AFAR 1 Flexible Learning Module Midterm Topic 2 ABC and Variable Costing.
AFAR 1 Flexible Learning Module Midterm Topic 2 ABC and Variable Costing.
DEVELOPER This module is prepared by Mr. Val Lawrence V. Flores. He is a Certified Public
AND THEIR Accountant. He teaches basic accounting, financial accounting courses and
BACKGROUND advanced financial accounting courses. Mr. Flores is currently a Member of
Philippine Institute of Certified Public Accountants (PICPA).
COURSE This course is a dynamic discipline constantly responding to the needs of
DESCRIPTION managers in a highly competitive and global business world. Managers need cost
accounting measurements to determine product costs for internal management
and external financial reporting.
COURSE 1. Cost concepts and cost behavior
OUTLINE 2. Activity based and variable costing
3. Job order costing
4. Accounting for materials (with JIT and backflush costing)
5. Accounting for labor
6. Accounting for factory overhead
7. Standard costing and variance analysis
8. Process costing
9. Joint product and by-product costing
CHAPTER NO. 2
TITLE Activity based and variable costing
I. RATIONALE
This module covers cost concepts and cost behavior, the first topic of Advanced Financial
Accounting and Reporting 1 course. In its developmental activities section, it provides substantial
discussions of the topics. It discusses the concepts, nature, scope and principles of the topics.
Ample examples, illustrations and word problems with suggested solutions are provided for the
application of concepts and practical exercises. To evaluate what the students have learned, this
module provides work exercises at the closure activities section. To ensure that learning objectives
are attained at the end of the semester, the learner / students are evaluated based on attendance,
portfolio journal, formative assessment and summative assessment. See evaluation section for the
details. For further readings, see assignment / agreement section.
Page | 1
7. Prepare income statements using variable and absorption costing.
8. Reconcile absorption costing income with variable costing income.
III. CONTENT
A. PREPARATORY ACTIVITIES
This module covers the cost concepts and cost behavior. With this, learners / students must:
1. Since this chapter is a new chapter and has nothing to do with past accounting
subjects already taken, read in advance the topic on the suggested books given in the
syllabus of the subject.
B. DEVELOPMENTAL ACTIVITIES
Determining the cost of a product is termed product costing. Product costs consist of direct materials,
direct labor, and factory overhead. The direct materials and direct labor are direct costs that can be
traced to the product. However, factory overhead includes indirect costs that must be allocated to the
product. The methods of allocating factory overhead costs are as follows:
Managers are concerned about allocating factory overhead because the allocation affects the accuracy
of product costs. In turn, product costs are used for decisions such as determining product mix,
establishing product price, and determining whether or not to discontinue a product line.
A company may use a predetermined factory overhead rate to allocate factory overhead costs to
products. Under the single plant-wide factory overhead rate method, factory overhead costs are
allocated to products using only one rate.
Illustration 1
Assume the following data for Ruiz Company, which manufactures product RED and BLUE in a
single factory.
Under the single plant-wide factory overhead rate method, the P 1,600,000 budgeted factory overhead
is applied to all products by using one rate. This rate is computed as follows:
The budgeted allocation base is a measure of operating activity in the factory. Common allocation
bases would include direct labor hours, direct labor dollars, and machine hours. Ruiz Company
allocates factory overhead using budgeted direct labor hours as the plant-wide allocation base. Thus,
Ruiz’s single plantwide factory overhead rate is P80 per direct labor hour, computed as follows:
Page | 2
20,000 Direct Labor Hours
= P80 per direct labor hour
Ruiz uses the plant-wide rate of P80 per direct labor hour to allocate factory overhead to RED and
BLUE as shown below.
As shown above, the factory overhead allocated to each product is P800. This is because each product
uses the same number of direct labor hours.
The primary advantage of using the single plant-wide overhead rate method is that it is simple and
inexpensive to use. However, the single plant-wide rate assumes that the factory overhead costs are
consumed in the same way by all products. For example, in the preceding illustration Ruiz Company
assumes that factory overhead costs are consumed as each direct labor hour is incurred. The preceding
assumption may be valid for companies that manufacture one or a few products. If, however, a
company manufactures products that consume factory overhead costs in different ways, a single plant-
wide rate may not accurately allocate factory overhead costs to the products.
