Slab(334-CHM-001)_U334
Building Finishing 28-Sep-20 02-Dec-20 26-Nov-20 09-Feb-21 52 52 02-Dec-20, Building Finishing
CC334AR45215 Masonry Work Wall&Plester(334-CHM-001)_U334 09-Oct-20 06-Nov-20 10-Dec-20 14-Jan-21 24 24 Masonry Work Wall&Plester(334-CHM-001)_U334
CC334AR45220 Painting Internal(334-CHM-001)_U334 31-Oct-20 02-Dec-20 07-Jan-21 09-Feb-21 24 24 Painting Internal(334-CHM-001)_U334
CC334AR45225 Water proofin g - Floor(334-CHM-001)_U334 28-Sep-20 30-Oct-20 26-Nov-20 06-Jan-21 28 28 Water proofin g - Floor(334-CHM-001)_U334
CC334AR45230 Door & Window Plus Accessories(334-CHM-001)_U334 31-Oct-20 24-Nov-20 07-Jan-21 01-Feb-21 18 18 Door & Window Plus Accessories(334-CHM-001)_U334
Electrical 26-Feb-21 29-Mar-21 18-Feb-21 19-Mar-21 21 21 29-Mar-21, Electrical
Lighting 26-Feb-21 29-Mar-21 18-Feb-21 19-Mar-21 21 21 29-Mar-21, Lighting
CC334EL60130 Installation of Lighting Fixture System (334-CHM-001)_U334 26-Feb-21 29-Mar-21 18-Feb-21 19-Mar-21 21 21 Installation of Lighting Fixture System (334-CHM-001)_U334
CC334EL60215 Cabling Lighting(334-CHM-001)_U334 26-Feb-21 29-Mar-21 18-Feb-21 19-Mar-21 21 21 Cabling Lighting(334-CHM-001)_U334
U337 10-Dec-19 A 29-Jun-20 21-Nov-19 28-Apr-20 127 107 29-Jun-20, U337

Engineering 10-Dec-19 A 29-Jun-20 21-Nov-19 28-Apr-20 127 107 29-Jun-20, Engineering

Actual Level of Effort Actual Work Critical Remaining Work Page 37 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Architectural 10-Dec-19 A 29-Jun-20 21-Nov-19 28-Apr-20 127 107 29-Jun-20, Architectural
Calculation 28-Feb-20 29-Jun-20 13-Jan-20 28-Apr-20 84 84 29-Jun-20, Calculation
EC337AR10005A Structural Calculation Building_U337 [IFR] 28-Feb-20 27-Mar-20 13-Jan-20 07-Feb-20 20 20 Structural Calculation Building_U337 [IFR]
EC337AR10005B Structural Calculation Building_U337 [Review-IFR] 28-Mar-20 11-Apr-20 08-Feb-20 22-Feb-20 15 15 Structural Calculation Building_U337 [Review-IFR]
EC337AR10005G Structural Calculation Building_U337 [AFD] 02-Jun-20 29-Jun-20 31-Mar-20 28-Apr-20 20 20 Structural Calculation Building_U337 [AFD]
Architecture Basic 10-Dec-19 A 29-May-20 21-Nov-19 30-Mar-20 106 86 29-May-20, Architecture Basic
EC337AR20005A Foundation/Pile Location Plan(Builidng&Shelter)_U337 [IFR] 31-Jan-20 05-Mar-20 12-Dec-19 17-Jan-20 25 25 Foundation/Pile Location Plan(Builidng&Shelter)_U337 [IFR]
EC337AR20005B Foundation/Pile Location Plan(Builidng&Shelter)_U337 [Review-IFR] 06-Mar-20 20-Mar-20 18-Jan-20 01-Feb-20 15 15 Foundation/Pile Location Plan(Builidng&Shelter)_U337 [Review-IFR]
EC337AR20005G Foundation/Pile Location Plan(Builidng&Shelter)_U337 [IFC] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Foundation/Pile Location Plan(Builidng&Shelter)_U337 [IFC]
EC337AR20010A Architectural Basic Drawing(Builidng&Shelter)_U337 [IFR] 10-Dec-19 A 20-Feb-20 21-Nov-19 03-Jan-20 30 19 Architectural Basic Drawing(Builidng&Shelter)_U337 [IFR]
EC337AR20010B Architectural Basic Drawing(Builidng&Shelter)_U337 [Review-IFR] 21-Feb-20 06-Mar-20 04-Jan-20 18-Jan-20 15 15 Architectural Basic Drawing(Builidng&Shelter)_U337 [Review-IFR]
EC337AR20010G Architectural Basic Drawing(Builidng&Shelter)_U337 [IFC] 09-Mar-20 14-Apr-20 20-Jan-20 21-Feb-20 25 25 Architectural Basic Drawing(Builidng&Shelter)_U337 [IFC]
EC337AR20015A Structural Basic Drawing(Builidng&Shelter)_U337 [IFR] 07-Feb-20 12-Mar-20 19-Dec-19 24-Jan-20 25 25 Structural Basic Drawing(Builidng&Shelter)_U337 [IFR]
EC337AR20015B Structural Basic Drawing(Builidng&Shelter)_U337 [Review-IFR] 13-Mar-20 27-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Basic Drawing(Builidng&Shelter)_U337 [Review-IFR]
EC337AR20015G Structural Basic Drawing(Builidng&Shelter)_U337 [IFC] 15-Apr-20 29-May-20 24-Feb-20 30-Mar-20 25 25 Structural Basic Drawing(Builidng&Shelter)_U337 [IFC]
Architecture Detail - Architectural 21-Feb-20 08-Jun-20 06-Jan-20 06-Apr-20 74 74 08-Jun-20, Architecture Detail - Architectural
EC337AR25005A Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [IFR] 21-Feb-20 27-Mar-20 06-Jan-20 07-Feb-20 25 25 Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [IFR]
EC337AR25005B Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [Revie w-IFR] 28-Mar-20 11-Apr-20 08-Feb-20 22-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [Revie w-IFR]
EC337AR25005G Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [IFC] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(Buili dng&Shelter)_U337 [IFC]
EC337AR25010A Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [IFR] 06-Mar-20 13-Apr-20 20-Jan-20 21-Feb-20 25 25 Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [IFR]
EC337AR25010B Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [Review-IFR] 14-Apr-20 28-Apr-20 22-Feb-20 07-Mar-20 15 15 Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [Review-IFR]
EC337AR25010G Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [IFC] 29-Apr-20 08-Jun-20 09-Mar-20 06-Apr-20 20 20 Architectural Detail Drawing for Misc.(Builidng&Shelter)_U337 [IFC]
Architecture Detail - Structural 21-Feb-20 29-Jun-20 06-Jan-20 28-Apr-20 89 89 29-Jun-20, Architecture Detail - Structural
EC337AR30005A Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [IFR] 21-Feb-20 27-Mar-20 06-Jan-20 07-Feb-20 25 25 Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [IFR]
EC337AR30005B Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [Review-IFR] 28-Mar-20 11-Apr-20 08-Feb-20 22-Feb-20 15 15 Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [Review-IFR]
EC337AR30005G Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [IFC] 08-May-20 15-Jun-20 16-Mar-20 14-Apr-20 20 20 Structural Detail Drawing for Framing(Builidng&Shelter)_U337 [IFC]
EC337AR30010A Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [IFR] 06-Mar-20 13-Apr-20 20-Jan-20 21-Feb-20 25 25 Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [IFR]
EC337AR30010B Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [Review-IFR] 14-Apr-20 28-Apr-20 22-Feb-20 07-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [Review-IFR]
EC337AR30010G Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [IFC] 02-Jun-20 29-Jun-20 31-Mar-20 28-Apr-20 20 20 Structural Detail Drawing for FDN, Column, Beam(Builidng&Shelter)_U337 [IFC]
U335 28-Nov-19 A 19-Jun-20 28-Nov-19 05-May-20 101 101 19-Jun-20, U335

Engineering 28-Nov-19 A 19-Jun-20 28-Nov-19 05-May-20 101 101 19-Jun-20, Engineering


Architectural 28-Nov-19 A 19-Jun-20 28-Nov-19 05-May-20 101 101 19-Jun-20, Architectural
Calculation 24-Feb-20 14-May-20 17-Feb-20 05-May-20 56 56 14-May-20, Calculation
EC335AR10005A Structural Calculation Building_U335 [IFR] 24-Feb-20 30-Mar-20 17-Feb-20 20-Mar-20 25 25 Structural Calculation Building_U335 [IFR]
EC335AR10005B Structural Calculation Building_U335 [Review-IFR] 31-Mar-20 14-Apr-20 21-Mar-20 04-Apr-20 15 15 Structural Calculation Building_U335 [Review-IFR]
EC335AR10005G Structural Calculation Building_U335 [AFD] 15-Apr-20 14-May-20 06-Apr-20 05-May-20 20 20 Structural Calculation Building_U335 [AFD]
Architecture Basic 28-Nov-19 A 19-Jun-20 28-Nov-19 06-Apr-20 101 101 19-Jun-20, Architecture Basic
EC335AR20005A Foundation/Pile Location Plan(Shelter)_U335 [IFR] 23-Mar-20 28-Apr-20 20-Jan-20 21-Feb-20 25 25 Foundation/Pile Location Plan(Shelter)_U335 [IFR]
EC335AR20005B Foundation/Pile Location Plan(Shelter)_U335 [Review-IFR] 29-Apr-20 13-May-20 22-Feb-20 07-Mar-20 15 15 Foundation/Pile Location Plan(Shelter)_U335 [Review-IFR]
EC335AR20005G Foundation/Pile Location Plan(Shelter)_U335 [IFC] 14-May-20 19-Jun-20 09-Mar-20 06-Apr-20 20 20 Foundation/Pile Location Plan(Shelter)_U335 [IFC]
EC335AR20010A Architectural Basic Drawing(Shelter)_U335 [IFR] 28-Nov-19 A 17-Jan-20 A 28-Nov-19 17-Jan-20 35 0 Architectural Basic Drawing(Shelter)_U335 [IFR]
EC335AR20010B Architectural Basic Drawing(Shelter)_U335 [Review-IFR] 18-Jan-20 A 09-Feb-20 18-Jan-20 01-Feb-20 15 15 Architectural Basic Drawing(Shelter)_U335 [Review-IFR]
EC335AR20010G Architectural Basic Drawing(Shelter)_U335 [IFC] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Architectural Basic Drawing(Shelter)_U335 [IFC]
EC335AR20015A Structural Basic Drawing(Shelter)_U335 [IFR] 27-Jan-20 21-Feb-20 20-Jan-20 14-Feb-20 20 20 Structural Basic Drawing(Shelter)_U335 [IFR]
EC335AR20015B Structural Basic Drawing(Shelter)_U335 [Review-IFR] 22-Feb-20 07-Mar-20 15-Feb-20 29-Feb-20 15 15 Structural Basic Drawing(Shelter)_U335 [Review-IFR]
EC335AR20015G Structural Basic Drawing(Shelter)_U335 [IFC] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Structural Basic Drawing(Shelter)_U335 [IFC]
Architecture Detail - Architectural 27-Jan-20 21-Apr-20 20-Jan-20 14-Apr-20 60 60 21-Apr-20, Architecture Detail - Architectural
EC335AR25005A Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [IFR] 27-Jan-20 21-Feb-20 20-Jan-20 14-Feb-20 20 20 Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [IFR]
EC335AR25005B Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [Review-IFR] 22-Feb-20 07-Mar-20 15-Feb-20 29-Feb-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [Review-IFR]
EC335AR25005G Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [IFC] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(Shelt er)_U335 [IFC]
EC335AR25010A Architectural Detail Drawing for Misc.(Shelter)_U335 [IFR] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Architectural Detail Drawing for Misc.(Shelter)_U335 [IFR]
EC335AR25010B Architectural Detail Drawing for Misc.(Shelter)_U335 [Review-IFR] 07-Mar-20 21-Mar-20 29-Feb-20 14-Mar-20 15 15 Architectural Detail Drawing for Misc.(Shelter)_U335 [Review-IFR]
EC335AR25010G Architectural Detail Drawing for Misc.(Shelter)_U335 [IFC] 23-Mar-20 21-Apr-20 16-Mar-20 14-Apr-20 20 20 Architectural Detail Drawing for Misc.(Shelter)_U335 [IFC]
Architecture Detail - Structural 10-Feb-20 06-May-20 03-Feb-20 28-Apr-20 60 60 06-May-20, Architecture Detail - Structural
EC335AR30005A Structural Detail Drawing for Framing(Shelter)_U335 [IFR] 10-Feb-20 06-Mar-20 03-Feb-20 28-Feb-20 20 20 Structural Detail Drawing for Framing(Shelter)_U335 [IFR]
EC335AR30005B Structural Detail Drawing for Framing(Shelter)_U335 [Review-IFR] 07-Mar-20 21-Mar-20 29-Feb-20 14-Mar-20 15 15 Structural Detail Drawing for Framing(Shelter)_U335 [Review-IFR]
EC335AR30005G Structural Detail Drawing for Framing(Shelter)_U335 [IFC] 31-Mar-20 21-Apr-20 23-Mar-20 14-Apr-20 15 15 Structural Detail Drawing for Framing(Shelter)_U335 [IFC]
EC335AR30010A Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [IFR] 02-Mar-20 20-Mar-20 24-Feb-20 13-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [IFR]
EC335AR30010B Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [Review-IFR] 21-Mar-20 04-Apr-20 14-Mar-20 28-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [Review-IFR]
EC335AR30010G Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [IFC] 15-Apr-20 06-May-20 07-Apr-20 28-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelter)_U335 [IFC]
U319 17-Feb-20 02-Jun-20 27-Dec-19 06-Mar-20 74 74 02-Jun-20, U319

Engineering 17-Feb-20 02-Jun-20 27-Dec-19 06-Mar-20 74 74 02-Jun-20, Engineering


Architectural 17-Feb-20 02-Jun-20 27-Dec-19 06-Mar-20 74 74 02-Jun-20, Architectural
Calculation 17-Feb-20 02-Jun-20 27-Dec-19 06-Mar-20 74 74 02-Jun-20, Calculation
EB319AR10005A Structural Calculation Building_U319 [IFR] 17-Feb-20 13-Mar-20 27-Dec-19 24-Jan-20 20 20 Structural Calculation Building_U319 [IFR]
EB319AR10005B Structural Calculation Building_U319 [Review-IFR] 14-Mar-20 28-Mar-20 25-Jan-20 08-Feb-20 15 15 Structural Calculation Building_U319 [Review-IFR]
EB319AR10005G Structural Calculation Building_U319 [AFD] 23-Apr-20 02-Jun-20 10-Feb-20 06-Mar-20 20 20 Structural Calculation Building_U319 [AFD]
319-TCR-001 27-Jan-20 05-May-20 08-Jan-20 17-Apr-20 68 68 05-May-20, 319-TCR-001

Engineering 27-Jan-20 05-May-20 08-Jan-20 17-Apr-20 68 68 05-May-20, Engineering


HVAC 27-Jan-20 05-May-20 08-Jan-20 17-Apr-20 68 68 05-May-20, HVAC
HVAC & Control System 27-Jan-20 05-May-20 08-Jan-20 17-Apr-20 68 68 05-May-20, HVAC & Control System
ED341HV10014A Control System(TCR-001)_U341 [IFR] 27-Jan-20 13-Mar-20 08-Jan-20 25-Feb-20 35 35 Control System(TCR-001)_U341 [IFR]
ED341HV10014B Control System(TCR-001)_U341 [Review/Appr.-IFR] 14-Mar-20 28-Mar-20 26-Feb-20 11-Mar-20 15 15 Control System(TCR-001)_U341 [Review/Appr.-IFR]
ED341HV10014G Control System(TCR-001)_U341 [AFD] 30-Mar-20 05-May-20 12-Mar-20 17-Apr-20 25 25 Control System(TCR-001)_U341 [AFD]

Actual Level of Effort Actual Work Critical Remaining Work Page 38 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Shelter_U320 27-Jan-20 07-Jul-20 16-Dec-19 19-May-20 113 113 07-Jul-20, Shelter_U320

Engineering 27-Jan-20 07-Jul-20 16-Dec-19 19-May-20 113 113 07-Jul-20, Engineering


Architectural 27-Jan-20 07-Jul-20 16-Dec-19 19-May-20 113 113 07-Jul-20, Architectural
Calculation 31-Mar-20 23-Jun-20 19-Feb-20 04-May-20 58 58 23-Jun-20, Calculation
EB320AR10005A Structural Calculation for Shelter_U320 [IFR] 31-Mar-20 28-Apr-20 19-Feb-20 17-Mar-20 20 20 Structural Calculation for Shelter_U320 [IFR]
EB320AR10005B Structural Calculation for Shelter_U320 [Review-IFR] 29-Apr-20 13-May-20 18-Mar-20 01-Apr-20 15 15 Structural Calculation for Shelter_U320 [Review-IFR]
EB320AR10005G Structural Calculation for Shelter_U320 [AFD] 18-May-20 23-Jun-20 03-Apr-20 04-May-20 20 20 Structural Calculation for Shelter_U320 [AFD]
Architecture Basic 27-Jan-20 09-Jun-20 16-Dec-19 17-Apr-20 93 93 09-Jun-20, Architecture Basic
EB320AR20005A Foundation/Pile Location Plan(Shelters)_U320 [IFR] 17-Feb-20 13-Mar-20 31-Dec-19 28-Jan-20 20 20 Foundation/Pile Location Plan(Shelters)_U320 [IFR]
EB320AR20005B Foundation/Pile Location Plan(Shelters)_U320 [Review-IFR] 14-Mar-20 28-Mar-20 29-Jan-20 12-Feb-20 15 15 Foundation/Pile Location Plan(Shelters)_U320 [Review-IFR]
EB320AR20005G Foundation/Pile Location Plan(Shelters)_U320 [IFC] 14-Apr-20 13-May-20 05-Mar-20 02-Apr-20 20 20 Foundation/Pile Location Plan(Shelters)_U320 [IFC]
EB320AR20010A Architectural Basic Drawing(Shelters)_U320 [IFR] 27-Jan-20 20-Mar-20 16-Dec-19 11-Feb-20 40 40 Architectural Basic Drawing(Shelters)_U320 [IFR]
EB320AR20010B Architectural Basic Drawing(Shelters)_U320 [Review-IFR] 21-Mar-20 04-Apr-20 12-Feb-20 26-Feb-20 15 15 Architectural Basic Drawing(Shelters)_U320 [Review-IFR]
EB320AR20010G Architectural Basic Drawing(Shelters)_U320 [IFC] 06-Apr-20 13-May-20 27-Feb-20 02-Apr-20 25 25 Architectural Basic Drawing(Shelters)_U320 [IFC]
EB320AR20015A Structural Basic Drawing(Shelters)_U320 [IFR] 16-Mar-20 14-Apr-20 05-Feb-20 03-Mar-20 20 20 Structural Basic Drawing(Shelters)_U320 [IFR]
EB320AR20015B Structural Basic Drawing(Shelters)_U320 [Review-IFR] 15-Apr-20 29-Apr-20 04-Mar-20 18-Mar-20 15 15 Structural Basic Drawing(Shelters)_U320 [Review-IFR]
EB320AR20015G Structural Basic Drawing(Shelters)_U320 [IFC] 30-Apr-20 09-Jun-20 19-Mar-20 17-Apr-20 20 20 Structural Basic Drawing(Shelters)_U320 [IFC]
Architecture Detail - Architectural 23-Mar-20 26-Jun-20 12-Feb-20 11-May-20 67 67 26-Jun-20, Architecture Detail - Architectural
EB320AR25005A Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [IFR] 23-Mar-20 21-Apr-20 12-Feb-20 10-Mar-20 20 20 Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [IFR]
EB320AR25005B Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [Review-IFR] 22-Apr-20 06-May-20 11-Mar-20 25-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [Review-IFR]
EB320AR25005G Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [IFC] 14-May-20 19-Jun-20 03-Apr-20 04-May-20 20 20 Architectural Detail Drawing for Plan & Wall Section(Shelt ers)_U320 [IFC]
EB320AR25010A Architectural Detail Drawing for Misc.(Shelters)_U320 [IFR] 07-Apr-20 06-May-20 26-Feb-20 24-Mar-20 20 20 Architectural Detail Drawing for Misc.(Shelters)_U320 [IFR]
EB320AR25010B Architectural Detail Drawing for Misc.(Shelters)_U320 [Review-IFR] 07-May-20 21-May-20 25-Mar-20 08-Apr-20 15 15 Architectural Detail Drawing for Misc.(Shelters)_U320 [Review-IFR]
EB320AR25010G Architectural Detail Drawing for Misc.(Shelters)_U320 [IFC] 29-May-20 26-Jun-20 09-Apr-20 11-May-20 20 20 Architectural Detail Drawing for Misc.(Shelters)_U320 [IFC]
Architecture Detail - Structural 23-Mar-20 07-Jul-20 12-Feb-20 19-May-20 74 74 07-Jul-20, Architecture Detail - Structural
EB320AR30005A Structural Detail Drawing for Framing(Shelters)_U320 [IFR] 23-Mar-20 28-Apr-20 12-Feb-20 17-Mar-20 25 25 Structural Detail Drawing for Framing(Shelters)_U320 [IFR]
EB320AR30005B Structural Detail Drawing for Framing(Shelters)_U320 [Review-IFR] 29-Apr-20 13-May-20 18-Mar-20 01-Apr-20 15 15 Structural Detail Drawing for Framing(Shelters)_U320 [Review-IFR]
EB320AR30005G Structural Detail Drawing for Framing(Shelters)_U320 [IFC] 18-May-20 23-Jun-20 03-Apr-20 04-May-20 20 20 Structural Detail Drawing for Framing(Shelters)_U320 [IFC]
EB320AR30010A Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [IFR] 07-Apr-20 14-May-20 26-Feb-20 01-Apr-20 25 25 Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [IFR]
EB320AR30010B Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [Review-IFR] 15-May-20 29-May-20 02-Apr-20 16-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [Review-IFR]
EB320AR30010G Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [IFC] 10-Jun-20 07-Jul-20 20-Apr-20 19-May-20 20 20 Structural Detail Drawing for FDN, Column, Beam(Shelters)_U320 [IFC]
Op. Shelter 29-Jul-19 A 26-Jun-20 02-Dec-19 02-Jul-20 209 106 26-Jun-20, Op. Shelter

Engineering 29-Jul-19 A 26-Jun-20 02-Dec-19 02-Jul-20 209 106 26-Jun-20, Engineering


Architectural 01-Aug-19 A 26-Jun-20 02-Dec-19 24-Apr-20 209 106 26-Jun-20, Architectural
Calculation 10-Feb-20 14-May-20 22-Jan-20 24-Apr-20 66 66 14-May-20, Calculation
ED341AR10075A Structural Calculation for Op.Shelter_U341 [IFR] 10-Feb-20 06-Mar-20 22-Jan-20 18-Feb-20 20 20 Structural Calculation for Op.Shelter_U341 [IFR]
ED341AR10075B Structural Calculation for Op.Shelter_U341 [Review-IFR] 07-Mar-20 21-Mar-20 19-Feb-20 04-Mar-20 15 15 Structural Calculation for Op.Shelter_U341 [Review-IFR]
ED341AR10075G Structural Calculation for Op.Shelter_U341 [AFD] 07-Apr-20 14-May-20 19-Mar-20 24-Apr-20 25 25 Structural Calculation for Op.Shelter_U341 [AFD]
Architecture Basic 01-Aug-19 A 26-Jun-20 02-Dec-19 02-Apr-20 132 106 26-Jun-20, Architecture Basic
ED341AR20215A Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 01-Aug-19 A 23-Aug-19 A 02-Dec-19 07-Jan-20 25 0 Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR20215B Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR] 24-Aug-19 A 03-Oct-19 A 08-Jan-20 22-Jan-20 15 0 Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR20215G Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 17-Sep-19 A 05-Mar-20 23-Jan-20 19-Feb-20 20 19 Architectural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
ED341AR20220A Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 07-Apr-20 06-May-20 22-Jan-20 18-Feb-20 20 20 Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR20220B Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR] 07-May-20 21-May-20 19-Feb-20 04-Mar-20 15 15 Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR20220G Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 29-May-20 26-Jun-20 05-Mar-20 02-Apr-20 20 20 Foundation/Pile Location Plan(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
ED341AR20225A Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 27-Jan-20 21-Feb-20 08-Jan-20 04-Feb-20 20 20 Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR20225B Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 05-Feb-20 19-Feb-20 15 15 Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR20225G Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 09-Mar-20 06-Apr-20 20-Feb-20 18-Mar-20 20 20 Structural Basic Drawing(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
Architecture Detail - Architectural 09-Aug-19 A 14-May-20 08-Jan-20 24-Apr-20 178 75 14-May-20, Architecture Detail - Architectural
ED341AR25145A Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 09-Aug-19 A 23-Aug-19 A 08-Jan-20 04-Feb-20 20 0 Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR25145B Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
24-Aug-19 A 02-Oct-19 A 05-Feb-20 19-Feb-20 15 0 Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR25145G Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 13-Sep-19 A 14-Feb-20 20-Feb-20 11-Mar-20 15 15 Architectural Detail Drawing for Plan & Wall Section(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
ED341AR25150A Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 09-Mar-20 06-Apr-20 19-Feb-20 17-Mar-20 20 20 Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR25150B Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR] 07-Apr-20 21-Apr-20 18-Mar-20 01-Apr-20 15 15 Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR25150G Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 22-Apr-20 14-May-20 03-Apr-20 24-Apr-20 15 15 Architectural Detail Drawing for Misc.(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
Architecture Detail - Structural 17-Feb-20 28-Apr-20 29-Jan-20 09-Apr-20 51 51 28-Apr-20, Architecture Detail - Structural
ED341AR30145A Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 17-Feb-20 06-Mar-20 29-Jan-20 18-Feb-20 15 15 Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR30145B Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR] 07-Mar-20 21-Mar-20 19-Feb-20 04-Mar-20 15 15 Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR30145G Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 23-Mar-20 14-Apr-20 05-Mar-20 26-Mar-20 15 15 Structural Detail Drawing for Framing(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
ED341AR30150A Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [IFR] 24-Feb-20 20-Mar-20 05-Feb-20 03-Mar-20 20 20 Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [IFR]
ED341AR30150B Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
21-Mar-20 04-Apr-20 04-Mar-20 18-Mar-20 15 15 Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [Review-IFR]
ED341AR30150G Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [IFC] 07-Apr-20 28-Apr-20 19-Mar-20 09-Apr-20 15 15 Structural Detail Drawing for FDN, Column, Beam(OP-04/06/07/12/13/14/15/16)_U341 [IFC]
HVAC 29-Jul-19 A 14-May-20 08-Jan-20 02-Jul-20 155 75 14-May-20, HVAC
HVAC & Control System 29-Jul-19 A 11-Mar-20 08-Jan-20 04-May-20 120 4 11-Mar-20, HVAC & Control System
ED341HV10200A HVAC System(Operator Shelter)_U341 [IFR] 29-Jul-19 A 29-Aug-19 A 08-Jan-20 25-Feb-20 35 0 HVAC System(Operator Shelter)_U341 [IFR]
ED341HV10200B HVAC System(Operator Shelter)_U341 [Review-IFR] 29-Aug-19 A 24-Sep-19 A 26-Feb-20 11-Mar-20 15 0 HVAC System(Operator Shelter)_U341 [Review-IFR]
ED341HV10200G HVAC System(Operator Shelter)_U341 [IFC] 18-Sep-19 A 11-Mar-20 12-Mar-20 04-May-20 35 4 HVAC System(Operator Shelter)_U341 [IFC]
Plumbing 29-Jul-19 A 14-May-20 08-Jan-20 02-Jul-20 155 75 14-May-20, Plumbing
ED341HV15135A Duct & Piping(Operator Shelter)_U341 [IFR] 29-Jul-19 A 29-Aug-19 A 26-Feb-20 16-Apr-20 35 0 Duct & Piping(Operator Shelter)_U341 [IFR]
ED341HV15135B Duct & Piping(Operator Shelter)_U341 [Review-IFR] 29-Aug-19 A 23-Sep-19 A 17-Apr-20 01-May-20 15 0 Duct & Piping(Operator Shelter)_U341 [Review-IFR]
ED341HV15135G Duct & Piping(Operator Shelter)_U341 [IFC] 18-Sep-19 A 14-May-20 05-May-20 02-Jul-20 35 42 Duct & Piping(Operator Shelter)_U341 [IFC]
ED341HV15140A Plumbing(Operator Shelter)_U341 [IFR] 29-Jul-19 A 05-Feb-20 08-Jan-20 18-Feb-20 30 8 Plumbing(Operator Shelter)_U341 [IFR]
ED341HV15140B Plumbing(Operator Shelter)_U341 [Review-IFR] 29-Aug-19 A 20-Feb-20 19-Feb-20 04-Mar-20 15 25 Plumbing(Operator Shelter)_U341 [Review-IFR]
No 13. RDMP - Building 27-Feb-19 A 22-Apr-22 27-Feb-19 30-Nov-21 790 563 22-Apr-22, No 13. RDMP - Building

Actual Level of Effort Actual Work Critical Remaining Work Page 39 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Milestone 27-Feb-19 A 24-Jan-22 27-Feb-19 03-Nov-21 730 0 24-Jan-22, Milestone
Common 27-Feb-19 A 28-May-19 A 27-Feb-19 28-May-19 61 0 28-May-19 A, Common
Milestone - Common 27-Feb-19 A 28-May-19 A 27-Feb-19 28-May-19 61 0 28-May-19 A, Milestone - Common
MD000CO00010_PPFeed Verification 27-Feb-19 A 28-May-19 A 27-Feb-19 28-May-19 61 0 Feed Verification
Rotating Equipment 24-Jan-22 24-Jan-22 03-Nov-21 03-Nov-21 0 0 24-Jan-22, Rotating Equipment
Milestone - Common 24-Jan-22 24-Jan-22 03-Nov-21 03-Nov-21 0 0 24-Jan-22, Milestone - Common
ME000MR0005 Mechanical Completion Marine Area 24-Jan-22 03-Nov-21 0 0 Mechanical Completion Marine Area,
Engineering 03-Mar-19 A 18-Mar-21 29-Mar-19 30-Oct-20 492 286 18-Mar-21, Engineering
Process 29-Apr-19 A 28-Jul-20 29-Apr-19 30-Apr-20 313 128 28-Jul-20, Process
Design Basis 29-Apr-19 A 31-Mar-20 29-Apr-19 14-Jan-20 179 46 31-Mar-20, Design Basis
EE323PR05005A Process Design Basis_U323 [IFR] 29-Apr-19 A 27-Jun-19 A 29-Apr-19 11-Jul-19 47 0 Process Design Basis_U323 [IFR]
EE323PR05005B Process Design Basis_U323 [Review-IFR] 05-Jun-19 A 09-Feb-20 12-Jul-19 26-Jul-19 15 15 Process Design Basis_U323 [Review-IFR]
EE323PR05005G Process Design Basis_U323 [AFD] 23-Jun-19 A 12-Feb-20 29-Jul-19 09-Sep-19 30 13 Process Design Basis_U323 [AFD]
EE323PR05015A SAFE Chart_U323 [IFR] [Deleted] 12-Sep-19 A 09-Oct-19 A 12-Sep-19 09-Oct-19 20 0 SAFE Chart_U323 [IFR] [Deleted]
EE323PR05015B SAFE Chart_U323 [Approved-IFR] [Deleted] 10-Oct-19 A 24-Oct-19 A 10-Oct-19 24-Oct-19 15 0 SAFE Chart_U323 [Approved-IFR] [Deleted]
EE323PR05015G SAFE Chart_U323 [AFD] [Deleted] 25-Oct-19 A 21-Nov-19 A 25-Oct-19 21-Nov-19 20 0 SAFE Chart_U323 [AFD] [Deleted]
EE323PR05020A Equipment Sizing_U323 [IFR] 03-Jun-19 A 24-Jun-19 A 19-Jun-19 28-Aug-19 50 0 Equipment Sizing_U323 [IFR]
EE323PR05020B Equipment Sizing_U323 [Review/Appr.-IFR] 25-Jun-19 A 10-Jul-19 A 29-Aug-19 12-Sep-19 15 0 Equipment Sizing_U323 [Review/Appr.-IFR]
EE323PR05020G Equipment Sizing_U323 [AFD] 11-Jul-19 A 31-Mar-20 25-Nov-19 14-Jan-20 35 46 Equipment Sizing_U323 [AFD]
EE323PR05025A PSV Calculation_U323 [IFR] 25-Jun-19 A 16-Sep-19 A 25-Jun-19 13-Aug-19 35 0 PSV Calculation_U323 [IFR]
EE323PR05025B PSV Calculation_U323 [Review/Appr.-IFR] 17-Sep-19 A 08-Oct-19 A 14-Aug-19 28-Aug-19 15 0 PSV Calculation_U323 [Review/Appr.-IFR]
EE323PR05025G PSV Calculation_U323 [AFD] 09-Oct-19 A 30-Dec-19 A 29-Aug-19 16-Oct-19 35 0 PSV Calculation_U323 [AFD]
Process Data Sheet 20-May-19 A 10-Feb-20 28-Jun-19 07-Jan-20 200 10 10-Feb-20, Process Data Sheet
EE323PR10015A Pumps Datasheets/ Summary sheets_U323 [IFR] [Deleted] 28-Jun-19 A 11-Jul-19 A 28-Jun-19 25-Jul-19 20 0 Pumps Datasheets/ Summary sheets_U323 [IFR] [Deleted]
EE323PR10015B Pumps Datasheets/ Summary sheets_U323 [Review-IFR] [Deleted] 12-Jul-19 A 09-Aug-19 A 26-Jul-19 09-Aug-19 15 0 Pumps Datasheets/ Summary sheets_U323 [Review-IFR] [Deleted]
EE323PR10015G Pumps Datasheets/ Summary sheets_U323 [IFD] [Deleted] 09-Aug-19 A 07-Jan-20 A 09-Dec-19 07-Jan-20 20 0 Pumps Datasheets/ Summary sheets_U323 [IFD] [Deleted]
EE323PR10035A Process Data Sheet(Marine Loading Arm & Gangway)_U323 [IFR] 20-May-19 A 03-Jun-19 A 28-Jun-19 25-Jul-19 20 0 Process Data Sheet(Marine Loading Arm & Gangway)_U323 [IFR]
EE323PR10035B Process Data Sheet(Marine Loading Arm & Gangway)_U323 [Review-IFR] 04-Jun-19 A 26-Jun-19 A 26-Jul-19 09-Aug-19 15 0 Process Data Sheet(Marine Loading Arm & Gangway)_U323 [Review-IFR]
EE323PR10035G Process Data Sheet(Marine Loading Arm & Gangway)_U323 [IFD] 27-Jun-19 A 03-Sep-19 A 21-Oct-19 15-Nov-19 20 0 Process Data Sheet(Marine Loading Arm & Gangway)_U323 [IFD]
EE323PR10040A Process Data Sheet(Pump)_U323 [IFR] 28-Jun-19 A 08-Jul-19 A 28-Jun-19 25-Jul-19 20 0 Process Data Sheet(Pump)_U323 [IFR]
EE323PR10040B Process Data Sheet(Pump)_U323 [Review/Appr.-IFR] 09-Jul-19 A 02-Aug-19 A 26-Jul-19 09-Aug-19 15 0 Process Data Sheet(Pump)_U323 [Review/Appr.-IFR]
EE323PR10040G Process Data Sheet(Pump)_U323 [IFD] 03-Aug-19 A 04-Sep-19 A 21-Oct-19 15-Nov-19 20 0 Process Data Sheet(Pump)_U323 [IFD]
EE323PR10045A Process Data Sheet(Pressure Vessel)_U323 [IFR] 28-Jun-19 A 21-Aug-19 A 28-Jun-19 25-Jul-19 20 0 Process Data Sheet(Pressure Vessel)_U323 [IFR]
EE323PR10045B Process Data Sheet(Pressure Vessel)_U323 [Review/Appr.-IFR] 22-Aug-19 A 17-Sep-19 A 26-Jul-19 09-Aug-19 15 0 Process Data Sheet(Pressure Vessel)_U323 [Review/Appr.-IFR]
EE323PR10045G Process Data Sheet(Pressure Vessel)_U323 [IFD] 18-Sep-19 A 10-Feb-20 21-Oct-19 15-Nov-19 20 11 Process Data Sheet(Pressure Vessel)_U323 [IFD]
Process Data Sheet for Instrument 17-Jun-19 A 10-Feb-20 10-Jul-19 07-Jan-20 110 10 10-Feb-20, Process Data Sheet for Instrument
EE323PR10010A Instrument Process Data Sheet(Valve)_U323 [IFR] 10-Jul-19 A 16-Sep-19 A 10-Jul-19 21-Aug-19 30 0 Instrument Process Data Sheet(Valve)_U323 [IFR]
EE323PR10010B Instrument Process Data Sheet(Valve)_U323 [Review-IFR] 17-Sep-19 A 03-Oct-19 A 22-Aug-19 05-Sep-19 15 0 Instrument Process Data Sheet(Valve)_U323 [Review-IFR]
EE323PR10010G Instrument Process Data Sheet(Valve)_U323 [IFD] 04-Oct-19 A 10-Feb-20 28-Oct-19 15-Nov-19 15 11 Instrument Process Data Sheet(Valve)_U323 [IFD]
EE323PR10020A Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [IFR] 17-Jun-19 A 10-Jul-19 A 31-Jul-19 21-Aug-19 15 0 Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [IFR]
EE323PR10020B Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [Review/Appr.-IFR]
11-Jul-19 A 01-Aug-19 A 22-Aug-19 05-Sep-19 15 0 Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [Review/Appr.-IFR]
EE323PR10020G Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [IFD] 02-Aug-19 A 12-Dec-19 A 16-Dec-19 07-Jan-20 4 0 Instrument Process Data Sheet(Custody Transfer and Fiscal Metering System)_U323 [IFD]
Summary / Report / Study 03-Jun-19 A 31-Mar-20 05-Jul-19 07-Jan-20 162 46 31-Mar-20, Summary / Report / Study
EE323PR05010A Process Control Narrative_U323 [IFR] 15-Aug-19 A 15-Jan-20 A 15-Aug-19 18-Sep-19 25 0 Process Control Narrative_U323 [IFR]
EE323PR05010B Process Control Narrative_U323 [Review-IFR] 16-Jan-20 A 09-Feb-20 19-Sep-19 03-Oct-19 15 15 Process Control Narrative_U323 [Review-IFR]
EE323PR05010G Process Control Narrative_U323 [AFD] 10-Feb-20 28-Feb-20 04-Oct-19 24-Oct-19 15 15 Process Control Narrative_U323 [AFD]
EE323PR25005A Hydraulic Calculations - Pumps_U323 [IFR] 03-Jun-19 A 28-Jun-19 A 05-Jul-19 25-Jul-19 15 0 Hydraulic Calculations - Pumps_U323 [IFR]
EE323PR25005B Hydraulic Calculations - Pumps_U323 [Review-IFR] 29-Jun-19 A 15-Jul-19 A 26-Jul-19 09-Aug-19 15 0 Hydraulic Calculations - Pumps_U323 [Review-IFR]
EE323PR25005G Hydraulic Calculations - Pumps_U323 [AFD] 16-Jul-19 A 31-Mar-20 09-Dec-19 07-Jan-20 20 10 Hydraulic Calculations - Pumps_U323 [AFD]
EE323PR60005A Line Sizing_U323 [IFR] 10-Jul-19 A 23-Sep-19 A 10-Jul-19 14-Aug-19 25 0 Line Sizing_U323 [IFR]
EE323PR60005B Line Sizing_U323 [Review/Appr.-IFR] 24-Sep-19 A 08-Oct-19 A 15-Aug-19 29-Aug-19 15 0 Line Sizing_U323 [Review/Appr.-IFR]
EE323PR60005G Line Sizing_U323 [AFD] 09-Oct-19 A 13-Feb-20 30-Aug-19 21-Nov-19 60 14 Line Sizing_U323 [AFD]
PFD, UFD & Material Balance 07-May-19 A 09-Mar-20 07-May-19 30-Dec-19 196 30 09-Mar-20, PFD, UFD & Material Balance
EE323PR30005A Process Flow Diagram_U323 [IFR] 07-May-19 A 26-Jun-19 A 07-May-19 09-Jul-19 40 0 Process Flow Diagram_U323 [IFR]
EE323PR30005B Process Flow Diagram_U323 [Approved-IFR] 27-Jun-19 A 17-Sep-19 A 10-Jul-19 24-Jul-19 15 0 Process Flow Diagram_U323 [Approved-IFR]
EE323PR30005E Process Flow Diagram_U323 [IFD] 18-Sep-19 A 12-Nov-19 A 30-Sep-19 25-Oct-19 20 0 Process Flow Diagram_U323 [IFD]
EE323PR30005F Process Flow Diagram_U323 [Approved-IFD] 13-Nov-19 A 10-Dec-19 A 26-Oct-19 09-Nov-19 15 0 Process Flow Diagram_U323 [Approved-IFD]
EE323PR30005G Process Flow Diagram_U323 [IFC] 11-Dec-19 A 09-Mar-20 02-Dec-19 30-Dec-19 20 15 Process Flow Diagram_U323 [IFC]
EE323PR30025A Heat & Material Balances_U323 [IFR] 03-Jun-19 A 24-Jun-19 A 10-Jul-19 14-Aug-19 25 0 Heat & Material Balances_U323 [IFR]
EE323PR30025B Heat & Material Balances_U323 [Approved-IFR] 25-Jun-19 A 10-Jul-19 A 15-Aug-19 29-Aug-19 15 0 Heat & Material Balances_U323 [Approved-IFR]
EE323PR30025G Heat & Material Balances_U323 [AFD] 11-Jul-19 A 09-Mar-20 02-Dec-19 30-Dec-19 20 31 Heat & Material Balances_U323 [AFD]
Piping & Instrument Diagram 25-Jun-19 A 30-Jun-20 25-Jun-19 01-Apr-20 254 108 30-Jun-20, Piping & Instrument Diagram
EE022PR40005A Piping & Instrument Diagram_U022 [IFR] 25-Jun-19 A 14-Aug-19 A 25-Jun-19 13-Aug-19 35 0 Piping & Instrument Diagram_U022 [IFR]
EE022PR40005B Piping & Instrument Diagram_U022 [Approved-IFR] 15-Aug-19 A 13-Dec-19 A 14-Aug-19 28-Aug-19 15 0 Piping & Instrument Diagram_U022 [Approved-IFR]
EE022PR40005C Piping & Instrument Diagram_U022 [IFH] 28-Aug-19 A 03-Jan-20 A 30-Aug-19 24-Oct-19 40 0 Piping & Instrument Diagram_U022 [IFH]
EE022PR40005D Piping & Instrument Diagram_U022 [Approved-IFH] 04-Jan-20 A 24-Jan-20 A 25-Oct-19 08-Nov-19 15 0 Piping & Instrument Diagram_U022 [Approved-IFH]
EE022PR40005E Piping & Instrument Diagram_U022 [IFD] 18-Feb-20 16-Mar-20 02-Dec-19 30-Dec-19 20 20 Piping & Instrument Diagram_U022 [IFD]
EE022PR40005F Piping & Instrument Diagram_U022 [Approved-IFD] 17-Mar-20 31-Mar-20 31-Dec-19 14-Jan-20 15 15 Piping & Instrument Diagram_U022 [Approved-IFD]
EE022PR40005G Piping & Instrument Diagram_U022 [IFC] 01-Apr-20 30-Jun-20 15-Jan-20 01-Apr-20 55 55 Piping & Instrument Diagram_U022 [IFC]
EE323PR40005A Piping & Instrument Diagram_U323 [IFR] 10-Jul-19 A 14-Aug-19 A 10-Jul-19 14-Aug-19 25 0 Piping & Instrument Diagram_U323 [IFR]
EE323PR40005B Piping & Instrument Diagram_U323 [Approved-IFR] 15-Aug-19 A 04-Feb-20 15-Aug-19 29-Aug-19 15 10 Piping & Instrument Diagram_U323 [Approved-IFR]
EE323PR40005C Piping & Instrument Diagram_U323 [IFH] 28-Aug-19 A 04-Feb-20 30-Aug-19 24-Oct-19 40 7 Piping & Instrument Diagram_U323 [IFH]
EE323PR40005D Piping & Instrument Diagram_U323 [Approved-IFH] 04-Jan-20 A 19-Feb-20 25-Oct-19 08-Nov-19 15 15 Piping & Instrument Diagram_U323 [Approved-IFH]
EE323PR40005E Piping & Instrument Diagram_U323 [IFD] 20-Feb-20 18-Mar-20 02-Dec-19 30-Dec-19 20 20 Piping & Instrument Diagram_U323 [IFD]

