Project: MBTA Project No. E22CN07, GLXC Project No. 4019139 DP24 New South Abutment SPL Wall Design Temporary Condition 2 - Strength I
Project: MBTA Project No. E22CN07, GLXC Project No. 4019139 DP24 New South Abutment SPL Wall Design Temporary Condition 2 - Strength I
4019139
DP24 New South Abutment SPL Wall Design
Temporary Condition 2 - Strength I
Originator: SG Date: 4/2/2020
Checker: ALS Date: 4/2/2020
2/12
Extended Summary
Table: Extended summary for all design sections.
Design Section Calculation Result Wall Displacement Settlement
Name (in) (in)
Base model Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia Calculation successful 1.93 6.85
Table: Extended summary for wall moments and shears for all design sections.
Design Section Wall Moment Wall Moment Wall Shear Wall Shear
Name (k-ft/ft) (k-ft) (k/ft) (k)
Base model Not analyzed Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia 178.36 1457.33 17.82 145.57
Table: Extended summary for wall stress checks for all design sections.
Design Section STR Combined STR Moment STR Shear Wall Concrete Service
Name Wall Ratio Wall Ratio Wall Ratio Stress Ratio FIC
Base model Not analyzed Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia 0.599 0.594 0.421 N/A
Table notes:
STR Combined: Combined stress check, along eccentricity line considering axial load and moment (demand/capacity).
STR Moment : Moment stress check, assuming constant axial load on wall (demand/capacity).
STR Shear : Shear stress check (shear force demand/wall shear capacity).
Table: Extended summary for support results for all design sections
Design Section Max Support Max Support Critical STR Support Support Geotech
Name Reaction (k/ft) Reaction (k) Support Check Ratio Capacity Ra o (pull
Base model Not analyzed Not analyzed Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia 19.73 161.19 0.944 0.756 0.944
Table notes:
STR Support ra o: Cri cal structural stress check for support (force demand/structural capacity).
Support geotech capacity ra o: Cri cal geotechnical capacity stress check (demand/geotechnical capacity).
Cri cal support check: Cri cal demand/design capacity ra o (structural or geotechnical).
Table: Summary for basal stability and wall embedment safety factors from conventional analyses.
Design Section FS Toe FS Toe FS Toe FS
Name Basal Passive Rotation Length
Base model Not analyzed Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia 2.273 N/A 98.529 1.413
Table notes:
FSbasal : Cri cal basal stability safety factor (relevant only when so clays are present beneath the excava on).
TOE FS Passive : Safety factor for wall embedment based on FS= Available horizontal thrust resistance/Driving hor. thrust.
TOE FS Rota on: Safety factor for wall embedment based on FS= Available resis ng moment/Driving moment.
TOE FS Length : Safety factor for wall embedment based on FS= Available wall embedment/Required embedment for FS=1.0
Table: Summary for wall embedment safety factors from elastoplastic analyses.
Originator: SG Date: 4/2/2020
Checker: ALS Date: 4/2/2020 3/12
Design Section FS Mobilized FS
Name Passive True/Active
Base model Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia N/A N/A
Table notes:
FS Mobilized Passive : Safety factor= Available horizontal passive resistance/Mobilized passive thrust.
FS True/Ac ve : Soil thrust on retained wall side/Minimum theore cally horizontal ac ve force thrust.
Table: Summary for hydraulic safety factors, water flow, and slope stability
Design Section Hydraulic Qflow FSslope
Name Heave FS (ft3/hr)
Base model Not analyzed Not analyzed Not analyzed
0: AASHTO LRFD (2012): Strength Ia 2.163 N/A N/A
Summary of Basal Stability and Predicted Wall Movements According to Clough 1989 Method Wall: W
1. FSmin 2. DxMax (in) 2. Stiffness 2. FSbasal 3. Dx/H (%) 3. Stiffness 3. FSbasal
@ stage 0 @ stage 0 @ DxMax @ DxMax @ stage 0 @ Dx/H max @ Dx/H max
2.273 3.183 6 2.273 0.957 6.016 2.273
Wall Shear Wall Shear STR Combined STR Moment STR Shear
(k/ft) (k) Wall Ratio Wall Ratio Wall Ratio
Strength I 17.82 145.57 0.599 0.594 0.421
Table notes:
STR Combined: Combined stress check, along eccentricity line considering axial load and moment (demand/capacity).
