OC 6000e System Overview
OC 6000e System Overview
Energy
OC 6000e
System configuration
Basic course
Before start
• Time schedule:
- 10:00 - 13:00 morning session
- 14:00 – 17:00 afternoon session
• Toilets, smoking area, lunch, etc
• Switch off mobile phones
• Ask questions as soon as appears
• Make your notes in your text book
2/
GE Confidential
May 2007
Course objectives
By the completion of this course you will be able to
3/
GE Confidential
May 2007
Course contents
4/
GE Confidential
May 2007
1. OC6000 System overview
5/
GE Confidential
May 2007
System Architecture
Large Screen
GPS
Modbus
CCS DEH
Atlas 505/505e DAS MEH
SCS ECS
NCS Remote I/O TSI
FSSS ETS
Remote Controller
6/
GE Confidential
May 2007
OC 6000e DCS Network
Plant Data Highway (PDH)
Engineer’s Performance
Operator Stations Workstation Historian Calculations
Unit Data Highway
Switch Fiber
Controller IONet
Switch
IONet
FCS
8/
GE Confidential
May 2007
OC 6000e DCS Network
Communications
IONet (Internal to I/O network)
- 100 MHz Ethernet Bus Request Response Protocol (TCP/IP)
- Ethernet (UTP Cat 5 or Fiber) Ethernet Global Data (UDP/IP)
- Supports Control at 10ms 100
40ms, 64 bytes, 10MB
Unit Data Highway (OC 6000e, Mark VI, EX2100, LCI)
80
- Ethernet (UTP Cat 5 or Fiber) EGD Protocol
% Utilization
- Peer-To-Peer Communications (40ms) 60
TCP/IP
- +/-1ms Time Coherence (NTP Protocol)
40
14
10
12
2
8
- RS232 Modbus Master / Slave Number of Nodes
- Ethernet TCP-IP Modbus Slave
- Ethernet TCP-IP GSM (time tags, event driven messages, periodic data)
- Other Links Supported By CIMPLICITYTM GUI
- External Time Synch: Usually with IRIG-B
9/
GE Confidential
May 2007
OC 6000e Time Synchronization
Operator Stations
10 /
GE Confidential
May 2007
OC 6000e DCS Network Specification
Information
Information Control
Control IONet
IONet
•• IEEE
IEEESpecification
Specification 802.3u
802.3u 802.3u
802.3u 802.3u
802.3u
•• Wire
WireSpeed
Speed 100MB
100MB 100MB
100MB 100MB
100MB
•• Cable
CableType
Type UTP
UTPCat.
Cat.5/Fiber
UTP
UTPCat.
5/Fiber Cat.5/Fiber
5/Fiber UTP
UTPCat.
Cat.5/Fiber
5/Fiber
•• Connector
ConnectorType
Type RJ-45
RJ-45//SC
SC RJ-45
RJ-45//SC
SC RJ-45
RJ-45//SCSC
•• Maximum
MaximumNodes
Nodes 255
255 120
120 199
199
•• Topology
Topology Star
Star Optical
OpticalRing/Star
Ring/Star Star
Star
•• Protocol
Protocol TCP/IP
TCP/IPbased
based EGD,
EGD,UDP/IP
UDP/IP EGD
EGD
•• Time
TimeSynch
Synch NTP
NTP&&PTP
PTP PTP
PTP(IEE
(IEE1588)
1588)
•• Distance
Distance 100m/2km
100m/2kmfiber
fiber 100m/2km
100m/2kmfiber
fiber 100m/2km
100m/2kmfiberfiber
Notes
1. Optical ring topology is available for the Control network on large systems.
Star topology is used on medium and small systems
2. The distance for multi-mode fiber is 2km. Single mode can be 15km, 40km,
and 80km.