Illustration 2
The total factory overhead for Morris Company is budgeted for the year at P650,000. Morris
manufactures two office furniture products: a credenza and desk. The credenza and desk each require
four direct labor hours (d/h) to manufacture. Each product is budgeted for 5,000 units of production
for the year. Determine (a) the total number of budgeted direct labor hours for the year, (b) the single
plant-wide factory overhead rate, and (c) the factory overhead allocated per unit for each product
using the single plant-wide factory overhead rate.
a. Credenza: 5,000 units x 4 direct labor hours = 20,000 direct labor hours
Desk: 5,000 units x 4 direct labor hours = 20,000
40,000 direct labor hours
b. Single plant-wide factory overhead rate: P650,000/40,000 dlh P16.25 per dlh
c. Credenza: P16.25 per direct labor hour x 4 dlh per unit = P65 per unit
Desk: P16.25 per direct labor hour x 4 dlh per unit = P65 per unit
The activity-based costing (ABC) method focuses on the cost of activities and then allocates these
costs to products using a variety of activity bases. Under activity-based costing, factory overhead
costs are initially accounted for in activity cost pools. These cost pools are related to a given activity,
such as machine usage, inspections, moving, production setups, and engineering activities.
Activity-based costing identifies the causal relationship between the incurrence of cost and activities,
determines the underlying drive of activities, establishes cost pools related to individual drivers,
develops costing rates, and applies cost to product on the basis of resources consumed (drivers).
Definition of terms:
Activity – is an event, task or unit of work with a specified purpose. Examples of activities
are designing products, and setting up machines
Page | 3
o Unit-level activities – these activities are performed for each unit of product that is
produced. Some examples are hours of work, inspecting each item, operating a
machine and performing a specific assembly task.
o Batch-level activities – these activities occur each time a batch is produced. Some
examples are machine setup, purchasing, materials handling, and batch inspection.
o Product-sustaining activities – these activities are incurred in order to support the
production of a different product from what is currently produced. Examples include
product design, and engineering changes.
o Facility-sustaining activities – these activities are incurred to support production in
general and are generally fixed costs such as, security, maintenance, plant
management, depreciation of the factory and property taxes.
Cost Object – is anything for which costs are accumulated for managerial purposes.
Cost Driver – is anything (it can be an activity, an event, or a volume of something) that
causes costs to be incurred each time the driver occurs. Examples of cost drivers are set-ups,
moving, number of parts, casting, packaging or handling.
Traditional ABC
Description 1. Also called as Volume Based 1. Involves a two-stage costing
or Throughput Based Costing processes
Illustration 3
To illustrate the activity-based costing method, the prior illustration for Ruiz Company is used.
Assume that the following activities have been identified for producing product RED and BLUE:
Page | 4
1. Fabrication, which consists of cutting metal to shape the product. This activity is machine-
intensive.
2. Assembly, which consists of manually assembling machined pieces into a final product.
This activity is labor-intensive.
3. Setup, which consists of changing tooling in machines in preparation for making a new product.
Each production run requires a setup.
5. Engineering changes, which consist of processing changes in design or process specifications for a
product. The document that initiates changing a product or process is called an engineering change
order (ECO).
Fabrication and assembly are now identified as activities rather than departments. As a result, the
setup, quality-control inspections, and engineering change functions that were previously allocated to
the fabrication and assembly departments are now classified as separate activities.
The budgeted factory overhead for each activity cost pool is as follows:
The activity cost pools are assigned to products using factory overhead rates for each activity. These
rates are called activity rates because they are related to activities. Activity rates are determined as
follows:
The term activity base, rather than allocation base, is used because the base is related to an activity
cost pool.
To illustrate, it is assumed that RED is a new product for Ruiz Company, and engineers are still
making minor design changes. BLUE has been produced by Ruiz Company for many years.
Additional data about the two products include:
RED BLUE
Estimated units of total production 1,000 units 1,000 units
Estimated engineering change orders 12 change orders 4 change orders
Estimated setups 100 setups 20 setups
Units per production run 10 units (1,000/100 setups) 50 units (1,000/20 setups)
Quality-control inspections 100 inspections 4 inspections
Page | 5
The number of direct labor hours used by each product is 10,000 hours as shown below.
BLUE:
Activity Base
Quality-Control Engineering
Products Fabrication Assembly Setup Inspections Changes
RED 8,000 dlh 2,000 dlh 100 setups 100 inspections 12 ECOs
BLUE 2,000 8,000 20 4 4_____
Total activity base 10,000 dlh 10,000 dlh 120 setups 104 inspections 16 ECOs
Page | 6
RED BLUE
Activity Activity Activity Activity Activity Activity
x = x =
Activity Base Rate Cost Base Rate Cost
The factory overhead costs per unit for Ruiz Company using the two allocation methods are shown
below.