Actual Level of Effort Actual Work Critical Remaining Work Page 40 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323PR40005F Piping & Instrument Diagram_U323 [Approved-IFD] 19-Mar-20 02-Apr-20 31-Dec-19 14-Jan-20 15 15 Piping & Instrument Diagram_U323 [Approved-IFD]
EE323PR40005G Piping & Instrument Diagram_U323 [IFC] 01-Apr-20 30-Jun-20 15-Jan-20 01-Apr-20 55 55 Piping & Instrument Diagram_U323 [IFC]
Equipment List 03-Jun-19 A 31-Mar-20 03-Jul-19 14-Jan-20 85 46 31-Mar-20, Equipment List
EE323PR50005A Equipment List_U323 [IFR] 03-Jun-19 A 23-Aug-19 A 03-Jul-19 06-Aug-19 25 0 Equipment List_U323 [IFR]
EE323PR50005B Equipment List_U323 [Review/Appr.-IFR] 24-Aug-19 A 18-Sep-19 A 07-Aug-19 21-Aug-19 15 0 Equipment List_U323 [Review/Appr.-IFR]
EE323PR50005G Equipment List_U323 [IFC] 19-Sep-19 A 31-Mar-20 16-Dec-19 14-Jan-20 20 46 Equipment List_U323 [IFC]
EE323PR50010A PSV List_U323 [IFR] 15-Aug-19 A 23-Sep-19 A 15-Aug-19 11-Sep-19 20 0 PSV List_U323 [IFR]
EE323PR50010B PSV List_U323 [Review/Appr.-IFR] 24-Sep-19 A 08-Oct-19 A 12-Sep-19 26-Sep-19 15 0 PSV List_U323 [Review/Appr.-IFR]
EE323PR50010G PSV List_U323 [IFC] 09-Oct-19 A 31-Mar-20 16-Dec-19 14-Jan-20 20 46 PSV List_U323 [IFC]
Line List 15-Aug-19 A 28-Jul-20 15-Aug-19 30-Apr-20 231 91 28-Jul-20, Line List
EE323PR60010A Line Designation Table_U323 [IFR] 15-Aug-19 A 30-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Line Designation Table_U323 [IFR]
EE323PR60010B Line Designation Table_U323 [Approved-IFR] 01-Oct-19 A 14-Oct-19 A 12-Sep-19 26-Sep-19 15 0 Line Designation Table_U323 [Approved-IFR]
EE323PR60010E Line Designation Table_U323 [IFD] 15-Oct-19 A 02-Apr-20 31-Dec-19 28-Jan-20 20 10 Line Designation Table_U323 [IFD]
EE323PR60010F Line Designation Table_U323 [Approved-IFD] 03-Apr-20 17-Apr-20 29-Jan-20 12-Feb-20 15 15 Line Designation Table_U323 [Approved-IFD]
EE323PR60010G Line Designation Table_U323 [IFC] 01-Jul-20 28-Jul-20 02-Apr-20 30-Apr-20 20 20 Line Designation Table_U323 [IFC]
Civil 15-Apr-19 A 24-Sep-20 15-Apr-19 29-Jun-20 365 170 24-Sep-20, Civil
Design Basis 15-Apr-19 A 21-Aug-19 A 15-Apr-19 05-Sep-19 101 0 21-Aug-19 A, Design Basis
EE323CV05005A Design Criteria and Specification for Jetty Work [IFR] 15-Apr-19 A 03-Jun-19 A 15-Apr-19 18-Jun-19 39 0 Design Criteria and Specification for Jetty Work [IFR]
EE323CV05005B Design Criteria and Specification for Jetty Work [Approved-IFR] 04-Jun-19 A 21-Jun-19 A 19-Jun-19 03-Jul-19 15 0 Design Criteria and Specification for Jetty Work [Approved-IFR]
EE323CV05005G Design Criteria and Specification for Jetty Work [IFC] 24-Jun-19 A 21-Aug-19 A 04-Jul-19 05-Sep-19 45 0 Design Criteria and Specification for Jetty Work [IFC]
Calculation 05-Nov-19 A 11-Sep-20 05-Dec-19 19-Jun-20 144 161 11-Sep-20, Calculation
EE323CV10005A Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [IFR] 05-Nov-19 A 10-Feb-20 09-Dec-19 14-Jan-20 25 11 Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [IFR]
EE323CV10005B Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [Review-IFR] 13-Dec-19 A 24-Feb-20 15-Jan-20 29-Jan-20 15 30 Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [Review-IFR]
EE323CV10005G Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [AFD] 25-Feb-20 31-Mar-20 30-Jan-20 04-Mar-20 25 25 Structural Calculation for Jetty 6A and Pipe Rack Support_U323 [AFD]
EE323CV10010A Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [IFR] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [IFR]
EE323CV10010B Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [Review-IFR] 29-Jul-20 12-Aug-20 29-Apr-20 13-May-20 15 15 Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [Review-IFR]
EE323CV10010G Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [AFD] 13-Aug-20 11-Sep-20 14-May-20 19-Jun-20 20 20 Structural Calculation for Underground Facilities (Ductbank & Culvert)_U323 [AFD]
EE323CV10015A Structural Calculation for Pipe Bridge and Sleeper_U323 [IFR] 12-Mar-20 17-Apr-20 05-Dec-19 10-Jan-20 25 25 Structural Calculation for Pipe Bridge and Sleeper_U323 [IFR]
EE323CV10015B Structural Calculation for Pipe Bridge and Sleeper_U323 [Review-IFR] 18-Apr-20 02-May-20 11-Jan-20 25-Jan-20 15 15 Structural Calculation for Pipe Bridge and Sleeper_U323 [Review-IFR]
EE323CV10015G Structural Calculation for Pipe Bridge and Sleeper_U323 [AFD] 04-May-20 17-Jun-20 27-Jan-20 28-Feb-20 25 25 Structural Calculation for Pipe Bridge and Sleeper_U323 [AFD]
EE323CV10020A Structural Calculation for Metering Foundation_U323 [IFR] 08-Apr-20 15-May-20 21-Jan-20 24-Feb-20 25 25 Structural Calculation for Metering Foundation_U323 [IFR]
EE323CV10020B Structural Calculation for Metering Foundation_U323 [Review-IFR] 16-May-20 30-May-20 25-Feb-20 10-Mar-20 15 15 Structural Calculation for Metering Foundation_U323 [Review-IFR]
EE323CV10020G Structural Calculation for Metering Foundation_U323 [AFD] 02-Jun-20 06-Jul-20 11-Mar-20 16-Apr-20 25 25 Structural Calculation for Metering Foundation_U323 [AFD]
EE323CV10025A Structural Calculation for Marine Loading Arm Foundation_U323 [IFR] 05-May-20 18-Jun-20 06-Feb-20 11-Mar-20 25 25 Structural Calculation for Marine Loading Arm Foundation_U323 [IFR]
EE323CV10025B Structural Calculation for Marine Loading Arm Foundation_U323 [Review-IFR] 19-Jun-20 03-Jul-20 12-Mar-20 26-Mar-20 15 15 Structural Calculation for Marine Loading Arm Foundation_U323 [Review-IFR]
EE323CV10025G Structural Calculation for Marine Loading Arm Foundation_U323 [AFD] 06-Jul-20 10-Aug-20 27-Mar-20 04-May-20 25 25 Structural Calculation for Marine Loading Arm Foundation_U323 [AFD]
Summary / Report / Study 16-Aug-19 A 10-Aug-20 16-Aug-19 16-Apr-20 240 137 10-Aug-20, Summary / Report / Study
EE000CV15005A Offshore Geotechnical Investigation Report [IFR] 16-Aug-19 A 18-Dec-19 A 16-Aug-19 03-Oct-19 35 0 Offshore Geotechnical Investigation Report [IFR]
EE000CV15005B Offshore Geotechnical Investigation Report [Approved-IFR] 19-Dec-19 A 06-Jan-20 A 04-Oct-19 18-Oct-19 15 0 Offshore Geotechnical Investigation Report [Approved-IFR]
EE000CV15005G Offshore Geotechnical Investigation Report [IFC] 27-Jan-20 28-Feb-20 21-Oct-19 22-Nov-19 25 25 Offshore Geotechnical Investigation Report [IFC]
EE000CV15010A Offshore Pile Test Report [IFR] 29-Apr-20 11-Jun-20 16-Jan-20 17-Feb-20 23 23 Offshore Pile Test Report [IFR]
EE000CV15010B Offshore Pile Test Report [Review-IFR] 12-Jun-20 26-Jun-20 18-Feb-20 03-Mar-20 15 15 Offshore Pile Test Report [Review-IFR]
EE000CV15010G Offshore Pile Test Report [IFC] 29-Jun-20 10-Aug-20 04-Mar-20 16-Apr-20 30 30 Offshore Pile Test Report [IFC]
EE000CV15015A Bathymetry Survey and Met-Ocean Report [IFR] 26-Aug-19 A 18-Dec-19 A 26-Aug-19 11-Oct-19 35 0 Bathymetry Survey and Met-Ocean Report [IFR]
EE000CV15015B Bathymetry Survey and Met-Ocean Report [Approved-IFR] 22-Nov-19 A 06-Jan-20 A 12-Oct-19 26-Oct-19 15 0 Bathymetry Survey and Met-Ocean Report [Approved-IFR]
EE000CV15015G Bathymetry Survey and Met-Ocean Report [IFC] 17-Dec-19 A 21-Feb-20 28-Oct-19 22-Nov-19 20 20 Bathymetry Survey and Met-Ocean Report [IFC]
Piling 20-May-19 A 20-Mar-20 01-Jul-19 13-Dec-19 181 39 20-Mar-20, Piling
ED000CV05005A MR for Stone Column Material(OC4) [IFQ] 20-May-19 A 03-Jun-19 A 01-Jul-19 19-Jul-19 15 0 MR for Stone Column Material(OC4) [IFQ]
ED000CV05005B MR for Stone Column Material(OC4) [Review/Approval] 04-Jun-19 A 21-Jun-19 A 20-Jul-19 08-Aug-19 20 0 MR for Stone Column Material(OC4) [Review/Approval]
ED000CV05005G MR for Stone Column Material(OC4) [IFP] 16-Sep-19 A 02-Oct-19 A 16-Sep-19 27-Sep-19 10 0 MR for Stone Column Material(OC4) [IFP]
ED000CV05010A Calculation Sheet for Stone Column of SS-111 & SS-102 Area [IFR] [Added] 08-Sep-19 A 15-Oct-19 A 42 0 Calculation Sheet for Stone Column of SS-111 & SS-102 Area [IFR] [Added]
ED000CV05010B Calculation Sheet for Stone Column of SS-111 & SS-102 Area [Review/Appr.-IFR] [Added] 16-Oct-19 A 06-Nov-19 A 15 0 Calculation Sheet for Stone Column of SS-111 & SS-102 Area [Review/Appr.-IFR] [Added]
ED000CV05010G Calculation Sheet for Stone Column of SS-111 & SS-102 Area [IFC] [Added] 07-Nov-19 A 26-Nov-19 A 12 0 Calculation Sheet for Stone Column of SS-111 & SS-102 Area [IFC] [Added]
ED000CV05015A Stone Column Layout for SS-111 & SS-102 Area [IFR] [Added] 16-Sep-19 A 24-Oct-19 A 42 0 Stone Column Layout for SS-111 & SS-102 Area [IFR] [Added]
ED000CV05015B Stone Column Layout for SS-111 & SS-102 Area [Review/Appr.-IFR] [Added] 25-Oct-19 A 14-Nov-19 A 15 0 Stone Column Layout for SS-111 & SS-102 Area [Review/Appr.-IFR] [Added]
ED000CV05015G Stone Column Layout for SS-111 & SS-102 Area [IFC] [Added] 15-Nov-19 A 27-Nov-19 A 12 0 Stone Column Layout for SS-111 & SS-102 Area [IFC] [Added]
ED000CV05020A Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [IFR] [Added] 12-Nov-19 A 02-Dec-19 A 42 0 Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [IFR] [Added]
ED000CV05020B Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [Review/Appr.-IFR]
03-Dec-19
[Added]
A 18-Dec-19 A 15 0 Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [Review/Appr.-IFR] [Added]
ED000CV05020G Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [IFC] [Added] 19-Sep-19 A 06-Jan-20 A 8 0 Calculation sheet for Stone Column of SS-101, SS(ISH)-103 & SS(ISH)-105 Area [IFC] [Added]
ED000CV20010A TBE for Stone Column Material(OC4) [IFP] 24-Jun-19 A 01-Nov-19 A 19-Aug-19 30-Aug-19 10 0 TBE for Stone Column Material(OC4) [IFP]
ED000CV20010B TBE for Stone Column Material(OC4) [Review/Approval 02-Nov-19 A 20-Nov-19 A 31-Aug-19 14-Sep-19 15 0 TBE for Stone Column Material(OC4) [Review/Approval
EE323CV30005A Jetty Piling Drawing(Jetty 6A)_U323 [IFR] 19-Sep-19 A 31-Jan-20 19-Sep-19 30-Oct-19 30 5 Jetty Piling Drawing(Jetty 6A)_U323 [IFR]
EE323CV30005B Jetty Piling Drawing(Jetty 6A)_U323 [Review-IFR] 18-Dec-19 A 09-Feb-20 31-Oct-19 14-Nov-19 15 15 Jetty Piling Drawing(Jetty 6A)_U323 [Review-IFR]
EE323CV30005G Jetty Piling Drawing(Jetty 6A)_U323 [IFC] 02-Mar-20 20-Mar-20 25-Nov-19 13-Dec-19 15 15 Jetty Piling Drawing(Jetty 6A)_U323 [IFC]
Foundation - Piperack 12-Aug-19 A 07-Feb-20 15-Aug-19 07-Nov-19 87 9 07-Feb-20, Foundation - Piperack
EE323CV00010A Jetty Layout Drawing(Jetty 6A)_U323 [IFR] 12-Aug-19 A 17-Oct-19 A 15-Aug-19 18-Sep-19 25 0 Jetty Layout Drawing(Jetty 6A)_U323 [IFR]
EE323CV00010B Jetty Layout Drawing(Jetty 6A)_U323 [Review-IFR] 22-Aug-19 A 06-Nov-19 A 19-Sep-19 03-Oct-19 15 0 Jetty Layout Drawing(Jetty 6A)_U323 [Review-IFR]
EE323CV00010G Jetty Layout Drawing(Jetty 6A)_U323 [IFC] 07-Nov-19 A 07-Feb-20 04-Oct-19 07-Nov-19 25 10 Jetty Layout Drawing(Jetty 6A)_U323 [IFC]
Foundation - Sleeper & Local Support 21-Aug-19 A 29-Jun-20 12-Sep-19 21-Apr-20 197 107 29-Jun-20, Foundation - Sleeper & Local Support
EE323CV45005A Pipe Bridge and Sleeper Plan_U323 [IFR] 21-Aug-19 A 29-Jan-20 12-Sep-19 23-Oct-19 30 3 Pipe Bridge and Sleeper Plan_U323 [IFR]
EE323CV45005B Pipe Bridge and Sleeper Plan_U323 [Review-IFR] 30-Jan-20 13-Feb-20 24-Oct-19 07-Nov-19 15 15 Pipe Bridge and Sleeper Plan_U323 [Review-IFR]
EE323CV45005G Pipe Bridge and Sleeper Plan_U323 [IFC] 29-Apr-20 15-Jun-20 02-Mar-20 06-Apr-20 25 25 Pipe Bridge and Sleeper Plan_U323 [IFC]
EE323CV45010A Pipe Bridge and Sleeper Detail & Section_U323 [IFR] 30-Jan-20 11-Mar-20 24-Oct-19 04-Dec-19 30 30 Pipe Bridge and Sleeper Detail & Section_U323 [IFR]
EE323CV45010B Pipe Bridge and Sleeper Detail & Section_U323 [Review-IFR] 12-Mar-20 26-Mar-20 05-Dec-19 19-Dec-19 15 15 Pipe Bridge and Sleeper Detail & Section_U323 [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 41 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323CV45010G Pipe Bridge and Sleeper Detail & Section_U323 [IFC] 15-May-20 29-Jun-20 16-Mar-20 21-Apr-20 25 25 Pipe Bridge and Sleeper Detail & Section_U323 [IFC]
Foundation - Equipment 10-Mar-20 25-Jun-20 20-Dec-19 19-Mar-20 75 75 25-Jun-20, Foundation - Equipment
EE323CV40005A Equipment Foundation Drawing(Metering)_U323 [IFR] 10-Mar-20 07-Apr-20 20-Dec-19 20-Jan-20 20 20 Equipment Foundation Drawing(Metering)_U323 [IFR]
EE323CV40005B Equipment Foundation Drawing(Metering)_U323 [Review-IFR] 08-Apr-20 22-Apr-20 21-Jan-20 04-Feb-20 15 15 Equipment Foundation Drawing(Metering)_U323 [Review-IFR]
EE323CV40005G Equipment Foundation Drawing(Metering)_U323 [IFC] 23-Apr-20 02-Jun-20 05-Feb-20 03-Mar-20 20 20 Equipment Foundation Drawing(Metering)_U323 [IFC]
EE323CV40015A Equipment Foundation Drawing(Marine Loading Arm)_U323 [IFR] 03-Apr-20 04-May-20 09-Jan-20 05-Feb-20 20 20 Equipment Foundation Drawing(Marine Loading Arm)_U323 [IFR]
EE323CV40015B Equipment Foundation Drawing(Marine Loading Arm)_U323 [Review-IFR] 05-May-20 19-May-20 06-Feb-20 20-Feb-20 15 15 Equipment Foundation Drawing(Marine Loading Arm)_U323 [Review-IFR]
EE323CV40015G Equipment Foundation Drawing(Marine Loading Arm)_U323 [IFC] 20-May-20 25-Jun-20 21-Feb-20 19-Mar-20 20 20 Equipment Foundation Drawing(Marine Loading Arm)_U323 [IFC]
Drainage/Trench/Other U/G Work 10-Jun-20 24-Sep-20 09-Mar-20 29-Jun-20 77 77 24-Sep-20, Drainage/Trench/Other U/G Work
EE323CV65005A Underground Facilities (Ductbank & Culvert) Plan_U323 [IFR] 10-Jun-20 14-Jul-20 09-Mar-20 14-Apr-20 25 25 Underground Facilities (Ductbank & Culvert) Plan_U323 [IFR]
EE323CV65005B Underground Facilities (Ductbank & Culvert) Plan_U323 [Review-IFR] 15-Jul-20 29-Jul-20 15-Apr-20 29-Apr-20 15 15 Underground Facilities (Ductbank & Culvert) Plan_U323 [Review-IFR]
EE323CV65005G Underground Facilities (Ductbank & Culvert) Plan_U323 [IFC] 30-Jul-20 31-Aug-20 30-Apr-20 09-Jun-20 20 20 Underground Facilities (Ductbank & Culvert) Plan_U323 [IFC]
EE323CV65010A Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [IFR] 15-Jul-20 12-Aug-20 15-Apr-20 14-May-20 20 20 Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [IFR]
EE323CV65010B Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [Review-IFR] 13-Aug-20 27-Aug-20 15-May-20 29-May-20 15 15 Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [Review-IFR]
EE323CV65010G Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [IFC] 28-Aug-20 24-Sep-20 02-Jun-20 29-Jun-20 20 20 Underground Facilities (Ductbank & Culvert) Detail & Section_U323 [IFC]
General & Specification 20-Sep-19 A 31-Jan-20 20-Sep-19 13-Dec-19 70 4 31-Jan-20, General & Specification
EE323CV15020A Datasheet for Quick Release Hook_U323 [IFR] 20-Sep-19 A 23-Oct-19 A 20-Sep-19 24-Oct-19 25 0 Datasheet for Quick Release Hook_U323 [IFR]
EE323CV15020B Datasheet for Quick Release Hook_U323 [Review/Appr.-IFR] 24-Oct-19 A 13-Nov-19 A 25-Oct-19 08-Nov-19 15 0 Datasheet for Quick Release Hook_U323 [Review/Appr.-IFR]
EE323CV15020G Datasheet for Quick Release Hook_U323 [AFD] 14-Nov-19 A 31-Jan-20 11-Nov-19 13-Dec-19 25 5 Datasheet for Quick Release Hook_U323 [AFD]
Steel Structure 28-May-19 A 29-Jun-20 30-Sep-19 14-Apr-20 182 107 29-Jun-20, Steel Structure
Piperack 12-Aug-19 A 29-May-20 30-Sep-19 13-Mar-20 154 86 29-May-20, Piperack
EE323SS20005A Pipe Rack Drawing(South P/R)_U323 [IFR] 12-Aug-19 A 17-Dec-19 A 30-Sep-19 22-Nov-19 40 0 Pipe Rack Drawing(South P/R)_U323 [IFR]
EE323SS20005B Pipe Rack Drawing(South P/R)_U323 [Review-IFR] 04-Oct-19 A 03-Feb-20 23-Nov-19 07-Dec-19 15 9 Pipe Rack Drawing(South P/R)_U323 [Review-IFR]
EE323SS20005G Pipe Rack Drawing(South P/R)_U323 [IFC] 18-Oct-19 A 05-Feb-20 09-Dec-19 04-Feb-20 40 2 Pipe Rack Drawing(South P/R)_U323 [IFC]
EE323SS20010A Pipe Rack Drawing(North P/R)_U323 [IFR] 12-Aug-19 A 20-Dec-19 A 14-Oct-19 06-Dec-19 40 0 Pipe Rack Drawing(North P/R)_U323 [IFR]
EE323SS20010B Pipe Rack Drawing(North P/R)_U323 [Review-IFR] 04-Oct-19 A 17-Feb-20 07-Dec-19 21-Dec-19 15 23 Pipe Rack Drawing(North P/R)_U323 [Review-IFR]
EE323SS20010G Pipe Rack Drawing(North P/R)_U323 [IFC] 18-Oct-19 A 28-Feb-20 23-Dec-19 18-Feb-20 40 9 Pipe Rack Drawing(North P/R)_U323 [IFC]
EE323SS20015A Pipe Rack Drawing(Jetty 6A)_U323 [IFR] 31-Oct-19 A 24-Dec-19 A 28-Oct-19 20-Dec-19 40 0 Pipe Rack Drawing(Jetty 6A)_U323 [IFR]
EE323SS20015B Pipe Rack Drawing(Jetty 6A)_U323 [Review-IFR] 25-Dec-19 A 13-Jan-20 A 21-Dec-19 04-Jan-20 15 0 Pipe Rack Drawing(Jetty 6A)_U323 [Review-IFR]
EE323SS20015G Pipe Rack Drawing(Jetty 6A)_U323 [IFC] 27-Jan-20 20-Mar-20 06-Jan-20 28-Feb-20 40 40 Pipe Rack Drawing(Jetty 6A)_U323 [IFC]
EE323SS20020A Jetty Structure Drawing(Jetty 6A)_U323 [IFR] 31-Oct-19 A 20-Feb-20 28-Oct-19 20-Dec-19 40 19 Jetty Structure Drawing(Jetty 6A)_U323 [IFR]
EE323SS20020B Jetty Structure Drawing(Jetty 6A)_U323 [Review-IFR] 03-Jan-20 A 06-Mar-20 21-Dec-19 04-Jan-20 15 15 Jetty Structure Drawing(Jetty 6A)_U323 [Review-IFR]
EE323SS20020G Jetty Structure Drawing(Jetty 6A)_U323 [IFC] 09-Mar-20 29-May-20 06-Jan-20 13-Mar-20 50 50 Jetty Structure Drawing(Jetty 6A)_U323 [IFC]
Equipment Structure 28-May-19 A 28-Feb-20 08-Oct-19 22-Jan-20 99 24 28-Feb-20, Equipment Structure
ED000SS25005A MR(Steel Structure) [IFQ] 28-May-19 A 10-Sep-19 A 08-Oct-19 23-Oct-19 12 0 MR(Steel Structure) [IFQ]
ED000SS25005B MR(Steel Structure) [Review/Approval] 11-Sep-19 A 02-Oct-19 A 24-Oct-19 07-Nov-19 15 0 MR(Steel Structure) [Review/Approval]
ED000SS25005G MR(Steel Structure) [IFP] 17-Feb-20 28-Feb-20 12-Dec-19 26-Dec-19 10 10 MR(Steel Structure) [IFP]
ED000SS25010A TBE(Steel Structure) [IFP] 03-Dec-19 A 31-Jan-20 11-Nov-19 26-Nov-19 12 5 TBE(Steel Structure) [IFP]
ED000SS25010B TBE(Steel Structure) [Review/Approval] 01-Feb-20 15-Feb-20 27-Nov-19 11-Dec-19 15 15 TBE(Steel Structure) [Review/Approval]
EE000SS25005A MR(Fender) [IFQ] 08-Oct-19 A 28-Oct-19 A 08-Oct-19 04-Nov-19 20 0 MR(Fender) [IFQ]
EE000SS25005B MR(Fender) [Review/Approval] 29-Oct-19 A 13-Nov-19 A 05-Nov-19 19-Nov-19 15 0 MR(Fender) [Review/Approval]
EE000SS25005G MR(Fender) [IFP] 17-Feb-20 28-Feb-20 26-Dec-19 09-Jan-20 10 10 MR(Fender) [IFP]
EE000SS25006A TBE(Fender) [IFP] 29-Nov-19 A 31-Jan-20 26-Nov-19 09-Dec-19 10 5 TBE(Fender) [IFP]
EE000SS25006B TBE(Fender) [Review/Approval] 01-Feb-20 15-Feb-20 10-Dec-19 24-Dec-19 15 15 TBE(Fender) [Review/Approval]
EE000SS25010A MR(Quick Release Hook) [IFQ] 25-Oct-19 A 11-Nov-19 A 25-Oct-19 14-Nov-19 15 0 MR(Quick Release Hook) [IFQ]
EE000SS25010B MR(Quick Release Hook) [Review/Approval] 12-Nov-19 A 10-Dec-19 A 15-Nov-19 29-Nov-19 15 0 MR(Quick Release Hook) [Review/Approval]
EE000SS25010G MR(Quick Release Hook) [IFP] 21-Feb-20 21-Feb-20 09-Jan-20 22-Jan-20 1 1 MR(Quick Release Hook) [IFP]
EE000SS25011A TBE(Quick Release Hook) [IFP] 29-Nov-19 A 31-Jan-20 06-Dec-19 19-Dec-19 10 5 TBE(Quick Release Hook) [IFP]
EE000SS25011B TBE(Quick Release Hook) [Review/Approval] 01-Feb-20 20-Feb-20 20-Dec-19 08-Jan-20 20 20 TBE(Quick Release Hook) [Review/Approval]
Misc. Structure 26-Nov-19 A 29-Jun-20 25-Nov-19 14-Apr-20 79 107 29-Jun-20, Misc. Structure
EE323CV55015A Jetty Misc. Drawing(Jetty 6A)_U323 [IFR] 26-Nov-19 A 05-Mar-20 25-Nov-19 07-Jan-20 30 29 Jetty Misc. Drawing(Jetty 6A)_U323 [IFR]
EE323CV55015B Jetty Misc. Drawing(Jetty 6A)_U323 [Review/Appr.-IFR] 03-Jan-20 A 20-Mar-20 08-Jan-20 22-Jan-20 15 15 Jetty Misc. Drawing(Jetty 6A)_U323 [Review/Appr.-IFR]
EE323CV55015G Jetty Misc. Drawing(Jetty 6A)_U323 [IFC] 29-Apr-20 29-Jun-20 24-Feb-20 14-Apr-20 35 35 Jetty Misc. Drawing(Jetty 6A)_U323 [IFC]
HVAC 06-Mar-20 13-Apr-20 05-Mar-20 09-Apr-20 25 25 13-Apr-20, HVAC
Plumbing 06-Mar-20 13-Apr-20 05-Mar-20 09-Apr-20 25 25 13-Apr-20, Plumbing
ED341HV15140G Plumbing(Operator Shelter)_U341 [IFC] 06-Mar-20 13-Apr-20 05-Mar-20 09-Apr-20 25 25 Plumbing(Operator Shelter)_U341 [IFC]
Rotating Equipment 01-May-19 A 04-Mar-20 16-Jul-19 07-Jan-20 166 27 04-Mar-20, Rotating Equipment
Pump 25-Jun-19 A 28-Feb-20 19-Aug-19 28-Nov-19 131 24 28-Feb-20, Pump
EB000MR15005A MR(API Centrifugal Pump (BB)) [IFQ] 15-Jul-19 A 29-Jul-19 A 19-Aug-19 06-Sep-19 15 0 MR(API Centrifugal Pump (BB)) [IFQ]
EB000MR15005B MR(API Centrifugal Pump (BB)) [Review/Approval] 30-Jul-19 A 19-Aug-19 A 07-Sep-19 21-Sep-19 15 0 MR(API Centrifugal Pump (BB)) [Review/Approval]
EB000MR15005G MR(API Centrifugal Pump (BB)) [IFP] 24-Dec-19 A 21-Feb-20 15-Nov-19 28-Nov-19 10 20 MR(API Centrifugal Pump (BB)) [IFP]
EB000MR15010A TBE(API Centrifugal Pump (BB)) [IFP] 20-Aug-19 A 27-Nov-19 A 30-Sep-19 18-Oct-19 15 0 TBE(API Centrifugal Pump (BB)) [IFP]
EB000MR15010B TBE(API Centrifugal Pump (BB)) [Review/Approval] 28-Nov-19 A 18-Dec-19 A 19-Oct-19 07-Nov-19 15 0 TBE(API Centrifugal Pump (BB)) [Review/Approval]
EE000MR15020A MR(API Centrifugal Pump (OH2)) [IFQ] 25-Jun-19 A 25-Jul-19 A 19-Aug-19 06-Sep-19 15 0 MR(API Centrifugal Pump (OH2)) [IFQ]
EE000MR15020B MR(API Centrifugal Pump (OH2)) [Review/Approval] 26-Jul-19 A 19-Aug-19 A 07-Sep-19 21-Sep-19 15 0 MR(API Centrifugal Pump (OH2)) [Review/Approval]
EE000MR15020G MR(API Centrifugal Pump (OH2)) [IFP] 04-Feb-20 17-Feb-20 11-Nov-19 22-Nov-19 10 10 MR(API Centrifugal Pump (OH2)) [IFP]
EE000MR15025A TBE(API Centrifugal Pump (OH2)) [IFP] 21-Aug-19 A 05-Nov-19 A 30-Sep-19 18-Oct-19 15 0 TBE(API Centrifugal Pump (OH2)) [IFP]
EE000MR15025B TBE(API Centrifugal Pump (OH2)) [Review/Approval] 06-Nov-19 A 30-Jan-20 19-Oct-19 07-Nov-19 12 5 TBE(API Centrifugal Pump (OH2)) [Review/Approval]
EE000MR15035A MR(API Centrifugal Pump (Vertical)) [IFQ] 15-Jul-19 A 25-Jul-19 A 19-Aug-19 06-Sep-19 15 0 MR(API Centrifugal Pump (Vertical)) [IFQ]
EE000MR15035B MR(API Centrifugal Pump (Vertical)) [Review/Approval] 26-Jul-19 A 19-Aug-19 A 07-Sep-19 21-Sep-19 15 0 MR(API Centrifugal Pump (Vertical)) [Review/Approval]
EE000MR15035G MR(API Centrifugal Pump (Vertical)) [IFP] 17-Feb-20 28-Feb-20 11-Nov-19 22-Nov-19 10 10 MR(API Centrifugal Pump (Vertical)) [IFP]
EE000MR15040A TBE(API Centrifugal Pump (Vertical)) [IFP] 21-Aug-19 A 14-Nov-19 A 30-Sep-19 18-Oct-19 15 0 TBE(API Centrifugal Pump (Vertical)) [IFP]
EE000MR15040B TBE(API Centrifugal Pump (Vertical)) [Review/Approval] 15-Nov-19 A 15-Feb-20 19-Oct-19 07-Nov-19 20 21 TBE(API Centrifugal Pump (Vertical)) [Review/Approval]
Material Handling Equipment 01-May-19 A 28-Feb-20 23-Jul-19 24-Dec-19 150 24 28-Feb-20, Material Handling Equipment
ED000MR35010A MR(Crane & Hoist) [IFQ] 21-Aug-19 A 11-Sep-19 A 09-Oct-19 24-Oct-19 12 0 MR(Crane & Hoist) [IFQ]