11 /
GE Confidential
May 2007
OC 6000 Hardware Components
12 /
GE Confidential
May 2007
Standard cabinet
13 /
GE Confidential
May 2007
Controller and I/O subsytem
The Controller
The I/O module
IO Network
14 /
GE Confidential
May 2007
OC 6000e Controller
Features
• Single board including:
Main Processor
Control Network Communications - Ethernet
IO Network Communications – Ethernet
USB and COM ports
• Processor: Freescale 8349, 667MHz
• Operating system: QNX RTOS
• Base mounting
• Status LEDs
Environment
• Operating temperature 0°C to +60 °C
• No fans required
15 /
GE Confidential
May 2007
Electrical
I/O Modules • 1 cpu & 2 data acquisition boards/module
• (2) 100MB Ethernets / module (IONet)
IEEE-1588 Precision Time Protocol
• Hot-swap capability
• Module Power: 24Vdc
• Cabinet Power: 90-240Vac or 110/220Vdc
Terminations
• Type: 24-pin (dual row), 16-pin (single row)
• Wire Gauge: 2.5mm2, 2-wire
• Isolation: 2.21kV
• Density: 5.08mm between pins
Packaging
17 /
GE Confidential
May 2007
Analog I/O Modules *
Analog input modules
• A/D Converter: 1 per point
• Channel 16 independent & isolated channel
• Input converter resolution 24 bit analog to digital converter
MAI10 Analog Input for mA and Voltage signals
• Input span 0-5V/1-5V/±5V/±10V or 0-20mA/4-20mA
MAI20 Temperature sensor TC/RTD signals input
• Input span RTD of Pt100/Cu50 or TC of T,J,E,K,N,B,R,S
Analog output modules
• A/D Converter: 1 per point
• Channels: 8
• Resolution: 12-bit
• Signal: 0-20ma, 0-10v
20 /
GE Confidential
May 2007
Valve Position Control Module (MVP10,11+BVP10)
• Power input: 24VDC
• Control cycle: < 10ms
• Control signals: 0 - +/- 10, 40, 80, 250, 400mA, +/- 10VDC
• Feedback signal: 0-20mA, ±10V DC, LVDT, RLVDT
• DI: •AI:
Channel: 2 Channel: 2
On-state: 15-30V/2-5.5mA Signal: +/- 10VDC, 0-20mA
Off-state: 0-5V/0 - 0.5mA •AO:
• D0: Channel: 2
Channel: 1 Output: 0-5VDC
Output relay status: NO •LVDT:
Relay capacity: 220VAC/VDC Channel: 2
Contact type: wet/dry Accuracy: 0.25%
•Servo out:
Channel: 2
Accuracy: 0.2%
Current:. +/- 40mA(MVP10) +/- 400mA(MVP11)
22 /
GE Confidential
May 2007
Speed Detection & Protection Module (MSP10+BSP10)
• AI:
Number per SDP module (Terminal): 2
Accuracy: 0.01%
Input: 0-5VDC or 0-20mA
• Proximity Speed Input:
• Speed Inputs, Number per SDP module (terminal ): 1
• Magnetic Pickup Input
Voltage range for magnetic pickup input: 50mV RMS to 110V RMS
23 /
GE Confidential
May 2007
Speed Detection & Protection Module (MSP10+BSP10)
Speed Acquisition Specifications
• Cycle time:
Time interval from speed input to protection contact output (2K~10K ): 1-
10ms
• Speed acquisition
Low speed acquisition time (<10rpm): 1ms – 5S
Min and max speed measure range: 0.4 - 20K Hz
Precision of speed acquisition (2K~4K ): 0.1HZ
• Speed display
Speed value displayed on screen down to 0.1 rpm
• Speed acceleration
Speed acceleration precision: 0.1%
24 /
GE Confidential
May 2007
Speed Detection & Protection Module (MSP10+BSP10)
SDP Relay Module Specifications
• Power input: 24VDC
• DO:
Number per SDP relay module (terminal) 3 OPC and 3 AST: 6
DO output via 2oo3 voting
Each DO contact capacity 220VDC/AC, 0-1A
• Power input, high voltage
Optional 1~4 channels 220/110 VDC/AC voltage connect with DO in series to
provide the power of solenoid
• DI:
Number per SDP relay module (D-SUB): 6
25 /
GE Confidential
May 2007
OC6000 Software overview
26 /
GE Confidential
May 2007
MPC – Master control software
27 /
GE Confidential
May 2007
Diagnostics
28 /
GE Confidential
May 2007
SystCFG – Configuration tool
29 /
GE Confidential
May 2007
Alarm Management & Graphics
30 /
GE Confidential
May 2007
FigView – Operator graphics
Feedwater
31 /
GE Confidential
May 2007
FigEdit – Operator graphics creation
32 /
GE Confidential
May 2007
System Security Configuration
33 /
GE Confidential
May 2007