If Ruiz Company used the P800 factory overhead cost allocation (single plant-wide rate) instead of
activity-based costing for pricing product RED and product BLUE, the following would likely result:
1. The Product RED would be underpriced because its factory overhead cost is understated by P494
(P1,294 - P800).
2. The Product BLUE would be overpriced because its factory overhead cost is overstated by P494
(P800 - P306).
As a result, Ruiz would likely lose sales of product BLUE because they are overpriced. In contrast,
sale of product RED would increase because they are underpriced. Due to these pricing errors, Ruiz
might incorrectly decide to expand production of product RED and discontinue making product
BLUE. If Ruiz uses the activity-based costing method, its product costs would be more accurate.
Thus, Ruiz would have a better starting point for making proper pricing decisions. Although the
product cost distortions are not as great, similar results would occur if Ruiz had used the multiple
production department rate method.
Illustration 4
The total factory overhead for Morris Company is budgeted for the year at P600,000, divided into
four activity pools: fabrication, P300,000; assembly, P120,000; setup, P100,000; and material
handling, P80,000. Morris manufactures two office furniture products: a credenza and desk. The
activity-base usage quantities for each product by each activity are as follows:
Fabrication Assembly Setup Material Handling
Credenza 5,000 dlh 15,000 dlh 30 setups 50 moves
Desk 15,000 5,000 220 350
20,000 dlh 20,000 dlh 250 setups 400 moves
Each product is budgeted for 5,000 units of production for the year. Determine (a) the activity rates
for each activity and (b) the activity-based factory overhead per unit for each product.
Page | 7
Assembly: P120,000/20,000 direct labor hours = P6 per dlh
Setup: P100,000/250 setups = P400 per setup
Material handling: P80,000/400 moves = P200 per move
b.
Credenza Desk
Activity Activity Activity Activity Activity Activity
x = x =
Activity Base Rate Cost Base Rate Cost
Illustration 4
Hammer Company plans to use activity-based costing to determine its product costs. It presently uses
a single plant-wide factory overhead rate for allocating factory overhead to products, based on direct
labor hours. The total factory overhead cost is as follows:
The company determined that it performed four major activities in the Production Support
Department. These activities, along with their budgeted costs, are as follows:
Hammer Company estimated the following activity-base usage and units produced for each of its
three products:
Page | 8
Instructions:
1. Determine the factory overhead cost per unit for the TV, computer, and cell phone under the single
plant-wide factory overhead rate method. Use direct labor hours as the activity base.
2. Determine the factory overhead cost per unit for the TV, computer, and cell phone under activity-
based costing. Round off to whole centavos.
3. Which method provides more accurate product costing? Why?
Solution:
P 1,400,000
=
1. Single plant-wide factory overhead rate 175,000 direct labor hours
= P8 per direct labor hour
2. Under activity-based costing, an activity rate must be determined for each activity pool:
Page | 9
3. Activity-based costing is more accurate, compared to the single plant-wide factory overhead rate
method. Activity-based costing properly shows that the cell phone is actually less expensive to make,
while the other two products are more expensive to make. The reason is that the single plant-wide
factory overhead rate method fails to account for activity costs correctly. The setup, production
control, quality control, and materials management activities are all performed on products in rates
that are different from their volumes. For example, the computer requires many of these activities
relative to its actual unit volume. The computer requires 40 setups over a volume of 2,000 units
(average production run size 50 units), while the cell phone has only 5 setups over 50,000 units
(average production run size 10,000 units). Thus, the computer requires greater support costs relative
to the cell phone. The cell phone requires minimum activity support because it is scheduled in large
batches and requires no inspections (has high quality) and few requisitions. The other two products
exhibit the opposite characteristics.
Page | 10
Examination)
The next topic is Job Order Costing. Learner / student is advised to read in advance the topic in the
book of Pedro P. Guerrero, Cost Accounting Principles and Procedural Application/Norma D. De
Leon, Ellery D. De Leon, Guillermo M. De Leon Jr., Cost Accounting and Control/Carter, Cost
Accounting 14th edition. Thomson Asian Edition/Warren, Reeve, Duchac, Managerial Accounting
10e/Cost Accounting- Kinney, Raiborn and Carter (Compilation Version) 2013.
REFERENCES
Carter, Cost Accounting 14th edition. Thomson Asian Edition
Cost Accounting- Kinney, Raiborn and Carter (Compilation Version) 2013
Rodelio S. Roque, Management Advisory Services
Pedro P. Guerrero, Cost Accounting Principles and Procedural Application
Norma D. De Leon, Ellery D. De Leon, Guillermo M. De Leon Jr., Cost Accounting and Control
Roque, R.S. Management Advisory Services. 16th Edition
Page | 11