Actual Level of Effort Actual Work Critical Remaining Work Page 42 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED000MR35010B MR(Crane & Hoist) [Review/Approval] 12-Sep-19 A 12-Sep-19 A 25-Oct-19 08-Nov-19 30 0 MR(Crane & Hoist) [Review/Approval]
ED000MR35010G MR(Crane & Hoist) [IFP] 17-Feb-20 28-Feb-20 11-Dec-19 24-Dec-19 10 10 MR(Crane & Hoist) [IFP]
ED000MR35015A TBE(Crane & Hoist) [IFP] 27-Oct-19 A 31-Jan-20 12-Nov-19 25-Nov-19 10 5 TBE(Crane & Hoist) [IFP]
ED000MR35015B TBE(Crane & Hoist) [Review/Approval] 01-Feb-20 15-Feb-20 26-Nov-19 10-Dec-19 15 15 TBE(Crane & Hoist) [Review/Approval]
EE000MR35005A Mechanical Data Sheet(Marine Loading Arm & Gangway) [IFR] 01-May-19 A 23-Jul-19 A 23-Jul-19 13-Aug-19 15 0 Mechanical Data Sheet(Marine Loading Arm & Gangway) [IFR]
EE000MR35005B Mechanical Data Sheet(Marine Loading Arm & Gangway) [Review-IFR] 28-May-19 A 15-Aug-19 A 08-Aug-19 22-Aug-19 15 0 Mechanical Data Sheet(Marine Loading Arm & Gangway) [Review-IFR]
EE000MR35005G Mechanical Data Sheet(Marine Loading Arm & Gangway) [IFC] 31-Oct-19 A 13-Feb-20 31-Oct-19 20-Nov-19 15 14 Mechanical Data Sheet(Marine Loading Arm & Gangway) [IFC]
EE000MR35030A MR(Marine Loading Arm & Gangway) [IFQ] 01-Jul-19 A 23-Jul-19 A 02-Aug-19 23-Aug-19 15 0 MR(Marine Loading Arm & Gangway) [IFQ]
EE000MR35030B MR(Marine Loading Arm & Gangway) [Review/Approval] 24-Jul-19 A 21-Aug-19 A 24-Aug-19 07-Sep-19 15 0 MR(Marine Loading Arm & Gangway) [Review/Approval]
EE000MR35030G MR(Marine Loading Arm & Gangway) [IFP] 17-Feb-20 28-Feb-20 21-Nov-19 04-Dec-19 10 10 MR(Marine Loading Arm & Gangway) [IFP]
EE000MR35035A TBE(Marine Loading Arm & Gangway) [IFP] 21-Aug-19 A 10-Dec-19 A 30-Sep-19 18-Oct-19 15 0 TBE(Marine Loading Arm & Gangway) [IFP]
EE000MR35035B TBE(Marine Loading Arm & Gangway) [Review/Approval] 11-Dec-19 A 14-Feb-20 01-Nov-19 20-Nov-19 20 20 TBE(Marine Loading Arm & Gangway) [Review/Approval]
Other Rotating Equipment 01-Oct-19 A 04-Mar-20 68 27 04-Mar-20, Other Rotating Equipment
EE000MR40500A MR(Gangway) [IFQ] [Added] 01-Oct-19 A 29-Oct-19 A 13 0 MR(Gangway) [IFQ] [Added]
EE000MR40500B MR(Gangway) [Review/Appr.-IFQ] [Added] 30-Oct-19 A 14-Nov-19 A 15 0 MR(Gangway) [Review/Appr.-IFQ] [Added]
EE000MR40500G MR(Gangway) [IFP] [Added] 30-Jan-20 04-Mar-20 25 25 MR(Gangway) [IFP] [Added]
EE000MR40505A TBE(Gangway) [IFP] [Added] 09-Nov-19 A 31-Jan-20 22 5 TBE(Gangway) [IFP] [Added]
EE000MR40505B TBE(Gangway) [Review/Appr.-IFP] [Added] 01-Feb-20 01-Mar-20 30 30 TBE(Gangway) [Review/Appr.-IFP] [Added]
Tower, Vessle, Reactor 28-Jun-19 A 17-Feb-20 16-Jul-19 07-Jan-20 166 15 17-Feb-20, Tower, Vessle, Reactor
EB320MR15005A Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [IFR] 01-Jul-19 A 29-Jul-19 A 26-Jul-19 16-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [IFR]
EB320MR15005B Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [Review-IFR] 30-Jul-19 A 16-Aug-19 A 17-Aug-19 31-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [Review-IFR]
EB320MR15005G Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [IFC] 24-Dec-19 A 13-Feb-20 08-Nov-19 28-Nov-19 15 14 Mechanical Data Sheet(API Centrifugal Pump (BB))_U320 [IFC]
EE000MR15005A Mechanical Datasheet LNG Booster Pump [IFR] [Deleted] 16-Jul-19 A 27-Aug-19 A 16-Jul-19 27-Aug-19 30 0 Mechanical Datasheet LNG Booster Pump [IFR] [Deleted]
EE000MR15005B Mechanical Datasheet LNG Booster Pump [Review-IFR] [Deleted] 28-Aug-19 A 11-Sep-19 A 28-Aug-19 10-Sep-19 14 0 Mechanical Datasheet LNG Booster Pump [Review-IFR] [Deleted]
EE000MR15005G Mechanical Datasheet LNG Booster Pump [IFC] [Deleted] 25-Nov-19 A 07-Jan-20 A 25-Nov-19 07-Jan-20 30 0 Mechanical Datasheet LNG Booster Pump [IFC] [Deleted]
EE000MR15015A Mechanical Data Sheet(API Centrifugal Pump (OH2)) [IFR] 28-Jun-19 A 25-Jul-19 A 26-Jul-19 16-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (OH2)) [IFR]
EE000MR15015B Mechanical Data Sheet(API Centrifugal Pump (OH2)) [Review-IFR] 26-Jul-19 A 15-Aug-19 A 17-Aug-19 31-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (OH2)) [Review-IFR]
EE000MR15015G Mechanical Data Sheet(API Centrifugal Pump (OH2)) [IFC] 16-Aug-19 A 17-Feb-20 04-Nov-19 22-Nov-19 15 16 Mechanical Data Sheet(API Centrifugal Pump (OH2)) [IFC]
EE000MR15030A Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [IFR] 01-Jul-19 A 25-Jul-19 A 23-Jul-19 13-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [IFR]
EE000MR15030B Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [Review-IFR] 26-Jul-19 A 15-Aug-19 A 14-Aug-19 28-Aug-19 15 0 Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [Review-IFR]
EE000MR15030G Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [IFC] 16-Aug-19 A 17-Feb-20 04-Nov-19 22-Nov-19 15 16 Mechanical Data Sheet(API Centrifugal Pump (Vertical)) [IFC]
EE000MR40005A Mechanical Datasheet for Jetty Sump (Z-323-01) [IFR] [Deleted] 09-Aug-19 A 30-Aug-19 A 09-Aug-19 30-Aug-19 15 0 Mechanical Datasheet for Jetty Sump (Z-323-01) [IFR] [Deleted]
EE000MR40005B Mechanical Datasheet for Jetty Sump (Z-323-01) [Review-IFR] [Deleted] 31-Aug-19 A 14-Sep-19 A 31-Aug-19 14-Sep-19 15 0 Mechanical Datasheet for Jetty Sump (Z-323-01) [Review-IFR] [Deleted]
EE000MR40005G Mechanical Datasheet for Jetty Sump (Z-323-01) [IFC] [Deleted] 31-Oct-19 A 20-Nov-19 A 31-Oct-19 20-Nov-19 15 0 Mechanical Datasheet for Jetty Sump (Z-323-01) [IFC] [Deleted]
EE000MR40010A Mechanical Data Sheet(Fire Monitor) [IFR] 01-Jul-19 A 02-Aug-19 A 01-Nov-19 21-Nov-19 15 0 Mechanical Data Sheet(Fire Monitor) [IFR]
EE000MR40010B Mechanical Data Sheet (Fire Monitor)[Review-IFR] 03-Aug-19 A 24-Aug-19 A 22-Nov-19 06-Dec-19 15 0 Mechanical Data Sheet (Fire Monitor)[Review-IFR]
EE000MR40010G Mechanical Data Sheet (Fire Monitor)[IFC] 27-Jan-20 14-Feb-20 09-Dec-19 30-Dec-19 15 15 Mechanical Data Sheet (Fire Monitor)[IFC]
Static Equipment 21-Jun-19 A 01-Nov-19 A 21-Jun-19 04-Dec-19 151 0 01-Nov-19 A, Static Equipment
Tower, Vessle, Reactor 21-Jun-19 A 01-Nov-19 A 21-Jun-19 04-Dec-19 151 0 01-Nov-19 A, Tower, Vessle, Reactor
EE000MS10005A Mechanical Data Sheet(Pressure Vessel) [IFR] 21-Jun-19 A 08-Aug-19 A 21-Jun-19 08-Aug-19 35 0 Mechanical Data Sheet(Pressure Vessel) [IFR]
EE000MS10005B Mechanical Data Sheet(Pressure Vessel) [Review-IFR] 09-Aug-19 A 30-Aug-19 A 09-Aug-19 02-Sep-19 16 0 Mechanical Data Sheet(Pressure Vessel) [Review-IFR]
EE000MS10005G Mechanical Data Sheet(Pressure Vessel) [AFD] 31-Aug-19 A 01-Nov-19 A 10-Oct-19 04-Dec-19 40 0 Mechanical Data Sheet(Pressure Vessel) [AFD]
Piping 28-May-19 A 20-Jan-21 28-May-19 30-Oct-20 413 248 20-Jan-21, Piping
General & Specification 29-Aug-19 A 13-Nov-19 A 29-Aug-19 13-Nov-19 54 0 13-Nov-19 A, General & Specification
EE000PI15065A Datasheet for Strainer [IFR] [Deleted] 29-Aug-19 A 02-Oct-19 A 29-Aug-19 02-Oct-19 25 0 Datasheet for Strainer [IFR] [Deleted]
EE000PI15065B Datasheet for Strainer [Review/Appr.-IFR] [Deleted] 03-Oct-19 A 17-Oct-19 A 03-Oct-19 16-Oct-19 14 0 Datasheet for Strainer [Review/Appr.-IFR] [Deleted]
EE000PI15065G Datasheet for Strainer [IFC] [Deleted] 17-Oct-19 A 13-Nov-19 A 17-Oct-19 13-Nov-19 20 0 Datasheet for Strainer [IFC] [Deleted]
EE000PI15070A Datasheet for Flexible Hose & Hose Connection [IFR] [Deleted] 29-Aug-19 A 02-Oct-19 A 29-Aug-19 02-Oct-19 25 0 Datasheet for Flexible Hose & Hose Connection [IFR] [Deleted]
EE000PI15070B Datasheet for Flexible Hose & Hose Connection [Review/Appr.-IFR] [Deleted] 03-Oct-19 A 17-Oct-19 A 03-Oct-19 16-Oct-19 14 0 Datasheet for Flexible Hose & Hose Connection [Review/Appr.-IFR] [Deleted]
EE000PI15070G Datasheet for Flexible Hose & Hose Connection [IFC] [Deleted] 17-Oct-19 A 13-Nov-19 A 17-Oct-19 13-Nov-19 20 0 Datasheet for Flexible Hose & Hose Connection [IFC] [Deleted]
Plot Plan & Equipment Layout 03-Jun-19 A 28-Apr-20 26-Jun-19 28-Feb-20 210 65 28-Apr-20, Plot Plan & Equipment Layout
EB320PI20005A Unit Plot Plan(Existing Tank Farm Area)_U320 [IFR] 03-Jun-19 A 04-Jul-19 A 26-Jun-19 14-Aug-19 35 0 Unit Plot Plan(Existing Tank Farm Area)_U320 [IFR]
EB320PI20005B Unit Plot Plan(Existing Tank Farm Area)_U320 [Approved-IFR] 05-Jul-19 A 19-Jul-19 A 15-Aug-19 29-Aug-19 15 0 Unit Plot Plan(Existing Tank Farm Area)_U320 [Approved-IFR]
EB320PI20005E Unit Plot Plan(Existing Tank Farm Area)_U320 [IFD] 30-Jul-19 A 09-Oct-19 A 30-Sep-19 20-Dec-19 60 0 Unit Plot Plan(Existing Tank Farm Area)_U320 [IFD]
EB320PI20005F Unit Plot Plan(Existing Tank Farm Area)_U320 [Approved-IFD] 10-Oct-19 A 30-Jan-20 21-Dec-19 04-Jan-20 15 5 Unit Plot Plan(Existing Tank Farm Area)_U320 [Approved-IFD]
EB320PI20005G Unit Plot Plan(Existing Tank Farm Area)_U320 [IFC] 02-Mar-20 28-Apr-20 06-Jan-20 28-Feb-20 40 40 Unit Plot Plan(Existing Tank Farm Area)_U320 [IFC]
EE323PI20005A Unit Plot Plan_U323 [IFR] 03-Jun-19 A 04-Jul-19 A 26-Jun-19 14-Aug-19 35 0 Unit Plot Plan_U323 [IFR]
EE323PI20005B Unit Plot Plan_U323 [Approved-IFR] 05-Jul-19 A 19-Jul-19 A 15-Aug-19 29-Aug-19 15 0 Unit Plot Plan_U323 [Approved-IFR]
EE323PI20005E Unit Plot Plan_U323 [IFD] 22-Jul-19 A 09-Oct-19 A 30-Sep-19 20-Dec-19 60 0 Unit Plot Plan_U323 [IFD]
EE323PI20005F Unit Plot Plan_U323 [Approved-IFD] 10-Oct-19 A 09-Feb-20 21-Dec-19 04-Jan-20 15 15 Unit Plot Plan_U323 [Approved-IFD]
EE323PI20005G Unit Plot Plan_U323 [IFC] 02-Mar-20 28-Apr-20 06-Jan-20 28-Feb-20 40 40 Unit Plot Plan_U323 [IFC]
3D Model 28-May-19 A 08-Oct-20 28-May-19 17-Jul-20 335 170 08-Oct-20, 3D Model
E0000PI250055 3D Model (30%) - Modelling - Offsite 28-May-19 A 02-Dec-19 A 28-May-19 04-Sep-19 65 0 3D Model (30%) - Modelling - Offsite
E0000PI250060 3D Model (60%) - Modelling - Offsite 10-Dec-19 A 28-Apr-20 30-Sep-19 28-Feb-20 78 65 3D Model (60%) - Modelling - Offsite
E0000PI250065 3D Model (90%) - Modelling - Offsite 17-Jun-20 03-Sep-20 16-Mar-20 12-Jun-20 54 54 3D Model (90%) - Modelling - Offsite
E0000PI250105 3D Model (30%) - Review Meeting - Offsite 08-Dec-19 A 09-Dec-19 A 23-Sep-19 27-Sep-19 2 0 3D Model (30%) - Review Meeting - Offsite
E0000PI250110 3D Model (60%) - Review Meeting - Offsite 03-Jun-20 16-Jun-20 02-Mar-20 13-Mar-20 10 10 3D Model (60%) - Review Meeting - Offsite
E0000PI250115 3D Model (90%) - Review Meeting - Offsite 04-Sep-20 17-Sep-20 15-Jun-20 26-Jun-20 10 10 3D Model (90%) - Review Meeting - Offsite
E0000PI250215 3D Model (30%) - Issue Report - Offsite 10-Dec-19 A 30-Jan-20 30-Sep-19 18-Oct-19 15 4 3D Model (30%) - Issue Report - Offsite
E0000PI250220 3D Model (60%) - Issue Report - Offsite 17-Jun-20 07-Jul-20 16-Mar-20 06-Apr-20 15 15 3D Model (60%) - Issue Report - Offsite
E0000PI250225 3D Model (90%) - Issue Report - Offsite 18-Sep-20 08-Oct-20 29-Jun-20 17-Jul-20 15 15 3D Model (90%) - Issue Report - Offsite
Stress Analysis 13-Aug-20 21-Dec-20 15-May-20 01-Oct-20 89 89 21-Dec-20, Stress Analysis
EE323PI40005A Stress Analysis Report_U323 [IFR] 13-Aug-20 09-Oct-20 15-May-20 20-Jul-20 40 40 Stress Analysis Report_U323 [IFR]
EE323PI40005B Stress Analysis Report_U323 [Review/Appr.-IFR] 10-Oct-20 24-Oct-20 21-Jul-20 04-Aug-20 15 15 Stress Analysis Report_U323 [Review/Appr.-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 43 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323PI40005G Stress Analysis Report_U323 [AFD] 26-Oct-20 21-Dec-20 05-Aug-20 01-Oct-20 40 40 Stress Analysis Report_U323 [AFD]
A/G Piping 17-Jun-20 02-Oct-20 16-Mar-20 13-Jul-20 75 75 02-Oct-20, A/G Piping
EE323PI55005G Piping Isometric Drawing_U323 [IFC] 17-Jun-20 02-Oct-20 16-Mar-20 13-Jul-20 75 75 Piping Isometric Drawing_U323 [IFC]
Pipe Support 21-Sep-20 20-Jan-21 30-Jun-20 30-Oct-20 82 82 20-Jan-21, Pipe Support
EE323PI60005A Special Pipe Support Drawing_U323 [IFR] 21-Sep-20 02-Nov-20 30-Jun-20 11-Aug-20 30 30 Special Pipe Support Drawing_U323 [IFR]
EE323PI60005B Special Pipe Support Drawing_U323 [Review-IFR] 03-Nov-20 17-Nov-20 12-Aug-20 26-Aug-20 15 15 Special Pipe Support Drawing_U323 [Review-IFR]
EE323PI60005G Special Pipe Support Drawing_U323 [IFC] 08-Dec-20 20-Jan-21 18-Sep-20 30-Oct-20 30 30 Special Pipe Support Drawing_U323 [IFC]
Requisition 14-Oct-19 A 04-Feb-20 14-Oct-19 04-Feb-20 56 7 04-Feb-20, Requisition
EE000PI55441A MR(Strainer) [IFQ] 28-Oct-19 A 22-Nov-19 A 14-Oct-19 08-Nov-19 20 0 MR(Strainer) [IFQ]
EE000PI55441B MR(Strainer) [Review/Approval] 23-Nov-19 A 14-Dec-19 A 11-Nov-19 22-Nov-19 10 0 MR(Strainer) [Review/Approval]
EE000PI55441G MR(Strainer) [IFP] 22-Jan-20 A 04-Feb-20 22-Jan-20 04-Feb-20 10 7 MR(Strainer) [IFP]
EE000PI75371A MR(Flexible Hose & Hose Connector) [IFQ] [Deleted] 14-Oct-19 A 08-Nov-19 A 14-Oct-19 08-Nov-19 20 0 MR(Flexible Hose & Hose Connector) [IFQ] [Deleted]
EE000PI75371B MR(Flexible Hose & Hose Connector) [Review/Approval] [Deleted] 09-Nov-19 A 23-Nov-19 A 11-Nov-19 22-Nov-19 10 0 MR(Flexible Hose & Hose Connector) [Review/Approval] [Deleted]
EE000PI75371G MR(Flexible Hose & Hose Connector) [IFP] [Deleted] 22-Jan-20 A 04-Feb-20 22-Jan-20 04-Feb-20 10 7 MR(Flexible Hose & Hose Connector) [IFP] [Deleted]
Technical Bid Evaluation 02-Dec-19 A 21-Jan-20 A 02-Dec-19 21-Jan-20 56 0 21-Jan-20 A, Technical Bid Evaluation
EE000PI55442A TBE(Strainer) [IFP] [Deleted] 02-Dec-19 A 20-Dec-19 A 02-Dec-19 20-Dec-19 15 0 TBE(Strainer) [IFP] [Deleted]
EE000PI55442B TBE(Strainer) [Review/Approval] [Deleted] 23-Dec-19 A 21-Jan-20 A 23-Dec-19 21-Jan-20 20 0 TBE(Strainer) [Review/Approval] [Deleted]
EE000PI75372A TBE For Flexible Hose & Hose Connector [IFP] 02-Dec-19 A 20-Dec-19 A 02-Dec-19 20-Dec-19 15 0 TBE For Flexible Hose & Hose Connector [IFP]
EE000PI75372B TBE For Flexible Hose & Hose Connector [Review/Approval] [Deleted] 23-Dec-19 A 21-Jan-20 A 23-Dec-19 21-Jan-20 20 0 TBE For Flexible Hose & Hose Connector [Review/Approval] [Deleted]
Electrical 29-Mar-19 A 07-Dec-20 29-Mar-19 20-Jul-20 424 218 07-Dec-20, Electrical
General & Specification 18-Apr-19 A 20-Dec-19 A 18-Apr-19 15-Nov-19 186 0 20-Dec-19 A, General & Specification
ED000EL00005A Specification for Fire Alarm System [IFR] 18-Apr-19 A 21-May-19 A 18-Apr-19 28-Jun-19 44 0 Specification for Fire Alarm System [IFR]
ED000EL00005B Specification for Fire Alarm System [Review/Appr.-IFR] 22-May-19 A 18-Jun-19 A 29-Jun-19 13-Jul-19 15 0 Specification for Fire Alarm System [Review/Appr.-IFR]
ED000EL00005G Specification for Fire Alarm System [IFC] 19-Jun-19 A 31-Jul-19 A 15-Jul-19 16-Sep-19 45 0 Specification for Fire Alarm System [IFC]
ED000EL00010A Specification for Berthing Aid System [IFR] 04-Jul-19 A 23-Aug-19 A 04-Jul-19 12-Sep-19 50 0 Specification for Berthing Aid System [IFR]
ED000EL00010B Specification for Berthing Aid System [Review/Appr.-IFR] 24-Aug-19 A 24-Sep-19 A 13-Sep-19 27-Sep-19 15 0 Specification for Berthing Aid System [Review/Appr.-IFR]
ED000EL00010G Specification for Berthing Aid System [AFD] 25-Sep-19 A 20-Dec-19 A 30-Sep-19 15-Nov-19 35 0 Specification for Berthing Aid System [AFD]
Electrical Equipment 03-Jun-19 A 20-Mar-20 15-Jul-19 27-Jan-20 231 39 20-Mar-20, Electrical Equipment
EB320EL10005A Datasheet for(LV MCC P- 30- MC67LB)_U320 [IFR] 09-Aug-19 A 10-Sep-19 A 09-Aug-19 20-Sep-19 30 0 Datasheet for(LV MCC P- 30- MC67LB)_U320 [IFR]
EB320EL10005B Datasheet for(LV MCC P- 30- MC67LB)_U320 [Review-IFR] 11-Sep-19 A 02-Oct-19 A 13-Sep-19 27-Sep-19 15 0 Datasheet for(LV MCC P- 30- MC67LB)_U320 [Review-IFR]
EB320EL10005G Datasheet for(LV MCC P- 30- MC67LB)_U320 [IFC] 03-Oct-19 A 04-Mar-20 30-Dec-19 27-Jan-20 20 7 Datasheet for(LV MCC P- 30- MC67LB)_U320 [IFC]
EB320EL10010A Datasheet for(MV MCC 320- 25A/B/C)_U320 [IFR] 03-Jun-19 A 10-Jul-19 A 09-Aug-19 20-Sep-19 30 0 Datasheet for(MV MCC 320- 25A/B/C)_U320 [IFR]
EB320EL10010B Datasheet for(MV MCC 320- 25A/B/C)_U320 [Review-IFR] 11-Jul-19 A 29-Jul-19 A 21-Sep-19 05-Oct-19 15 0 Datasheet for(MV MCC 320- 25A/B/C)_U320 [Review-IFR]
EB320EL10010G Datasheet for(MV MCC 320- 25A/B/C)_U320 [IFC] 30-Jul-19 A 04-Mar-20 30-Dec-19 27-Jan-20 20 7 Datasheet for(MV MCC 320- 25A/B/C)_U320 [IFC]
EC335EL10005A Datasheet for(LV MCC P- 30- MC75LA)_U335 [IFR] 11-Aug-19 A 10-Sep-19 A 23-Sep-19 01-Nov-19 30 0 Datasheet for(LV MCC P- 30- MC75LA)_U335 [IFR]
EC335EL10005B Datasheet for(LV MCC P- 30- MC75LA)_U335 [Review-IFR] 11-Sep-19 A 02-Oct-19 A 02-Nov-19 16-Nov-19 15 0 Datasheet for(LV MCC P- 30- MC75LA)_U335 [Review-IFR]
EC335EL10005G Datasheet for(LV MCC P- 30- MC75LA)_U335 [IFC] 03-Oct-19 A 05-Feb-20 18-Nov-19 07-Jan-20 35 8 Datasheet for(LV MCC P- 30- MC75LA)_U335 [IFC]
ED000EL10005A MR(Existing MV/LV Switchgear Modification) [IFQ] 21-Sep-19 A 23-Sep-19 A 16-Oct-19 05-Nov-19 15 0 MR(Existing MV/LV Switchgear Modification) [IFQ]
ED000EL10005B MR(Existing MV/LV Switchgear Modification) [Review/Approval] 24-Sep-19 A 30-Sep-19 A 06-Nov-19 20-Nov-19 15 0 MR(Existing MV/LV Switchgear Modification) [Review/Approval]
ED000EL10005G MR(Existing MV/LV Switchgear Modification) [IFP] 09-Mar-20 20-Mar-20 02-Jan-20 15-Jan-20 10 10 MR(Existing MV/LV Switchgear Modification) [IFP]
ED000EL10010A TBE(Existing MV/LV Switchgear Modification) [IFP] 17-Jan-20 A 20-Feb-20 04-Dec-19 17-Dec-19 10 19 TBE(Existing MV/LV Switchgear Modification) [IFP]
ED000EL10010B TBE(Existing MV/LV Switchgear Modification) [Review/Approval] 21-Feb-20 06-Mar-20 18-Dec-19 01-Jan-20 15 15 TBE(Existing MV/LV Switchgear Modification) [Review/Approval]
EE323EL10005A Datasheet for(MV MCC 320- 24A/B/C)_U323 [IFR] 10-Jun-19 A 10-Jul-19 A 23-Sep-19 15-Nov-19 40 0 Datasheet for(MV MCC 320- 24A/B/C)_U323 [IFR]
EE323EL10005B Datasheet for(MV MCC 320- 24A/B/C)_U323 [Review-IFR] 11-Jul-19 A 27-Jul-19 A 16-Nov-19 30-Nov-19 15 0 Datasheet for(MV MCC 320- 24A/B/C)_U323 [Review-IFR]
EE323EL10005G Datasheet for(MV MCC 320- 24A/B/C)_U323 [IFC] 29-Jul-19 A 06-Feb-20 02-Dec-19 14-Jan-20 30 9 Datasheet for(MV MCC 320- 24A/B/C)_U323 [IFC]
EE323EL10015A Datasheet for Berthing Aid System_U323 [IFR] 30-Sep-19 A 17-Dec-19 A 30-Sep-19 08-Nov-19 30 0 Datasheet for Berthing Aid System_U323 [IFR]
EE323EL10015B Datasheet for Berthing Aid System_U323 [Review/Appr.-IFR] 18-Dec-19 A 07-Jan-20 A 09-Nov-19 23-Nov-19 15 0 Datasheet for Berthing Aid System_U323 [Review/Appr.-IFR]
EE323EL10015G Datasheet for Berthing Aid System_U323 [IFC] 27-Jan-20 14-Feb-20 25-Nov-19 13-Dec-19 15 15 Datasheet for Berthing Aid System_U323 [IFC]
EE341EL10015A Electrical Data Sheet(Fire Alarm System)_U341 [IFR] 15-Jul-19 A 07-Aug-19 A 15-Jul-19 09-Sep-19 40 0 Electrical Data Sheet(Fire Alarm System)_U341 [IFR]
EE341EL10015A_UOP
Electrical Data Sheet(Fire Alarm System)_U341 [IFR] [Added] 15-Jul-19 A 07-Aug-19 A 40 0 Electrical Data Sheet(Fire Alarm System)_U341 [IFR] [Added]
EE341EL10015B Electrical Data Sheet(Fire Alarm System)_U341 [Review-IFR] 08-Aug-19 A 06-Sep-19 A 10-Sep-19 24-Sep-19 15 0 Electrical Data Sheet(Fire Alarm System)_U341 [Review-IFR]
EE341EL10015B_UOP
Electrical Data Sheet(Fire Alarm System)_U341 [Review-IFR] [Added] 08-Aug-19 A 06-Sep-19 A 15 0 Electrical Data Sheet(Fire Alarm System)_U341 [Review-IFR] [Added]
EE341EL10015G Electrical Data Sheet(Fire Alarm System)_U341 [IFC] 09-Sep-19 A 30-Dec-19 A 25-Sep-19 29-Oct-19 25 0 Electrical Data Sheet(Fire Alarm System)_U341 [IFC]
EE341EL10015G_UOP
Electrical Data Sheet(Fire Alarm System)_U341 [IFC] [Added] 09-Sep-19 A 06-Jan-20 A 25 0 Electrical Data Sheet(Fire Alarm System)_U341 [IFC] [Added]
Calculation 29-Mar-19 A 31-Jan-20 29-Mar-19 09-Sep-19 114 4 31-Jan-20, Calculation
EE323EL15005A Lighting Calculation for (Indoor Type)_U323 [IFR] [Deleted] 29-Mar-19 A 12-Jun-19 A 29-Mar-19 12-Jun-19 45 0 Lighting Calculation for (Indoor Type)_U323 [IFR] [Deleted]
EE323EL15005B Lighting Calculation for (Indoor Type)_U323 [Review-IFR] [Deleted] 13-Jun-19 A 27-Jun-19 A 13-Jun-19 27-Jun-19 15 0 Lighting Calculation for (Indoor Type)_U323 [Review-IFR] [Deleted]
EE323EL15005G Lighting Calculation for (Indoor Type)_U323 [AFD] [Deleted] 28-Jun-19 A 31-Jan-20 28-Jun-19 09-Sep-19 51 5 Lighting Calculation for (Indoor Type)_U323 [AFD] [Deleted]
Summary / Report / Study 26-Jul-19 A 09-Apr-20 26-Jul-19 15-Jan-20 176 53 09-Apr-20, Summary / Report / Study
ED341EL20005A Electrical Load List_Unit 323 & 341 [IFR] 26-Jul-19 A 08-Jan-20 A 26-Jul-19 13-Sep-19 35 0 Electrical Load List_Unit 323 & 341 [IFR]
ED341EL20005B Electrical Load List_Unit 323 & 341 [Review-IFR] 28-Dec-19 A 21-Jan-20 A 14-Sep-19 28-Sep-19 15 0 Electrical Load List_Unit 323 & 341 [Review-IFR]
ED341EL20005G Electrical Load List_Unit 323 & 341 [AFD] 27-Feb-20 09-Apr-20 03-Dec-19 15-Jan-20 30 30 Electrical Load List_Unit 323 & 341 [AFD]
ED341EL20010A Lighting Calculation for (Indoor Type)_U341 [IFR] [Deleted] 26-Jul-19 A 13-Sep-19 A 26-Jul-19 13-Sep-19 35 0 Lighting Calculation for (Indoor Type)_U341 [IFR] [Deleted]
ED341EL20010B Lighting Calculation for (Indoor Type)_U341 [Review-IFR] [Deleted] 14-Sep-19 A 28-Sep-19 A 14-Sep-19 28-Sep-19 15 0 Lighting Calculation for (Indoor Type)_U341 [Review-IFR] [Deleted]
ED341EL20010G Lighting Calculation for (Indoor Type)_U341 [AFD] [Deleted] 30-Sep-19 A 21-Feb-20 30-Sep-19 22-Nov-19 40 20 Lighting Calculation for (Indoor Type)_U341 [AFD] [Deleted]
Hazardous Area Classific ation 18-Jul-19 A 30-Mar-20 18-Jul-19 29-Nov-19 174 45 30-Mar-20, Hazardous Area Classification
EE323EL25005A Hazardous Area Classification Drawing_U323 [IFR] 18-Jul-19 A 04-Oct-19 A 18-Jul-19 12-Sep-19 40 0 Hazardous Area Classification Drawing_U323 [IFR]
EE323EL25005B Hazardous Area Classification Drawing_U323 [Review-IFR] 05-Oct-19 A 15-Jan-20 A 13-Sep-19 27-Sep-19 15 0 Hazardous Area Classification Drawing_U323 [Review-IFR]
EE323EL25005G Hazardous Area Classification Drawing_U323 [IFD] 27-Jan-20 30-Mar-20 30-Sep-19 29-Nov-19 45 45 Hazardous Area Classification Drawing_U323 [IFD]
Single Line Diagram & Schemetic Diagram 07-Aug-19 A 02-Jun-20 09-Aug-19 28-Feb-20 191 88 02-Jun-20, Single Line Diagram & Schemetic Diagram
EB320EL30005A Single Line Diagram_U320 [IFR] 19-Aug-19 A 06-Sep-19 A 19-Aug-19 20-Sep-19 25 0 Single Line Diagram_U320 [IFR]
EB320EL30005B Single Line Diagram_U320 [Review-IFR] 07-Sep-19 A 02-Oct-19 A 21-Sep-19 05-Oct-19 15 0 Single Line Diagram_U320 [Review-IFR]
EB320EL30005G Single Line Diagram_U320 [IFD] 03-Oct-19 A 28-Feb-20 17-Dec-19 22-Jan-20 25 25 Single Line Diagram_U320 [IFD]
EC335EL30005A Single Line Diagram_U335 [IFR] 07-Aug-19 A 06-Sep-19 A 26-Aug-19 20-Sep-19 20 0 Single Line Diagram_U335 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 44 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EC335EL30005B Single Line Diagram_U335 [Review-IFR] 07-Sep-19 A 02-Oct-19 A 21-Sep-19 05-Oct-19 15 0 Single Line Diagram_U335 [Review-IFR]
EC335EL30005G Single Line Diagram_U335 [IFD] 03-Oct-19 A 02-Jun-20 27-Jan-20 28-Feb-20 25 81 Single Line Diagram_U335 [IFD]
ED341EL30005A Interconnection Diagrams_U341 [IFR] 04-Oct-19 A 08-Nov-19 A 23-Sep-19 08-Nov-19 35 0 Interconnection Diagrams_U341 [IFR]
ED341EL30005B Interconnection Diagrams_U341 [Review-IFR] 09-Nov-19 A 09-Feb-20 09-Nov-19 23-Nov-19 15 15 Interconnection Diagrams_U341 [Review-IFR]
ED341EL30005G Interconnection Diagrams_U341 [IFC] 24-Mar-20 02-Jun-20 06-Jan-20 28-Feb-20 40 40 Interconnection Diagrams_U341 [IFC]
ED341EL30010A Single Line Diagram_U341 [IFR] 09-Aug-19 A 03-Oct-19 A 09-Aug-19 20-Sep-19 30 0 Single Line Diagram_U341 [IFR]
ED341EL30010B Single Line Diagram_U341 [Review-IFR] 24-Sep-19 A 26-Jan-20 21-Sep-19 05-Oct-19 15 0 Single Line Diagram_U341 [Review-IFR]
ED341EL30010G Single Line Diagram_U341 [IFD] 11-Oct-19 A 02-Jun-20 27-Jan-20 28-Feb-20 25 81 Single Line Diagram_U341 [IFD]
EE323EL30005A Single Line Diagram_U323 [IFR] 09-Aug-19 A 06-Sep-19 A 09-Aug-19 20-Sep-19 30 0 Single Line Diagram_U323 [IFR]
EE323EL30005B Single Line Diagram_U323 [Review-IFR] 07-Sep-19 A 02-Oct-19 A 21-Sep-19 05-Oct-19 15 0 Single Line Diagram_U323 [Review-IFR]
EE323EL30005G Single Line Diagram_U323 [IFD] 03-Oct-19 A 09-Apr-20 10-Dec-19 15-Jan-20 25 53 Single Line Diagram_U323 [IFD]
Electrical Installaion Details 14-Oct-19 A 11-Feb-20 14-Oct-19 11-Feb-20 85 11 11-Feb-20, Electrical Installaion Details
EE000EL35005A Typical Installation Details - Fire Alarm [IFR] [Deleted] 14-Oct-19 A 29-Nov-19 A 14-Oct-19 29-Nov-19 35 0 Typical Installation Details - Fire Alarm [IFR] [Deleted]
EE000EL35005B Typical Installation Details - Fire Alarm [Review-IFR] [Deleted] 30-Nov-19 A 14-Dec-19 A 30-Nov-19 14-Dec-19 15 0 Typical Installation Details - Fire Alarm [Review-IFR] [Deleted]
EE000EL35005G Typical Installation Details - Fire Alarm [IFD] [Deleted] 16-Dec-19 A 11-Feb-20 16-Dec-19 11-Feb-20 40 12 Typical Installation Details - Fire Alarm [IFD] [Deleted]
Power & Control 09-Sep-19 A 23-Nov-20 09-Sep-19 23-Jun-20 290 208 23-Nov-20, Power & Control
EB319EL45005A Electrical Cable Route Layout(Building/Shelter)_U319 [IFR] 17-Feb-20 13-Mar-20 27-Dec-19 24-Jan-20 20 20 Electrical Cable Route Layout(Building/Shelter)_U319 [IFR]
EB319EL45005B Electrical Cable Route Layout(Building/Shelter)_U319 [Review-IFR] 14-Mar-20 28-Mar-20 25-Jan-20 08-Feb-20 15 15 Electrical Cable Route Layout(Building/Shelter)_U319 [Review-IFR]
EB319EL45005G Electrical Cable Route Layout(Building/Shelter)_U319 [IFC] 31-Mar-20 28-Apr-20 10-Feb-20 06-Mar-20 20 20 Electrical Cable Route Layout(Building/Shelter)_U319 [IFC]
EB319EL45010A Power Layout(Building/Shelter)_U319 [IFR] 16-Mar-20 14-Apr-20 27-Jan-20 21-Feb-20 20 20 Power Layout(Building/Shelter)_U319 [IFR]
EB319EL45010B Power Layout(Building/Shelter)_U319 [Review-IFR] 15-Apr-20 29-Apr-20 22-Feb-20 07-Mar-20 15 15 Power Layout(Building/Shelter)_U319 [Review-IFR]
EB319EL45010G Power Layout(Building/Shelter)_U319 [IFC] 30-Apr-20 09-Jun-20 09-Mar-20 06-Apr-20 20 20 Power Layout(Building/Shelter)_U319 [IFC]
EB320EL45005A Electrical Cable Route Layout(Shelter)_U320 [IFR] 09-Sep-19 A 12-Feb-20 09-Sep-19 18-Oct-19 30 13 Electrical Cable Route Layout(Shelter)_U320 [IFR]
EB320EL45005B Electrical Cable Route Layout(Shelter)_U320 [Review-IFR] 13-Feb-20 27-Feb-20 19-Oct-19 02-Nov-19 15 15 Electrical Cable Route Layout(Shelter)_U320 [Review-IFR]
EB320EL45005G Electrical Cable Route Layout(Shelter)_U320 [IFC] 28-Feb-20 20-Apr-20 02-Jan-20 19-Feb-20 35 35 Electrical Cable Route Layout(Shelter)_U320 [IFC]
EB320EL45010A Power Layout(Shelter)_U320 [IFR] 07-Oct-19 A 15-Nov-19 A 07-Oct-19 15-Nov-19 30 0 Power Layout(Shelter)_U320 [IFR]
EB320EL45010B Power Layout(Shelter)_U320 [Review-IFR] 16-Nov-19 A 10-Feb-20 16-Nov-19 30-Nov-19 15 15 Power Layout(Shelter)_U320 [Review-IFR]
EB320EL45010G Power Layout(Shelter)_U320 [IFC] 06-Apr-20 20-May-20 06-Feb-20 18-Mar-20 30 30 Power Layout(Shelter)_U320 [IFC]
EC334EL45005A Electrical Cable Route Layout(Building/Shelter)_U334 [IFR] 27-Jan-20 28-Feb-20 19-Dec-19 24-Jan-20 25 25 Electrical Cable Route Layout(Building/Shelter)_U334 [IFR]
EC334EL45005B Electrical Cable Route Layout(Building/Shelter)_U334 [Review-IFR] 29-Feb-20 14-Mar-20 25-Jan-20 08-Feb-20 15 15 Electrical Cable Route Layout(Building/Shelter)_U334 [Review-IFR]
EC334EL45005G Electrical Cable Route Layout(Building/Shelter)_U334 [IFC] 14-Sep-20 23-Oct-20 02-Mar-20 14-Apr-20 30 30 Electrical Cable Route Layout(Building/Shelter)_U334 [IFC]
EC334EL45010A Power Layout(Building/Shelter)_U334 [IFR] [Deleted] 23-Mar-20 21-Apr-20 27-Jan-20 21-Feb-20 20 20 Power Layout(Building/Shelter)_U334 [IFR] [Deleted]
EC334EL45010B Power Layout(Building/Shelter)_U334 [Review-IFR] [Deleted] 22-Apr-20 05-May-20 22-Feb-20 06-Mar-20 14 14 Power Layout(Building/Shelter)_U334 [Review-IFR] [Deleted]
EC334EL45010G Power Layout(Building/Shelter)_U334 [IFC] [Deleted] 26-Oct-20 23-Nov-20 15-Apr-20 14-May-20 20 20 Power Layout(Building/Shelter)_U334 [IFC] [Deleted]
EC334EL45085A Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [IFR] 17-Feb-20 06-Mar-20 23-Sep-19 11-Oct-19 15 15 Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [IFR]
EC334EL45085B Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [Review-IFR] 07-Mar-20 21-Mar-20 12-Oct-19 26-Oct-19 15 15 Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [Review-IFR]
EC334EL45085G Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [IFC] 05-Oct-20 23-Oct-20 23-Mar-20 14-Apr-20 15 15 Electrical Cable Route Layout(Building/Shelter)(334-CHM-001)_U334 [IFC]
EC334EL45090A Power Layout(Building/Shelter)(334-CHM-001)_U334 [IFR] [Deleted] 22-Oct-19 A 11-Nov-19 A 22-Oct-19 11-Nov-19 15 0 Power Layout(Building/Shelter)(334-CHM-001)_U334 [IFR] [Deleted]
EC334EL45090B Power Layout(Building/Shelter)(334-CHM-001)_U334 [Review-IFR] [Deleted] 12-Nov-19 A 26-Nov-19 A 12-Nov-19 26-Nov-19 15 0 Power Layout(Building/Shelter)(334-CHM-001)_U334 [Review-IFR] [Deleted]
EC334EL45090G Power Layout(Building/Shelter)(334-CHM-001)_U334 [IFC] [Deleted] 26-Oct-20 23-Nov-20 15-Apr-20 14-May-20 20 20 Power Layout(Building/Shelter)(334-CHM-001)_U334 [IFC] [Deleted]
EC335EL45005A Electrical Cable Route Layout(Building/Shelter)_U335 [IFR] 09-Sep-19 A 18-Oct-19 A 09-Sep-19 18-Oct-19 30 0 Electrical Cable Route Layout(Building/Shelter)_U335 [IFR]
EC335EL45005B Electrical Cable Route Layout(Building/Shelter)_U335 [Review-IFR] 19-Oct-19 A 28-Jan-20 19-Oct-19 02-Nov-19 15 3 Electrical Cable Route Layout(Building/Shelter)_U335 [Review-IFR]
EC335EL45005G Electrical Cable Route Layout(Building/Shelter)_U335 [IFC] 20-May-20 09-Jul-20 02-Mar-20 14-Apr-20 30 30 Electrical Cable Route Layout(Building/Shelter)_U335 [IFC]
EC335EL45010A Power Layout(Building/Shelter)_U335 [IFR] 21-Oct-19 A 15-Nov-19 A 21-Oct-19 15-Nov-19 20 0 Power Layout(Building/Shelter)_U335 [IFR]
EC335EL45010B Power Layout(Building/Shelter)_U335 [Review-IFR] 16-Nov-19 A 25-Feb-20 16-Nov-19 30-Nov-19 15 31 Power Layout(Building/Shelter)_U335 [Review-IFR]
EC335EL45010G Power Layout(Building/Shelter)_U335 [IFC] 10-Jul-20 07-Aug-20 15-Apr-20 14-May-20 20 20 Power Layout(Building/Shelter)_U335 [IFC]
EC337EL45005A Electrical Cable Route Layout(Building/Shelter)_U337 [IFR] 21-Feb-20 13-Apr-20 06-Jan-20 21-Feb-20 35 35 Electrical Cable Route Layout(Building/Shelter)_U337 [IFR]
EC337EL45005B Electrical Cable Route Layout(Building/Shelter)_U337 [Review-IFR] 14-Apr-20 28-Apr-20 22-Feb-20 07-Mar-20 15 15 Electrical Cable Route Layout(Building/Shelter)_U337 [Review-IFR]
EC337EL45005G Electrical Cable Route Layout(Building/Shelter)_U337 [IFC] 18-Aug-20 15-Sep-20 16-Mar-20 14-Apr-20 20 20 Electrical Cable Route Layout(Building/Shelter)_U337 [IFC]
EC337EL45010A Power Layout(Building/Shelter)_U337 [IFR] 06-Apr-20 13-May-20 17-Feb-20 20-Mar-20 25 25 Power Layout(Building/Shelter)_U337 [IFR]
EC337EL45010B Power Layout(Building/Shelter)_U337 [Review-IFR] 14-May-20 28-May-20 21-Mar-20 04-Apr-20 15 15 Power Layout(Building/Shelter)_U337 [Review-IFR]
EC337EL45010G Power Layout(Building/Shelter)_U337 [IFC] 16-Sep-20 13-Oct-20 15-Apr-20 14-May-20 20 20 Power Layout(Building/Shelter)_U337 [IFC]
ED341EL45030A Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [IFR] 21-Nov-19 A 12-Feb-20 21-Nov-19 26-Dec-19 13 13 Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [IFR]
ED341EL45030B Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [Review-IFR] 13-Feb-20 27-Feb-20 27-Dec-19 10-Jan-20 15 15 Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [Review-IFR]
ED341EL45030G Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS&ISH-103_OC4)_U341 [IFC]
ED341EL45035A Power Layout(SS&ISH-103_OC4)_U341 [IFR] 06-Feb-20 11-Mar-20 19-Dec-19 24-Jan-20 25 25 Power Layout(SS&ISH-103_OC4)_U341 [IFR]
ED341EL45035B Power Layout(SS&ISH-103_OC4)_U341 [Review-IFR] 12-Mar-20 26-Mar-20 25-Jan-20 08-Feb-20 15 15 Power Layout(SS&ISH-103_OC4)_U341 [Review-IFR]
ED341EL45035G Power Layout(SS&ISH-103_OC4)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Power Layout(SS&ISH-103_OC4)_U341 [IFC]
ED341EL45040A Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [IFR] 21-Nov-19 A 12-Feb-20 21-Nov-19 26-Dec-19 25 13 Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [IFR]
ED341EL45040B Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [Review-IFR] 13-Feb-20 27-Feb-20 27-Dec-19 10-Jan-20 15 15 Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [Review-IFR]
ED341EL45040G Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [IFC] 03-Jun-20 30-Jun-20 02-Mar-20 30-Mar-20 20 20 Electrical Cable Route Layout(SS&ISH-104_OC4)_U341 [IFC]
ED341EL45045A Power Layout(SS&ISH-104_OC4)_U341 [IFR] 06-Feb-20 11-Mar-20 19-Dec-19 24-Jan-20 25 25 Power Layout(SS&ISH-104_OC4)_U341 [IFR]
ED341EL45045B Power Layout(SS&ISH-104_OC4)_U341 [Review-IFR] 12-Mar-20 26-Mar-20 25-Jan-20 08-Feb-20 15 15 Power Layout(SS&ISH-104_OC4)_U341 [Review-IFR]
ED341EL45045G Power Layout(SS&ISH-104_OC4)_U341 [IFC] 01-Jul-20 28-Jul-20 31-Mar-20 28-Apr-20 20 20 Power Layout(SS&ISH-104_OC4)_U341 [IFC]
ED341EL45047A Power Layout(SS&ISH-104_OC3)_U341 [IFR] 31-Jan-20 05-Mar-20 06-Jan-20 07-Feb-20 25 25 Power Layout(SS&ISH-104_OC3)_U341 [IFR]
ED341EL45047B Power Layout(SS&ISH-104_OC3)_U341 [Review-IFR] 06-Mar-20 20-Mar-20 08-Feb-20 22-Feb-20 15 15 Power Layout(SS&ISH-104_OC3)_U341 [Review-IFR]
ED341EL45047G Power Layout(SS&ISH-104_OC3)_U341 [IFC] 15-Apr-20 14-May-20 16-Mar-20 14-Apr-20 20 20 Power Layout(SS&ISH-104_OC3)_U341 [IFC]
ED341EL45050A Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [IFR] 12-Dec-19 A 17-Feb-20 12-Dec-19 17-Jan-20 25 16 Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [IFR]
ED341EL45050B Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [Review-IFR] 18-Feb-20 03-Mar-20 18-Jan-20 01-Feb-20 15 15 Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [Review-IFR]
ED341EL45050G Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [IFC] 04-Mar-20 01-Apr-20 03-Feb-20 28-Feb-20 20 20 Electrical Cable Route Layout(SS&ISH-105_OC4)_U341 [IFC]
ED341EL45055A Power Layout(SS&ISH-105_OC4)_U341 [IFR] 11-Feb-20 16-Mar-20 13-Jan-20 14-Feb-20 25 25 Power Layout(SS&ISH-105_OC4)_U341 [IFR]
ED341EL45055B Power Layout(SS&ISH-105_OC4)_U341 [Review-IFR] 17-Mar-20 31-Mar-20 15-Feb-20 29-Feb-20 15 15 Power Layout(SS&ISH-105_OC4)_U341 [Review-IFR]
ED341EL45055G Power Layout(SS&ISH-105_OC4)_U341 [IFC] 02-Apr-20 30-Apr-20 02-Mar-20 30-Mar-20 20 20 Power Layout(SS&ISH-105_OC4)_U341 [IFC]

Actual Level of Effort Actual Work Critical Remaining Work Page 45 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341EL45100A Electrical Cable Route Layout(ISH-110_OC4)_U341 [IFR] 11-Mar-20 23-Apr-20 06-Jan-20 14-Feb-20 30 30 Electrical Cable Route Layout(ISH-110_OC4)_U341 [IFR]
ED341EL45100B Electrical Cable Route Layout(ISH-110_OC4)_U341 [Review-IFR] 24-Apr-20 08-May-20 15-Feb-20 29-Feb-20 15 15 Electrical Cable Route Layout(ISH-110_OC4)_U341 [Review-IFR]
ED341EL45100G Electrical Cable Route Layout(ISH-110_OC4)_U341 [IFC] 11-May-20 07-Jul-20 02-Mar-20 21-Apr-20 35 35 Electrical Cable Route Layout(ISH-110_OC4)_U341 [IFC]
ED341EL45105A Power Layout(ISH-110_OC4)_U341 [IFR] 09-Apr-20 03-Jun-20 03-Feb-20 13-Mar-20 30 30 Power Layout(ISH-110_OC4)_U341 [IFR]
ED341EL45105B Power Layout(ISH-110_OC4)_U341 [Review-IFR] 04-Jun-20 18-Jun-20 14-Mar-20 28-Mar-20 15 15 Power Layout(ISH-110_OC4)_U341 [Review-IFR]
ED341EL45105G Power Layout(ISH-110_OC4)_U341 [IFC] 24-Jun-20 05-Aug-20 07-Apr-20 29-May-20 30 30 Power Layout(ISH-110_OC4)_U341 [IFC]
ED341EL45151A Electrical Cable Route Layout(Operator Shelter)_U341 [IFR] 08-Jan-20 A 15-Jan-20 A 08-Jan-20 11-Feb-20 25 0 Electrical Cable Route Layout(Operator Shelter)_U341 [IFR]
ED341EL45151B Electrical Cable Route Layout(Operator Shelter)_U341 [Review-IFR] 16-Jan-20 A 10-Feb-20 12-Feb-20 26-Feb-20 15 15 Electrical Cable Route Layout(Operator Shelter)_U341 [Review-IFR]
ED341EL45151G Electrical Cable Route Layout(Operator Shelter)_U341 [IFC] 18-May-20 30-Jun-20 27-Feb-20 02-Apr-20 25 25 Electrical Cable Route Layout(Operator Shelter)_U341 [IFC]
ED341EL45156A Power Layout(Operator Shelter)_U341 [IFR] 27-Jan-20 21-Feb-20 12-Feb-20 10-Mar-20 20 20 Power Layout(Operator Shelter)_U341 [IFR]
ED341EL45156B Power Layout(Operator Shelter)_U341 [Review-IFR] 22-Feb-20 07-Mar-20 11-Mar-20 25-Mar-20 15 15 Power Layout(Operator Shelter)_U341 [Review-IFR]
ED341EL45156G Power Layout(Operator Shelter)_U341 [IFC] 01-Jul-20 05-Aug-20 03-Apr-20 12-May-20 25 25 Power Layout(Operator Shelter)_U341 [IFC]
ED341EL65006A Electrical Cable and Drum Schedule(Offshore)_U341 [IFR] 27-Jan-20 21-Apr-20 30-Sep-19 20-Dec-19 60 60 Electrical Cable and Drum Schedule(Offshore)_U341 [IFR]
ED341EL65006B Electrical Cable and Drum Schedule(Offshore)_U341 [Review-IFR] 22-Apr-20 06-May-20 21-Dec-19 04-Jan-20 15 15 Electrical Cable and Drum Schedule(Offshore)_U341 [Review-IFR]
ED341EL65006G Electrical Cable and Drum Schedule(Offshore)_U341 [IFC] 08-May-20 13-Jul-20 16-Jan-20 11-Mar-20 40 40 Electrical Cable and Drum Schedule(Offshore)_U341 [IFC]
EE000EL75010A Marine Navigation [IFR] 27-Jan-20 03-Feb-20 14-Oct-19 29-Nov-19 6 6 Marine Navigation [IFR]
EE000EL75010B Marine Navigation [Review-IFR] 04-Feb-20 18-Feb-20 30-Nov-19 14-Dec-19 15 15 Marine Navigation [Review-IFR]
EE000EL75010G Marine Navigation [IFD] 19-Feb-20 16-Apr-20 16-Dec-19 11-Feb-20 40 40 Marine Navigation [IFD]
EE323EL45005A Electrical Cable Route Layout(323-JET-001)_U323 [IFR] 20-Dec-19 A 18-Feb-20 25-Nov-19 20-Dec-19 20 17 Electrical Cable Route Layout(323-JET-001)_U323 [IFR]
EE323EL45005B Electrical Cable Route Layout(323-JET-001)_U323 [Review-IFR] 19-Feb-20 04-Mar-20 21-Dec-19 04-Jan-20 15 15 Electrical Cable Route Layout(323-JET-001)_U323 [Review-IFR]
EE323EL45005G Electrical Cable Route Layout(323-JET-001)_U323 [IFC] 15-May-20 22-Jun-20 16-Mar-20 14-Apr-20 20 20 Electrical Cable Route Layout(323-JET-001)_U323 [IFC]
EE323EL45010A Power Layout(323-JET-001)_U323 [IFR] 19-Feb-20 17-Mar-20 23-Dec-19 21-Jan-20 20 20 Power Layout(323-JET-001)_U323 [IFR]
EE323EL45010B Power Layout(323-JET-001)_U323 [Review-IFR] 18-Mar-20 01-Apr-20 22-Jan-20 05-Feb-20 15 15 Power Layout(323-JET-001)_U323 [Review-IFR]
EE323EL45010G Power Layout(323-JET-001)_U323 [IFC] 02-Jun-20 06-Jul-20 23-Mar-20 28-Apr-20 25 25 Power Layout(323-JET-001)_U323 [IFC]
EE323EL45015A Electrical Cable Route Layout_U323 [IFR] [Deleted] 09-Sep-19 A 18-Oct-19 A 09-Sep-19 18-Oct-19 30 0 Electrical Cable Route Layout_U323 [IFR] [Deleted]
EE323EL45015B Electrical Cable Route Layout_U323 [Review-IFR] [Deleted] 19-Oct-19 A 02-Nov-19 A 19-Oct-19 02-Nov-19 15 0 Electrical Cable Route Layout_U323 [Review-IFR] [Deleted]
EE323EL45015G Electrical Cable Route Layout_U323 [IFC] [Deleted] 03-Jun-20 14-Jul-20 02-Mar-20 14-Apr-20 30 30 Electrical Cable Route Layout_U323 [IFC] [Deleted]
EE323EL45020A Power Layout_U323 [IFR] 19-Oct-19 A 29-Jan-20 21-Oct-19 29-Nov-19 30 3 Power Layout_U323 [IFR]
EE323EL45020B Power Layout_U323 [Review-IFR] 30-Jan-20 13-Feb-20 30-Nov-19 14-Dec-19 15 15 Power Layout_U323 [Review-IFR]
EE323EL45020G Power Layout_U323 [IFC] 17-Jun-20 12-Aug-20 16-Mar-20 14-May-20 40 40 Power Layout_U323 [IFC]
EE323EL45025A Electrical Cable Route Layout(Main)_U323 [IFR] 09-Sep-19 A 10-Jan-20 A 09-Sep-19 08-Nov-19 45 0 Electrical Cable Route Layout(Main)_U323 [IFR]
EE323EL45025B Electrical Cable Route Layout(Main)_U323 [Review-IFR] 11-Jan-20 A 24-Jan-20 A 09-Nov-19 23-Nov-19 15 0 Electrical Cable Route Layout(Main)_U323 [Review-IFR]
EE323EL45025G Electrical Cable Route Layout(Main)_U323 [IFC] 03-Jun-20 28-Jul-20 02-Mar-20 28-Apr-20 40 40 Electrical Cable Route Layout(Main)_U323 [IFC]
EE323EL45030A Electrical Main Grounding Wiring Layout_U323 [IFR] 19-Sep-19 A 03-Feb-20 19-Sep-19 06-Nov-19 35 6 Electrical Main Grounding Wiring Layout_U323 [IFR]
EE323EL45030B Electrical Main Grounding Wiring Layout_U323 [Review-IFR] 04-Feb-20 18-Feb-20 07-Nov-19 21-Nov-19 15 15 Electrical Main Grounding Wiring Layout_U323 [Review-IFR]
EE323EL45030G Electrical Main Grounding Wiring Layout_U323 [IFC] 17-Jun-20 12-Aug-20 16-Mar-20 14-May-20 40 40 Electrical Main Grounding Wiring Layout_U323 [IFC]
EE323EL45065A Electrical Cable Route Layout(323-JET-002)_U323 [IFR] 19-Dec-19 A 24-Feb-20 19-Dec-19 24-Feb-20 46 21 Electrical Cable Route Layout(323-JET-002)_U323 [IFR]
EE323EL45065B Electrical Cable Route Layout(323-JET-002)_U323 [Review/Appr.-IFR] 25-Feb-20 10-Mar-20 25-Feb-20 10-Mar-20 15 15 Electrical Cable Route Layout(323-JET-002)_U323 [Review/Appr.-IFR]
EE323EL45065G Electrical Cable Route Layout(323-JET-002)_U323 [IFC] 15-May-20 22-Jun-20 16-Mar-20 14-Apr-20 20 20 Electrical Cable Route Layout(323-JET-002)_U323 [IFC]
EE323EL45070A Power Layout(323-JET-002)_U323 [IFR] 25-Feb-20 30-Apr-20 25-Feb-20 30-Apr-20 46 46 Power Layout(323-JET-002)_U323 [IFR]
EE323EL45070B Power Layout(323-JET-002)_U323 [Review/Appr.-IFR] 01-May-20 15-May-20 01-May-20 15-May-20 15 15 Power Layout(323-JET-002)_U323 [Review/Appr.-IFR]
EE323EL45070G Power Layout(323-JET-002)_U323 [IFC] 23-Jun-20 20-Jul-20 18-May-20 23-Jun-20 20 20 Power Layout(323-JET-002)_U323 [IFC]
Earthing and Grouding 01-Jul-19 A 10-Jul-20 01-Jul-19 03-Jun-20 258 116 10-Jul-20, Earthing and Grouding
EB319EL50005A Earthing and Lightning Protection Layout(Building/Shelter)_U319 [IFR] 17-Feb-20 14-Apr-20 27-Dec-19 21-Feb-20 40 40 Earthing and Lightning Protection Layout(Building/Shelter)_U319 [IFR]
EB319EL50005B Earthing and Lightning Protection Layout(Building/Shelter)_U319 [Review-IFR] 15-Apr-20 29-Apr-20 22-Feb-20 07-Mar-20 15 15 Earthing and Lightning Protection Layout(Building/Shelter)_U319 [Review-IFR]
EB319EL50005G Earthing and Lightning Protection Layout(Building/Shelter)_U319 [IFC] 30-Apr-20 09-Jun-20 09-Mar-20 06-Apr-20 20 20 Earthing and Lightning Protection Layout(Building/Shelter)_U319 [IFC]
EB320EL50005A Earthing and Lightning Protection Layout(Shelter)_U320 [IFR] 23-Mar-20 29-May-20 12-Feb-20 08-Apr-20 40 40 Earthing and Lightning Protection Layout(Shelter)_U320 [IFR]
EB320EL50005B Earthing and Lightning Protection Layout(Shelter)_U320 [Review-IFR] 30-May-20 13-Jun-20 09-Apr-20 23-Apr-20 15 15 Earthing and Lightning Protection Layout(Shelter)_U320 [Review-IFR]
EB320EL50005G Earthing and Lightning Protection Layout(Shelter)_U320 [IFC] 15-Jun-20 10-Jul-20 24-Apr-20 03-Jun-20 20 20 Earthing and Lightning Protection Layout(Shelter)_U320 [IFC]
EC334EL50003A Earthing and Lightning Protection Layout_U334 [IFR] (TBD) 15-Aug-19 A 20-Feb-20 28-Nov-19 24-Jan-20 40 19 Earthing and Lightning Protection Layout_U334 [IFR] (TBD)
EC334EL50003B Earthing and Lightning Protection Layout_U334 [Review-IFR] (TBD) 12-Oct-19 A 05-Mar-20 25-Jan-20 08-Feb-20 15 10 Earthing and Lightning Protection Layout_U334 [Review-IFR] (TBD)
EC334EL50003G Earthing and Lightning Protection Layout_U334 [IFC] (TBD) 06-Mar-20 05-May-20 10-Feb-20 06-Apr-20 40 40 Earthing and Lightning Protection Layout_U334 [IFC] (TBD)
EC334EL50005A Earthing and Lightning Protection Layout(Shlter)_U334 [IFR] 27-Jan-20 20-Mar-20 28-Nov-19 24-Jan-20 40 40 Earthing and Lightning Protection Layout(Shlter)_U334 [IFR]
EC334EL50005B Earthing and Lightning Protection Layout(Shlter)_U334 [Review-IFR] 21-Mar-20 04-Apr-20 25-Jan-20 08-Feb-20 15 15 Earthing and Lightning Protection Layout(Shlter)_U334 [Review-IFR]
EC334EL50005G Earthing and Lightning Protection Layout(Shlter)_U334 [IFC] 06-Apr-20 05-May-20 10-Feb-20 06-Mar-20 20 20 Earthing and Lightning Protection Layout(Shlter)_U334 [IFC]
EC334EL50075A Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [IFR] 03-Feb-20 30-Mar-20 12-Dec-19 07-Feb-20 40 40 Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [IFR]
EC334EL50075B Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [Review-IFR] 31-Mar-20 14-Apr-20 08-Feb-20 22-Feb-20 15 15 Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [Review-IFR]
EC334EL50075G Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [IFC] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Earthing and Lightning Protection Layout(Shlter)(334-CHM-001)_U334 [IFC]
EC335EL50005A Earthing and Lightning Protection Layout(Building/Shelter)_U335 [IFR] 01-Jul-19 A 26-Aug-19 A 01-Jul-19 26-Aug-19 40 0 Earthing and Lightning Protection Layout(Building/Shelter)_U335 [IFR]
EC335EL50005B Earthing and Lightning Protection Layout(Building/Shelter)_U335 [Review-IFR] 27-Aug-19 A 10-Sep-19 A 27-Aug-19 10-Sep-19 15 0 Earthing and Lightning Protection Layout(Building/Shelter)_U335 [Review-IFR]
EC335EL50005G Earthing and Lightning Protection Layout(Building/Shelter)_U335 [IFC] 02-Mar-20 30-Mar-20 17-Jan-20 13-Feb-20 20 20 Earthing and Lightning Protection Layout(Building/Shelter)_U335 [IFC]
EC337EL50005A Earthing and Lightning Protection Layout(Building/Shelter)_U337 [IFR] 05-Dec-19 A 19-Mar-20 05-Dec-19 31-Jan-20 40 39 Earthing and Lightning Protection Layout(Building/Shelter)_U337 [IFR]
EC337EL50005B Earthing and Lightning Protection Layout(Building/Shelter)_U337 [Review-IFR] 20-Mar-20 03-Apr-20 01-Feb-20 15-Feb-20 15 15 Earthing and Lightning Protection Layout(Building/Shelter)_U337 [Review-IFR]
EC337EL50005G Earthing and Lightning Protection Layout(Building/Shelter)_U337 [IFC] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Earthing and Lightning Protection Layout(Building/Shelter)_U337 [IFC]
ED341EL45005A Earthing and Lightning Protection Layout(Overall)_U341 [IFR] 27-Jan-20 03-Apr-20 05-Nov-19 14-Jan-20 49 49 Earthing and Lightning Protection Layout(Overall)_U341 [IFR]
ED341EL45005B Earthing and Lightning Protection Layout(Overall)_U341 [Review-IFR] 04-Apr-20 18-Apr-20 15-Jan-20 29-Jan-20 15 15 Earthing and Lightning Protection Layout(Overall)_U341 [Review-IFR]
ED341EL45005G Earthing and Lightning Protection Layout(Overall)_U341 [IFC] 20-Apr-20 25-Jun-20 30-Jan-20 26-Mar-20 40 40 Earthing and Lightning Protection Layout(Overall)_U341 [IFC]
ED341EL50015A Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [IFR] 31-Oct-19 A 10-Dec-19 A 31-Oct-19 26-Dec-19 40 0 Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [IFR]
ED341EL50015B Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 27-Dec-19 10-Jan-20 15 0 Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [Review-IFR]
ED341EL50015G Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [IFC] 21-Feb-20 19-Mar-20 23-Jan-20 19-Feb-20 20 20 Earthing and Lightning Protection Layout(SS&ISH-103_OC4)_U341 [IFC]
ED341EL50020A Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [IFR] 31-Oct-19 A 10-Dec-19 A 31-Oct-19 26-Dec-19 40 0 Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [IFR]
ED341EL50020B Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 27-Dec-19 10-Jan-20 15 0 Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [Review-IFR]
ED341EL50020G Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [IFC] 24-Feb-20 20-Mar-20 17-Jan-20 13-Feb-20 20 20 Earthing and Lightning Protection Layout(SS&ISH-104_OC4)_U341 [IFC]

