This document provides information and formulas for calculating pile driving efficiency. It includes types of piles, hammer specifications, resistance factors, and formulas for determining the number of blows required to reach a given settlement.

Uploaded by

perunding thd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views9 pages

Fill in The Cells in Light Green

This document provides information and formulas for calculating pile driving efficiency. It includes types of piles, hammer specifications, resistance factors, and formulas for determining the number of blows required to reach a given settlement.

Uploaded by

perunding thd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

Hiley's Formula For Set Calculation (fill in the cells in light green)

Type of pile = 350 mm Square Pile


Weight of pile per meter = 294 kg/m
Working load of pile = 150 tonnes
Estimated Pile length, L = 12 meter 150mm Sq Pile = 54
Driving Hammer = Hydraulic Hammer 175mm Sq Pile = 73
Weight of ram, W = 7 tonnes 200mm Sq Pile = 96
Weight of pile, P = 3.528 tonnes 225mm Sq Pile = 122
Ram drop height, H = 26.58 inches 675.132 mm 250mm Sq Pile = 150
Hammer efficiency, ef = 1 275mm Sq Pile = 183
Coeff. Restitution, N = 0.25 300mm Sq Pile = 216
Temp. compression, C = 0.500 inches 325mm Sq Pile = 255
C1 = 0.01 m 350mm Sq Pile = 294
C2 = 0.0009 m 375mm Sq Pile = 337
C3 = 0.0027 m 400mm Sq Pile = 384
C= C1+ C2 + C3 = 0.0127 m 0.500 inches 450mm Sq Pile = 486
EFFICIENCY FACTOR, f = W + (P x N x N)
W+P ef = 1.00 for diesel hammer
= 0.6858 ef = 0.75 for drop hammer actuated by rope and fric
Ultimate Resistance, R = ef x W x H x f
S + C/2
Factor of safety = 2 times working load of pile
required R = 300 tonnes
Set, S = ef x W x H x f _ C
R 2
= 0.1754 inches
Set / 10 blow required = 1.754 inches
= 45 mm
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

mer actuated by rope and friction winch


Hiley's Formula For Set Calculation (fill in the cells in light green) 250mm ICP Piles = 88
Type of pile = 350 f mm Spun Pile 300mm ICP Piles = 118
Area of pile = 61575 mm2 350mm ICP Piles = 160
Weight of pile per meter = 160 kg/m 400mm ICP Piles = 209
Working load of pile = 100 tonnes 450mm ICP Piles = 242
Estimated Pile length, L = 21 meter 500mm ICP Piles = 301
Driving Hammer = Hydraulic Hammer 600mm ICP Piles = 408
Weight of ram, W = 5 tonnes 700mm ICP Piles = 530
Weight of pile, P = 3.36 tonnes 800mm ICP Piles = 667
Ram drop height, H = 31.5 inches 800.1 mm 900mm ICP Piles = 818
Hammer coefficient, ef = 0.78 1000mm ICP Piles = 983
Coeff. Restitution, N = 0.45
Temp. compression, C = 0.55 inches CEPCO
C1 = 0.01 m 250mm PHC Piles = 87
C2 = 0.0021 m 300mm PHC Piles = 117
C3 = 0.0032 m 350mm PHC Piles = 142
C= C1+ C2 + C3 = 0.0132 m 0.520 inches 400mm PHC Piles = 178
EFFICIENCY FACTOR, f = W + (P x N x N) 450mm PHC Piles = 217
W+P 500mm PHC Piles = 274
= 0.6795 600mm PHC Piles = 375
Ultimate Resistance, R = ef x W x H x f 700mm PHC Piles = 490
S + C/2 800mm PHC Piles = 620
Factor of safety = 2 times working load of pile 900mm PHC Piles = 765
required R = 200 tonnes 1000mm PHC Piles = 924
Set, S = ef x W x H x f _ C
R 2 CEPCO
= 0.1424 inches 250mm PC Piles = 87
Set / 10 blow required = 1.424 inches 300mm PC Piles = 117
= 36 mm 350mm PC Piles = 160
400mm PC Piles = 209
450mm PC Piles = 242
500mm PC Piles = 301
600mm PC Piles = 408
700mm PC Piles = 530
800mm PC Piles = 666
900mm PC Piles = 818
1000mm PC Piles = 983

ef = 1.00 for diesel hammer


ef = 0.75 for drop hammer actuated by rope and friction win
kg/m 33694 mm2
kg/m 45239 mm2
kg/m 61575 mm2
kg/m 80425 mm2
kg/m 92991 mm2
kg/m 115925 mm2
kg/m 157080 mm2
kg/m 203889 mm2
kg/m 256354 mm2
kg/m 314473 mm2
kg/m 378248 mm2

kg/m 17940 mm2


kg/m 35757 mm2
kg/m 61840 mm2
kg/m 103160 mm2
kg/m 161220 mm2
kg/m 249240 mm2
kg/m 500030 mm2
kg/m 901340 mm2
kg/m 1503970 mm2
kg/m 2367230 mm2
kg/m 3553260 mm2

kg/m 17940 mm2


kg/m 35760 mm2
kg/m 66260 mm2
kg/m 113110 mm2
kg/m 171570 mm2
kg/m 262990 mm2
kg/m 526470 mm2
kg/m 949760 mm2
kg/m 1581240 mm2
kg/m 2480720 mm2
kg/m 3712880 mm2

r actuated by rope and friction winch


Easy Driving: Medium Driving: Hard Driving: Very Hard Driving:
p1 = 35 kg/cm2 p1 = 70 kg/cm2 p1 = 105 kg/cm2 p1 = 140 kg/cm2
on Head of Cap on Head of Cap on Head of Cap on Head of Cap
C1 (m) 0.003 0.006 0.01 0.013
C2 (m) C2 = RL/AEp, Ep =32 KN/mm (Include additional value for followers)
2

