01-02 Working Principles of The GOMU Board
01-02 Working Principles of The GOMU Board
This topic describes working principles of the GOMU board. One or two GOMU boards are
configured on the BSC to communicate between the BSC and the O&M system.
Slot 6 Slot 7
GSCU GSCU
Internal
network
GOMU
Hub
External
network
LMT M2000 ……
Backplane transmission
Ethernet cable transmission
The two internal Ethernet adapters ETH4-SCU7 and ETH5-SCU6 on the GOMU board
backplane are connected to GSCUs in slot 7 and slot 6 respectively in the GMPS subrack.
Through the network equipment, such as the HUB, Lan swith , and router, the two external
Ethernet adapters ETH0 and ETH1 of the GOMU board are connected to the O&M system to
communicate between the BSC and the O&M system.
Slot 7 Slot 6
GSCU GSCU
Internal
network
Hub
External
network
LMT M2000 ……
Backplane transmission
Ethernet cable transmission
The two internal Ethernet adapters ETH4-SCU7 and ETH5-SCU6 on the GOMU board
backplane are connected to GSCUs in slot 7 and slot 6 respectively in the GMPS subrack.
Through the network equipment, such as the HUB, Lan swith , and router, the two external
Ethernet adapters ETH0 and ETH1 of the GOMU board are connected to the O&M system to
communicate between the BSC and the O&M system.
The working principles of the standby GOMU board is similar to that of the active GOMU board.
The ETH3-UPDATEs of the active and standby GOMU boards are connected to each other
through the backplane. The ETH3-UPDATE performs the data synchronization between active
and standby GOMU boards and the update of the OMU software.
NOTE
l The switchover between the active and standby GOMU boards takes about two to three minutes. The
data synchronization after the switchover takes about 30 to 50 minutes.
l The communication between the O&M system and BSC is disrupted about two to three minutes in the
process of the active/standby GOMU board switchover.
Manual Swtichover
When the GOMU board is working in dual-server mode, and the data synchronization between
the active/standby GOMU boards is normal, the GOMU board can be forced to be switched over
manually according to the actual situation. After the manual switchover, the standby GOMU
board is switched over to the active GOMU board, and the active GOMU board is switched over
to the standby GOMU board.
Automatic Switchover
When the GOMU board is working normally in dual-server mode, only the active GOMU board
is running. The standby GOMU board is monitoring the active GOMU board. When the active
GOMU board is faulty, and the time duration is over one minute, the standby GOMU board
automatically switches over to the active GOMU board. When the active GOMU fault is cleared,
the standby GOMU board restored to its original state. If the active GOMU board fault is cleared
within one minute, the switchover does not occur.