Actual Level of Effort Actual Work Critical Remaining Work Page 46 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341EL50025A Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [IFR] 21-Nov-19 A 10-Dec-19 A 21-Nov-19 17-Jan-20 40 0 Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [IFR]
ED341EL50025B Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [Review-IFR] 11-Dec-19 A 31-Dec-19 A 18-Jan-20 01-Feb-20 15 0 Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [Review-IFR]
ED341EL50025G Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [IFC] 02-Mar-20 30-Mar-20 03-Feb-20 28-Feb-20 20 20 Earthing and Lightning Protection Layout(SS&ISH-105_OC4)_U341 [IFC]
ED341EL50050A Earthing and Lightning Protection Layout(ISH-110)_U341 [IFR] 26-Feb-20 23-Apr-20 19-Dec-19 14-Feb-20 40 40 Earthing and Lightning Protection Layout(ISH-110)_U341 [IFR]
ED341EL50050B Earthing and Lightning Protection Layout(ISH-110)_U341 [Review-IFR] 24-Apr-20 08-May-20 15-Feb-20 29-Feb-20 15 15 Earthing and Lightning Protection Layout(ISH-110)_U341 [Review-IFR]
ED341EL50050G Earthing and Lightning Protection Layout(ISH-110)_U341 [IFC] 11-May-20 16-Jun-20 09-Mar-20 06-Apr-20 20 20 Earthing and Lightning Protection Layout(ISH-110)_U341 [IFC]
ED341EL50075A Earthing and Lightning Protection Layout(Operator Shelter)_U341 [IFR] 23-Jul-19 A 17-Sep-19 A 09-Dec-19 04-Feb-20 40 0 Earthing and Lightning Protection Layout(Operator Shelter)_U341 [IFR]
ED341EL50075B Earthing and Lightning Protection Layout(Operator Shelter)_U341 [Review-IFR] 17-Sep-19 A 10-Feb-20 05-Feb-20 19-Feb-20 15 15 Earthing and Lightning Protection Layout(Operator Shelter)_U341 [Review-IFR]
ED341EL50075G Earthing and Lightning Protection Layout(Operator Shelter)_U341 [IFC] 07-Oct-19 A 03-Apr-20 20-Feb-20 18-Mar-20 20 20 Earthing and Lightning Protection Layout(Operator Shelter)_U341 [IFC]
EE000EL50241A MR(Grounding & Lightning Materials) [IFQ] 18-Jul-19 A 01-Aug-19 A 12-Sep-19 27-Sep-19 12 0 MR(Grounding & Lightning Materials) [IFQ]
EE000EL50241A_UOP
MR(Grounding & Lightning Materials) [IFQ] [Added] 18-Jul-19 A 01-Aug-19 A 12 0 MR(Grounding & Lightning Materials) [IFQ] [Added]
EE000EL50241B MR(Grounding & Lightning Materials) [Review/Approval] 02-Aug-19 A 16-Aug-19 A 30-Sep-19 11-Oct-19 10 0 MR(Grounding & Lightning Materials) [Review/Approval]
EE000EL50241B_UOP
MR(Grounding & Lightning Materials) [Review/Approval] [Added] 02-Aug-19 A 16-Aug-19 A 10 0 MR(Grounding & Lightning Materials) [Review/Approval] [Added]
EE000EL50241G MR(Grounding & Lightning Materials) [IFP] 19-Aug-19 A 21-Feb-20 21-Nov-19 04-Dec-19 10 20 MR(Grounding & Lightning Materials) [IFP]
EE000EL50241G_UOP
MR(Grounding & Lightning Materials) [IFP] [Added] 06-Apr-20 20-Apr-20 10 10 MR(Grounding & Lightning Materials) [IFP] [Added]
EE000EL50242A TBE(Grounding & Lightning Materials) [IFP] 13-Aug-19 A 19-Nov-19 A 23-Oct-19 05-Nov-19 10 0 TBE(Grounding & Lightning Materials) [IFP]
EE000EL50242A_UOP
TBE(Grounding & Lightning Materials) [IFP] [Added] 13-Aug-19 A 19-Nov-19 A 10 0 TBE(Grounding & Lightning Materials) [IFP] [Added]
EE000EL50242B TBE(Grounding & Lightning Materials) [Review/Approval] 20-Nov-19 A 10-Dec-19 A 06-Nov-19 20-Nov-19 15 0 TBE(Grounding & Lightning Materials) [Review/Approval]
EE000EL50242B_UOP
TBE(Grounding & Lightning Materials) [Review/Approval] [Added] 20-Nov-19 A 03-Apr-20 15 4 TBE(Grounding & Lightning Materials) [Review/Approval] [Added]
EE323EL50005A Earthing and Lightning Protection Layout(Building/Shelter)_U323 [IFR] 20-Dec-19 A 17-Feb-20 19-Dec-19 14-Feb-20 40 16 Earthing and Lightning Protection Layout(Building/Shelter)_U323 [IFR]
EE323EL50005B Earthing and Lightning Protection Layout(Building/Shelter)_U323 [Review-IFR] 18-Feb-20 03-Mar-20 15-Feb-20 29-Feb-20 15 15 Earthing and Lightning Protection Layout(Building/Shelter)_U323 [Review-IFR]
EE323EL50005G Earthing and Lightning Protection Layout(Building/Shelter)_U323 [IFC] 15-May-20 22-Jun-20 16-Mar-20 14-Apr-20 20 20 Earthing and Lightning Protection Layout(Building/Shelter)_U323 [IFC]
EE323EL50010A Earthing and Lightning Protection Layout_U323 [IFR] 15-Aug-19 A 10-Feb-20 15-Aug-19 09-Oct-19 47 11 Earthing and Lightning Protection Layout_U323 [IFR]
EE323EL50010B Earthing and Lightning Protection Layout_U323 [Review-IFR] 11-Feb-20 25-Feb-20 10-Oct-19 24-Oct-19 15 15 Earthing and Lightning Protection Layout_U323 [Review-IFR]
EE323EL50010G Earthing and Lightning Protection Layout_U323 [IFC] 29-Apr-20 06-Jul-20 02-Mar-20 28-Apr-20 40 40 Earthing and Lightning Protection Layout_U323 [IFC]
Lighting 21-Sep-19 A 07-Dec-20 30-Sep-19 07-Jul-20 271 218 07-Dec-20, Lighting
EB319EL60005A Lighting and Small Power Layout(Building/Shelter)_U319 [IFR] 31-Mar-20 28-Apr-20 10-Feb-20 06-Mar-20 20 20 Lighting and Small Power Layout(Building/Shelter)_U319 [IFR]
EB319EL60005B Lighting and Small Power Layout(Building/Shelter)_U319 [Review-IFR] 29-Apr-20 13-May-20 07-Mar-20 21-Mar-20 15 15 Lighting and Small Power Layout(Building/Shelter)_U319 [Review-IFR]
EB319EL60005G Lighting and Small Power Layout(Building/Shelter)_U319 [IFC] 18-May-20 23-Jun-20 23-Mar-20 21-Apr-20 20 20 Lighting and Small Power Layout(Building/Shelter)_U319 [IFC]
EB320EL60005A Lighting and Small Power Layout(Shelter)_U320 [IFR] 26-Feb-20 16-Apr-20 01-Nov-19 19-Dec-19 35 35 Lighting and Small Power Layout(Shelter)_U320 [IFR]
EB320EL60005B Lighting and Small Power Layout(Shelter)_U320 [Review-IFR] 17-Apr-20 01-May-20 20-Dec-19 03-Jan-20 15 15 Lighting and Small Power Layout(Shelter)_U320 [Review-IFR]
EB320EL60005G Lighting and Small Power Layout(Shelter)_U320 [IFC] 13-Jul-20 02-Sep-20 29-Apr-20 29-Jun-20 35 35 Lighting and Small Power Layout(Shelter)_U320 [IFC]
EC334EL60005A Lighting and Small Power Layout(Building/Shelter)_U334 [IFR] 16-Mar-20 14-Apr-20 10-Feb-20 06-Mar-20 20 20 Lighting and Small Power Layout(Building/Shelter)_U334 [IFR]
EC334EL60005B Lighting and Small Power Layout(Building/Shelter)_U334 [Review-IFR] 15-Apr-20 29-Apr-20 07-Mar-20 21-Mar-20 15 15 Lighting and Small Power Layout(Building/Shelter)_U334 [Review-IFR]
EC334EL60005G Lighting and Small Power Layout(Building/Shelter)_U334 [IFC] 26-Oct-20 23-Nov-20 15-Apr-20 14-May-20 20 20 Lighting and Small Power Layout(Building/Shelter)_U334 [IFC]
EC334EL60105A Lighting and Small Power Layout(Shelter)(334-CHM-001)_U334 [IFR] 24-Jun-20 14-Jul-20 22-Apr-20 14-May-20 15 15 Lighting and Small Power Layout(Shelter)(334-CHM-001)_U334 [IFR]
EC334EL60105B Lighting and Small Power Layout(Shelter)(334-CHM-001)_U334 [Review-IFR] 15-Jul-20 29-Jul-20 15-May-20 29-May-20 15 15 Lighting and Small Power Layout(Shelter)(334-CHM-001)_U334 [Review-IFR]
EC334EL60105G Lighting and Small Power Layout(Shelter(334-CHM-001)_U334 [IFC] 10-Nov-20 07-Dec-20 02-Jun-20 29-Jun-20 20 20 Lighting and Small Power Layout(Shelter(334-CHM-001)_U334 [IFC]
EC335EL60005A Lighting and Small Power Layout(Shelter)_U335 [IFR] 04-Nov-19 A 29-Nov-19 A 04-Nov-19 29-Nov-19 20 0 Lighting and Small Power Layout(Shelter)_U335 [IFR]
EC335EL60005B Lighting and Small Power Layout(Shelter)_U335 [Review-IFR] 30-Nov-19 A 09-Feb-20 30-Nov-19 14-Dec-19 15 15 Lighting and Small Power Layout(Shelter)_U335 [Review-IFR]
EC335EL60005G Lighting and Small Power Layout(Shelter)_U335 [IFC] 24-Jul-20 25-Aug-20 29-Apr-20 08-Jun-20 20 20 Lighting and Small Power Layout(Shelter)_U335 [IFC]
EC337EL60005A Lighting and Small Power Layout(Building/Shelter)_U337 [IFR] 21-Apr-20 05-Jun-20 02-Mar-20 06-Apr-20 25 25 Lighting and Small Power Layout(Building/Shelter)_U337 [IFR]
EC337EL60005B Lighting and Small Power Layout(Building/Shelter)_U337 [Review-IFR] 06-Jun-20 20-Jun-20 07-Apr-20 21-Apr-20 15 15 Lighting and Small Power Layout(Building/Shelter)_U337 [Review-IFR]
EC337EL60005G Lighting and Small Power Layout(Building/Shelter)_U337 [IFC] 14-Oct-20 11-Nov-20 15-May-20 22-Jun-20 20 20 Lighting and Small Power Layout(Building/Shelter)_U337 [IFC]
ED341EL45171A Panel board Schedule_U341 [IFR] 04-Jun-20 15-Jul-20 17-Feb-20 30-Mar-20 30 30 Panel board Schedule_U341 [IFR]
ED341EL45171B Panel board Schedule_U341 [Review-IFR] 16-Jul-20 30-Jul-20 31-Mar-20 14-Apr-20 15 15 Panel board Schedule_U341 [Review-IFR]
ED341EL45171G Panel board Schedule_U341 [IFC] 03-Aug-20 22-Sep-20 15-Apr-20 15-Jun-20 35 35 Panel board Schedule_U341 [IFC]
ED341EL60015A Lighting and Small Power Layout(SS&ISH-103)_U341 [IFR] 27-Dec-19 A 14-Jan-20 A 27-Dec-19 07-Feb-20 30 0 Lighting and Small Power Layout(SS&ISH-103)_U341 [IFR]
ED341EL60015B Lighting and Small Power Layout(SS&ISH-103)_U341 [Review-IFR] 15-Jan-20 A 10-Apr-20 08-Feb-20 22-Feb-20 15 15 Lighting and Small Power Layout(SS&ISH-103)_U341 [Review-IFR]
ED341EL60015G Lighting and Small Power Layout(SS&ISH-103)_U341 [IFC] 01-Jul-20 12-Aug-20 31-Mar-20 14-May-20 30 30 Lighting and Small Power Layout(SS&ISH-103)_U341 [IFC]
ED341EL60020A Lighting and Small Power Layout(SS&ISH-104)_U341 [IFR] 27-Dec-19 A 17-Jan-20 A 27-Dec-19 07-Feb-20 30 0 Lighting and Small Power Layout(SS&ISH-104)_U341 [IFR]
ED341EL60020B Lighting and Small Power Layout(SS&ISH-104)_U341 [Review-IFR] 18-Jan-20 A 18-Jan-20 A 08-Feb-20 22-Feb-20 15 0 Lighting and Small Power Layout(SS&ISH-104)_U341 [Review-IFR]
ED341EL60020G Lighting and Small Power Layout(SS&ISH-104)_U341 [IFC] 01-Jul-20 12-Aug-20 31-Mar-20 14-May-20 30 30 Lighting and Small Power Layout(SS&ISH-104)_U341 [IFC]
ED341EL60025A Lighting and Small Power Layout(SS&ISH-105)_U341 [IFR] 20-Jan-20 A 23-Jan-20 A 20-Jan-20 28-Feb-20 30 0 Lighting and Small Power Layout(SS&ISH-105)_U341 [IFR]
ED341EL60025B Lighting and Small Power Layout(SS&ISH-105)_U341 [Review-IFR] 24-Jan-20 A 15-Apr-20 29-Feb-20 14-Mar-20 15 15 Lighting and Small Power Layout(SS&ISH-105)_U341 [Review-IFR]
ED341EL60025G Lighting and Small Power Layout(SS&ISH-105)_U341 [IFC] 16-Apr-20 09-Jun-20 16-Mar-20 28-Apr-20 30 30 Lighting and Small Power Layout(SS&ISH-105)_U341 [IFC]
ED341EL60050A Lighting and Small Power Layout(ISH-110)_U341 [IFR] 12-May-20 01-Jul-20 02-Mar-20 14-Apr-20 30 30 Lighting and Small Power Layout(ISH-110)_U341 [IFR]
ED341EL60050B Lighting and Small Power Layout(ISH-110)_U341 [Review-IFR] 02-Jul-20 16-Jul-20 15-Apr-20 29-Apr-20 15 15 Lighting and Small Power Layout(ISH-110)_U341 [Review-IFR]
ED341EL60050G Lighting and Small Power Layout(ISH-110)_U341 [IFC] 22-Jul-20 04-Sep-20 08-May-20 29-Jun-20 30 30 Lighting and Small Power Layout(ISH-110)_U341 [IFC]
ED341EL60075A Lighting and Small Power Layout(Operator Shelter)_U341 [IFR] 21-Sep-19 A 21-Oct-19 A 26-Feb-20 24-Mar-20 20 0 Lighting and Small Power Layout(Operator Shelter)_U341 [IFR]
ED341EL60075B Lighting and Small Power Layout(Operator Shelter)_U341 [Review-IFR] 03-Oct-19 A 12-Nov-19 A 25-Mar-20 08-Apr-20 15 0 Lighting and Small Power Layout(Operator Shelter)_U341 [Review-IFR]
ED341EL60075G Lighting and Small Power Layout(Operator Shelter)_U341 [IFC] 08-Nov-19 A 21-Aug-20 20-Apr-20 04-Jun-20 25 116 Lighting and Small Power Layout(Operator Shelter)_U341 [IFC]
ED341EL60080A Lighting & Receptacles Connection Diagram for Building_U341 [IFR] 31-Mar-20 29-May-20 12-Feb-20 01-Apr-20 35 35 Lighting & Receptacles Connection Diagram for Building_U341 [IFR]
ED341EL60080B Lighting & Receptacles Connection Diagram for Building_U341 [Review-IFR] 30-May-20 13-Jun-20 02-Apr-20 16-Apr-20 15 15 Lighting & Receptacles Connection Diagram for Building_U341 [Review-IFR]
ED341EL60080G Lighting & Receptacles Connection Diagram for Building_U341 [IFC] 15-Jun-20 10-Aug-20 17-Apr-20 24-Jun-20 40 40 Lighting & Receptacles Connection Diagram for Building_U341 [IFC]
ED341EL60085A Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [IFR] 31-Mar-20 14-May-20 12-Feb-20 24-Mar-20 30 30 Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [IFR]
ED341EL60085B Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [Review-IFR] 15-May-20 29-May-20 25-Mar-20 08-Apr-20 15 15 Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [Review-IFR]
ED341EL60085G Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [IFC] 02-Jun-20 20-Jul-20 09-Apr-20 10-Jun-20 35 35 Lighting & Receptacle Panel Schedule for (Building Utilities)_U341 [IFC]
EE000EL60005A Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [IFQ] 30-Sep-19 A 06-Nov-19 A 30-Sep-19 18-Oct-19 15 0 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [IFQ]
EE000EL60005B Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [Review-IFQ] 07-Nov-19 A 21-Nov-19 A 19-Oct-19 02-Nov-19 15 0 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [Review-IFQ]
EE000EL60005G Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [IFP] 03-Feb-20 05-Feb-20 28-Nov-19 11-Dec-19 3 3 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) MR [IFP]
EE000EL60006A TBE(Lighting Fixture (Indoor & Outdoor - Weather Proof Type)) [IFP] 04-Jan-20 A 31-Jan-20 11-Nov-19 27-Nov-19 13 5 TBE(Lighting Fixture (Indoor & Outdoor - Weather Proof Type)) [IFP]
EE000EL60006B TBE(Lighting Fixture (Indoor & Outdoor - Weather Proof Type)) [Review-IFP] 01-Feb-20 15-Feb-20 28-Nov-19 12-Dec-19 15 15 TBE(Lighting Fixture (Indoor & Outdoor - Weather Proof Type)) [Review-IFP]

Actual Level of Effort Actual Work Critical Remaining Work Page 47 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE000EL60051A MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFQ] 30-Sep-19 A 06-Nov-19 A 30-Sep-19 18-Oct-19 15 0 MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFQ]
EE000EL60051B MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [Approved-IFQ] 07-Nov-19 A 21-Nov-19 A 19-Oct-19 02-Nov-19 15 0 MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [Approved-IFQ]
EE000EL60051G MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFP] 09-Mar-20 20-Mar-20 09-Dec-19 20-Dec-19 10 10 MR(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFP]
EE000EL60052A TBE(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFP] 17-Jan-20 A 20-Feb-20 11-Nov-19 22-Nov-19 10 19 TBE(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [IFP]
EE000EL60052B TBE(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [Approved-IFP] 21-Feb-20 06-Mar-20 23-Nov-19 07-Dec-19 15 15 TBE(LV Power Dist. Panel Board (Indoor & Weather Proof Type)) [Approved-IFP]
EE323EL60005A Lighting and Small Power Layout(323-JET-001)_U323 [IFR] 04-Mar-20 01-Apr-20 08-Jan-20 04-Feb-20 20 20 Lighting and Small Power Layout(323-JET-001)_U323 [IFR]
EE323EL60005B Lighting and Small Power Layout(323-JET-001)_U323 [Review-IFR] 02-Apr-20 16-Apr-20 05-Feb-20 19-Feb-20 15 15 Lighting and Small Power Layout(323-JET-001)_U323 [Review-IFR]
EE323EL60005G Lighting and Small Power Layout(323-JET-001)_U323 [IFC] 16-Jun-20 20-Jul-20 07-Apr-20 14-May-20 25 25 Lighting and Small Power Layout(323-JET-001)_U323 [IFC]
EE323EL60010A Lighting and Small Power Layout_U323 [IFR] 05-Feb-20 12-Feb-20 04-Nov-19 13-Dec-19 6 6 Lighting and Small Power Layout_U323 [IFR]
EE323EL60010B Lighting and Small Power Layout_U323 [Review-IFR] 13-Feb-20 27-Feb-20 14-Dec-19 28-Dec-19 15 15 Lighting and Small Power Layout_U323 [Review-IFR]
EE323EL60010G Lighting and Small Power Layout_U323 [IFC] 01-Jul-20 28-Aug-20 31-Mar-20 08-Jun-20 40 40 Lighting and Small Power Layout_U323 [IFC]
EE323EL60025A Lighting and Small Power Layout(323-JET-002)_U323 [IFR] 10-Mar-20 18-May-20 10-Mar-20 18-May-20 46 46 Lighting and Small Power Layout(323-JET-002)_U323 [IFR]
EE323EL60025B Lighting and Small Power Layout(323-JET-002)_U323 [Review/Appr.-IFR] 19-May-20 02-Jun-20 19-May-20 02-Jun-20 15 15 Lighting and Small Power Layout(323-JET-002)_U323 [Review/Appr.-IFR]
EE323EL60025G Lighting and Small Power Layout(323-JET-002)_U323 [IFC] 07-Jul-20 04-Aug-20 10-Jun-20 07-Jul-20 20 20 Lighting and Small Power Layout(323-JET-002)_U323 [IFC]
Communication 13-Oct-19 A 09-Oct-20 11-Nov-19 20-Jul-20 218 177 09-Oct-20, Communication
ED341EL65020A Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [IFR] 21-Nov-19 A 10-Dec-19 A 21-Nov-19 24-Jan-20 45 0 Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [IFR]
ED341EL65020B Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 25-Jan-20 08-Feb-20 15 0 Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [Approved-IFR]
ED341EL65020G Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [IFC] 24-Dec-19 A 28-Jul-20 17-Feb-20 28-Apr-20 50 88 Telecom/Security/PAGA System Layout(SS&ISH-103)_U341 [IFC]
ED341EL65025A Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [IFR] 13-Oct-19 A 10-Dec-19 A 28-Nov-19 24-Jan-20 40 0 Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [IFR]
ED341EL65025B Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 25-Jan-20 08-Feb-20 15 0 Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [Approved-IFR]
ED341EL65025G Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [IFC] 24-Dec-19 A 28-Jul-20 02-Mar-20 28-Apr-20 40 88 Telecom/Security/PAGA System Layout(SS&ISH-104)_U341 [IFC]
ED341EL65030A Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [IFR] 13-Oct-19 A 10-Dec-19 A 12-Dec-19 14-Feb-20 45 0 Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [IFR]
ED341EL65030B Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [Approved-IFR] 11-Dec-19 A 24-Dec-19 A 15-Feb-20 29-Feb-20 15 0 Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [Approved-IFR]
ED341EL65030G Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [IFC] 24-Dec-19 A 30-Apr-20 02-Mar-20 14-May-20 50 31 Telecom/Security/PAGA System Layout(SS&ISH-105)_U341 [IFC]
ED341EL65055A Telecom/Security/PAGA System Layout(ISH-110)_U341 [IFR] 02-Apr-20 03-Jun-20 27-Jan-20 13-Mar-20 35 35 Telecom/Security/PAGA System Layout(ISH-110)_U341 [IFR]
ED341EL65055B Telecom/Security/PAGA System Layout(ISH-110)_U341 [Approved-IFR] 04-Jun-20 18-Jun-20 14-Mar-20 28-Mar-20 15 15 Telecom/Security/PAGA System Layout(ISH-110)_U341 [Approved-IFR]
ED341EL65055G Telecom/Security/PAGA System Layout(ISH-110)_U341 [IFC] 19-Jun-20 07-Aug-20 31-Mar-20 29-May-20 35 35 Telecom/Security/PAGA System Layout(ISH-110)_U341 [IFC]
ED341EL65135A Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [IFR] 18-Oct-19 A 10-Dec-19 A 07-Jan-20 10-Mar-20 46 0 Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [IFR]
ED341EL65135B Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [Review/Appr.-IFR] 11-Dec-19 A 23-Dec-19 A 11-Mar-20 25-Mar-20 15 0 Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [Review/Appr.-IFR]
ED341EL65135G Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [IFC] 24-Dec-19 A 28-Jul-20 26-Mar-20 11-May-20 30 101 Telecom/Security/PAGA System Layout(Operator Shelter)_U341 [IFC]
EE323EL65005A Telecom/Security/PAGA System Layout_U323 [IFR] 11-Nov-19 A 12-Feb-20 11-Nov-19 14-Jan-20 45 13 Telecom/Security/PAGA System Layout_U323 [IFR]
EE323EL65005B Telecom/Security/PAGA System Layout_U323 [Review-IFR] 13-Feb-20 27-Feb-20 15-Jan-20 29-Jan-20 15 15 Telecom/Security/PAGA System Layout_U323 [Review-IFR]
EE323EL65005G Telecom/Security/PAGA System Layout_U323 [IFC] 13-Aug-20 09-Oct-20 15-May-20 20-Jul-20 40 40 Telecom/Security/PAGA System Layout_U323 [IFC]
Fire Alarm 05-Aug-19 A 09-Oct-20 10-Sep-19 20-Jul-20 280 177 09-Oct-20, Fire Alarm
ED000EL68005A Block Diagram for Fire Alarm System - Balikpapan Refinery [IFR] 08-Aug-19 A 21-Aug-19 A 10-Sep-19 07-Oct-19 20 0 Block Diagram for Fire Alarm System - Balikpapan Refinery [IFR]
ED000EL68005B Block Diagram for Fire Alarm System - Balikpapan Refinery [IReview/Appr.-IFR] 22-Aug-19 A 24-Oct-19 A 08-Oct-19 28-Oct-19 15 0 Block Diagram for Fire Alarm System - Balikpapan Refinery [IReview/Appr.-IFR]
ED000EL68005G Block Diagram for Fire Alarm System - Balikpapan Refinery [IFC] 25-Oct-19 A 03-Jan-20 A 30-Oct-19 26-Nov-19 20 0 Block Diagram for Fire Alarm System - Balikpapan Refinery [IFC]
ED323EL68005A Fire Alarm System Index and I/O Schedule Unit 323 [IFR] 18-Nov-19 A 12-Feb-20 18-Nov-19 14-Jan-20 40 13 Fire Alarm System Index and I/O Schedule Unit 323 [IFR]
ED323EL68005B Fire Alarm System Index and I/O Schedule Unit 323 [Review/Appr.-IFR] 13-Feb-20 04-Mar-20 15-Jan-20 04-Feb-20 15 15 Fire Alarm System Index and I/O Schedule Unit 323 [Review/Appr.-IFR]
ED323EL68005G Fire Alarm System Index and I/O Schedule Unit 323 [IFC] 13-Aug-20 09-Oct-20 15-May-20 20-Jul-20 40 40 Fire Alarm System Index and I/O Schedule Unit 323 [IFC]
ED341EL68210A Fire Alarm Layout(Operator Shelter)_U341 [IFR] [Deleted] 27-Jan-20 31-Mar-20 12-Feb-20 17-Apr-20 46 46 Fire Alarm Layout(Operator Shelter)_U341 [IFR] [Deleted]
ED341EL68210B Fire Alarm Layout(Operator Shelter)_U341 [Review/Appr.-IFR] [Deleted] 01-Apr-20 15-Apr-20 18-Apr-20 02-May-20 15 15 Fire Alarm Layout(Operator Shelter)_U341 [Review/Appr.-IFR] [Deleted]
ED341EL68210G Fire Alarm Layout(Operator Shelter)_U341 [IFC] [Deleted] 01-Jul-20 28-Jul-20 04-May-20 10-Jun-20 20 20 Fire Alarm Layout(Operator Shelter)_U341 [IFC] [Deleted]
EE000EL68111A MR(Fire Alarm System) [IFQ] 05-Aug-19 A 20-Aug-19 A 24-Sep-19 09-Oct-19 12 0 MR(Fire Alarm System) [IFQ]
EE000EL68111A_UOP
MR(Fire Alarm System) [IFQ] [Added] 05-Aug-19 A 20-Aug-19 A 12 0 MR(Fire Alarm System) [IFQ] [Added]
EE000EL68111B MR(Fire Alarm System) [Review/Approval] 21-Aug-19 A 04-Sep-19 A 10-Oct-19 30-Oct-19 15 0 MR(Fire Alarm System) [Review/Approval]
EE000EL68111B_UOP
MR(Fire Alarm System) [Review/Approval] [Added] 21-Aug-19 A 04-Sep-19 A 15 0 MR(Fire Alarm System) [Review/Approval] [Added]
EE000EL68111G MR(Fire Alarm System) [IFP] 23-Mar-20 06-Apr-20 06-Dec-19 19-Dec-19 10 10 MR(Fire Alarm System) [IFP]
EE000EL68111G_UOP
MR(Fire Alarm System) [IFP] [Added] 03-Sep-20 16-Sep-20 10 10 MR(Fire Alarm System) [IFP] [Added]
EE000EL68112A TBE(Fire Alarm System) [IFP] 12-Nov-19 A 31-Jan-20 05-Nov-19 18-Nov-19 10 5 TBE(Fire Alarm System) [IFP]
EE000EL68112A_UOP
TBE(Fire Alarm System) [IFP] [Added] 12-Nov-19 A 10-Jul-20 10 109 TBE(Fire Alarm System) [IFP] [Added]
EE000EL68112B TBE(Fire Alarm System) [Review/Approval] 03-Feb-20 19-Feb-20 19-Nov-19 05-Dec-19 13 13 TBE(Fire Alarm System) [Review/Approval]
EE000EL68112B_UOP
TBE(Fire Alarm System) [Review/Approval] [Added] 13-Jul-20 29-Jul-20 13 13 TBE(Fire Alarm System) [Review/Approval] [Added]
EE323EL68005A Fire Alarm Layout_U323 [IFR] [Deleted] 18-Nov-19 A 12-Feb-20 18-Nov-19 14-Jan-20 40 13 Fire Alarm Layout_U323 [IFR] [Deleted]
EE323EL68005B Fire Alarm Layout_U323 [Review-IFR] [Deleted] 13-Feb-20 27-Feb-20 15-Jan-20 29-Jan-20 15 15 Fire Alarm Layout_U323 [Review-IFR] [Deleted]
EE323EL68005G Fire Alarm Layout_U323 [IFC] [Deleted] 13-Aug-20 09-Oct-20 15-May-20 20-Jul-20 40 40 Fire Alarm Layout_U323 [IFC] [Deleted]
Others 05-Dec-19 A 20-Mar-20 11-Nov-19 05-Feb-20 59 30 20-Mar-20, Others
EE000EL75005A Berthing Aid System (For Jetty Only) MR [IFQ] 05-Dec-19 A 24-Dec-19 A 11-Nov-19 29-Nov-19 15 0 Berthing Aid System (For Jetty Only) MR [IFQ]
EE000EL75005B Berthing Aid System (For Jetty Only) MR [Review/Approval] 25-Dec-19 A 15-Jan-20 A 30-Nov-19 14-Dec-19 15 0 Berthing Aid System (For Jetty Only) MR [Review/Approval]
EE000EL75005G Berthing Aid System (For Jetty Only) MR [IFP] 09-Mar-20 20-Mar-20 23-Jan-20 05-Feb-20 10 10 Berthing Aid System (For Jetty Only) MR [IFP]
EE000EL75006A TBE(Berthing Aid System (For Jetty Only)) [IFP] 10-Feb-20 21-Feb-20 23-Dec-19 07-Jan-20 10 10 TBE(Berthing Aid System (For Jetty Only)) [IFP]
EE000EL75006B TBE(Berthing Aid System (For Jetty Only)) [Review/Approval] 22-Feb-20 07-Mar-20 08-Jan-20 22-Jan-20 15 15 TBE(Berthing Aid System (For Jetty Only)) [Review/Approval]
Instrumentation & Control 03-Mar-19 A 19-Jan-21 12-Jun-19 30-Oct-20 402 247 19-Jan-21, Instrumentation & Control
General & Specification 03-Mar-19 A 06-Jan-20 A 12-Jun-19 06-Jan-20 154 0 06-Jan-20 A, General & Specification
EB319IC00005A Specification for Single Loop Control_U319 [IFR] [Deleted] 03-Mar-19 A 28-May-19 A 12-Jun-19 14-Aug-19 45 0 Specification for Single Loop Control_U319 [IFR] [Deleted]
EB319IC00005B Specification for Single Loop Control_U319 [Review-IFR] [Deleted] 29-May-19 A 29-Aug-19 A 15-Aug-19 28-Aug-19 14 0 Specification for Single Loop Control_U319 [Review-IFR] [Deleted]
EB319IC00005G Specification for Single Loop Control_U319 [AFD] [Deleted] 17-Jun-19 A 06-Nov-19 A 29-Aug-19 06-Nov-19 50 0 Specification for Single Loop Control_U319 [AFD] [Deleted]
EE000IC00005A Specification for Metering System_U323 [IFR] 01-May-19 A 28-May-19 A 12-Jun-19 23-Jul-19 30 0 Specification for Metering System_U323 [IFR]
EE000IC00005B Specification for Metering System_U323 [Review-IFR] 29-May-19 A 19-Jun-19 A 24-Jul-19 07-Aug-19 15 0 Specification for Metering System_U323 [Review-IFR]
EE000IC00005G Specification for Metering System_U323 [IFC] 20-Jun-19 A 31-Jul-19 A 08-Aug-19 26-Sep-19 35 0 Specification for Metering System_U323 [IFC]
EE000IC00010A Specification for Oil Movements System_U323 [IFR] [Deleted] 12-Jun-19 A 14-Aug-19 A 12-Jun-19 14-Aug-19 45 0 Specification for Oil Movements System_U323 [IFR] [Deleted]
EE000IC00010B Specification for Oil Movements System_U323 [Review-IFR] [Deleted] 15-Aug-19 A 29-Aug-19 A 15-Aug-19 28-Aug-19 14 0 Specification for Oil Movements System_U323 [Review-IFR] [Deleted]
EE000IC00010G Specification for Oil Movements System_U323 [AFD] [Deleted] 08-Nov-19 A 06-Jan-20 A 08-Nov-19 06-Jan-20 40 0 Specification for Oil Movements System_U323 [AFD] [Deleted]
Summary / Report / Study 31-Mar-20 13-Jul-20 03-Feb-20 13-May-20 72 72 13-Jul-20, Summary / Report / Study

Actual Level of Effort Actual Work Critical Remaining Work Page 48 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323IC15005A Instrument Alarm Setpoint Summary_U323 [IFR] 31-Mar-20 14-May-20 03-Feb-20 13-Mar-20 30 30 Instrument Alarm Setpoint Summary_U323 [IFR]
EE323IC15005B Instrument Alarm Setpoint Summary_U323 [Review-IFR] 15-May-20 29-May-20 14-Mar-20 28-Mar-20 15 15 Instrument Alarm Setpoint Summary_U323 [Review-IFR]
EE323IC15005G Instrument Alarm Setpoint Summary_U323 [AFD] 02-Jun-20 13-Jul-20 30-Mar-20 13-May-20 30 30 Instrument Alarm Setpoint Summary_U323 [AFD]
EE323IC15010A Instrument Index and I/O Schedule_U323 [IFR] 31-Mar-20 14-May-20 03-Feb-20 13-Mar-20 30 30 Instrument Index and I/O Schedule_U323 [IFR]
EE323IC15010B Instrument Index and I/O Schedule_U323 [Review-IFR] 15-May-20 29-May-20 14-Mar-20 28-Mar-20 15 15 Instrument Index and I/O Schedule_U323 [Review-IFR]
EE323IC15010G Instrument Index and I/O Schedule_U323 [AFD] 02-Jun-20 13-Jul-20 30-Mar-20 13-May-20 30 30 Instrument Index and I/O Schedule_U323 [AFD]
Logic / Loop Diagram 15-Jul-20 09-Oct-20 22-Apr-20 27-Jul-20 60 60 09-Oct-20, Logic / Loop Diagram
EE323IC20005G Instrument Loop Diagram_U323 [IFC] 15-Jul-20 09-Oct-20 22-Apr-20 27-Jul-20 60 60 Instrument Loop Diagram_U323 [IFC]
Installation Details 26-Aug-19 A 01-Oct-20 08-Jan-20 27-Jul-20 164 98 01-Oct-20, Installation Details
EE323IC25005A Instrument Hook-Up Drawing_U323 [IFR] 15-May-20 20-Jul-20 16-Mar-20 14-May-20 40 40 Instrument Hook-Up Drawing_U323 [IFR]
EE323IC25005B Instrument Hook-Up Drawing_U323 [Review-IFR] 21-Jul-20 04-Aug-20 15-May-20 29-May-20 15 15 Instrument Hook-Up Drawing_U323 [Review-IFR]
EE323IC25005G Instrument Hook-Up Drawing_U323 [IFC] 05-Aug-20 01-Oct-20 02-Jun-20 27-Jul-20 40 40 Instrument Hook-Up Drawing_U323 [IFC]
EE323IC25010G Instrument Level Setting Diagram_U323 [IFI] 26-Aug-19 A 13-Sep-19 A 08-Jan-20 01-Apr-20 60 0 Instrument Level Setting Diagram_U323 [IFI]
Instrument Location Plan 15-Aug-19 A 29-Jun-20 15-Aug-19 28-Apr-20 59 9 29-Jun-20, Instrument Location Plan
EE323IC35005A Instrument Key Plan_U323 [IFR] 15-Aug-19 A 15-Oct-19 A 15-Aug-19 02-Oct-19 35 0 Instrument Key Plan_U323 [IFR]
EE323IC35005B Instrument Key Plan_U323 [Review-IFR] 16-Oct-19 A 07-Nov-19 A 03-Oct-19 17-Oct-19 15 0 Instrument Key Plan_U323 [Review-IFR]
EE323IC35005G Instrument Key Plan_U323 [AFD] 08-Nov-19 A 29-Jun-20 16-Mar-20 28-Apr-20 30 9 Instrument Key Plan_U323 [AFD]
Control System 30-Jul-19 A 30-Oct-20 22-Aug-19 10-Aug-20 295 192 30-Oct-20, Control System
EB000IC40005A MR(Single Loop Control) [IFQ] 30-Jul-19 A 29-Aug-19 A 12-Feb-20 27-Feb-20 12 0 MR(Single Loop Control) [IFQ]
EB000IC40005B MR(Single Loop Control) [Review/Approval] 30-Aug-19 A 26-Sep-19 A 28-Feb-20 13-Mar-20 15 0 MR(Single Loop Control) [Review/Approval]
EB000IC40005G MR(Single Loop Control) [IFP] 16-Mar-20 30-Mar-20 29-Apr-20 14-May-20 10 10 MR(Single Loop Control) [IFP]
EB000IC40010A TBE(Single Loop Control) [IFP] 25-Oct-19 A 21-Jan-20 A 20-Mar-20 13-Apr-20 15 0 TBE(Single Loop Control) [IFP]
EB000IC40010B TBE(Single Loop Control) [Review/Approval] 22-Jan-20 A 09-Feb-20 14-Apr-20 28-Apr-20 15 15 TBE(Single Loop Control) [Review/Approval]
EB319IC40017A ICSS Network Drawing (Tanjung Batu Control Room)_U319 [IFR] 07-Aug-19 A 23-Aug-19 A 31-Jan-20 12-Mar-20 30 0 ICSS Network Drawing (Tanjung Batu Control Room)_U319 [IFR]
EB319IC40017B ICSS Network Drawing (Tanjung Batu Control Room)_U319 [Review/Appr.-IFR] 24-Aug-19 A 12-Sep-19 A 13-Mar-20 27-Mar-20 15 0 ICSS Network Drawing (Tanjung Batu Control Room)_U319 [Review/Appr.-IFR]
EB319IC40017G ICSS Network Drawing (Tanjung Batu Control Room)_U319 [IFC] 13-Sep-19 A 31-Oct-19 A 30-Mar-20 27-Apr-20 20 0 ICSS Network Drawing (Tanjung Batu Control Room)_U319 [IFC]
EB319IC60005A Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [IFR] 17-Nov-19 A 20-Dec-19 A 03-Jan-20 27-Feb-20 40 0 Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [IFR]
EB319IC60005B Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [Review-IFR] 21-Dec-19 A 10-Feb-20 28-Feb-20 13-Mar-20 15 15 Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [Review-IFR]
EB319IC60005G Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [IFC] 04-Sep-20 15-Oct-20 15-Jun-20 24-Jul-20 30 30 Instrument Panels and Console Arrangement Layout(TCR-001)_U341 [IFC]
EB319IC60011A Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [IFR] 11-May-20 14-Jul-20 17-Feb-20 14-Apr-20 40 40 Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [IFR]
EB319IC60011B Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [Review-IFR] 15-Jul-20 29-Jul-20 15-Apr-20 29-Apr-20 15 15 Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [Review-IFR]
EB319IC60011G Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [IFC] 18-Sep-20 30-Oct-20 29-Jun-20 10-Aug-20 30 30 Instrument Cable Assignment for Multi Cable Transit(TCR-001)_U341 [IFC]
ED000IC40005A MR(Multi Cable Transit & Accessories) [IFQ] 04-Oct-19 A 31-Oct-19 A 23-Sep-19 08-Oct-19 12 0 MR(Multi Cable Transit & Accessories) [IFQ]
ED000IC40005B MR(Multi Cable Transit & Accessories) [Review/Approval] 01-Nov-19 A 22-Nov-19 A 09-Oct-19 23-Oct-19 15 0 MR(Multi Cable Transit & Accessories) [Review/Approval]
ED000IC40005G MR(Multi Cable Transit & Accessories) [IFP] 09-Mar-20 20-Mar-20 06-Dec-19 19-Dec-19 10 10 MR(Multi Cable Transit & Accessories) [IFP]
ED000IC40010A TBE(Multi Cable Transit & Accessories) [IFP] 03-Feb-20 21-Feb-20 30-Oct-19 19-Nov-19 15 15 TBE(Multi Cable Transit & Accessories) [IFP]
ED000IC40010B TBE(Multi Cable Transit & Accessories) [Review/Approval] 22-Feb-20 08-Mar-20 20-Nov-19 05-Dec-19 16 16 TBE(Multi Cable Transit & Accessories) [Review/Approval]
ED341IC60005A Instrument Panels and Console Arragement Layout (ISH-110)_U341 [IFR] 29-Oct-19 A 17-Dec-19 A 10-Jan-20 27-Feb-20 35 0 Instrument Panels and Console Arragement Layout (ISH-110)_U341 [IFR]
ED341IC60005B Instrument Panels and Console Arragement Layout (ISH-110)_U341 [Review-IFR] 18-Dec-19 A 06-Jan-20 A 28-Feb-20 13-Mar-20 15 0 Instrument Panels and Console Arragement Layout (ISH-110)_U341 [Review-IFR]
ED341IC60005G Instrument Panels and Console Arragement Layout (ISH-110)_U341 [IFC] 05-Aug-20 17-Sep-20 06-May-20 26-Jun-20 30 30 Instrument Panels and Console Arragement Layout (ISH-110)_U341 [IFC]
ED341IC60012A Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [IFR] 24-Apr-20 24-Jun-20 24-Jan-20 12-Mar-20 35 35 Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [IFR]
ED341IC60012B Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [Review-IFR] 25-Jun-20 09-Jul-20 13-Mar-20 27-Mar-20 15 15 Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [Review-IFR]
ED341IC60012G Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [IFC] 21-Aug-20 01-Oct-20 29-May-20 10-Jul-20 30 30 Instrument Cable Assignment for Multi Cable Transit (ISH-110)_U341 [IFC]
EE000IC40005A MR(Custody Transfer and Fiscal Metering System) [IFQ] 07-Aug-19 A 20-Aug-19 A 22-Aug-19 11-Sep-19 15 0 MR(Custody Transfer and Fiscal Metering System) [IFQ]
EE000IC40005B MR(Custody Transfer and Fiscal Metering System) [Review/Approval] 21-Aug-19 A 20-Sep-19 A 12-Sep-19 26-Sep-19 15 0 MR(Custody Transfer and Fiscal Metering System) [Review/Approval]
EE000IC40005G MR(Custody Transfer and Fiscal Metering System) [IFP] 24-Dec-19 A 06-Feb-20 01-Nov-19 14-Nov-19 10 7 MR(Custody Transfer and Fiscal Metering System) [IFP]
EE000IC40010A TBE(Custody Transfer and Fiscal Metering System) [IFP] 30-Aug-19 A 06-Jan-20 A 03-Oct-19 16-Oct-19 10 0 TBE(Custody Transfer and Fiscal Metering System) [IFP]
EE000IC40010B TBE(Custody Transfer and Fiscal Metering System) [Review/Approval] 07-Jan-20 A 20-Jan-20 A 17-Oct-19 31-Oct-19 15 0 TBE(Custody Transfer and Fiscal Metering System) [Review/Approval]
EE000IC40015A MR (Upgrading and Modification Fiscal Custody Metering System) [IFQ] [Added] 15-Nov-19 A 20-Jan-20 A 20 0 MR (Upgrading and Modification Fiscal Custody Metering System) [IFQ] [Added]
EE000IC40015B MR (Upgrading and Modification Fiscal Custody Metering System) [Review/Appr.-IFQ] [Added] 21-Jan-20 A 09-Feb-20 15 15 MR (Upgrading and Modification Fiscal Custody Metering System) [Review/Appr.-IFQ] [Added]
EE000IC40015G MR (Upgrading and Modification Fiscal Custody Metering System) [IFP] [Added] 10-Mar-20 22-Apr-20 30 30 MR (Upgrading and Modification Fiscal Custody Metering System) [IFP] [Added]
EE000IC40020A TBE (Upgrading and Modification Fiscal Custody Metering System) [IFP] [Added] 24-Feb-20 20-Mar-20 20 20 TBE (Upgrading and Modification Fiscal Custody Metering System) [IFP] [Added]
EE000IC40020B TBE (Upgrading and Modification Fiscal Custody Metering System) [Review/Appr.-IFP] [Added] 21-Mar-20 19-Apr-20 30 30 TBE (Upgrading and Modification Fiscal Custody Metering System) [Review/Appr.-IFP] [Added]
Anlayzer 02-Oct-19 A 22-Feb-20 02-Oct-19 11-Dec-19 26 19 22-Feb-20, Anlayzer
EE000IC45005A MR(Gas Detector and Alarms) [IFQ] 02-Oct-19 A 27-Dec-19 A 02-Oct-19 22-Oct-19 15 0 MR(Gas Detector and Alarms) [IFQ]
EE000IC45005B MR(Gas Detector and Alarms) [Review/Approval] 28-Dec-19 A 18-Jan-20 A 23-Oct-19 06-Nov-19 15 0 MR(Gas Detector and Alarms) [Review/Approval]
EE000IC45005G MR(Gas Detector and Alarms) [IFP] 10-Feb-20 21-Feb-20 28-Nov-19 11-Dec-19 10 10 MR(Gas Detector and Alarms) [IFP]
EE000IC45010A TBE(Gas Detector and Alarms) [IFP] 28-Nov-19 A 07-Feb-20 13-Nov-19 26-Nov-19 10 10 TBE(Gas Detector and Alarms) [IFP]
EE000IC45010B TBE(Gas Detector and Alarms) [Review/Approval] 08-Feb-20 22-Feb-20 27-Nov-19 11-Dec-19 15 15 TBE(Gas Detector and Alarms) [Review/Approval]
Valve 20-Jun-19 A 20-Mar-20 20-Jun-19 24-Feb-20 188 39 20-Mar-20, Valve
EB319IC10005A Datasheet For On Off Valve_U319 [IFR] 22-Aug-19 A 13-Sep-19 A 22-Aug-19 18-Sep-19 20 0 Datasheet For On Off Valve_U319 [IFR]
EB319IC10005B Datasheet For On Off Valve_U319 [Review-IFR] 14-Sep-19 A 26-Dec-19 A 19-Sep-19 03-Oct-19 15 0 Datasheet For On Off Valve_U319 [Review-IFR]
EB319IC10005G Datasheet For On Off Valve_U319 [AFD] 11-Feb-20 09-Mar-20 18-Nov-19 13-Dec-19 20 20 Datasheet For On Off Valve_U319 [AFD]
EB319IC10010A Datasheet For Pressure Switch_U319 [IFR] 22-Aug-19 A 16-Sep-19 A 22-Aug-19 18-Sep-19 20 0 Datasheet For Pressure Switch_U319 [IFR]
EB319IC10010B Datasheet For Pressure Switch_U319 [Review-IFR] 17-Sep-19 A 09-Feb-20 19-Sep-19 03-Oct-19 15 15 Datasheet For Pressure Switch_U319 [Review-IFR]
EB319IC10010G Datasheet For Pressure Switch_U319 [AFD] 11-Feb-20 09-Mar-20 18-Nov-19 13-Dec-19 20 20 Datasheet For Pressure Switch_U319 [AFD]
EB319IC10015A Datasheet For Single Loop Controller_U319 [IFR] [Deleted] 22-Aug-19 A 02-Oct-19 A 22-Aug-19 02-Oct-19 30 0 Datasheet For Single Loop Controller_U319 [IFR] [Deleted]
EB319IC10015B Datasheet For Single Loop Controller_U319 [Review-IFR] [Deleted] 03-Oct-19 A 17-Oct-19 A 03-Oct-19 16-Oct-19 14 0 Datasheet For Single Loop Controller_U319 [Review-IFR] [Deleted]
EB319IC10015G Datasheet For Single Loop Controller_U319 [AFD] [Deleted] 03-Feb-20 13-Mar-20 14-Jan-20 24-Feb-20 30 30 Datasheet For Single Loop Controller_U319 [AFD] [Deleted]
EB319IC10020A Datasheet For Control Valve_U319 [IFR] 22-Aug-19 A 23-Sep-19 A 22-Aug-19 18-Sep-19 20 0 Datasheet For Control Valve_U319 [IFR]
EB319IC10020B Datasheet For Control Valve_U319 [Review-IFR] 24-Sep-19 A 22-Jan-20 A 19-Sep-19 03-Oct-19 15 0 Datasheet For Control Valve_U319 [Review-IFR]
EB319IC10020G Datasheet For Control Valve_U319 [AFD] 11-Feb-20 09-Mar-20 18-Nov-19 13-Dec-19 20 20 Datasheet For Control Valve_U319 [AFD]
EE000IC10005A Datasheet For Pressure & DP Gauge [IFR] 15-Aug-19 A 16-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For Pressure & DP Gauge [IFR]
EE000IC10005B Datasheet For Pressure & DP Gauge [Review-IFR] 17-Sep-19 A 03-Oct-19 A 12-Sep-19 26-Sep-19 15 0 Datasheet For Pressure & DP Gauge [Review-IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 49 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE000IC10005G Datasheet For Pressure & DP Gauge [AFD] 04-Oct-19 A 09-Mar-20 18-Nov-19 13-Dec-19 20 31 Datasheet For Pressure & DP Gauge [AFD]
EE000IC10010A Datasheet For Pressure & Diff. Pressure Transmitter [IFR] 15-Aug-19 A 16-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For Pressure & Diff. Pressure Transmitter [IFR]
EE000IC10010B Datasheet For Pressure & Diff. Pressure Transmitter [Review-IFR] 17-Sep-19 A 03-Oct-19 A 12-Sep-19 26-Sep-19 15 0 Datasheet For Pressure & Diff. Pressure Transmitter [Review-IFR]
EE000IC10010G Datasheet For Pressure & Diff. Pressure Transmitter [AFD] 04-Oct-19 A 09-Mar-20 18-Nov-19 13-Dec-19 20 31 Datasheet For Pressure & Diff. Pressure Transmitter [AFD]
EE000IC10015A Datasheet For Pressure Safety & Relief Valve [IFR] 14-Aug-19 A 13-Sep-19 A 14-Aug-19 10-Sep-19 20 0 Datasheet For Pressure Safety & Relief Valve [IFR]
EE000IC10015B Datasheet For Pressure Safety & Relief Valve [Review-IFR] 14-Sep-19 A 03-Oct-19 A 11-Sep-19 25-Sep-19 15 0 Datasheet For Pressure Safety & Relief Valve [Review-IFR]
EE000IC10015G Datasheet For Pressure Safety & Relief Valve [AFD] 04-Oct-19 A 09-Mar-20 18-Nov-19 13-Dec-19 20 31 Datasheet For Pressure Safety & Relief Valve [AFD]
EE000IC10020A Datasheet For Orifice & Flow Nozzle [IFR] 15-Aug-19 A 16-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For Orifice & Flow Nozzle [IFR]
EE000IC10020B Datasheet For Orifice & Flow Nozzle [Review-IFR] 17-Sep-19 A 20-Jan-20 A 12-Sep-19 26-Sep-19 15 0 Datasheet For Orifice & Flow Nozzle [Review-IFR]
EE000IC10020G Datasheet For Orifice & Flow Nozzle [AFD] 11-Feb-20 09-Mar-20 18-Nov-19 13-Dec-19 20 20 Datasheet For Orifice & Flow Nozzle [AFD]
EE000IC10025A Datasheet For MOV [IFR] 15-Aug-19 A 16-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For MOV [IFR]
EE000IC10025B Datasheet For MOV [Review-IFR] 17-Sep-19 A 07-Oct-19 A 12-Sep-19 26-Sep-19 15 0 Datasheet For MOV [Review-IFR]
EE000IC10025G Datasheet For MOV [AFD] 08-Oct-19 A 07-Jan-20 A 18-Nov-19 13-Dec-19 20 0 Datasheet For MOV [AFD]
EE000IC10030A Datasheet For F&G Detector [IFR] 15-Aug-19 A 14-Oct-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For F&G Detector [IFR]
EE000IC10030B Datasheet For F&G Detector [Review-IFR] 15-Oct-19 A 23-Jan-20 A 12-Sep-19 26-Sep-19 15 0 Datasheet For F&G Detector [Review-IFR]
EE000IC10030G Datasheet For F&G Detector [AFD] 11-Feb-20 09-Mar-20 18-Nov-19 13-Dec-19 20 20 Datasheet For F&G Detector [AFD]
EE000IC10035A Datasheet For Fiscal & Custody Metering [IFR] 07-Aug-19 A 21-Oct-19 A 07-Aug-19 28-Aug-19 15 0 Datasheet For Fiscal & Custody Metering [IFR]
EE000IC10035B Datasheet For Fiscal & Custody Metering [Review-IFR] 22-Oct-19 A 16-Nov-19 A 29-Aug-19 12-Sep-19 15 0 Datasheet For Fiscal & Custody Metering [Review-IFR]
EE000IC10035G Datasheet For Fiscal & Custody Metering [AFD] 17-Nov-19 A 06-Feb-20 30-Sep-19 18-Oct-19 15 9 Datasheet For Fiscal & Custody Metering [AFD]
EE000IC10040A Datasheet For GWR Level Transmitter [IFR] 24-Jul-19 A 16-Sep-19 A 24-Jul-19 21-Aug-19 20 0 Datasheet For GWR Level Transmitter [IFR]
EE000IC10040B Datasheet For GWR Level Transmitter [Review-IFR] 17-Sep-19 A 07-Oct-19 A 22-Aug-19 05-Sep-19 15 0 Datasheet For GWR Level Transmitter [Review-IFR]
EE000IC10040G Datasheet For GWR Level Transmitter [AFD] 08-Oct-19 A 16-Jan-20 A 18-Nov-19 13-Dec-19 20 0 Datasheet For GWR Level Transmitter [AFD]
EE000IC10045A Datasheet For Level Gauge & Flow Sight Glass [IFR] 15-Aug-19 A 16-Sep-19 A 15-Aug-19 11-Sep-19 20 0 Datasheet For Level Gauge & Flow Sight Glass [IFR]
EE000IC10045B Datasheet For Level Gauge & Flow Sight Glass [Review-IFR] 17-Sep-19 A 17-Oct-19 A 12-Sep-19 26-Sep-19 15 0 Datasheet For Level Gauge & Flow Sight Glass [Review-IFR]
EE000IC10045G Datasheet For Level Gauge & Flow Sight Glass [AFD] 18-Oct-19 A 09-Mar-20 18-Nov-19 13-Dec-19 20 31 Datasheet For Level Gauge & Flow Sight Glass [AFD]
EE000IC10050A Datasheet For Oil Movements System [IFR] [Deleted] 20-Jun-19 A 31-Jul-19 A 20-Jun-19 31-Jul-19 30 0 Datasheet For Oil Movements System [IFR] [Deleted]
EE000IC10050B Datasheet For Oil Movements System [Review-IFR] [Deleted] 01-Aug-19 A 15-Aug-19 A 01-Aug-19 14-Aug-19 14 0 Datasheet For Oil Movements System [Review-IFR] [Deleted]
EE000IC10050G Datasheet For Oil Movements System [AFD] [Deleted] 27-Jan-20 13-Mar-20 07-Jan-20 24-Feb-20 35 35 Datasheet For Oil Movements System [AFD] [Deleted]
EE000IC50005A MOV & AOV (Ball Type) MR [IFQ] 03-Aug-19 A 02-Sep-19 A 26-Sep-19 16-Oct-19 15 0 MOV & AOV (Ball Type) MR [IFQ]
EE000IC50005B MOV & AOV (Ball Type) MR [Review/Approval] 03-Sep-19 A 01-Oct-19 A 17-Oct-19 05-Nov-19 20 0 MOV & AOV (Ball Type) MR [Review/Approval]
EE000IC50005G MOV & AOV (Ball Type) MR [IFP] 09-Mar-20 20-Mar-20 06-Dec-19 19-Dec-19 10 10 MOV & AOV (Ball Type) MR [IFP]
EE000IC50006A TBE(MOV & AOV (Ball Type)) [IFP] 15-Oct-19 A 20-Feb-20 07-Nov-19 20-Nov-19 10 19 TBE(MOV & AOV (Ball Type)) [IFP]
EE000IC50006B TBE(MOV & AOV (Ball Type)) [Review/Approval] 21-Feb-20 06-Mar-20 21-Nov-19 05-Dec-19 15 15 TBE(MOV & AOV (Ball Type)) [Review/Approval]
EE000IC50010A MR(Control Valve & Pressure Regulator) [IFQ] 03-Aug-19 A 02-Sep-19 A 25-Sep-19 15-Oct-19 15 0 MR(Control Valve & Pressure Regulator) [IFQ]
EE000IC50010B MR(Control Valve & Pressure Regulator) [Review/Approval] 03-Sep-19 A 01-Oct-19 A 16-Oct-19 30-Oct-19 15 0 MR(Control Valve & Pressure Regulator) [Review/Approval]
EE000IC50010G MR(Control Valve & Pressure Regulator) [IFP] 17-Feb-20 28-Feb-20 05-Dec-19 18-Dec-19 10 10 MR(Control Valve & Pressure Regulator) [IFP]
EE000IC50011A TBE(Control Valve & Pressure Regulator) [IFP] 11-Oct-19 A 31-Jan-20 06-Nov-19 19-Nov-19 10 5 TBE(Control Valve & Pressure Regulator) [IFP]
EE000IC50011B TBE(Control Valve & Pressure Regulator) [Review/Approval] 01-Feb-20 15-Feb-20 20-Nov-19 04-Dec-19 15 15 TBE(Control Valve & Pressure Regulator) [Review/Approval]
EE000IC50015A MR(On-Off Valve (Ball Type)) [IFQ] 03-Aug-19 A 02-Sep-19 A 25-Sep-19 15-Oct-19 15 0 MR(On-Off Valve (Ball Type)) [IFQ]
EE000IC50015B MR(On-Off Valve (Ball Type)) [Review/Approval] 03-Sep-19 A 01-Oct-19 A 16-Oct-19 30-Oct-19 15 0 MR(On-Off Valve (Ball Type)) [Review/Approval]
EE000IC50015G MR(On-Off Valve (Ball Type)) [IFP] 09-Mar-20 20-Mar-20 05-Dec-19 18-Dec-19 10 10 MR(On-Off Valve (Ball Type)) [IFP]
EE000IC50020A MR(Pressure Safety & Relief Valve) [IFQ] 06-Aug-19 A 05-Sep-19 A 25-Sep-19 15-Oct-19 15 0 MR(Pressure Safety & Relief Valve) [IFQ]
EE000IC50020B MR(Pressure Safety & Relief Valve) [Review/Approval] 06-Sep-19 A 02-Oct-19 A 16-Oct-19 30-Oct-19 15 0 MR(Pressure Safety & Relief Valve) [Review/Approval]
EE000IC50020G MR(Pressure Safety & Relief Valve) [IFP] 03-Feb-20 14-Feb-20 05-Dec-19 18-Dec-19 10 10 MR(Pressure Safety & Relief Valve) [IFP]
EE000IC50021A TBE(Pressure Safety & Relief Valve) [IFP] 11-Oct-19 A 17-Jan-20 A 06-Nov-19 19-Nov-19 10 0 TBE(Pressure Safety & Relief Valve) [IFP]
EE000IC50021B TBE(Pressure Safety & Relief Valve) [Review/Approval] 18-Jan-20 A 01-Feb-20 20-Nov-19 04-Dec-19 15 7 TBE(Pressure Safety & Relief Valve) [Review/Approval]
EE000IC50025A TBE(On-Off Valve (Ball Type)) [IFP] 11-Oct-19 A 20-Feb-20 06-Nov-19 19-Nov-19 10 19 TBE(On-Off Valve (Ball Type)) [IFP]
EE000IC50025B TBE(On-Off Valve (Ball Type)) [Review/Approval] 21-Feb-20 06-Mar-20 20-Nov-19 04-Dec-19 15 15 TBE(On-Off Valve (Ball Type)) [Review/Approval]
Field Instrument 02-Sep-19 A 20-Mar-20 26-Sep-19 13-Jan-20 119 39 20-Mar-20, Field Instrument
EE000IC53005A MR(Flow Element) [IFQ] 03-Sep-19 A 23-Sep-19 A 17-Oct-19 06-Nov-19 15 0 MR(Flow Element) [IFQ]
EE000IC53005B MR(Flow Element) [Review/Approval] 24-Sep-19 A 30-Sep-19 A 07-Nov-19 21-Nov-19 15 0 MR(Flow Element) [Review/Approval]
EE000IC53005G MR(Flow Element) [IFP] [Deleted] 27-Dec-19 A 10-Jan-20 A 27-Dec-19 10-Jan-20 10 0 MR(Flow Element) [IFP] [Deleted]
EE000IC53006A TBE(Flow Element) [IFP] [Deleted] 28-Nov-19 A 11-Dec-19 A 28-Nov-19 11-Dec-19 10 0 TBE(Flow Element) [IFP] [Deleted]
EE000IC53006B TBE(Flow Element) [Review/Approval] [Deleted] 12-Dec-19 A 26-Dec-19 A 12-Dec-19 26-Dec-19 15 0 TBE(Flow Element) [Review/Approval] [Deleted]
EE000IC53010A MR(Radar and GWR type Level Instrument) [IFQ] 03-Sep-19 A 23-Sep-19 A 26-Sep-19 16-Oct-19 15 0 MR(Radar and GWR type Level Instrument) [IFQ]
EE000IC53010B MR(Radar and GWR type Level Instrument) [Review/Approval] 24-Sep-19 A 30-Sep-19 A 17-Oct-19 31-Oct-19 15 0 MR(Radar and GWR type Level Instrument) [Review/Approval]
EE000IC53010G MR(Radar and GWR type Level Instrument) [IFP] 09-Mar-20 20-Mar-20 06-Dec-19 19-Dec-19 10 10 MR(Radar and GWR type Level Instrument) [IFP]
EE000IC53011A TBE(Radar and GWR type Level Instrument) [IFP] 07-Nov-19 A 20-Feb-20 07-Nov-19 20-Nov-19 10 19 TBE(Radar and GWR type Level Instrument) [IFP]
EE000IC53011B TBE(Radar and GWR type Level Instrument) [Review/Approval] 21-Feb-20 06-Mar-20 21-Nov-19 05-Dec-19 15 15 TBE(Radar and GWR type Level Instrument) [Review/Approval]
EE000IC53015A MR(Level Gauge & Flow Sight Glass) [IFQ] 02-Sep-19 A 17-Sep-19 A 17-Oct-19 06-Nov-19 15 0 MR(Level Gauge & Flow Sight Glass) [IFQ]
EE000IC53015B MR(Level Gauge & Flow Sight Glass) [Review/Approval] 18-Sep-19 A 18-Sep-19 A 07-Nov-19 21-Nov-19 15 0 MR(Level Gauge & Flow Sight Glass) [Review/Approval]
EE000IC53015G MR(Level Gauge & Flow Sight Glass) [IFP] 09-Mar-20 20-Mar-20 27-Dec-19 10-Jan-20 10 10 MR(Level Gauge & Flow Sight Glass) [IFP]
EE000IC53016A TBE(Level Gauge & Flow Sight Glass) [IFP] 16-Jan-20 A 20-Feb-20 28-Nov-19 11-Dec-19 10 19 TBE(Level Gauge & Flow Sight Glass) [IFP]
EE000IC53016B TBE(Level Gauge & Flow Sight Glass) [Review/Approval] 21-Feb-20 06-Mar-20 12-Dec-19 26-Dec-19 15 15 TBE(Level Gauge & Flow Sight Glass) [Review/Approval]
EE000IC53020A MR(Smart Field Transmitter) [IFQ] 02-Sep-19 A 23-Sep-19 A 25-Oct-19 11-Nov-19 12 0 MR(Smart Field Transmitter) [IFQ]
EE000IC53020B MR(Smart Field Transmitter) [Review/Approval] 24-Sep-19 A 27-Sep-19 A 12-Nov-19 26-Nov-19 15 0 MR(Smart Field Transmitter) [Review/Approval]
EE000IC53020G MR(Smart Field Transmitter) [IFP] 30-Dec-19 A 13-Jan-20 A 30-Dec-19 13-Jan-20 10 0 MR(Smart Field Transmitter) [IFP]
EE000IC53021A TBE(Smart Field Transmitter) [IFP] 03-Dec-19 A 16-Dec-19 A 03-Dec-19 16-Dec-19 10 0 TBE(Smart Field Transmitter) [IFP]
EE000IC53021B TBE(Smart Field Transmitter) [Review/Approval] 17-Dec-19 A 31-Dec-19 A 17-Dec-19 28-Dec-19 12 0 TBE(Smart Field Transmitter) [Review/Approval]
EE000IC53025A MR(Local Gauge) [IFQ] 02-Sep-19 A 26-Sep-19 A 17-Oct-19 06-Nov-19 15 0 MR(Local Gauge) [IFQ]
EE000IC53025B MR(Local Gauge) [Review/Approval] 27-Sep-19 A 27-Sep-19 A 07-Nov-19 21-Nov-19 15 0 MR(Local Gauge) [Review/Approval]
EE000IC53025G MR(Local Gauge) [IFP] 30-Sep-19 A 10-Jan-20 A 27-Dec-19 10-Jan-20 10 0 MR(Local Gauge) [IFP]
EE000IC53026A TBE(Local Gauge) [IFP] 28-Nov-19 A 11-Dec-19 A 28-Nov-19 11-Dec-19 10 0 TBE(Local Gauge) [IFP]