STR Moment : Moment stress check, assuming constant axial load on wall (demand/capacity).
STR Shear : Shear stress check (shear force demand/wall shear capacity).
Max Support Max Support Critical STR Support Support Geotech
Reaction (k/ft) Reaction (k) Support Check Ratio Capacity Ra o (pull out
Strength I 19.73 161.19 0.944 0.756 0.944
Table notes:
STR Support ra o: Cri cal structural stress check for support (force demand/structural capacity).
Support geotech capacity ra o: Cri cal geotechnical capacity stress check (demand/geotechnical capacity).
Cri cal support check: Cri cal demand/design capacity ra o (structural or geotechnical).
FS Toe FS Toe FS Toe FS Zcut FS Mobilized FS
Basal Passive Rotation Length (nonlinear) Passive True/Active
Strength I 2.273 N/A 98.529 1.413 N/A N/A N/A
Embedment FS vs Stage
Min Toe FS FS1 Passive FS2 Rotation FS3 Length (from FS1, FS2) FS4 Mobilized Passive FS5 Actual Drive Thrust / Theory
Stage 0 1.413 N/A 98.529 1.413 N/A N/A
Table notes:
FSbasal : Cri cal basal stability safety factor (relevant only when so clays are present beneath the excava on).
Wall embedment safety factors from conven onal analysis (limit-equilibrium):
FS1 Passive : Safety factor for wall embedment based on FS= Available horizontal thrust resistance/Driving hor. thrust.
FS2 Rota on: Safety factor for wall embedment based on FS= Available resis ng moment/Driving moment.
FS3 Length : Safety factor for wall embedment based on FS= Available wall embedment/Required embedment for FS=1.0
Wall embedment safety factors from non-linear analysis:
FS4 Mobilized Passive : Safety factor= Available horizontal passive resistance/Mobilized passive thrust.
FS5 True/Ac ve : Soil thrust on retained wall side/Minimum theore cally horizontal ac ve force thrust.
Tables for stress checks follow: Support force/Design capacity
Reinforcement Requirements
Parameter Description
Note: Wall does not use steel reinforcement. Section does not apply.
SOIL DATA
Name g tot g dry Frict C' Su FRp FRcv Eload rEur kAp kPp kAcv kPcv Vary Spring Color
(pcf) (pcf) (deg) (psf) (psf) (deg) (deg) (ksf) (-) NL NL NL NL Model
Fill 125 125 32 0 N/A N/A N/A 300 3 0.31 3.26 N/A N/A True EXP
Glacial Till 135 135 38 0 N/A N/A N/A 626.3 3 0.24 4.2 N/A N/A True Linear
B2/B3 Bedroc 155 155 0 36000 N/A N/A N/A 300 3 1 1 N/A N/A True Linear
Name Poisson Min Ka Min sh ko.NC nOCR aH.EXP aV.EXP qSkin qNails kS.nails PL
v (clays) (clays) - - (0 to 1) (0 to 1) (psi) (psi) (k/ft3) (ksi)
Fill 0.35 - - 0.47 0.5 1 0 7.2 4.8 20 -
Glacial Till 0.45 - - 0.384 0.5 - - 35 19.3 70 -
B2/B3 Bedroc 0.35 - - 1 0.8 - - 0 0 0 -
SOIL BORINGS
Top Elev= superior SOil level
Soil type= type of the soil (sand , clay , etc)
OCR= overconsolida on ra o
K0= at rest coefficient
Name: Boring 1, pos: (-65.617, 0)
Top elev. Soil type OCR Ko
47.22 Fill 1 0.47
20 Glacial Till 1 0.38
4.4 B2/B3 Bedroc 1 1
WALL DATA
Originator: SG Date: 4/2/2020
Checker: ALS Date: 4/2/2020 8/12
Wall section 0: Wall 1