C3 (m) Nominal value =0.003 m Range = 0.005 for resilient soild to 0 for hardpan
Hiley's Formula (fill in the cells in light green)
Type of pile = 400 mm Square Pile
Weight of pile per meter = 384 kg/m
Driven Pile length, L = 30 meter
Driving Hammer = Hydraulic Hammer 150mm Sq Pile =
Weight of ram, W = 7 tonnes 175mm Sq Pile =
Weight of pile, P = 11.52 tonnes 200mm Sq Pile =
Ram drop height, H = 800 mm = 31.50 inches 225mm Sq Pile =
Hammer efficiency, ef = 0.75 250mm Sq Pile =
Coeff. Restitution, N = 0.25 275mm Sq Pile =
Temp. compression, C = 18 mm = 0.709 inches 300mm Sq Pile =
Set / 10 blow , S = 20 mm = 0.79 inches 325mm Sq Pile =
Efficiency Factor, f = W + (P x N x N) 350mm Sq Pile =
W+P 375mm Sq Pile =
= 0.4168 400mm Sq Pile =
Ultimate Resistance, R = ef x W x H x f 450mm Sq Pile =
S + C/2
= 159.16 tonnes

ef = 1.00 for diesel hammer


ef = 0.75 for drop hammer actuated by rope and friction winch
54 kg/m
73 kg/m
96 kg/m
122 kg/m
150 kg/m
183 kg/m
216 kg/m
255 kg/m
294 kg/m
337 kg/m
384 kg/m
486 kg/m
Hiley's Formula (fill in the cells in light green) 250mm ICP Piles = 88
Type of pile = 500 f mm Spun Pile 300mm ICP Piles = 118
Area of pile = 115925 mm2 350mm ICP Piles = 160
Weight of pile per meter = 301 kg/m 400mm ICP Piles = 209
Driven Pile length, L = 28 m 450mm ICP Piles = 242
Driving Hammer = Hydraulic Hammer 500mm ICP Piles = 301
Weight of ram, W = 9 tonnes 600mm ICP Piles = 408
Weight of pile, P = 8.428 tonnes 700mm ICP Piles = 530
Ram drop height, H = 600 mm = 23.62 inches 800mm ICP Piles = 667
Hammer coefficient, ef = 0.8 900mm ICP Piles = 818
Coeff. Restitution, N = 0.4 1000mm ICP Piles = 983
Temp. compression, C = 10 mm = 0.39 inches
Set / 10 blow , S = 25 mm = 0.98 inches CEPCO
Efficiency Factor, f = W + (P x N x N) 250mm PHC Piles = 87
W+P 300mm PHC Piles = 117
= 0.5938 350mm PHC Piles = 142
Ultimate Resistance, R = ef x W x H x f 400mm PHC Piles = 178
S + C/2 450mm PHC Piles = 217
= 342.02 tonnes 500mm PHC Piles = 274
600mm PHC Piles = 375
700mm PHC Piles = 490
800mm PHC Piles = 620
900mm PHC Piles = 765
1000mm PHC Piles = 924
ef = 1.00 for diesel hammer
ef = 0.75 for drop hammer actuated by rope and friction winch CEPCO
250mm PC Piles = 87
300mm PC Piles = 117
350mm PC Piles = 160
400mm PC Piles = 209
450mm PC Piles = 242
500mm PC Piles = 301
600mm PC Piles = 408
700mm PC Piles = 530
800mm PC Piles = 666
900mm PC Piles = 818
1000mm PC Piles = 983
kg/m 33694 mm2
kg/m 45239 mm2
kg/m 61575 mm2
kg/m 80425 mm2
kg/m 92991 mm2
kg/m 115925 mm2
kg/m 157080 mm2
kg/m 203889 mm2
kg/m 256354 mm2
kg/m 314473 mm2
kg/m 378248 mm2

kg/m 17940 mm2


kg/m 35757 mm2
kg/m 61840 mm2
kg/m 103160 mm2
kg/m 161220 mm2
kg/m 249240 mm2
kg/m 500030 mm2
kg/m 901340 mm2
kg/m 1503970 mm2
kg/m 2367230 mm2
kg/m 3553260 mm2

kg/m 17940 mm2


kg/m 35760 mm2
kg/m 66260 mm2
kg/m 113110 mm2
kg/m 171570 mm2
kg/m 262990 mm2
kg/m 526470 mm2
kg/m 949760 mm2
kg/m 1581240 mm2
kg/m 2480720 mm2
kg/m 3712880 mm2