Actual Level of Effort Actual Work Critical Remaining Work Page 50 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE000IC53026B TBE(Local Gauge) [Review/Approval] 12-Dec-19 A 26-Dec-19 A 12-Dec-19 26-Dec-19 15 0 TBE(Local Gauge) [Review/Approval]
Cable Race Way 16-Mar-20 22-Oct-20 10-Jan-20 03-Aug-20 152 152 22-Oct-20, Cable Race Way
EB319IC55005A Instrument Cable Tray Layout(TCR-001)_U341 [IFR] 11-May-20 14-Jul-20 17-Feb-20 14-Apr-20 40 40 Instrument Cable Tray Layout(TCR-001)_U341 [IFR]
EB319IC55005B Instrument Cable Tray Layout(TCR-001)_U341 [Review-IFR] 15-Jul-20 29-Jul-20 15-Apr-20 29-Apr-20 15 15 Instrument Cable Tray Layout(TCR-001)_U341 [Review-IFR]
EB319IC55005G Instrument Cable Tray Layout(TCR-001)_U341 [IFC] 04-Sep-20 15-Oct-20 15-Jun-20 24-Jul-20 30 30 Instrument Cable Tray Layout(TCR-001)_U341 [IFC]
ED341IC55007A Instrument Cable Tray Layout (ISH-110)_U341 [IFR] 24-Apr-20 17-Jun-20 10-Jan-20 20-Feb-20 30 30 Instrument Cable Tray Layout (ISH-110)_U341 [IFR]
ED341IC55007B Instrument Cable Tray Layout (ISH-110)_U341 [Review-IFR] 18-Jun-20 02-Jul-20 21-Feb-20 06-Mar-20 15 15 Instrument Cable Tray Layout (ISH-110)_U341 [Review-IFR]
ED341IC55007G Instrument Cable Tray Layout (ISH-110)_U341 [IFC] 28-Aug-20 01-Oct-20 08-Jun-20 10-Jul-20 25 25 Instrument Cable Tray Layout (ISH-110)_U341 [IFC]
EE323IC55005A Instrument Cable Tray and Trench Layout_U323 [IFR] 16-Mar-20 14-May-20 20-Jan-20 13-Mar-20 40 40 Instrument Cable Tray and Trench Layout_U323 [IFR]
EE323IC55005B Instrument Cable Tray and Trench Layout_U323 [Review-IFR] 15-May-20 29-May-20 14-Mar-20 28-Mar-20 15 15 Instrument Cable Tray and Trench Layout_U323 [Review-IFR]
EE323IC55005G Instrument Cable Tray and Trench Layout_U323 [IFC] 04-Sep-20 22-Oct-20 15-Jun-20 03-Aug-20 35 35 Instrument Cable Tray and Trench Layout_U323 [IFC]
EE323IC60010A Instrument Main Cable Routing Layout Unit 323_U323 [IFR] 07-Apr-20 08-Jun-20 10-Feb-20 30-Mar-20 35 35 Instrument Main Cable Routing Layout Unit 323_U323 [IFR]
EE323IC60010B Instrument Main Cable Routing Layout Unit 323_U323 [Review-IFR] 09-Jun-20 23-Jun-20 31-Mar-20 14-Apr-20 15 15 Instrument Main Cable Routing Layout Unit 323_U323 [Review-IFR]
EE323IC60010G Instrument Main Cable Routing Layout Unit 323_U323 [IFC] 04-Sep-20 22-Oct-20 15-Jun-20 03-Aug-20 35 35 Instrument Main Cable Routing Layout Unit 323_U323 [IFC]
Cable 05-Dec-19 A 19-Jan-21 11-Nov-19 30-Oct-20 273 247 19-Jan-21, Cable
EB319IC60012A Instrument Cable Wiring Layout(TCR-001)_U341 [IFR] 11-May-20 14-Jul-20 17-Feb-20 14-Apr-20 40 40 Instrument Cable Wiring Layout(TCR-001)_U341 [IFR]
EB319IC60012B Instrument Cable Wiring Layout(TCR-001)_U341 [Review-IFR] 15-Jul-20 29-Jul-20 15-Apr-20 29-Apr-20 15 15 Instrument Cable Wiring Layout(TCR-001)_U341 [Review-IFR]
EB319IC60012G Instrument Cable Wiring Layout(TCR-001)_U341 [IFC] 18-Sep-20 30-Oct-20 29-Jun-20 10-Aug-20 30 30 Instrument Cable Wiring Layout(TCR-001)_U341 [IFC]
EB319IC60020A Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [IFR] (DELETED) 03-Jun-20 14-Jul-20 02-Mar-20 14-Apr-20 30 30 Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [IFR] (DELETED)
EB319IC60020B Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [Review-IFR] (DELETED)
15-Jul-20 29-Jul-20 15-Apr-20 29-Apr-20 15 15 Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [Review-IFR] (DELETED)
EB319IC60020G Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [IFC] (DELETED) 25-Sep-20 30-Oct-20 06-Jul-20 10-Aug-20 25 25 Instrument Gas Detector Wiring Layout for Existing Update Tj Batu_U319 [IFC] (DELETED)
ED000IC60010A MR(Instrument Cable Gland) [IFQ] 05-Dec-19 A 24-Dec-19 A 11-Nov-19 29-Nov-19 15 0 MR(Instrument Cable Gland) [IFQ]
ED000IC60010B MR(Instrument Cable Gland) [Review/Approval] 25-Dec-19 A 16-Jan-20 A 30-Nov-19 14-Dec-19 15 0 MR(Instrument Cable Gland) [Review/Approval]
ED000IC60010G MR(Instrument Cable Gland) [IFP] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 MR(Instrument Cable Gland) [IFP]
ED000IC60011A TBE(Instrument Cable Gland) [IFP] 03-Jan-20 A 28-Feb-20 23-Dec-19 07-Jan-20 10 25 TBE(Instrument Cable Gland) [IFP]
ED000IC60011B TBE(Instrument Cable Gland) [Review/Approval] 29-Feb-20 14-Mar-20 08-Jan-20 22-Jan-20 15 15 TBE(Instrument Cable Gland) [Review/Approval]
ED341IC60022A Instrument Cable Wiring Layout (ISH-110)_U341 [IFR] 24-Apr-20 08-Jul-20 10-Jan-20 12-Mar-20 45 45 Instrument Cable Wiring Layout (ISH-110)_U341 [IFR]
ED341IC60022B Instrument Cable Wiring Layout (ISH-110)_U341 [Review-IFR] 09-Jul-20 23-Jul-20 13-Mar-20 27-Mar-20 15 15 Instrument Cable Wiring Layout (ISH-110)_U341 [Review-IFR]
ED341IC60022G Instrument Cable Wiring Layout (ISH-110)_U341 [IFC] 28-Jul-20 24-Sep-20 28-Apr-20 03-Jul-20 40 40 Instrument Cable Wiring Layout (ISH-110)_U341 [IFC]
EE022IC60005A Instrument Gas Detector Wiring Layout for Existing Update_U022 [IFR] 03-Jun-20 28-Jul-20 02-Mar-20 28-Apr-20 40 40 Instrument Gas Detector Wiring Layout for Existing Update_U022 [IFR]
EE022IC60005B Instrument Gas Detector Wiring Layout for Existing Update_U022 [Review-IFR] 29-Jul-20 12-Aug-20 29-Apr-20 13-May-20 15 15 Instrument Gas Detector Wiring Layout for Existing Update_U022 [Review-IFR]
EE022IC60005G Instrument Gas Detector Wiring Layout for Existing Update_U022 [AFD] 16-Sep-20 04-Nov-20 25-Jun-20 13-Aug-20 35 35 Instrument Gas Detector Wiring Layout for Existing Update_U022 [AFD]
EE323IC60015A Instrument Gas Detector Wiring Layout_U323 [IFR] 07-Apr-20 29-May-20 10-Feb-20 20-Mar-20 30 30 Instrument Gas Detector Wiring Layout_U323 [IFR]
EE323IC60015B Instrument Gas Detector Wiring Layout_U323 [Review-IFR] 30-May-20 13-Jun-20 21-Mar-20 04-Apr-20 15 15 Instrument Gas Detector Wiring Layout_U323 [Review-IFR]
EE323IC60015G Instrument Gas Detector Wiring Layout_U323 [IFC] 15-Jun-20 10-Aug-20 06-Apr-20 12-Jun-20 40 40 Instrument Gas Detector Wiring Layout_U323 [IFC]
EE323IC60025A Instrument Cable Schedule_U323 [IFR] 02-Oct-20 20-Nov-20 13-Jul-20 02-Sep-20 35 35 Instrument Cable Schedule_U323 [IFR]
EE323IC60025B Instrument Cable Schedule_U323 [Review-IFR] 21-Nov-20 05-Dec-20 03-Sep-20 17-Sep-20 15 15 Instrument Cable Schedule_U323 [Review-IFR]
EE323IC60025G Instrument Cable Schedule_U323 [IFC] 07-Dec-20 19-Jan-21 18-Sep-20 30-Oct-20 30 30 Instrument Cable Schedule_U323 [IFC]
EE323IC60030G Instrument Termination and Wiring Layout Unit_U323 [IFC] 17-Jun-20 11-Sep-20 23-Mar-20 29-Jun-20 60 60 Instrument Termination and Wiring Layout Unit_U323 [IFC]
Air Piping & Tubing 01-Jul-20 16-Oct-20 07-Apr-20 05-Aug-20 74 74 16-Oct-20, Air Piping & Tubing
EE323IC65005A Instument Air Piping layout Unit 323_U323 [IFR] 01-Jul-20 28-Aug-20 07-Apr-20 15-Jun-20 40 40 Instument Air Piping layout Unit 323_U323 [IFR]
EE323IC65005B Instument Air Piping layout Unit 323_U323 [Review-IFR] 29-Aug-20 12-Sep-20 16-Jun-20 30-Jun-20 15 15 Instument Air Piping layout Unit 323_U323 [Review-IFR]
EE323IC65005G Instument Air Piping layout Unit 323_U323 [AFD] 14-Sep-20 16-Oct-20 01-Jul-20 05-Aug-20 25 25 Instument Air Piping layout Unit 323_U323 [AFD]
Other Instrument Work 11-Nov-19 A 06-Apr-20 11-Nov-19 05-Feb-20 92 50 06-Apr-20, Other Instrument Work
ED000IC75005A MR(Instrument Junction Boxes) [IFQ] 05-Dec-19 A 24-Dec-19 A 11-Nov-19 29-Nov-19 15 0 MR(Instrument Junction Boxes) [IFQ]
ED000IC75005B MR(Instrument Junction Boxes) [Review/Approval] 25-Dec-19 A 22-Jan-20 A 30-Nov-19 14-Dec-19 15 0 MR(Instrument Junction Boxes) [Review/Approval]
ED000IC75005G MR(Instrument Junction Boxes) [IFP] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 MR(Instrument Junction Boxes) [IFP]
ED000IC75006A TBE(Instrument Junction Boxes) [IFP] 03-Jan-20 A 28-Feb-20 23-Dec-19 07-Jan-20 10 25 TBE(Instrument Junction Boxes) [IFP]
ED000IC75006B TBE(Instrument Junction Boxes) [Review/Approval] 29-Feb-20 14-Mar-20 08-Jan-20 22-Jan-20 15 15 TBE(Instrument Junction Boxes) [Review/Approval]
ED000IC75010A MR(Instrument Support) [IFQ] 10-Jan-20 A 31-Jan-20 11-Nov-19 22-Nov-19 10 5 MR(Instrument Support) [IFQ]
ED000IC75010B MR(Instrument Support) [Review/Approval] 01-Feb-20 15-Feb-20 23-Nov-19 07-Dec-19 15 15 MR(Instrument Support) [Review/Approval]
ED000IC75010G MR(Instrument Support) [IFP] 23-Mar-20 06-Apr-20 15-Jan-20 28-Jan-20 10 10 MR(Instrument Support) [IFP]
ED000IC75011A TBE(Instrument Support) [IFP] 24-Feb-20 06-Mar-20 16-Dec-19 30-Dec-19 10 10 TBE(Instrument Support) [IFP]
ED000IC75011B TBE(Instrument Support) [Review/Approval] 07-Mar-20 21-Mar-20 31-Dec-19 14-Jan-20 15 15 TBE(Instrument Support) [Review/Approval]
EE000IC75005A MR(Instrument Tube, Valve and Tube Fittings) [IFQ] 06-Dec-19 A 24-Dec-19 A 11-Nov-19 29-Nov-19 13 0 MR(Instrument Tube, Valve and Tube Fittings) [IFQ]
EE000IC75005B MR(Instrument Tube, Valve and Tube Fittings) [Review/Approval] 25-Dec-19 A 09-Jan-20 A 30-Nov-19 14-Dec-19 15 0 MR(Instrument Tube, Valve and Tube Fittings) [Review/Approval]
EE000IC75005G MR(Instrument Tube, Valve and Tube Fittings) [IFP] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 MR(Instrument Tube, Valve and Tube Fittings) [IFP]
EE000IC75006A TBE(Instrument Tube, Valve and Tube Fittings) [IFP] 14-Jan-20 A 28-Feb-20 23-Dec-19 07-Jan-20 10 25 TBE(Instrument Tube, Valve and Tube Fittings) [IFP]
EE000IC75006B TBE(Instrument Tube, Valve and Tube Fittings) [Review/Approval] 29-Feb-20 14-Mar-20 08-Jan-20 22-Jan-20 15 15 TBE(Instrument Tube, Valve and Tube Fittings) [Review/Approval]
EE000IC75010A MR(Instrument Piping and Pipe Fittings) [IFQ] [Deleted] 11-Nov-19 A 29-Nov-19 A 11-Nov-19 29-Nov-19 15 0 MR(Instrument Piping and Pipe Fittings) [IFQ] [Deleted]
EE000IC75010B MR(Instrument Piping and Pipe Fittings) [Review/Approval] [Deleted] 30-Nov-19 A 14-Dec-19 A 30-Nov-19 14-Dec-19 15 0 MR(Instrument Piping and Pipe Fittings) [Review/Approval] [Deleted]
EE000IC75010G MR(Instrument Piping and Pipe Fittings) [IFP] [Deleted] 23-Jan-20 A 05-Feb-20 23-Jan-20 05-Feb-20 10 8 MR(Instrument Piping and Pipe Fittings) [IFP] [Deleted]
EE000IC75011A TBE(Instrument Piping and Pipe Fittings) [IFP] [Deleted] 23-Dec-19 A 07-Jan-20 A 23-Dec-19 07-Jan-20 10 0 TBE(Instrument Piping and Pipe Fittings) [IFP] [Deleted]
EE000IC75011B TBE(Instrument Piping and Pipe Fittings) [Review/Approval] [Deleted] 08-Jan-20 A 22-Jan-20 A 08-Jan-20 22-Jan-20 15 0 TBE(Instrument Piping and Pipe Fittings) [Review/Approval] [Deleted]
Safety & Fire Fighting 24-Jun-19 A 18-Mar-21 15-Jul-19 12-Jun-20 418 286 18-Mar-21, Safety & Fire Fighting
General & Specification 15-Jul-19 A 25-Jun-20 15-Jul-19 25-Feb-20 237 56 25-Jun-20, General & Specification
EE323SF00005A Safety Action Item Tracking Register_x000D_U323 [IFR] [Deleted] 09-Dec-19 A 14-Jan-20 A 09-Dec-19 14-Jan-20 25 0 Safety Action Item Tracking Register_x000D_U323 [IFR] [Deleted]
EE323SF00005B Safety Action Item Tracking Register_x000D_U323 [Revie w-IFR] [Dele ted] 15-Jan-20 A 19-May-20 15-Jan-20 28-Jan-20 14 44 Safety Action Item Tracking Register_x000D_U323 [Revie w-IFR] [Dele ted]
EE323SF00005G Safety Action Item Tracking Register_x000D_U323 [AFD] [Deleted] 20-May-20 25-Jun-20 29-Jan-20 25-Feb-20 20 20 Safety Action Item Tracking Register_x000D_U323 [AFD] [Deleted]
EE323SF00010A Piping Layout Netwok Fire Protection System_U323 [IFR] [Deleted] 15-Jul-19 A 09-Sep-19 A 15-Jul-19 09-Sep-19 40 0 Piping Layout Netwok Fire Protection System_U323 [IFR] [Deleted]
EE323SF00010B Piping Layout Netwok Fire Protection System_U323 [Approved-IFR] [Deleted] 10-Sep-19 A 24-Sep-19 A 10-Sep-19 23-Sep-19 14 0 Piping Layout Netwok Fire Protection System_U323 [Approved-IFR] [Deleted]
EE323SF00010G Piping Layout Netwok Fire Protection System_U323 [AFD] [Deleted] 05-May-20 25-Jun-20 15-Jan-20 25-Feb-20 30 30 Piping Layout Netwok Fire Protection System_U323 [AFD] [Deleted]
Summary / Report / Study 24-Jun-19 A 25-Aug-20 15-Aug-19 08-May-20 242 139 25-Aug-20, Summary / Report / Study
EE323SF10005A Alarm Rationalization Study Report for Jetty Area_U323 [IFR] [Deleted] 10-Feb-20 20-Mar-20 14-Jan-20 24-Feb-20 30 30 Alarm Rationalization Study Report for Jetty Area_U323 [IFR] [Deleted]

Actual Level of Effort Actual Work Critical Remaining Work Page 51 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
EE323SF10005B Alarm Rationalization Study Report for Jetty Area_U323 [Review-IFR] [Deleted] 21-Mar-20 03-Apr-20 25-Feb-20 09-Mar-20 14 14 Alarm Rationalization Study Report for Jetty Area_U323 [Review-IFR] [Deleted]
EE323SF10005G Alarm Rationalization Study Report for Jetty Area_U323 [AFD] [Deleted] 26-Jun-20 25-Aug-20 10-Mar-20 08-May-20 40 40 Alarm Rationalization Study Report for Jetty Area_U323 [AFD] [Deleted]
EE323SF10010A Hazardous Area Classification Schedule for Jetty Area_U323 [IFR] 24-Jun-19 A 16-Jul-19 A 15-Aug-19 09-Oct-19 40 0 Hazardous Area Classification Schedule for Jetty Area_U323 [IFR]
EE323SF10010B Hazardous Area Classification Schedule for Jetty Area_U323 [Review-IFR] 17-Jul-19 A 01-Aug-19 A 10-Oct-19 24-Oct-19 15 0 Hazardous Area Classification Schedule for Jetty Area_U323 [Review-IFR]
EE323SF10010G Hazardous Area Classification Schedule for Jetty Area_U323 [IFD] 02-Aug-19 A 22-Aug-19 A 31-Dec-19 11-Feb-20 30 0 Hazardous Area Classification Schedule for Jetty Area_U323 [IFD]
HAZOP & SIL 02-Dec-19 A 20-May-20 02-Dec-19 23-Apr-20 136 79 20-May-20, HAZOP & SIL
EE323SF15005A HAZOP Study Report for Jetty Area_U323 [IFR] [Deleted] 02-Dec-19 A 30-Dec-19 A 02-Dec-19 30-Dec-19 20 0 HAZOP Study Report for Jetty Area_U323 [IFR] [Deleted]
EE323SF15005B HAZOP Study Report for Jetty Area_U323 [Review-IFR] [Deleted] 31-Dec-19 A 08-Feb-20 31-Dec-19 13-Jan-20 14 14 HAZOP Study Report for Jetty Area_U323 [Review-IFR] [Deleted]
EE323SF15005G HAZOP Study Report for Jetty Area_U323 [AFD] [Deleted] 10-Feb-20 21-Feb-20 14-Jan-20 27-Jan-20 10 10 HAZOP Study Report for Jetty Area_U323 [AFD] [Deleted]
EE323SF15010A SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [IFR] [Deleted] 02-Dec-19 A 30-Dec-19 A 02-Dec-19 30-Dec-19 20 0 SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [IFR] [Deleted]
EE323SF15010B SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [Review-IFR] [Deleted] 31-Dec-19 A 08-Feb-20 31-Dec-19 13-Jan-20 14 14 SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [Review-IFR] [Deleted]
EE323SF15010G SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [AFD] [Deleted] 10-Feb-20 21-Feb-20 14-Jan-20 27-Jan-20 10 10 SIL Cla ssification (LOPA) Study Report for Jetty Area_U323 [AFD] [Deleted]
EE323SF15015A Package HAZOP Study Report for Jetty Area_U323 [IFR] [Deleted] 31-Dec-19 A 21-Feb-20 31-Dec-19 28-Jan-20 20 20 Package HAZOP Study Report for Jetty Area_U323 [IFR] [Deleted]
EE323SF15015B Package HAZOP Study Report for Jetty Area_U323 [Review-IFR] [Deleted] 24-Feb-20 08-Mar-20 29-Jan-20 11-Feb-20 14 14 Package HAZOP Study Report for Jetty Area_U323 [Review-IFR] [Deleted]
EE323SF15015G Package HAZOP Study Report for Jetty Area_U323 [AFD] [Deleted] 09-Mar-20 20-Mar-20 12-Feb-20 25-Feb-20 10 10 Package HAZOP Study Report for Jetty Area_U323 [AFD] [Deleted]
EE323SF15020A Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [IFR] [Deleted] 31-Dec-19 A 21-Feb-20 31-Dec-19 28-Jan-20 20 20 Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [IFR] [Deleted]
EE323SF15020B Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [Review-IFR] [Deleted] 24-Feb-20 08-Mar-20 29-Jan-20 11-Feb-20 14 14 Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [Review-IFR] [Deleted]
EE323SF15020G Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [AFD] [Deleted] 09-Mar-20 20-Mar-20 12-Feb-20 25-Feb-20 10 10 Package SIL Classification (LOPA) Study Report for Jetty Area_U323 [AFD] [Deleted]
EE323SF15025A HAZOP Close-out Report_U323 [IFR] [Deleted] 24-Feb-20 06-Apr-20 29-Jan-20 10-Mar-20 30 30 HAZOP Close-out Report_U323 [IFR] [Deleted]
EE323SF15025B HAZOP Close-out Report_U323 [Review-IFR] [Deleted] 07-Apr-20 20-Apr-20 11-Mar-20 24-Mar-20 14 14 HAZOP Close-out Report_U323 [Review-IFR] [Deleted]
EE323SF15025G HAZOP Close-out Report_U323 [AFD] [Deleted] 21-Apr-20 20-May-20 26-Mar-20 23-Apr-20 20 20 HAZOP Close-out Report_U323 [AFD] [Deleted]
Fire Fighting Equipment 15-Aug-19 A 29-Jun-20 15-Aug-19 12-Jun-20 210 107 29-Jun-20, Fire Fighting Equipment
EE000SF20005A MR(Clean Agent System) [IFQ] [Deleted] 22-Nov-19 A 06-Apr-20 22-Nov-19 02-Apr-20 92 50 MR(Clean Agent System) [IFQ] [Deleted]
EE000SF20005B MR(Clean Agent System) [Review/Approval] [Deleted] 07-Apr-20 20-Apr-20 03-Apr-20 16-Apr-20 14 14 MR(Clean Agent System) [Review/Approval] [Deleted]
EE000SF20005G MR(Clean Agent System) [IFP] [Deleted] 29-May-20 12-Jun-20 29-May-20 12-Jun-20 10 10 MR(Clean Agent System) [IFP] [Deleted]
EE000SF20010A TBE(Clean Agent System) [IFP] [Deleted] 07-Apr-20 14-May-20 03-Apr-20 12-May-20 25 25 TBE(Clean Agent System) [IFP] [Deleted]
EE000SF20010B TBE(Clean Agent System) [Review/Approval] [Deleted] 15-May-20 28-May-20 13-May-20 26-May-20 14 14 TBE(Clean Agent System) [Review/Approval] [Deleted]
EE323SF20005A Fire & Safety Equipment Location Plan_U323 [IFR] [Deleted] 15-Aug-19 A 27-Jan-20 15-Aug-19 26-Sep-19 31 1 Fire & Safety Equipment Location Plan_U323 [IFR] [Deleted]
EE323SF20005B Fire & Safety Equipment Location Plan_U323 [Approved-IFR] [Deleted] 28-Jan-20 11-Feb-20 27-Sep-19 11-Oct-19 15 15 Fire & Safety Equipment Location Plan_U323 [Approved-IFR] [Deleted]
EE323SF20005G Fire & Safety Equipment Location Plan_U323 [AFD] [Deleted] 29-Apr-20 29-Jun-20 02-Mar-20 21-Apr-20 35 35 Fire & Safety Equipment Location Plan_U323 [AFD] [Deleted]
Fire Fighting Drawing 17-Jul-19 A 18-Mar-21 17-Jul-19 08-Jun-20 416 286 18-Mar-21, Fire Fighting Drawing
EB319SF25135A Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [IFR] 17-Feb-20 20-Mar-20 27-Dec-19 31-Jan-20 25 25 Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [IFR]
EB319SF25135B Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [Review/Appr.-IFR]
21-Mar-20 04-Apr-20 01-Feb-20 15-Feb-20 15 15 Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [Review/Appr.-IFR]
EB319SF25135G Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [AFD] 06-Apr-20 05-May-20 17-Feb-20 13-Mar-20 20 20 Fire & Safety Equipment Location Plan-Tanjung Batu Metering Skid Shelter_U319 [AFD]
EB320SF25135A Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [IFR] 23-Mar-20 06-May-20 12-Feb-20 24-Mar-20 30 30 Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [IFR]
EB320SF25135B Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [Review/Appr.-IFR] 07-May-20 21-May-20 25-Mar-20 08-Apr-20 15 15 Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [Review/Appr.-IFR]
EB320SF25135G Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [AFD] 29-May-20 26-Jun-20 09-Apr-20 11-May-20 20 20 Fire & Safety Equipment Location Plan-Pumps Shelter_U320 [AFD]
EC334SF25005A P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFR] [Deleted] 31-Jul-19 A 04-Sep-19 A 31-Jul-19 04-Sep-19 25 0 P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFR] [Deleted]
EC334SF25005B P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Approved-IFR] [Deleted]
05-Sep-19 A 19-Sep-19 A 05-Sep-19 19-Sep-19 15 0 P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Approved-IFR] [Deleted]
EC334SF25005E P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFD] [Deleted] 14-Oct-19 A 08-Nov-19 A 14-Oct-19 08-Nov-19 20 0 P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFD] [Deleted]
EC334SF25005F P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Approved-IFD] [Deleted]
09-Nov-19 A 23-Nov-19 A 09-Nov-19 23-Nov-19 15 0 P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Approved-IFD] [Deleted]
EC334SF25005G P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFC] [Deleted] 14-Feb-20 12-Mar-20 13-Jan-20 07-Feb-20 20 20 P&ID for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFC] [Deleted]
EC334SF25010A Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFR] [Deleted]
05-Sep-19 A 09-Oct-19 A 05-Sep-19 09-Oct-19 25 0 Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [IFR] [Deleted]
EC334SF25010B Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR]
10-Oct-19
[Deleted]
A 24-Oct-19 A 10-Oct-19 24-Oct-19 15 0 Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR] [Deleted]
EC334SF25010G Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [AFD] [Deleted]
28-Feb-20 27-Mar-20 27-Jan-20 21-Feb-20 20 20 Piping Scheme for Sprinkler System-Laboratory & Operator Change Shelter_U334 [AFD] [Deleted]
EC334SF25135A Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [IFR] 30-Jan-20 11-Mar-20 27-Dec-19 07-Feb-20 30 30 Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [IFR]
EC334SF25135B Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [Review/Appr.-IFR]
12-Mar-20 26-Mar-20 08-Feb-20 22-Feb-20 15 15 Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [Review/Appr.-IFR]
EC334SF25135G Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [AFD] 27-Mar-20 04-May-20 24-Feb-20 30-Mar-20 25 25 Fire & Safety Equipment Location Plan-Dehydrator and Sludge Drying Room_U334 [AFD]
EC334SF25235A Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 11-Mar-20
[IFR] 08-Apr-20 22-Jan-20 18-Feb-20 20 20 Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 [IFR]
EC334SF25235B Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 09-Apr-20
[Review/Appr.-IFR]
23-Apr-20 19-Feb-20 04-Mar-20 15 15 Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 [Review/Appr.-IFR]
EC334SF25235G Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 24-Apr-20
[AFD] 03-Jun-20 05-Mar-20 02-Apr-20 20 20 Fire & Safety Equipment Location Plan-Chemical Shelter & Blower Room(334-CHM-001)_U334 [AFD]
EC334SF30005A Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [IFR] 13-Feb-20 11-Mar-20 13-Jan-20 07-Feb-20 20 20 Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [IFR]
EC334SF30005B Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR]
12-Mar-20 26-Mar-20 08-Feb-20 22-Feb-20 15 15 Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR]
EC334SF30005G Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [AFD] 30-Mar-20 27-Apr-20 24-Feb-20 20-Mar-20 20 20 Fire & Safety Equipment Location Plan-Laboratory & Operator Change Shelter_U334 [AFD]
EC335SF25135A Fire & Safety Equipment Location Plan_U335 [IFR] 27-Jan-20 21-Feb-20 20-Jan-20 14-Feb-20 20 20 Fire & Safety Equipment Location Plan_U335 [IFR]
EC335SF25135B Fire & Safety Equipment Location Plan_U335 [Review/Appr.-IFR] 22-Feb-20 07-Mar-20 15-Feb-20 29-Feb-20 15 15 Fire & Safety Equipment Location Plan_U335 [Review/Appr.-IFR]
EC335SF25135G Fire & Safety Equipment Location Plan_U335 [AFD] 09-Mar-20 06-Apr-20 02-Mar-20 30-Mar-20 20 20 Fire & Safety Equipment Location Plan_U335 [AFD]
EC337SF25005A P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFR] [Deleted] 31-Jul-19 A 04-Sep-19 A 31-Jul-19 04-Sep-19 25 0 P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFR] [Deleted]
EC337SF25005B P&ID for Sprinkler System-Workshop & Warehouse_U337 [Approved-IFR] [Deleted] 05-Sep-19 A 19-Sep-19 A 05-Sep-19 19-Sep-19 15 0 P&ID for Sprinkler System-Workshop & Warehouse_U337 [Approved-IFR] [Deleted]
EC337SF25005E P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFD] [Deleted] 14-Oct-19 A 08-Nov-19 A 14-Oct-19 08-Nov-19 20 0 P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFD] [Deleted]
EC337SF25005F P&ID for Sprinkler System-Workshop & Warehouse_U337 [Approved-IFD] [Deleted] 09-Nov-19 A 23-Nov-19 A 09-Nov-19 23-Nov-19 15 0 P&ID for Sprinkler System-Workshop & Warehouse_U337 [Approved-IFD] [Deleted]
EC337SF25005G P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFC] [Deleted] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 P&ID for Sprinkler System-Workshop & Warehouse_U337 [IFC] [Deleted]
EC337SF25135A Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing21-Feb-20
System & Annex_U337
19-Mar-20
[IFR] 06-Jan-20 31-Jan-20 20 20 Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing System & Annex_U337 [IFR]
EC337SF25135B Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing20-Mar-20
System & Annex_U337
03-Apr-20
[Review/A
01-Feb-20 15-Feb-20 15 15 Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing System & Annex_U337 [Review/A
EC337SF25135G Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing15-Apr-20
System & Annex_U337
14-May-20
[AFD] 24-Feb-20 20-Mar-20 20 20 Fire & Safety Equipment Location Plan-SulphuricAcid & Sodium Bulk Storage Shelter & Dosing System & Annex_U337 [AFD]
EC337SF30005A Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [IFR] 21-Feb-20 19-Mar-20 06-Jan-20 31-Jan-20 20 20 Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [IFR]
EC337SF30005B Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [Review/Appr.-IFR] 20-Mar-20 03-Apr-20 01-Feb-20 15-Feb-20 15 15 Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [Review/Appr.-IFR]
EC337SF30005G Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [AFD] 29-Apr-20 08-Jun-20 09-Mar-20 06-Apr-20 20 20 Fire & Safety Equipment Location Plan-Workshop & Warehouse_U337 [AFD]
ED341SF25041A P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFR] 17-Jul-19 A 14-Feb-20 17-Jul-19 28-Aug-19 30 15 P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFR]
ED341SF25041B P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [Review/Appr.-IFR] 12-Sep-19 A 14-Feb-20 29-Aug-19 12-Sep-19 15 19 P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [Review/Appr.-IFR]
ED341SF25041E P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFD] 09-Dec-19 A 24-Mar-20 14-Oct-19 08-Nov-19 20 27 P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFD]
ED341SF25041F P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [Approved-IFD] 25-Mar-20 08-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [Approved-IFD]
ED341SF25041G P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFC] 09-Apr-20 11-May-20 09-Jan-20 05-Feb-20 20 20 P&ID and Piping Scheme for F/F System(SS&ISH-103)_U341 [IFC]
ED341SF25045A Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [IFR] 12-Aug-19 A 03-Oct-19 A 28-Nov-19 10-Jan-20 30 0 Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [IFR]

Actual Level of Effort Actual Work Critical Remaining Work Page 52 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341SF25045B Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [Review/Appr.-IFR] 04-Oct-19 A 31-Dec-19 A 11-Jan-20 25-Jan-20 15 0 Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [Review/Appr.-IFR]
ED341SF25045G Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [IFC] 24-Apr-20 03-Jun-20 27-Jan-20 21-Feb-20 20 20 Fire & Safety Equipment Location Plan(SS&ISH-103)_U341 [IFC]
ED341SF25061A P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFR] 24-Jul-19 A 21-Feb-20 24-Jul-19 04-Sep-19 30 20 P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFR]
ED341SF25061B P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [Approved-IFR] 12-Sep-19 A 06-Mar-20 05-Sep-19 19-Sep-19 15 41 P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [Approved-IFR]
ED341SF25061E P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFD] 09-Dec-19 A 06-Apr-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFD]
ED341SF25061F P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [Approved-IFD] 07-Apr-20 21-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [Approved-IFD]
ED341SF25061G P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFC] 22-Apr-20 29-May-20 09-Jan-20 05-Feb-20 20 20 P&ID and Piping Scheme for F/F System(SS&ISH-105)_U341 [IFC]
ED341SF25111A P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFR] 31-Jul-19 A 02-Dec-20 31-Jul-19 04-Sep-19 25 208 P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFR]
ED341SF25111B P&ID and Piping Scheme for F/F System(ISH-110)_U341 [Review/Appr.-IFR] 03-Dec-20 17-Dec-20 05-Sep-19 19-Sep-19 15 15 P&ID and Piping Scheme for F/F System(ISH-110)_U341 [Review/Appr.-IFR]
ED341SF25111E P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFD] 18-Dec-20 18-Jan-21 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFD]
ED341SF25111F P&ID and Piping Scheme for F/F System(ISH-110)_U341 [Approved-IFD] 19-Jan-21 02-Feb-21 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(ISH-110)_U341 [Approved-IFD]
ED341SF25111G P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFC] 03-Feb-21 03-Mar-21 24-Feb-20 20-Mar-20 20 20 P&ID and Piping Scheme for F/F System(ISH-110)_U341 [IFC]
ED341SF25135A Fire & Safety Equipment Location Plan-Operator Building_U341 [IFR] 13-Aug-19 A 05-Feb-20 08-Jan-20 18-Feb-20 30 8 Fire & Safety Equipment Location Plan-Operator Building_U341 [IFR]
ED341SF25135B Fire & Safety Equipment Location Plan-Operator Building_U341 [Review/Appr.-IFR] 24-Sep-19 A 20-Feb-20 19-Feb-20 04-Mar-20 15 25 Fire & Safety Equipment Location Plan-Operator Building_U341 [Review/Appr.-IFR]
ED341SF25135G Fire & Safety Equipment Location Plan-Operator Building_U341 [AFD] 18-Dec-19 A 19-Mar-20 05-Mar-20 02-Apr-20 20 20 Fire & Safety Equipment Location Plan-Operator Building_U341 [AFD]
ED341SF25141A P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFR] 31-Jul-19 A 30-Sep-19 A 20-Jan-20 28-Feb-20 30 0 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFR]
ED341SF25141B P&ID and Piping Scheme for F/F System(SS-114)_U341 [Review/Appr.-IFR] 01-Oct-19 A 02-Mar-20 29-Feb-20 13-Mar-20 14 36 P&ID and Piping Scheme for F/F System(SS-114)_U341 [Review/Appr.-IFR]
ED341SF25141E P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFD] 03-Mar-20 31-Mar-20 16-Mar-20 14-Apr-20 20 20 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFD]
ED341SF25141F P&ID and Piping Scheme for F/F System(SS-114)_U341 [Approved-IFD] [Deleted] 01-Apr-20 14-Apr-20 15-Apr-20 28-Apr-20 14 14 P&ID and Piping Scheme for F/F System(SS-114)_U341 [Approved-IFD] [Deleted]
ED341SF25141G P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFC] [Deleted] 15-Apr-20 14-May-20 29-Apr-20 08-Jun-20 20 20 P&ID and Piping Scheme for F/F System(SS-114)_U341 [IFC] [Deleted]
ED341SF25341A P&ID and Piping Scheme for F/F System(TCR-001)_U341 [IFR] 31-Jul-19 A 21-Feb-20 31-Jul-19 04-Sep-19 25 20 P&ID and Piping Scheme for F/F System(TCR-001)_U341 [IFR]
ED341SF25341B P&ID and Piping Scheme for F/F System(TCR-001)_U341 [Review/Appr.-IFR] 22-Feb-20 07-Mar-20 05-Sep-19 19-Sep-19 15 15 P&ID and Piping Scheme for F/F System(TCR-001)_U341 [Review/Appr.-IFR]
ED341SF25341E P&ID and Piping Scheme for F/F System(TCR-001)_U341 [IFD] 09-Mar-20 06-Apr-20 14-Oct-19 08-Nov-19 20 20 P&ID and Piping Scheme for F/F System(TCR-001)_U341 [IFD]
ED341SF25341F P&ID and Piping Scheme for F/F System(TCR-001)_U341 [Approved-IFD] 07-Apr-20 21-Apr-20 09-Nov-19 23-Nov-19 15 15 P&ID and Piping Scheme for F/F System(TCR-001)_U341 [Approved-IFD]
ED341SF25341G P&ID and Piping Scheme for F/F System(TCR-001)_U341 [AFD] 22-Apr-20 29-May-20 27-Feb-20 26-Mar-20 20 20 P&ID and Piping Scheme for F/F System(TCR-001)_U341 [AFD]
ED341SF30095A Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [IFR] 05-Sep-19 A 21-Oct-19 A 20-Jan-20 28-Feb-20 30 0 Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [IFR]
ED341SF30095B Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [Review/Appr.-IFR]
22-Oct-19 A 11-Jan-20 A 29-Feb-20 14-Mar-20 15 0 Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [Review/Appr.-IFR]
ED341SF30095G Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [AFD] 18-Feb-21 18-Mar-21 16-Mar-20 14-Apr-20 20 20 Fire & Safety Equipment Location Plan-Tank Guage ISH (Small) (ISH-110)_U341 [AFD]
ED341SF30185A Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [IFR]11-Feb-20 23-Mar-20 28-Nov-19 10-Jan-20 30 30 Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [IFR]
ED341SF30185B Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [Review/Appr.-IFR]
24-Mar-20 07-Apr-20 11-Jan-20 25-Jan-20 15 15 Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [Review/Appr.-IFR]
ED341SF30185G Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [AFD]12-May-20 17-Jun-20 27-Feb-20 26-Mar-20 20 20 Fire & Safety Equipment Location Plan-Tanjung Batu Control Room (319-TCR-001)_U341 [AFD]
EE323SF25005A Drawing List for Fire Protection System_U323 [IFR] 30-Aug-19 A 10-Feb-20 30-Aug-19 10-Oct-19 30 11 Drawing List for Fire Protection System_U323 [IFR]
EE323SF25005B Drawing List for Fire Protection System_U323 [Approved-IFR] 11-Feb-20 25-Feb-20 11-Oct-19 25-Oct-19 15 15 Drawing List for Fire Protection System_U323 [Approved-IFR]
EE323SF25005G Drawing List for Fire Protection System_U323 [AFD] 29-Apr-20 29-Jun-20 02-Mar-20 21-Apr-20 35 35 Drawing List for Fire Protection System_U323 [AFD]
EE323SF25010A P&ID and Piping Scheme for F/F System_U323 [IFR] 18-Jul-19 A 22-Aug-19 A 22-Aug-19 16-Oct-19 40 0 P&ID and Piping Scheme for F/F System_U323 [IFR]
EE323SF25010B P&ID and Piping Scheme for F/F System_U323 [Approved-IFR] 23-Aug-19 A 13-Dec-19 A 17-Oct-19 31-Oct-19 15 0 P&ID and Piping Scheme for F/F System_U323 [Approved-IFR]
EE323SF25010E P&ID and Piping Scheme for F/F System_U323 [IFD] 12-Dec-19 A 10-Feb-20 01-Nov-19 27-Nov-19 19 11 P&ID and Piping Scheme for F/F System_U323 [IFD]
EE323SF25010F P&ID and Piping Scheme for F/F System_U323 [Approved-IFD] 11-Feb-20 25-Feb-20 28-Nov-19 12-Dec-19 15 15 P&ID and Piping Scheme for F/F System_U323 [Approved-IFD]
EE323SF25010G P&ID and Piping Scheme for F/F System_U323 [IFC] 29-Apr-20 08-Jun-20 02-Mar-20 30-Mar-20 20 20 P&ID and Piping Scheme for F/F System_U323 [IFC]
EE323SF25015A Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U32325-Oct-19
[IFR] A 30-Dec-19 A 25-Oct-19 21-Nov-19 20 0 Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U323 [IFR]
EE323SF25015B Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U32331-Dec-19
[Review/Appr.-IFR]
A 16-Jan-20 A 22-Nov-19 06-Dec-19 15 0 Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U323 [Review/Appr.-IFR]
EE323SF25015G Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U32327-Jan-20
[AFD] 21-Feb-20 09-Dec-19 07-Jan-20 20 20 Equipment Layout Fire Water & Fire Portable Extinguisher - Construction Jetty & Berth 6A_U323 [AFD]
EE323SF25135A Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [IFR] 18-Oct-19 A 12-Feb-20 19-Sep-19 12-Dec-19 61 13 Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [IFR]
EE323SF25135B Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [Review/Appr.-IFR] 13-Feb-20 27-Feb-20 13-Dec-19 27-Dec-19 15 15 Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [Review/Appr.-IFR]
EE323SF25135G Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [AFD] 29-Apr-20 08-Jun-20 02-Mar-20 30-Mar-20 20 20 Fire & Safety Equipment Location Plan-Utility Building Berth 6A_U323 [AFD]
F&G Detection System 15-Aug-19 A 10-Aug-20 15-Aug-19 12-Jun-20 224 137 10-Aug-20, F&G Detection System
EB319SF30005A Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFR] 17-Feb-20 20-Mar-20 27-Dec-19 31-Jan-20 25 25 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFR]
EB319SF30005B Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [Review-IFR] 21-Mar-20 04-Apr-20 01-Feb-20 15-Feb-20 15 15 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [Review-IFR]
EB319SF30005G Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFC] 06-Apr-20 20-May-20 17-Feb-20 30-Mar-20 30 30 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFC]
EB319SF30010A Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319
05-Sep-19
[IFR] [Deleted]
A 08-Nov-19 A 05-Sep-19 08-Nov-19 47 0 Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319 [IFR] [Deleted]
EB319SF30010B Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319
09-Nov-19
[Review/Appr.-IFR]_To
A 23-Nov-19
beAdelet09-Nov-19 22-Nov-19 14 0 Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319 [Review/Appr.-IFR]_To be delet
EB319SF30010G Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319
25-Nov-19
[IFD] [Deleted]
A 20-Dec-19 A 25-Nov-19 20-Dec-19 20 0 Fire and Gas Detection System Location Plan -Tanjung Batu Control Room (319-TCR-001)_U319 [IFD] [Deleted]
EC334SF30010A Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [IFR]
05-Sep-19
[Deleted]
A 09-Oct-19 A 05-Sep-19 09-Oct-19 25 0 Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [IFR] [Deleted]
EC334SF30010B Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR]
10-Oct-19 A 24-Oct-19
[Deleted] A 10-Oct-19 23-Oct-19 14 0 Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [Review/Appr.-IFR] [Deleted]
EC334SF30010G Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [IFD]
25-Oct-19
[Deleted]
A 20-Nov-19 A 24-Oct-19 20-Nov-19 20 0 Fire and Gas Detection System Location Plan - Laboratory & Operator Change Shelter_U334 [IFD] [Deleted]
EC337SF25010A Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [IFR] [Deleted] 12-Dec-19 A 17-Jan-20 A 12-Dec-19 17-Jan-20 25 0 Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [IFR] [Deleted]
EC337SF25010B Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [Review/Appr.-IFR] [Deleted]
18-Jan-20 A 20-Mar-20 18-Jan-20 01-Feb-20 15 15 Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [Review/Appr.-IFR] [Deleted]
EC337SF25010G Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [AFD] [Deleted] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Piping Scheme for Sprinkler System-Workshop & Warehouse_U337 [AFD] [Deleted]
EC337SF30010A Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [IFR] [Deleted] 19-Sep-19 A 16-Oct-19 A 19-Sep-19 16-Oct-19 20 0 Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [IFR] [Deleted]
EC337SF30010B Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [Review/Appr.-IFR]
17-Oct-19
[Deleted]
A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [Review/Appr.-IFR] [Deleted]
EC337SF30010G Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [IFD] [Deleted] 15-Apr-20 14-May-20 24-Feb-20 20-Mar-20 20 20 Fire and Gas Detection System Location Plan -Workshop & Warehouse_U337 [IFD] [Deleted]
ED341SF30040A Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341
29-Aug-19
[IFR] [Deleted]
A 09-Oct-19 A 29-Aug-19 09-Oct-19 30 0 Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341 [IFR] [Deleted]
ED341SF30040B Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341
10-Oct-19
[Review/Appr.-IFR]_[Deleted]
A 24-Oct-19 A 10-Oct-19 23-Oct-19 14 0 Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341 [Review/Appr.-IFR]_[Deleted]
ED341SF30040G Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341
24-Oct-19
[IFD] [Deleted]
A 20-Nov-19 A 24-Oct-19 20-Nov-19 20 0 Fire and Gas Detection System Location Plan - Common Facilities SS-4 (ISH 341-SS-104)_U341 [IFD] [Deleted]
ED341SF30042A F&G Detection System Location Plan(SS&ISH-103)_U341 [IFR] [Deleted] 13-Jan-20 A 06-Mar-20 13-Jan-20 21-Feb-20 30 30 F&G Detection System Location Plan(SS&ISH-103)_U341 [IFR] [Deleted]
ED341SF30042B F&G Detection System Location Plan(SS&ISH-103)_U341 [Approved-IFR] [Deleted] 07-Mar-20 20-Mar-20 22-Feb-20 06-Mar-20 14 14 F&G Detection System Location Plan(SS&ISH-103)_U341 [Approved-IFR] [Deleted]
ED341SF30042G F&G Detection System Location Plan(SS&ISH-103)_U341 [IFD] [Deleted] 29-May-20 26-Jun-20 31-Mar-20 28-Apr-20 20 20 F&G Detection System Location Plan(SS&ISH-103)_U341 [IFD] [Deleted]
ED341SF30062A F&G Detection System Location Plan(SS&ISH-105)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(SS&ISH-105)_U341 [IFR] [Deleted]
ED341SF30062B F&G Detection System Location Plan(SS&ISH-105)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(SS&ISH-105)_U341 [Approved-IFR] [Deleted]
ED341SF30062G F&G Detection System Location Plan(SS&ISH-105)_U341 [IFD] [Deleted] 31-Oct-19 A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 F&G Detection System Location Plan(SS&ISH-105)_U341 [IFD] [Deleted]
ED341SF30102A F&G Detection System Location Plan(SS-110)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(SS-110)_U341 [IFR] [Deleted]
ED341SF30102B F&G Detection System Location Plan(SS-110)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(SS-110)_U341 [Approved-IFR] [Deleted]
ED341SF30102G F&G Detection System Location Plan(SS-110)_U341 [IFD] [Deleted] 21-Apr-20 20-May-20 02-Mar-20 30-Mar-20 20 20 F&G Detection System Location Plan(SS-110)_U341 [IFD] [Deleted]

Actual Level of Effort Actual Work Critical Remaining Work Page 53 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
ED341SF30110A Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [IFR] 29-Aug-19
[Deleted] A 16-Oct-19 A 29-Aug-19 16-Oct-19 35 0 Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [IFR] [Deleted]
ED341SF30110B Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [Review/Appr.-IFR]
17-Oct-19 A [Deleted]
31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [Review/Appr.-IFR] [Deleted]
ED341SF30110G Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [IFD] 31-Oct-19
[Deleted] A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 Fire and Gas Detection System Location Plan - Utility Control Room (341-UCR-001)_U341 [IFD] [Deleted]
ED341SF30112A F&G Detection System Location Plan(ISH-110)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(ISH-110)_U341 [IFR] [Deleted]
ED341SF30112B F&G Detection System Location Plan(ISH-110)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(ISH-110)_U341 [Approved-IFR] [Deleted]
ED341SF30112G F&G Detection System Location Plan(ISH-110)_U341 [IFD] [Deleted] 31-Oct-19 A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 F&G Detection System Location Plan(ISH-110)_U341 [IFD] [Deleted]
ED341SF30120A Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [IFR]
05-Sep-19
[Deleted]A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [IFR] [Deleted]
ED341SF30120B Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [Review/Appr.-IFR]
17-Oct-19 A [Deleted]
31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [Review/Appr.-IFR] [Deleted]
ED341SF30120G Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [IFD]
31-Oct-19
[Deleted]A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 Fire and Gas Detection System Location Plan - Offsite Control Room (341-OCR-001)_U341 [IFD] [Deleted]
ED341SF30122A F&G Detection System Location Plan(SS-111)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(SS-111)_U341 [IFR] [Deleted]
ED341SF30122B F&G Detection System Location Plan(SS-111)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(SS-111)_U341 [Approved-IFR] [Deleted]
ED341SF30122G F&G Detection System Location Plan(SS-111)_U341 [IFD] [Deleted] 31-Oct-19 A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 F&G Detection System Location Plan(SS-111)_U341 [IFD] [Deleted]
ED341SF30132A F&G Detection System Location Plan(SS-113)_U341 [IFR] [Deleted] 05-Sep-19 A 16-Oct-19 A 05-Sep-19 16-Oct-19 30 0 F&G Detection System Location Plan(SS-113)_U341 [IFR] [Deleted]
ED341SF30132B F&G Detection System Location Plan(SS-113)_U341 [Approved-IFR] [Deleted] 17-Oct-19 A 31-Oct-19 A 17-Oct-19 30-Oct-19 14 0 F&G Detection System Location Plan(SS-113)_U341 [Approved-IFR] [Deleted]
ED341SF30132G F&G Detection System Location Plan(SS-113)_U341 [IFD] [Deleted] 31-Oct-19 A 27-Nov-19 A 31-Oct-19 27-Nov-19 20 0 F&G Detection System Location Plan(SS-113)_U341 [IFD] [Deleted]
ED341SF30142A F&G Detection System Location Plan(SS-114)_U341 [IFR] [Deleted] 27-Jan-20 06-Mar-20 02-Mar-20 14-Apr-20 30 30 F&G Detection System Location Plan(SS-114)_U341 [IFR] [Deleted]
ED341SF30142B F&G Detection System Location Plan(SS-114)_U341 [Approved-IFR] [Deleted] 07-Mar-20 20-Mar-20 15-Apr-20 28-Apr-20 14 14 F&G Detection System Location Plan(SS-114)_U341 [Approved-IFR] [Deleted]
ED341SF30142G F&G Detection System Location Plan(SS-114)_U341 [IFD] [Deleted] 23-Mar-20 21-Apr-20 29-Apr-20 08-Jun-20 20 20 F&G Detection System Location Plan(SS-114)_U341 [IFD] [Deleted]
ED341SF30205A Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFR] 11-Feb-20 16-Mar-20 26-Dec-19 30-Jan-20 25 25 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFR]
ED341SF30205B Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [Review-IFR] 17-Mar-20 31-Mar-20 31-Jan-20 14-Feb-20 15 15 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [Review-IFR]
ED341SF30205G Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFC] 07-Apr-20 29-May-20 17-Feb-20 30-Mar-20 30 30 Fire and Gas Detection System Cause & Effect for Tanjung Batu_U319 [IFC]
EE323SF30015A Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [IFR] [Deleted]
15-Aug-19 A 18-Sep-19 A 15-Aug-19 18-Sep-19 25 0 Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [IFR] [Deleted]
EE323SF30015B Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [Review/Appr.-IFR]
19-Sep-19 [Deleted]
A 03-Oct-19 A 19-Sep-19 02-Oct-19 14 0 Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [Review/Appr.-IFR] [Deleted]
EE323SF30015G Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [AFD] [Deleted]
03-Oct-19 A 30-Oct-19 A 03-Oct-19 30-Oct-19 20 0 Piping Scheme for Fire Water & Foam System - Construction Jetty & Berth 6A_U323 [AFD] [Deleted]
EE323SF30020A Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [IFR] [Deleted]
14-May-20 26-Jun-20 13-Mar-20 20-Apr-20 25 25 Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [IFR] [Deleted]
EE323SF30020B Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [Review/Appr.-IFR]
27-Jun-20[Deleted]11-Jul-20 21-Apr-20 05-May-20 15 15 Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [Review/Appr.-IFR] [Deleted]
EE323SF30020G Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [AFD] [Deleted]
13-Jul-20 10-Aug-20 06-May-20 12-Jun-20 20 20 Fire and Gas Detection System Block Diagram-Construction Jetty & Berth 6A_U323 [AFD] [Deleted]
Fire Proofing 24-Jun-19 A 22-Aug-19 A 11-Oct-19 21-Apr-20 143 0 22-Aug-19 A, Fire Proofing
EE323SF35005A Passive fire proofing schedule for Jetty Area_U323 [IFR] 24-Jun-19 A 16-Jul-19 A 11-Oct-19 21-Nov-19 30 0 Passive fire proofing schedule for Jetty Area_U323 [IFR]
EE323SF35005B Passive fire proofing schedule for Jetty Area_U323 [Review-IFR] 17-Jul-19 A 01-Aug-19 A 22-Nov-19 06-Dec-19 15 0 Passive fire proofing schedule for Jetty Area_U323 [Review-IFR]
EE323SF35005G Passive fire proofing schedule for Jetty Area_U323 [AFD] 02-Aug-19 A 22-Aug-19 A 02-Mar-20 21-Apr-20 35 0 Passive fire proofing schedule for Jetty Area_U323 [AFD]
Procurement 25-Jul-19 A 28-Mar-22 09-Sep-19 21-Nov-21 628 544 28-Mar-22, Procurement
Steel Structure 24-Oct-19 A 10-Apr-21 24-Oct-19 05-Feb-21 364 288 10-Apr-21, Steel Structure
General & Specification 15-May-20 10-Apr-21 07-Mar-20 05-Feb-21 331 331 10-Apr-21, General & Specification
PB319SS00002D Steel Structure_U319 [MFG/FOB] 16-Oct-20 12-Feb-21 12-Aug-20 09-Dec-20 120 120 Steel Structure_U319 [MFG/FOB]
PB319SS00002E Steel Structure_U319 [DTS] 13-Feb-21 05-Mar-21 10-Dec-20 30-Dec-20 21 21 Steel Structure_U319 [DTS]
PB320SS00002D Steel Structure_U320 [MFG/FOB] 20-Aug-20 17-Dec-20 16-Jun-20 13-Oct-20 120 120 Steel Structure_U320 [MFG/FOB]
PB320SS00002E Steel Structure_U320 [DTS] 18-Dec-20 07-Jan-21 14-Oct-20 03-Nov-20 21 21 Steel Structure_U320 [DTS]
PC325SS00002D Steel Structure_U325 [MFG/FOB] (TBD) 28-Nov-20 27-Mar-21 25-Sep-20 22-Jan-21 120 120 Steel Structure_U325 [MFG/FOB] (TBD)
PC325SS00002E Steel Structure_U325 [DTS] (TBD) 28-Mar-21 10-Apr-21 23-Jan-21 05-Feb-21 14 14 Steel Structure_U325 [DTS] (TBD)
PC334SS00002D Steel Structure_U334 [MFG/FOB] (TBD) 28-Nov-20 27-Mar-21 25-Sep-20 22-Jan-21 120 120 Steel Structure_U334 [MFG/FOB] (TBD)
PC334SS00002E Steel Structure_U334 [DTS] (TBD) 28-Mar-21 10-Apr-21 23-Jan-21 05-Feb-21 14 14 Steel Structure_U334 [DTS] (TBD)
PC335SS00002D Steel Structure_U335 [MFG/FOB] 12-Aug-20 09-Dec-20 09-Jun-20 06-Oct-20 120 120 Steel Structure_U335 [MFG/FOB]
PC335SS00002E Steel Structure_U335 [DTS] 10-Dec-20 30-Dec-20 07-Oct-20 27-Oct-20 21 21 Steel Structure_U335 [DTS]
PC337SS00002D Steel Structure_U337 [MFG/FOB] 21-Jul-20 17-Nov-20 07-May-20 03-Sep-20 120 120 Steel Structure_U337 [MFG/FOB]
PC337SS00002E Steel Structure_U337 [DTS] 18-Nov-20 08-Dec-20 04-Sep-20 24-Sep-20 21 21 Steel Structure_U337 [DTS]
PE323SS00002D Steel Structure_U323 [MFG/FOB] 15-May-20 11-Sep-20 07-Mar-20 04-Jul-20 120 120 Steel Structure_U323 [MFG/FOB]
PE323SS00002E Steel Structure_U323 [DTS] 12-Sep-20 02-Oct-20 05-Jul-20 25-Jul-20 21 21 Steel Structure_U323 [DTS]
Equipment Structure 24-Oct-19 A 16-Feb-21 24-Oct-19 04-Jan-21 327 251 16-Feb-21, Equipment Structure
PD000SS25002A Steel Structure [RFQ/Bid Close] 24-Oct-19 A 29-Nov-19 A 24-Oct-19 08-Nov-19 12 0 Steel Structure [RFQ/Bid Close]
PD000SS25002B Steel Structure [PO] 20-Feb-20 28-Feb-20 17-Dec-19 26-Dec-19 7 7 Steel Structure [PO]
PD341SS25002D Steel Structure_U341 [MFG/FOB] 15-May-20 11-Sep-20 07-Mar-20 04-Jul-20 120 120 Steel Structure_U341 [MFG/FOB]
PD341SS25002E Steel Structure [DTS] 12-Sep-20 02-Oct-20 05-Jul-20 25-Jul-20 21 21 Steel Structure [DTS]
PE000SS25002A Fender [RFQ/Bid Close] 29-Oct-19 A 28-Nov-19 A 05-Nov-19 25-Nov-19 15 0 Fender [RFQ/Bid Close]
PE000SS25002B Fender [PO] 17-Feb-20 28-Feb-20 26-Dec-19 09-Jan-20 10 10 Fender [PO]
PE000SS25002C Fender [Key VDR] 02-Mar-20 01-Apr-20 10-Jan-20 10-Feb-20 22 22 Fender [Key VDR]
PE000SS25002D Fender [MFG/FOB] 29-Feb-20 27-Jun-20 10-Jan-20 08-May-20 120 120 Fender [MFG/FOB]
PE000SS25002E Fender [DTS] 28-Jun-20 11-Jul-20 09-May-20 22-May-20 14 14 Fender [DTS]
PE000SS25002F Fender [Final Doc.] 12-Jul-20 07-Jan-21 23-May-20 18-Nov-20 180 180 Fender [Final Doc.]
PE000SS25012A Quick Release Hook [RFQ/Bid Close] 12-Nov-19 A 28-Nov-19 A 15-Nov-19 05-Dec-19 15 0 Quick Release Hook [RFQ/Bid Close]
PE000SS25012B Quick Release Hook [PO] 21-Feb-20 05-Mar-20 09-Jan-20 22-Jan-20 10 10 Quick Release Hook [PO]
PE000SS25012C Quick Release Hook [Key VDR] 06-Mar-20 07-Apr-20 23-Jan-20 21-Feb-20 22 22 Quick Release Hook [Key VDR]
PE000SS25012D Quick Release Hook [MFG/FOB] 06-Mar-20 06-Aug-20 23-Jan-20 24-Jun-20 154 154 Quick Release Hook [MFG/FOB]
PE000SS25012E Quick Release Hook [DTS] 07-Aug-20 20-Aug-20 25-Jun-20 08-Jul-20 14 14 Quick Release Hook [DTS]
PE000SS25012F Quick Release Hook [Final Doc.] 21-Aug-20 16-Feb-21 09-Jul-20 04-Jan-21 180 180 Quick Release Hook [Final Doc.]
HVAC 27-Jan-20 14-Feb-20 16-Jan-20 05-Feb-20 15 15 14-Feb-20, HVAC
Design Basis 27-Jan-20 14-Feb-20 16-Jan-20 05-Feb-20 15 15 14-Feb-20, Design Basis
PE000HV05002B HVAC Equipment [PO] [Deleted] 27-Jan-20 14-Feb-20 16-Jan-20 05-Feb-20 15 15 HVAC Equipment [PO] [Deleted]
Rotating Equipment 29-Jul-19 A 09-Oct-21 09-Sep-19 07-Jul-21 511 427 09-Oct-21, Rotating Equipment
Pump 29-Jul-19 A 09-Oct-21 09-Sep-19 07-Jul-21 511 427 09-Oct-21, Pump
PB000MR15005A API Centrifugal Pump (BB) [RFQ/Bid Close] 29-Jul-19 A 21-Aug-19 A 09-Sep-19 27-Sep-19 15 0 API Centrifugal Pump (BB) [RFQ/Bid Close]
PB000MR15005B API Centrifugal Pump (BB) [PO] 19-Dec-19 A 23-Dec-19 A 13-Nov-19 03-Dec-19 3 0 API Centrifugal Pump (BB) [PO]
PB320MR15005C API Centrifugal Pump (BB) [Key VDR] 24-Dec-19 A 21-Feb-20 04-Dec-19 16-Jan-20 30 20 API Centrifugal Pump (BB) [Key VDR]
PB320MR15005D API Centrifugal Pump (BB) [MFG/FOB] 24-Dec-19 A 21-Dec-20 04-Dec-19 27-Nov-20 360 331 API Centrifugal Pump (BB) [MFG/FOB]

Actual Level of Effort Actual Work Critical Remaining Work Page 54 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
PB320MR15005E API Centrifugal Pump (BB) [DTS] 22-Dec-20 01-Feb-21 28-Nov-20 08-Jan-21 42 42 API Centrifugal Pump (BB) [DTS]
PB320MR15005F API Centrifugal Pump (BB) [Final Doc.] 02-Feb-21 31-Jul-21 09-Jan-21 07-Jul-21 180 180 API Centrifugal Pump (BB) [Final Doc.]
PE000MR15020A API Centrifugal Pump (OH2) [RFQ/Bid Close] 29-Jul-19 A 20-Aug-19 A 09-Sep-19 27-Sep-19 15 0 API Centrifugal Pump (OH2) [RFQ/Bid Close]
PE000MR15020B API Centrifugal Pump (OH2) [PO] 31-Jan-20 20-Feb-20 08-Nov-19 28-Nov-19 15 15 API Centrifugal Pump (OH2) [PO]
PE000MR15035A API Vertical Pump (Vertical-I) [RFQ/Bid Close] 29-Jul-19 A 20-Aug-19 A 09-Sep-19 27-Sep-19 15 0 API Vertical Pump (Vertical-I) [RFQ/Bid Close]
PE000MR15035B API Vertical Pump (Vertical-I) [PO] 17-Feb-20 06-Mar-20 08-Nov-19 28-Nov-19 15 15 API Vertical Pump (Vertical-I) [PO]
PE323MR15020C API Centrifugal Pump (OH2) [Key VDR] 21-Feb-20 23-Mar-20 29-Nov-19 31-Dec-19 22 22 API Centrifugal Pump (OH2) [Key VDR]
PE323MR15020D API Centrifugal Pump (OH2) [MFG/FOB] 21-Feb-20 14-Feb-21 29-Nov-19 22-Nov-20 360 360 API Centrifugal Pump (OH2) [MFG/FOB]
PE323MR15020E API Centrifugal Pump (OH2) [DTS] 15-Feb-21 28-Mar-21 23-Nov-20 03-Jan-21 42 42 API Centrifugal Pump (OH2) [DTS]
PE323MR15020F API Centrifugal Pump (OH2) [Final Doc.] 29-Mar-21 24-Sep-21 04-Jan-21 02-Jul-21 180 180 API Centrifugal Pump (OH2) [Final Doc.]
PE323MR15035C API Vertical Pump (Vertical-I) [Key VDR] 09-Mar-20 21-Apr-20 29-Nov-19 13-Jan-20 30 30 API Vertical Pump (Vertical-I) [Key VDR]
PE323MR15035D API Vertical Pump (Vertical-I) [MFG/FOB] 07-Mar-20 01-Mar-21 29-Nov-19 22-Nov-20 360 360 API Vertical Pump (Vertical-I) [MFG/FOB]
PE323MR15035E API Vertical Pump (Vertical-I) [DTS] 02-Mar-21 12-Apr-21 23-Nov-20 03-Jan-21 42 42 API Vertical Pump (Vertical-I) [DTS]
PE323MR15035F API Vertical Pump (Vertical-I) [Final Doc.] 13-Apr-21 09-Oct-21 04-Jan-21 02-Jul-21 180 180 API Vertical Pump (Vertical-I) [Final Doc.]
PE323MR15100D API Centrifugal Pump (OH2)_U323 [FOB] 21-Feb-20 14-Feb-21 29-Nov-19 22-Nov-20 360 360 API Centrifugal Pump (OH2)_U323 [FOB]
PE323MR15100E API Centrifugal Pump (OH2)_U323 [DTS] 15-Feb-21 28-Mar-21 23-Nov-20 03-Jan-21 42 42 API Centrifugal Pump (OH2)_U323 [DTS]
Material Handling Equipment 29-Jul-19 A 14-Aug-21 09-Sep-19 20-May-21 468 374 14-Aug-21, Material Handling Equipment
PB319MR35012D Crane & Hoist_U319 [MFG/FOB] 04-Mar-20 29-Sep-20 28-Dec-19 24-Jul-20 210 210 Crane & Hoist_U319 [MFG/FOB]
PB319MR35012E Crane & Hoist_U319 [DTS] 30-Sep-20 28-Nov-20 25-Jul-20 22-Sep-20 60 60 Crane & Hoist_U319 [DTS]
PB320MR35012D Crane & Hoist_U320 [MFG/FOB] 04-Mar-20 29-Oct-20 28-Dec-19 23-Aug-20 240 240 Crane & Hoist_U320 [MFG/FOB]
PB320MR35012E Crane & Hoist_U320 [DTS] 30-Oct-20 28-Dec-20 24-Aug-20 22-Oct-20 60 60 Crane & Hoist_U320 [DTS]
PC000MR30210A Crane & Hoist [RFQ/Bid Close] 12-Sep-19 A 26-Oct-19 A 25-Oct-19 11-Nov-19 12 0 Crane & Hoist [RFQ/Bid Close]
PC000MR30210B Crane & Hoist [PO] 19-Feb-20 03-Mar-20 13-Dec-19 27-Dec-19 10 10 Crane & Hoist [PO]
PC000MR30210C Crane & Hoist [Key VDR] 04-Mar-20 30-Apr-20 30-Dec-19 24-Feb-20 40 40 Crane & Hoist [Key VDR]
PC000MR30210F Crane & Hoist [Final Doc.] 29-Nov-20 27-May-21 23-Sep-20 21-Mar-21 180 180 Crane & Hoist [Final Doc.]
PC331MR35010D Crane & Hoist_U331 [MFG/FOB] 04-Mar-20 28-Nov-20 28-Dec-19 22-Sep-20 270 270 Crane & Hoist_U331 [MFG/FOB]
PC331MR35010E Crane & Hoist_U331 [DTS] 29-Nov-20 27-Jan-21 23-Sep-20 21-Nov-20 60 60 Crane & Hoist_U331 [DTS]
PC335MR35012D Crane & Hoist_U335 [MFG/FOB] 04-Mar-20 29-Sep-20 28-Dec-19 24-Jul-20 210 210 Crane & Hoist_U335 [MFG/FOB]
PC335MR35012E Crane & Hoist_U335 [DTS] 30-Sep-20 28-Nov-20 25-Jul-20 22-Sep-20 60 60 Crane & Hoist_U335 [DTS]
PC337MR35012D Crane & Hoist_U337 [MFG/FOB] 04-Mar-20 29-Oct-20 28-Dec-19 23-Aug-20 240 240 Crane & Hoist_U337 [MFG/FOB]
PC337MR35012E Crane & Hoist_U337 [DTS] 30-Oct-20 28-Dec-20 24-Aug-20 22-Oct-20 60 60 Crane & Hoist_U337 [DTS]
PE000MR35002A Marine Loading Arm & Gangway [RFQ/Bid Close] 29-Jul-19 A 20-Aug-19 A 09-Sep-19 27-Sep-19 15 0 Marine Loading Arm & Gangway [RFQ/Bid Close]
PE000MR35002B Marine Loading Arm & Gangway [PO] 20-Feb-20 04-Mar-20 26-Nov-19 09-Dec-19 10 10 Marine Loading Arm & Gangway [PO]
PE000MR35002C Marine Loading Arm & Gangway [Key VDR] 05-Mar-20 09-Apr-20 10-Dec-19 15-Jan-20 25 25 Marine Loading Arm & Gangway [Key VDR]
PE000MR35002D Marine Loading Arm & Gangway [MFG/FOB] 05-Mar-20 29-Dec-20 10-Dec-19 04-Oct-20 300 300 Marine Loading Arm & Gangway [MFG/FOB]
PE000MR35002E Marine Loading Arm & Gangway [DTS] 30-Dec-20 15-Feb-21 05-Oct-20 21-Nov-20 48 48 Marine Loading Arm & Gangway [DTS]
PE000MR35002F Marine Loading Arm & Gangway [Final Doc.] 16-Feb-21 14-Aug-21 22-Nov-20 20-May-21 180 180 Marine Loading Arm & Gangway [Final Doc.]
PE323MR35012D Crane & Hoist_U323 [MFG/FOB] 11-Jun-20 06-Jan-21 24-Mar-20 19-Oct-20 210 210 Crane & Hoist_U323 [MFG/FOB]
PE323MR35012E Crane & Hoist_U323 [DTS] 07-Jan-21 07-Mar-21 20-Oct-20 18-Dec-20 60 60 Crane & Hoist_U323 [DTS]
Other Rotating Equipment 30-Oct-19 A 13-Aug-21 431 366 13-Aug-21, Other Rotating Equipment
PE000MR40500A Gangway [RFQ/Bid Close] [Added] 30-Oct-19 A 08-Nov-19 A 25 0 Gangway [RFQ/Bid Close] [Added]
PE000MR40500B Gangway [PO] [Added] 02-Mar-20 20-Mar-20 15 15 Gangway [PO] [Added]
PE000MR40500C Gangway [Key VDR] [Added] 23-Mar-20 29-Jun-20 60 60 Gangway [Key VDR] [Added]
PE000MR40500D Gangway [MFG/FOB] [Added] 21-Mar-20 16-Sep-20 180 180 Gangway [MFG/FOB] [Added]
PE000MR40500E Gangway [DTS] [Added] 17-Sep-20 15-Nov-20 60 60 Gangway [DTS] [Added]
PE000MR40500F Gangway [Final Doc.] [Added] 16-Nov-20 13-Aug-21 180 180 Gangway [Final Doc.] [Added]
Piping 11-Nov-19 A 10-Oct-21 11-Nov-19 08-May-21 447 427 10-Oct-21, Piping
A/G Piping 11-Nov-19 A 10-Oct-21 11-Nov-19 08-May-21 447 427 10-Oct-21, A/G Piping
PE000PI55440A Strainer [RFQ/Bid Close] [Deleted, Consolidated by PC000PI55440] 23-Nov-19 A 29-Nov-19 A 11-Nov-19 29-Nov-19 15 0 Strainer [RFQ/Bid Close] [Deleted, Consolidated by PC000PI55440]
PE000PI55440B Strainer [PO] 04-Feb-20 24-Feb-20 23-Jan-20 12-Feb-20 15 15 Strainer [PO]
PE000PI55440D Strainer - 1st [FOB] 10-Mar-20 30-Jun-20 27-Feb-20 18-Jun-20 113 113 Strainer - 1st [FOB]
PE000PI55440E Strainer - 1st [DTS] 01-Jul-20 29-Aug-20 19-Jun-20 17-Aug-20 60 60 Strainer - 1st [DTS]
PE000PI55441D Strainer - Final [FOB] 16-Oct-20 12-Feb-21 14-May-20 10-Sep-20 120 120 Strainer - Final [FOB]
PE000PI55441E Strainer - Final [DTS] 13-Feb-21 13-Apr-21 11-Sep-20 09-Nov-20 60 60 Strainer - Final [DTS]
PE000PI55441F Strainer [Final Doc.] 14-Apr-21 10-Oct-21 10-Nov-20 08-May-21 180 180 Strainer [Final Doc.]
PE000PI75370A Flexible Hose & Hose Connector [RFQ/Bid Close] 11-Nov-19 A 29-Nov-19 A 11-Nov-19 29-Nov-19 15 0 Flexible Hose & Hose Connector [RFQ/Bid Close]
PE000PI75370B Flexible Hose & Hose Connector [PO] [Deleted] 23-Jan-20 A 12-Feb-20 23-Jan-20 12-Feb-20 15 13 Flexible Hose & Hose Connector [PO] [Deleted]
PE000PI75370D Flexible Hose & Hose Connector - 1st [FOB] 27-Feb-20 25-Jul-20 27-Feb-20 25-Jul-20 150 150 Flexible Hose & Hose Connector - 1st [FOB]
PE000PI75370E Flexible Hose & Hose Connector - 1st [DTS] 26-Jul-20 22-Aug-20 26-Jul-20 22-Aug-20 28 28 Flexible Hose & Hose Connector - 1st [DTS]
PE000PI75371D Flexible Hose & Hose Connector - Final [FOB] 16-Oct-20 14-Mar-21 14-May-20 10-Oct-20 150 150 Flexible Hose & Hose Connector - Final [FOB]
PE000PI75371E Flexible Hose & Hose Connector - Final [DTS] 15-Mar-21 13-Apr-21 11-Oct-20 09-Nov-20 30 30 Flexible Hose & Hose Connector - Final [DTS]
PE000PI75371F Flexible Hose & Hose Connector [Final Doc.] 14-Apr-21 10-Oct-21 10-Nov-20 08-May-21 180 180 Flexible Hose & Hose Connector [Final Doc.]
Electrical 25-Jul-19 A 27-Mar-22 30-Sep-19 21-Nov-21 611 543 27-Mar-22, Electrical
Electrical Equipment 24-Sep-19 A 07-Jul-21 06-Nov-19 16-Apr-21 425 334 07-Jul-21, Electrical Equipment
PD000EL10002A Existing MV/LV Switchgear Modification [RFQ/Bid Close] 24-Sep-19 A 16-Jan-20 A 06-Nov-19 03-Dec-19 20 0 Existing MV/LV Switchgear Modification [RFQ/Bid Close]
PD000EL10002B Existing MV/LV Switchgear Modification [PO] 09-Mar-20 13-Apr-20 02-Jan-20 22-Jan-20 24 24 Existing MV/LV Switchgear Modification [PO]
PD000EL10002C Existing MV/LV Switchgear Modification [Key VDR] 14-Apr-20 15-May-20 23-Jan-20 21-Feb-20 22 22 Existing MV/LV Switchgear Modification [Key VDR]
PD341EL10002D Existing MV/LV Switchgear Modification [MFG/FOB] 14-Apr-20 09-Nov-20 23-Jan-20 19-Aug-20 210 210 Existing MV/LV Switchgear Modification [MFG/FOB]
PD341EL10002E Existing MV/LV Switchgear Modification [DTS] 10-Nov-20 08-Jan-21 20-Aug-20 18-Oct-20 60 60 Existing MV/LV Switchgear Modification [DTS]
PD341EL10002F Existing MV/LV Switchgear Modification [Final Doc.] 09-Jan-21 07-Jul-21 19-Oct-20 16-Apr-21 180 180 Existing MV/LV Switchgear Modification [Final Doc.]
Earthing and Grouding 25-Jul-19 A 27-Mar-22 30-Sep-19 09-Nov-21 611 543 27-Mar-22, Earthing and Grouding
PA000EL50240A Grounding & Lightning Materials [RFQ/Bid Close] 25-Jul-19 A 12-Aug-19 A 30-Sep-19 22-Oct-19 17 0 Grounding & Lightning Materials [RFQ/Bid Close]
PA000EL50240A_UOP
Grounding & Lightning Materials [RFQ/Bid Close] [Added] 25-Jul-19 A 12-Aug-19 A 17 0 Grounding & Lightning Materials [RFQ/Bid Close] [Added]
PA000EL50240B Grounding & Lightning Materials [PO] 11-Dec-19 A 05-Feb-20 21-Nov-19 04-Dec-19 10 7 Grounding & Lightning Materials [PO]

Actual Level of Effort Actual Work Critical Remaining Work Page 55 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
PA000EL50240B_UOP
Grounding & Lightning Materials [PO] [Added] 06-Apr-20 20-Apr-20 10 10 Grounding & Lightning Materials [PO] [Added]
PA000EL50240D Grounding & Lightning Materials - 1st [MFG/FOB] 06-Feb-20 04-Jul-20 05-Dec-19 02-May-20 150 150 Grounding & Lightning Materials - 1st [MFG/FOB]
PA000EL50240D_UOP
Grounding & Lightning Materials - 1st [MFG/FOB] [Added] 21-Apr-20 17-Sep-20 150 150 Grounding & Lightning Materials - 1st [MFG/FOB] [Added]
PA000EL50240E Grounding & Lightning Materials - 1st [DTS] 05-Jul-20 25-Jul-20 03-May-20 23-May-20 21 21 Grounding & Lightning Materials - 1st [DTS]
PA000EL50240E_UOP
Grounding & Lightning Materials - 1st [DTS] [Added] 18-Sep-20 08-Oct-20 21 21 Grounding & Lightning Materials - 1st [DTS] [Added]
PA000EL50241D Grounding & Lightning Materials - 2nd [MFG/FOB] 28-Oct-20 26-Mar-21 26-Aug-20 22-Jan-21 150 150 Grounding & Lightning Materials - 2nd [MFG/FOB]
PA000EL50241D_UOP
Grounding & Lightning Materials - 2nd [MFG/FOB] [Added] 11-Jan-21 09-Jun-21 150 150 Grounding & Lightning Materials - 2nd [MFG/FOB] [Added]
PA000EL50241E Grounding & Lightning Materials - 2nd [DTS] 27-Mar-21 16-Apr-21 23-Jan-21 12-Feb-21 21 21 Grounding & Lightning Materials - 2nd [DTS]
PA000EL50241E_UOP
Grounding & Lightning Materials - 2nd [DTS] [Added] 10-Jun-21 30-Jun-21 21 21 Grounding & Lightning Materials - 2nd [DTS] [Added]
PA000EL50242D Grounding & Lightning Materials - Final [MFG/FOB] 26-Jan-21 24-Jun-21 24-Nov-20 22-Apr-21 150 150 Grounding & Lightning Materials - Final [MFG/FOB]
PA000EL50242D_UOP
Grounding & Lightning Materials - Final [MFG/FOB] [Added] 11-Apr-21 07-Sep-21 150 150 Grounding & Lightning Materials - Final [MFG/FOB] [Added]
PA000EL50242E Grounding & Lightning Materials - Final [DTS] 25-Jun-21 15-Jul-21 23-Apr-21 13-May-21 21 21 Grounding & Lightning Materials - Final [DTS]
PA000EL50242E_UOP
Grounding & Lightning Materials - Final [DTS] [Added] 08-Sep-21 28-Sep-21 21 21 Grounding & Lightning Materials - Final [DTS] [Added]
PA000EL50242F Grounding & Lightning Materials [Final Doc.] 16-Jul-21 11-Jan-22 14-May-21 09-Nov-21 180 180 Grounding & Lightning Materials [Final Doc.]
PA000EL50242F_UOP
Grounding & Lightning Materials [Final Doc.] [Added] 29-Sep-21 27-Mar-22 180 180 Grounding & Lightning Materials [Final Doc.] [Added]
Lighting 07-Nov-19 A 20-Feb-22 21-Oct-19 21-Nov-21 539 505 20-Feb-22, Lighting
PA000EL60050A LV Power Dist. Panel Board (Indoor & Weather Proof Type) [RFQ/Bid Close] 07-Nov-19 A 06-Jan-20 A 21-Oct-19 08-Nov-19 15 0 LV Power Dist. Panel Board (Indoor & Weather Proof Type) [RFQ/Bid Close]
PA000EL60050B LV Power Dist. Panel Board (Indoor & Weather Proof Type) [PO] 13-Mar-20 27-Mar-20 13-Dec-19 27-Dec-19 10 10 LV Power Dist. Panel Board (Indoor & Weather Proof Type) [PO]
PA000EL60050D LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 1st [MFG/FOB] 28-Mar-20 23-Sep-20 28-Dec-19 24-Jun-20 180 180 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 1st [MFG/FOB]
PA000EL60050E LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 1st [DTS] 24-Sep-20 28-Oct-20 25-Jun-20 29-Jul-20 35 35 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 1st [DTS]
PA000EL60051D LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 2nd [MFG/FOB] 24-Oct-20 21-Apr-21 25-Jul-20 20-Jan-21 180 180 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 2nd [MFG/FOB]
PA000EL60051E LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 2nd [DTS] 22-Apr-21 26-May-21 21-Jan-21 24-Feb-21 35 35 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - 2nd [DTS]
PA000EL60052D LV Power Dist. Panel Board (Indoor & Weather Proof Type) - Final [MFG/FOB] 22-Jan-21 20-Jul-21 23-Oct-20 20-Apr-21 180 180 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - Final [MFG/FOB]
PA000EL60052E LV Power Dist. Panel Board (Indoor & Weather Proof Type) - Final [DTS] 21-Jul-21 24-Aug-21 21-Apr-21 25-May-21 35 35 LV Power Dist. Panel Board (Indoor & Weather Proof Type) - Final [DTS]
PA000EL60052F LV Power Dist. Panel Board (Indoor & Weather Proof Type) [Final Doc.] 25-Aug-21 20-Feb-22 26-May-21 21-Nov-21 180 180 LV Power Dist. Panel Board (Indoor & Weather Proof Type) [F
PE000EL60002A Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [RFQ/Bid Close] 07-Nov-19 A 03-Jan-20 A 21-Oct-19 08-Nov-19 15 0 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [RFQ/Bid Close]
PE000EL60002B Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [PO] 17-Feb-20 28-Feb-20 13-Dec-19 27-Dec-19 10 10 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [PO]
PE000EL60002D Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [MFG/FOB] 29-Feb-20 27-Jul-20 28-Dec-19 25-May-20 150 150 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [MFG/FOB]
PE000EL60002E Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [DTS] 28-Jul-20 10-Aug-20 26-May-20 08-Jun-20 14 14 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [DTS]
PE000EL60002F Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [Final Doc.] 11-Aug-20 06-Feb-21 09-Jun-20 05-Dec-20 180 180 Lighting Fixture (Indoor & Outdoor - Weather Proof Type) [Final Doc.]
Fire Alarm 21-Aug-19 A 14-Jun-21 10-Oct-19 18-Oct-20 408 329 14-Jun-21, Fire Alarm
PE000EL68110A Fire Alarm System [RFQ/Bid Close] 21-Aug-19 A 11-Nov-19 A 10-Oct-19 04-Nov-19 18 0 Fire Alarm System [RFQ/Bid Close]
PE000EL68110A_UOP
Fire Alarm System [RFQ/Bid Close] [Added] 21-Aug-19 A 11-Nov-19 A 18 0 Fire Alarm System [RFQ/Bid Close] [Added]
PE000EL68110B Fire Alarm System [PO] 20-Feb-20 06-Mar-20 06-Dec-19 23-Dec-19 12 12 Fire Alarm System [PO]
PE000EL68110B_UOP
Fire Alarm System [PO] [Added] 30-Jul-20 18-Aug-20 12 12 Fire Alarm System [PO] [Added]
PE000EL68110C Fire Alarm System [Key VDR] 09-Mar-20 28-Apr-20 24-Dec-19 12-Feb-20 35 35 Fire Alarm System [Key VDR]
PE000EL68110C_UOP
Fire Alarm System [Key VDR] [Added] 19-Aug-20 07-Oct-20 35 35 Fire Alarm System [Key VDR] [Added]
PE000EL68110D Fire Alarm System [MFG/FOB] 07-Mar-20 01-Nov-20 24-Dec-19 19-Aug-20 240 240 Fire Alarm System [MFG/FOB]
PE000EL68110D_UOP
Fire Alarm System [MFG/FOB] [Added] 19-Aug-20 15-Apr-21 240 240 Fire Alarm System [MFG/FOB] [Added]
PE000EL68110E Fire Alarm System [DTS] 02-Nov-20 31-Dec-20 20-Aug-20 18-Oct-20 60 60 Fire Alarm System [DTS]
PE000EL68110E_UOP
Fire Alarm System [DTS] [Added] 16-Apr-21 14-Jun-21 60 60 Fire Alarm System [DTS] [Added]
Others 06-Jan-20 A 19-Jun-21 02-Dec-19 06-May-21 350 350 19-Jun-21, Others
PE000EL75002A Berthing Aid System (For Jetty Only) [RFQ/Bid Close] 06-Jan-20 A 07-Feb-20 02-Dec-19 20-Dec-19 15 10 Berthing Aid System (For Jetty Only) [RFQ/Bid Close]
PE000EL75002B Berthing Aid System (For Jetty Only) [PO] 09-Mar-20 20-Mar-20 23-Jan-20 05-Feb-20 10 10 Berthing Aid System (For Jetty Only) [PO]
PE000EL75002C Berthing Aid System (For Jetty Only) [Key VDR] 23-Mar-20 23-Apr-20 06-Feb-20 06-Mar-20 22 22 Berthing Aid System (For Jetty Only) [Key VDR]
PE323EL75002D Berthing Aid System (For Jetty Only) [MFG/FOB] 21-Mar-20 15-Nov-20 06-Feb-20 02-Oct-20 240 240 Berthing Aid System (For Jetty Only) [MFG/FOB]
PE323EL75002E Berthing Aid System (For Jetty Only) [DTS] 16-Nov-20 21-Dec-20 03-Oct-20 07-Nov-20 36 36 Berthing Aid System (For Jetty Only) [DTS]
PE323EL75002F Berthing Aid System (For Jetty Only) [Final Doc.] 22-Dec-20 19-Jun-21 08-Nov-20 06-May-21 180 180 Berthing Aid System (For Jetty Only) [Final Doc.]
Instrumentation & Control 31-Jul-19 A 28-Mar-22 12-Sep-19 06-Jul-21 626 544 28-Mar-22, Instrumentation & Control
Control System 31-Jul-19 A 28-Mar-22 12-Sep-19 06-Jul-21 624 544 28-Mar-22, Control System
PB000IC40022A Single Loop Control [RFQ/Bid Close] 30-Aug-19 A 23-Oct-19 A 28-Feb-20 19-Mar-20 15 0 Single Loop Control [RFQ/Bid Close]
PB000IC40022B Single Loop Control [PO] 16-Mar-20 30-Mar-20 29-Apr-20 14-May-20 10 10 Single Loop Control [PO]
PB000IC40022C Single Loop Control [Key VDR] 31-Mar-20 30-Apr-20 15-May-20 24-Jun-20 22 22 Single Loop Control [Key VDR]
PB000IC40022D Single Loop Control [MFG/FOB] 31-Mar-20 26-Oct-20 15-May-20 10-Dec-20 210 210 Single Loop Control [MFG/FOB]
PB000IC40022E Single Loop Control [DTS] 27-Oct-20 23-Nov-20 11-Dec-20 07-Jan-21 28 28 Single Loop Control [DTS]
PB000IC40022F Single Loop Control [Final Doc.] 24-Nov-20 22-May-21 08-Jan-21 06-Jul-21 180 180 Single Loop Control [Final Doc.]
PD000IC40002A Multi Cable Transit & Accessorie s [RFQ/Bid Close] 01-Nov-19 A 31-Jan-20 09-Oct-19 29-Oct-19 15 5 Multi Cable Transit & Accessorie s [RFQ/Bid Close]
PD000IC40002B Multi Cable Transit & Accessorie s [PO] 09-Mar-20 30-Mar-20 06-Dec-19 27-Dec-19 15 15 Multi Cable Transit & Accessorie s [PO]
PD000IC40002D Multi Cable Transit & Accessorie s [MFG/FOB] 31-Mar-20 26-Sep-20 28-Dec-19 24-Jun-20 180 180 Multi Cable Transit & Accessorie s [MFG/FOB]
PD000IC40002E Multi Cable Transit & Accessorie s [DTS] 27-Sep-20 17-Oct-20 25-Jun-20 15-Jul-20 21 21 Multi Cable Transit & Accessorie s [DTS]
PD000IC40002F Multi Cable Transit & Accessorie s [Fin al Doc.] 18-Oct-20 15-Apr-21 16-Jul-20 11-Jan-21 180 180 Multi Cable Transit & Accessorie s [Fin al Doc.]
PE000IC40012A Custody Transfer and Fiscal Metering System [RFQ/Bid Close] 31-Jul-19 A 29-Aug-19 A 12-Sep-19 02-Oct-19 15 0 Custody Transfer and Fiscal Metering System [RFQ/Bid Close]
PE000IC40012B Custody Transfer and Fiscal Metering System [PO] 12-Dec-19 A 23-Dec-19 A 04-Nov-19 19-Nov-19 12 0 Custody Transfer and Fiscal Metering System [PO]
PE000IC40012C Custody Transfer and Fiscal Metering System [Key VDR] 24-Dec-19 A 09-Mar-20 20-Nov-19 19-Dec-19 22 31 Custody Transfer and Fiscal Metering System [Key VDR]
PE000IC40012D Custody Transfer and Fiscal Metering System [MFG/FOB] 24-Dec-19 A 14-Jan-21 20-Nov-19 13-Nov-20 360 355 Custody Transfer and Fiscal Metering System [MFG/FOB]
PE000IC40012E Custody Transfer and Fiscal Metering System [DTS] 15-Jan-21 11-Feb-21 14-Nov-20 11-Dec-20 28 28 Custody Transfer and Fiscal Metering System [DTS]
PE000IC40012F Custody Transfer and Fiscal Metering System [Final Doc.] 12-Feb-21 10-Aug-21 12-Dec-20 09-Jun-21 180 180 Custody Transfer and Fiscal Metering System [Final Doc.]
PE000IC40015A Upgrading and Modification Fiscal Custody Metering System [RFQ/Bid Close] [Added] 27-Jan-20 21-Feb-20 20 20 Upgrading and Modification Fiscal Custody Metering System [RFQ/Bid Close] [Added]
PE000IC40015B Upgrading and Modification Fiscal Custody Metering System [PO] [Added] 23-Apr-20 15-May-20 15 15 Upgrading and Modification Fiscal Custody Metering System [PO] [Added]
PE000IC40015C Upgrading and Modification Fiscal Custody Metering System [Key VDR] [Added] 18-May-20 21-Aug-20 60 60 Upgrading and Modification Fiscal Custody Metering System [Key VDR] [Added]
PE000IC40015D Upgrading and Modification Fiscal Custody Metering System [MFG/FOB] [Added] 16-May-20 10-May-21 360 360 Upgrading and Modification Fiscal Custody Metering System [MFG/FOB] [Added]
PE000IC40015E Upgrading and Modification Fiscal Custody Metering System [DTS] [Added] 11-May-21 09-Jul-21 60 60 Upgrading and Modification Fiscal Custody Metering System [DTS] [Added]
PE000IC40015F Upgrading and Modification Fiscal Custody Metering System [Final Doc.] [Added] 12-Jul-21 28-Mar-22 180 180 Upgrading and Modification Fiscal Custody Metering Sy
Anlayzer 12-Nov-19 A 29-Mar-21 23-Oct-19 17-Jan-21 311 274 29-Mar-21, Anlayzer

Actual Level of Effort Actual Work Critical Remaining Work Page 56 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
PE000IC45002A Gas Detector and Alarms [RFQ/Bid Close] 12-Nov-19 A 27-Nov-19 A 23-Oct-19 12-Nov-19 15 0 Gas Detector and Alarms [RFQ/Bid Close]
PE000IC45002B Gas Detector and Alarms [PO] 24-Feb-20 06-Mar-20 12-Dec-19 26-Dec-19 10 10 Gas Detector and Alarms [PO]
PE000IC45002C Gas Detector and Alarms [Key VDR] 09-Mar-20 08-Apr-20 27-Dec-19 28-Jan-20 22 22 Gas Detector and Alarms [Key VDR]
PE000IC45002D Gas Detector and Alarms [MFG/FOB] 07-Mar-20 02-Sep-20 27-Dec-19 23-Jun-20 180 180 Gas Detector and Alarms [MFG/FOB]
PE000IC45002E Gas Detector and Alarms [DTS] 03-Sep-20 30-Sep-20 24-Jun-20 21-Jul-20 28 28 Gas Detector and Alarms [DTS]
PE000IC45002F Gas Detector and Alarms [Final Doc.] 01-Oct-20 29-Mar-21 22-Jul-20 17-Jan-21 180 180 Gas Detector and Alarms [Final Doc.]
Valve 03-Sep-19 A 02-May-21 16-Oct-19 29-Jan-21 399 312 02-May-21, Valve
PE000IC50002A MOV & AOV (Ball Type) [RFQ/Bid Close] 03-Sep-19 A 10-Oct-19 A 17-Oct-19 06-Nov-19 15 0 MOV & AOV (Ball Type) [RFQ/Bid Close]
PE000IC50002B MOV & AOV (Ball Type) [PO] 10-Mar-20 26-Mar-20 09-Dec-19 24-Dec-19 12 12 MOV & AOV (Ball Type) [PO]
PE000IC50002C MOV & AOV (Ball Type) [Key VDR] 27-Mar-20 28-Apr-20 26-Dec-19 27-Jan-20 22 22 MOV & AOV (Ball Type) [Key VDR]
PE000IC50002D MOV & AOV (Ball Type) [MFG/FOB] 27-Mar-20 22-Sep-20 25-Dec-19 21-Jun-20 180 180 MOV & AOV (Ball Type) [MFG/FOB]
PE000IC50002E MOV & AOV (Ball Type) [DTS] 23-Sep-20 03-Nov-20 22-Jun-20 02-Aug-20 42 42 MOV & AOV (Ball Type) [DTS]
PE000IC50002F MOV & AOV (Ball Type) [Final Doc.] 04-Nov-20 02-May-21 03-Aug-20 29-Jan-21 180 180 MOV & AOV (Ball Type) [Final Doc.]
PE000IC50012A Control Valve & Pressure Regulator [RFQ/Bid Close] 03-Sep-19 A 10-Oct-19 A 16-Oct-19 05-Nov-19 15 0 Control Valve & Pressure Regulator [RFQ/Bid Close]
PE000IC50012B Control Valve & Pressure Regulator [PO] 18-Feb-20 04-Mar-20 06-Dec-19 23-Dec-19 12 12 Control Valve & Pressure Regulator [PO]
PE000IC50012C Control Valve & Pressure Regulator [Key VDR] 05-Mar-20 06-Apr-20 24-Dec-19 24-Jan-20 22 22 Control Valve & Pressure Regulator [Key VDR]
PE000IC50012D Control Valve & Pressure Regulator [MFG/FOB] 05-Mar-20 31-Aug-20 24-Dec-19 20-Jun-20 180 180 Control Valve & Pressure Regulator [MFG/FOB]
PE000IC50012E Control Valve & Pressure Regulator [DTS] 01-Sep-20 12-Oct-20 21-Jun-20 01-Aug-20 42 42 Control Valve & Pressure Regulator [DTS]
PE000IC50012F Control Valve & Pressure Regulator [Final Doc.] 13-Oct-20 10-Apr-21 02-Aug-20 28-Jan-21 180 180 Control Valve & Pressure Regulator [Final Doc.]
PE000IC50022A On-Off Valve (Ball Type) [RFQ/Bid Close] 03-Sep-19 A 10-Oct-19 A 16-Oct-19 05-Nov-19 15 0 On-Off Valve (Ball Type) [RFQ/Bid Close]
PE000IC50022B On-Off Valve (Ball Type) [PO] 10-Mar-20 26-Mar-20 06-Dec-19 23-Dec-19 12 12 On-Off Valve (Ball Type) [PO]
PE000IC50022C On-Off Valve (Ball Type) [Key VDR] 27-Mar-20 28-Apr-20 24-Dec-19 24-Jan-20 22 22 On-Off Valve (Ball Type) [Key VDR]
PE000IC50022D On-Off Valve (Ball Type) [MFG/FOB] 27-Mar-20 22-Sep-20 24-Dec-19 20-Jun-20 180 180 On-Off Valve (Ball Type) [MFG/FOB]
PE000IC50022E On-Off Valve (Ball Type) [DTS] 23-Sep-20 03-Nov-20 21-Jun-20 01-Aug-20 42 42 On-Off Valve (Ball Type) [DTS]
PE000IC50022F On-Off Valve (Ball Type) [Final Doc.] 04-Nov-20 02-May-21 02-Aug-20 28-Jan-21 180 180 On-Off Valve (Ball Type) [Final Doc.]
PE000IC50032A Pressure Safety & Relief Valve [RFQ/Bid Close] 06-Sep-19 A 10-Oct-19 A 16-Oct-19 05-Nov-19 15 0 Pressure Safety & Relief Valve [RFQ/Bid Close]
PE000IC50032B Pressure Safety & Relief Valve [PO] 04-Feb-20 19-Feb-20 06-Dec-19 23-Dec-19 12 12 Pressure Safety & Relief Valve [PO]
PE000IC50032C Pressure Safety & Relief Valve [Key VDR] 20-Feb-20 20-Mar-20 24-Dec-19 24-Jan-20 22 22 Pressure Safety & Relief Valve [Key VDR]
PE000IC50032D Pressure Safety & Relief Valve [MFG/FOB] 20-Feb-20 03-Jul-20 24-Dec-19 06-May-20 135 135 Pressure Safety & Relief Valve [MFG/FOB]
PE000IC50032E Pressure Safety & Relief Valve [DTS] 12-Oct-20 01-Nov-20 07-May-20 27-May-20 21 21 Pressure Safety & Relief Valve [DTS]
PE000IC50032F Pressure Safety & Relief Valve [Final Doc.] 02-Nov-20 30-Apr-21 28-May-20 23-Nov-20 180 180 Pressure Safety & Relief Valve [Final Doc.]
Field Instrument 17-Sep-19 A 22-Mar-21 17-Oct-19 22-Jan-21 350 264 22-Mar-21, Field Instrument
PE000IC53002A Flow Element [RFQ/Bid Close] [Deleted, Consolidated by PC000IC53070] 24-Sep-19 A 27-Nov-19 A 07-Nov-19 27-Nov-19 15 0 Flow Element [RFQ/Bid Close] [Deleted, Consolidated by PC000IC53070]
PE000IC53002B Flow Element [PO] 09-Mar-20 20-Mar-20 27-Dec-19 10-Jan-20 10 10 Flow Element [PO]
PE000IC53002C Flow Element [Key VDR] 23-Mar-20 23-Apr-20 13-Jan-20 11-Feb-20 22 22 Flow Element [Key VDR]
PE000IC53002D Flow Element [MFG/FOB] 21-Mar-20 18-Jul-20 11-Jan-20 09-May-20 120 120 Flow Element [MFG/FOB]
PE000IC53002E Flow Element [DTS] 19-Jul-20 01-Aug-20 10-May-20 23-May-20 14 14 Flow Element [DTS]
PE000IC53002F Flow Element [Final Doc.] 02-Aug-20 28-Jan-21 24-May-20 19-Nov-20 180 180 Flow Element [Final Doc.]
PE000IC53012A Radar and GWR type Level Instrument [RFQ/Bid Close] 24-Sep-19 A 06-Nov-19 A 17-Oct-19 06-Nov-19 15 0 Radar and GWR type Level Instrument [RFQ/Bid Close]
PE000IC53012B Radar and GWR type Level Instrument [PO] 09-Mar-20 20-Mar-20 06-Dec-19 19-Dec-19 10 10 Radar and GWR type Level Instrument [PO]
PE000IC53012C Radar and GWR type Level Instrument [Key VDR] 23-Mar-20 23-Apr-20 20-Dec-19 22-Jan-20 22 22 Radar and GWR type Level Instrument [Key VDR]
PE000IC53012D Radar and GWR type Level Instrument [MFG/FOB] 21-Mar-20 18-Jul-20 20-Dec-19 17-Apr-20 120 120 Radar and GWR type Level Instrument [MFG/FOB]
PE000IC53012E Radar and GWR type Level Instrument [DTS] 19-Jul-20 01-Aug-20 18-Apr-20 01-May-20 14 14 Radar and GWR type Level Instrument [DTS]
PE000IC53012F Radar and GWR type Level Instrument [Final Doc.] 02-Aug-20 28-Jan-21 02-May-20 28-Oct-20 180 180 Radar and GWR type Level Instrument [Final Doc.]
PE000IC53022A Level Gauge & Flow Sight Glass [RFQ/Bid Close] 17-Sep-19 A 15-Jan-20 A 07-Nov-19 27-Nov-19 15 0 Level Gauge & Flow Sight Glass [RFQ/Bid Close]
PE000IC53022B Level Gauge & Flow Sight Glass [PO] 09-Mar-20 20-Mar-20 27-Dec-19 10-Jan-20 10 10 Level Gauge & Flow Sight Glass [PO]
PE000IC53022C Level Gauge & Flow Sight Glass [Key VDR] 23-Mar-20 23-Apr-20 13-Jan-20 11-Feb-20 22 22 Level Gauge & Flow Sight Glass [Key VDR]
PE000IC53022D Level Gauge & Flow Sight Glass [MFG/FOB] 21-Mar-20 18-Jul-20 11-Jan-20 09-May-20 120 120 Level Gauge & Flow Sight Glass [MFG/FOB]
PE000IC53022E Level Gauge & Flow Sight Glass [DTS] 19-Jul-20 01-Aug-20 10-May-20 23-May-20 14 14 Level Gauge & Flow Sight Glass [DTS]
PE000IC53022F Level Gauge & Flow Sight Glass [Final Doc.] 02-Aug-20 28-Jan-21 24-May-20 19-Nov-20 180 180 Level Gauge & Flow Sight Glass [Final Doc.]
PE000IC53032A Smart Field Transmitter [RFQ/Bid Close] [Deleted, Consolidated by PC000IC53300] 23-Nov-19 A 02-Dec-19 A 12-Nov-19 02-Dec-19 15 0 Smart Field Transmitter [RFQ/Bid Close] [Deleted, Consolidated by PC000IC53300]
PE000IC53032B Smart Field Transmitter [PO] 02-Mar-20 13-Mar-20 31-Dec-19 14-Jan-20 10 10 Smart Field Transmitter [PO]
PE000IC53032C Smart Field Transmitter [Key VDR] 16-Mar-20 16-Apr-20 15-Jan-20 13-Feb-20 22 22 Smart Field Transmitter [Key VDR]
PE000IC53032D Smart Field Transmitter [MFG/FOB] 14-Mar-20 09-Sep-20 15-Jan-20 12-Jul-20 180 180 Smart Field Transmitter [MFG/FOB]
PE000IC53032E Smart Field Transmitter [DTS] 10-Sep-20 23-Sep-20 13-Jul-20 26-Jul-20 14 14 Smart Field Transmitter [DTS]
PE000IC53032F Smart Field Transmitter [Final Doc.] 24-Sep-20 22-Mar-21 27-Jul-20 22-Jan-21 180 180 Smart Field Transmitter [Final Doc.]
PE000IC53042A Local Gauge [RFQ/Bid Close] [Deleted] 07-Nov-19 A 27-Nov-19 A 07-Nov-19 27-Nov-19 15 0 Local Gauge [RFQ/Bid Close] [Deleted]
PE000IC53042B Local Gauge [PO] 15-May-20 08-Jun-20 27-Dec-19 10-Jan-20 10 10 Local Gauge [PO]
PE000IC53042C Local Gauge [Key VDR] 09-Jun-20 08-Jul-20 13-Jan-20 11-Feb-20 22 22 Local Gauge [Key VDR]
PE000IC53042D Local Gauge [MFG/FOB] 09-Jun-20 06-Sep-20 11-Jan-20 09-Apr-20 90 90 Local Gauge [MFG/FOB]
PE000IC53042E Local Gauge [DTS] 07-Sep-20 20-Sep-20 10-Apr-20 23-Apr-20 14 14 Local Gauge [DTS]
PE000IC53042F Local Gauge [Final Doc.] 21-Sep-20 19-Mar-21 24-Apr-20 20-Oct-20 180 180 Local Gauge [Final Doc.]
Cable 25-Dec-19 A 15-Apr-21 02-Dec-19 20-Feb-21 326 272 15-Apr-21, Cable
PD000IC60022A Instrument Cable Gland [RFQ/Bid Close] 25-Dec-19 A 02-Jan-20 A 02-Dec-19 20-Dec-19 15 0 Instrument Cable Gland [RFQ/Bid Close]
PD000IC60022B Instrument Cable Gland [PO] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 Instrument Cable Gland [PO]
PD000IC60022D Instrument Cable Gland [MFG/FOB] 31-Mar-20 26-Sep-20 06-Feb-20 03-Aug-20 180 180 Instrument Cable Gland [MFG/FOB]
PD000IC60022E Instrument Cable Gland [DTS] 27-Sep-20 17-Oct-20 04-Aug-20 24-Aug-20 21 21 Instrument Cable Gland [DTS]
PD000IC60022F Instrument Cable Gland [Final Doc.] 18-Oct-20 15-Apr-21 25-Aug-20 20-Feb-21 180 180 Instrument Cable Gland [Final Doc.]
Other Instrument Work 02-Dec-19 A 22-Apr-21 25-Nov-19 27-Feb-21 331 311 22-Apr-21, Other Instrument Work
PD000IC75010A Instrument Junction Boxes [RFQ/Bid Close] 25-Dec-19 A 02-Jan-20 A 02-Dec-19 20-Dec-19 15 0 Instrument Junction Boxes [RFQ/Bid Close]
PD000IC75010B Instrument Junction Boxes [PO] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 Instrument Junction Boxes [PO]
PD000IC75010D Instrument Junction Boxes [MFG/FOB] 31-Mar-20 26-Sep-20 06-Feb-20 03-Aug-20 180 180 Instrument Junction Boxes [MFG/FOB]
PD000IC75010E Instrument Junction Boxes [DTS] 27-Sep-20 24-Oct-20 04-Aug-20 31-Aug-20 28 28 Instrument Junction Boxes [DTS]
PD000IC75010F Instrument Junction Boxes [Final Doc.] 25-Oct-20 22-Apr-21 01-Sep-20 27-Feb-21 180 180 Instrument Junction Boxes [Final Doc.]

Actual Level of Effort Actual Work Critical Remaining Work Page 57 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
PD000IC75052A Instrument Support [RFQ/Bid Close] 03-Feb-20 21-Feb-20 25-Nov-19 13-Dec-19 15 15 Instrument Support [RFQ/Bid Close]
PD000IC75052B Instrument Support [PO] 23-Mar-20 06-Apr-20 15-Jan-20 28-Jan-20 10 10 Instrument Support [PO]
PD000IC75052D Instrument Support [MFG/FOB] 07-Apr-20 03-Sep-20 29-Jan-20 26-Jun-20 150 150 Instrument Support [MFG/FOB]
PD000IC75052E Instrument Support [DTS] 04-Sep-20 01-Oct-20 27-Jun-20 24-Jul-20 28 28 Instrument Support [DTS]
PD000IC75052F Instrument Support [Final Doc.] 02-Oct-20 30-Mar-21 25-Jul-20 20-Jan-21 180 180 Instrument Support [Final Doc.]
PE000IC75032A Instrument Tube, Valve and Tube Fittings [RFQ/Bid Close] 03-Jan-20 A 13-Jan-20 A 02-Dec-19 20-Dec-19 15 0 Instrument Tube, Valve and Tube Fittings [RFQ/Bid Close]
PE000IC75032B Instrument Tube, Valve and Tube Fittings [PO] 16-Mar-20 30-Mar-20 23-Jan-20 05-Feb-20 10 10 Instrument Tube, Valve and Tube Fittings [PO]
PE000IC75032D Instrument Tube, Valve and Tube Fittings [MFG/FOB] 31-Mar-20 26-Sep-20 06-Feb-20 03-Aug-20 180 180 Instrument Tube, Valve and Tube Fittings [MFG/FOB]
PE000IC75032E Instrument Tube, Valve and Tube Fittings [DTS] 27-Sep-20 24-Oct-20 04-Aug-20 31-Aug-20 28 28 Instrument Tube, Valve and Tube Fittings [DTS]
PE000IC75032F Instrument Tube, Valve and Tube Fittings [Final Doc.] 25-Oct-20 22-Apr-21 01-Sep-20 27-Feb-21 180 180 Instrument Tube, Valve and Tube Fittings [Final Doc.]
PE000IC75042A Instrument Piping and Pipe Fittings [RFQ/Bid Close] [Deleted] 02-Dec-19 A 20-Dec-19 A 02-Dec-19 20-Dec-19 15 0 Instrument Piping and Pipe Fittings [RFQ/Bid Close] [Deleted]
PE000IC75042B Instrument Piping and Pipe Fittings [PO] [Deleted] 23-Jan-20 A 05-Feb-20 23-Jan-20 05-Feb-20 10 8 Instrument Piping and Pipe Fittings [PO] [Deleted]
PE000IC75042D Instrument Piping and Pipe Fittings [MFG/FOB] 06-Feb-20 03-Aug-20 06-Feb-20 03-Aug-20 180 180 Instrument Piping and Pipe Fittings [MFG/FOB]
PE000IC75042E Instrument Piping and Pipe Fittings [DTS] 04-Aug-20 31-Aug-20 04-Aug-20 31-Aug-20 28 28 Instrument Piping and Pipe Fittings [DTS]
PE000IC75042F Instrument Piping and Pipe Fittings [Final Doc.] 01-Sep-20 27-Feb-21 01-Sep-20 27-Feb-21 180 180 Instrument Piping and Pipe Fittings [Final Doc.]
Construction 31-May-19 A 22-Apr-22 18-Oct-19 30-Nov-21 591 563 22-Apr-22, Construction
Civil 31-May-19 A 16-Jun-21 18-Oct-19 26-Mar-21 403 374 16-Jun-21, Civil
Piling 31-May-19 A 27-Jan-21 18-Oct-19 22-Jul-20 305 276 27-Jan-21, Piling
CB319CV30005 Piling Work(Building/Shelter)_U319 09-May-20 30-May-20 09-Jul-20 22-Jul-20 12 12 Piling Work(Building/Shelter)_U319
CB320CV30005 Piling Work(Building/Shelter)_U320 06-Jun-20 10-Jul-20 14-May-20 26-Jun-20 30 30 Piling Work(Building/Shelter)_U320
CB320CV30010 Stone Column_(Building/Shelter)_U320&U325 [Deleted] 08-Jan-21 27-Jan-21 19-Feb-20 09-Mar-20 14 14 Stone Column_(Building/Shelter)_U320&U325 [Deleted]
CB320CV30010A Stone Column_(Building/Shelter)_U320 [Added]->[Deleted] 27-Jan-20 13-Feb-20 14 14 Stone Column_(Building/Shelter)_U320 [Added]->[Deleted]
CB320CV30010B Stone Column_U325 [Added] -> [Deleted] 10-Jun-20 24-Jul-20 39 39 Stone Column_U325 [Added] -> [Deleted]
CC334CV30005 Piling Work (Building/Shelter)_U334 08-Jun-20 04-Jul-20 03-Apr-20 02-May-20 24 24 Piling Work (Building/Shelter)_U334
CC334CV30015 Stone Column_SS-102&105&111 and U337 22-Nov-19 A 20-May-20 24-Feb-20 23-Mar-20 67 62 Stone Column_SS-102&105&111 and U337
CC334CV30015A Stone Column(SS-102)_U334 [Added] 13-Dec-19 A 20-May-20 39 86 Stone Column(SS-102)_U334 [Added]
CC334CV30015B Stone Column_U337 [Added] 22-Nov-19 A 06-Apr-20 14 51 Stone Column_U337 [Added]
CC334CV30015C Stone Column(SS-105)_U337 [Added] 02-May-20 16-May-20 12 12 Stone Column(SS-105)_U337 [Added]
CC334CV30015D Stone Column_(SS-101)_U331 [Added] 21-Jan-20 A 25-Apr-20 30 67 Stone Column_(SS-101)_U331 [Added]
CC337CV30005 Piling Work (Building/Shelter)_U337 08-Jun-20 29-Sep-20 08-May-20 01-Jul-20 95 95 Piling Work (Building/Shelter)_U337
CD331CV30005 Stone Column_U320(Early Work) & 331 31-May-19 A 30-Apr-20 18-Oct-19 24-Dec-19 50 71 Stone Column_U320(Early Work) & 331
CE323CV30005 Piling Work_U323 07-Apr-20 15-Jul-20 19-Dec-19 04-Apr-20 75 75 Piling Work_U323
Foundation - Piperack 10-Sep-20 09-Dec-20 13-Jun-20 08-Sep-20 72 72 09-Dec-20, Foundation - Piperack
CE323CV35105 Pile Cap(South Piperack)_U323 10-Sep-20 05-Nov-20 13-Jun-20 08-Aug-20 48 48 Pile Cap(South Piperack)_U323
CE323CV35125 Pile Cap(North Piperack)_U323 08-Oct-20 09-Dec-20 11-Jul-20 08-Sep-20 48 48 Pile Cap(North Piperack)_U323
Foundation - Equipment Structure 29-Jun-20 23-Sep-20 19-Mar-20 26-Jun-20 72 72 23-Sep-20, Foundation - Equipment Structure
CE323CV40005 Pile Cap(Platform Jetty)_U323 29-Jun-20 23-Sep-20 19-Mar-20 26-Jun-20 72 72 Pile Cap(Platform Jetty)_U323
Foundation - Sleeper & Local Support 14-Jul-20 26-Nov-20 08-May-20 25-Sep-20 110 110 26-Nov-20, Foundation - Sleeper & Local Support
CB320CV45005 Foundation - Sleeper_U320 14-Jul-20 26-Nov-20 08-May-20 25-Sep-20 110 110 Foundation - Sleeper_U320
Foundation - Equipment 03-Sep-20 23-Feb-21 06-Jun-20 22-Feb-21 129 129 23-Feb-21, Foundation - Equipment
CB319CV90015 Foundation - Metering Skid(MS-323-05 A/B)_U323 12-Jan-21 23-Feb-21 10-Dec-20 22-Jan-21 30 30 Foundation - Metering Skid(MS-323-05 A/B)_U323
CB319CV90020 Foundation - Metering Skid(MS-323-06 A/B)_U323 12-Jan-21 23-Feb-21 10-Dec-20 22-Jan-21 30 30 Foundation - Metering Skid(MS-323-06 A/B)_U323
CB320CV55025 Equipment Foundation(G-320-14A/B/C, G-320-24A/B/C)_U320 14-Dec-20 22-Feb-21 14-Dec-20 22-Feb-21 48 48 Equipment Foundation(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320CV55050 Equipment Foundation(G-320-025A/B/C)_U320 22-Oct-20 28-Dec-20 22-Oct-20 28-Dec-20 48 48 Equipment Foundation(G-320-025A/B/C)_U320
CC337CV55005 Equipment Foundation (337-SWR-002)_U337 30-Sep-20 27-Oct-20 14-Aug-20 12-Sep-20 24 24 Equipment Foundation (337-SWR-002)_U337
CC337CV55010 Equipment Foundation (337-SWR-005A/B/C/D/E)_U337 19-Oct-20 14-Dec-20 04-Sep-20 22-Oct-20 42 42 Equipment Foundation (337-SWR-005A/B/C/D/E)_U337
CC337CV55015 Equipment Foundation (337-SWR-004A/B/C/D/E)_U337 19-Oct-20 14-Dec-20 04-Sep-20 22-Oct-20 42 42 Equipment Foundation (337-SWR-004A/B/C/D/E)_U337
CE323CV55005 Foundation - Metering Skid(MS-323-01 A/B)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(MS-323-01 A/B)_U323
CE323CV55010 Foundation - Metering Skid(MS-323-07 A/B)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(MS-323-07 A/B)_U323
CE323CV55015 Foundation - Metering Skid(MS-323-04 A/B)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(MS-323-04 A/B)_U323
CE323CV55025 Foundation - Metering Skid(MS-323-03)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(MS-323-03)_U323
CE323CV55030 Foundation - Metering Skid(FQIT-855 A/B)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(FQIT-855 A/B)_U323
CE323CV55035 Foundation - Metering Skid(FQIT-518 A/B)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(FQIT-518 A/B)_U323
CE323CV55040 Foundation - Metering Skid(MS-323-02)_U323 28-Sep-20 02-Nov-20 01-Jul-20 05-Aug-20 30 30 Foundation - Metering Skid(MS-323-02)_U323
CE323CV55110 Foundation - Loading Arm(L-323-05 A/B)_U323 03-Sep-20 21-Oct-20 06-Jun-20 24-Jul-20 42 42 Foundation - Loading Arm(L-323-05 A/B)_U323
CE323CV55115 Foundation - Loading Arm(L-323-02)_U323 03-Sep-20 21-Oct-20 06-Jun-20 24-Jul-20 42 42 Foundation - Loading Arm(L-323-02)_U323
CE323CV55120 Foundation - Loading Arm(L-323-03)_U323 03-Sep-20 21-Oct-20 06-Jun-20 24-Jul-20 42 42 Foundation - Loading Arm(L-323-03)_U323
CE323CV55125 Foundation - Loading Arm(L-323-01 A/B)_U323 03-Sep-20 21-Oct-20 06-Jun-20 24-Jul-20 42 42 Foundation - Loading Arm(L-323-01 A/B)_U323
CE323CV55135 Foundation - Loading Arm(L-323-04)_U323 03-Sep-20 21-Oct-20 06-Jun-20 24-Jul-20 42 42 Foundation - Loading Arm(L-323-04)_U323
Foundation - Miscellaneous 27-Aug-20 13-Nov-20 29-May-20 15-Aug-20 66 66 13-Nov-20, Foundation - Miscellaneous
CE323CV57030 Pile Cap Mooring Dolphin (5 unit)_U323 24-Sep-20 13-Nov-20 27-Jun-20 15-Aug-20 42 42 Pile Cap Mooring Dolphin (5 unit)_U323
CE323CV57035 Pile Cap Breasting Dolphin (4 unit)_U323 27-Aug-20 28-Oct-20 29-May-20 01-Aug-20 54 54 Pile Cap Breasting Dolphin (4 unit)_U323
Drainage/Trench/Other U/G Work 09-Oct-20 09-Mar-21 14-Jul-20 24-Nov-20 108 108 09-Mar-21, Drainage/Trench/Other U/G Work
CB320CV65205 Duct Banks_U323 09-Oct-20 10-Feb-21 14-Jul-20 30-Oct-20 90 90 Duct Banks_U323
CB320CV65215 Culvert_U323 31-Oct-20 09-Mar-21 05-Aug-20 24-Nov-20 90 90 Culvert_U323
Other Civil Work 16-Nov-20 01-Feb-21 18-Aug-20 20-Oct-20 54 54 01-Feb-21, Other Civil Work
CE323CV80010 Installation - QRH Bollard Mooring Dolphin_U323 16-Nov-20 06-Jan-21 18-Aug-20 29-Sep-20 36 36 Installation - QRH Bollard Mooring Dolphin_U323
CE323CV80015 Installation - QRH Bollard Breasting Dolphin_U323 16-Nov-20 06-Jan-21 18-Aug-20 29-Sep-20 36 36 Installation - QRH Bollard Breasting Dolphin_U323
CE323CV80020 Installation - Fender Breasting Dolphin_U323 10-Dec-20 01-Feb-21 09-Sep-20 20-Oct-20 36 36 Installation - Fender Breasting Dolphin_U323
Revamping Work 21-May-21 16-Jun-21 25-Feb-21 26-Mar-21 21 21 16-Jun-21, Revamping Work
CE323CV90005 Demolition Existing Building (323-JET-002)_U323 21-May-21 16-Jun-21 25-Feb-21 26-Mar-21 21 21 Demolition Existing Building (323-JET-002)_U323
Steel Structure 06-Nov-20 10-Apr-21 10-Aug-20 24-Dec-20 108 108 10-Apr-21, Steel Structure
Misc. Structure 06-Nov-20 10-Apr-21 10-Aug-20 24-Dec-20 108 108 10-Apr-21, Misc. Structure
CE323SS30005 Steel Installation(Catwalk Work Type 1)_U323 06-Nov-20 14-Jan-21 10-Aug-20 06-Oct-20 48 48 Steel Installation(Catwalk Work Type 1)_U323
CE323SS30010 Steel Installation(Catwalk Work Type 2)_U323 06-Nov-20 14-Jan-21 10-Aug-20 06-Oct-20 48 48 Steel Installation(Catwalk Work Type 2)_U323

Actual Level of Effort Actual Work Critical Remaining Work Page 58 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CE323SS30015 Steel Installation(Catwalk Work Type 3)_U323 18-Dec-20 26-Feb-21 16-Sep-20 12-Nov-20 48 48 Steel Installation(Catwalk Work Type 3)_U323
CE323SS30020 Steel Installation(Catwalk Work Type 4)_U323 18-Dec-20 26-Feb-21 16-Sep-20 12-Nov-20 48 48 Steel Installation(Catwalk Work Type 4)_U323
CE323SS30025 Steel Installation(Catwalk Work Type 5)_U323 18-Dec-20 26-Feb-21 16-Sep-20 12-Nov-20 48 48 Steel Installation(Catwalk Work Type 5)_U323
CE323SS30030 Steel Installation(Catwalk Work Type 6)_U323 02-Feb-21 10-Apr-21 21-Oct-20 24-Dec-20 48 48 Steel Installation(Catwalk Work Type 6)_U323
CE323SS30035 Steel Installation(Catwalk Work Type 7)_U323 02-Feb-21 10-Apr-21 21-Oct-20 24-Dec-20 48 48 Steel Installation(Catwalk Work Type 7)_U323
Rotating Equipment 23-Feb-21 25-Oct-21 30-Nov-20 09-Sep-21 189 189 25-Oct-21, Rotating Equipment
Pump 10-Apr-21 09-Sep-21 18-Jan-21 09-Sep-21 118 118 09-Sep-21, Pump
CB320MR15005 Installation - Pump(G-320-025A/B/C)_U320 21-Jul-21 09-Sep-21 21-Jul-21 09-Sep-21 42 42 Installation - Pump(G-320-025A/B/C)_U320
CB320MR15010 Installation - Pump(G-320-24A/B/C)_U320 15-Jul-21 03-Sep-21 15-Jul-21 03-Sep-21 42 42 Installation - Pump(G-320-24A/B/C)_U320
CE323MR15005 Installation - Pump(G-323-01 A/B)_U323 10-Apr-21 16-Jun-21 18-Jan-21 26-Mar-21 48 48 Installation - Pump(G-323-01 A/B)_U323
CE323MR15010 Installation - Pump(G-323-02 A/B)_U323 26-Apr-21 01-Jul-21 18-Jan-21 26-Mar-21 48 48 Installation - Pump(G-323-02 A/B)_U323
Special Package 12-Apr-21 01-Jul-21 13-Jan-21 08-Apr-21 60 60 01-Jul-21, Special Package
CC323MR25005 Gangway Work_U323 12-Apr-21 01-Jul-21 13-Jan-21 08-Apr-21 60 60 Gangway Work_U323
Material Handling Equipment 23-Feb-21 25-Oct-21 30-Nov-20 16-Aug-21 189 189 25-Oct-21, Material Handling Equipment
CB319MR35005 Installation - Crane & Hoist(TM-320-01)_U319 17-Mar-21 23-Apr-21 17-Mar-21 23-Apr-21 30 30 Installation - Crane & Hoist(TM-320-01)_U319
CB319MR35010 Installation - Crane & Hoist(TM-319-01)_U319 10-May-21 23-Jun-21 24-Mar-21 29-Apr-21 30 30 Installation - Crane & Hoist(TM-319-01)_U319
CC335MR35005 Installation - Crane & Hoist(TM-335-01)_U335 12-Mar-21 14-Apr-21 14-Jan-21 18-Feb-21 25 25 Installation - Crane & Hoist(TM-335-01)_U335
CC335MR35010 Installation - Crane & Hoist(TM-335-02)_U335 12-Mar-21 13-Apr-21 19-Feb-21 25-Mar-21 24 24 Installation - Crane & Hoist(TM-335-02)_U335
CE022MR35005 Installation - Marine Loading Arm(LPG/Propylene)_U022 14-Aug-21 25-Oct-21 05-Jun-21 16-Aug-21 60 60 Installation - Marine Loading Arm(LPG/Propylene)_U022
CE022MR35010 Installation - Marine Loading Arm(Jet Fuel)_U022 14-Aug-21 25-Oct-21 05-Jun-21 16-Aug-21 60 60 Installation - Marine Loading Arm(Jet Fuel)_U022
CE323MR35005 Installation - Marine Loading Arm(L-323-05 A/B)_U323 23-Feb-21 12-May-21 30-Nov-20 24-Feb-21 60 60 Installation - Marine Loading Arm(L-323-05 A/B)_U323
CE323MR35015 Installation - Marine Loading Arm(L-323-02)_U323 23-Feb-21 12-May-21 30-Nov-20 24-Feb-21 60 60 Installation - Marine Loading Arm(L-323-02)_U323
CE323MR35020 Installation - Marine Loading Arm(L-323-03)_U323 23-Feb-21 12-May-21 30-Nov-20 24-Feb-21 60 60 Installation - Marine Loading Arm(L-323-03)_U323
Other Rotating Equipment 05-Apr-21 25-May-21 08-Feb-21 31-Mar-21 36 36 25-May-21, Other Rotating Equipment
CC337MR40005 Installation - Crane & Hoist(TM-337-02)_U337 05-Apr-21 25-May-21 08-Feb-21 31-Mar-21 36 36 Installation - Crane & Hoist(TM-337-02)_U337
Piping 27-Aug-20 28-Oct-21 27-Jun-20 20-Aug-21 326 326 28-Oct-21, Piping
Revamping Work 10-Dec-20 08-Mar-21 09-Sep-20 20-Nov-20 60 60 08-Mar-21, Revamping Work
CE323PI45130 Piping Tie Up Work Under New Construction Jetty_U323 10-Dec-20 08-Mar-21 09-Sep-20 20-Nov-20 60 60 Piping Tie Up Work Under New Construction Jetty_U323
U/G Piping 14-Jun-21 28-Oct-21 24-Mar-21 20-Aug-21 114 114 28-Oct-21, U/G Piping
CE022PI50005 A/G Piping - Field Piping_U022 09-Jul-21 06-Oct-21 20-Apr-21 28-Jul-21 75 75 A/G Piping - Field Piping_U022
CE022PI50010 Pipe Support_U022 [Deleted] 14-Jun-21 25-Aug-21 24-Mar-21 15-Jun-21 60 60 Pipe Support_U022 [Deleted]
CE022PI50020 A/G Piping - Hydro Test_U022 23-Sep-21 28-Oct-21 15-Jul-21 20-Aug-21 30 30 A/G Piping - Hydro Test_U022
A/G Piping 30-Oct-20 21-Sep-21 03-Aug-20 08-May-21 241 241 21-Sep-21, A/G Piping
CB320PI50005 A/G Piping - Field Piping(OC4)_U320 30-Oct-20 09-Jul-21 03-Aug-20 01-Apr-21 180 180 A/G Piping - Field Piping(OC4)_U320
CE323PI50005 A/G Piping - Field Piping_U323 11-Feb-21 31-Aug-21 23-Sep-20 16-Apr-21 150 150 A/G Piping - Field Piping_U323
CE323PI50010 Pipe Support_U323 [Deleted] 06-Nov-20 24-Apr-21 10-Aug-20 13-Jan-21 120 120 Pipe Support_U323 [Deleted]
CE323PI50020 A/G Piping - Hydro Test_U323 09-Aug-21 21-Sep-21 25-Mar-21 08-May-21 36 36 A/G Piping - Hydro Test_U323
Pipe Support 27-Aug-20 23-Feb-21 27-Jun-20 11-Dec-20 135 135 23-Feb-21, Pipe Support
CB320PI60005 Pipe Support_U320 [Deleted] 27-Aug-20 23-Feb-21 27-Jun-20 11-Dec-20 135 135 Pipe Support_U320 [Deleted]
A/G Hydro Test 22-Jun-21 14-Aug-21 12-Mar-21 08-May-21 45 45 14-Aug-21, A/G Hydro Test
CB320PI65005 A/G Piping - Hydro Test(OC4)_U320 - rela ted OC4 22-Jun-21 14-Aug-21 12-Mar-21 08-May-21 45 45 A/G Piping - Hydro Test(OC4)_U320 - rela ted OC4
Electrical 10-Sep-20 24-Jan-22 27-Jun-20 03-Nov-21 344 344 24-Jan-22, Electrical
Electrical Equipment 24-May-21 21-Jul-21 02-Mar-21 04-May-21 48 48 21-Jul-21, Electrical Equipment
CE323EL10005 Installation - UPS(with Battery)_U323 24-May-21 21-Jul-21 02-Mar-21 04-May-21 48 48 Installation - UPS(with Battery)_U323
Cable Race Way 29-Jan-21 28-Oct-21 18-Nov-20 24-Aug-21 208 208 28-Oct-21, Cable Race Way
CB319EL45005 Electrical Cable Tray Installation(MS-323-05A/B, MS-323-06A/B)_U319 09-Jun-21 07-Jul-21 15-Apr-21 21-May-21 24 24 Electrical Cable Tray Installation(MS-323-05A/B, MS-323-06A/B)_U319
CB319EL45040- Electrical Conduit Pipe(MS-323-05A/B, MS-323-06A/B)_U319 28-Jun-21 19-Jul-21 05-May-21 04-Jun-21 18 18 Electrical Conduit Pipe(MS-323-05A/B, MS-323-06A/B)_U319
CB320EL45005 Electrical Cable Tray Installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 17-Jun-21 20-Jul-21 17-Jun-21 20-Jul-21 28 28 Electrical Cable Tray Installation(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL45010- Electrical Cable Tray Installation(G-320-14A/B/C, G-320-24A/B/C)_U320 17-Jun-21 20-Jul-21 17-Jun-21 20-Jul-21 28 28 Electrical Cable Tray Installation(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL45015 Electrical Cable Tray Installation(MS-323-01/02)_U320 15-Jun-21 17-Jul-21 15-Jun-21 17-Jul-21 28 28 Electrical Cable Tray Installation(MS-323-01/02)_U320
CB320EL45020- Electrical Cable Tray Installation(G-320-01A/B/C)_U320 05-Apr-21 07-May-21 05-Apr-21 07-May-21 28 28 Electrical Cable Tray Installation(G-320-01A/B/C)_U320
CB320EL45025 Electrical Cable Tray Installation(G-320-03A/B)_U320 17-Mar-21 21-Apr-21 17-Mar-21 21-Apr-21 28 28 Electrical Cable Tray Installation(G-320-03A/B)_U320
CB320EL45030- Electrical Cable Tray Installation(G-320-025A/B/C)_U320 27-Apr-21 09-Jun-21 27-Apr-21 09-Jun-21 28 28 Electrical Cable Tray Installation(G-320-025A/B/C)_U320
CB320EL45035 Electrical Cable Tray Installation(G-320-20A/B, G-320-22A/B)_U320 08-Jun-21 10-Jul-21 08-Jun-21 10-Jul-21 28 28 Electrical Cable Tray Installation(G-320-20A/B, G-320-22A/B)_U320
CB320EL45040- Electrical Cable Tray Installation(G-320-23A/B)_U320 27-Apr-21 09-Jun-21 27-Apr-21 09-Jun-21 28 28 Electrical Cable Tray Installation(G-320-23A/B)_U320
CB320EL45045 Electrical Cable Tray Installation(G-320-07A/B)_U320 05-May-21 16-Jun-21 05-May-21 16-Jun-21 28 28 Electrical Cable Tray Installation(G-320-07A/B)_U320
CB320EL45050 Electrical Cable Tray Installation(G-320-13A/B, G-320-16A/B)_U320 06-Apr-21 08-May-21 06-Apr-21 08-May-21 28 28 Electrical Cable Tray Installation(G-320-13A/B, G-320-16A/B)_U320
CB320EL45055 Electrical Cable Tray Installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 19-Mar-21 23-Apr-21 19-Mar-21 23-Apr-21 28 28 Electrical Cable Tray Installation(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL45070- Electrical Conduit Pipe(G-320-23A/B)_U320 10-May-21 09-Jun-21 10-May-21 09-Jun-21 18 18 Electrical Conduit Pipe(G-320-23A/B)_U320
CB320EL45085 Electrical Conduit Pipe(G-320-13A/B, G-320-16A/B)_U320 31-May-21 21-Jun-21 31-May-21 21-Jun-21 18 18 Electrical Conduit Pipe(G-320-13A/B, G-320-16A/B)_U320
CB320EL45100- Electrical Conduit Pipe(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 06-Jul-21 26-Jul-21 06-Jul-21 26-Jul-21 18 18 Electrical Conduit Pipe(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL45115 Electrical Conduit Pipe(G-320-20A/B, G-320-22A/B)_U320 25-Jun-21 16-Jul-21 25-Jun-21 16-Jul-21 18 18 Electrical Conduit Pipe(G-320-20A/B, G-320-22A/B)_U320
CB320EL45130- Electrical Conduit Pipe(G-320-14A/B/C, G-320-24A/B/C)_U320 03-Jul-21 23-Jul-21 03-Jul-21 23-Jul-21 18 18 Electrical Conduit Pipe(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL45145 Electrical Conduit Pipe(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 10-Apr-21 30-Apr-21 10-Apr-21 30-Apr-21 18 18 Electrical Conduit Pipe(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL45160- Electrical Conduit Pipe(G-320-07A/B)_U320 03-Jun-21 23-Jun-21 03-Jun-21 23-Jun-21 18 18 Electrical Conduit Pipe(G-320-07A/B)_U320
CB320EL45175 Electrical Conduit Pipe(G-320-03A/B)_U320 31-Mar-21 21-Apr-21 31-Mar-21 21-Apr-21 18 18 Electrical Conduit Pipe(G-320-03A/B)_U320
CB320EL45190- Electrical Conduit Pipe(G-320-01A/B/C)_U320 23-Apr-21 22-May-21 23-Apr-21 22-May-21 18 18 Electrical Conduit Pipe(G-320-01A/B/C)_U320
CB320EL45205 Electrical Conduit Pipe(G-320-025A/B/C)_U320 25-May-21 16-Jun-21 25-May-21 16-Jun-21 18 18 Electrical Conduit Pipe(G-320-025A/B/C)_U320
CB320EL45220 Electrical Conduit Pipe(MS-323-01/02)_U320 05-Jul-21 24-Jul-21 05-Jul-21 24-Jul-21 18 18 Electrical Conduit Pipe(MS-323-01/02)_U320
CC334EL43205 Electrical Cable Tray Installation(334-CHM-001)_U334 29-Jan-21 10-Mar-21 21-Jan-21 02-Mar-21 28 28 Electrical Cable Tray Installation(334-CHM-001)_U334
CC334EL43210 Electrical Conduit Pipe(334-CHM-001)_U334 24-Feb-21 25-Mar-21 16-Feb-21 17-Mar-21 21 21 Electrical Conduit Pipe(334-CHM-001)_U334
CC334EL45005 Electrical Cable Tray Installation(334-WWT-001)_U334 04-Feb-21 02-Mar-21 11-Jun-21 01-Jul-21 18 18 Electrical Cable Tray Installation(334-WWT-001)_U334
CC334EL45010- Electrical Cable Tray Installation(334-WWT-002)_U334 22-Mar-21 24-Apr-21 17-Jul-21 20-Aug-21 28 28 Electrical Cable Tray Installation(334-WWT-002)_U334
CC334EL45025 Electrical Conduit Pipe(334-WWT-001)_U334 09-Feb-21 10-Mar-21 15-Jun-21 09-Jul-21 21 21 Electrical Conduit Pipe(334-WWT-001)_U334
CC334EL45040- Electrical Conduit Pipe(334-WWT-002)_U334 05-Apr-21 28-Apr-21 29-Jul-21 24-Aug-21 21 21 Electrical Conduit Pipe(334-WWT-002)_U334

Actual Level of Effort Actual Work Critical Remaining Work Page 59 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CC335EL45005 Electrical Cable Tray Installation(A-335-02)_U335 07-Apr-21 28-May-21 09-Feb-21 01-Apr-21 36 36 Electrical Cable Tray Installation(A-335-02)_U335
CC335EL45010- Electrical Cable Tray Installation(A-335-03)_U335 21-Apr-21 12-Jun-21 05-Apr-21 25-May-21 36 36 Electrical Cable Tray Installation(A-335-03)_U335
CC335EL45015 Electrical Cable Tray Installation(A-335-01)_U335 15-Apr-21 07-Jun-21 19-Feb-21 10-Apr-21 36 36 Electrical Cable Tray Installation(A-335-01)_U335
CC335EL45020- Electrical Cable Tray Installation(A-335-05)_U335 05-Apr-21 25-May-21 16-Mar-21 29-Apr-21 36 36 Electrical Cable Tray Installation(A-335-05)_U335
CC335EL45035 Electrical Conduit Pipe(A-335-01)_U335 03-May-21 14-Jun-21 12-Mar-21 17-Apr-21 28 28 Electrical Conduit Pipe(A-335-01)_U335
CC335EL45050- Electrical Conduit Pipe(A-335-02)_U335 23-Apr-21 05-Jun-21 02-Mar-21 09-Apr-21 28 28 Electrical Conduit Pipe(A-335-02)_U335
CC335EL45065 Electrical Conduit Pipe(A-335-03)_U335 08-May-21 19-Jun-21 21-Apr-21 03-Jun-21 28 28 Electrical Conduit Pipe(A-335-03)_U335
CC335EL45080 Electrical Conduit Pipe(A-335-05)_U335 29-Apr-21 03-Jun-21 13-Apr-21 07-May-21 21 21 Electrical Conduit Pipe(A-335-05)_U335
CC337EL45005 Electrical Cable Tray Installation(337-SWR-003)_U337 09-Jun-21 21-Jul-21 14-Apr-21 05-Jun-21 36 36 Electrical Cable Tray Installation(337-SWR-003)_U337
CC337EL45010 Electrical Cable Tray Installation(337-SWR-005)_U337 07-May-21 28-Jun-21 19-Mar-21 04-May-21 36 36 Electrical Cable Tray Installation(337-SWR-005)_U337
CC337EL45015 Electrical Cable Tray Installation(337-SWR-004)_U337 27-Apr-21 18-Jun-21 08-Mar-21 23-Apr-21 36 36 Electrical Cable Tray Installation(337-SWR-004)_U337
CC337EL45020 Electrical Cable Tray Installation(337-SWR-002)_U337 05-Apr-21 25-May-21 08-Feb-21 31-Mar-21 36 36 Electrical Cable Tray Installation(337-SWR-002)_U337
CC337EL45025 Electrical Cable Tray Installation(323-JET-001)_U323 22-Apr-21 25-May-21 11-Jan-21 08-Feb-21 21 21 Electrical Cable Tray Installation(323-JET-001)_U323
CC337EL45040 Electrical Conduit Pipe(337-SWR-002)_U337 22-Apr-21 25-May-21 02-Mar-21 31-Mar-21 21 21 Electrical Conduit Pipe(337-SWR-002)_U337
CC337EL45055 Electrical Conduit Pipe(337-SWR-003)_U337 05-Jul-21 28-Jul-21 10-May-21 12-Jun-21 21 21 Electrical Conduit Pipe(337-SWR-003)_U337
CC337EL45070 Electrical Conduit Pipe(337-SWR-004)_U337 31-May-21 24-Jun-21 06-Apr-21 29-Apr-21 21 21 Electrical Conduit Pipe(337-SWR-004)_U337
CC337EL45085 Electrical Conduit Pipe(337-SWR-005)_U337 18-Jun-21 13-Jul-21 23-Apr-21 27-May-21 21 21 Electrical Conduit Pipe(337-SWR-005)_U337
CE323EL45015 Electrical Cable Tray Installation_U323 09-Feb-21 24-Apr-21 18-Nov-20 04-Feb-21 55 55 Electrical Cable Tray Installation_U323
CE323EL45020 Electrical Conduit Pipe_U323 26-Feb-21 10-May-21 04-Dec-20 23-Feb-21 55 55 Electrical Conduit Pipe_U323
CE323EL45035 Electrical Conduit Pipe(323-JET-001)_U323 05-May-21 08-Jun-21 25-Jan-21 23-Feb-21 21 21 Electrical Conduit Pipe(323-JET-001)_U323
CE323EL45040 Electrical Cable Tray Installation(323-JET-002)_U323 30-Sep-21 25-Oct-21 22-Jul-21 16-Aug-21 21 21 Electrical Cable Tray Installation(323-JET-002)_U323
CE323EL45055 Electrical Conduit Pipe(323-JET-002)_U323 12-Oct-21 28-Oct-21 03-Aug-21 20-Aug-21 14 14 Electrical Conduit Pipe(323-JET-002)_U323
Power & Control 08-Feb-21 10-Nov-21 16-Nov-20 24-Sep-21 212 212 10-Nov-21, Power & Control
CB319EL45030- Termination - Power & Control(MS-323-05A/B, MS-323-06A/B)_U319 27-Jul-21 18-Aug-21 12-Jun-21 03-Jul-21 18 18 Termination - Power & Control(MS-323-05A/B, MS-323-06A/B)_U319
CB319EL45035 Cabling - Power & Control(MS-323-05A/B, MS-323-06A/B)_U319 03-Jul-21 04-Aug-21 10-May-21 21-Jun-21 28 28 Cabling - Power & Control(MS-323-05A/B, MS-323-06A/B)_U319
CB320EL45060- Termination - Power & Control(G-320-23A/B)_U320 31-Jul-21 19-Aug-21 14-Jul-21 30-Jul-21 15 15 Termination - Power & Control(G-320-23A/B)_U320
CB320EL45065 Cabling - Power & Control(G-320-23A/B)_U320 10-Jun-21 13-Jul-21 10-Jun-21 13-Jul-21 28 28 Cabling - Power & Control(G-320-23A/B)_U320
CB320EL45075 Termination - Power & Control(G-320-13A/B, G-320-16A/B)_U320 07-Jul-21 23-Jul-21 22-Jun-21 09-Jul-21 15 15 Termination - Power & Control(G-320-13A/B, G-320-16A/B)_U320
CB320EL45080- Cabling - Power & Control(G-320-13A/B, G-320-16A/B)_U320 10-May-21 21-Jun-21 10-May-21 21-Jun-21 28 28 Cabling - Power & Control(G-320-13A/B, G-320-16A/B)_U320
CB320EL45090- Termination - Power & Control(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 30-Aug-21 15-Sep-21 14-Aug-21 01-Sep-21 15 15 Termination - Power & Control(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL45095 Cabling - Power & Control(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 12-Jul-21 13-Aug-21 12-Jul-21 13-Aug-21 28 28 Cabling - Power & Control(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL45105 Termination - Power & Control(G-320-20A/B, G-320-22A/B)_U320 24-Aug-21 09-Sep-21 24-Jul-21 11-Aug-21 15 15 Termination - Power & Control(G-320-20A/B, G-320-22A/B)_U320
CB320EL45110- Cabling - Power & Control(G-320-20A/B, G-320-22A/B)_U320 01-Jul-21 03-Aug-21 01-Jul-21 03-Aug-21 28 28 Cabling - Power & Control(G-320-20A/B, G-320-22A/B)_U320
CB320EL45120- Termination - Power & Control(G-320-14A/B/C, G-320-24A/B/C)_U320 30-Aug-21 15-Sep-21 02-Aug-21 20-Aug-21 15 15 Termination - Power & Control(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL45125 Cabling - Power & Control(G-320-14A/B/C, G-320-24A/B/C)_U320 12-Jul-21 13-Aug-21 12-Jul-21 13-Aug-21 28 28 Cabling - Power & Control(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL45135 Termination - Power & Control(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 23-Jun-21 10-Jul-21 21-May-21 09-Jun-21 15 15 Termination - Power & Control(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL45140- Cabling - Power & Control(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 15-Apr-21 27-May-21 15-Apr-21 27-May-21 28 28 Cabling - Power & Control(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL45150- Termination - Power & Control(G-320-07A/B)_U320 05-Aug-21 24-Aug-21 06-Jul-21 22-Jul-21 15 15 Termination - Power & Control(G-320-07A/B)_U320
CB320EL45155 Cabling - Power & Control(G-320-07A/B)_U320 08-Jun-21 10-Jul-21 08-Jun-21 10-Jul-21 28 28 Cabling - Power & Control(G-320-07A/B)_U320
CB320EL45165 Termination - Power & Control(G-320-03A/B)_U320 03-Jul-21 20-Jul-21 11-May-21 07-Jun-21 15 15 Termination - Power & Control(G-320-03A/B)_U320
CB320EL45170- Cabling - Power & Control(G-320-03A/B)_U320 13-Apr-21 24-May-21 13-Apr-21 24-May-21 28 28 Cabling - Power & Control(G-320-03A/B)_U320
CB320EL45180- Termination - Power & Control(G-320-01A/B/C)_U320 13-Jul-21 29-Jul-21 08-Jun-21 24-Jun-21 15 15 Termination - Power & Control(G-320-01A/B/C)_U320
CB320EL45185 Cabling - Power & Control(G-320-01A/B/C)_U320 28-Apr-21 10-Jun-21 28-Apr-21 10-Jun-21 28 28 Cabling - Power & Control(G-320-01A/B/C)_U320
CB320EL45195 Termination - Power & Control(G-320-025A/B/C)_U320 13-Jul-21 29-Jul-21 24-Jun-21 12-Jul-21 15 15 Termination - Power & Control(G-320-025A/B/C)_U320
CB320EL45200 Cabling - Power & Control(G-320-025A/B/C)_U320 24-May-21 26-Jun-21 24-May-21 26-Jun-21 28 28 Cabling - Power & Control(G-320-025A/B/C)_U320
CB320EL45210 Termination - Power & Control(MS-323-01/02)_U320 25-Aug-21 10-Sep-21 30-Jul-21 18-Aug-21 15 15 Termination - Power & Control(MS-323-01/02)_U320
CB320EL45215 Cabling - Power & Control(MS-323-01/02)_U320 03-Jul-21 04-Aug-21 03-Jul-21 04-Aug-21 28 28 Cabling - Power & Control(MS-323-01/02)_U320
CC323EL45005 Cabling - Power & Control_U323 07-Apr-21 26-Jun-21 14-Jan-21 09-Apr-21 60 60 Cabling - Power & Control_U323
CC323EL45010 Termination - Power & Control_U323 07-Jun-21 19-Jul-21 17-Mar-21 30-Apr-21 36 36 Termination - Power & Control_U323
CC334EL45015 Termination - Power & Control(334-WWT-001)_U334 01-Apr-21 22-Apr-21 20-Jul-21 09-Aug-21 18 18 Termination - Power & Control(334-WWT-001)_U334
CC334EL45020- Cabling - Power & Control(334-WWT-001)_U334 01-Mar-21 08-Apr-21 23-Jun-21 26-Jul-21 28 28 Cabling - Power & Control(334-WWT-001)_U334
CC334EL45030- Termination - Power & Control(334-WWT-002)_U334 11-May-21 10-Jun-21 04-Sep-21 24-Sep-21 18 18 Termination - Power & Control(334-WWT-002)_U334
CC334EL45035 Cabling - Power & Control(334-WWT-002)_U334 21-Apr-21 03-Jun-21 16-Aug-21 17-Sep-21 28 28 Cabling - Power & Control(334-WWT-002)_U334
CC334EL45205 Cabling - Power & Control(334-CHM-001)_U334 22-Mar-21 21-Apr-21 12-Mar-21 14-Apr-21 25 25 Cabling - Power & Control(334-CHM-001)_U334
CC334EL45210 Termination - Power & Control(334-CHM-001)_U334 16-Apr-21 04-May-21 09-Apr-21 26-Apr-21 15 15 Termination - Power & Control(334-CHM-001)_U334
CC335EL45025 Termination - Power & Control(A-335-01)_U335 17-Jun-21 16-Jul-21 21-Apr-21 29-May-21 25 25 Termination - Power & Control(A-335-01)_U335
CC335EL45030- Cabling - Power & Control(A-335-01)_U335 03-Jun-21 01-Jul-21 07-Apr-21 06-May-21 25 25 Cabling - Power & Control(A-335-01)_U335
CC335EL45040- Termination - Power & Control(A-335-02)_U335 02-Jun-21 30-Jun-21 06-Apr-21 05-May-21 25 25 Termination - Power & Control(A-335-02)_U335
CC335EL45045 Cabling - Power & Control(A-335-02)_U335 08-May-21 16-Jun-21 19-Mar-21 20-Apr-21 25 25 Cabling - Power & Control(A-335-02)_U335
CC335EL45055 Termination - Power & Control(A-335-03)_U335 13-Jul-21 02-Aug-21 25-Jun-21 16-Jul-21 18 18 Termination - Power & Control(A-335-03)_U335
CC335EL45060- Cabling - Power & Control(A-335-03)_U335 14-Jun-21 19-Jul-21 27-May-21 01-Jul-21 30 30 Cabling - Power & Control(A-335-03)_U335
CC335EL45070- Termination - Power & Control(A-335-05)_U335 18-Jun-21 17-Jul-21 02-Jun-21 30-Jun-21 25 25 Termination - Power & Control(A-335-05)_U335
CC335EL45075 Cabling - Power & Control(A-335-05)_U335 04-Jun-21 03-Jul-21 08-May-21 16-Jun-21 25 25 Cabling - Power & Control(A-335-05)_U335
CC337EL45030 Termination - Power & Control(337-SWR-002)_U337 14-Jun-21 05-Jul-21 19-Apr-21 10-May-21 18 18 Termination - Power & Control(337-SWR-002)_U337
CC337EL45035 Cabling - Power & Control(337-SWR-002)_U337 08-May-21 19-Jun-21 22-Mar-21 24-Apr-21 28 28 Cabling - Power & Control(337-SWR-002)_U337
CC337EL45045 Termination - Power & Control(337-SWR-003)_U337 26-Jul-21 16-Aug-21 10-Jun-21 30-Jun-21 18 18 Termination - Power & Control(337-SWR-003)_U337
CC337EL45050 Cabling - Power & Control(337-SWR-003)_U337 07-Jul-21 07-Aug-21 12-May-21 23-Jun-21 28 28 Cabling - Power & Control(337-SWR-003)_U337
CC337EL45060 Termination - Power & Control(337-SWR-004)_U337 26-Jun-21 17-Jul-21 03-May-21 02-Jun-21 18 18 Termination - Power & Control(337-SWR-004)_U337
CC337EL45065 Cabling - Power & Control(337-SWR-004)_U337 08-Jun-21 10-Jul-21 13-Apr-21 24-May-21 28 28 Cabling - Power & Control(337-SWR-004)_U337
CC337EL45075 Termination - Power & Control(337-SWR-005)_U337 14-Jul-21 03-Aug-21 28-May-21 18-Jun-21 18 18 Termination - Power & Control(337-SWR-005)_U337
CC337EL45080 Cabling - Power & Control(337-SWR-005)_U337 17-Jun-21 20-Jul-21 22-Apr-21 04-Jun-21 28 28 Cabling - Power & Control(337-SWR-005)_U337
CD341EL45445- Modification - SWGR & MCC(SS-71)_U341 08-Feb-21 15-Apr-21 16-Nov-20 22-Jan-21 48 48 Modification - SWGR & MCC(SS-71)_U341
CD341EL45450- Modification - SWGR & MCC(SS-67)_U341 08-Feb-21 15-Apr-21 16-Nov-20 22-Jan-21 48 48 Modification - SWGR & MCC(SS-67)_U341

Actual Level of Effort Actual Work Critical Remaining Work Page 60 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CD341EL45455- Modification - SWGR & MCC(SS-75)_U341 08-Feb-21 15-Apr-21 16-Nov-20 22-Jan-21 48 48 Modification - SWGR & MCC(SS-75)_U341
CE323EL45025 Termination - Power & Control(323-JET-001)_U323 28-May-21 22-Jun-21 10-Feb-21 12-Mar-21 21 21 Termination - Power & Control(323-JET-001)_U323
CE323EL45030 Cabling - Power & Control(323-JET-001)_U323 30-Apr-21 08-Jun-21 20-Jan-21 23-Feb-21 24 24 Cabling - Power & Control(323-JET-001)_U323
CE323EL45045 Termination - Power & Control(323-JET-002)_U323 27-Oct-21 10-Nov-21 19-Aug-21 01-Sep-21 12 12 Termination - Power & Control(323-JET-002)_U323
CE323EL45050 Cabling - Power & Control(323-JET-002)_U323 15-Oct-21 05-Nov-21 06-Aug-21 28-Aug-21 18 18 Cabling - Power & Control(323-JET-002)_U323
Earthing and Grouding 10-Sep-20 05-Aug-21 27-Jun-20 16-Jun-21 245 245 05-Aug-21, Earthing and Grouding
CB319EL50005 Cabling - Grounding(MS-323-05A/B, MS-323-06A/B)_U319 29-Apr-21 11-Jun-21 12-Mar-21 17-Apr-21 28 28 Cabling - Grounding(MS-323-05A/B, MS-323-06A/B)_U319
CB320EL50005 Cabling - Grounding(G-320-23A/B)_U320 23-Mar-21 26-Apr-21 23-Mar-21 26-Apr-21 28 28 Cabling - Grounding(G-320-23A/B)_U320
CB320EL50010 Cabling - Grounding(G-320-13A/B, G-320-16A/B)_U320 02-Mar-21 09-Apr-21 02-Mar-21 09-Apr-21 28 28 Cabling - Grounding(G-320-13A/B, G-320-16A/B)_U320
CB320EL50015 Cabling - Grounding(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 05-May-21 16-Jun-21 05-May-21 16-Jun-21 28 28 Cabling - Grounding(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL50020 Cabling - Grounding(G-320-20A/B, G-320-22A/B)_U320 22-Apr-21 07-Jun-21 22-Apr-21 07-Jun-21 30 30 Cabling - Grounding(G-320-20A/B, G-320-22A/B)_U320
CB320EL50025 Cabling - Grounding(G-320-14A/B/C, G-320-24A/B/C)_U320 03-May-21 16-Jun-21 03-May-21 16-Jun-21 30 30 Cabling - Grounding(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL50030 Cabling - Grounding(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 03-Feb-21 18-Mar-21 03-Feb-21 18-Mar-21 30 30 Cabling - Grounding(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL50035 Cabling - Grounding(G-320-07A/B)_U320 29-Mar-21 04-May-21 29-Mar-21 04-May-21 30 30 Cabling - Grounding(G-320-07A/B)_U320
CB320EL50040 Cabling - Grounding(G-320-03A/B)_U320 03-Feb-21 16-Mar-21 03-Feb-21 16-Mar-21 28 28 Cabling - Grounding(G-320-03A/B)_U320
CB320EL50045 Cabling - Grounding(G-320-01A/B/C)_U320 04-Mar-21 12-Apr-21 04-Mar-21 12-Apr-21 28 28 Cabling - Grounding(G-320-01A/B/C)_U320
CB320EL50050 Cabling - Grounding(G-320-025A/B/C)_U320 19-Mar-21 23-Apr-21 19-Mar-21 23-Apr-21 28 28 Cabling - Grounding(G-320-025A/B/C)_U320
CB320EL50055 Cabling - Grounding(MS-323-01/02)_U320 29-Apr-21 11-Jun-21 29-Apr-21 11-Jun-21 28 28 Cabling - Grounding(MS-323-01/02)_U320
CC323EL50005 Cabling - Grounding_U323 24-Sep-20 22-Jan-21 27-Jun-20 13-Oct-20 90 90 Cabling - Grounding_U323
CC323EL50020 Cabling - Grounding(323-JET-001)_U323 05-Jan-21 05-Feb-21 28-Sep-20 24-Oct-20 24 24 Cabling - Grounding(323-JET-001)_U323
CC334EL50005 Cabling - Grounding(334-WWT-001)_U334 27-Oct-20 27-Nov-20 03-Mar-21 06-Apr-21 24 24 Cabling - Grounding(334-WWT-001)_U334
CC334EL50010 Cabling - Grounding(334-WWT-002)_U334 10-Sep-20 21-Oct-20 05-Jan-21 24-Feb-21 36 36 Cabling - Grounding(334-WWT-002)_U334
CC334EL50105 Cabling - Grounding(334-CHM-001)_U334 22-Dec-20 03-Feb-21 14-Sep-20 17-Oct-20 30 30 Cabling - Grounding(334-CHM-001)_U334
CC335EL50005 Cabling - Grounding(A-335-02)_U335 12-Mar-21 27-Apr-21 14-Jan-21 05-Mar-21 36 36 Cabling - Grounding(A-335-02)_U335
CC335EL50010 Cabling - Grounding(A-335-03)_U335 12-Mar-21 17-Apr-21 19-Feb-21 31-Mar-21 28 28 Cabling - Grounding(A-335-03)_U335
CC335EL50015 Cabling - Grounding(A-335-01)_U335 04-Feb-21 29-Mar-21 09-Dec-20 29-Jan-21 36 36 Cabling - Grounding(A-335-01)_U335
CC335EL50020 Cabling - Grounding(A-335-05)_U335 18-Feb-21 09-Apr-21 28-Jan-21 22-Mar-21 36 36 Cabling - Grounding(A-335-05)_U335
CC337EL50005 Cabling - Grounding(337-SWR-003)_U337 26-Feb-21 07-Apr-21 04-Jan-21 10-Feb-21 28 28 Cabling - Grounding(337-SWR-003)_U337
CC337EL50010 Cabling - Grounding(337-SWR-005)_U337 24-Apr-21 07-Jun-21 04-Mar-21 12-Apr-21 28 28 Cabling - Grounding(337-SWR-005)_U337
CC337EL50015 Cabling - Grounding(337-SWR-004)_U337 15-Apr-21 27-May-21 22-Feb-21 01-Apr-21 28 28 Cabling - Grounding(337-SWR-004)_U337
CC337EL50030 Cabling - Grounding(337-SWR-002)_U337 23-Feb-21 03-Apr-21 29-Dec-20 05-Feb-21 28 28 Cabling - Grounding(337-SWR-002)_U337
CE323EL50015 Cabling - Grounding(323-JET-002)_U323 09-Jul-21 05-Aug-21 20-Apr-21 27-May-21 24 24 Cabling - Grounding(323-JET-002)_U323
Lighting 23-Oct-20 23-Nov-21 16-Sep-20 11-Sep-21 273 273 23-Nov-21, Lighting
CB319EL60025 Installation - Distribution Panel(MS-323-05A/B, MS-323-06A/B)_U319 31-Jul-21 03-Sep-21 17-Jun-21 20-Jul-21 28 28 Installation - Distribution Panel(MS-323-05A/B, MS-323-06A/B)_U319
CB319EL60027 Cabling - Lightening(MS-323-05A/B, MS-323-06A/B)_U319 26-Jul-21 24-Aug-21 11-Jun-21 09-Jul-21 24 24 Cabling - Lightening(MS-323-05A/B, MS-323-06A/B)_U319
CB319EL60030 Lightening work(MS-323-05A/B, MS-323-06A/B)_U319 26-Jul-21 24-Aug-21 11-Jun-21 09-Jul-21 24 24 Lightening work(MS-323-05A/B, MS-323-06A/B)_U319
CB319EL60040 Installation of Lighting Fixture System (MS-323-05A/B, MS-323-06A/B)_U319 26-Jun-21 21-Jul-21 04-May-21 07-Jun-21 21 21 Installation of Lighting Fixture System (MS-323-05A/B, MS-323-06A/B)_U319
CB319EL60205 Cabling Lighting (MS-323-05A/B, MS-323-06A/B)_U319 26-Jun-21 21-Jul-21 04-May-21 07-Jun-21 21 21 Cabling Lighting (MS-323-05A/B, MS-323-06A/B)_U319
CB320EL60005 Installation - Distribution Panel(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 24-Jul-21 08-Sep-21 24-Jul-21 08-Sep-21 38 38 Installation - Distribution Panel(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320
CB320EL60010 Installation - Distribution Panel(G-320-14A/B/C, G-320-24A/B/C)_U320 24-Jul-21 08-Sep-21 24-Jul-21 08-Sep-21 38 38 Installation - Distribution Panel(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320EL60015 Installation - Distribution Panel(MS-323-01/02)_U320 20-Jul-21 03-Sep-21 20-Jul-21 03-Sep-21 38 38 Installation - Distribution Panel(MS-323-01/02)_U320
CB320EL60020 Installation - Distribution Panel(G-320-01A/B/C)_U320 08-Jun-21 22-Jul-21 08-Jun-21 22-Jul-21 38 38 Installation - Distribution Panel(G-320-01A/B/C)_U320
CB320EL60025 Installation - Distribution Panel(G-320-03A/B)_U320 28-May-21 13-Jul-21 28-May-21 13-Jul-21 38 38 Installation - Distribution Panel(G-320-03A/B)_U320
CB320EL60030 Installation - Distribution Panel(G-320-025A/B/C)_U320 08-Jun-21 22-Jul-21 08-Jun-21 22-Jul-21 38 38 Installation - Distribution Panel(G-320-025A/B/C)_U320
CB320EL60035 Installation - Distribution Panel(G-320-20A/B, G-320-22A/B)_U320 19-Jul-21 02-Sep-21 19-Jul-21 02-Sep-21 38 38 Installation - Distribution Panel(G-320-20A/B, G-320-22A/B)_U320
CB320EL60040 Installation - Distribution Panel(G-320-23A/B)_U320 26-Jun-21 11-Aug-21 26-Jun-21 11-Aug-21 38 38 Installation - Distribution Panel(G-320-23A/B)_U320
CB320EL60045 Installation - Distribution Panel(G-320-07A/B)_U320 01-Jul-21 16-Aug-21 01-Jul-21 16-Aug-21 38 38 Installation - Distribution Panel(G-320-07A/B)_U320
CB320EL60050 Installation - Distribution Panel(G-320-13A/B, G-320-16A/B)_U320 02-Jun-21 16-Jul-21 02-Jun-21 16-Jul-21 38 38 Installation - Distribution Panel(G-320-13A/B, G-320-16A/B)_U320
CB320EL60055 Installation - Distribution Panel(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 10-May-21 03-Jul-21 10-May-21 03-Jul-21 38 38 Installation - Distribution Panel(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320
CB320EL60060 Cabling - Lightening(G-320-23A/B)_U320 [Deleted] 30-Apr-21 04-Jun-21 30-Apr-21 04-Jun-21 21 21 Cabling - Lightening(G-320-23A/B)_U320 [Deleted]
CB320EL60065 Lightening work(G-320-23A/B)_U320 [Deleted] 30-Apr-21 04-Jun-21 30-Apr-21 04-Jun-21 21 21 Lightening work(G-320-23A/B)_U320 [Deleted]
CB320EL60070 Cabling - Lightening(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 19-Apr-21 21-May-21 19-Apr-21 21-May-21 21 21 Cabling - Lightening(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
CB320EL60075 Lightening work(G-320-13A/B, G-320-16A/B)_U320 [Deleted] 19-Apr-21 21-May-21 19-Apr-21 21-May-21 21 21 Lightening work(G-320-13A/B, G-320-16A/B)_U320 [Deleted]
CB320EL60080 Cabling - Lightening(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 29-Jun-21 23-Jul-21 29-Jun-21 23-Jul-21 21 21 Cabling - Lightening(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
CB320EL60085 Lightening work(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted] 29-Jun-21 23-Jul-21 29-Jun-21 23-Jul-21 21 21 Lightening work(G-320-08A/B, G-320-09A/B, G-320-18A/B, G-320-19)_U320 [Deleted]
CB320EL60090 Cabling - Lightening(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 19-Jun-21 14-Jul-21 19-Jun-21 14-Jul-21 21 21 Cabling - Lightening(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
CB320EL60095 Lightening work(G-320-20A/B, G-320-22A/B)_U320 [Deleted] 19-Jun-21 14-Jul-21 19-Jun-21 14-Jul-21 21 21 Lightening work(G-320-20A/B, G-320-22A/B)_U320 [Deleted]
CB320EL60100 Cabling - Lightening(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 21-Jun-21 15-Jul-21 21-Jun-21 15-Jul-21 21 21 Cabling - Lightening(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
CB320EL60105 Lightening work(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted] 21-Jun-21 15-Jul-21 21-Jun-21 15-Jul-21 21 21 Lightening work(G-320-14A/B/C, G-320-24A/B/C)_U320 [Deleted]
CB320EL60110 Cabling - Lightening(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 01-Apr-21 26-Apr-21 01-Apr-21 26-Apr-21 21 21 Cabling - Lightening(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
CB320EL60115 Lightening work(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted] 01-Apr-21 26-Apr-21 01-Apr-21 26-Apr-21 21 21 Lightening work(G-320-12A/B, G-320-05A/B, G-320-06A/B, G-320-02)_U320 [Deleted]
CB320EL60120 Cabling - Lightening(G-320-07A/B)_U320 [Deleted] 08-May-21 11-Jun-21 08-May-21 11-Jun-21 21 21 Cabling - Lightening(G-320-07A/B)_U320 [Deleted]
CB320EL60125 Lightening work(G-320-07A/B)_U320 [Deleted] 08-May-21 11-Jun-21 08-May-21 11-Jun-21 21 21 Lightening work(G-320-07A/B)_U320 [Deleted]
CB320EL60130 Cabling - Lightening(G-320-03A/B)_U320 [Deleted] 17-Mar-21 13-Apr-21 17-Mar-21 13-Apr-21 21 21 Cabling - Lightening(G-320-03A/B)_U320 [Deleted]
CB320EL60135 Lightening work(G-320-03A/B)_U320 [Deleted] 17-Mar-21 13-Apr-21 17-Mar-21 13-Apr-21 21 21 Lightening work(G-320-03A/B)_U320 [Deleted]
CB320EL60140 Cabling - Lightening(G-320-01A/B/C)_U320 [Deleted] 13-Apr-21 07-May-21 13-Apr-21 07-May-21 21 21 Cabling - Lightening(G-320-01A/B/C)_U320 [Deleted]
CB320EL60145 Lightening work(G-320-01A/B/C)_U320 [Deleted] 13-Apr-21 07-May-21 13-Apr-21 07-May-21 21 21 Lightening work(G-320-01A/B/C)_U320 [Deleted]
CB320EL60150 Cabling - Lightening(G-320-025A/B/C)_U320 [Deleted] 29-Apr-21 03-Jun-21 29-Apr-21 03-Jun-21 21 21 Cabling - Lightening(G-320-025A/B/C)_U320 [Deleted]
CB320EL60155 Lightening work(G-320-025A/B/C)_U320 [Deleted] 29-Apr-21 03-Jun-21 29-Apr-21 03-Jun-21 21 21 Lightening work(G-320-025A/B/C)_U320 [Deleted]
CB320EL60160 Cabling - Lightening(MS-323-01/02)_U320 21-Jun-21 15-Jul-21 21-Jun-21 15-Jul-21 21 21 Cabling - Lightening(MS-323-01/02)_U320
CB320EL60165 Lightening work(MS-323-01/02)_U320 21-Jun-21 15-Jul-21 21-Jun-21 15-Jul-21 21 21 Lightening work(MS-323-01/02)_U320
CC334EL60005 Installation - Distribution Panel(334-WWT-001)_U334 29-Mar-21 22-Apr-21 16-Jul-21 09-Aug-21 21 21 Installation - Distribution Panel(334-WWT-001)_U334
CC334EL60010 Installation - Distribution Panel(334-WWT-002)_U334 12-Apr-21 10-May-21 05-Aug-21 03-Sep-21 24 24 Installation - Distribution Panel(334-WWT-002)_U334

Actual Level of Effort Actual Work Critical Remaining Work Page 61 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CC334EL60015 Cabling - Lightening(334-WWT-001)_U334 08-Dec-20 12-Jan-21 14-Apr-21 12-May-21 24 24 Cabling - Lightening(334-WWT-001)_U334
CC334EL60020 Lightening work(334-WWT-001)_U334 08-Dec-20 12-Jan-21 14-Apr-21 12-May-21 24 24 Lightening work(334-WWT-001)_U334
CC334EL60025 Cabling - Lightening(334-WWT-002)_U334 19-Mar-21 23-Apr-21 16-Jul-21 19-Aug-21 28 28 Cabling - Lightening(334-WWT-002)_U334
CC334EL60030 Lightening work(334-WWT-002)_U334 19-Mar-21 23-Apr-21 16-Jul-21 19-Aug-21 28 28 Lightening work(334-WWT-002)_U334
CC334EL60105 Installation - Distribution Panel(334-CHM-001)_U334 05-Mar-21 08-Apr-21 25-Feb-21 31-Mar-21 24 24 Installation - Distribution Panel(334-CHM-001)_U334
CC334EL60110 Cabling - Lightening(334-CHM-001)_U334 31-Oct-20 08-Dec-20 07-Jan-21 16-Feb-21 28 28 Cabling - Lightening(334-CHM-001)_U334
CC334EL60115 Lightening work(334-CHM-001)_U334 23-Oct-20 30-Nov-20 29-Dec-20 05-Feb-21 28 28 Lightening work(334-CHM-001)_U334
CC335EL60005 Installation - Distribution Panel(A-335-02)_U335 10-Jun-21 08-Jul-21 14-Apr-21 12-May-21 24 24 Installation - Distribution Panel(A-335-02)_U335
CC335EL60010 Installation - Distribution Panel(A-335-03)_U335 01-Jul-21 13-Aug-21 15-Jun-21 27-Jul-21 36 36 Installation - Distribution Panel(A-335-03)_U335
CC335EL60015 Installation - Distribution Panel(A-335-01)_U335 29-Jun-21 27-Jul-21 04-May-21 10-Jun-21 24 24 Installation - Distribution Panel(A-335-01)_U335
CC335EL60025 Cabling - Lightening(A-335-01)_U335 (TBD) 09-Mar-21 10-Apr-21 12-Jan-21 15-Feb-21 24 24 Cabling - Lightening(A-335-01)_U335 (TBD)
CC335EL60030 Lightening work(A-335-01)_U335 (TBD) 09-Mar-21 10-Apr-21 12-Jan-21 15-Feb-21 24 24 Lightening work(A-335-01)_U335 (TBD)
CC335EL60035 Cabling - Lightening(A-335-02)_U335 (TBD) 06-May-21 12-Jun-21 17-Mar-21 16-Apr-21 24 24 Cabling - Lightening(A-335-02)_U335 (TBD)
CC335EL60040 Lightening work(A-335-02)_U335 (TBD) 06-May-21 12-Jun-21 17-Mar-21 16-Apr-21 24 24 Lightening work(A-335-02)_U335 (TBD)
CC335EL60045 Cabling - Lightening(A-335-03)_U335 (TBD) 26-Apr-21 03-Jun-21 09-Apr-21 07-May-21 24 24 Cabling - Lightening(A-335-03)_U335 (TBD)
CC335EL60050 Lightening work(A-335-03)_U335 (TBD) 26-Apr-21 03-Jun-21 09-Apr-21 07-May-21 24 24 Lightening work(A-335-03)_U335 (TBD)
CC335EL60055 Installation - Distribution Panel(A-335-05)_U335 (TBD) 16-Jun-21 28-Jul-21 29-May-21 12-Jul-21 36 36 Installation - Distribution Panel(A-335-05)_U335 (TBD)
CC335EL60057 Cabling - Lightening(A-335-05)_U335 (TBD) 10-Apr-21 08-May-21 23-Mar-21 21-Apr-21 24 24 Cabling - Lightening(A-335-05)_U335 (TBD)
CC335EL60060 Lightening work(A-335-05)_U335 (TBD) 10-Apr-21 08-May-21 23-Mar-21 21-Apr-21 24 24 Lightening work(A-335-05)_U335 (TBD)
CC337EL60005 Installation - Distribution Panel(337-SWR-003)_U337 05-Aug-21 03-Sep-21 21-Jun-21 19-Jul-21 24 24 Installation - Distribution Panel(337-SWR-003)_U337
CC337EL60010 Installation - Distribution Panel(337-SWR-005)_U337 21-Jul-21 19-Aug-21 05-Jun-21 03-Jul-21 24 24 Installation - Distribution Panel(337-SWR-005)_U337
CC337EL60015 Installation - Distribution Panel(337-SWR-004)_U337 08-Jul-21 04-Aug-21 21-May-21 19-Jun-21 24 24 Installation - Distribution Panel(337-SWR-004)_U337
CC337EL60020 Installation - Distribution Panel(337-SWR-002)_U337 14-Jun-21 12-Jul-21 19-Apr-21 25-May-21 24 24 Installation - Distribution Panel(337-SWR-002)_U337
CC337EL60025 Installation - Distribution Panel(323-JET-001)_U337 07-May-21 10-Jun-21 27-Jan-21 25-Feb-21 21 21 Installation - Distribution Panel(323-JET-001)_U337
CC337EL60035 Cabling - Lightening(337-SWR-002)_U337 15-Apr-21 27-May-21 22-Feb-21 01-Apr-21 28 28 Cabling - Lightening(337-SWR-002)_U337
CC337EL60040 Lightening work(337-SWR-002)_U337 19-Apr-21 27-May-21 25-Feb-21 01-Apr-21 25 25 Lightening work(337-SWR-002)_U337
CC337EL60047 Cabling - Lightening(337-SWR-003)_U337 16-Apr-21 28-May-21 23-Feb-21 03-Apr-21 28 28 Cabling - Lightening(337-SWR-003)_U337
CC337EL60050 Lightening work(337-SWR-003)_U337 20-Apr-21 28-May-21 26-Feb-21 03-Apr-21 25 25 Lightening work(337-SWR-003)_U337
CC337EL60055 Cabling - Lightening(337-SWR-004)_U337 09-Jun-21 12-Jul-21 14-Apr-21 25-May-21 28 28 Cabling - Lightening(337-SWR-004)_U337
CC337EL60060 Lightening work(337-SWR-004)_U337 12-Jun-21 12-Jul-21 17-Apr-21 25-May-21 25 25 Lightening work(337-SWR-004)_U337
CC337EL60065 Cabling - Lightening(337-SWR-005)_U337 04-Jun-21 07-Jul-21 09-Apr-21 12-May-21 28 28 Cabling - Lightening(337-SWR-005)_U337
CC337EL60070 Lightening work(337-SWR-005)_U337 08-Jun-21 07-Jul-21 13-Apr-21 12-May-21 25 25 Lightening work(337-SWR-005)_U337
CC337EL60120 Cabling Lighting (337-SWR-005A/B/C/D/E)_U337 21-Jul-21 14-Aug-21 05-Jun-21 29-Jun-21 21 21 Cabling Lighting (337-SWR-005A/B/C/D/E)_U337
CC337EL60130 Cabling Lighting (337-SWR-004A/B/C/D/E)_U337 12-Jul-21 04-Aug-21 25-May-21 19-Jun-21 21 21 Cabling Lighting (337-SWR-004A/B/C/D/E)_U337
CC337EL60140 Cabling Lighting (337-SWR-003)_U337 05-Aug-21 31-Aug-21 21-Jun-21 15-Jul-21 21 21 Cabling Lighting (337-SWR-003)_U337
CC337EL60150 Cabling Lighting (337-SWR-002)_U337 11-Jun-21 06-Jul-21 16-Apr-21 11-May-21 21 21 Cabling Lighting (337-SWR-002)_U337
CD341EL60790 Cabling Lighting (ISH-110)_U341 30-Mar-21 19-Apr-21 25-Mar-21 14-Apr-21 21 21 Cabling Lighting (ISH-110)_U341
CD341EL60800 Cabling Lighting (SWP-001)_U341 12-Apr-21 06-May-21 25-Jan-21 23-Feb-21 21 21 Cabling Lighting (SWP-001)_U341
CE323EL60005 Installation - Distribution Panel_U323 26-Mar-21 03-Jun-21 04-Jan-21 12-Mar-21 48 48 Installation - Distribution Panel_U323
CE323EL60010 Cabling - Lightening_U323 01-Mar-21 03-May-21 13-Nov-20 21-Jan-21 48 48 Cabling - Lightening_U323
CE323EL60015 Lightening work_U323 18-Dec-20 26-Feb-21 16-Sep-20 12-Nov-20 48 48 Lightening work_U323
CE323EL60020 Cabling - Lightening(323-JET-001)_U323 10-Mar-21 05-Apr-21 24-Nov-20 17-Dec-20 18 18 Cabling - Lightening(323-JET-001)_U323
CE323EL60025 Lightening work(323-JET-001)_U323 08-Feb-21 09-Mar-21 26-Oct-20 23-Nov-20 21 21 Lightening work(323-JET-001)_U323
CE323EL60030 Installation - Distribution Panel(323-JET-002)_U323 19-Oct-21 23-Nov-21 09-Aug-21 11-Sep-21 28 28 Installation - Distribution Panel(323-JET-002)_U323
CE323EL60035 Cabling - Lightening(323-JET-002)_U323 07-Oct-21 28-Oct-21 29-Jul-21 20-Aug-21 18 18 Cabling - Lightening(323-JET-002)_U323
CE323EL60040 Lightening work(323-JET-002)_U323 13-Sep-21 06-Oct-21 05-Jul-21 28-Jul-21 21 21 Lightening work(323-JET-002)_U323
CE323EL60050 Installation of Lighting Fixture System_323 12-Apr-21 10-Jun-21 20-Jan-21 22-Mar-21 42 42 Installation of Lighting Fixture System_323
CE323EL60070 Cabling Lighting_323 12-Apr-21 10-Jun-21 20-Jan-21 22-Mar-21 42 42 Cabling Lighting_323
Communication 23-Mar-21 21-Dec-21 29-Dec-20 05-Oct-21 212 212 21-Dec-21, Communication
CE323EL65005 Installation - Communication System_U323 23-Mar-21 29-May-21 29-Dec-20 08-Mar-21 48 48 Installation - Communication System_U323
CE323EL65010 Installation - Communication System(323-JET-001)_U323 10-Jun-21 05-Jul-21 25-Feb-21 26-Mar-21 21 21 Installation - Communication System(323-JET-001)_U323
CE323EL65015 Installation - Communication System(323-JET-002)_U323 23-Nov-21 21-Dec-21 11-Sep-21 05-Oct-21 21 21 Installation - Communication System(323-JET-002)_U323
CE323EL65020 Cabling - Communication_U323 23-Mar-21 29-May-21 29-Dec-20 08-Mar-21 48 48 Cabling - Communication_U323
CE323EL65025 Cabling - Communication(323-JET-001)_U323 10-Jun-21 05-Jul-21 25-Feb-21 26-Mar-21 21 21 Cabling - Communication(323-JET-001)_U323
CE323EL65030 Cabling - Communication(323-JET-002)_U323 23-Nov-21 21-Dec-21 11-Sep-21 05-Oct-21 21 21 Cabling - Communication(323-JET-002)_U323
Fire Alarm 19-Mar-21 22-Nov-21 24-Dec-20 10-Sep-21 193 193 22-Nov-21, Fire Alarm
CE323EL68005 Installation - Fire Alarm System_U323 19-Mar-21 11-Jun-21 24-Dec-20 23-Mar-21 60 60 Installation - Fire Alarm System_U323
CE323EL68010 Installation - Fire Alarm System(323-JET-001)_U323 10-Jun-21 05-Jul-21 25-Feb-21 26-Mar-21 21 21 Installation - Fire Alarm System(323-JET-001)_U323
CE323EL68015 Installation - Fire Alarm System(323-JET-002)_U323 26-Oct-21 22-Nov-21 18-Aug-21 10-Sep-21 21 21 Installation - Fire Alarm System(323-JET-002)_U323
CE323EL68120 Cabling - Fire Alarm_U323 19-Mar-21 11-Jun-21 24-Dec-20 23-Mar-21 60 60 Cabling - Fire Alarm_U323
CE323EL68325 Cabling - Fire Alarm(323-JET-001)_U323 10-Jun-21 05-Jul-21 25-Feb-21 26-Mar-21 21 21 Cabling - Fire Alarm(323-JET-001)_U323
CE323EL68330 Cabling - Fire Alarm(323-JET-002)_U323 26-Oct-21 22-Nov-21 18-Aug-21 10-Sep-21 21 21 Cabling - Fire Alarm(323-JET-002)_U323
Others 22-Dec-20 22-Mar-21 60 60 22-Mar-21, Others
CE323EL75005 Installation - Berthing Aid System_U323 [Added] 22-Dec-20 22-Mar-21 60 60 Installation - Berthing Aid System_U323 [Added]
Revamping Work 02-Nov-21 24-Jan-22 25-Aug-21 03-Nov-21 60 60 24-Jan-22, Revamping Work
CE022EL80005 Revamping - Electrical Work_U022 02-Nov-21 24-Jan-22 25-Aug-21 03-Nov-21 60 60 Revamping - Electrical Work_U022
Instrumentation & Control 15-Jan-21 13-Jan-22 07-Oct-20 21-Oct-21 252 252 13-Jan-22, Instrumentation & Control
Control System 02-Mar-21 13-Oct-21 30-Dec-20 21-Oct-21 157 157 13-Oct-21, Control System
CB319IC40105 Control System - Installation (SLC/PLC)(MS-323-05A/B, MS-323-06A/B)_U319 25-May-21 08-Jul-21 09-Sep-21 21-Oct-21 36 36 Control System - Installation (SLC/PLC)(MS-323-05A/B, MS-323-06A/B)_U319
CB319IC40115 Installation - Metering System(MS-323-05A/B)_U319 10-May-21 15-Jul-21 24-Mar-21 31-May-21 48 48 Installation - Metering System(MS-323-05A/B)_U319
CB319IC40120 Installation - Metering System(MS-323-06 A/B)_U319 10-May-21 15-Jul-21 24-Mar-21 31-May-21 48 48 Installation - Metering System(MS-323-06 A/B)_U319
CE323IC40005 Installation - Metering System(MS-323-01 A/B)_U323 02-Mar-21 26-Apr-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(MS-323-01 A/B)_U323
CE323IC40010 Installation - Metering System(MS-323-07 A/B)_U323 02-Mar-21 26-Apr-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(MS-323-07 A/B)_U323
CE323IC40015 Installation - Metering System(MS-323-04 A/B)_U323 02-Mar-21 26-Apr-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(MS-323-04 A/B)_U323

Actual Level of Effort Actual Work Critical Remaining Work Page 62 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation
RDMP - Level-3 Schedule_Updated L3 based on EOT(Cut-off : 25-Jan-20)_200207 Building 17-Feb-20 15.52
Activity ID Activity Name Start Finish BL Project BL Project Original Remaining 2019 2020 2021 2022
Start Finish Duration Duration
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
CE323IC40020 Installation - Metering System(MS-323-03)_U323 15-Jul-21 03-Sep-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(MS-323-03)_U323
CE323IC40025 Installation - Metering System(FQIT-855 A/B)_U323 15-Jul-21 03-Sep-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(FQIT-855 A/B)_U323
CE323IC40030 Installation - Metering System(FQIT-518 A/B)_U323 15-Jul-21 03-Sep-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(FQIT-518 A/B)_U323
CE323IC40035 Installation - Metering System(MS-323-02)_U323 26-Aug-21 13-Oct-21 30-Dec-20 01-Mar-21 42 42 Installation - Metering System(MS-323-02)_U323
CE323IC40045 Installation - Metering System (FQIT-4511)_U323 [Added] 15-Jul-21 10-Sep-21 42 42 Installation - Metering System (FQIT-4511)_U323 [Added]
CE323IC40050 Installation - Metering System (FQIT-4531)_U323 [Added] 15-Jul-21 10-Sep-21 42 42 Installation - Metering System (FQIT-4531)_U323 [Added]
CE323IC40055 Installation - Metering System (FQIT-1241)_U323 [Added] 15-Jul-21 10-Sep-21 42 42 Installation - Metering System (FQIT-1241)_U323 [Added]
CE323IC40065 Control System - Installation_U323 08-Apr-21 29-May-21 05-Mar-21 22-Apr-21 36 36 Control System - Installation_U323
Field Instrument 10-Jul-21 27-Oct-21 28-Apr-21 30-Aug-21 91 91 27-Oct-21, Field Instrument
CB319IC53205 Installation of Field Instrument(MS-323-05A/B, MS-323-06A/B)_U319 25-Aug-21 12-Oct-21 10-Jul-21 30-Aug-21 42 42 Installation of Field Instrument(MS-323-05A/B, MS-323-06A/B)_U319
CB320C53015 Installation of Field Instrument(G-320-14A/B/C, G-320-24A/B/C)_U320 10-Jul-21 14-Aug-21 29-Jun-21 03-Aug-21 30 30 Installation of Field Instrument(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC53115 Installation of Field Instrument(G-320-025A/B/C)_U320 10-Jul-21 14-Aug-21 26-Jun-21 31-Jul-21 30 30 Installation of Field Instrument(G-320-025A/B/C)_U320
CE323IC53005 Installation of Field Instrument_U323 29-Jul-21 27-Oct-21 28-Apr-21 05-Aug-21 75 75 Installation of Field Instrument_U323
Cable Race Way 15-Jan-21 14-Sep-21 07-Oct-20 30-Jul-21 181 181 14-Sep-21, Cable Race Way
CB319IC55205 Instrument Cable Tray-Ladder(MS-323-05A/B, MS-323-06A/B)_U319 08-Jul-21 31-Jul-21 22-May-21 17-Jun-21 21 21 Instrument Cable Tray-Ladder(MS-323-05A/B, MS-323-06A/B)_U319
CB319IC55210 Instrument Cable Tray-Perforated(MS-323-05A/B, MS-323-06A/B)_U319 02-Aug-21 14-Sep-21 18-Jun-21 30-Jul-21 36 36 Instrument Cable Tray-Perforated(MS-323-05A/B, MS-323-06A/B)_U319
CB320IC55010 Instrument Cable Tray-Ladder(G-320-14A/B/C, G-320-24A/B/C)_U320 25-May-21 08-Jul-21 25-May-21 08-Jul-21 36 36 Instrument Cable Tray-Ladder(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC55035 Instrument Cable Tray-Ladder(G-320-025A/B/C)_U320 31-Mar-21 21-May-21 31-Mar-21 21-May-21 36 36 Instrument Cable Tray-Ladder(G-320-025A/B/C)_U320
CB320IC55065 Instrument Cable Tray-Perforated(G-320-14A/B/C, G-320-24A/B/C)_U320 10-Jun-21 22-Jul-21 10-Jun-21 22-Jul-21 36 36 Instrument Cable Tray-Perforated(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC55070 Instrument Cable Tray-Perforated(G-320-025A/B/C)_U320 28-May-21 10-Jul-21 28-May-21 10-Jul-21 36 36 Instrument Cable Tray-Perforated(G-320-025A/B/C)_U320
CB320IC55130 Instrument Junction Box Installation(G-320-14A/B/C, G-320-24A/B/C)_U320 28-May-21 10-Jul-21 28-May-21 10-Jul-21 36 36 Instrument Junction Box Installation(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC55135 Instrument Junction Box Installation(G-320-025A/B/C)_U320 24-Apr-21 16-Jun-21 24-Apr-21 16-Jun-21 36 36 Instrument Junction Box Installation(G-320-025A/B/C)_U320
CE323IC55005 Instrument Cable Tray-Ladder_U323 26-Apr-21 08-Jun-21 05-Feb-21 18-Mar-21 28 28 Instrument Cable Tray-Ladder_U323
CE323IC55010 Instrument Cable Tray-Perforated_U323 11-May-21 06-Sep-21 24-Feb-21 28-Jun-21 90 90 Instrument Cable Tray-Perforated_U323
CE323IC55020 Instrument Junction Box Installation_U323 15-Jan-21 17-Mar-21 07-Oct-20 30-Nov-20 42 42 Instrument Junction Box Installation_U323
Cable 23-Jun-21 13-Jan-22 31-May-21 13-Oct-21 162 162 13-Jan-22, Cable
CB319IC60205 Instrument Cable Pulling Primary(MS-323-05A/B, MS-323-06A/B)_U319 15-Jul-21 27-Aug-21 31-May-21 13-Jul-21 36 36 Instrument Cable Pulling Primary(MS-323-05A/B, MS-323-06A/B)_U319
CB319IC60210 Instrument Cable Termination Prim ary(MS-323-05A/B, MS-323-06A/B)_U319 13-Aug-21 10-Sep-21 29-Jun-21 27-Jul-21 24 24 Instrument Cable Termination Prim ary(MS-323-05A/B, MS-323-06A/B)_U319
CB319IC60215 Instrument Cable Pulling Secondary(MS-323-05A/B, MS-323-06A/B)_U319 20-Aug-21 30-Sep-21 06-Jul-21 18-Aug-21 36 36 Instrument Cable Pulling Secondary(MS-323-05A/B, MS-323-06A/B)_U319
CB319IC60220 Instrument Cable Termination Secondary(MS-323-05A/B, MS-323-06A/B)_U319 17-Sep-21 14-Oct-21 03-Aug-21 01-Sep-21 24 24 Instrument Cable Termination Secondary(MS-323-05A/B, MS-323-06A/B)_U319
CB320IC60020 Instrument Cable Pulling Primary(G-320-14A/B/C, G-320-24A/B/C)_U320 31-Jul-21 13-Sep-21 21-Jul-21 02-Sep-21 36 36 Instrument Cable Pulling Primary(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC60025 Instrument Cable Termination Prim ary(G-320-14A/B/C, G-320-24A/B/C)_U320 28-Aug-21 24-Sep-21 18-Aug-21 14-Sep-21 24 24 Instrument Cable Termination Prim ary(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC60035 Instrument Cable Pulling Secondary(G-320-14A/B/C, G-320-24A/B/C)_U320 26-Jun-21 07-Aug-21 26-Jun-21 07-Aug-21 36 36 Instrument Cable Pulling Secondary(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC60040 Instrument Cable Termination Secondary(G-320-14A/B/C, G-320-24A/B/C)_U320 26-Jul-21 24-Aug-21 26-Jul-21 24-Aug-21 24 24 Instrument Cable Termination Secondary(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC60145 Instrument Cable Pulling Primary(G-320-025A/B/C)_U320 21-Jul-21 02-Sep-21 08-Jul-21 20-Aug-21 36 36 Instrument Cable Pulling Primary(G-320-025A/B/C)_U320
CB320IC60155 Instrument Cable Termination Prim ary(G-320-025A/B/C)_U320 31-Aug-21 23-Sep-21 18-Aug-21 10-Sep-21 21 21 Instrument Cable Termination Prim ary(G-320-025A/B/C)_U320
CB320IC60160 Instrument Cable Pulling Secondary(G-320-025A/B/C)_U320 23-Jun-21 04-Aug-21 23-Jun-21 04-Aug-21 36 36 Instrument Cable Pulling Secondary(G-320-025A/B/C)_U320
CB320IC60165 Instrument Cable Termination Secondary(G-320-025A/B/C)_U320 26-Jul-21 20-Aug-21 26-Jul-21 20-Aug-21 21 21 Instrument Cable Termination Secondary(G-320-025A/B/C)_U320
CE323IC60005 Instrument Cable Pulling-Primary_U323 02-Oct-21 24-Nov-21 13-Jul-21 01-Sep-21 42 42 Instrument Cable Pulling-Primary_U323
CE323IC60010 Instrument Cable Termination-Prim ary_U323 09-Nov-21 10-Dec-21 19-Aug-21 15-Sep-21 24 24 Instrument Cable Termination-Prim ary_U323
CE323IC60020 Instrument Cable Pulling-Secondary_U323 25-Oct-21 28-Dec-21 03-Aug-21 29-Sep-21 48 48 Instrument Cable Pulling-Secondary_U323
CE323IC60025 Instrument Cable Termination-Secondary_U323 13-Dec-21 13-Jan-22 16-Sep-21 13-Oct-21 24 24 Instrument Cable Termination-Secondary_U323
Air Piping & Tubing 05-Aug-21 03-Dec-21 29-Jun-21 09-Sep-21 97 97 03-Dec-21, Air Piping & Tubing
CB320IC65025 Air Piping & Tubing Installation(G-320-14A/B/C, G-320-24A/B/C)_U320 05-Aug-21 08-Sep-21 26-Jul-21 28-Aug-21 28 28 Air Piping & Tubing Installation(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC65045 Air Piping & Tubing Installation(G-320-025A/B/C)_U320 05-Aug-21 08-Sep-21 23-Jul-21 26-Aug-21 28 28 Air Piping & Tubing Installation(G-320-025A/B/C)_U320
CE323IC65010 Air Piping & Tubing Installation_U323 20-Sep-21 03-Dec-21 29-Jun-21 09-Sep-21 60 60 Air Piping & Tubing Installation_U323
Safety & Fire Fighting 19-Feb-21 11-Oct-21 15-Dec-20 19-Aug-21 180 180 11-Oct-21, Safety & Fire Fighting
Fire Fighting Equipment 19-Feb-21 11-Oct-21 15-Dec-20 19-Aug-21 180 180 11-Oct-21, Fire Fighting Equipment
CE323SF35010 Installation - Fire Fighting Equipment_U323 19-Feb-21 11-Oct-21 15-Dec-20 19-Aug-21 180 180 Installation - Fire Fighting Equipment_U323
Pre-commissioning 09-Sep-21 22-Apr-22 27-Aug-21 30-Nov-21 168 168 22-Apr-22, Pre-commissioning
Loop Test 09-Sep-21 22-Apr-22 27-Aug-21 30-Nov-21 168 168 22-Apr-22, Loop Test
CB319IC70025 Pre-Commissioning - Loop Test_(MS-323-05A/B, MS-323-06A/B)_U319 01-Oct-21 05-Nov-21 22-Oct-21 30-Nov-21 30 30 Pre-Commissioning - Loop Test_(MS-323-05A/B, MS-323-06A/B)_U319
CB320IC70030 Pre-Commissioning - Loop Test(G-320-14A/B/C, G-320-24A/B/C)_U320 09-Sep-21 02-Oct-21 30-Aug-21 22-Sep-21 21 21 Pre-Commissioning - Loop Test(G-320-14A/B/C, G-320-24A/B/C)_U320
CB320IC70165 Pre-Commissioning - Loop Test(G-320-025A/B/C)_U320 09-Sep-21 02-Oct-21 27-Aug-21 20-Sep-21 21 21 Pre-Commissioning - Loop Test(G-320-025A/B/C)_U320
CE323IC70005 Pre-Commissioning - Loop Test_U323 28-Jan-22 22-Apr-22 10-Sep-21 23-Nov-21 60 60 Pre-Commissioning - Loop Test_U323

Actual Level of Effort Actual Work Critical Remaining Work Page 63 of 63 TASK filter: (Untitled Filter).
Primary Baseline Remaining Work Milestone © Oracle Corporation